HomeMy WebLinkAbout2A, City Hall Council Chamber Gates EN HILLS
Request for Council Action
i
2A
Prepared By: Dave Scherbel, Building Official Work Session Date: May 7, 2012
City Hall Council Chamber Gates
Budgeted Amount: Actual Amount: Funding Source:
N/A From $3,661 to $5,985 Equipment, Building &
Replacement Capital Fund
Discussion Topic:
Direction on how to proceed regarding installing gates.
Supporting Documents:
1. Memorandum dated May 7,2012, from Dave Scherbel, Building Official.
2. Quotes from Commercial Fixtures, Inc.,North Metro Millwork, Inc., and Steven Cabinets.
ItIM.-
A . EN HILLS
MEMORANDUM
DATE: May 7, 2012
TO: Mayor and City Council
Patrick Klaers, City Administrator
Jill Hutmacher, Community Development Director
FROM: Dave Scherbel, Building Official
SUBJECT: City Hall Council Chamber Gates
Background
I have obtained quotes for installing a gate at the west end of the staff desk and between the staff
and Council Chamber desk. Staff has received three quotes. Staff requested a price for two
gates that match the existing desk fronts and as an alternate converting the gate between the
Council Chamber and staff desk to another work station/desk for the recording secretary. The
work station area will also have the bullet-proof material installed on the underside of the desk
and counter.
The quotes are as follows:
Cabinet Maker 2 Gates Convert Gate to Desk Total
Commercial Fixtures $5,724.00 Add $261 $5,985.00
North Metro Millwork $4,714.00 Add $327 $5,041.00
Steven Cabinets $3,661.00 Add $733 $4,394.00
Attached are the proposals for the above quotes. The above chart includes sales tax of 7.125%
for all the quotes.
03/15/2012 07:31 651-628-9111 UIrtIYIGRC 1HL i u,i Vi\�� —
COMMERCIAL FLxTUREs, INC. Proposal
1730 Terrace Drive * Roseville, MN 55113 Proposal Number:
Phone (651) 628-9199 * Fax (651) 628-9111 3993-1
For: Proposal Date:
Mar 15, 2012
City of Arden Hills Good Thru
1450 West Highway 96 4/14/12
Arden Hills , MN 55112 Page: 1 of 1
Attention Customer Project Pavment Terms
Dave Scherbel City Council Chamber Net 30 Days
Phone Architect Date of Plans
Description Extension
(2) new gates at existing City Council Desk to match existing
desk finishes. Gates to be prefinished to match existing and
installed.
Subtotal. 5,343. 00
Alt. #1: Continue existing desk on north wall to meet with desk
on east wall matching design of existing desks.
Add: $244. 00
ALL ITEMS PROPERTY OF COMMERCIAL FIXTURES INC. UNTIL 100% PAID FOR.
All rrmtorial is guaranteed to be as specifled. At I work to be completed Ina workmanilke manner according to standard practices.Any alteration or deviation
from above specifications involving extra costs will be executed only upon written orders,and will become an extra charge over and above the estimate.All
agreements contingent upon strikes,accidents or delays beyond our control. Owner to carry fire,tornado and offer necessary insurance. Our workers are
fully covered by Workman's Compensation Insurance.
Signature '
i
Acceptance of Proposal-The prices,specifications and conditions are Subtotal 5,343. 00
satisfactory and are hereby accepted. You are authorized to do the work as Sales Tax 380 . 69
specified. Payment will be made according to the terms specified.
cce Lance Signature Total
1 p
Sc
AwlMumnl C
Woglwe.k
NORTH METRO MILLWORK,INC. Estimate
2025 Gateway Circle -
Suite 3 Date Estimate#
Centerville,MN 55038 4/12/2012 289
Office Number: 651-762-0142
Fax Number: 651-762-0143
E-mail: norihmetromillwork@hotmaii.com
Name/Address
CITY OF ARDEN HILLS
1245 WEST HIGHWAY 96
ARDEN HILLS,MN 55112
Terms 50%downpayment required before order
will be placed. Balance due upon delivery.
Description Qty Total
desk remodel and gate 4,705.00T
1.plain top $ 475.00
2.birch and cherry die wall $ 1190.00
3.gate and posts $ 1300.00
4.clear finishing $ 350.00
5.plain top supports $ 140.00
6.installed $ 1250.00
Subtotal $4,705.00
General Warranty-North Metro Millwork(NMM)warrants that its products are
manufactured and sold free from defects at the time of shipment. NMM will not be liable for Sales Tax (0.0%) $0.00
any damage done to our products due to improper handling or cleaning or if the product is
stored for extended periods without being propertly sealed and top coated. NMM will not Total
warrant any defects that could have been prevented by the customer,such as improper $4,705.00
surface prep for a product that is to be finished. This warranty is valid for one year from the
date of shipment
Balance Due
Phone#
651-762-0142
NORTH METRO MILLWORK, INC. Estimate
2025 Gateway Circle
Suite 3 Date Estimate#
Centerville, MN 55038 4/23/2012 290
Office Number: 651-762-0142
Fax Number: 651-762-0143
E-mail: northmetromillwork @hotmail.com
Name/Address
CITY OF ARDEN HILLS
1245 WEST HIGHWAY 96
ARDEN HILLS,MN 55112
Terms 50%downpayment required before order
will be placed. Balance due upon delivery.
Description Qty Total
deal;remodel with gates 4,400.00T
1. gate and post $ 1300,00
2.gate and die wall $1500.00
1.clear finishing 3 0,00
4,installiA $ 1250,00
Subtotal $4,400.00
General Warranty-North Metro Millwork(NMM)warrants that its products are
manufactured and sold free from defects at the time of shipment. NMM will not be liable for Sales Tax (0.0%) $0.00
any damage done to our products due to improper handling or cleaning or if the product is
stored for extended periods without being propertly sealed and top coated. NMM will not Total
warrant any defects that could have been prevented by the customer,such as improper $4,400.00
surface prep for a product that is to be finished. This warranty is valid for one year from the
date of shipment
Balance Due
Phone#
651-762-0142
2211 East Hennepin Ave. Proposal
Minneapolis,MN 55413
Date Estimate#
612-378-1812 Phone 4/12/2012 2621
612-378-0026 Fax
Name/Address Ship To
City of Arden Hills
1245 West Highway 96
Arden Hills,MN 55112
W/O or Job# P.O No. Rep Terms
DU 1/2 Down,Bal on Completion
Description Qty Cost Ea. Total
Re:Projects in Council Chambers
Construct;finish and install 2 swing gates as per discussion on 4-11-2012.Matching P.Lam top caps; 3,417.12 3,417.12
birch and cherry panels.Each gate to have safety latches.
Cost to change center gate to front wall with a P.Lam work counter behind. Install your bullet proof 684.50 _684.50
material to wall and under side of top.
Thank you,
David
Please sign and return proposal with a check for 1/2 down deposit S u btotal $4,101.62
Signed and Sales Tax (7.125%) $0.00
Approved: Date:
Total $4,101.62