Loading...
HomeMy WebLinkAbout7A, 2013 Pavement Management Program - Public Hearing Ridgewood, Asbury, Edgewater, and Glenhill Neighborhood lt ,-AREN,HILLS Request for Council Action 7A ................... ................. ------ ............. Prepared By: John Anderson,P.E.,Assistant Council Meeting Date: January 14,2013 City Engineer 2013 Pavement Management Program—Public Hearing Ridgewood,Asbury, Edgewater, and Glenhill Neighborhood Budgeted Amount: Actual Amount: Funding Source: $1,700,000 $1,165,678 to $1,671,185 PIR, Sanitary Sewer, Water, Surface Water Management Recommendation: • Staff Presentation • Conduct Public Hearing Supporting Documents: 1. Memorandum dated January 14, 2013, from John Anderson,Assistant City Engineer. 2. Comments received by staff. 3. Survey results. 'It EN HILLS MEMORANDUM DATE: January 14, 2013 TO: Honorable Mayor and City Council Members Patrick Klaers, City Administrator FROM: John M. Anderson P.E., Assistant City Engineer SUBJECT: 2013 Pavement Management Program—Public Hearing Background: On November 13, 2012, the City Council received the feasibility report for the 2013 PMP Improvement Project and ordered the public hearing for January 14, 2013. Prior to opening the hearing, City staff will present general information regarding construction, standards, and assessments that apply for this project. Following Minnesota Statutes, Chapter 429, notice of the public hearing must be posted twice prior to the meeting (this was done in the Bulletin on December 26, 2012 and January 9, 2013). A notice was also sent to each property proposed to be assessed as a part of this project. Once the hearing is closed, the next step in the process is for the City Council to order the improvements and preparation of plans and specifications. Discussion: The following is a brief summary of proposed improvements; for more detail, please reference the feasibility report. Street Improvements: Two options for street improvements have been proposed in the feasibility study. The first option, Reconstruction, involves fully rebuilding the road base and surface and is the most intrusive option as well as the more costly option. The reconstruction option also includes addition of concrete curb and gutter throughout the entire neighborhood to tie in and continue the reconstruction completed in the Roseville portion of the neighborhood in 2008. The second option, Reclamation, involves pulverizing the existing bituminous surface and recycling that material to be used as an aggregate base. This option is less expensive and has less impact to the surroundings. The existing street has bituminous curb in some locations to direct drainage or support steep boulevard grades. Bituminous curb would be replaced as needed in the reclamation option. Page 1 of 5 Storm Drainage and Storm Water Quality Improvements: Storm drainage improvements involve replacement of all the storm collection and conveyance in the neighborhood. With the replacement of the storm collection,,,storm sewer is also expected to be extended along Edgewater Avenue to facilitate better collection of storm events and provide an outlet for rain gardens as needed. Storm water quality improvements, as required by Rice Creek Watershed District, are dependent on the type of work proposed in the permit. City staff has met with watershed district staff and established that street reclamation is not an activity that requires storm water treatment and falls under the definition of rehabilitation. The amount of storm water treatment required by Rice Creek Watershed will be dependent on the level of improvement to the roadway. At this point, based on our conversations with the watershed, we estimated the following amount of treatment to be require for each option Alternative 1 —Reconstruction— 13,885 Cubic Feet Alternative 2—Reclamation—2,400 Cubic Feet Water System Improvements: The improvements to the water system include replacement of the watermain on Edgewater Avenue and Ridgewood Road north of Glenhill Road. Additionally all seven hydrants and eight valves in the neighborhood will be replaced. Sanitary Sewer System Improvements: The sanitary sewer improvements associated with the project include replacement of the manhole frames and covers to match the new street grade as well as replacement of the force main from lift station nine to the intersection of Glenhill Road and Snelling Avenue. Financial Implications: The estimated total project cost for the improvements is $1,671,185 which includes all overhead costs. Consistent with the City's assessment policy, 37% overhead costs for the street improvements has been included, which was used to calculate preliminary assessment rates. The overhead is broken down as follows: City Administration 2.5% Design Engineering 10.0% Construction Engineering 10.0% Legal 2.0% Fiscal 3.0% Interest During Construction 4.5% Assessment Roll Preparation 1.0% Contin e_g_ ncies 4.0% TOTAL 37.0% Page 2 of 5 The project is proposed with alternatives for roadway rehabilitation. The costs of these alternatives are broken down in the following tables taken from the feasibility study: Alternative 1 —Reconstruction ESTIMATED PROJECT COSTS Street Improvements Construction Cost $ 626,384 Contingency&Overhead (37%) $ 231,763 Total Estimated Cost $ 858,147 Watermain Improvements Construction Cost $ 274,774 Contingency&Overhead (30%) $ 82,433 Total Estimated Cost $ 357,207. Sanitary Sewer Improvements Construction Cost $ 47,750 Contingency&Overhead (30%) $ 14,325 Total Estimated Cost $ 62,075 Storm Drainage Improvements-Biofiltration Construction Cost $ 302,889 Contingency&Overhead (30%) $ 90,867 Total Estimated Cost $ 393,756 Total Street Improvements Cost $ 858,147 Total Utility Improvements Cost $ 813,038 Total Project Cost $ 1,671,185 Alternative 2 - Reclamation ESTIMATED PROJECT COSTS Street Improvements Construction Cost $ 311,528 Contingency&Overhead (37%) $ 115,266 Total Estimated Cost $ 426,794 Watermain Improvements Construction Cost $ 274,774 Contingency&Overhead (30%) $ 82,433 Total Estimated Cost $ 357,207 Sanitary Sewer Improvements Construction Cost $ 47,750 Contingency&Overhead (30%) $ 14,325 Total Estimated Cost $ 62,075 Storm Drainage Improvements-Biofiltration Construction Cost $ 245,847 Contingency&Overhead (30%) $ 73,754 Total Estimated Cost $ 319,602 Total Street Improvements Cost $ 426,794 Total Utility Improvements Cost $ 738,884 Total Project Cost $ 1,165,678 Page 3 of 5 The City's portion of the project costs are currently budgeted from the PIR and Utility Enterprise Funds (sanitary sewer, surface water management and watermain funds). The proposed project funding summary is listed in the table below. Alternative 1 —Reconstruction Funding Source Cost Residential Assessments $ 427,719 PIR Fund $ 430,429 Sanitary Sewer Enterprise Fund $ 62,075 Watermain Enterprise Fund $ 357,207 Surface Water Management Fund $ 393,756 Total Funding $1,671,186 Alternative 2 - Reclamation Funding Source Cost Residential Assessments $ 212,042 PIR Fund $ 214,752 Sanitary Sewer Enterprise Fund $ 62,075 Watermain Enterprise Fund $ 357,207 Surface Water Management Fund $ 319,602 Total Funding $1,165,678 Assessments: As detailed in the feasibility report, two preliminary assessment rates have been established; the first for alternative 1, Reconstruction, and the second for alternative 2, Reclamation. Based on 48 REU, and the estimated street improvement costs, the estimated assessment rate per REU is $8,939.03 for Alternative 1, Reconstruction, and $4,445.77 for Alternative 2, Reclamation. Neighborhood Survey Results: A survey was conducted to solicit input from the neighborhood on a few key items. The results of the survey are attached to this memo. As of January 8, 2013, there were 32 responses to the survey out of 48 properties proposed to be assessed. One question dealt with the preferred type of roadway rehabilitation. Of those responding to this question, Page 4 of 5 81% favored the reclamation option. One question dealt with storm water treatment, of those responding to this question 13 properties indicated a willingness to have a rain garden or participate in the maintenance of one. Resident Comments/Concerns: City staff has attached written comments received from property owners regarding the proposed project. Any additional comments received after the Council packet is issued and prior to the public hearing will be provided at the public hearing. 11/1/12 Maureen McGuire (email) 11/9/12 Ray Conroe (email) 11/26/12 Dan Erding (email) 11/26/12 Nancy Jacobson(email) 11/27/12 Thomas Fabel (email) 12/30/12 Victor Cox (email) 1/5/13 Nancy Jacobson(email) 1/5/13 Senay Kindler(email) Council Actions Requested: Hold the Public Improvement Hearing for the 2013 Pavement Management Program. Page 5 of 5 John Anderson From: Maureen McGuire ] Sent: Thursday, November 01, 2012 8:56 AM To: John Anderson Subject: Re: 2012 Pavement Management Program neighborhood meeting-Oct 23, 2012 Thank you, John. We are definitely in support of this project. I will attend the upcoming Nov meeting. Maureen From: John Anderson <john.anderson(aD-ci.arden-h ills.mn.us> To: Maureen McGuire Sent:Wednesday, October 31, 2012 3:48 PM Subject: RE: 2012 Pavement Management Program neighborhood meeting -Oct 23, 2012 Maureen Attached is the power point presentation that was presented at the neighborhood meeting on October 23`d. The report city staff is preparing on the streets will be presented to the City council on November 13,2012. At that meeting the City council will review the report and may order a public hearing on the improvement. The public hearing will be advertised in the local paper as well as mailed notices will be sent to all affected residents. The purpose of the public hearing is to share the intent of the proposed plans and take testimony from residents related to the project. The public hearing, if ordered will most likely take place in December or January Hopefully this answers your questions if you have more please feel free to contact me by phone or email Thanks John Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 a -� (651) 792-7846 -. mailto:terry.maurer(@ci.arden-hills.mn.us Itow- EN 1 From:Maureen McGuire ] Sent: Saturday,October 06,2012 7:48 PM To: John Anderson Cc: Subject: 2012 Pavement Management Program neighborhood meeting-Oct 23,2012 John, My husband and I are new residents in Arden Hills and we received a letter about the Oct 23 meeting about street improvements. We are unable to make the meeting but want to express that want to learn more about the plan. The