Loading...
HomeMy WebLinkAbout8B, Planning Case 12-009 - 1201 County Road E Reuse Proposal� EN HILLS Request for Council Action Prepared By: Meagan Beekman, City Planner Council Meeting Date: May 14, 2012 Planning Case 12-009 —1201 County Road E; Preliminary and Final Plat and Master and Final PUD Budgeted Amount: Actual Amount: Funding Source: NA NA NA Recommendation: Motion to deny Planning Case 12-009, based on the findings of fact and submitted plans as presented in the May 14, 2012, planning case report. Supportin� Documents: 1. Memorandum from Meagan Beekman, dated May 14, 2012. 2. Application and supporting materials submitted since the April 18, 2012, Planning Commission Meeting. 3. April 18, 2012, Planning Commission packet. 4. April 18, 2012, draft Planning Commission minutes. 5. Public Works Director comments. 6. 2008 Guiding Plan Trafiic Study excerpts. 7. Supporting materials submitted on May 10, 2012. � EN HILLS MEMORANDUM DATE: May 14, 2012 TO: Honorable Mayor & City Councilmembers Patrick Klaers, City Administrator FROM: Meagan Beekman, City Planner SUBJECT: Planning Case #12-009 Applicant: 1201 County Road E LLC and TAT Properties LLC Property Location: 1201 West County Road E Request: Preliminary and Final Plat, Master and Final Planned Unit Development Back�round The property at 1201 County Road E is owned by TAT Properties, represented by Rob Davidson. In March 2008, the City approved a request from TAT Properties and Northwestern College granting an Interim Use Permit (IUP) at the former Holiday Inn property that would allow the College to operate a student housing facility in the B-2 District. TAT Properties had purchased the building and intended to lease it, in its entirety, to Northwestern College. The IUP expired on May 30, 2011. Prior to the expiration of the IUP, the City approved a request by TAT Properties to allow the student housing on a permanent basis provided that Northwestern College remained the sole tenant of the building, and continued to operate and manage it. Citing a drop in expected attendance and financing, Northwestern College withdrew their interest in the property shortly after that approval. Northwestern College has since vacated the building. At the time of the IUP approval, the City was just beginning the process of developing the Guiding Plan for the B-2 District, which was ultimately accepted in October 2008. The City's zoning regulations were consequently amended to incorporate the goals of the Guiding Plan for the B-2 District shortly after it was accepted, including design standards for new construction. In 2011; the City reviewed and approved a subsequent proposal from Select Senior Living to convert the building into assisted senior housing. That application included a request to City ofArden Hills City Council Meeting for May 14, 2012 P: IPlanninglPlanning Cases12012112-009 -1201 County Road E- PUD and Plat (PC Denied)105-14-12 - Holiday Inn - Memo.docx Page 1 of 7 subdivide the property into two parcels, leaving the eastern two acres for a future development. Select Senior Living has since ended their negotiations with the property owner to purchase the property for this use. The approvals for this application have subsequently expired. Overview of Request TAT Properties is now requesting a Master and Final PUD to allow the reuse of the existing hotel at 1201 County Road E as 120 rental apartment units. The original building had 155 hotel rooms, which were used as student dormitories by Northwestern College. The current proposal is to convert 70 of these rooms into 35 one-bedroom apartment units. There are 5 existing one- bedroom units in the property; therefore, the final mix would include 40 one-bedroom and 80 efficiency apartments, for a total of 1201iving units. The applicant would install a counter top, sink, under counter refrigerator, base cabinet drawers, and a cook top and oven in each unit. The applicant would bring the property up to building code requirements, and is proposing improvements to the main floor in terms of tenant amenities (Attachment A). The applicant is requesting a phasing plan for the building that would allow him to complete renovations on the first two floors only. The remainder of the units, located on the third and fourth floors, would be converted over time, as the market dictates. The third and fourth floors would remain vacant in the interim. At this time there is no plan for reuse of the McGuire's restaurant space, or the banquet facilities that are located on the main floor of the hotel. It is anticipated that these spaces would be reused at some point, though it is unclear what that might be. These spaces would remain vacant in the interim. In addition to the request for Master and Final PUD, TAT Properties is proposing to subdivide the property into two parcels, reserving the eastern two acres of the site for a future development option that has yet to be determined. The submitted plans include a conceptual drawing of what might be possible on Lot 2, but the applicant is not seeking approval for development on Lot 2 at this time. In order to accommodate the request for the subdivision, and bring the property into compliance with the City's zoning regulations, the storm water ponding and landscaped area would be shared by the two parcels. This proposed use is distinct from the previous use of the building as student housing. As a net lessee of the building, Northwestern College was able to exercise a great deal of control over the students that lived in the building, and could guarantee that only students would be allowed to live in it. This would not be the case with a privately owned landlord/tenant situation,. as is City of Arden Hills City Council Meeting for May 14, 2012 Pr IPZanninglPlanning Cases12012112-009 - l201 County Road E- PUD and Plat (PC Denied)105-14-12 - Holiday Inn - Memo.docx Page 2 of 7 proposed here. The applicant believes the target market to be students, young professionals and seniors. The Planning Commission reviewed this application at a special meeting on April 18, 2012, and voted (5-2) to recommend denial of the request. The Planning Commission packet and full review of the zoning requirements is included (Attachment B). Since the April 18 Planning Commission meeting the applicant has submitted additional information for the Council to review. This information includes floor plan layouts for the four floors of the apartments, a revised landscape and site plan, and an addendum to the traffic study (Attachment A). In addition, the applicant submitted a packet of additional information on May 10 (Attachment F). Unfortunately, the Council report staff deadline is also May 10, so Staff has not had an opportunity to review this new material. Discussion Staff has spent a considerable amount of time evaluating this proposal, and continues to have concerns regarding the proposed use of the site. While the applicant intends to market this building to students of Bethel University and Northwestern College, the applicant cannot limit residents to only this demographic, as was possible with the student housing facility. The efficiency units are approximately 300 square feet in size, some of which do not have windows to the outside, but rather look out over the fitness area. In addition, Staff has concerns over the phasing plan which would keep two floors, and the banquet and McGuire's spaces, vacant for a period of time. There is also traffic generation and parking demand unlcnowns associated with the aspects of this site that have yet to be developed, both within the existing building and on Lot 2. An ideal scenario would be to plan for the redevelop the site as a whole, rather than the City reviewing it in segments over time. Traffic The City Engineer and Ramsey County Traffic Engineers reviewed the submitted traffic study, the subsequent revision by RLK Engineering, and the addendum to the RLK traffic study, which was submitted by the applicant on May 2, 2012. Staff comments regarding the addendum are attached (Attachment D). Previous Staff comments are included in the April 18, 2012, planning case report (Attachment A). The May 2, 2012, addendum makes reference to the 2008 Guiding Plan Traffic Study, which assumed a traffic light to be installed as part of a redevelopment of this property. Pertinent excerpts of the 2008 traffic study have been included in this report (Attachment E). City of Arden Hills City Council Meeting for May 14, 2012 P: IPlanninglPlanning Cases12012112-009 -1201 County Road E- PUD and Plat (PC Denied)105-14-12 - Holiday Inn - Memo.docx Page 3 of 7 Land Use Component One frustration with this application process has been the changing of identified land uses for the various components of this development. Without a comprehensive land use plan it is not possible to adequately analyze overall traffic impacts and parking demand. As a result, as future phases of this project come forward it is difficult to compare them to the master plan in order to analyze their impacts, which is the very purpose of a Master PUD process. Landscape and Site Plan Since the April 18, 2012, Planning Commission meeting, the applicant has submitted a revised landscape plan that would conform to the City's landscape requirements. The applicant has also submitted a revised site plan that addresses the outdoor seating and site furnishing requirements of the B-2 District design standards. Subdivision The subdivision of the property into two parcels creates a nonconforming Lot 2, which would not have guaranteed access to County Road E or Lexington Avenue. The County has issued a permit for a right in right out only on Lexington Avenue from Lot 2; however, the permit is contingent on an approved land use plan for a 2,500 square foot bank. The current plans indicate a conceptual development on Lot 2 that is for a 20,000 + square foot office use. The County has not indicated their approval of a right in right out for this use. Safety and Security The Ramsey County Sheriff's Department has reviewed the plans and submitted comments based on a conversation that Deputy Eastham had with the applicant (Attachment A). Deputy Eastham has three primary concerns. The first is lighting of the parking lot. During the time when the building was used as student housing there was a marked increase in vehicle break-ins. The Deputy has recommended that additional lighting be maintained at a minimum of 3-foot candles at ground level across the parking lot surface. The applicant has indicated that he is agreeable to meeting the Ramsey County Sheriff Department's recommendation. The second area of concern is the vacant space that will remain after the first phase is complete. The Deputy has asked for a camera and locking plan, subject to his approval, prior to the issuance of a building permit. He remains concerned over the ability to secure vacant spaces once the building is partially occupied. City of Arden Hills City Council Meeting for May 14, 2012 P: IPlanninglPlanning Cases12012112-009 -1201 County Road E- PUD and Plat (PC Denied)105-14-12 - Holiday Inn - Memo.docx Page 4 of 7 The third area of concern is regarding the controlled access and security personnel for the building. The Deputy remains concerned over the details of this plan. Park Dedication Park use dedications for recreation or conservation purposes would be required as part of an approval of this application, and are determined by the City Council. According to the City's subdivision ordinance the property is subject to a park dedication requirement because of the platting of the parcel. Based on the Code, park dedication can be in the form of a percentage of land dedicated to the City, or as cash in lieu of a dedication. In the event of a cash dedication, the amount could be up to ten percent of the fair market value of the property. According to the Ramsey County Assessor, the property has an assessed value of $2.67 million. Based on the current assessed value of the property the park dedication could be up to $267,000. This equates to $2,225 per unit. By comparison, Pulte paid $3,513 per unit, and the average per unit park dedication amount for all residential development over the past five years in Arden Hills has been $4,932. A survey of three other area communities regarding per unit park dedication fees indicated that the average per unit fee is between $3,500 and $5,500 for multi-family housing. According to State Statute, cash payments made to cities in lieu of park dedication can only be used towards the construction of new recreation facilities and cannot be used to maintain existing facilities. Findings of Fact The Planning Commission offers the following findings for consideration: 1. The application lacks a comprehensive master land use plan. 2. The application lacks a detailed phasing and construction plan with timing for phasing implementation. 3. The traffic and paxking cannot be fully analyzed because a comprehensive land use plan has not been submitted. 4. Lot 2 is a non conforming lot, which does not have approved access to County Road E or Lexington Avenue based on the submitted concept plan. 5. The application lacks a detailed lighting plan. 6. The application lacks a detailed security plan. 7. The application has too many variables that remain undefined. City ofArden Hills City Council Meeting for May 14, 2012 P: IPlanninglPlanning Cases12012112-009 -1201 County Road E- PUD and Plat (PC Denied) IDS-14-12 - Holiday Inn - Memo.docx Page 5 of 7 Planning Commission Recommendation The Planning Commission recommends denial of Planning Case 12-009, based on the findings of fact and submitted plans as presented in the April 18, 2012, planning case report. Staff Recommendation Staff acknowledges that this site is an important gateway to the B-2 District, and has been vacant for a year. Two other development applications have been reviewed by the City and approved in the past two years on this property, both of which did not come to fruition. Staff understands the frustration of both the City and developer to find a mutually benefcial and productive reuse of this property. Furthermore, additional information has been submitted since the Planning Commission reviewed this application. If the Council chooses to not follow the Planning Commission's recommendation, then Staff recommends tabling this item to review the new inFormation, which may include bringing it back to the Planning Commission so that their recommendation may be based on a full analysis of all the information. Options & Proposed Motion Langua�e l. Recommend Denial: Motion to recommend denial of Planning Case 12-009 for a Preliminary and Final Plat, and Master and Final PUD at 1201 County Road E based on the findings of fact, submitted plans, and the following additional reasons: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. 2. Table: Motion to table Planning Case 12-009 for a Preliminary and Final Plat, and Master and Final PUD at 1201 County Road E to allow staff additional time to review new material, this may include bringing it back to the Planning Commission for a full review. Deadline for Agency Actions The City of Arden Hills received the completed application for this request on April 4, 2012. Pursuant to Minnesota State Statute, the City must act on this request by June 3, 2012 (60 days), unless the City provides the petitioner with written reasons for an additional 60 day review period. The City may, with the consent of the applicant, extend the review period beyond the City ofArden Hills City Counci! Meeting for May 14, 2012 P.• IPlanninglPlanning Cases12012112-009 -1201 County Road E- PUD and Plat (PC Denied)105-14-12 - Holiday Inn - Memo.docx Page 6 of 7 initial 120 days. Attachments A. Application and Supporting Materials submitted since the April 18, 2012, Planning Commission Meeting B. April 18, 2012, Planning Commission Packet C. April 18, 2012, Draft Planning Commission Minutes D. Public Works Director Comments E. 2008 Guiding Plan Traffic Study Excerpts F. Supporting Materials Submitted on May 10, 2012 City of Arden Hills City Council Meeting for May 14, 2012 P: IPlanninglPlanning Cases12012V 2-009 -1201 County Road E- PUD and Plat (PC Denied)105-14-12 - Holiday Inn - Memo.docx Page 7 of 7 Attachment Application and Supporting Materials submitted since the April 18, 2012, Planning Commission Meeting The Planning Commission Voted 5-2 (Zimmerman; Hames dissenting) to recommend denial of this planning case � -���.Ls May 14, 2012, City Council Meeting DAl11DSOH ADDITION p ����� E G�Ea�� PARNINGSTALLS �ECExu w a;o„a, P LOT 1- STALLS SHOWN = 25B e ExSiNG UttJtt PO�E JAN PltY9,m12 CONCEPT SITE, DRAINAGE & UTILITY PLAN � , L07 2- STALLS SHOWN � 80 Exsnx� wp�R ���� � �� � :��' � E.s�� �,���. � CIt� of Arden NiI1s, Minnesota � I.J . I' � __ IMPERVIOUS AREAS _ m E�=n�� _�M'�a�,aE �° :g � g � � :. � cxsnwc snurnnr Mnuxa � . 