Loading...
HomeMy WebLinkAbout7D, Motion to Approve Ordinance 2012-010 Adopting the 2013 Fee Schedule and Authorizing Publication of the Ordinance Summary ,`1ZEN HILLS Request for Council Action 7D Prepared By: Amy Dietl, Deputy Clerk Council Meeting Date: December 10, 2012 Motion to Approve Ordinance 2012-010 Adopting the 2013 Fee Schedule and Authorizing Publication of the Ordinance Summary Budgeted Amount: Actual Amount: Funding Source: NA NA NA Recommendation: Motion to approve Ordinance 2012-010 adopting the 2013 Fee Schedule and authorizing publication of the Ordinance Summary. Supporting Documents: 1. Memorandum Dated December 10, 2012, from Amy Dietl, Deputy Clerk. 2. Attachment A—2013 Fee Schedule(redlined version). 3. Attachment B - Ordinance 2012-010 and Appendix A—2013 Fee Schedule(final format). 4. Attachment C -Ordinance 2012-010 Publication Summary. �- IZEN�HILLS MEMORANDUM DATE: December 10, 2012 TO: Honorable Mayor and City Council Members Patrick Klaers, City Administrator FROM: Amy Died, Deputy Clerk SUBJECT: 2013 Fee Schedule Backl4round The City Council annually establishes a fee schedule for administrative, building construction, liquor licensing, copying of maps and ordinances, park and recreation facility usage, planning and zoning, utilities, business licenses, false alarms, utility fees, and other miscellaneous permits and penalties that are enforced by the City. The Council reviewed the proposed changes to the 2013 Fee Schedule at their October 15, 2012, Council work session. During that meeting, the consensus among the Council, in addition to the changes proposed by staff, was to raise fees by five percent to cover increased costs for providing services. The proposed changes discussed at the October 15, 2012, Council work session have been incorporated in the attached ordinance. At the time of the October 15, 2012, Council work session, the proposed changes to the 2013 Fee Schedule did not include any adjustments to the utility rates as those charges (i.e. water rates) were scheduled to be discussed at the November 19, 2012, Council work session. The Council did not reach a decision on what to do with water rates at the November 19, 2012, work session and the issue was continued to this December 10th City Council meeting. The FPAC met on December 4, 2012, and their recommendation on rates is to be considered at tonight's meeting prior to adopting the 2013 Fee Schedule and will determine whether or not additional amendments to the fee schedule are required. Requested Action Motion to approve Ordinance 2012-010 adopting the 2013 Fee Schedule and authorizing publication of the Ordinance Summary. Attachment A : 2013 Fee Schedule (redlined version) December 10, 2012—City Council Meeting City of Arden Hills -APPEN HILLS -AVEN HILLS REDLINED VERSION City of Arden Hills Ordinance 2012-XXX — Appendix A 2013 Fee Schedule I. Administrative Dogs/Cats-Licenses Two years(Pro-rated for second $ 5-99 26.00 year @$12.50) Dogs/Cats-Duplicate Tags Each $649__X6.50 Dogs/Cats-Boarding $4-�per day$19.00 Dogs/Cats-Impoundment Fee $4299-X44.00 Dogs/Cats-Surrender Fee Each $44.40- 25.00 Dogs/Cats-Residential Kennel Annual $24.99 $21.00 License Dogs/Cats-Dangerous Dog Fee Annual $64.44 163.00 Copying-Minutes, City Council Annual $6649 $69.00 Meetings Copying-Minutes, Planning Annual $-_`-3-99_L56.00 Commission Meetings Copying-Agendas, City Annual $43-99 $14.00 Council Meetings Copying-Agendas,Planning Annual $6-99 $7.00 Commission Meetings Copying-Agenda Packets, City Annual Cost based on per sheet, staff Council Meetings labor,and postage Copying-Agenda Packets, Annual Cost based on per sheet, staff Planning Commission labor,and postage Copying-General Any Size $0.25 per side I Assessment Search $39-99 per half hour 53.00 U. Building Construction Building Permits- Permit Fee Fees shall be based according to I the 244-9 2011 State Statute 32613.153 and are determined by the City's Building Official Building Permits-Plan Review 65%of Building Permit Fee Fee Building Permits-Re-inspection $35 99 40.00 Building Permits-Manufactured $42,90+$5.00 State Surcharge Home Location, Swimming $55.00 Pools,and Demolition Building Permits-Special 100%of Permit Fee Investigations _ Page 1 of 10 State Surcharge—based on .0095 PC-8i iopt VAII-ILA A4: valuation is gf@M@ fee based on 2011 State Statute 326B.148 State Surcharge—Fixed Fees $5.00 Plumbing Permits—Minimum $3&88 40.00 Fee j Plumbing Permits—Residential 1.25%of Project Value Plumbing Permits—Non- 1.25% of Project Value+$50.00 Residential Electrical Permits—Minimum $35.00 Fee Electrical Permits—Maximum $150.00 Single Family Dwelling Fee Electrical Permits—General See Exhibit"A"attached to fee schedule Mechanical Permits—Minimum $38. 