streets are a mess and something needs to be done. Can you please keep us aprised of the plans? I believe you and I met under poor circumstances when you came onto my property yelling at me about a fallen tree only to realize that you never returned any of our phone calls. I truly hope that this transition will result in better communication between the city and concerned neighbors. Maureen McGuire 0 ' 2 John Anderson From: Terry Maurer Sent: Tuesday, November 13, 2012 1:28 PM To: John Anderson Subject: FW: PMP Presentation Re: 2013 PMP -----Original Message----- From: Ray Conroe [mailto. ] Sent: Friday, November 09, 2012 6:43 AM To: Terry Maurer Subject: FW: PMP Presentation Terry - Here's the response from our tree consultant. I agree with his recommendation of getting a forester to provide input to the City. Keep me posted. Thanks, Ray Conroe -----Original Message----- From: Roger Gatz [mail'] Sent: Tuesday, November 06, 2012 7:12 AM To: 'Ray Conroe' Subject: RE: PMP Presentation Ray, Thanks for the info. Simply put, of the options available, go with the one that causes the least disruption to the base of the trees. I would think that Arden Hills would have a City Forester on contract to advise them. Roger -----Original Message----- From: Ray Conroe [mailto: ] Sent: Sunday, November 04, 2012 6:34 AM To: Subject: FW: PMP Presentation Roger - Here's the info about the alternative methods the City of Arden Hills is considering for repaving our street. Let me know if you have questions. Thanks much, Ray Conroe of -----Original Message----- From: Terry Maurer [mailto:terry.maurer(@ci.arden-hills.mn.us] Sent: Friday, October 26, 2012 8:42 AM 1 To: Subject: PMP Presentation Terry Maurer PE Public Works Director City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 (651) 792-7847 terry.maurer(@ci.arden-hills.mn.us 2 John Anderson From: John Anderson Sent: Monday, November 26, 2012 9:07 AM To: 'Dan Erding'; Terry Maurer; Danielle Erding Subject: RE: Street Reconstruction Mr. Erding Thank you for your comments. At this point no decision has been made on the street section(curbed, no curb, bituminous curb). The public hearing is scheduled for January 14, 2013,we will include your email along with other comments we receive in our report to the City council for the Public Hearing. I encourage you to attend this meeting to share your comments with the City Council . John Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 (651) 792-7846 john.anderson(@ci.arden-hills.mn.us Tt EN IHMLZ) From: Dan Erding Sent: Wednesday, November 21, 2012 6:01 PM To: John Anderson; Terry Maurer; Danielle Erding Subject: Street Reconstruction Hi John and Terry, I live at 3120 Asbury Ave in Arden Hills, my garage sits in Roseville and my house in Arden Hills. I'm being told by my neighbors that when re-doing the street, they are most likely going to skip the concrete curbs. As you probably can guess, I am opposed to this. I can't even believe this is an option since I was told back in 2008 there is NO WAY I'd have to have part of my property curbed and the other part not after Arden Hills finally decides to re-do their streets. Of course I was also told the curb would end at my property line rather than in the middle of my yard. Well that didn't happen, so you can probably see where I'm going with this. I see on the website both proposals and I'm curious what the general feedback is that you've received from the neighborhood? The ones telling me that they aren't going to curb it are the "old timers" who don't want to pay for anything and have been fighting the street re-construction for the past decade even though they've lived in this neighborhood for 50 years and used the street for that long. Any feedback is appreciated. i John Anderson From: John Anderson Sent: Wednesday, November 28, 2012 10:31 AM To: 'Ed Dickinson' Cc: Terry Maurer Subject: RE: 2013 PMP Nancy Thank you for your thoughtful consideration of the issues related to this project. We will be providing the City Council with copies of all the comments we receive for their consideration at the January 14th Public Hearing. John Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 (651) 792-7846 john.anderson @ci.arden-hills.mn.us ,It IT rN EN IHZLZ� From: Ed Dickinson [ ] Sent: Monday, November 26, 2012 1:43 PM To: John Anderson Cc: Terry Maurer Subject: 2013 PMP John, Thank you for the presentation on Oct 23 rd.It gave the neighborhood and myself time to think about the project. Since then I've read the Feasibility Report for 2013 Pavement Management Plan that was submitted to the Council this November. I want to express a concern I have with both Alternatives presented and offer another option. Either removing the woods or removing the tennis court in order to create adequate rain water storage would be a problem for the neighborhood. The tennis court has been an asset to our neighborhood over the many years we have managed it, only recently becoming a City park. Removing the trees and shrubs that act as a buffer to Snelling Avenue would also be seen by many residents as a blow to the quality of life here. So I am offering another option for finding adequate rain water storage, one not mentioned in either the Oct 23`d presentation or the feasibility report. i Glen Hill Road The widths