6'-,_ •._�-+' F': �' 8 umxc ic�canane uumo�e � . . . . :.._... ... .... . . _ � � ' EX157[NG SIfE �5 ¢„snuc rxcc � � $ �� � - qRFA SF 743,543 uX � GATHERING AREA w.�aM.H � L'< _ _ IMPERVfOUS(SF) . z66t00 . _ . —W cxsnxc ]l 5%-.. n w ` � �� -. -- . [xsnxc aVeNH[no E�ciwc �� PERVl�t15 SF 71943 �� -- Exsnxc �no[ncnouNo [iEcix�c B'�' WARNINGII � � zz.5� - - '� � w p `_ - BUNIEO FlBER OPiIC CABIE ' ----o-- tnsnxc �xo[xcRouxo iuErxorv[ ,� °� u o 0 . ... FlFJA V£RIYY 40CAlI0N PMOP [qsnuc cns z K W a I._ N I � ., . -wgv excavnnaxs . PROPOSEU SIiE -- —' � rqRr �� w � ew.... ..��, ensnxc �' '.. . .. ..�.. LOTI LOT3 OVERALL —>— cxxnxc x '�-?�' o �T'� a � nar+no[ swn�c � ARFA (SF) 260,]16 82,827 393,593 —»— rvc 5roau s[w[R g� 3 y , n ' - �' '� BBI2 coNCREIE ape k `_ � I86 299 66,262 252,511 � —�— Pncwos[o wnr[nuwry ry I . �r q��P (�yp) . _. IMPERVIOUS (SF) . �l 4% BOA% ]3.5% .... B1P .... ksnxc�+ v* couiwus� o R ... . , ... .... � � � ]4,967 1fi,5fi5 91,032 P� ¢ � , ,.. ...._.... .... � % .... �y . .,..: �� '"wi..; s' _ PERVIOUS �SF1 ...... . E o � * N _ _ y_� .... _ I , � �'.. , � � ,�� .�.� i-•....... �_ �� ` . . m B � ,,. �'. ,. � �a .... .. EDGE OF WA1ER � ]B.fi% 20.0% 26.5% � I : ,.. _ . _�� pUGlIST 2. 2b10 3� w s ,. % I ,... ,oU � •. ,r �l{��\r���� � _ /1 � � . ._ . . � _ . . � az / � •� .. 1 I �� .� d 2s L' ��... ::.::: ' v .9� I '� ` . � � r � w� ... I' _ __ ��wY I —' m as �� �`� �w"' �,/s�^a eY �� � '� ki -....,..... " � m8� � " `\�' �i \ --.., '.`' 1 mEA cn A9N e : e9 qry .. I1 � _ �xE'�g C � __ I � ��__` �����` . � •.� .,,_ � ?1> { W I EDGE OF WPIER '� . £ �py n y .. � � � _ �� � � ... � . D10 e i » � -PR �\a � \ b... �= ,5�, �� � U g�g� � ,' ;: —_ ' ,,, :. J5 :; q CUST 2 2 abserc_-- �_, ��.." ap . l—.__. e� -� � I £@= W I a( , I �� . I I _ � � _ �.� t . E.u�, � , � � �� .� � �a I y� �: a � - � � I—M M-�—M--M�WM �_ — � cxmnxee ro ee w.osm �ex xa x BINM NOU9 TO 9E pEPNCEO W/ vr�oscnnxc) . — _ n j- ,\ ,;�. � � ,��.� ,-o,�� ,< Wao �f // �i���%��' ' � � �� � / / . /� ��� ��CF /f 7201 WEST COUNTY ROAD E"� � G�.�. /�////�Ra;$Tdg eRckeli�ol��l'1*' �T, � j�PUl01NG HEIGHT NBDVE CRADE 18 FEET V�ST SIDE 42 fEET EAST SIDE � 6ULDING-FOOTPRNT �REA �fi,]fi9 50. FT.� / �, �� k/��� �:���/, ; � , � � /�� J8.3/�� 29]/ 12J.M1 �o .. ... .... ... ..... �_ .., , I i` ��E�o �a�oo. � �na� ��. . � --�- _ � � s„ _: � —< o-... . .,_yy � W� W_W W W Wa.�-W � .....' F% HYORn �y - i � r . � — — � _.. �Zy �. , , ..........e�L.. �ti> , �WEST QUNTY ROAL�_. — _f __ — — — ����I PEVInCFOW/eW109GRNN0) � , � _ • ,.: �snmc nono ' � �o .... , ,' .a:a iz � s . � < � 0 � ...._ . '.. � � ��a :-.e . �,<.s ° x -� , � ``�e,� - � ....... . . - - .:-� � FB<R �J '�ft -, � .., �o....,� .. .. .. .... � :,. -. s°�¢ �XIShNC P�ND 1 nicxi �oui ax�v � p izrT-r���, rrT�,_�YT,_� ' �. � N ' ` e � � \ � � � i � �-L i � � �TT� :�-� - -�<--�. � C � �5 � ' � � � � i 0 6� ' � � � �� , �-----� �l ` e � �. � � �j �—n_ j „ � � � �r�r �......... � � (,.__-i iisi j ��I � i i i \ 'N � �s _ p� 8 � .\ �'�- ___ IJ�L� 1 I I I I v �� . � c wv vzae ,..,.. I _ �-��_�d.d J +.v ( � is . Y - - ] f II I 140� - I � I' - Pmpare� far � _ .IJ....L.. . ^ °°. .' I _- � �,„� _-�.��-___ F . ��COMP�WIE�S . . . . _ "" '''fI� �� �� �� s� I-- I . '..' I �II ' \`-§ � n�inenHlaMNsswzfu �61.n �/ �_ _ �-.�... NCEPNAL BIIILDING 9ZE k I'I� •. ���� I.00RTION �� I �� �s rv[ v 5x�s on �8511f �-_ • - ' F��I851)4B1A2a9�. / _ (200002 SF) _ � � ./ I___ �� r����� I (W/ L07 2 CONSTRI1Cl10N} _ � ?�� . �tni I � '- � FIINRE ROOF ORAINFGE TO B I ' � I LJ I ' 1 %/i/9� s� /� �... - _ _- �� UIPECIEO TO STORM WATFA L I� I ��� � �'� j ��/ I - I � TFEATMENT BASIN ��� � 8 C7`� ���.�-.,, � i ;ea,s �� p + � „ d � � fNix ' PIIUPOSEo 6 IT -- _�.i.' . 4- �'� �. ,. � INOECCNCNEIE BttEP - . � , _.„�.. -- �\ . �� _; �„�� a w.`�^a� �� � �� a, „ � q =pE PLOWE - , � `�K a� ��� ,�, ° E� -�� �` � a . .. ,.— � . . , .. , -" . .... .... . .. EX61NE[flING,INC. �.,. — "�J� �.. � e'ieo�am� �a'-Im \\ ,rP �� .���cpNo/oxuty�u�x�osC,wNo. E �leatlaetai0t310 � "'�^� - F NORTH �� V. 82B B �.. e . �, ........ \ : v `. /, ,. ...._ . .. _ „`� aAlxEAxCnPE.1 — \ (oENPI W/ LPNUSCFPWC) I� _� 9FANCEs <cONOEa.N U . . \ . . . . . . .. . � 'ED 6 Ff N10E fINE NYURANi LOCAlEO lN1HIN 1 . �E 91DEWAIx (ils) SU fEEi df MaR f Rf ' OEPMTAENT WNHECTONS • LAYOUT OF LOT 2 IS CONCEPT ONLY - �� �� u�o ACTUAL LAYOUT TO BE OGTERMINEO BY a� (m) � OTHERS FOR REqUIRED PERMITTING DAVIDSON ADDITION LANDSCAPE PLAN CitY of Arqen Nills, Minnesota I I I I I � �— LOT 1- PARIfING ISLAND RE(�UIREMENTS LOT 1- PERENNIAL 8 SNRUB REQUIREMEMITS LOi 1- TREE BEQUIREMEWi� PARKING STALL AREA = � yiuT^"/] . �.��.�u1�J LANOSCAPE AREA = lq,qg) Sq. Fi. O1 REQUIF[0 CALIPER INCHES (PEN CWE): = 52,909 S.F. 104.000 SU. Fi. _ J20 CAIIPER INCH6 aso REOUIREO ISLAIJ� APEA = 10R OF PARKING LOT AREA REOUIftED PERENNIAL 9iRt1B AREA: = 10R OF LAN�SCAPE PREA � = 102 % 52,90B S.F. = 10R X]4,46] S0. FT. ' O2 PROVI�EO CALIPEF INCHES: � � = 5.291 S.F. _],44] 50. FT. ' E%IS11NG OECIOUOUS 1IiEES = 4B� CAIIPEft INCXES PRONDEO ISLAND AREA = G,]5B S.f. _ pqoPosEo NEW mEfs = 41 CAUPEa iNCHEs PROVI�EO PEFENNIAL SHRUe AREq:- = 8,5]1 50. FT. , TOTAL CALIPEN INCNES PRONo[� = SJ] CALIPER INCHES = PEflENNIAI/SWiUB ApEAS � LOT 1- iREE PLANi1NGS � _ NUN9ER � TPE PHOPOSFD �� \_ _ &IMm FlBEP OPllcCo�e�t � � OIIFflSiOBViAEFB 6 "M 1➢ NKIfY LOCAliON PPIOR e� �oun� amE itl �" � FlEY61LlY IXCAVnToxs AneNuwet, sy Voamera weire � _ a . Inarmla "Shy�'ola" � � _- ,` � ""� _ �� `_ � 09NIIMEMAITflFFB ifi �up� �' '". � � � �—�__ \ � � � ,� 'I , �' � ' � / � � . ' � _ o Re9e�t' t��� - . �`` �\ �E�CE OF WATER vnMvi[ sv[m¢ smNx. vain sn[aFs xeWixeMwrs �rvo nvuuewtt _�� AUGIIST 2, 2(lta � � �� a \_� , / / %/i / � `��� / I �� . ii�� � lI � �� �� I I � i i%i�. i�i /�/ /�/ %�i �� /%i� i�i / ri � .�� � _ � �c ( R mi LC � ' -�� �+wc �ne l, � � _ i i� ,w��{,. �_ �� � � � "i �r ' r�' � � �i 4 \ �� I I � / �i/i/� �� �I� ' _ �� f / ! I �EDGF. OF WA'IER _� /.i/.i/i. �ii/,i/.�_ � \ `�� AUWST 2, 2010 Gi i�i /i�/�/ / / i�i� / i /i i�i�� Y'/ G/'/ii�iA ` G p.G. m o�c.w.P �. P io-� ex LwuhqV 0, �12 � �� �s � ��� �p�§ - z� a�Sw ���a I/I�� -- ` ;�= \ � ` . = ���EXISIINCPONO . � _ � . � II I _ _ � x, �- / 1 -� I . �` 1\ `� � � _,� , ` =�� 2 ' ,- ' � �, ,;\ �` � / . I`,_ - `, ,,--, � � ' � � �- �'��x ,M� g I 1 II I �z TY��T�.� �sq�^oie'SnNc p�,p ,..,rc � 5 c� � \ --------- / /' 1 � I I ` I i ; ;�ri ?,sr�P�� k _ s � g U � ' � � � � �7, � � �a � a�5 i , � � i � � � / / // 1201 WCST COUNTY ROAD "[" � �///,%/z �a's16ar eaa< ouisofuc// �� �/� � �LDING HEIGHT AOOVE CPAOE 18 FEET WEST�SDE 4) FEET ENSi SIDE BUI�DING-FOOiPRINT AREA Sfi,369 50 Fi.� /� m � �� /���� � ' / � � ;�,. , SE / V8.3 n 2I/ �21 :'.:.'.- .,= 12�.4 1 3 � � �m� /�e:oiricnPc . .. . .. .. ...... _........ i r wEo ��. ,,—«� � �� - - . � 7 .- = m a- w w w- w w � w w w—w= WEST COUNTY ROAD �^ ------_-�=---- — " „ 1 ��� � ___=_za �� e � �� � ; � � �,,� � � � = s = w ..o, ox�, �° —�— � i�l �� � ��� �� � I I Z a'0 3'� _._-r— � �L'L.L1 '� i i i -� I ._ e a . --i-- T �--__-��1-i- - _� � �� I ` n . ___I�� 1 -� �y __ ---�_ —_ I ' Q I � . vrevoa�v�osoei. � ii i i // i// '__ I.i =_.. �"�I : CO 8 N Mw �'s/4� i i�� i-- ... ___ I I� . h I + I . . M�51 / _I_- jj %. / _ I .� i ..Z I e..(6st14eie� I � � �� --�_-' I I � � _ � � / -- � I i� //� ii II� i I // / ii "_ I II �I �� I I �`� !.. �i _- __ � i . . �� I � wc z ..�y 1 ' ' ' / � - aFHc - _......_ ...,.. 6_e�> _. � tl � _ . i� � I . _ _. J ! .� � tl �J €rw,nx� � — — _ � - _ -�P- �E�E�� �-� --, - � PLEOWE ��: _- _- . . : _- . - , . . , .. . : , . .-,.- -: _ -.-.�,.... ENGIN , .� — — — — — � � �. , � � _h—< < < < — �- —� . ` R^ nn �ou E�v cc E ,,,� °ua°ur"�cmu ,xu,oE.on� ��xow«a,m�b�,< --w .. w—w w w u�.. _. m w,(srecuiuuosenaixo. vxowE�,ro�nx,ex�o w u�Pion nrsn r��cm,rm,.e,u, —. .._ NORTH „E„ e �_. —__ — .— ___ — ._— —_ __— — o� cnmexwcancn , — ..--- — --- ` (en+ai w/ w+oscnaixc� ` � + LAYOUT OF LOT 2 IS CONCEPT ONLY - �� . ACIUAL LAYOUT TO BE DETERMWtII dY OTHERS FOR REOUI2E� PI:RMIT(ING DAVIDSON ADDITI�H LANDSCAPE PLAN CitY of Arden Hilis, Minnesota -�� �� I L0T 1- SNURB 8 PEREHNIAL PLANTINGS " __ _ ��- _ '-__ ta _ ` � -� 7 i . _ n 0 � ���li. _ �- _` '. �_ \_ _ ` \ _ _ � _ ` \ ,—E; � 29 ` \� jj i /// i j'� .�jjjj//L /,, /% /iii�, i�� jj �/% /� j j � /j � � � . __ //� � �i� �� �-- - 32 RETAINING � �2 _ � 25 _ -- �' , �5 n I I SVMBM NEY Qtt B ON NMIE WOUS 9HflUB3 � 91 RNFIANCHIER AINIFONIIR '11ECFNT p5 POi � PRW IG S�II% WPP�R[ IFAF �RCPC 1NLLOW p5 POT � I1C IG RIBES ALPINYM A WHPENi �5 POi QO 'FNNRB¢lE' � HT➢flANCEA p5 POT CRE* �RYS 11 iRl(113 X 4FOIA 'TAUNIONI' BS POT � �J 10 JIMIPFA615 SABINR 65 POT Q nncnotn' ps ror PF.NENNYMS � KFO CN..1MA6qO5T5 M FWTMRN 1GILL ro[ns1E � 11 POT o xeumacnws �rwn oE oxa� d� am ia sranaeaws xrrtno ris e� P m P� eucrcE oveo sus �n rm Ks�i koeowEunmis � p roi C91 d9 HOSTA '6Po➢ SiANOM 'U RNOAPo HoSiA � al PO1 o P.G. P.Gx� ���:w:�: P;o-;z� �wJPNUARY 9, 2013 � �� �� �� ���� ��w¢ � $ °'a o�g-� jcu�mrv- a�cuca an�m�. vcn�r� xc�iw ncwmcmuria rv�v nvnii..o�iii�. A,� -V I i -L �_ _-� ' � ��� � � 3as' � � _ —_— ] /� ,.�� A- � Ic== -_-,�� �� � � ----- � ', I� �I �� � � � \ �"� ��� 0 \\\` -\� \�_ `` ` `_\ \I� 11 0 0 � � �� I �. �� 1 �� � — � i i ����\�—�------� �� 1 \ �'_ ' _—___� / „/��, ;�,,, //�� �F�000 ucul / � ;� , � �� � — xe. �g m r�-� i� � F S a� i i i�; ��� ��r�� ������������ �. � �m ��''��; ; 1 � �� �� � q � C � , � yom� .--_"�29 6� ��SI I I�� I 1 Preoaiokr. ____.�---- �e �L.I�� � � -I I sam°�n'�.n,a,zs --i-- - -i r___ -���_,;�1 — — _I�—OT =- � — — g�;x�„��s;��e ��,� _ , � � a,�� _ i _ ._ — — i i� _-- _ _ H_ �___ _��, I�/ — — �-- - � -- - — --�--- ----- ' 1 PLOWE --- �,� — — — . _ _ _ I I� � EN6IXEERIXG, INC. — — _ � I� �E — I ��.E„o �_ I I �xo�s.Mx�„ a' _ _.. I I� o �:�<s,��n�az,o \=m__d --� I I� f,"�:iob,��,e,o� � �I NdRTH � ��y _ � � �-E�E��— ' -.�-s� �r �s .� : .'� � .. —�,..�� `�,' T� = L �_-�� --- - �� T -- C3 OUMPSTEft � \ l_--.+—..--_— Rosa Architectural Group Inc. roea ste�� suee� St. Pe�, Minrresota 55fl9 t91: 651-739-7988 tex: 651-739�165 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55192 � � � � �������0� ���000����0�� J N � EXI�STING 2ND LEVEL m • �m m 2ND LEVEL WJIi COUNT FOR CONVERSION 24) STUDIO UMiS . 17j� ONE BEDROOM UNI7S MUMBERED 1 THRU 7?a L>J PRWECT NUMBFR: 212�6 DhTE: 4/2�/12 DRAWN BY: KF CHECKED BY: _ RR RNISIONS: EXISTMIG FLOOR PLANS A1,1 N i EXI�5TING MAIN_LE_v_EL_ /� lrt j M(AW LEVEL I�HT COIMT FOR CONVERSION - (e)�ON �BEroDR00M UWi3 (NUMBERED.1 THRU 8) � � - Rosa Architectural Group Inc. 7084 SterNig Sheet SL Paul, Mmeso[a 55719 tet 651-739-7988 � faz: 851-738-3185 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 PROJECT NUMBER: 21206 OATE'. __ M1/2]/12 �RNWN BY: KF CI�IEf;KE� BY: RR REVISIONS: EXISTMG FLOOR PLANS A1,2 N � E �I�SiING 3RP LEVEL �. . .. . . � . � . . . . . 3FD LEVEL UMT COUNi FOR CONVERSION � . (18) 3TUDI0 UrNTS (10) ONE BEDROOM 11NRS (NUMBERED i THRU 10) . . � � � � N z EX�I�STINCs 4TH LEVEL � 4TH LEVEL UMT COIAdT FOR CONVERSION (18j 3TUDI0 UNIiS (10) OFE BFAROOM UNfT3 (NUMBFAED 1 THRU 10) Rosa Architectural Group Inc. 7084 Stering SMeat St. Pau� Minnesota 55119 tel: B51-739-7988 fax: 651-738-3185 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 . � REMODEL MAM LEVEL � IJNIT MIX A 11NIi - I B IJNIT - 4 G I1NIT - I D LINIT - 5 � E IJNIT� - I F �NIT - I G UNIi - I HUNIT -'I I IINIT - O J I1NIi - O K UNIi - O � uNiT - o nuNrc -� TOTAL LAlITS . 38 UNI7 MIX a uwt - o 6 UNIi - o GIWIT -O p IINIT - 12 E NJIT - O F I1NIT - I G UNIT - O uuwT -m I lPJli - I J UNIT - l K IJNIT - 3 L UNIi - 4 M UNIT - 8 TOTAL UNITS = 36 PROJECT NUMBER: 21206 DATE� 4(2� 12 DRAWN BY: KF CHECKE� 13Y: RR REviSioNs: REMODEL FLOOR PLANS A3,1 N � REMODEL 2ND LEVEL � HAM ENTRY 0 � �► �r.���...� �..�N...��...���..,�� .�. .�. \�� � !;�'�� ■ ' m � K�::-�y ���■ I.�I n � �II --- II � m � i i t. �. � 1 _ I� I� - ��� � I� I� ca � I� ■ -� - 1 I m _ � �_ �- �- - •',e.� a I - i- � ■Ir�i�� � m �I � � � i•�. i� � !Tk �� �, ��� .�� � I! � , � � _ 1� IC� � �) - � .- • m � "' � �� � , `�- � I �� • I ����� � � i� �r� m � ����� --�e��l�� �' � - � �� I� 1� i�� .. _�.J � � �; �-; - � � ��I �. ,,,� �;. �� 1111 It� = !! III = .��,n�j ri la m � ",'L :i�.y� ��I ' � ��ill� , , ���' _ m � i •' - - - m� i° � m r r I��', � i• � - ' I� e i I I - � �i-I°- �� m ■ ����� � i '�, n � � ■ iil �u , i , � �� � -: � � � � � � � o�� o�� o�� o �� o�� o �� o N � �ENLARGED REMODEL MAIN LEVEL � � — ��r� N..r.m. � � `1 � � 7 xls* �cH LJ s,� �EG�.� ST�E LJ LJ � o -; � `°�� 0 0 Rosa Architectural Group Inc. 1084 S�e�g Sfreet 9t. PeJ, Afinesota 55118 teL• 651-739-7986 faz: 85f739-3185 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 PRQIECT NUM6ER: 212�6 onTe: a/2�/iz �RAWN BY: KF CHECKE� BY: RR REVISIONS: EM.ARCfD REMODEL FLOOR PLAN A3,2 m �oo.w.�.�, =o,� wos..w���,E�,�A.� �Ao�P Rosa Architectural Group Inc. ,084 SterNng SNee� St PaW, Mmrreso�a 55119 tek 851-739-7988 fa�c . 851-739�165 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 PROJECT NUMBER: 21206 OATE: 4/2)/12 ORAWN BY: - KF CHECKE� �Y: RR REVISIONS: ENLARGED REMODEL FLOOR PLAN A3,3 N %1 ENLARCiED REMODEL MAIN LEVEL � �� k'•i'� Rosa Architectural Group Inc. � � � ' •� ■ , 3������7I'{�h�i'EiE�_ � - �� '�� � M184 g�arkp gNee� Sf. Paul, A�rnesota 55118 tet 857-739-7988 fax 651-738-3165 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 PRQIECT NUMBER: 21206 DATE: 4/2]I12 DRNWN BY: HF CHECKEO BY: RR REVISIONS: Fxa�o r�oo�. aao LEVEL FLOOR PLAN A3,4 � �oP�w���.:o,: Aas..w���,E�,�A.� �wo�P Rosa Architectural Group Inc. 1064 Sferig Sheet SG PaW, MmesOte 55718 tet� 851-739-7988 tax: &57-739-3165 ARDEN HALI APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 _ y .. ��n'�.c. ,;�i�:' ..;i %v �r.� � PROJECT NlIM6ER: 21206 � DATE: 4/2�/12 DRAWN BY: KF CHECKE� BY�. RR REVISIONS: ENLAA�m REMODE� 2M � LEVEL Fl.00R PU1N� A3,5 � �oP.a���, zon �..w����E���a�� �ao�� N �\.\ ENLARGEP REMOPEL2NP LEVEL � . `"�� k'•i�.o� �� � � 1��°_a ,�� I� hl � 0 � � . �1 iYPICAL STUDIO UN�T TYPE 'D' . . �J . �° . - . 7 � � � �/ • • �� �� �� � • • �� �� �0 �o � -- �� � � T7PICAL STUplO UNIT TYPE 'C �� . -- - � - �i� iYPICAL STUDIO UNIT TYPE 'B' lJ " �� '�'��' °' - �. � � Rosa Architectural Group lnc. 1084 3terfmg Street St. PaW, Mimesota 55119 tek &51-739-7988 � fax: 651-739-3165 ARDEN HALL APARTMENTS 120D1 WEST C.R. E ARDEN HILLS, MN 55112 ['ROJECT NUTABER: )1206 DATE�. 4/2�/12 DRAWN BY' KF CHECKF.p BY: RR REVISIONS: TYPICAL UNfi PLANS A3,6 � TYPICAL STlJDlO-UNIi TYPE 'A' Um•.�.e� .� TYPIGAL STUDIO UNIT TYPE 'J' y.I'.m• �e1��/ TYPICAL STUplO UNIT 1YPE 'H' �% k"p °• �b TYPICAL STLIDIO LINIT TYPE 'G' y..� a. 6 TYPICAL STLI_DIO I1NIT TYPE_'F'_ q'•I m ]�,1 0� � O � � _ i � 0 i II II I 1 I �I � TYPICAL ONE BEDROOM LINIT TYPE 'K" � ti..�._m. Rosa Architectural Group Inc. ioaa s���a sr�eae SL PaW, AMnnesota 55119 tet 851-739-7988 fax: 85t739-3165 ARDEN HALL APARTMENTS 12001 WEST C.R. E ARDEN HILLS, MN 55112 � � —_—' O �� o - � _ _ � ❑ �. ���� � TYPICAL ONE BEDROOM IJNIT TYPE 'M" �J y.r.a, PROJECT NUMBER�. 21206 onrE: a/z�/iz UNAWN BY: KF CHECKED BV: RR REVISIONS: TYPICAL UNIi PLANS A3,7 vs TYPICAL ONE BEDROOM IJNIi iYPE 'E" /il TYPIGAL ONE BEDROOM UNIT TYPE 'P y.,,_m. —.._— y..r.m. %1 ?YPICAL SiUDlO UNIi TYPE 'L' w•.r-� Attachment April 18, 2012, Planning Commission P acket If not included in the packet please find at: www.ci.arden-hills.mn.us/plannin cg ases " �EN HILLS May 14, 2012, City Council Meeting Attachment April 18, 2012, Draft Planning Commission Minutes � -fl�xII.Ls May 14, 2012, City Council Meeting April 18, 2012, Draft Planning Commission Minutes Planning Case 12-009; Preliminary and Final Plat, and Master and Final PUD; TAT Properties; 1201 County Road E— Public Hearing City Planner Meagan Beekman stated the applicant has requested a Preliminary and Final Plat, and Master and Final Planned Unit Development (PUD) to subdivide the property at 1201 County Road E into two parcels and reuse the existing building as a 120-unit apartment building with a mix of efficiency and one-bedroom units. City Planner Meagan Beekman reviewed the property is located at 1201 County Road E and owned by TAT Properties, represented by Rob Davidson. The applicant is seeking to convert the Holiday Inn, which has been vacant since August 2007, and previously used by Northwestern College for housing for three years, to an apartment building. According to the applicant, the building would be developed in multiple phases with the first phase consisting of the first and second floors as well as the common areas, including the pool conversion. A future phase would complete floors three and four. McGuire's and the banquet facilities would be developed thereafter but at this time usage is unknown. Additionally, the parking area would be reconstructed. City Planner Meagan Beekman reviewed according to the applicant, green space requirements would be met. The site layout proposal indicates the central access drive will close while the other two will remain open. The primary entrance would be relocated to the rear of the structure and the front would remain locked. There will be 259 parking stalls. The proposed room layout consists of 80 studios and 40 one-bedrooms. Updated floor plans were not submitted and would be needed prior to review by City Council. Applicant submitted a traffic study with assumed various future uses. City Planner Meagan Beekman stated Staff is requesting an easement along the property line between Carrol's Furniture and the two properties behind it, which currently access County Road E via an alley. The easement would be used to create a proper access for these four properties, and relocate Carrol's parking lot to allow for the City to install a sidewalk along County Road E. City Planner Meagan Beekman offered the following findings of fact regarding this planning case: General Findings: 1. The applicant is proposing to redevelop the existing building at 1201 County Road E into a 120-unit multiple-family building. 