9 40.00 Fee Mechanical Permits—Residential 2% of Project Value Mechanical Permits—Non- 1.25%of Project Value+ $50.00 Residential Fire Protection Permits—Permit Fees shall be based according to I Fee the 2948 2011 State Statute 326B.153 and are determined by the City's Building Official Fire Protection Permits—Plan 65%of Permit Fee Review Fee Fire Protection Permits—Re- $4"_$A0_-00 inspection III. Liquor Licensing On-sale 1,999 square feet(SF)or less $x;389-99 J1165.00 On-sale 2,000(SF)—2,999 (SF) _ $4,49949 4 620.00 On-sale 3,000(SF)—3,999 (SF) $4-,&4449 J5 J75.00 On-sale 4,000(SF)or more $ 99.00 6 930.00 On-sale, Sunday $299-98 210.00 Off-sale $�99-99 210.00 Club Fee $389-89 315.00 i On-sale,Malt Beverage $42490 $126.00 Off-sale,Malt Beverage $49 89 $42.00 On-sale,Wine $2,999-99 $2,1 00.00(or half of on-sale license fee,whichever is less) Strong Beer No Charge(as part of On-Sale Wine License) Investigation Fee $4-5&99 $158.00 First Violation $449-99 ILQ5.00 Minor Consumption Violation Second Violation 525.00 with Server Training Third Violation $4;999.99 $LL50.00 Fourth Violation $4- -99 1 575.00 Page 2 of 10 First Violation U00-94 ILZ5.00 Minor Consumption Violation Second Violation $4;999:99 $1.050.00 without Server Training Third Violation $41;599-99 ILL75.00 Fourth Violation $3;080-98 $2.100.00 and may be subject to license revocation IV. Maps and Ordinances Zoning Ordinance $0.25 per side Municipal Code Comprehensive Plan Color Maps (8.5 x 11) $2.00 Color Maps(11 x 17) $4.00 Street Maps $2.00 As-Builts(11 x 17) Based on number of copies and staff time V. Parks& Recreation Youth Athletic Association Field Per four hour time block $8.0058 per time block Rental +applicable tax I Adult Club/Intramural Field Per two hour time block $219.00 per time block Rental +applicable tax I Ball Field Rental,Unlighted Per four hour time block. $333.00 per time block Tournament fees are extra. +applicable tax I Ball Field Rental,Lighted Per four hour time block. $849.00 per time block Tournament fees are extra. +applicable tax Ball Field Tournament Fee Includes all day maintenance $52599.00 per day+$1059.00 (Adult),Full Maintenance staff on site ! damage deposit+applicable tax Ball Field Tournament Fee Includes prep for fields and $31500.00 per day+ $1050.00 (Adult),Minimum Maintenance midday drag of fields damage deposit+applicable tax Warming House Rental/Ice Rink Only allowed during non-public $265.00 per hour+ Rental use hours $1050.00 damage deposit +applicable tax Picnic Shelters,Resident Includes up to three picnic tables $375.00 per day+applicable tax Picnic Shelters-Non-Resident Includes up to three picnic tables $539.00 per day+applicable tax Picnic Shelters- Includes up to three picnic tables $110.00 per day Resident Non-Profit Picnic Shelters- Includes up to three picnic tables $375.00 per day Other Non-Profit I Picnic Pavilions-Resident Includes up to five picnic tables $530.00 per day+$1050.00 damage deposit+$530.00 key deposit+applicable tax Picnic Pavilions-Non-Resident Includes up to five picnic tables $795.00 per day+$1050.00 damage deposit+$530.00 key deposit+applicable tax IPicnic Pavilions- Includes up to five picnic tables $265.00 per day+$1059.00 Resident Non-Profit damage deposit& $539.00 key deposit IPicnic Pavilions- Includes up to five picnic tables $630.00 per day+$1059.00 Other Non-Profit damage deposit& $530.00 key deposit Page 3 of 10 Additional Picnic Tables For every two extra tables $5.00+applicable tax Community Garden Plot—One Annual $34—.2.00+applicable tax Plot _ Community Garden Plot— Annual $176.00 +applicable tax Second Plot Room Rental—City Hall, Per Day(Scheduling a room after Daytime usage:No charge Community Room regular hours is contingent upon Army National Guard:No charge the presence of a city employee; City Government:No charge In the event staff is not available, Resident,Non-profit: $638.00 the City reserves the right to Resident,For-profit: $748.00 deny application). Non-Resident,Non-profit: $1058.00 Non-Resident,For-profit: $1378.00 (+applicable tax) Room Rental—City Hall, Small Per Day(Scheduling a room after Daytime usage:No charge Conference Room regular hours is contingent upon Army National Guard:No charge the presence of a city employee; City Government:No charge I In the event staff is not available, Resident,Non-profit: $265.00 the City reserves the right to Resident,For-profit: $328.00 deny application). Non-Resident,Non-profit: $428.00 Non-Resident, For-profit: $538.00 (+applicable tax) _ Room Rental—Damage Deposit I Required $1058.00 Equipment Rental—DVD,VCR, $118.00+applicable tax T.V. VI. _Planning and Zoning(Each separate land use request shall be charged a separate fee even if submitted on the same application. In addition to the application fee, all planning cases are subject to a minimum escrow fee to cover any consulting costs the City may incur. Additional charges may apply if the consulting costs exceed the escrow amount. The escrow may be waived,reduced, or increased by the City Planner on a project by project basis.) Description Escrow Fees Initial Application Fees Preliminary Plat Administrative Fee $6380.00+ $265.00 per lot Escrow $1,57500-00 57588.00 Final Plat Administrative Fee $52588.00+$265.00 per lot _ Escrow No charge Lot Split/Minor Subdivision Administrative Fee_ $47358.00 Escrow $1,W00.00 Rezoning Administrative Fee $6380.00 Escrow $1,0580.00 Comprehensive Plan Amendment Administrative Fee $89358.00 Escrow _ $1,0580.00 Variance Administrative Fee $31588.00 Escrow $6380.00 Conditional Use Permit or Administrative Fee $6380.00; $31589.00 for Home Amendment Occupation or if no Site Plan Review is required Escrow $6380.00 Page 4 of 10 Interim Use Permit or Administrative Fee $6300.00; $31598.00 if no Site Amendment Plan Review is required Escrow $73500.00 Planned Unit Development Administrative Fee $63000.00 Master Plan Escrow $2,1800.00 Final Planned Unit Development Administrative Fee $31500.00 Escrow ( $6380.00 Planned Unit Development Administrative Fee I $6,00.00; $31508.00 if no Site Amendment Plan Review is required Escrow $2,1800.00 Planned Unit Development Administrative Fee $31500.00 Concept Review Escrow No Charge Vacation of Easement Administrative Fee $4200.00 Escrow $6380.00 Site Plan Review Administrative Fee $3' 500.00 Escrow $6 0.00 City