HomeMy WebLinkAbout2B, 2013 Fee Schedule 'I't
WIZEN HILLS
Request for Council Action 2B
Prepared By: Amy Died, Deputy Clerk Work Session Date: October 15,2012
2013 Fee Schedule
Discussion Topic:
Review the proposed 2013 Fee Schedule.
Supporting Documents:
1. Memorandum from Amy Died, Deputy Clerk, dated October 15, 2012.
2. Draft Ordinance 2012-XXX.
EN HILLS
MEMORANDUM
DATE: October 15, 2012
TO: Honorable Mayor and City Council Members
Patrick Klaers, City Administrator
FROM: Amy Died, Deputy Clerk
SUBJECT: 2013 Fee Schedule
Background
The City Council annually establishes a fee schedule for administrative, building
construction, liquor licensing, copying of maps and ordinances, park and recreation
facility usage, planning and zoning, utilities, business licenses, false alarms, utility fees,
and other miscellaneous permits and penalties that are enforced by the City.
Staff has reviewed the fee schedule and is recommending a few minor changes. The
changes are noted in red bold print on the attached 2013 Fee Schedule. A brief
explanation of the reason for the changes is provided below.
It should be noted that the majority of last year's Fee Schedule discussion included
adjustments that were made to Park and Recreation fees.
Building Construction Fees (pages 1 &2)
The updates found under Building Construction simply note that 2011 State Statute
326B.153 will be followed by the City's Building Official for fee determination. As
such, it is being added as a separate attachment to the Fee Schedule. Further, electrical
permit fees are set by the City's electrical inspector. A copy of his fee sheet is also
included as an attachment to the Fee Schedule.
Utility Hookup Charges (page 6)
The water meter/spacer charges for 3/4"x 7 '/2"and 1"meters were increased slightly due
to the increase in the price of materials.
Due to the fact that no one requests the 3/4"x 9" size water meter/spacer, it is being
removed from the Fee Schedule.
The Sewer Access Charge is set by the Met Council, and it is a fee that they increased.
Miscellaneous/Retail Activities (page 8)
The Tobacco Sales License fee is a proposed increase of$100 to cover participation fees
in the North Suburban Tobacco Compliance Check Project, for compliance check
enforcement twice per year. The overall proposed $300 Tobacco Sales License fee also
includes the cost of the background investigation fee as well as administrative costs.
A Recreational Outdoor Archery Range License was added to the 2013 Fee Schedule to
accommodate for the Special Conditional Use Permit that was issued to North Heights
Lutheran Church at the June 11, 2012, City Council meeting. An initial fee of$200 was
agreed upon with a renewal fee of$50 annually.
Recycling Fees page 10)
The recycling fees went up slightly to accommodate for the increase in fees per the
recycling contract.
Utility Rates
The utility rates and charges (i.e. SAC/WAC fees) will be discussed at the November
work session with the utility rate study.
Requested Action
Staff would like Council feedback on the proposed 2013 Fee Schedule.
'T�
!,41�EN HILL,
BLACKLINED VERSION
City of Arden Hills
Ordinance 2012-XXX — Appendix A
2013 Fee Schedule
I. Administrative
Dogs/Cats—Licenses Two years(Pro-rated for second $25.00
year @$12.50)
Dogs/Cats—Duplicate Tags Each $6.00
Dogs/Cats—Boarding $18.00 per day
Dogs/Cats—Impoundment Fee $42.00
Dogs/Cats—Surrender Fee Each $24.00
Dogs/Cats—Residential Kennel Annual $20.00
License
Dogs/Cats—Dangerous Dog Fee Annual $60.00
Copying—Minutes,City Council Annual $66.00
Meetings
Copying—Minutes,Planning Annual $53.00
Commission Meetings
Copying—Agendas,City Annual $13.00
Council Meetings
Copying—Agendas,Planning Annual $6.50
Commission Meetings
Copying—Agenda Packets,City Annual Cost based on per sheet, staff
Council Meetings labor, and postage
Copying—Agenda Packets, Annual Cost based on per sheet, staff
Planning Commission _ labor, and postage
Copying—General Any Size $0.25 per side
Assessment Search $50.00 per half hour
II. Building Construction
Building Permits—Permit Fee Fees shall be based according to
the 24S 2011 State Statute
326B.153 and are determined by
the City's Building Official
Building Permits—Plan Review 65% of Building Permit Fee
Fee
.................. .