2. The proposed use is allowed through a Planned Unit Development process in the B-2 District. 3. The proposal would increase vehicle trips to and from the site compared to existing and past conditions. The amount of increase cannot be quantified based on the plans submitted. 4. Required parking demand cannot be determined based on the plans submitted. 5. The proposal is in compliance with the City's setback, lot size, lot coverage, and density requirements. 6. The proposal would meet or exceeds the City's general regulation requirements for the B-2 District. 7. The proposal, if approved, would generate up to $267,000 in park dedication. Staff acknowledges that this site is an important gateway to the B-2 District, and yet remains vacant. Two other development applications have been reviewed by the City and approved in the past two years on this property, both of which did not come to fruition. Staff understands the frustration of both the City and developer to find a mutually beneficial and productive reuse of this property. In that vein, if the Planning Commission chooses to approve this application based on the general findings and submitted plans, as presented in the April 18, 2012, report to the Planning Commission, Staff recommends the following conditions of approval: 1. The project shall be completed in accordance with the plans submitted as amended by the conditions of approval. Any significant changes to these plans, as determined by the City Planner, shall require review and approval by the Planning Commission and City Council. 2. Development agreements, drafted by the City Attorney, shall be signed by the property owners of Lot 1 and Lot 2 prior to the execution of the Final Plat. 3. The applicant shall provide for park dedication in the amount of $267,000. The park dedication shall be paid in full prior to the execution of the Final Plat, or the property owner shall enter into an agreement for a payment plan that is in accordance with Section 1130.08 Subd. E of the City Code. 4. The applicant shall provide drainage and utility easements, in favor of the City, in accordance with 1130.05 of the City Code, prior to the execution of the final plat. 5. The applicant shall provide a 30-foot by 30-foot triangular permanent easement at the intersection of Lexington Avenue and County road E for roadway and utility purposes, as well as gateway monument. 6. The applicant shall file the Final Plat with Ramsey County within 180 days of City approval, or the approval for the Final Plat shall expire, unless extended by the City Council prior to the approval's expiration. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 7. The applicant shall dedicate to the City a twelve-foot wide pedestrian easement along the property lines adjacent to County Road E and Lexington Avenue, within which the six-foot wide sidewalk shall be constructed. This will likely need to be provided in a separate document from the plat. 8. The applicant shall provide limited access through the platting process for both the Lexington Avenue and County Road E frontage for all areas not being allowed to be used as driveways. This will likely need to be provided in a separate document from the plat. 9. The applicant shall provide a 64-foot wide easement along the western property line for the City to implement a shared drive-aisle and parking solution to accommodate the three businesses west of the property. The City's intention is to minimize impacts to the property and to vacate any portion of the easement not part of the long-term solution. The applicant shall not be required to improve any portion of property within this easement until a solution is implemented. 10. The applicant shall obtain all necessary permits, including, but not limited to, NPDES, Rice Creek Watershed District, Ramsey County, and City Erosion Control Permits. Copies of all necessary permits shall be submitted to the City prior to the issuance of any development permits. 11. The applicant shall submit a lighting plan, subject to the approval of the Ramsey County Sheriff, which indicates a minimum of three-foot candles maintained at ground level across the parking lot surface, prior to the issuance of any development permits. 12. The applicant shall submit a security plan, which includes details on staffing, cameras, the locks, subject to the approval of the Ramsey County Sheriff, prior to the issuance of any development permits. 13. The property and property management shall participate in the Crime Free Multi- Family Housing program. 14. The applicant shall submit a revised landscaping plan indicating compliance with the City's landscape requirements. 15. The applicant shall submit a financial surety in a form acceptable to the City Attorney for 125 percent of the cost of materials and installation of the landscaping plan prior to the City issuing any development permits for Lot 1. The City shall retain the financial surety for at least two years after full implementation of the landscaping plan. The financial surety shall only be released upon successful inspection of the landscaping by the City Planner, which shall only occur during the growing season. 16. The applicant shall obtain a certificate of occupancy for Lot 1 within one year of the approval date of the development agreement, or the Master and Final PUD approval shall expire, unless extended by the City Council prior to the approval's expiration date. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 17. All improvements illustrated on the approved plans, as amended by these conditions of approval, shall be completed prior to the issuance of a Certificate of Occupancy for Lot 1. 18. The applicant shall comply with the Building Official's and Fire Marshal's comments dated February 22, 2012. 19. Building on Lot 1 shall comply with Chapter 1306, Special Fire Protection Systems, of the State Building Code, which requires the installation of a fire sprinkler protection system that complies with NFPA 13, subject to the approval of the Fire Marshal. 20. Fire Hydrants shall be located within 150 feet of the Fire Department Connections (FDC) to each building on Lot 1 and Lot 2. 21. Building on Lot 1 shall comply with all provisions of Chapter 14 of the City Code regarding property maintenance, subject to the approval of the Building Official 22. An 8" water main shall be extended from County Road E to the northerly plat line between the two proposed lots, subject to the approval of the Public Works Director. 23. Permanently affixed bicycle racks shall be provided near all primary entrances to the building on Lot 1, subject to the approval of the City. 24. The applicant shall remove all portions of the bituminous parking lot on Lot 2, with the exception of a 25-foot width to the east of the existing building, subject to the approval of the Fire Department. 25. All exposed soils, not considered improved hard surfaces or perennial planting areas, shall be seeded or sodded with an approved grass mixture. 26. The applicant shall consult with the County regarding sidewalk placement to ensure that the sidewalk placement will work with the County Road E and Lexington Avenue intersection's geometric changes planned for the future. 27. Traffic management shall be implemented at the eastern most driveway, subject to the approval of the Public Works Director, to effectively provide efficient and safe ingress and egress to Lot 2. Additional traffic management devices may be installed at the time of Lot 2 development, subject to the approval of the Public Works Director. 28. The applicant shall agree to waive their rights to appeal future assessments related to the installation of landscaping, street lighting, benches, and other features associated with the County Road E streetscape improvements, in an amount not to exceed $350 per linear foot of county Road E street frontage. 29. The applicant shall provide to the City temporary construction easements for implementing the County Road E streetscape improvements, provided the City repair and replace any disturbances on the applicant's property. 30. The applicant shall submit to the City joint maintenance agreements, and shared access agreements, between Lot 1 and Lot 2 prior to the issuance of building permits for Lot 2. 31. Prior to ten yeaxs elapsing, or upon any future PUD approval of the parcel, the City may incorporate a civic feature into the southeast corner of Lot 2. City Planner Meagan Beekman asked Deputy John Eastham, Crime Prevention Deputy for the County, to comment on safety and security for the proposal. Chair Larson asked Deputy Eastham to explain the crime prevention through environmental design (CPTED) to which Mr. �astham replied it is creating an environment that alters human behavior and creates buildings that are less likely to attract crime. Deputy Eastham stated that for three years the building was being used as dormitories for Northwestern College. Based on his experience of the student housing use he shared the following points of concern: Lighting. There was insufficient lighting, specifically in the parking lot and during college use there was a huge uptick in theft from autos. He requested a lighting plan that would deal with IES minimum requirements for exterior parking, which would maintain the minimum three-foot candles across the board at ground level, noting that .5-foot candles are not enough. The property has foot traffic as well as vehicle traffic during all hours of the day and night so criminal activity could go up, especially theft from autos. Visitors and security. All buildings need to have controlled access; some barrier and locking system. He stated that Mr. Davidson explained there would be a doorman in charge of letting visitors in the building after being notified by the resident. A concern is the empty space, if a large section of the building is empty while half of the building is not, preventive measures need to be taken — areas locked off, cameras, et al. When asked the positions of the cameras, if they are videotaping or monitored, he was told they would be monitored, so not, reactive. He expressed concern over the ability for one staff person to act as doorman, effectively monitor cameras, tour the building, and respond to issues as they arise. Security staff. He was told there would be 24-hour staff. Number of security personnel. When the question was asked if the person manning the front door and cameras and the person doing building tours would be the same person he did not receive an answer. He noted this would be physically impossible for one person to do. Chair Larson asked for clarification that when letting people in by security personnel, security would be called by residents. So if a person is coming to visit they would call the resident and the resident would then call the security desk. Deputy Eastham replied that is correct and that he did not know how a resident would know a guest is coming. Chair Larson opened the floor to Commissioner comments. Commissioner Zimmerman asked what the requirements would be if the building were to become a certified crime prevention building. Deputy Eastham replied that the manager and any accessory staff would need to go through the program. Also, a survey of the property would be done involving having to have jam doors, deadbolts, peepholes with a 180-degree view, lighting throughout the exterior and interior, and any site line issues caused by trees, bushes et al resolved. After passing, there needs to be two meetings a year, one business and one social. The survey is renewed annually. Commissioner Hames asked if the property is not ready for the survey does the building receive approval only when completed or off of the plans. Deputy Eastham replied it has to be eyes on; however, the lighting plan, if available, could state if it meets the minimum requirements. Commissioner Hames asked for a description of ground level lighting, if it meant shining down or on the ground. Deputy Eastham replied at ground level, which has to be certified by those who do the lighting plan. Commissioner Hames clarified lighting is measured down below but illuminated by other sources, to which Deputy Eastham replied yes. Chair Larson asked about lighting brightness for any neighbors. Deputy Eastham referenced Walmart, noting that they have three-foot candles and lighting drops off closer to the road and to their property line. Chair Larson commented that without any riearby properties the lighting would not be obtrusive, it is pretty much all commercial. Deputy Eastham replied that there are no citizens nearby. He added that the property has buffer zones built in and that the parking lot can be sufficiently lit. The building is four stories high so anybody not going into the lot will not be hindered by the lot due to distance and physical barriers already in place. Commissioner Hames asked what are the standards of operation for certifying buildings with multiple entrances and exits. Deputy Eastham replied that usually buildings. have one main entrance and the side entrances are keyed for residents. If there is more than one main entrance they would call into a phone; a controlled access point for visitors would have to be in place for both. If there is a single main entrance all other access points would need to be blocked off with key access only. Commissioner Hames asked about a monitoring system for the doors, for example, if a door is propped open. Deputy Eastham replied that he did not know. He added that legitimate move outs take place during the day so with constant movement the door does not usually stay open too long to cause concern. However, this would be problematic if friends are let in at night; but, if a door is open and gets noticed it should get shut. Commissioner Scott asked if the Deputy knows of any other apartment buildings of this size with an open access entrance to the person attending the desk. Deputy Eastham replied that he knew of none with this system and there is one that has a non-lock access, which is a nightmare. Commissioner Thompson asked if there is a higher risk of criminal activity with people parking, entering, and exiting a building if there is no availability to observe those coming and going. Deputy Eastham replied that this was less of a concern provided there was sufficient lighting. He stated that it has been proven that the most effective deterrent for criminal activity is lighting, especially with apartment buildings. Commissioner Holewa asked if the City is charged for additional police and fire calls. Deputy Eastham replied that his understanding is that all calls are included, except false alarms. He noted that if a property ends up on his desk because of the number of police calls, then there is something going sideways with the property and a better solution is needed. He added that this particular property ended up on his desk when it was being used by the college. Commissioner Hames asked the size of other properties in the Crime Free Multi-Family Housing Program, if there were any apartment buildings with 105+ units and if so, the largest. Deputy Eastham replied there are, for example, Montreal has nine buildings and over 3,000 residents. Commissioner Hames asked what are the most similar properties to the proposed. Deputy Eastham replied nothing due to the proposed size of the apartments themselves. Commissioner