Code Amendment Administrative Fee $6300.00 Escrow $1,0580.00 Zoning Code Amendment Administrative Fee $6390.00 Escrow $1,0580.00 Zoning Letter Per half hour $538.00+$538.00 per half hour after one hour of staff research time Land Use Requests—Not Administrative Fee(Escrow may $2100.00 Already Specified also apply) IZoning Permit—New Fence $538.00 for first 100 lineal feet+ Construction or Expansion $110.00 each additional 100 lineal feet, or fraction thereof IZoning Permit—New Driveway $530.00 for first 1,000 square Construction or Expansion feet+$110.00 each additional 1,000 square feet,or fraction thereof Recreational Vehicle Parking 7 Day Permit,renewable once $118.00 Permit per 12 months Home Occupation I Permit No charge Home Occupation II Permit Consulting fees and $36839.00 administrative escrow Right-of-Way Permit Per Excavation $18474.00 Grading&Erosion Control Fees Administrative Fee $1580.00 Escrow $3,675388/acre Appeal of Administrative Cost of staff time to prepare $1050.00 Zoning, Sign, or Subdivision appeal information Decisions VII. Utility Hookup Charges Water Permits—Service Per inspection $403.8.00 Installation/Repairs/Alteration Water Permits—Interior $403$.00 Plumbing,New Home Water Turn On/Off,Temporary $403-9.00 Page 5 of 10 IWater Permanent Disconnect $2185.00 Curb Box and Service Lead, 1" $16-55.00 Service Connection on Unsurfaced Street l Restoration of Typical Road Mix $1058.00 Street Restoration of Higher-Type Set by Engineer Street Larger than 1" Service Set by Inspector Connection Water Permits—Plan Check Fee Set by Inspector Water Permits—Re-inspection $4038.00 Water Meter/Spacer Charges— Fee includes removal of meter, Customer Requested Water bench test at maintenance $140—Residential Meter Accuracy Test facility,and returning meter to $160 -Commercial residence;Fee will not be applied if the meter is found to be inaccurate to a degree exceeding three percent(3%)from the result of the bench test .... ....... Water Meter/Spacer Charges— $390.00 3/4"x 7 1/2"Meter Water Meter/Spacer Charges— Contact Public Works for Quote 3/4"x 9"Meter Water Meter/Spacer Charges— $480.00 1"Meter Water Meter/Spacer Charges— Contact Public Works for Quote Greater than 1" Water Connection Fee— $8400.00 per acre or portion Connection fee for previously thereof un-served or expanded lots Water Availability Fee— The units are based on the $52500.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availability charge(SAC)units I Sewer Connection Fee— $8480.00 per acre or portion Connection fee for previously thereof un-served or expanded lots _ Sewer Availability Fee— The units are based on the $52500.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availability charge(SAC)units Sewer Permits— Service Per inspection $403.8.00 Installation/Alternations/Repairs Sewer Permits—Plan Review Set by Inspector Fee Sewer Permits—Reins ections $4038.00 er hour Sewer Access Charge Set by Met Council Annually $2,435.00 Page 6of10 Sanitary Sewer Utility Prohibited $100.00 per month Sump Pump Connection Surcharge VIII. Miscellaneous/Retail Activities 3/4" Hydrant Meter Rental No monthly fee if returned within $24-0.00 for permit+$100.00 7 days deposit+$30 .00 per month rental+water usage+$5.00 state surcharge i 3"Hydrant Meter Rental No monthly fee if returned within $2-0.00 for permit+$1,200 7 days deposit+ $30 .00 per month rental+water usage+$5.00 state surcharge Boutique/Garage Sale Application/notification of City No charge Hall required Casual Roadside Stands Application/notification of City No charge Hall required Tent Permit $553.00+State Surcharge Sidewalk Sales $538.00 Business Licensing— Includes arcade,dance hall, $1058.00 Amusement Facilities movie theater,poolibilliard tables,bowling alleys, indoor tennis, skating facility, outdoor tennis, driving ranges,etc. Business Licensing—Wholesale Liability insurance required $2100.00 Bulk Fuel Storage _ Business Licensing— $6.500 per room Hotel/Motel Business Licensing—Courtesy $26-5.00 Bench,Non-advertising Business Licensing—Courtesy $79-S.00 Bench, Advertising Business Licensing— Includes musical devices, $16-5.00 per location+ $16-5.00 Mechanical/Electronic Devices amusement rides,bowling alleys, per machine etc. Business Licensing—Retail Sales Includes antique shops, $530.00 beauty/barber shops,boat dealers, Christmas tree sales,dry cleaning, laundry,bakery, candy, meats,wholesale foods,caterers, motor vehicle sales,optometrist, mortuary,video sales/rentals, over-the-counter tobacco sales, vending machines(excluding tobacco), &other retail goods not listed Business Licensing— $218.00 per 1,000 square feet,or Restaurants,Cafes, Coffee fraction thereof Houses,etc. Page 7 of 10 Business Licensing— $31599.00 Restaurants,Drive-Thru Business Licensing—Service $1059.00 Stations Business Licensing—Grocery $219.00 per 1,000 square feet,or fraction thereof I Charitable Gambling Permit— Includes investigation fee $1589.00 Per Minnesota State Statute, Chapter 349 Tobacco Sales License Includes investigation fee $2()().)O__$!00.00 Fireworks Sales As part of existing business $1050.00 Fireworks Sales Exclusive Business $368-50.00 Massage Therapist Annual Fee,Includes $530.00 investigation fee Massage Therapist Establishment Annual Fee,Includes $1589.00 investigation fee Recreational Outdoor Archery $200 first year Ran a $50 annual renewal Solicitors,Peddlers,Transient Please reference Section 340 of $1580.00 background Permit—For-Profit Organizations the Municipal Code for more investigation+$1050.00 per