Building Permits—Re-inspection $38.00
Building Permits—Manufactured $52.00+$5.00 State Surcharge
Home Location, Swimming
Pools,and Demolition
Building Permits—Special 100%of Permit Fee
Investigations
Page 1 of 10
State Surcharge—based on
7' Valtle Of:
valuation fee based on
2011 State Statute 326B.148
State Surcharge—Fixed Fees $5.00
Plumbing Permits Minimum $38.00
Fee
Plumbing Permits—Residential 1.25% of Project Value
Plumbing Permits—Non- 1.25%of Project Value+ $50.00
Residential
Electrical Permits—Minimum $35.00
Fee
Electrical Permits—Maximum $150.00
Single Family Dwelling Fee
Electrical Permits—General See Exhibit"A" attached to fee
schedule
.. ................ .........
Mechanical Permits—Minimum $38.00
Fee
Mechanical Permits—Residential 2%of Project Value
....................
Mechanical Permits—Non- 1.25%of Project Value+$50.00
Residential
Fire Protection Permits—Permit Fees shall be based according to
Fee the 2444 2011 State Statute
326B.153 and are determined by
the City's Buildin Official
Fire Protection Permits—Plan 65%of Permit Fee
Review Fee
Fire Protection Permits—Re- $38.00
inspection
M. Liquor Licensing
On-sale 1,999 square feet(SF)or less $3,300.00
On-sale 2,000(SF)—2,999(SF) $4,400.00
On-sale 3,000(SF)—3,999(SF) $5,500.00
On-sale 4,000(SF)or more $6,600.00
On-sale, Sunday $200.00
Off-sale $200.00
Club Fee $300.00
On Malt Beverage $120.00
Off-sale,Malt Beverage $40.00
On-sale,Wine $2,000.00(or half of on-sale
license fee,whichever is less)
Strong Beer No Charge(as part of On-Sale
Wine License)
Investigation Fee $150.00
First Violation $100.00
Minor Consumption Violation Second Violation $500.00
with Server Training Third Violation $1,000.00
Fourth Violation $1,500.00
Minor Consumption Violation I First Violation $500.00
Page 2 of 10
without Server Training Second Violation $1,000.00
Third Violation _ $1,500.00
Fourth Violation $2,000.00 and may be subject to
license revocation
IV. Maps and Ordinances
Zoning Ordinance $0.25 per side
Municipal Code
Comprehensive Plan
Color Maps(8.5 x 11) $2.00
Color Maps(11 x 17) $4.00
Street Maps $2.00
As-Builts(11 x 17) Based on number of copies and
staff time
V. Parks &Recreation
Youth Athletic Association Field Per four hour time block $7.50 per time block
Rental +applicable tax
Adult Club/Intramural Field Per two hour time block $20.00 per time block
Rental +applicable tax
Ball Field Rental,Unlighted Per four hour time block. $32.00 per time block
Tournament fees are extra. +applicable tax
Ball Field Rental,Lighted Per four hour time block. $80.00 per time block
Tournament fees are extra. + applicable tax
Ball Field Tournament Fee Includes all day maintenance $500.00 per day+$100.00
(Adult),Full Maintenance staff on site damage deposit+applicable tax
Ball Field Tournament Fee Includes prep for fields and $300.00 per day+$100.00
(Adult),Minimum Maintenance midday drag of fields damage deposit+applicable tax
Warming House Rental/Ice Rink Only allowed during non-public $25.00 per hour+
Rental use hours $100.00 damage deposit
+applicable tax
Picnic Shelters,Resident Includes up to three picnic tables $35.00 per day+applicable tax
Picnic Shelters-Non-Resident Includes up to three picnic tables $50.00 per day+applicable tax
Picnic Shelters- Includes up to three picnic tables $10.00 per day
Resident Non-Profit _
Picnic Shelters- Includes up to three picnic tables $35.00 per day
Other Non-Profit
Picnic Pavilions-Resident Includes up to five picnic tables $50.00 per day+$100.00
damage deposit+$50.00 key
deposit+applicable tax
Picnic Pavilions-Non-Resident Includes up to five picnic tables $75.00 per day+$100.00
damage deposit+$50.00 key
deposit+applicable tax
Picnic Pavilions- Includes up to five picnic tables $25.00 per day+$100.00
Resident Non-Profit damage deposit& $50.00 key
deposit.