of all of our streets vary from 25-36'. Instead of these varying widths, I would like to suggest building streets in the neighborhood at 24' wide, a width that would more appropriately handle our neighborhood's lower volume of traffic. By constructing streets to this narrower width the remaining space can then be used for rain gardens. For example Glen Hill Avenue from Asbury to Ridgewood Road is 30' wide; making this section a 24' roadway would provide six feet that could be used for rainwater storage(not counting the residential boulevard for each home). This also would reduce the amount of impervious surface that would need to be managed. Asbury Avenue Asbury Avenue from Glen Hill to Edgewater serves as a route for at most 10 houses. The width of this section of Asbury is 30'. The feasibility report designates the Northwestern College side of the road as a rain garden. However much of that side has a steep slope with many shrubs growing on it, and since Northwestern College has a busy road on the other side of the fence, this shrub border acts as a much needed buffer to the sound coming from that road as well as to its view, and the view of the many buildings and college layout that so significantly contrasts with our neighborhood. This sloping section of boulevard would be unsuitable to water storage. The only way to create enough area flat enough to hold water would be to do significant clearing and grubbing. A retaining wall, should it be needed, would be expensive to build and maintain. By narrowing the street 6' much of the converted road bed could be easily used as a rain garden. I've attached two pictures facing north and south on Asbury in front of my house taken this weekend, showing that the normal road traffic doesn't now use the whole width of the road. Notice the snow and leaves stuck to the road on the College side—the space between the leaves was created by rivulet's of water flowing through the leaves during a fall rain storm, not by tire tracks. By making the new road 24' wide we would have a road as wide as we are effectively using now that would cost less to build, and would reduce the neighborhood's need for water storage. Ridgewood The road section to the beach property serves only two homes and would not need to be redone to its current width of between 29 and 33'. If it were narrowed to 24' there would be space for a rain garden along the wetland side that would require less clearing and grubbing. Edgewater Avenue Edgewater is currently 25' and would benefit from a slightly narrower street. Overall then, my view is that a 24' wide road would be appropriate and adequate for our neighborhood usage, would provide several areas alongside the road that could be used for rainwater storage, and also reduce our construction costs. Thanks for your consideration, Nancy Jacobson 3188 Asbury Ave 2 John Anderson From: John Anderson Sent: Tuesday, November 27, 2012 3:04 PM To: 'thomas fabel' Cc: Terry Maurer Subject: RE: My email to the City Council Tom I did receive your email and will be sure to pass the information on to the city council prior to the Tan 14 city council meeting. Thank you for thoughtfully considering the options and taking the time to share your input. John -----Original Message----- From: thomas fabel Sent: Tuesday, November 27, 2012 3:03 PM To: John Anderson Subject: My email to the City Council John: For some reason my computer reports that my email to the Council concerning the 2013 paving project, which I cc'ed to you, could not be delivered. Please let me know if you received it, and if so, whether you will be delivering to the Council yourself. Thanks, John. Tom Fabel 1 John Anderson From: thomas fabel Sent: Tuesday, November 27, 2012 2:55 PM To: David Grant; Brenda Holden; Fran Holmes; edwerner88 @yahoo.com; nick @llgardens.com Cc: John Anderson Subject: 2013 Pavement Management Program Mayor Grant and Members of the City Council: My name is Tom Fabel. My wife Jean and I have resided at 1550 Edgewater in Arden Hills for the past 28 1/2 years. I am writing with regard to the proposed 2013 street improvements, which will include our block on Edgewater Avenue. First, I wish to compliment the city engineer's office for the thorough and professional report it has prepared on this project, and also on its courtesy and responsiveness to neighborhood questions and concerns. Both at the October 23 meeting at City Hall and in a subsequent neighborhood visit by Assistant City Engineer John Anderson, the office demonstrated high levels of competence and professionalism. Also, the City Council itself deserves praise for street paving policies which are flexible and responsive to the needs and concerns of individual neighborhoods. Thank you. The Feasibility Report prepared by the engineer's office presents the Council with two options for the street pavement aspect of this project. Alternative 1 is captioned "Reconstruction": it involves more extensive grading, the removal of more material, and the installation of concrete curbs on the sides of the streets. Alternative 2 is captioned "Reclamation": it involves less grading, less removal, and, significantly, the preservation of the historic condition, which is an absence of curbing. The estimated assessment per residence is approximately $9,000 