Hames asked if there is more traffic calls to apartment buildings with larger or smaller size units. Deputy Eastham replied that it is difficult to say because there are no apartment buildings that only have one size apartments, every complex have one and two bedrooms. Commissioner Hames asked if most received calls are crimes against property and theft auto or crimes against people such as domestic. Deputy Eastham replied that it varies, multi-housing creates more people in a concentrated area. The Program works through a cooperative arrangement with management and the Sheriff's Department in order to identify problems and figure out how to remove problem tenants. He added most multi-housing tenants are good people, 1-2% cause 80 -90 % of the problems. Chair Larson asked for an explanation of the last item on the board, which states "unclear whether units would have land-line telephone access." Deputy Eastham replied every multi-housing unit has jacks so if a resident chooses to have a landline they can. He added that a landline is preferred due to the enhanced 911 system. City Planner Meagan Beekman stated there are a number of concerns related to this application and conditions of approval have been prepared that address many of these concerns. She added if there is a recommendation the application will be reviewed at the May 14, 2012 City Council meeting. City Planner Meagan Beekman noted that Staff has received three phone calls from businesses stating concerns. A letter from a neighbor to the property was also received. The applicant is here to present and answer any questions. Commissioner Scott noted that there are 259 proposed parking spots for currently 120 units and asked if the minimum is 240. He also asked when McGuire's is developed how that would play into it. City Planner Beekman replied the minimum required parking is 240 stalls for the apartment building, and that staff is concerned about adequate parking as the site builds out. Parking would need to be reevaluated when McGuire's and the banquet facility has a proposed use. This may create a shared parking situation where portions of the lot are assigned to residents and others are shared, depending upon the reuse of that site, but a restaurant use would create a concern, given the amount of parking that would be needed. There is also an opportunity for shared parking on Lot 2, but it has not been contemplated at this time. Commissioner Scott asked if the 259 spots include the easement. City Planner Beekman replied the easement does have the potential to impact some of those stalls but staff is committed to minimizing this impact. Commissioner Hames asked if the minimum requirements are being met based on the entire building being built out or if the numbers reflect only Phase 1. City Planner Beekman replied it is based on all 120 units, two stalls per unit. Chair Larson stated the easement impacts access to this project while it solves access to two buildings in the back. Carrol's Furniture has very little parking, especially after a six-foot sidewalk is installed. Public Works Director Maurer replied the easement is broad-based and covers a large area because a plan for the shared access has not yet been formulated. The City would like to take the easement with the understanding that it is there for discussion purposes as the project moves through and to come up with a reasonable solution for all four buildings, with cross access. A possible solution would be a main access point to the apartments but also to the buildings in back, and maybe shut the most westerly one in front of Carrol's. If it is not taken at this point the opportunity might be lost in the future. Chair Larson asked to assess how it fits in with County Road E for all properties. Public Works Director Maurer replied this is part of the consultants work scope, for opportunities to better align, within the next several months. Commissioner Zimmerman asked about licenses for apartment buildings. City Planner Beekman replied that the current program is limited to four or fewer units. When the rental program was reviewed in 2009 the focus was on single-family rental properties; however, there likely is an opportunity to re-evaluate the rental program. Commissioner Zimmerman asked if there is County licensing requirements in lieu of no City requirements. City Planner Beekman replied that she is not aware of any. Chair Larson referenced Condition 27 and asked for a definition of traffic management and what it entails. City Planner Beekman replied when the senior living proposal was reviewed it was a similar scenario to this, closing the central access drive and creating a one-way drop off point, with concerns about access to Lot 2. At that time they looked at putting a median in that would prevent traffic entering from the north and creating a conflict point for those leaving Lot 2; however, the exact location of the median has not been finalized and they want to leave an opportunity for the Public Works Director to review and make adjustments if necessary. Chair Larson asked if Lexington Avenue is an eastern right in right out will that be the same for the western access point. City Planner Beekman replied they are and would continue to be full access points so they would need to stay in their current location. Commissioner Stodola asked if the exit on Lexington Avenue is both directions. City Planner Beekman replied it is right in right out only. Commissioner Holewa asked who did the traffic study, if it was RLK Engineering, a consultant of the developer. City Planner Beekman replied staff prefers to have the City contract for traffic studies; however, RLK had done the traffic study for the Select Senior Living proposal, where traffic concerns were minimal. It seemed sensible to have them update the traffic study, and was the most cost effective for the developer. Chair Larson asked if the County traffic engineer was present. City Planner Beekman replied they were not but had reviewed the study and submitted comments. Chair Larson then asked if RLK Engineering was present and, if so, requested they discuss the traffic study. Mr. Steve Manhart, representing RLK Engineering, Transportation Engineer, stated they were present a year ago and discussed this traffic study. Chair Larson asked for a quick synopsis of the conditions that were evaluated in terms of current and future development of the site and scenaxios that may arise that could be impactful, positive or negative. Mr. Manhart replied they were selected to do a traffic study for the previous use and used that to build on for this use. They were asked by the City to analyze different uses and make assumptions to what could go in the former McGuire's and banquet sites, although difficult to come up with what could go in the site. He showed a manual "Trip Generation" that was used to try and make a determination. They looked at a variety of uses for Lot 2 and then distributed throughout the system for results, although difficult to make a true assessment of what level of development the City wanted to assign. Chair Larson asked as it sits today with no development on the corner, compared to the previous use as a hotel, the increase or decrease impact. Mr. Manhart replied the hotel, with ancillary uses, would generate more than an apartment building. Chair Larson asked what the most intense use on that corner would be in the realm of development. Mr. Manhart replied a pharmacy was a more intense use, but it might not make sense because there is a similar use nearby. Chair Larson asked if the approval of Lexington Avenue access is conditional based on a bank on the corner. Mr. Manhart replied he believes that is correct. Chair Larson asked if a bank is low intensity use. Mr. Manhart replied that it depends on the size, that it has peaks, for example Friday payday. In terms of comparison, a typical drive thru has fewer trips than a pharmacy. Chair Larson asked if the use of a pharmacy is not a good use due to there being one across the street. He asked the impact of a combined bank use on the corner with apartment use compared to a hotel and ancillaries. Mr. Manhart replied he is not sure the figures are calculated at this time. Discussion on traffic ensued. Commissioner Scott asked if there was still another variable with the future development of the McGuire's site. Mr. Manhart replied he would have to check and see if that was included. Commissioner Zimmerman asked about a discussion with the County engineer regarding expansion of the Lexington Bridge over 694 and what impact that would have regarding access to the property. Mr. Manhart replied they have not had a conversation with the County engineer. Commissioner Zimmerman stated this is a discussion that needs to occur, how it's going to impact that or any other property. Mr. Manhart replied that he agreed, that the B-2 plan is the basis for analysis. Commissioner Hames noted in the original B-2 planning for the site, the City and engineers laid out a plan of business and apartment mix use and the traffic study worst case scenario still doesn't meet the anticipated traffic for the site in the B-2 plan. Mr. Manhart agreed. Commissioner Scott asked if the trips per PM peak hour were 237 previously and with a bank and 120 units they came up with 200. 1VIr. Manhart replied 237 previously and with a bank and 120 units the number is 221, which includes the health club and daycare. City Planner Beekman added that on Page 5 of the traffic study, it shows a full list of the build out — daycare, health club, apartment and pharmacy, for 336 PM peak trips. Commissioner Hames asked if that accounted for 900 trips a day. City Planner Beekman replied that is correct. Chair Larson noted that there is confusion on the traffic report based on an unknown future. Commissioner Stodola noted the farthest west entrance onto County Road E is 425 feet from the intersection and asked if the entrance on Lexington and County Road E is closer than that. Mr. Manhart replied this was an access that was looked at as a right turn only; if too congested to turn right there is two other access points out. It can be considered close proximity but in terms of 24 hours a day it may be congested one hour of the day. Commissioner Stodola asked if there was a concern with the access being that close to the intersection. Mr. Manhart replied there will be a median separating the north and south bounds, which would not cause a left turn problem and a right turn would probably be of minor concern. Commissioner Holewa stated with aging population in the City a lot more traffic is happening in the middle of the day so a mid-day, not just a peak AM and a peak PM study should be done. She asked if these study numbers will change if Shoreview decides to build east of Lexington Avenue on County Road E. Mr. Manhart replied the numbers are based on a guiding plan of other consulting companies so if based on those impacts, yes, and if not, no. Commissioner Holewa asked about the controversy of peak hour trips at a 44% reduction. Mr. Manhart replied the 44% is a standard reduction, not a number RLK came up with. The Trip Generation Handbook indicates there could be reductions associated with a mix- use development, they can be combined trips and use a% for trip generation; therefore, certain trip generation totals can be reduced by a% based on mix-uses sharing those trips. With increases in bicycle and other transit use certain reductions can be made in trips and parking per site to handle those other types of trips that aren't single occupant based. Commissioner Holewa questioned comparing urban to suburban. Mr. Manhart agreed but stated different populations are coming into the suburbs so they can apply sorne of those figures. Commissioner Holewa asked the variables that went into the 44% number. Mr. Manhart replied mode share, pedestrian and bicycle use, and transit use. Commissioner Holewa referenced mix-use and asked if there was something somewhere that a reasonable person could confirm that 44% was correct. Mr. Manhart replied yes, the number could be replicated. Commissioner Holewa asked if another firm would come up with a similar number. Mr. Manhart replied yes, although it seems high it could be replicated. Commissioner Hames, referencing Lot 2, asked if there are any uses prohibited by City Code or traffic, for example a gas station. And, if a bank is put there would another access be needed, could they use a right in off of Lexington Avenue and flow through the apartment building onto County Road E. City Planner Beekman replied her understanding was that a gas station is not a permitted use in the B-2 District. Also, there are regulations on drive thru windows with a bank or a fast food restaurant. Code does have limits for distance between drive thru windows. Chair Larson invited Mr. Davidson to make a presentation. Mr. Davidson, representing TAT Properties, appeared before the Commission and introduced his Staff. Mr. Davidson stated that with the Stuart Companies partnership they had a successful tenancy with Northwestern College. He added Northwestern College moved out a little over a year ago. Proposals have been modified to be compliant with B-2 and should attract a large student base. Commissioner Zimmerman asked if the property will be marketed as an apartment and if leases would be attached to the renting process and, if so, the length. Mr. Davidson replied yes on both with a term of one year. Commissioner Zimmerman questioned that a college student would have to sign a year lease, although living there only 8-9 months. Mr. Davidson replied many landlords' answer is that tenants are required to sign a year lease whether they use it or not. Commissioner Zimmerman asked if a security deposit will be required. Mr. Davidson replied yes. Commissioner Zimmertnan reiterated concerns by Ramsey County regarding security, noting it seems the more secure the facility the easier to market. Mr. Davidson replied they share the same security concerns, if residents don't feel safe they are not going to rent. He added that it is their desire to comply with requirements — IES illumination requirements, security at the front door, a single point of access and 24/7 staff. All rooms are currently wired for a landline and it's up to the tenants whether they hook up to them. Commissioner Holewa asked if the landline would go through them or a phone company. Mr. Davidson replied the infrastructure is there and tenants would choose a phone company. Commissioner Zimmerman asked if floors three and four could be locked off so that it is impossible for those on floors one and two to access. Mr. Davidson replied the floors will be locked and secure, but nothing was impossible. Commissioner Zimmerman asked if the elevator could be programmed to go to floors one and two only. Also, could the stairwell be secured so it cannot be accessed. Mr. Davidson replied yes to both. Commissioner Zimmerman asked if the intent was to mange the property as an apartment building or if they were hiring a company who specializes in this area. Mr. Davidson replied their partner is the owner and operator and will be responsible. Commissioner Holewa asked for a definition of partner. Mr. Davidson replied an equal interest in the property. Commissioner Zimmerman asked if there was a need for more than one person on duty. Mr. Davidson deferred the question to his partner whom he stated was more familiar with operations. Mr. Stuart Nolan stated this was his 42"a year in business, that he manages in excess of 5,000 apartments — smaller and bigger than this, and that he is more concerned about security than the City, that residents are their responsibility. He added they provide clean, safe, secure housing. All complexes in the municipality have crime free housing and a good relationship with the police. They intend to have a person there in the evening, have onsite monitoring 24/7 and digital cameras outside, which is just part of business these days. Potential tenants go through a very thorough screening process — background, credit, criminal and work history, and they deny people all the time. Commissioner Zimmerman asked if other complexes that have apartments of similar size are more effective than those with no two bedrooms, if it changes demographics in marketing. Mr. Nolan replied no, it makes it easier because studios equal less occupancy. Although parking Code has the same requirements, two per unit, studios will not have the same number of cars so the problem is less with fewer occupants. Commissioner Zimmerman asked if there will be occupancy limits on studios versus one bedroom. Mr. Nolan replied sure, one tenant in every