Picnic Pavilions- Includes up to five picnic tables $60.00 per day+$100.00
Other Non-Profit damage deposit& $50.00 key
deposit
Additional Picnic Tables L For every two extra tables $5.00+applicable tax
Page 3 of 10
Community Garden Plot—One Annual $32.00+applicable tax
Plot
Community Garden Plot— Annual $16.00 +applicable tax
Second Plot
Room Rental—City Hall, Per Day(Scheduling a room after Daytime usage:No charge
Community Room regular hours is contingent upon Army National Guard:No charge
the presence of a city employee; City Government:No charge
In the event staff is not available, Resident,Non-profit: $60.00
the City reserves the right to Resident,For-profit: $70.00
deny application). Non-Resident,Non-profit:
$100.00
Non-Resident,For-profit:
$130.00
(+applicable tax)
Room Rental—City Hall, Small Per Day(Scheduling a room after Daytime usage:No charge
Conference Room regular hours is contingent upon Army National Guard:No charge
the presence of a city employee; City Government:No charge
In the event staff is not available, Resident,Non-profit: $25.00
the City reserves the right to Resident,For-profit: $30.00
deny application). Non-Resident,Non-profit:
$40.00
Non-Resident,For-profit: $50.00
(+applicable tax)
Room Rental—Damage Deposit Required $100.00
Equipment Rental—DVD,VCR, $10.00 +applicable tax
T.V. I
Vl. Planning and Zoning(Each separate land use request shall be charged a separate fee even if
submitted on the same application. In addition to the application fee, all planning cases are subject to a
minimum escrow fee to cover any consulting costs the City may incur. Additional charges may apply if
the consulting costs exceed the escrow amount. The escrow may be waived,reduced, or increased by the
City Planner on a project by project basis.)
Description Escrow Fees Initial Application Fees
Preliminary Plat Administrative Fee $600.00+$25.00 per lot
Escrow $1,500.00
Final Plat Administrative Fee $500.00+$25.00 per lot
Escrow No charge
Lot Split/Minor Subdivision Administrative Fee $450.00
Escrow $1,000.00
Rezoning Administrative Fee $600.00
Escrow $1,000.00
Comprehensive Plan Amendment Administrative Fee $850.00
Escrow $1,000.00
Variance Administrative Fee $300.00
Escrow $600.00
Conditional Use Permit or Administrative Fee $600.00; $300.00 for Home
Amendment Occupation or if no Site Plan
Review is required
Escrow $600.00
Interim Use Permit or Administrative Fee $600.00; $300.00 if no Site Plan
Amendment Review is required
Page 4 of 10
Escrow $700.00
Planned Unit Development Administrative Fee $600.00
Master Plan Escrow $2,000.00
Final Planned Unit Development Administrative Fee $300.00
Escrow $600.00
Planned Unit Development Administrative Fee $600.00; $300.00 if no Site Plan
Amendment Review is required
Escrow $2,000.00
Planned Unit Development Administrative Fee $300.00
Concept Review Escrow No Charge
Vacation of Easement Administrative Fee $400.00
Escrow $600.00
Site Plan Review Administrative Fee $300.00
Escrow $600.00
City Code Amendment Administrative Fee $600.00
Escrow $1,000.00
Zoning Code Amendment Administrative Fee $600.00
Escrow $1,000.00
Zoning Letter Per half hour $50.00+$50.00 per half hour
after one hour of staff research
time
Land Use Requests—Not Administrative Fee(Escrow may $200.00
Already Specified also apply)
Zoning Permit—New Fence $50.00 for first 100 lineal feet+
Construction or Expansion $10.00 each additional 100 lineal