for Alternative 1 and approximately $4,500 for Alternative 2. As I understand the Report, both Alternatives would provide the neighborhood with stable roadways and satisfactory road surfaces for many years. Alternative 1 (Reconstruction) might provide better drainage in certain areas, brought about by the additional grading, the lowering of roads, and the installation of curbing. I know this outcome is desired by some of the residents. The potential downside of such additional grading is that it could damage the root systems of many mature oak trees which line our streets, which fear I happen to share. As far as aesthetics are concerned, some neighbors (including my wife) prefer the more pristine, almost rural appearance of no curbs (as has been the condition since initial development in the early 1950's), while others may prefer the more modern suburban development appearance of curbing. In my opinion the paving issue really comes down to this: curbs with a $9000 assessment, or no curbs with a $4,500 assessment. I'm sure we have some neighbors for whom the $4,500 difference is a minor matter. For others, however, including my family and perhaps others living on a fixed income, $4,500 is simply too much to pay for whatever amenity curbing may provide. Thus, the Fabel family urges you to select Alternative 2 (Reclamation) for the 2013 improvements. Thank you very much for your consideration, and thank you for your service to the residents of Arden Hills. Tom Fabel 1550 Edgewater Ave., Arden Hills 1 John Anderson From: John Anderson Sent: Tuesday, January 08, 2013 7:56 AM To: Vic Cox Cc: Terry Maurer Subject: RE: rain gardens request Attachments: 1-4-13 rain garden maint.pdf http:/lbluethumb.org/raingardens/ Vic Attached is a mailing that we sent out yesterday that hopefully answers some of your questions on maintenance of rain gardens. Also the link above is information on the design and construction of rain gardens. Hopefully this helps answer your questions. Take a look at the material and let me know if you have more questions. john Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, PIN 55112-5743 (651) 792-7846 janderson(@cityofardenhills.org EN WLL6 From: Vic Cox ] Sent: Monday, January 07, 2013 9:28 PM To: John Anderson Subject: rain gardens request Hello John, Thank you for your helpful note. I would like to know more about rain gardens. If you have any useful PDF files or links regarding rain gardens please send them to me. Thank you for consideration of my request, Vic Cox --------------------------------------------------------------------------------------------------------------------------- i On Wed, Jan 2, 2013 at 11:31 AM, John Anderson<JAnderson@cityofardenhills.org>wrote: Mr.Cox Thank you for your questions about the proposed street improvements in your neighborhood. Here are my comments on your questions. 1. The reconstruction option does have the potential to last longer than reclamation. This is due to a number of factors including the potential for edge deterioration with no curb and gutter, less efficient/effective drainage collection with no curb and gutter and potential for underlying soil problems not being corrected because they are not exposed by digging down. With this being said either option can produce a stable road surface that should perform its intended purpose for many years. 2. Rain gardens are most successful when they are located in the proper setting and receive adequate maintenance. When we mentioned front yard in the survey we intended to include all boulevard areas along the street. If you are situated on a corner lot this would apply to all sides of your lot that abuts the street. The flatter the grades are,the easier it is to create the rain garden and create more effective volume 3. Thank you for your comments on tennis court vs.trees question. We plan to include all written comments in our presentation to the city council on January 14, 2013. John Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 (651) 792-7846 janderson(@cityofardenhills.ore 2 ■Mrs. EN IHI LLS From: Victor Cox Jr ] Sent: Sunday, December 30, 2012 8:48 PM To: John Anderson Cc: Ed Dickinson Subject: 2013 payment management survey comments Hello John, Regarding the survey and the last informational meeting I have a few questions: 1. Considering the two to one cost ratio of the two payment methods, what are the advantages of the reconstruction method? In other words, does one "get what they paid for"? At the meeting there was an apparent reluctance to say that it would last longer but it was mentioned that the edges were more protected from injury with the reconstruction method. Please comment. 2. Rain gardens were only mentioned for the front yard but no consideration was made for corner lots such as mine at 3161 Ridgewood Road. In my case the lay of the land is flat on the Glen Hill side but steeply rises from the edge on Ridgewood. Therefore, it seems to me that the Glen Hill side is better suited for a rain garden. Please comment. 3. 1 think it would be foolish and expensive to tear up the tennis court to create a rain garden. I would much rather give up trees on the edge of the marsh. 