Loading...
HomeMy WebLinkAbout9A, 2012 Street-Trail Maintenance Summary.�� EN HILLS Request for Council Action _ __ __ _ __ _ Prepared By: Terry Maurer, Public Works Director Council Meeting Date: October 8, 2012 2012 Street/Trail Maintenance Summary Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Recommendation: Informational only. No action required. Supporting Documents: 1. Memorandum dated October 8, 2012, from Terry Maurer, Public Works Director. 2. Exhibit of maintenance activities. � EN HILLS MEMORANDUM DATE: TO: FROM: SUBJECT: October 8, 2012 Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator Terry Maurer, Public Works Director ,/� 2012 Street/Trail Maintenance Summary Background The 2012 CIP had two maintenance items included in it. There was a$50,000 item for maintenance of trails and a$215,000 item (a combination oi the 2011 and 2012 street maintenance items) for maintenance of streets. These two items were spent on a variety of maintenance activities and this memo is intended to provide a summary of these activities now that all work has been completed and the final costs have been determined. The trail maintenance monies were spent on three activities: applying Trial-Mat coating, trimming of trees along a trail corridor to provide access for equipment and to eliminate damage to adjacent vegetation, and crack filling trails in anticipation of future years trail coating. The street maintenance monies were spent on four activities: seal coating, crack filling, Trail-Mat application to delaminated areas prior to seal coating, and bituminous mill and patch of large areas. The attached map shows graphically where the various maintenance activities were applied and approximately what percentage of the total bituminous trail and street systems were positively affected by these activities. The following tables provide for both the trail and street maintenance activities, the cost of each treatment, approximate miles of the system impacted, and the approximate percentage of the total system treated. Ciry Council Meeting C:\Users\sonja.klingberg\Desktop\10-8-12Street-TrailMaintenanceSummary.doc Page 1 of 2 Trail Maintenance Activities Activi Trail-Mat Tree Trimming Crack Filling Final Cost $32,999.00 3,566.63 2,169.00 Miles Treated 2.49 1.09 .45 Total Spent $38,734.63 CIP Budget �50,000.00 Budget Unspent $11,265.37 Activi Street Maintenance Activities Final Cost Miles Treated Seal Coating $103,066.26 Crack Filling 41,527.03 Trail-Mat Patch 2,500.00 Bituminous Mill/Patch 62,687.35 Total Spent $209,780.64 CIP Budget 215,000.00 $ 5,219.36 Council Action Repuested Information on1y, no Council action needed. 5.20 12.00 NA 1.02 % of Svstem Treated 26% 11% 5% % of Svstem Treated 18% 42% NA 6% City Council Meetin� P:�Admin\Council�Agendas & Packet Information�2012\10-08-12 Reg Mtg\Packet\10-8-12Street- TrailMaintenanceSummary. doc Page 2 of 2 0 0.125 0.25 0.5 0.75 1 Miles 2012 Roadway Pathway Projects Completed � EN HILLS � �►\1/— ``y, . Legend — 2012 Trail Mat 2.5 Miles (26% of System) � 2012 Seal Coat 5.2 Miles (18% of System) 2012 Trail Crack Seal 0.45 Miles (5% of System) � 2012 Crack Seal 12 Miles (42% of System) 2012 Bit Mill & Patch 1.6 Miles (6% of System) Prepared by: =a�� „ �a��� aPo,a, ,,,� .e.rtme�� ,m�=ma �o��,�. it of Arden Hills En ineerin De artment P o Y 9 9 P _,,.._._._.._...._�.. ..Ma ,.,,__ �_. �r,...._._. �..,o.e.���eF��._�.,�...�... _�_ . _ _ _ .__.