feet,or fraction thereof
Zoning Permit—New Driveway $50.00 for first 1,000 square feet
Construction or Expansion +$10.00 each additional 1,000
square feet,or fraction thereof
Recreational Vehicle Parking 7 Day Permit,renewable once $10.00
Permit per 12 months
Home Occupation I Permit No charge
Home Occupation II Permit Consulting fees and $350.00
administrative escrow
Right-of-Way Permit Per Excavation $175.00
Grading&Erosion Control Fees Administrative Fee $150.00
Escrow $3,500/acre
Appeal of Administrative Cost of staff time to prepare $100.00
Zoning, Sign, or Subdivision appeal information
Decisions
VII. Utility Hookup Charges
Water Permits—Service Per inspection $38.00
Installation/Repairs/Alteration
Water Permits—Interior $38.00
Plumbing,New Home
Water Turn On/Off,Temporary $38.00
Water Permanent Disconnect $205.00
Page 5 of 10
Curb Box and Service Lead, 1" $155.00
Service Connection on
Unsurfaced Street
Restoration of Typical Road Mix $100.00
Street
Restoration of Higher-Type Set by Engineer
Street
Larger than 1" Service Set by Inspector
Connection
Water Permits—Plan Check Fee Set by Inspector
Water Permits—Re-inspection $38.00
Water Meter/Spacer Charges— Fee includes removal of meter, $130.00
Customer Requested Water bench test at maintenance
Meter Accuracy Test facility, and returning meter to
residence;Fee will not be applied
if the meter is found to be
inaccurate to a degree exceeding
three percent(3%)from the
result of the bench test
Water Meter/Spacer Charges— $350-00 390.00
3/4"3/4"x 7 1/2"Meter
.,«Ado+e«lC...t Meter
!`L,..«...,s
3!^ —Mete:
Water Meter/Spacer Charges— $430.00—$480.00
1"Meter
Water Meter/Spacer Charges— Contact Public Works for Quote
Greater than 1"
Water Connection Fee— $800.00 per acre or portion
Connection fee for previously thereof
un-served or expanded lots
Water Availability Fee— The units are based on the $500.00 per unit
New or Additional Connections Metropolitan Council's formula
for calculating new sewer
availability charge(SAC)units
Sewer Connection Fee— $800.00 per acre or portion
Connection fee for previously thereof
un-served or expanded lots
Sewer Availability Fee— The units are based on the $500.00 per unit
New or Additional Connections Metropolitan Council's formula
for calculating new sewer
availability charge(SAC)units
Sewer Permits— Service Per inspection $38.00
Installation/Alternations/Repairs
Sewer Permits—Plan Review Set by Inspector
Fee _
Sewer Permits—Reinspections $3 8.00 per hour
Sewer Access Charge Set by Met Council Annually $2,365.00$2,435.00
Sanitary Sewer Utility Prohibited $100.00 per month
Sump Pump Connection
Surcharge
Page 6 of 10
VIII. Miscellaneous/Retail Activities
3/4" Hydrant Meter Rental No monthly fee if returned within $10.00 for permit+$100.00
7 days deposit+$25.00 per month
rental+water usage+$5.00 state
surcharge
3"Hydrant Meter Rental No monthly fee if returned within $10.00 for permit+ $1,200
7 days deposit+ $25.00 per month
rental +water usage+$5.00 state
surcharge
Boutique/Garage Sale Application/notification of City No charge
Hall required
Casual Roadside Stands Application/notification of City No charge
Hall required
Tent Permit $50.00+State Surcharge
Sidewalk Sales $50.00
Business Licensing— Includes arcade,dance hall, $100.00
Amusement Facilities movie theater,pool/billiard
tables,bowling alleys, indoor
tennis, skating facility,outdoor
tennis, driving ranges,etc.