3 I look forward to your comments, Sincerely, Vic Cox Confidentiality Statement:The documents accompanying this transmission contain confidential information that is legally privileged.This information is intended only for the use of the individuals or entities listed above.If you are not the intended recipient,you are hereby notified that any disclosure,copying,distribution,or action taken in reliance on the contents of these documents is strictly prohibited.If you have received this information in error,please notify the sender immediately and arrange for the return or destruction of these documents. 4 John Anderson From: John Anderson Sent: Monday, January 07, 2013 9:10 AM To: 'Westhop' Cc: David Grant; Brenda Holden; Fran Holmes; edwerner88 @yahoo.com; nick @llgardens.com; Terry Maurer Subject: RE: 2013 Pavement Management Plan If you would like to stop by City Hall at 1:30 that would work just fine,see you then John Anderson From: Westhop Sent: Monday, January 07, 2013 9:07 AM To: John Anderson Cc: David Grant; Brenda Holden; Fran Holmes; edwerner88 @yahoo.com; nick @llgardens.com; Terry Maurer Subject: RE: 2013 Pavement Management Plan Thanks for being available on such short notice. I'm free from 1:30 on this afternoon. What time works for you? Nancy From: John Anderson fmailto:]Anderson @cityofardenhills.org] Sent: Monday, January 7, 2013 7:43 AM To: Westhop Cc: David Grant; Brenda Holden; Fran Holmes; edwerner880yahoo.com; nick @llgardens.com; Terry Maurer Subject: RE: 2013 Pavement Management Plan Ms.Jacobson I will be available all day today Monday January 7th to meet with you to discuss to 2013 PMP. We have had a great response to the survey we are conducting and welcome the opportunity to collect as much feedback from the neighborhood that can be passed on to the City Council. Feel free to stop by City Hall today so we can discuss your questions and suggestions. John Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 (651) 792-7846 ianderson(acityofardenhills.org r EN LS 1 From: Westhop� _ Sent: Saturday, January 05, 201 3: To: John Anderson Cc: David Grant; Brenda Holden; Fran Holmes; edwerner88@yahoo.com; nick@Ilgardens.com Subject: 2013 Pavement Management Plan John Anderson, Hello again. I appreciate the opportunity to further respond to the 2013 Pavement Management Plan. Also, the City deserves praise for street paving policies which are flexible and responsive to the needs and concerns of individuals and their neighborhoods. My November 26th email to you was a detailed response to the feasibility report in which I proposed, among other things, a narrower Asbury Avenue. I want to repeat and refine my comments as this time, as the public hearing is approaching and I haven't gotten any substantial response from the City to this narrower street option. I also have a few questions that have come up since the survey was sent out. 1. Requirement for stormwater treatment a. Do the number of raingardens identified in the feasibility report equal the amount of area needed for storm water treatment? b. Will the proposed raingardens be sufficient for storm water treatment, or will there still be a need for tree and/or tennis court removal? c. Does the area of stormwater treatment identified as either the woods by Snelling Avenue or the tennis court equal the amount of storm water treatment area necessary for the neighborhood? 2. Asbury Avenue a. In my November 26th email I asked the City to consider a narrower Asbury Avenue roadway section. This would provide about 6' of flat area for raingarden use, and would preserve the side slope and shrubs on the Northwestern side of the street. There is no earthen berm on College property across from our house, and so the slope and its shrubs are an important screen between us and the College and its ring road. b. The narrower street would more closely match the street width of the adjacent Edgewater Avenue. My professional experience is that a 24' wide road would adequately handle the level of traffic within our neighborhood. c. A narrower Asbury could utilize a radius at the outside edge of its intersection with Edgewater that would unite the two streets at the same width. This radius would have several advantages. i. More area of stormwater storage before and after the 1575 Edgewater driveway. ii. More distance to match the 1575 Edgewater driveway to the street elevation. iii. The radius would provide a cleaner edge for street maintenance and snow removal. My husband and I have been living at 3188 Asbury Ave for 15 years and hope to live here another 15 years, so the decisions made now will affect us in the short and long term. When I participated with the Northwestern College PUD application process several years ago I learned that it was necessary to make sure my concerns are heard before a public hearing, and so I would appreciate an opportunity to meet with you regarding my comments here. My work schedule only allows me Monday, Jan 7th, from early afternoon on, so I hope you will be available. With such short notification I would also be willing to speak with you on the phone. I look forward to hearing from you, and plan to attend the January 14th public hearing. Sincerely, 2 Nancy Jacobson =W Confidentiality Statement:The documents accompanying this transmission contain confidential information that is legally privileged.This information is intended only for the use of the individuals or entities listed above.If you are not the intended recipient,you are hereby notified that any disclosure,copying,distribution,or action taken in reliance on the contents of these documents is strictly prohibited.If you have received this information in error,please notify the sender immediately and arrange for the return or destruction of these documents. 