apartment is preferred. However, the federal government has family discrimination rules so in a one bedroom they have to take two occupants if they both apply and meet the requirements. He added he is not sure if they have to take two occupants in a studio but if they have to they will. Commissioner Thompson asked if they manage any buildings with amenities on the first floor such as those proposed. Mr. Nolan replied yes, others have Wi-Fi cafes, fitness centers, theaters and game rooms. Commissioner Thompson asked the process that will be in place, noting that one gap is that the Commission has not seen all of the plan details. She asked how they will manage the first floor and access within, noting that even with security it would be easy for non- residents to enter. Mr. Nolan replied they do this for every project they have. They have hours, and amenities are not open 24/7, for example the fitness center would be closed up by 10 pm. The person on duty would lock these facilities and empty out any one using them. He added they have close to 400 employees and do this all the time and there are no problems with the police department. If a person doesn't do their job they will be replaced. Commissioner Zimmerman asked if there will be an onsite manager. Mr. Nolan replied yes, during business hours then others during non-business hours. Commissioner Holewa asked if they were going for the certification the officer outlined. Mr. Nolan replied yes, that it is in the conditions. Commissioner Hames referenced Condition 13 wording "shall participate" and requested it read "become certified" to ensure intent. Mr. Nolan replied they would accept. Commissioner Hames noted the proposed security system and asked if it involves a push button code and if not how it works. Mr. Nolan replied they need to have a security company come and look at the building and provide what is the best measure. Some buildings have keys or key cards. He added he is not sure the building will have an intercom system, that they may have a callboard in the secure area. As a lot of people don't have landlines they would need to call in via cell phone. If they have a buzzer system guests can be buzzed in otherwise residents will have to come down. Commissioner Hames stated this is a two-pronged situation — a security person and some type of security system. So if the program requires key entry or some other type of technology would they agree to it. Mr. Nolan replied yes. Commissioner Holewa stated he is concerned about residents calling down to the security desk to let someone in, if they are on a cell phone how would the security person know if the call was coming from a resident in the building? Mr. Nolan replied they have two different security companies that will work with the property management company to determine what the best security measures are. Commissioner Thompson referenced the floor plans noting the layout and asked if the doors between hotel rooms will continue to exist. Mr. Davidson replied the layout is not accurate, that Code requires the door be removed between studios, that it cannot have a common door. However, for a one bedroom the door will remain open. Commissioner Hames asked if a one bedroom with the extra door that goes out to the hallway will then be removed. Mr. Davidson replied no, it will be functional. Commissioner Hames asked for confirmation that a one-bedroom unit will have two doors out to the hallway. Mr. Davidson replied that is correct. Commissioner Hames noted the plans were dated Apri12"d and not shown to Code as required. Commissioner Stodola referenced the layout "typical unit G" and noted confusion asking if there is a huge closet or storage. City Planner Beekman replied it is a stairwell and not internal to the unit. Commissioner Stodola noted that most drawings will say square footage and asked if footage was known. Mr. Davidson replied the efficiencies are 300 square feet and a one-bedroom is approximately 600 square feet. He added that some end units on each floor are larger as well as six units on the second floor. Commissioner Stodola asked if they have reviewed any area regarding vacancies noting that 300 square feet would be very small for today's standards. Mr. Davidson replied they did a survey of about 1,300 units in the area and found that availability for efficiencies showed no vacancies and of a one bedroom within the 1,300 showed 1.2% vacant. He stated he feels a market niche for smaller units is there, noting these units are smaller because that's what the infrastructure provides. He added they will invest a lot of thought and money into the first floor common area so residents can access more space. Commissioner Stodola referenced units near the U of M on Washington Avenue, noting the units are all two and three bedrooms units and that vacancies were always in the smaller units. Commissioner Thompson stated she would be interested in seeing the survey information. Commissioner Hames asked if the lease rent will be a flat rate per unit or per person. For example, will there be a set rate for the unit but if there is a second person the rent will increase by x dollars. Mr. Davidson replied they would anticipate a single occupant would have an x rate and if there was a second person the rate would increase. Commissioner Hames asked the range. Chair Larson cautioned Commission members regarding financials noting they are not part of the duties of this Committee. Commissioner Hames replied she understood and that the question was in relationship to square footage. She added that since there was no color concept drawings it is hard to imagine the first floor and asked for more detail. Mr. Davidson replied the Holiday Inn had a pool and hot tub, which will both be filled in and outfitted with treadmills, exercise bikes and weight resistance equipment. The former reception area on the south side of the building would be renovated into a sitting, TV, Wi-Fi area and adjacent to that would be a movie theater in a separate room, a game room in a separate area and a bike storage area. He concluded the area will be an interactive environment and he believes it will draw young people in. Commissioner Zimmerman asked when the plans will be completed and when they will start marketing. Mr. Davidson replied when they receive approval and was hopeful for this fall. Commissioner Hames asked what is envisioned for the exterior. Mr. Davidson replied from a physical perspective the parking lot, lighting and trees will all be redone. The building, as it sits, has a solid exterior, which will be cleaned and some areas refreshed. The entry point on the north side will be highlighted and more attractive. Hopefully, the corner can be developed as well in the second phase. Commissioner Hames asked about signage to which Mr. Davidson replied they were hopeful they would have some. Commissioner Holewa stated he understood they were marketing to Northwestern College and Bethel University but do not currently have any agreements with them. Mr. Davidson replied that is correct. Commissioner Holewa stated he heard that some colleges require students to be on campus for their first year and maybe second and asked if they were marketing to the upper class. Mr. Davidson replied yes. Chair Larson asked if Mr. Davidson would speak to the conditions of approval, specifically the request for an easement on the west side of the property. Mr. Davidson replied the easement is the taking of property and that they would strongly resist the easement. He added if the City wants to purchase a part of their land they could discuss it, noting he felt it was an inappropriate requesi. Chair Larson asked if there were any other conditions to which Mr. Davidson would like to speak. Mr. Davidson replied Condition 3 is an excessive fee being proposed. He added he doesn't feel it reflects the impact and that it will provide a negative on marketing that corner. The developer across the street did not pay a dedication fee and he would hope to negotiate this fee to a more reasonable amount. Mr. Davidson also noted Condition 22, which they were being asked to pay for a water main, stating that while it benefits their property it also benefits others so they should share in the cost. He concluded that there were several other smaller items but that he hoped they would be negotiated successfully. Commissioner Stodola noted some studios do not have exterior windows and asked if this meets Fire Code. Mr. Davidson replied each apartment meets Code, that some don't have windows as they overlook the pool area. He also noted that they will have alarms and sprinklers. Chair Larson opened the public hearing at 8:32 p.m. Chair Larson invited anyone for or against the application to come forward and make comment. Mr. Leon Kline stated he owns a building on the east side of Lexington Avenue and he is concerned about traffic. He asked if the easement is granted how many parking spots would be taken out of the 259, suggesting it looked like one-third. He also requested the Commission review the site concept again. He noted that health clubs added a lot of traffic and should be rethought. There being no additional comment Chair Larson closed the public hearing at 8:35 p.m. Commissioner Hames clarified that the health club is for residents only. Mr. Davidson replied that is correct. Commissioner Scott asked if it is possible for the Sheriff to certify a 120-unit building with an unlocked front door. Chair Larson stated he is not sure security has been settled at this point. Commissioner Scott stated this should have been submitted. Chair Larson stated he believes the front door will be locked but opened by security on staff. Mr. Davidson replied there is one point of access on the north side of the building, which will be monitored by staff. Commissioner Thompson asked if the other entrances will be exit only. Mr. Davidson replied yes, they will be fire exits. Commissioner Thompson asked how that will be managed. Mr. Nolan replied there is no security system that can't be penetrated and they can't prevent every possibility; however, they will work with residents of the building and if residents see these kinds of things, such as a rock propping open a door, their job is prevention. Commissioner Zimmerman asked if the doors will have an alarm bar. Mr. Davidson replied yes, it is an option. Commissioner Holewa stated he is concerned with traffic in the area and especially with the third and fourth floor builds and Lot 2. The owners will likely take care of a security system but we don't have it yet so they should come back with a plan in the future. Commissioner Stodola asked the timeframe for working on floors three and four noting the longer they are vacant the more potential for problems. Mr. Davidson replied they would love to do all at once, and if leasing success is strong they would proceed to do all floors, but with 120 units they would anticipate the timeline within a year after floors one and two are completed. Commissioner Hames stated that overall she likes the plan but feels Commissioners and residents would benefit from a review of a more detailed concept drawing. She asked if this is a temporary solution for an economic situation or if it is long-term. Mr. Davidson replied the investment being made is such that it is absolutely a long-term commitment. He added he feels they have a unique and wonderful market niche with young people in the area. Northwestern College proved that and although they controlled it, it functioned well and students got jobs in the community. Hopefully, young students brought in will move into housing in the area. He added if they were to bring back pictures of the common areas this will delay the project. Commissioner Thompson stated there are still several security concerns. The college was successful but they had control of it and that is what made it successful. Demographics have not been shown and are not in alignment with their success equaling this success. Aspects of security are of concern considering there are no detailed plans. Another concern is personal safety, not just for students but for others. There is concern about the common areas with security, how can one person lock up facilities yet watch the front door. Lighting can be addressed based on the Deputy's note. Another concern is traffic, there is no overall proposal, yet there is a huge empty area — McGuire's. A more comprehensive plan to ensure the right amount of parking is needed. There is also concern about some of the landscaping and not meeting perennial requirements. Overall, a full comprehensive plan of Lots 1 and 2 to ensure we have the right conditions in place, is needed; there are just too many undefined variables. Commissioner Zimmerman stated he understands the concern of paying taxes on an empty building. He believes there are conditions that address many of the concerns that were brought up. Regarding Lot 2, the hope is the success of this building will dictate what will end up on that corner, depending upon demographics of rental population. The units are relatively small but we have single homeowners that rent rooms out, so they don't get much more space. He concluded Mr. Davidson and Mr. Nolan have several years of experience. Commissioner Holewa stated a concern is that when the property housed Northwestern College students they were required to take the bus because there is not enough parking on campus for students. Now with no bus all students will have to park on campus. He asked if the Public Works Director would like to add anything. Public Works Director Maurer replied he is not sure anything else is relevant, he gave his opinion on the traffic report, noting they made assumptions and took some liberties equaling a lesser amount of traffic than anticipated for PM peak traffic. Chair Larson stated he finds it disconcerting that there are so many questions regarding the application, which is lacking in details. He added many of these questions may be answered to the Council, such as a lack of a comprehensive floor plan, ligk�ting plan and security plan, which gives too many unknowns. The traffic study is also confusing; the variables are many and based on other traffic studies although the assumptions are unknown. With that being said the Chair would entertain a motion at this time. Mr. Davidson stated he would like to address several of the comments made. As a condition of this approval they will submit to the security requirements of the Sheriff, but to come up with a detailed engineered plan now is premature. The Inn worked well for 30 years in terms of traffic and the apartment is anticipated to generate less traffic. Parking is way in excess of what is needed. He added that for each phase they will come before the Planning Commission to show how it all fits into the whole. Chair Larson cautioned to keep in mind this is an advisory board only and these questions may be sufficiently answered to the Council. Commissioner Zimmerman moved and Commissioner Hames seconded a motion to recommend approval of Plannin� Case 12-009 for a Preliminary and Final Plat, and Master and Final PUD at 1201 Countv Road E based on the findin�s of fact and the submitted plans as amended bv the conditions in the April 18, 2012, plannin� case report, amending Condition 13 wordin� "participate" to "obtain certification". Commissioner Hames suggested the wording "become certified and maintain certification" instead of "obtain certification." Chair Larson asked if Commissioner Zimmerman would accept this wording in the motion. Deputy Eastham stated that there is a"maintain" in order to be fully certified. Commissioner Zimmerman changed the motion wording to read "obtain and maintain certification" and Commissioner Hames agreed. Commissioner Zimmerman moved and Commissioner Hames seconded a substitute motion to recommend approval of Plannin� Case 12-009 for a Preliminary and Final Plat, and Master and Final PUD at 1201 County Road E based on the findin�s of fact and the submitted plans as amended bv the conditions in the AAril 18, 2012, plannin� case report, amending Condition 13 wording "narticinate" to "obtain and maintain certification". The motion failed (2-5). Commissioner Holewa, Commissioner Scott, Commissioner Stodola, Commissioner Thompson and Chair Larson opposed. Commissioner Hames moved to table approval of Plannin� Case 12-009 for a Preliminary and Final Plat, and Master and Final PUD at 1201 County Road E based on the findings of fact and the submitted plans as amended bv the conditions in the April 18, 2012, ulannin� case reqort for a more comprehensive plan and for some of the conditions to be a part of the