Business Licensing—Wholesale Liability insurance required $200.00
Bulk Fuel Stora e
Business Licensing— $6.00 per room
Hotel/Motel
Business Licensing—Courtesy $25.00
Bench,Non-advertising
Business Licensing—Courtesy $75.00
Bench,Advertising
Business Licensing— Includes musical devices, $15.00 per location+$15.00 per
Mechanical/Electronic Devices amusement rides,bowling alleys, machine
etc.
Business Licensing—Retail Sales Includes antique shops, $50.00
beauty/barber shops,boat
dealers, Christmas tree sales,dry
cleaning, laundry,bakery, candy,
meats,wholesale foods,caterers,
motor vehicle sales,optometrist,
mortuary,video sales/rentals,
over-the-counter tobacco sales,
vending machines(excluding
tobacco),&other retail goods not
listed
Business Licensing— $20.00 per 1,000 square feet, or
Restaurants, Cafes,Coffee fraction thereof
Houses,etc.
Business Licensing— $300.00
Restaurants,Drive-Thru _
Business Licensing—Service $100.00
Stations
Page 7 of 10
Business Licensing—Grocery $20.00 per 1,000 square feet,or
fraction thereof
Charitable Gambling Permit— Includes investigation fee $150.00
Per Minnesota State Statute,
Chapter 349
Tobacco Sales License Includes investigation fee $200.)8 300.00
Fireworks Sales As part of existin g business $100.00
Fireworks Sales Exclusive Business _ $350.00
Massage Therapist Annual Fee, Includes $50.00
investigation fee
Massage Therapist Establishment Annual Fee, Includes $150.00
investigation fee
Recreational Outdoor Archery $200 first year
Range $50 annual renewal
Solicitors,Peddlers,Transient Please reference Section 340 of $150.00 background
Permit—For-Profit Organizations the Municipal Code for more investigation+$100.00 per
information month permit fee
Solicitors,Peddlers,Transient Please reference Section 340 of No charge
Permit—Non-Profit the Municipal Code for more
Organizations information
IX. Signs
Initial Fee Per Sin $50.00
Permanent Signs,Annual Per Sign, 100 square feet or less $20.00
Renewal (maximum allowable size)
Temporary Signs $50.00
Signs,Impoundment First Offense $25.00
Si s, Impoundment Second Offense $50.00
Signs, Impoundment Third Offense $100.00
X. Miscellaneous Fees/Permits
Rubbish Hauler Annual $150.00
Recycling Hauler Annual $150.00
Contractor License Annual $50.00
Miscellaneous Permit Fee For all other permits not listed $38.00
Staff Research $50.00 per half hour
Penalties for Late Payment Failure to pay any penalty 10%of license fee or$30.00,
imposed shall be grounds for the whichever is greater
suspension or termination of any
license issued by the City
Tobacco Sales,Illegal First Offense $100.00
Tobacco Sales,Illegal Second Offense within 12 $500.00
months
Tobacco Sales,Illegal Third Offense within 12 months $1,000.00 and 7 business day
suspension or 30 day suspension
of the license
Tobacco Sales,Illegal Fourth Offense within 12 months Revocation of the license for a
one year period
Page 8 of 10
Candidate Filing Fee $2.00
Insufficient Funds/Retu.med $30.00
Check Fee
Rental Registration Fee $40.00 per rental unit
Rental Registration Penalty Fee $80.00 per rental unit
Residential Contractor License $5.00
Check
Business Subsidy Application Required to reimburse City for $2,000.00+ $10,000.00 escrow
Fee full cost of review
Construction Activity Waiver Per Waiver Application $250.00
XI. False Alarm Fees
False Alarm First three alarms No charge+letter
False Alarm Four through fifteen alarms $50.00 per alarm