information month permit fee Solicitors,Peddlers, Transient Please reference Section 340 of No charge Permit—Non-Profit the Municipal Code for more Organizations information IX. Signs -- _ Initial Fee Per Sign $530.00 Permanent Signs,Annual Per Sign, 100 square feet or less $219.00 Renewal (maximum allowable size) Tem orary Signs $530.00 Signs,Impoundment First Offense $26-5.00 Signs,Impoundment Second Offense $530.00 Signs,Impoundment Third Offense $1059.00 X. Miscellaneous Fees/Permits Rubbish Hauler Annual $1589.00 Recycling Hauler Annual $1589.00 Contractor License Annual $539.00 Miscellaneous Permit Fee For all other permits not listed $4035.00 Staff Research $539.00 per half hour Penalties for Late Payment Failure to pay any penalty 10%of license fee or$320.00, imposed shall be grounds for the whichever is greater suspension or termination of any license issued by the City_ Tobacco Sales,Illegal First Offense $1050.00 Tobacco Sales,Illegal Second Offense within 12 $52590.00 months Page 8 of 10 Tobacco Sales,Illegal Third Offense within 12 months $1,0500.00 and 7 business day suspension or 30 day suspension of the license Tobacco Sales,Illegal Fourth Offense within 12 months Revocation of the license for a one year period Candidate Filing Fee $2.00 Insufficient Funds/Returned $34.90 $35.00 Check Fee _ Rental Registration Fee $4)!-.00 per rental unit I Rental Registration Penalty Fee $8 .00 per rental unit Residential Contractor License $5.00 Check _ Business Subsidy Application Required to reimburse City for $2,1000.00+$10,5000.00 Fee full cost of review escrow_ Construction Activity Waiver Per Waiver Application $2A!s0.00 XI. False Alarm Fees False Alarm First twoflwee alarms No charge+ letter False Alarm ThreeFew through ten4fieen $-S 9 $60.00 per alarm alarms False Alarm Over tenfi€teen alarms $444A0 JLk0.00 per alarm XII. Investigation Fees Tobacco, Liquor, Charitable $1580.00 Gambling, & Solicitor's Permits XIII. Utility Use Charges Residential Water Per Quarter: Meter Charge $35-47 41.16 Consumption: 10,001-35,000 $444 3.51 er 1,000 gallons gals. -p g Consumption: Over 35,000 gals. $3-74 6.15 per 1,000 gallons Standby $ -44 $1.71 per account Water Test Fee set by MN State Health Dept $1.59 Residential Sanitary Sewer Per Quarter: Base Charge $53-8 85.55 Consumption: Over 15,000 gals. $4-83 4.93 per 1,000 gallons Residential Surface Water Per Quarter: Residential $10.50.1-9 per lot Residential-Townhomes $13.6020 per unit Apartment — - $83.11--$85.60 Commercial Water Per Quarter: Meter Base Charge 3/4"Meter Size or Smaller $3 8.4 7 pef:quaAer $41.16 Meter Rase Charge 1"Meter Size $7033 per-darter 75.25 Meter Rase Charge 1.5"Meter Size $140.13 Meter Base Charge 2"Meter Size 215.31 Meter Base Charge 3"Meter Size 448.52 Page 9 of 10 Meter Base Charge 4"Meter Size $6.19.40 gei- ff 1663.83 Meter Base Charge 6"Meter Size $1,094.39 Meter Base Charge 8"Meter Size $2,188.80 Meter Base Charge 10"Meter Size $3,103.78 Meter Base Charge 12"Meter Size 4 395.55 Consumption: 10,001 -35,000 alg lops Ovef Base 10,001 3.51 per 1,000 gallons 35 000 gElllaffs - -- - Consumption: Over 35,000 alms Over Base G..ea4e..thaii $5-74 $6.15 per 1,000 gallons (35,000)gall efts Standby (111) $ 4-9 6.62 Standby (1.25") $1Q.gB 11.11 Standby (1.5") $14.94 $15.30 Standby (1011) $548.P SL87.08 Standby (12") $W88.54 $843.76 Standby (2") $21.84 233 7 Standby (3") $4949 $52.74 Standby (4") $899 94.05 Standby (6") $19W.99 $Z10.89 Standby (8") $359:77 375.32 Standby (Shared 6.95) $2338 25.15 _ Water Test Fee set by MN State Health Dept $1.59 Commercial Sanitary Sewer Per Quarter: ICommercial Usage $5.3-23 per 1,000 gallons Mobile Home/Apartment ena7� 92.53 per unit Commercial Surface Water Per Quarter: Apartment 85.62 Industrial and/or Commercial _ Q,129.79 $133.67per acre _ Undeveloped Land $15.27$1'� per acre XIV.Recycling Fee and Bins Per Residential Parcel with Annual $49.Fri 42.60 curbside recycling I Per Residential Parcel without Annual $- $2.00 curbside recycling Recycling Bin One bin provided free of charge $6.00 for each additional bin I to each newly constructed home hefrseheld _ Page 10 of 10 Attachment B : Ordinance 2012-010 — Appendix A — 2013 Fee Schedule (final format) December 10, 2012 —City Council Meeting City of Arden Hills EN HILLS -AVEEN HILLS City of Arden Hills Ordinance 2012-010 — Appendix A 2013 Fee Schedule I. Administrative Dogs/Cats—Licenses Two years(Pro-rated for second $26.00 year @$12.50) Dogs/Cats—Duplicate Tags Each $6.50 Dogs/Cats—Boarding $19.00 per d_ay Dogs/Cats—Impoundment Fee $44.00 Dogs/Cats—Surrender Fee Each $25.00 Dogs/Cats—Residential Kennel Annual i�$21.00 License Dogs/Cats—Dangerous Dog Fee Annual $63.00 Copying—Minutes, City Council Annual $69.00 Meetings -------___.__.