plan. The motion failed for lack of a second. Chair Larson moved and Commissioner Holewa seconded a motion to deny approval of Planning Case 12-009 for a Preliminary and Final Plat, and Master and Final PUD at 1201 Countv Road E based on the findin�s of fact and the submitted plans as amended bv the conditions in the April 18, 2012, plannin� case report, keeping in mind the Planning Commission is an advisory board and based on the following findings includin� lack of details with comprehensive floor plans, li�htin� plans, securitv plans, no clear idea of traffc flow in this area, too manv variable, lack of a comprehensive plan for the site, and future securitv concerns. Commissioner Stodola commented that if this planning case were to come back to the Commission she would like to see suggestions from Bethel University and Northwestern College, if this is something they would support. The motion carried (5-2). Commissioner Hames and Commissioner Zimmerman opposed. Attachment Public Works Director Comments � ���HILLS May 14, 2012, City Council Meeting � EN HILLS MEMORANDUM DATEo May 9, 2012 TO: Meagan Beekman, City Planner FROM: Terry Maurer, Public Works Director SUBJECT: Arden Hall Development Traffic Impact Analysis-Clarification Addendum As requested, I have reviewed the May 2, 2012, memo from Vernon E. Swing, P.E., of RLK, Inc. to Rob Davidson titled Traffic Impact Analysis-Clarification Addendum (Arden Hall Development). This memo I believe, although it does not state this, is intended as an addendum to the February 13, 2012, Traffic Study prepared by RLK, Inc. for the same project and presented to the Planning Commission. The Addendum generates an entirely new p.m. peak hour vehicle trips for the full development of the site based on new assumptions as to how the site will develop. The following table compares the February 13, 2012, Traffic Study p.m. peak hour trips to the May 2, 2012, Addendum p.m. peak hour trips. Comparison of PM Peak Hour Trips-Traffic Study vs. Addendum Traffic Stud Addendum Apartments (150 units vs. 120 units 90 74 Specialty Retail (13,000 sq. ft.) Day Care/Fitness Club 80 35 Bike Shop/Insurance Office Lot 2 Pharmacy with drive thru 166 36 24,000 sq. ft. office Total PM Peak Hour Trips 336 145 The reduction for the apartments is appropriate as the Traffic Study assumed 150 units and the Addendum assumes the proposed 120 units. The reduction in traffic for the specialty retail portion of the old Holiday Inn/McGuire's site and the newly created Lot 2 are more questionable since nothing is proposed at this time for either site. The Traffic 1 of 3 Study had p.m. peak hour traffic for the specialty retail of 80 trips based on a day care facility and a fitness club. The Addendum changes those uses to a bike shop and an insurance office and reduces the p.m. peak hour trips from 80 to 35, a 56% reduction. Similarly, the Traffic Study predicted p.m. peak hour trip generation from Lot 2 at 166 based on a pharmacy w/drive-thru and the Addendum reduces that number of p.m. peak hour trips to 36 based on a 24,000 square foot office. This is a 78% reduction from the Traffic Study. The Addendum goes on to compare the reduced p.m. peak hour trips from the proposed redevelopment of the site to the 2008 Spack Consulting Traffic Impact Study that was prepared as part of the Guiding Plan for the B2 District. The Spack Traffic Impact Study estimated a total of 1,960 daily trips and 239 p.m. peak hour trips based on redevelopment of the Holiday Inn/McGuire's site into 95 apartment units and 120,000 square feet of office. The Addendum suggests that based on their development scenario for the site it will only generate 1,818 total daily trips with 145 p.m. peak hour trips. The Addendum states, "the current development plan results in less daily and p.m. peak hour trip generation than anticipated in the Guiding Plan for the B2 District." This is true if the site develops exactly as is indicated in the Addendum. I believe that there is an equally good chance that at full build-out it will generate as much or more p.m. peak hour trips as the Spack Traffic Impact Study estimated from the site. Because the Addendum is totally silent on other findings of the Spack Traffic Impact Study it tends to imply that as long as the development generates less traffic than anticipated in the Spack Study everything will be fine. This really is not the whole story. The Spack Study looked at the redevelopment of the Holiday Inn/McGuire's site assuming the existing building would be razed and the redevelopment would start with an empty lot. This would allow driveways to be positioned in the places where they would function best given the anticipated traffic. Even with this assumption the Executive SLul�mary of the Spack Study says the following: The driveways on County Road E for the Holiday Inn site and the Arden Plaza site will experience significant delay and queuing in the p.m. peak hour. This is acceptable as an interim situation because it is not expected to pose a safety problem, little queuing is anticipated on County Road E. Long term, the queuing will impact the vitality of the redevelopments and could lead to safety problems. These driveways should be realigned midway between Pine Tree Drive and Lexington Avenue to provide a four legged intersection that could be controlled with a traffic signal. Left turn lanes and shared through/right lanes should be provided on the north and south legs to provide adequate egress. 2 of 3 Looking deeper into the Spack Study Traffic Analysis for the Holiday Inn/McGuire's site, it states the following: 5. Traffic and Improvement Analysis a. 2030 Level of Service Analysis The Holiday Inn site driveway and the Arden Plaza driveway intersections on County Road E will operate acceptably with little delay and vehicle stacking on County Road E; however, vehicles will experience significant delay trying to turn onto County Road E during the evening peak period after the sites axe redeveloped. The LOS calculations predict it will take approximately 3 minutes per vehicle on average to turn from Arden Plaza onto County Road E and approximately 3%2 minutes per vehicle on average to turn from the Holiday Inn site onto County Road E. Because motorists are queuing in parking lots instead of on high speed public roadways, this type of delay can be tolerated in an interim situation but improvement should be planned to reduce these delays. b. Long Range Improvements Even though the roadways and intersections will operate within traffic engineering standards, it will be difficult for vehicles to leave the Holiday Inn and Arden Plaza sites during the evening rush hours. To assist the redevelopment efforts, it is recommended the Arden Plaza and Holiday Inn driveways be realigned midway between Pine Tree Drive and Lexington Avenue. Left turn lanes and shared right/through lanes should be built on the new north and south legs of the intersection to provide adequate egress and the intersection should be controlled with a traffic signal. In conclusion, based on these findings of the Spack Study, the Addendum to the RLK Traffic Study does very little to alleviate traffic concerns about the redevelopment of the Holiday Inn/McGuire's site and may, in fact, reinforce that the amount of traffic generated is a very real concern. 3 of 3 Attachment 2008 Guiding Plan Traffic Study Excerpts � -�,�.Ls May 14, 2012, City Council Meeting _� , _ � � ,. _ T�HE TRAFFIC STUDY COMPANY � � n ��� � � ( .. � i ��'' �� 'i, "'S� �a�'�'�+�. � � � ���o �'.��r���� ��*. " ' `�� �"'`y�='��- - � �r � �� �''� ., � " �, �� r� ��t ` } y;�t �—, ,�7,4,.� y,,,.� ��� 1 �'�� J $���""��'� � ��, F= - �r � � I � � �.,�i� a � �.� , . ti � �. { 4 *�' ,� �Q r, ��+ M : � � � tA� � �'ts .� ��p � r ,e +��%f�+ i � �.4 ''F; � a pa���r 'wr1 w �.., . � .+,s � �► a.a�' "� . . . _ ,. � ��*'•`� �,s �,' � ,�.�`; ,,.��i°._ n—� _..����;� f;,�:� �� � �;�� �� .�� a� �.r` t�'" �� : �-� � .��—��� � � ��"'� � �.� �;� I �"' k i _. * �� fia�. ! : ' i�4K+ y� �J�x���. ��#: �� fi��� ��- r � �� � � "��'���'�, .�. Traffic Im�act Stud Guiding Plan for the B2 District Arden Hills, MN I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. � ��' - . J 133 �f' � 'L� i .�,.'��'��_ � ' f �"�, �l3i€'I���f P. ti���ii''�;. �. � �_ictntic "�;is. -�l`t9's+; Date: December 5. 2008 --:�rts�+ TABLE OF CONTENTS 1. Introduction and Summary ........................................................1 2. Proposed Development ............................................................. 3 3. Analysis of Existing Conditions ............................................... 6 4. Projected Traffic .......................................................................12 5. Traffic and Improvement Analysis .......................................... 21 6. Conclusions and Recommendations ..................................... 25 7. Appendix ...................................................................................25 LIST OF FIGURES Figure2.1 - Location Map ..................................................................................4 Figure2.2 - Concept Plan ..................................................................................5 Figure 3.1 - Existing Conditions .......................................................................9 Figure 3.2 - Existing P.M. Peak Hour Traffic ..................................................10 Figure 3.3 - Existing Daily Traffic ....................................................................11 Figure 4.1 - Trip Distribution ...........................................................................14 Figure 4.2 - P.M. Peak Hour Volumes Due to Development ..........................15 Figure 4.3 - Daily Volumes Due to Development ...........................................16 Figure 4.4 - 2030 No-Build P.M. Peak Hour Volumes ....................................17 Figure 4.5 - 2030 No-Build Daily Volumes ......................................................18 Figure 4.6 - 2030 Build P.M. Peak Hour Volumes ..........................................19 Figure 4.7 - 2030 Build Daily Volumes ............................................................20 Figure 5.1 - Recommended Long Range Improvements ..............................24 LIST OF TABLES Table 3.1 - Average Annual Daily Traffic Volumes ..........................................7 Table 3.2 - Existing Level of Service (LOS) ......................................................8 Table 4.1 - Development Trip Generation ...................................:..................13 Table 5.1 - 2030 P.M. Peak Hour Level of Service (LOS) ...............................21 Guiding Plan for the B2 District i Arden Hills, MN Tra�c Impact Study December 2008 1. Introduction and Summary a. Purpose of Report and Study Objectives The City of Arden Hills is developing a Guiding Plan for the B2 District. The purpose of this report is to determine if existing transportation infrastructure can accommodate the redevelopment contemplated in the Guiding Plan and to recommend changes to the transportation infrastructure to enhance the redevelopment. The study objectives are: i. Determine how the existing County Road E/Hamline Avenue West Ramp, County Road E/Connelly Avenue, County Road E/Pine Tree Drive, County Road E/Holiday Inn Site Driveway, County Road E/Arden Plaza Driveway, County Road E/Lexington Avenue, and Lexington Avenue/Harriet Avenue intersections currently operate. ii. Determine if the above intersections will operate acceptably after the redevelopment is fully occupied in 2030. iii. Recommend improvements if needed. b. Executive Summary The City of Arden Hills is planning for redevelopment along the County Road E corridor. The redevelopment is planned to occur on three different sites along the corridor: (1) the Pot `O Gold bingo hall site will be replaced with 15,000 square feet of offices, (2) the Holiday Inn hotel will be replaced with 95 apartment units and 120,000 square feet of office, and (3) the 46,000 square feet of offices on the Arden Plaza site will be replaced with a 14,400 square foot pharmacy and 5,000 square foot shopping center. To determine if there will be significant traffic impacts to the County Road E corridor, the following intersections are analyzed in this study: • County Road E& Hamline Avenue West Ramp • County Road E& Hamline Avenue East Ramp/Connelly Avenue • County Road E& Pine Tree Drive • County Road E& Holiday Inn Site Driveway • County Road E& Arden Plaza Driveway • County Road E& Lexington Avenue • Lexington Avenue & Harriet Avenue Guiding Plan for the B2 District 1 Arden Hills, MN Traffic Impact Study December 2008 The principal findings of this study are: i. The roadways and study intersections within the study area currently operate acceptably at Level of Service (LOS) D or better and will continue to operate at LOS D or better through the 2030 Build scenario when the redevelopment is anticipated to be fully occupied. ii. The driveways on County Road E for the Holiday Inn site and the Arden Plaza site will experience significant delay and queuing in the p.m. peak hour. This is acceptable as an interim situation because little queuing is anticipated on County Road E to pose a safety problem. Long term, the queuing will impact the vitality of the redevelopments and could lead to safety problems. These driveways should be realigned midway between Pine Tree Drive and Lexington Avenue to provide a four legged intersection that could be controlled with a traffic signal. Left turn lanes and shared through/right lanes should be provided on the north and south legs to provide adequate egress. iii. No improvements are needed to facilitate the Pot `O Gold site redevelopment. iv. The County Road E corridor has a wide center two way left turn lane down the middle as well as many driveway intersections. This leads to a vehicle dominated corridor that is unfriendly to pedestrians and bicycles. It is envisioned County Road E will operate as a vibrant, multi- modal corridor that will attract pedestrians and bicycles. To provide a safe multi-modal corridor, it is recommended County Road E should ultimately be reconstructed from Hamline Avenue to Lexington Avenue to provide a landscaped median, bike lanes, boulevards, and sidewalks. Guiding Plan for the B2 District 2 Arden Hills, MN Tra�c Impact Study December 2008 5. Traffic and Improvement Analysis a. 2030 Level of Service Analysis The LOS results for the 2030 study hours are shown in Table 5.1. These are based on the existing traffic control and lane configurations as shown in Figure 3.1. The forecast turning movement volumes from Figures 4.4 and 4.6 were used in the LOS calculations. The LOS calculations were done using SYNCHROT"" software. Ramsey County's existing timing plans were used in the analyses. The complete LOS calculations are included in the Appendix. All of the intersections will operate acceptably at LOS D or better during the 2030 weekday p.m. peak hour in both the No-Build and Build scenarios. The Holiday Inn Site driveway and the Arden Plaza driveway intersections on County Road E will operate acceptably with little delay and vehicle stacking on County Road E, however vehicles will experience significant delay trying to turn onto County Road E during the evening peak period after the sites are redeveloped. The LOS calculations predict it will take approximately 3 minutes per vehicle on average to turn from Arden Plaza onto County Road E and approximatety 3'/2 minutes per vehicle on average to turn from the Holiday Inn site onto County Road E. Because motorists are queuing in parking lots instead of on high speed public roadways, this type of delay can be tolerated in an interim situation but improvements should be planned to reduce these delays. Based on calculations from the Transportation Research Board's Highway Capacity Manual, roadway segments operate at LOS D if they carry the following daily volumes: • 9,000 vehicles per day - Two Lane Roadways (Harriet Avenue) Guiding Plan for the B2 District 21 Arden Hills, MN Tra�c Impact Study December 2008 Table 5.1 — 2030 P.M. Peak Hour Level of Service (LOS) • 14,000 vehicles per day - Two Lane Roadways with Turn Lanes (Pine Tree Drive, Lexington Avenue at Harriet Avenue, and County Road E west of Hamline Avenue) • 27,000 vehicles per day - Four Lane Roadways with Turn Lanes (Lexington Avenue at County Road E and County Road E east of Hamline Avenue) • 45,000 vehicles per day - Four Lane Expressways (Hamline Avenue) Figures 4.5 and 4.7 show the 2030 daily volumes anticipated on the area roadways. The daily traffic volumes within the study area will operate at or better than LOS D in both the 2030 No-Build and 2030 Build scenarios. b. Long