False Alarm Over fifteen alarms $150.00 per alarm
XH. Investigation Fees
Tobacco, Liquor,Charitable $150.00
Gambling, & Solicitor's Permits L
XIII. Utility Use Charges
Residential Water Per Quarter:
Base Charge $38.47
Over Base— 10,001 to 35,000 $3.28 per 1,000 gallons
gallons
Over Base—Greater than 35,000 $5.75 per 1,000 gallons
Gallons
Standby $7.21 per account
Water Test Fee set by MN State Health Dept $1.59
Residential Sanitary Sewer Per Quarter:
Base Charge $83.87
Over Base—Greater than 15,000 $4.83 per 1,000 gallons
Gallons
Residential Surface Water Per Quarter:
Residential(Senior&Non-
$10.19 per lot
Senior)
Residential—Townhomes $13.20 per unit
Apartment $83.11
Commercial Water Per Quarter:
Base Charge 3/4"Meter Size or Smaller $38.47 per quarter
Base Charge 1"Meter Size $70.33 per uarter
Base Charge 1.5"Meter Size $130.96 per quarter
Base Charge 2"Meter Size $201.22 per quarter
Base Charge 3"Meter Size $419.18 per quarter
Base Charge 4"Meter Size $620.40 per quarter
Base Charge 6"Meter Size $1,022.79 per quarter
Base Charge 8"Meter Size $2,045.61 per quarter
Page 9 of 10
Base Charge 10" Meter Size $2,900.73 per quarter_
Base Charge 12" Meter Size $4,107.99 per quarter
Over Base—10,001 —35,000
$3.28 per 1,000 gallons
gallons
Over Base—Greater than
(35,000)Gallons $5.75 per 1,000 gallons
Standby 0") $6.19
Standby (1.25") $10.38
Standby (1.5") $14.30
Standby (10") $548.67
Standby (12") _ $788.56
Standby (2") - $21.84
Standby (3") $49.29
Standby (4") — $87.90
Standby (6" $197.09
Standby (8") $350.77
Standby (Shared 6_.95) $23.50
Water Test Fee set by MN State Health Dept
Commercial Sanitary Sewer Per Quarter:
Commercial Usage $5.23 per 1,000 gallons
Mobile Home/Apartment $90.72 per unit
Commercial Surface Water Per Quarter:
Apartment $83.13
Industrial and/or Commercial $129.78 per acre
Undeveloped Land $15.27 per acre
XIV.Recycling Fee and Bins
Per Residential Parcel with Annual $4 0.65 $42.60
curbside recycling
Per Residential Parcel without Annual $1.70 $2.00
curbside recycling
Recycling Bin One bin provided free of charge $6.00 for each additional bin
to each household
Page 10 of 10
326B.153 BUILDING PERMIT FEES.
Subdivision 1. Building permits.
(a) Fees for building permits submitted as required in section 32613.106 include:
(1) the fee as set forth in the fee schedule in paragraph(b) or as adopted by a
municipality; and
(2) the surcharge required by section 32613.148.
(b) The total valuation and fee schedule is:
(1) $1 to $500, $29.50;
(2) $501 to $2,000, $28 for the first $500 plus $3.70 for each additional $100 or
fraction thereof, to and including $2,000;
(3) $2,001 to $25,000, $83.50 for the first $2,000 plus $16.55 for each additional
$1,000 or fraction thereof,to and including $25,000;
(4) $25,001 to $50,000, $464.15 for the first $25,000 plus $12 for each additional
$1,000 or fraction thereof, to and including $50,000;
(5) $50,001 to $100,000, $764.15 for the first $50,000 plus $8.45 for each additional
$1,000 or fraction thereof, to and including $100,000;
(6) $100,001 to $500,000, $1,186.65 for the first $100,000 plus $6.75 for each
additional $1,000 or fraction thereof,to and including $500,000;
(7) $500,001 to $1,000,000, $3,886.65 for the first $500,000 plus $5.50 for each
additional $1,000 or fraction thereof,to and including $1,000,000; and
(8) $1,000,001 and up, $6,636.65 for the first $1,000,000 plus $4.50 for each
additional $1,000 or fraction thereof.