- Copying—Minutes,Planning Annual $56.00 Commission Meetings Copying—Agendas, City Annual $14.00 Council Meetings Copying Agendas,Planning Annual $7.00 Commission Meetings Copying—Agenda Packets,City Annual Cost based on per sheet, staff Council Meetings labor, and postage Copying—Agenda Packets, Annual Cost based on per sheet, staff Planning Commission labor, and postage Copying—General Any Size $0.25 per side Assessment Search $53.00 per half hour U. Building Construction Building Permits—Permit Fee Fees shall be based according to the 2011 State Statute 326B.153 and are determined by the City's Building Official Building Permits—Plan Review 65%of Building Permit Fee Fee Building Permits—Re-inspection _ $40.00 Building Permits—Manufactured $55.00+$5.00 State Surcharge Home Location, Swimming Pools,and Demolition Building Permits—Special 100%of Permit Fee Investigations State Surcharge—based on fee based on 2011 State Statute valuation 326B.148 State Surcharge—Fixed Fees $5.00 Page 1 of 10 Plumbing Permits—Minimum $40.00 Fee Plumbing Permits—Residential 1.25%of Project Value Plumbing Permits—Non- 1.25%of Project Value+$50.00 Residential Electrical Permits—Minimum $35.00 Fee Electrical Permits—Maximum $150.00 Single Family Dwelling Fee Electrical Permits—General See Exhibit"A"attached to fee schedule Mechanical Permits—Minimum $40.00 Fee Mechanical Permits—Residential 2%of Project Value Mechanical Permits—Non- 1.25%of Project Value+$50.00 Residential Fire Protection Permits—Permit Fees shall be based according to Fee the 2011 State Statute 326B.153 and are determined by the City's Building Official Fire Protection Permits—Plan 65%of Permit Fee Review Fee Fire Protection Permits—Re- $40.00 inspection III. Liquor Licensing On-sale 1,999 square feet(SF)or less $3,465.00 On-sale 2,000(SF)—2,999(SF) $4,620.00 On-sale 3,000(SF)—3,999(SF) $5,775.00 On-sale 4,000(SF)or more $6,930.00 On-sale, Sunday $210.00 _ Off-sale $210.00 Club Fee $315.00 On-sale,Malt Beverage $126.00 ............ Off-sale,Malt Beverage $42.00 On-sale,Wine $2,100.00(or half of on-sale license fee,whichever is less) Strong Beer No Charge(as part of On-Sale Wine License) Investigation Fee $158.00 First Violation $105.00 Minor Consumption Violation Second Violation $525.00 with Server Training Third Violation $1,050.00 Fourth Violation $1,575.00 First Violation $525.00 Minor Consumption Violation Second Violation $1,050.00 without Server Training Third Violation $1,575.00 Fourth Violation $2,100.00 and may be subject to license revocation Page 2 of 10 IV. Maps and Ordinances Zoning Ordinance $0.25 per side Municipal Code Comprehensive Plan Color Maps(8.5 x 11) $2.00 Color Maps(11 x_17) $4.00 Street Maps $2.00 As-Builts(1 l x 17) Based on number of copies and staff time V. Parks&Recreation Youth Athletic Association Field Per four hour time block $8.00 per time block Rental +applicable tax Adult Club/Intramural Field Per two hour time block $21.00 per time block Rental +applicable tax Ball Field Rental,Unlighted Per four hour time block. $33.00 per time block Tournament fees are extra. +applicable tax Ball Field Rental,Lighted Per four hour time block. $84.00 per time block Tournament fees are extra. +applicable tax Ball Field Tournament Fee Includes all day maintenance $525.00 per day+$105.00 (Adult),Full Maintenance staff on site damage deposit+applicable tax Ball Field Tournament Fee Includes prep for fields and $315.00 per day+$105.00 (Adult),Minimum Maintenance midday drag of fields damage deposit+applicable tax Warming House Rental/Ice Rink Only allowed during non-public $26.00 per hour+ Rental use hours $105.00 damage deposit +applicable tax Picnic Shelters, Resident Includes up to three picnic tables $37.00 per day+ap licable tax Picnic Shelters-Non-Resident Includes up to three picnic tables $53.00 per day+applicable tax Picnic Shelters- Includes up to three picnic tables $11.00 per day Resident Non-Profit Picnic Shelters- Includes up to three picnic tables $37.00 per day Other Non-Profit Picnic Pavilions-Resident Includes up to five picnic tables $53.00 per day+ $105.00 damage deposit+ $53.00 key deposit+applicable tax Picnic Pavilions-Non-Resident Includes up to five picnic tables $79.00 per day+$105.00 damage deposit+ $53.00 key deposit+applicable tax Picnic Pavilions- Includes up to five picnic tables $26.00 per day+$105.00 Resident Non-Profit damage deposit& $53.00 key deposit Picnic Pavilions- Includes up to five picnic tables $63.00 per day+ $105.00 Other Non-Profit damage deposit& $53.00 key deposit Additional Picnic Tables For every two extra tables $5.00+applicable tax Community Garden Plot-One Annual $34.00+applicable tax Plot Community Garden Plot- Annual $17.00 +applicable tax Second Plot Page 3 of 10 Room Rental—City Hall, Per Day(Scheduling a room after Daytime usage:No charge Community Room regular hours is contingent upon Army National Guard:No charge the presence of a city employee; City Government:No charge In the event staff is not available, Resident,Non-profit: $63.00 the City reserves the right to Resident,For-profit: $74.00 deny application). Non-Resident,Non-profit: $105.00 Non-Resident, For-profit: $137.00 (+applicable tax) Room Rental—City Hall, Small Per Day(Scheduling a room after Daytime usage:No charge Conference Room regular hours is contingent upon Army National Guard:No charge the presence of a city employee; City Government:No charge In the event staff is not available, Resident,Non-profit: $26.00 the City reserves the right to Resident,For-profit: $32.00 deny application). Non-Resident,Non-profit: $42.00 Non-Resident, For-profit: $53.00 (+a plicable tax) Room Rental—Damage Deposit Required $105.00 Equipment Rental—DVD,VCR, $11.00+applicable tax T.V. V1. Planning and Zoning(Each separate land use request shall be charged a separate fee even if submitted on the same application. In addition to the application fee,all planning cases are subject to a minimum escrow fee to cover any consulting costs the City may incur. Additional charges may apply if the consulting costs exceed the escrow amount. The escrow may be waived,reduced, or increased by the City Planner on a project by project basis.) Description Escrow Fees Initial Application Fees Preliminary Plat Administrative Fee $630.00+$26.00 per lot Escrow $1,575.00 Final