Range Improvements Even though the roadways and intersections will operate within traffic engineering standards, it will be difficult for vehicles to leave the Holiday Inn and Arden Plaza sites during the evening rush hour. To assist the redevelopment efforts, it is recommended the Arden Plaza and Holiday Inn driveways be realigned midway between Pine Tree Drive and Lexington Avenue. Left turn lanes and shared right/through lanes should be built on the new north and south legs of the intersection to provide adequate egress and the intersection should be controlled with a traffic signal. The signal should be installed when the traffic volumes at the intersection meet the criteria for installing a traffic signal per the Minnesota Manual on Uniform Traffic Control Devices. These improvements are shown schematically on Figure 5.1. When the traffic signal is installed at the new intersection it will operate at LOS B in the 2030 Build p.m. peak hour. This leaves capacity to accommodate significantly more redevelopment as long as the traffic from the redevelopment is focused at the signalized intersection. Based on the Guiding Planning efforts, it is envisioned the County Road E corridor should provide safe mobility for pedestrians and bicycles as well as vehicles. Several improvements are recommended to accomplish this goal (see Figure 5.1): • Construct a landscaped median on County Road E from Hamline Avenue to Lexington Avenue to convert the private driveways along County Road E into right-in/right-out accesses. • Driveways should be consolidated whenever feasible to limit the conflict points along the corridor. • Provide left turn lanes at public street intersections. Cruiding Plan for the B2 District 22 Arden Hills, MN Tra�c Impact Study December 2008 • Provide on street bicycle lanes. • Provide sidewalks. • Improve the landscaping to provide a human scale to the corridor. • Provide eleven foot wide travel lanes which will reinforce the 35 mph speed limit. • Minimize traffic signs within the corridor whenever feasible. • Extend the bicycle and pedestrian facilities through the County Road E/Hamline Avenue interchange when it is reconstructed. The cross section in Figure 5.1 was developed with MFRA to utilize the existing pavement width and curbs. Using the existing curb and gutter system will minimize the cost of reconstructing the corridor. It will also shorten the construction period, lessening the impact on local businesses. County Road E is under the jurisdiction of Ramsey County. The City will need to work collaboratively with the County to gain approval for these recommended improvements. Guiding Pdan for the B2 District 23 Arden Hills, MN Tra�c Impact Study December 2008 �C TNE TRAFFIC STUDY COMPANY Fiqure 5�� Recommended Long Range Improvements Guiding Plan for the B2 District Arden Hills, MN � I SI4EWALK 60ULEVARO �IKE DRIVE DRIVE �C�7— TURN LANE DFiIVE DRNE BIKE gpU�EVARD SIDENIALK I..-6��8'�2�5 �71`�...���1i'—�I�-11'—�I�iNE 3��2�8'._—�.I�—g'—+-! �� 44' �� '4' a I� — — 88' ROW — ��I � Reconstruct County Road E from Hamline Avenue to Lexington Avenue to provide a landscaped median, bike lanes, boulevards, and sidewalks. ` ��„ �`�� , ��_ +p "�� • _ , i� '�'� Ik� 'f � j� F�T" '; ��q � �� _� � �, . �����-�:� �� G � 5 � ' I'' ' � . � a � � �"'�'*�"�..�,,, ,-�Fa � � .} "`'*�. • � �� °� � dr' �—.'-' ��r �� � *, # ,.� CI `s �'�.. `�'�.3 .. —F�+ � , , � � )i 1. 1 ! s � '�i'�_ � �' 2 ��.�-' �. � - - � '�� � � �� s.�r � � �� � j�-+�,. �a� �..� w . ,. , �,, � �, .�,,�,� � h . .up' M�• �t��~+���� r� �� -*Y r �"�4��0 ' � � � k � �' � � � ,� ������ ,� N , � �4� .:� .� �',� .,�� i r . .1 r y'�� � �..�. J �� ..i�,� � us.. . E� �: � �.�� .. ; ' � 3�� . f ��P J ,� � " � � ��� '„�p,�, r ��� � �� I „ �r [y },. f�{I � ":� � k� � �, 4 ,7 . � •"�' ����. ��;�f� - Align Holiday Inn Site driveway and Arden Plaza driveway midway between Pine Tree Drive and Lexington Avenue. - Control newly formed intersection with a traffic signal. - Provide left turn lanes on the north and south approaches to the intersection. - Promote connecticity throughout parcels to utilize the signalized intersection. r � � w ' 4 � y Attachment Supporting Materials Submitted on May 10, 2012 � �EN HII,LS � May 14, 2012, City Council Meeting � � _� May 8, 2012 Meagan Beekman City of Arden Hills 1245 W Highway 96 Arden Hills, MN 55112 Dear Meagan, Enclosed please find the following: �'H�, �������� � l � JL �A Y JL��� �LA � '�.. - Response to Recommendation for denial Planning Cas� 12-009 letter dated 5-3-2012. - Traffic Impact Analysis - Clarification Addendum dated 5-2-2012. - Security System Protocol. - Cross Easement Drawing between Lot 1 and Lot 2. - Applicant Response to Staff Recommendation high�ighted in Red. - Drawing of Ramsey County Easement Request. - Letter of Recommendation - Northwestern College. - Specialty Retail Lease Commitment - NOW Bikes & Fitness. It is our request to have the above information included in the City Council information packets. Respectfully, a � Robin C. Davidson TAT Properties LLC cc: Stuart Nolan 3IU0 Northwoods Drive, Suite 125, Arden Hills, 1�1N 55112 Phone: 651 481-629U Fax: (651) 481 6289 �rnail: rob@daviusoncos.com �i. EN I-�ILLS May 3, 2012 Davidson Camganies Attn: Rob Davids�n 3900 I�Torthwoods Drive, Suite 125 Arden Hills, MN 55112 Re: Pl�tnning Case �12-OQ9 D�a�r Mr. Davidson: The Planni�n�g Co�ission review�d xour request fox a Master and Final Planned Unit Developmeat (PUD), and Preliminary and Finat Plat for �our property located at 12Q1 Caunty Road E, at their April 1$, 2012, special meeting. Please be advised that the Planning Cflmmission vot,ed 5-2 to recommend denial of your requesi. 1'he reasons far the recommendation were stated as follvws: 1. Lack af adequate detail related to proposed land uses 2. Lack of a lighting plan 3. Coniusing tra.ffic plan due to lack of detail xelated to o�verall proposal 4. Lack of detailed security plans S. Concerns over internal traf%c circulation betvveen lots ar�d access to Lot 2 6. General concern over lack o£ a eom�rehensive plan for the overall site , The City Council vv�ll revier� this applica�ion at their May 14, 2012, regular mee�ting. Y4u �nay svbmit additianal inforrnation prior to the City Council meeting; however, staff may not have tirne to adequately revi�ew any nevv information in time tQ include in the Council's packet. You ox a representative should bc present at the xneetin.g tu address any questions that the Council may have. Please note tlaat if the application is not approved by the City Couneil, the same application cannot be submitted for six months. If you have any�que�tions, please contact me at ($51) 792-7828 or by email at �ieagan.heekxnan Ca7�ei.axd.�a�i.-�i11R,�n�us:- T'hank you for yvur t,ime and considera#ion. Sincerely, � M an Beekm.axx City Planner . . . • . _ - • - . . Copy: FC# 1�-�09 : - Ciiy of Arden Bills ��z45 West Highway 96 � Arden gill.�, MN ♦ 55112-5743 Phone 651.792.7801} � Fas 651.634.513'1 ♦ wtvw.ci.arden-hilLs.mn.us 'I"�I�+; .��v���C�� ���I'�l'�I��, � I�C. May 8, 2012 Meagan Beekman City of Arden Hills 1245 W Highway 96 Arden Hills, MN 55112 Dear Ms. Beekman, In response to your letter dated May 3, 2012 please note the following responses to the six (6) areas of concern you note: #1) "Lack of detail related to proposed land use." Response: The project consists of A -120 Market Rate Apartments B-13,000 Square Feet of Specialty Retail C- Two (2) Acres Sub-Division - Concept 24,000 SF Office When the uses for B and C are identified we will present those uses to the City for approval. It is unrealistic and unfair to prohibit the development of the apartments until precise uses are identified for B& C. Traffic impact of A, B& C have been outlined in the attached traffic summary. Conclusion: Traffic generated by use A, B 8� C result in less daily PM Peak Hour trip generation than anticipated by the Guiding Plan for the B-2 District. #2) "Lack of a lighting plan." Response: Staff has indicated to the developer that submission of a lighting plan at this time was not required subject to agreement on lighting levels. Developer agrees to comply in the recommendation of Ramsey County Sheriff. #3) "Confusing traffic plan due to lack of detail related to overall proposal." Response: Developer met with staff on Monday, April 30th, 2012 and agreed to address questions related to traffic. On May 2, 2012 an addendum to the traffic study was submitted to staff. (See Attached) The summary demonstrates that uses A, B, C generate less traffic than anticipated in the Guiding Plan for the B-2 District. Developer has received no questions or comments from staff regarding the memo. 3900 Noxth�voods Dxive, Suite 125, Arden Hills, MN 55112 Phone: 651-481-6290 1'ax (651) 481-6289 FinaiL iob@davidsoncus.curri #4) "Lack of detailed security plan." Response: Developer submitted a description of security plan to staff on April 27, 2012. (See Attached) Developer has received no questions from staff regarding this submittal. #5) "Concerns over internal traffic circulation between lots and access to Lot 2." Response: Lot 2 will have limited access over Lot 1 to access County Road E; (see attached) the noted access will be governed by a private easement between the owners of Lot 1 and Lot 2. Access from Lot 2 to Lexington Ave has been assured by Ramsey County subject to the user of Lot 2 generating traffic consistent with that which has been described in Amended Traffic Study as attached. #6) "General concerns over lack of a comprehensive plan for overall site." Response: Same question as #1 - See response to question #1. The developer has worked diligently in addressing concerns expressed by the City by decreasing the overall apartment density as well as the inclusion of kitchens in each unit; to that end the market rate apartments are now fully compliant with City code. The developer is requesting no variances. We have identified a 9,000 SF Specialty Retailer (see NOW Bikes letter) as additional uses are identified for Lot 2 and the balance of the Specialty Retail area those uses will be presented to the city so they can be evaluated and compared against the standards we have submitted. The developer has received extremely positive feedback from potential tenants for the Specialty Retail as well as potential residents of the apartment complex. The developer looks forward to creating another successful development in Arden Hills, MN. Sincerely, ` �� Robin C. Davidson TAT Properties LLC cc: Stuart Nolan Engineering . Landscape Architecture • Planning • Surveying • Traffic INCORPORATED Creating extraortlinary Communities MEMORANDUM TO: Rob Davidson FROM: Vernon E. Swing, P.E. DATE: May 2, 2012 RE: Traffic Impact Analysis — Clarification Addendum (Arden Hall Development) RLK Project No. 2011-052-M rob@davidsoncos. com vswing@rlkinc. com Per your request, this addendum addresses whether the reserve capacity accounted for in the City's Traffic Impact Study prep�red by Spack Consulting for the Guiding Plan %r the B2 District is adequate to accommodate the propased uses. We have simplified the earlier traific impact analysis to focus solely on the only two relevant areas: 1) The planned uses per the Guiding Plan for the B2 District; and 2) The proposed uses for the site as discussed below. • 120 Unit Apartmsnt Building (reuse of the Holiday Inn) • 13,000 Squaxe Foot Specialty Retail • 24,000 Square Foot Office These uses were chosen for the analysis as they represent the best known information at this time. The apartment count has been reduced from the amount listed in the original traffic study (from 150 units to 120 units), and the retail users within the McGuire's space have not been fully identified at this time; however, they may include a combinatic�n of independent uses such as a bike shop and an in�urance store. Also, while not part of the current site approval process, the Guiding_Plan for the B2 District considered the site as a whole and included land use for Lot 2. The proposed use for Lot 2 reflects the demand Davidson Campanies is fielding at this time for this property. To simplify the discussion, we present the trip generation volumes listed in the Guidin� Plan for the B2 District compared with the proposed land uses discussed above. The source of the estimated trip generation potential is the Institute of Transportation Engineers (ITE}, Trip Generation, 8�' Edition. 2008 S�ack Stucl�- Holiday Inn Site Projected Trip Generation - 95 Apartment Units 638 Trips per Day; 59 Trips in PM Peak Hour - 120,000 sq. ft. Office 1,322 Trips per Day; 178 Trips in PM Peak Hour TOTAL Trips 1,960 Trips per Day; 239 Trips in PM Peak Hour Offic�s: auluth • Hc►rr� lake � Hik�bing • Minn�tonka • CJakdale (952j 933-0972 • b110 Blu� Circl� Driv� • Suit� 10(l • Minn�t�nkca, MN 55343 • F�X (952j 933-1 153 f'q�aal C?���ort�ariil�� �;rnpl�yer The information in the Guidin� Plan for the B2 District concludes the Holiday Inn site can redevelop with a traffic intensity of at least 1,960 trips per day and 239 trips during the PM Peak hour without adversely impacting the conditions of County Road E or Le�ngton Avenue. In other words there is reserved capacity on the surrounding roadways to accommodate development of 95 Aparhnent Units and 120,000 square foot office on the Holiday Inn site. To determine if the proposed use for the Holiday Inn site under consideration now (as summarized above) will result in traffic capacity issues not already addressed in the City's study, the trip generation potential for the proposed uses must be tested against the Guiding Plan for the B2 District reserve capacity for the site. The following summarizes the ITE trip generation estimates for the proposed uses: 2012 Pro�osal —Arden Hall Projected 7'ri� Generation - 120 Apartment Units 978 Trips per Day; 74 Trips in PM Peak Hour - 13,000 sq. ft. Specialty Retail 576 Trips per Day; 35 Trips in PM Peak Hour - 24,000 sq. ft. Office 264 Trips per Day; 36 Trips in PM Peak Hour TOTAL Trips 1,818 Trips per Day; 145 Trips in PM Peak Hour The current development plan results in less daily and PM Peak Hoar trip generation than anticipated in the Gnidin� Plan for the B2 Dtstrict. Therefore, there is sufiicient reserve capacity available on the surrounding street to address the traffic generated by the proposed uses for the site. Since the Guiding_ Plan for the B2 District traff'ic study assumed mare trafiic for'the Holiday Inn site and concluded there were no traffic operational issues associated with the redevelopment, it is concluded the present proposed site uses with less traffic will not result in tr�c operational problems. G:�Davidson Companies�20ll-052-Ivn_Correspondence�Davidson Memo 05012112.doc RLK Incorporated Page 2 of 2 May 2, 2012 Arden HaIl7rip Generation Addendum 2011-052-M Security Protocol • Front Door entry system with keypad and LCD Screen. o Entry system is expandable for multiple doors o Entry system has search capabilities to find residents from the LCD screen by name. • Allows residents and staff to buzz guests into the building from either a land line phone or cell phone. o Entry system is connected to a dedicated phone line for calling out to residents. o Long distance and PBX dialing. • The unit is prograinmable from staff computer using SPSWin software. o The unit is connected to the staff computer via Communicatian port. Any changes made on the computer are pushed to the system instantly. o When a resident moves out or updates their phone number staff can instantiy make these changes in the system. o The entry system database can be backed up and restored to a new computer due to fa�lure. � � � o Can be setup for automatic unlock schedules if necessary. • The entry system has a battery backup system so if power goes out guest and residents will still have access to the building. Travis Guza IT Systems Mana�er P: 95Z-948-9527 F: 952-346-7027 tguzaC�stuartco,cprn www.stuartca.com 1000 West 80th Street M+nneapolis, MN 55420 No virus found in this message. Checked by AVG - ��%����v.a�*.c�ttl Version: 2012.0.1913 / Virus Database: 2425/4985 - Release Date: 05/08/12 z LOi1-PAlId116�1ANs1{E�IR__�EM?S IOTt-PE9FlINIALRSNR9SBE@OIBEMIEMTS L9T1-iBEEREINIBF11E1RS --�' DA11tDSON ADDITION ��µ� , 4_ __; .��� �� ,..e� _ ,. � � _ ��� ar° oe u. uwc .nu LAN�$CAPE PLIIM �� �a»� ,�, : � � P,�,�o. ,�, ��,aEo �N. �R� .� ,..,, �. R .. o � - m�� �� ,Y,� �. ,.,,, ,,. �,� �a.,� .�,� ,�� a,,, ,o. R. ,o,—. � P�.� _ s �,..., ��, CIIY ef IlrAea pBs. Mlnnts�l8 �- YY �' Rm.wwr ..�� �1 �' ��M� �. � :� ,� ��� '� � �.—_ �li � b � �'�" w� ._ � � � I I L*` ��I�'�y�� ::�� e a�h- I � � ; �'i1r44�raM�'� � i� '��11 � r � � � t ���_ ,�,o _�_�„�,,,�,.,,�,�.�e....,...�. I �� �,� �,L..i f������7fi� I i ��.