3 John Anderson From: Senay Kindler[ �] Sent: Monday, January , 9:13 AM To: John Anderson Subject: Re: pavement management notice request thanks for the information. I will contact you if I'd like to meet. Senay Kindler On Mon, Jan 7, 2013 at 7:55 AM, John Anderson<JAnderson(i�cityofardenhills.org>wrote: I am providing a link to the City's web site http://www.citvofardenhills.org/index.aspx?nid=218 where information is available on the proposed 2013 PMP. The neighborhood meeting was held in Early October and the presentation from that meeting is available at this link. Additionally there is a link to the feasibility study which describes the proposed improvement options being considered. If you would like to meet with me at city hall I would be happy to bring you up to speed on the project. John Anderson PE Assistant City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 (651) 792-7846 -ianderson@cityofardenhills.org ■..tlmm EN 1 From: Senay Kindler [mailto- ] Sent: Saturday, January 05, 2013 4:52 PM To: John Anderson Subject: pavement management notice request hello, we received a 2013 pavement management program pubic hearing notice and in the notice another notice is referenced in which the two options are described. We did not receive this first notice. If you could please send us this notice before the January 14th meeting we would appreciate it. Our address is 1536 Edgewater Ave. Arden Hills, MN 55112. thank you, Senay Kindler Confidentiality Statement:The documents accompanying this transmission contain confidential information that is legally privileged.This information is intended only for the use of the individuals or entities listed above.If you are not the intended recipient,you are hereby notified that any disclosure,copying,distribution,or action taken in reliance on the contents of these documents is strictly prohibited.If you have received this information in error,please notify the sender immediately and arrange for the return or destruction of these documents. 2 2013 Pavement Management Program Project , SurveyMonkey Survey 1. Name of Property Owner Response Count 32 answered question 32 skipped question 0 2. Address Response Response Percent Count 100.0% 32 100.0% 32 answered question 32 skipped question 0 3. Phone Number Response Count 30 answered question 30 skipped question 2 1 of 4 4. E-mail Address Response Count 23 answered question 23 skipped question 9 5. 1 would prefer to be contacted by Response Response Percent Count phone 17.2% 5 e-mail 51.7% 15 US Postal Service 41.4% 12 answered question 29 skipped question 3 6. Street Rehabilitation The City is looking at two alternatives, one includes a full reconstruction of the roadway and addition of concrete curb and gutter,the second includes reclaiming the bituminous that is in place and repaving the roadway,without adding new curb, but replacing some of the existing bituminous curb. Response Response Percent Count I prefer the full reconstruction 15.6% 5 option prefer the reclamation option 81.3% 26 I do not have a preference on the 3.1% 1 street rehabilitation option answered question 32 skipped question 0 2of4 7. Storm Drainage The City will need to provide roughly 14,000 cubic feet of storm water treatment somewhere in the neighborhood. Some areas considered include the upland area of Johanna Marsh, the tennis court, and front yard rain gardens. Response Response Percent Count Yes, I am interested in a rain garden in my front yard and willing 52.0% 13 to maintain it. Losing trees in Johanna Marsh is a 56.0% 14 major concern for me. Losing the tennis court in Johanna Marsh is a major 68.0% 17 concern for me. answered question 25 skipped question 7 8. Other Response Response Percent Count I have drainage problems associated with the roadway/right - 40.0% 6 of way. I have problems with my sewer or 20.0% 3 water service. 1 have an underground irrigation system, invisible 66.7% 10 fence, or other electrical wiring near the street. answered question 15 skipped question 17 3 of 4 9. Please use this space to give more details on answers above or list other areas of concern. Response Count 23 answered question 23 skipped question 9 4 of 4 Q1. Please use this space to give more details on answers above or list other areas of concern. 1 We purchased our home in September 2012 and the tennis court was a major Jan 5,2013 2:38 PM plus for us since there is no playground or park within a one mile walk.We are an active young family and losing the tennis court is a major concern for us. We'd like to explore all other options before discussing losing the tennis courts. Also,we did not receive any notice discussing the options (referenced in your public hearing notice) I have contacted Mr.John Anderson to request a copy. 2 1 am not interested in a rain garden in my front yard as I have a sump pump Jan 4,2013 10:11 AM operating in my basement now and do not need additional seepage. I do not see any mention of work being done or the water system. Does that mean it is considered satisfactory. We have had I believe four breaks within the last few years with 3 adjoining lots which concerns me. Water collects at end of driveway. 