Plat Administrative Fee $525.00+$26.00 per lot Escrow No charge Lot Split/Minor Subdivision Administrative Fee $473.00 Escrow $1,050.00 Rezoning Administrative Fee $630.00 Escrow $1,050.00 Comprehensive Plan Amendment Administrative Fee $893.00 Escrow $1,050.00 Variance Administrative Fee $315.00 Escrow $630.00 Conditional Use Permit or Administrative Fee $630.00; $315.00 for Home Amendment Occupation or if no Site Plan Review is required Escrow $630.00 Interim Use Permit or Administrative Fee $630.00; $315.00 if no Site Plan Amendment Review is required Escrow $735.00 Planned Unit Development Administrative Fee $630.00 Master Plan Escrow $2,100.00 Final Planned Unit Development Administrative Fee $315.00 Page 4 of 10 Escrow $630.00 Planned Unit Development Administrative Fee $630.00; $315.00 if no Site Plan Amendment Review is required Escrow $2,100.00 Planned Unit Development Administrative Fee $315.00 Concept Review Escrow No Charge Vacation of Easement Administrative Fee $420.00 Escrow $630.00 _ Site Plan Review Administrative Fee $315.00 Escrow $630.00 City Code Amendment Administrative Fee $630.00 Escrow $1,050.00 Zoning Code Amendment Administrative Fee $630.00 Escrow $1,050.00 Zoning Letter Per half hour $53.00+$53.00 per half hour after one hour of staff research time Land Use Requests—Not Administrative Fee(Escrow may $210.00 Already Specified also apply) Zoning Permit—New Fence $53.00 for first 100 lineal feet+ Construction or Expansion $11.00 each additional 100 lineal feet,or fraction thereof Zoning Permit—New Driveway $53.00 for first 1,000 square feet Construction or Expansion +$11.00 each additional 1,000 square feet, or fraction thereof Recreational Vehicle Parking 7 Day Permit,renewable once $11.00 Permit per 12 months _ Home Occupation I Permit No charge Home Occupation II Permit Consulting fees and $368.00 administrative escrow Right-of--Way Permit Per Excavation $184.00 Grading&Erosion Control Fees Administrative Fee $158.00 Escrow $3,675 /acre Appeal of Administrative Cost of staff time to prepare $105.00 Zoning, Sign, or Subdivision appeal information Decisions VII. Utility Hookup Charges Water Permits—Service Per inspection $40.00 Installation/Repairs/Alteration Water Permits—Interior $40.00 Plumbing,New Home Water Turn On/Off,Temporary $40.00 Water Permanent Disconnect $215.00 Curb Box and Service Lead, 1" $165.00 Service Connection on Unsurfaced Street _ Restoration of Typical Road Mix $105.00 Street Page 5 of 10 Restoration of Higher-Type Set by Engineer Street Larger than 1" Service Set by Inspector Connection Water Permits—Plan Check Fee Set by Inspector Water Permits—Re-inspection $40.00 Water Meter/Spacer Charges— Fee includes removal of meter, $140.00—Residential Customer Requested Water bench test at maintenance $160.00-Commercial Meter Accuracy Test facility, and returning meter to residence;Fee will not be applied if the meter is found to be inaccurate to a degree exceeding three percent(3%)from the result of the bench test Water Meter/Spacer Charges— $390.00 3/4"x 7 1/2"Meter Water Meter/Spacer Charges— Contact Public Works for Quote 3/4"x 9"Meter Water Meter/Spacer Charges— $480.00 1"Meter Water Meter/Spacer Charges— Contact Public Works for Quote Greater than 1" Water Connection Fee— $840.00 per acre or portion Connection fee for previously thereof un-served or expanded lots Water Availability Fee— The units are based on the $525.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availability charge(SAC)units Sewer Connection Fee— $840.00 per acre or portion Connection fee for previously thereof un-served or expanded lots Sewer Availability Fee— The units are based on the $525.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availability charge(SAC)units Sewer Permits— Service Per inspection $40.00 Installation/Alternations/Repairs Sewer Permits—Plan Review Set by Inspector Fee Sewer Permits—Reins ections $40.00 per hour Sewer Access Charge Set by Met Council Annually $2,435.00 Sanitary Sewer Utility Prohibited $100.00 per month Sump Pump Connection Surcharge Page 6 of 10 VIII. Miscellaneous/Retail Activities 3/4" Hydrant Meter Rental No monthly fee if returned within $20.00 for permit+$100.00 7 days deposit+ $30.00 per month rental+water usage+ $5.00 state surcharge 3" Hydrant Meter Rental No monthly fee if returned within $20.00 for permit+$1,200 7 days deposit+$30.00 per month rental+water usage+ $5.00 state surcharge Boutique/Garage Sale Application/notification of City No charge Hall required Casual Roadside Stands Application/notification of City No charge Hall required Tent Permit $55.00+ State Surcharge Sidewalk Sales $53.00 Business Licensing— Includes arcade,dance hall, $105.00 Amusement Facilities movie theater,pooVbilliard tables,bowling alleys, indoor tennis, skating facility, outdoor tennis, driving ran es,etc. Business Licensing—Wholesale Liability insurance required $210.00 Bulk Fuel Storage Business Licensing— $6.50 per room Hotel/Motel Business Licensing—Courtesy $26.00 Bench,Non-advertising Business Licensing—Courtesy $79.00 Bench,Advertising Business Licensing— Includes musical devices, $16.00 per location+$16.00 per Mechanical/Electronic Devices amusement rides,bowling alleys, machine etc. Business Licensing—Retail Sales Includes antique shops, $53.00 beauty/barber shops,boat dealers,Christmas tree sales, dry cleaning, laundry,bakery, candy, meats,wholesale foods,caterers, motor vehicle sales,optometrist, mortuary,video sales/rentals, over-the-counter tobacco sales, vending machines(excluding