� � � y`J ���� f��L I I� :�,i i � .a i F�-i .c . � ,:.� � ..i i � .i � [�,� `�i , . � j; � `r5e zipli�� I � i � i i�:� i i 1-� � i�, k3i {Y��,� ���"�� i � ' �����h.�1�� f r�carw,ow �� I � I ' i .�1 L �{! yy� i � � ...� i i � i {��� a 1 d � ! . i ' � . �. � i � '� i � i i .. � i ' ..',, ' � � _ r, � � 6 rnsiwr G ' � �Y'IC-� i ` � „ � I � ` � _; i � ..:I` � I � ! � i .li �i i 1.. ; i r� tr�+ ` �`� rn",„�„„� e , � 1 � i � � -- ,-.- �_ , � � � I � I f'��,� ; ; , � I , � f , � , � , � �� , ," �. / � �� � w �, r� r�i ic� � _�.. -- - � �;'� �`' 'I� � I ' � - �� = .fi�.._�_ � � ,. �,._� �� � '� � -��_ � � �� � � � . .. � . � �i I :i i . � I � :� �� _ � � ��_..�._...-- { � � L� �� i� � �w,nr�,� � � jQ � LOT 1 y 4��� ,-�' i �LOT � s,� �+ a ..�:,,r I.. [ : i i y � ' F� , F�{. � 'I I�II I �;��e��ve% I � � � Y u .�:.,�� '�,��� .:.' ��. �� P r3i'� 4 � . � � �:�; � , �"� m...�������„� o.�m �, BLOCK � : � � 1 s ��� � ,� � �� � ; : ,, �--� � —6--,0. ,�--�—�-- � � _� ...�___ . : <. , � -F— � -� , ,� � __ _ '� �� . --�— _,_ __— _ ._� , , , .. I I � I ` - _ _.. - - , � �- --- I (7 �, �+�,." , a -�-�-;, re. _ _ , _ - �� �� � � ,.; °+' 1 � . � �__.. _ _._ .. _ ... . 1 �y, - , ' C ' , , � WE I plp' f _ . �_ ... - � .�w �:� �y� .— y, � � � � _w= -.w — _ __ 1 �,��:;� _�,H,�, . _._—._ __ --I � ''j''"' n�.— �— �— _• -'_ .w- W_-' w -sfs � l '{ yNORTN .__ w --w -. J �.j . ___ �_ �-.-: ���-� _ I � _„—. _ _ _ — . I ,1 _l �_ - — — — -- — —1 — — -� !, . � ____ _.__.__. __._ w�,�. � _ _ ----- - ,.�.,,.�„«..a„ � - -_ «• a A e -----� .. _ _ _ , _ r'�t! Cross Easement • ""°°T ` `°T "� CONL°� °NLY - /�� ncnin� �nrar m oe oc'rcnuiweo ar � O1MEP5 FOR flEW�� PtliNITlinG ] ,/ il I �, � Staff Recommendation Staff acknowledges that his site is an important gateway to the B-2 District, and yet remains vacant. Two other development applications have been reviewed by the City and approved in the past two years on this property, both of which did not come to fruition. Staff understands the frustration of both the City and developer to find a mutually beneficial and productive reuse of this property. In that vein, if the Planning Commission chooses to approve this application, Staff recommends the following conditions of approval: l. The project shall be completed in accardance with the plans submitted as amended by the conditions of approval. Any significant changes to these plans, as determined by the City Planner, shall require review and approval by the Planning Commission and City Council. 2. Development agreements, drafted by the City Attorney, shall be signed by the property owners of Lot 1 and Lot 2 prior to the execution of the Final Plat. 3. The applicant shall provide for park dedication in an amount of $ 6�'� ���"" � f��?`�. The park dedication shall be paid in full prior to the execution of the Final Plat, or the property owner shall enter into an agreement for a payment plan that is in accordanee with Section 1130.08 Subd E of the City Code. ���t �, I���c��c ��i���r_��� ��°���cpt��l b, ������.��ed ;� �133_.3�0 w� tael��u�; t��ais amc,da��t_x��c�r� ��c���°��c>ij a�;��til��� t��:� �r�,fl��aEy+ �}�� �i�c: ����ri� 4. The applicant shall provide drainage and utility easements, in favor of the City, in accardance with 1130.05 of the City Code, prior to the execution of the final plat. 5. The applicant shall provide a 30-foot by 30-foot triangular permanent easement at the intersection of Lexington Avenue and County Road E for roadway and utility purposes, as well as gateway monument ' r,A�• ��°�� <.i� ��k h:, � �. �;,� ' �._��� ��� ��������..�a-�Rf ��` � �� ., ;,. �;� .k�, -�$ ; F�R.�;F. �'(� �; F���. _��Y:B� �e'�� C d.�13�su ��� °;I�y.,r.i�fws:a w�:: �„ tf � #.� ��f;"% 6. The applicant shall file the Final Plat with Ramsey County within 180 days of City approval, or the approval for the Final Plat shall expire, unless extended by the City Council prior to the approval's expiration. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. �9��,rt„_36 � c��� �76� �sst��� o,� �� t�.�t''^ �' �� '; ei�*= s'*:'t��i :.'.13i i:i eit� ji§'�V1E911"��� c`i�7)?l'C9�'4,„� ���� C'6 t cs,ia}��t�;i`Il�iw 7. The applicant shall dedicate to the City a twelve-foot wide pedestrian easement along the property lines adjacent to County Road E and Lexington Avenue, within which the six-foot wide sidewalk shall be constructed. This will likely need to be provided in a separate document from the plat ��h��. � �: .,� Xf,;;�. a�it, 4�:^���+�,$� �}����:��'� �,' ,��. 9= ,.ti�;, i'wl �d <RE��;e .Da'i ¢. � �+� ..6w� 3 ':'_ i ���.dx{ r.... r�b� :3.}��,Sr#,pb�;�t .. � ::!d)liS� T! �zA �a § Q :��4..�r..R� �6�t `2 nY' �kl . . n°,� .%�Z F"}ii ... . 8. The applicant shall provide limited access through the platting process for both the Lexington Avenue and County Road E frontage for all areas not being allowed to be used as driveways. This will likely need to be provided in a separate document from the_ ��'�_:. �a`,j# f�3"; wra , t 3`ta '%" :e`�ilck r'�R: w:�"�P � ltlt�tt�' 9. The applicant shall provide a 64-foot wide easement along the western property line for the City to implement a shared drive-aisle and parking solution to accommodate the three businesses west of the property. The City's intention is to minimize impacts to the property and to vacate any portion of the easement not part of the long-term solution. The applicant shall not be required to improve any portion of property within this easement until a solution is implemented. ���v�� ��������iµ�� � r��.,��1���r.s�� ���at c;��t� �;�~ ���rsi,��,_r;l����aP�����r�� �;� �f�;: �e_"`;�€ ��:g���_c��»s it have a plan to do so. Ifthe City wishes to ��s� � �. �� � �-�° . °r����� .� 6,�x,� , ��¢� � K�� ; r ������> : ?�c�uld make us an offer- it is our belieFthat °�uch an eas�rnent wauld amounf to a"takin o�; f the proper ,ty". As an alternative the °<��plicant will.ca,nsicier th;e_ctt�'s easerr►ent re�uest as described in.this_,�+t�ra�raph_subi�ect _ �'� ���.�laita�.s�i�� � ° �� � �°,..��lc�,� $ ,•�, 10. The applicant shall abtain all necessary permits, including, but not limited to, NPDES, Rice Creek Watershed District, Ramsey County, and City Erosion Control Pertnits. Copies of all necessary permits shall be submitted to the City prior to the issuance of any development permits. 11. The applicant shall submit a lighting plan, subject to the approval of the Ramsey County Sheriff, which indicates a minimum of three foot candles maintained at ground level across the parking lot surface, prior to the issuance of any development permits. . ,� . -. , , � �g, '°'�� � g�1tk ��sp >�r��l �%i� � �'� na,,� �,r; wt,s�;��s�' � s; F;�,"�;� .��r t. ��1°1tV"�1 i. i':�:�_. 12. The applicant shall submit a security plan, which includes details on staffing, cameras, and locks, subject to the approval of the Ramsey County Sheriff, prior to the issuanceofanydevelopmentpermits. m,�c�c.;�;���d ,=�aa��?��'��Ea ��.�.�.u,,� .���� 4`-d ,e'i��7i.�7" � a;:i�� 4 a,.,{`.•" iQf �!i'�f�i.`� iae......a�"ri , i`Yiia� sr z..%�.,�I`= `r �,.� a. .�ar'.t411�.... 13. The property and property management shall participate in the Crime Free Multi- Family Housing program. 14. The applicant has submitted a revised landscaping plan indicating compliance with the City's landscape requirements. 15. The applicant shall submit a iinancial surety in a form acceptable to the City Attorney for 125 percent of the cost of materials and installation of the landscaping plan prior to the City issuing any development permits for Lot 1. The City shall retain the fmancial surety for at least two years after full implementation of the landscaping plan. The �nancial surety shall only be released upon successful inspection of the landscaping by the City Planner, which shall only occur during the growing season. 16. The applicant shall obtain a cartiiicate of occupancy for Lot 1 within one year of the approval date of the development agreement, or the Master and Final PUD approval shall expire, unless extended by the City Council prior to the approval's expiration date. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 17. All improvements illustrated on the approved plans, as amended by these conditions of approval, shall be completed prior to the issuance of a Certificate of Occupancy for Lot l. 18. The applicant shall comply with the Building Official and Fire Marshall's comments dated February 22, 2012. 19. Building on Lot 1 shall comply with Chapter 1306, Special Fire Protection Systems, of the State Building Code, which requires the installation of a%re sprinkler protection system that complies with NFPA 13, subject to the approval of the Fire Marshal. 20. Fire Hydrants shall be located within 150 feet of the Fire Department Connections (FDC) to each building on Lot 1 and Lot 2. 21. Building on Lot 1 shall comply with all provisions of Chapter 14 of the City Code regarding properiy maintenance, subject to the approval of the Building Official. 22. An 8" water main shall be extended from County Road E to the northerly plat line between the two proposed lots, subject to the approval of the Public Works Director. .. rr .,�e;. �i�t,t•� � ,1 ae: ia i'. . �.'F � �°.)1,� � ��� pt, . � I ..�_,__ 23. Permanently affixed bicycle racks shall be prdvided near all primary entrances to the building on Lot 1, subject to the approval of the City. 24. The applicant shall remove all portions of the bituminous parking lot on Lot 2, with the exception of a 25-foot width to the east of the existing building, subject to the approvaloftheFireDeparhnent_ �',��i� �� ���:�P .. :z�=la ���'r;,� ;��°�=:�a �3i � , ° �� � ��ia t. ��' ,3. t".— ,`i! <.l rS� ;ia.`i�l, 25. All exposed soils, not considered improved hard surfaces or perennial planting areas, shall be seeded or sodded with an approved grass mixture. 26. The applicant shall consult with the County regarding sidewalk placement to ensure that the sidewalk placement will work with the County Road E and Lexington Avenue intersection's geometric changes planned forthe future._`�i 1�;t!, ���� ���� ,���^l�a��� c��� . , , �, , . . . .- , , ��'mag����-.' �<,�,„ �.� 'a�€ iii�)7��t,� .g��;��f ,, �Ii�E 1 �`���:� i"�" t�s; 9 ° 7 � � .; ��;�.,,� 27. Traffic management shall be implemented at the eastern most driveway, subject to the approval of the Public Works Director, to effectively provide efficient and safe ingress and egress to Lot 2. Additional traffic management devices may be installed at the time of Lot 2 development, subject to the approval oithe Public Works Director. 28. The applicant shall agee to waive their right to appeal future assessments related to the installation of landscaping, street lighting, benches, and other features associated with the County Road E streetscape improvements, in an amount not to exceed $350 per linear foot of County Road E street frontage.,' :��� , 3t,��� 1�� ������._d ��� a�_a�! r�a ��.�f�� ���. �,���° l��,r�:��; £'�is19��'�� i#.� �'tp�1�[ j�3rbq�,.'i� � (1"a�✓�� t ., . _ � 29. The applicant shall provide to the City temporary construction easements for implementing the County Road E streetscape improvements, provided the City repair and replace any disturbances on applicant's property. 30. The applicant shall submit to the City joint maintenance agreements, and shared access agreements, between Lot 1 and Lot 2 prior to the issuance of building permits for Lot 2. 31. Prior to ten years elapsing, or upon future PUD approval of the parcel, the City may incorporate a civic feature into the southeast corner of Lot 2. � - � _��- "�� . � � � � � -� _ . _ 4 �. , �` �.�. , , ^ . . ' _y,� . ;.�b ... . ! �` � . . ' . . _ . .�i !� " - � � ' �s}. ' ��t . � - �� ��' � �-"�`d '�� . ��• _ �� . , _ � . � �� � . .�'� -� ,� � i � ��a� ' q . �A � - � �'� :. .� � .� ..� �,/_ \ y , ., =�r ;, , �;� ._��t�I'� . � Wy � v t: i: { ':,i� , ^ # ts� � i � �' � , ` 1\ -e� �` 'e�' •��•,.i*' i:.��i�:JEiXa i� 4. A F ( � � : �; �;, I� . � -. � J N���j �.3 €��1C3� �. � � . ,a � f �,e on� x r �... �.R t� . . .. . � - ..� , a ;� � . . � N ' ��----- ±� F � - . I ��- . � . • E �� �£ � �� _, l+— My g� � n i�, � ,. r o s . _��._ .. _. . � f , . ��. �' g�.wF . � ..�,,. -- — �1F� t • _ � ! . ` ' __„�.. t' �' ' " _— • _dw.. ` . :.. .,..-, ' . . : .. '.. �' -Y._ . . �. -,; 5 � . . i --.: -- - -= ��.'� � — . r � �: �, — -- '�, t. — . _ �. . ._ ' '�r: - - � � � .. ,.�,; ..�+ � �p . --� . _ f. � _ ' ' �:i� e� 9 � 4 � _ . � +r 5 1 . . .. � , . � s _ �� • ' �, .y,:,,`,P P}�t ,Y.- � �c .�.� '': . _� ?� _� ... , ,�+ t �, -� f �""' _� �-- '*t _,� � '"$ � � �{� pi' I ��� _ i E � .�w. - y_ , � � �t�, -.�� ` "" � � kl—.it _ � �„��«�, t� afi.� � , _� �' '���• � � ,. � , �._�.� ..� �:*a� -a�■s��.�z , , � � F __ ..� �.....,., +„�,�- -_ .�, .� -, . � � � ' a' 9��, , ';., .� � � =— � . � 5� � � � t. � �,� � �t ��Y� _ . �. � � . �t ,�� '�` . y ��i �-.. � '� � i � � .. .i�.' , I "`�4 � i "' k, I ,,�,Y � 4 s � � '� � " ' � � I +, ' .� �`t � y$ ��" 7 � 5.,� .„�, ���-'> � _ + t� � i� `;; • _ �� . , � � �ei; .. � � . . . .- . -..A. . itn�" . ' .- '�se . � :_ r� �� �"`.al�' �F . ' - :. _ • �� �`� �� : � �` � � � �, .r.+ � �, � w _ �. ; , _... . ... - P .. �.'+�. ' , . �'.�1� r�'��.�'." �u . .t� � i, � i , . r ,;„;�.y. w i �i. � _ � ' � �.,.. ,. '_�,�"''"'� � � � � + * � r� ... s. � e..v� ._ . _, _ _ _ n �I � 9 . _ " "..�.,_._ � a, „ R , � 1 �' � - s� .dt.�.. �r . ,�..r°.-' _ , ... .. NORTHWESTERN COLLEGE May 2, 2012 Mayor David Grant Cauncil Member Brenda Holden Councif Member Fran Holmes Council Member Nichofas Tamble Council Member Ed Wemer City of Arden Mills 1245 W Highway 96 Arden Hills, MN 55112 R�: Land Use Application Arden Hall Dear Mayar and Council Members: As you aware, Northwesiern College had a very positive experienc� for several years in the recent past with the City of Arden Hilfs and TAT Properties related fo the use of the facility cammon{y referred ta as Arden Ha{l. It is my understanding the Rob Davidson and TAT Properties are currently working with the City to bring about a creative new use for this property; a use that wi11 benefit a broad cross-section of stakeholders including the awners, local businesses, potential renters, and the City by way of the redevelopment and creative adaptive re-use of an aged, existing structure. eonverfing Arden Hall into market rate apartments will continue fhe previous success enjoyed by alf when Northwestem College was leasing the facility - residents paying rent, residents buying goods and services in the cammunity, local employment oppartunities for residents and businesses thus providing the building awners the opportunity ta upgrade and maintain a key piece of real esta#e in the community. It would seem apparent that the community would benefit from residential alternatives that will satisfy the housing needs of our and Bethel's students who desire to live off campus as welf as other young professianafs who are beginning their careers. A newly reconfigured Arden Hall will satisfy that demand. Based upon my first hand experience with the owners of Arden Hall, I would not hesitate to recommend the residential faciliiy they have pianned.ta our off-campus, commuter sfudents. Therefore, l encourage you to support, by your positive vote, TAT Properties application to convert #he former Holiday !nn into a 120 unit apartment building as well as subdivide fhe property into two parcels. Si cerefy, � _ ��`�-- Dou s R. Schroeder VP r Business/Chief Financial OfFcer Northwestem Colteg� CC: Mr. Rob Davidson, TAT Properties 3003 SNEI.LINC AVENUE NORTH � ST. PAUI, MN 551 7 3-1 598 � 800-692-4d2D � 65i-631-5700 � NWGEDU � �� d �=� ���-� F�.� ��� ��S & �t��� May 8, 2012 Mayor David Grant City of Arden Hilis 1245 Vil Highway J� Arden Hills, MN 55112 RE: Arden Hall Redevelopment Dear Mayar Grant: My company, Now Bikes and Fitness, has operated in Arden Hills for the past 15 years. Currently my business is located in Shannon Square, tucked in the comer of the development with very limited visibitity. Now Bikes must relocate to a much more visible location. I have entered into an agreement with The Davidson Companies to lease approximately 9,000 square feet of space in the praposed redevelopment of the former Holiday lnn (former banquet areaj. Now Bikes would benefit tremendausfy by the increased visibility as well as being part of the proposed mixed use development. I would appreciate your vote in favor of Mr. Davidson's pr.oposed markef rate apartment/mixed use development/lof split. Now Bikes is extremely excited about the Arden Hall redevelopment projecf and fooks forward to being a part af this project as well as remaining in the Arden Hills community. Now Bikes & Fitness 3673 Lexington Ave No, Arden Hills, MN 55 I 26 Phone: (651) 49Q-7709 Fax: �b51 J 490-7580 Email: pah t 9@aol.com President Now Bikes and Fitness