3 We are looking forward to this street improvement project. We as an association Jan 2,2013 9:09 AM would like more information as to the care and maintenance of rain gardens. 4 The tennis court played a significant role in our decision to move here last Jan 2,2013 9:06 AM month. 5 Since the January 14th meeting will include a discussion about rain gardens any Jan 2,2013 9:05 AM information about the care and maintenance of rain gardns should be sent to us and the neighborhood before the January 14th meeting. Edgewater is either icy in the winter or has too many potholes to safely walk. 6 First of all,thank you for requesting neighborhood input in this project. My Jan 1,2013 8:13 PM property is on the corner of Ridgewood Rd and Edgewater Ave. My side yard borders Ridgewood and front yard faces Edgewater. I am directly across the street(Ridgewood)from Johanna Marsh and the tennis court. I have reviewed both street rehabilitation plans and favor the reclamation project. I have significant concerns regarding any loss of trees along any streets as well as in Johanna Marsh. The proposal recommends a filtration basin along Ridgewood Rd on my property side of the street as well as a rain garden. I have a couple questions regarding both in terms of appearance and how they may affect my access to my back yard as my only utility and lawn care equipment access is from the side street(Ridgewood)at the south end of my property. Additionally, I have an irrigation system along both Ridgewood Rd and Edgewater Ave and have questions regarding any necessary changes or relocation. If raingardens are insufficient for storm water treatment and Johanna Marsh needs to be considered, I favor the retention of the trees in Johanna Marsh first and then the tennis court. And obviously, if the tennis court needs to be removed I favor a drainage pond that is functional but environmentally and aesthetically pleasing. Thank you for hearing my concerns. 7 1 see no reason for widening the street. We all have large driveways which take Dec 27,2012 8:09 AM care of cars except for special events. 8 No problems with losing the tennis court. Dec 26,2012 9:05 AM 9 1 would be glad to have a rain garden on the Glenhill side of my corner lot. I am Dec 26,2012 9:04 AM willing to have a rain garden on the Ridgewood side BUT only north of the driveway. 3of4 Q1. Please use this space to give more details on answers above or list other areas of concern. 10 Ridgewood Road drainage culvert in front yard. Dec 26, 2012 9:02 AM 11 Thank you for conducting this survey. I believe Asbury is perfect for reclamation, Dec 19, 2012 11:30 AM and to save or not spend more money is positive. 12 1 think an evaluation by a forester is needed to determine the impact of Dec 18, 2012 9:22 AM reconstruction vs. reclamation on the mature trees close to the street. Absent that, I support reclamation as it likely would do less damage to tree roots. 13 1 definitely want concrete curbs and gutters. The bituminous curbs are a joke- Dec 18, 2012 8:23 AM the first snow and the plows take them out on a street like ours which runs at an angle. If you don't put in concrete, I will. 14 We are concerned about(1)trees, (2)landscaping, and (3)slopes along Dec 18, 2012 8:21 AM Edgewater Avenue. $4,500 is also a big deal to us. 15 -not great water pressure-if the tennis court has to go, it would be too bad-I Dec 18, 2012 8:07 AM like the idea of rain gardens, but I would not have time to maintain one-few in our neighborhood are maintained correctly- I have trees near the road that I am concerned about- I would have difficulty funding$9,000 whereas$4,500 might be possible-I do not want curbs 16 Overflow and flooding are a concern. Dec 18, 2012 8:04 AM 17 1 have concerns about rain gardens not being maintained. We have sewer main Dec 18,2012 8:02 AM drain backups often. Thank you! We appreciate what you do for our community. 18 For#8-we just moved in so I don't know this for sure. My husband gives the Dec 18,2012 7:57 AM neighborhood kids free tennis lessons every summer. These courts mean a lot to this neighborhood. 19 we have a sprinkler system Dec 18, 2012 7:51 AM 20 1 prefer the money be spent in other ways. Burying electrical lines would seem Dec 18,2012 7:48 AM to me a better use of my tax dollars. I have 2 rain gardens and would be happy to have more. 21 Losing the tennis court is a major loss. Losing buffer trees is a huge loss too. Dec 18, 2012 7:46 AM 22 1 will help with the garden fronting Northwestern College. Dec 18,2012 7:46 AM 23 The water main on Edgewater has broken in front of my house at least 4 times Dec 10, 2012 8:26 AM and the street never drains properly.Will you be replacing the water main? Some residents are concerned about losing trees.You can take mine. I will plant new ones just to get a decent looking street with concrete curbs and gutters. My feeling is that curbs and gutters will improve the value of our property more then the reclamation option. Losing the tennis court doesn't bother me but I can see where it could for those who like to play tennis. 4of4