tobacco),&other retail goods not listed Business Licensing— $21.00 per 1,000 square feet,or Restaurants, Cafes,Coffee fraction thereof Houses,etc. Business Licensing— $315.00 Restaurants, Drive-Thru Page 7 of 10 Business Licensing—Service $105.00 Stations Business Licensing—Grocery $21.00 per 1,000 square feet, or fraction thereof Charitable Gambling Permit— Includes investigation fee $158.00 Per Minnesota State Statute, Chapter 349 Tobacco Sales License Includes investigation fee $300.00 Fireworks Sales As part of existing business $105.00 Fireworks Sales Exclusive Business $368.00 Massage Therapist Annual Fee,Includes $53.00 investigation fee Massage Therapist Establishment Annual Fee,Includes $158.00 investigation fee Recreational Outdoor Archery $200 first year Range $50 annual renewal Solicitors,Peddlers, Transient Please reference Section 340 of $158.00 background Permit—For-Profit Organizations the Municipal Code for more investigation+ $105.00 per information month permit fee Solicitors,Peddlers,Transient Please reference Section 340 of No charge Permit—Non-Profit the Municipal Code for more Organizations information IX. Signs Initial Fee Per Sign $53.00 Permanent Signs,Annual Per Sign, 100 square feet or less $21.00 Renewal (maximum allowable size) Temporary Signs $53.00 Si s, Impoundment First Offense $26.00 Si s,Impoundment Second Offense $53.00 Signs,Impoundment Third Offense $105.00 X. Miscellaneous Fees/Permits Rubbish Hauler Annual $158.00 Recycling Hauler Annual $158.00 Contractor License Annual $55.00 Miscellaneous Permit Fee For all other permits not listed $40.00 Staff Research $53.00 per half hour Penalties for Late Payment Failure to pay any penalty 10%of license fee or$32.00, imposed shall be grounds for the whichever is greater suspension or termination of any license issued by the City Tobacco Sales,Illegal. First Offense $105.00 Tobacco Sales,Illegal Second Offense within 12 $525.00 months Tobacco Sales,Illegal Third Offense within 12 months $1,050.00 and 7 business day suspension or 30 day suspension of the license Page 8 of 10 Tobacco Sales,Illegal Fourth Offense within 12 months Revocation of the license for a one year period Candidate Filing Fee $2.00 Insufficient Funds/Returned $35.00 Check Fee _ Rental Registration Fee $42.00 per rental unit Rental Registration Penalty Fee $84.00 per rental unit Residential Contractor License $5.00 Check Business Subsidy Application Required to reimburse City for $2,100.00+$10,500.00 escrow Fee full cost of review Construction Activi Waiver Per Waiver Application $263.00 XI. False Alarm Fees False Alarm First two alarms No charge+letter False Alarm Three through ten alarms $60.00 per alarm False Alarm Over ten alarms $160.00 er alarm XII. Investigation Fees Tobacco,Liquor,Charitable -�- $158.00 Gambling, & Solicitor's Permits XIII. Utility Use Charges Residential Water Per Quarter: Meter Charge $41.16 Consumption: 10,001-35,000 $3.51 per 1,000 gallons gals'.. - Consumption: Over 35,000 gals. $6.15 per 1,000 gallons Standby - $7.71 per account Water Test Fee set by MN State Health Dept $1.59 Residential Sanitary Sewer Per Quarter: Base Charge $85.55 Consumption: Over 15,000 gals. $4.93 per 1,000 gallons Residential Surface Water Per Quarter: Residential $10.50 per lot Residential-Townhomes $13.60 per unit Apartment $85.60 Commercial Water Per Quarter: Meter Charge 3/4"Meter Size or Smaller $41.16 Meter Charge 1"Meter Size $75.25 Meter Charge 1.5"Meter Size $140.13 Meter Charge 2"Meter Size $215.31 Meter Charge 3"Meter Size $448.52 Meter Charge 4"Meter Size $663.83 Meter Charge 6"Meter Size $1,094.39 Meter Charge 8"Meter Size $2,188.80 Meter Charge 10"Meter Size $3,103.78 Page 9 of 10 Meter Charge 12"Meter Size $4,395.55 Consumption: 10,001-35,000 $3.51 per 1,000 gallons gals. Consumption: Over 35,000 gals. $6.15 per 1,000 gallons Standby (1") $6.62 Standby (1.25") $11.11 Standby (1.5") $15.30 Standby (2") $23.37 Standby (3") $52.74 Standby (4") $94.05 Standb (6") $210.89 Standby (8") $375.32 Standby (10") $587.08 Standby (12") $843.76 Standby _ (Shared 6.95) _$25.15 Water Test Fee set by MN State Health Dept $1.59 Commercial Sanitary Sewer Per Quarter: Commercial Usage $5.33 per 1,000 gallons Mobile Home/Apartment $92.53 per unit Commercial Surface Water Per Quarter: Apartment $85.62 Industrial and/or Commercial $133.67 per acre Undeveloped Land $15.73 per acre XIV.Recycling Fee and Bins _ 11 11 -- Per Residential Parcel with Annual $42.60 curbside rec clin Per Residential Parcel without Annual $2.00 curbside recycling Recycling Bin One bin provided free of charge $6.00 for each additional bin to each newly constructed home Page 10 of 10 326B.153 BUILDING PERMIT FEES. Subdivision 1. Building permits. (a) Fees for building permits submitted as required in section 32613.106 include: (1)the fee as set forth in the fee schedule in paragraph(b) or as adopted by a municipality; and (2)the surcharge required by section 326B.148. (b) The total valuation and fee schedule is: (1) $1 to $500, $29.50; (2) $501 to $2,000, $28 for the first$500 plus $3.70 for each additional $100 or fraction thereof, to and including $2,000; (3) $2,001 to $25,000, $83.50 for the first$2,000 plus $16.55 for each additional $1,000 or fraction thereof, to and including $25,000; (4) $25,001 to $50,000, $464.15 for the first$25,000 plus $12 for each additional $1,000 or fraction thereof,to and including $50,000; (5) $50,001 to $100,000, $764.15 for the first$50,000 plus $8.45 for each additional $1,000 or fraction