(c) Other inspections and fees are:
(1) inspections outside of normal business hours (minimum charge two hours),
$63.25 per hour;
(2)reinspection fees, $63.25 per hour;
(3) inspections for which no fee is specifically indicated (minimum charge one-half
hour), $63.25 per hour; and
(4) additional plan review required by changes, additions, or revisions to approved
plans (minimum charge one-half hour), $63.25 per hour.
(d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than $63.25,
then the greater rate shall be paid. Hourly cost includes supervision, overhead,
equipment, hourly wages, and fringe benefits of the employees involved.
Subd. 2. Plan review. Fees for the review of building plans, specifications, and related
documents submitted as required by section 32613.106 must be paid based on 65 percent
of thebuilding permit fee required in subdivision 1.
Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including
public buildings and state licensed facilities as required by section 32613.148.
Subd. 4. Distribution.
(a) This subdivision establishes the fee distribution between the state and municipalities
contracting for plan review and inspection of public buildings and state licensed
facilities.
(b) If plan review and inspection services are provided by the state building official, all
fees for those services must be remitted to the state.
(c) If plan review services are provided by the state building official and inspection
services are provided by a contracting municipality:
(1) the state shall charge 75 percent of the plan review fee required by the state's fee
schedule in subdivision 2; and
(2)the municipality shall charge 25 percent of the plan review fee required by the
municipality's adopted fee schedule, for orientation to the plans, in addition to the
permit and other customary fees charged by the municipality.
(d) If plan review and inspection services are provided by the contracting municipality,
all fees for those services must be remitted to the municipality in accordance with
their adopted fee schedule.
Attachment A
Electrical Permit Fees
Fees are effective Jan is`,2010.
Check websites.
Electrical Inspector:
Pete Tokle of Tokle Inspections Inc.
Phone: 763.754.2983
Please contact between 7-8:30am, Monday through Friday only
Contractors
Homeowners Complete an application form. Include your complete address
Complete an application form(available at your City Hall). Be including zip code. Be sure to add in the State Surcharge of
sure to add in the State Surcharge of$0.50 0.50. Mail a co to the City.
All Services Circuits and Feeders
There is a$2 per circuit charge for replacing circuits that are The inspection fee for the installation,addition,alteration,or
disconnected in the old service panel and reconnected in the repair of each circuit,feeder,feeder tap,or set of transformer
new panel in the same location. secondary conductors:
0 to 300 amp $50 0 to 30 amp $8
-----------__.._
400 amp $58 31 to 100 amp $10
500 amp $72 101 to 200 amp $15
600 amp $86 300 amp $20
800 amp $114 400 amp ; $25
1000 amp $142 500 amp $30
1100 amp $156 600 amp $35
1200 amp $170 700 amp $40
Add$14 for each additional 100 amps. Add$5 for each additional 100 amps
-----------_----------------------------- — -
Minimum Fee: Minimum permit fee is$35 plus$0.50 state surcharge. This is for one inspection only.
Minimum fee for rough-in inspection and final is$70 plus$0.50 state surcharge.
Maximum Fee: Maximum fee for single family dwelling not over 200 amps is$150 plus$0.50 state surcharge.
Maximum of 2 rough-ins and one final inspection.
----------------------___-----_----- _----------------------—---—------__---_---------—-------______..-------p-_________-----___------____-----____—--------------
Apartment Buildings: Maximum fee per unit of an apartment or condominium complex is 70. This does not cover
service and house wiring. A separate permit must be issued for house wiring.
Swimming Pools: $35 per inspection +circuits
Traffic Signals: $7 per each standard
Street Lighting: $4 per each standard
Transformers/Generators: $8 per unit+.40 cents per KVA.30 cents for each KVA over 100KVA.
Retro Fit Lighting: $0.65 per fixture
Sign Transformer: $8
Remote Control/Signal Circuits: 75 cents per device.
Re-inspection Fee: $35
** The fee is doubled if the work starts before the permit is issued. **
City Hall Addresses:
City of Arden Hills, 1245 West Highway 96,Arden Hills MN 55112