thereof,to and including $100,000; (6) $100,001 to $500,000, $1,186.65 for the first $100,000 plus $6.75 for each additional $1,000 or fraction thereof,to and including $500,000; (7) $500,001 to $1,000,000, $3,886.65 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof,to and including $1,000,000; and (8) $1,000,001 and up, $6,636.65 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereof. (c) Other inspections and fees are: (1) inspections outside of normal business hours (minimum charge two hours), $63.25 per hour; (2)reinspection fees, $63.25 per hour; (3) inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per hour; and (4) additional plan review required by changes, additions, or revisions to approved plans (minimum charge one-half hour), $63.25 per hour. (d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than$63.25, then the greater rate shall be paid. Hourly cost includes supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. Subd. 2. Plan review. Fees for the review of building plans, specifications, and related documents submitted as required by section 3268.106 must be paid based on 65 percent of thebuilding permit fee required in subdivision 1. Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including public buildings and state licensed facilities as required by section 32613.148. Subd. 4. Distribution. (a) This subdivision establishes the fee distribution between the state and municipalities contracting for plan review and inspection of public buildings and state licensed facilities. (b) If plan review and inspection services are provided by the state building official, all fees for those services must be remitted to the state. (c) If plan review services are provided by the state building official and inspection services are provided by a contracting municipality: (1)the state shall charge 75 percent of the plan review fee required by the state's fee schedule in subdivision 2; and (2)the municipality shall charge 25 percent of the plan review fee required by the municipality's adopted fee schedule, for orientation to the plans, in addition to the permit and other customary fees charged by the municipality. (d) If plan review and inspection services are provided by the contracting municipality, all fees for those services must be remitted to the municipality in accordance with their adopted fee schedule. Attachment A Electrical Permit Fees Fees are effective Jan 1s`,2010. Check websites. Electrical Inspector: Pete Tokle of Tokle Inspections Inc. Phone: 763.754.2983 Please contact between 7-8:30am, Monday through Friday only Contractors Homeowners Complete an application form. Include your complete address Complete an application form(available at your City Hall). Be including zip code. Be sure to add in the State Surcharge of sure to add in the State Surcharge of$0.50 0.50. Mail a copy to the City... All Services Circuits and Feeders There is a$2 per circuit charge for replacing circuits that are The inspection fee for the installation,addition,alteration,or disconnected in the old service panel and reconnected in the repair of each circuit,feeder,feeder tap,or set of transformer new panel in the same location. secondary conductors: 0 to 300 amp $50 0 to 30 amp $8 _ �W 400 amp $58 31 to 100 amp $10 500 amp $72 101 to 200 amp $15 600 amp $86 300 amp $20 800 amp $114 400 amp I $25 1000 amp $142 500 amp $30 1100 amp $156 600 amp $35 1200 amp $170 700 amp $40 Add$14 for each additional 100 amps. Add$5 for each additional 100 amps Minimum Fee: Minimum permit fee is$35 plus$0.50 state surcharge. This is for one inspection only. Minimum fee for rough-in inspection and final is$70 plus$0.50 state surcharge. Maximum Fee: Maximum fee for single family dwelling not over 200 amps is$150 plus$0.50 state surcharge. Maximum of 2 rough-ins and one final inspection. Apartment Buildings: Maximum fee per unit of an apartment or condominium complex is$70. This does not cover service and house wiring. A separate permit must be issued for house wiring. Swimming Pools: $35 per inspection +circuits Traffic Signals: $7 per each standard Street Lighting: $4 per each standard Transformers/Generators: $8 per unit+.40 cents per KVA.30 cents for each KVA over 100KVA. Retro Fit Lighting: $0.65 per fixture Sign Transformer: $8 Remote Control/Signal Circuits: 75 cents per device. Re-inspection Fee: $35 ** The fee is doubled if the work starts before the permit is issued. ** City Hall Addresses: City of Arden Hills, 1245 West Highway 96,Arden Hills MN 55112 Attachment C : Ordinance 2012-010 Publication Summary December 10, 2012—City Council Meeting City of Arden Hills EN HILLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA SUMMARY OF ORDINANCE NO. 2012-010 On the 10th day of December, 2012, the Arden Hills City Council adopted Appendix A of Ordinance No. 2012-010, and by five affirmative votes pursuant to Minn. Stat. §412.191, Subd. 4, directed that a summary of Appendix A of Ordinance 2012-010 be published. Appendix A of Ordinance 2012-010 entitled "2013 Fee Schedule" an Ordinance Relating to Fees Payable within the City of Arden Hills for 2013. The primary purpose of the ordinance amendment is to update the Municipal Code to reflect fees for the calendar year of 2013. A full copy of Appendix A of Ordinance 2012-010 is available for inspection by any person during regular business hours at the office of the City Administrator, 1245 West Highway 96, Arden Hills, Minnesota 55112. The Ordinance is also available online at http://www.cityofardenhills.com