Loading...
HomeMy WebLinkAbout8B, US 10/Hwy 96 Agreements ,-AR EN_HILLS Request for Council Action 8 -B Prepared By: Terry Maurer, Public Works Director Council Meeting Date: January 28, 2013 US 10/Hwy 96 Agreements Budgeted Amount: Actual Amount: Funding Source: 5490,000 $125,000-S 1.50,000 Municipal State Aid Fund, Sanitary Sewer Utility Fund, and PIR Fund Recommendation: The Council is requested to individually adopt Resolution 2013-010 Entering into Mn/DOT Agreement No. 02885 for the US 10/Hwy 96 Grade Separation Project, adopt Resolution 2013-011 Entering into Ramsey County Agreement PW 2013-002 for the US 10/Hwy 96 Grade Separation Project, and adopt Resolution 2013-012 Entering into Mn/DOT Signal Agreement No. 02212-R for the Signal Systems in the US 10/Hwy 96 Grade Separation Project Supporting Documents: 1. Memorandum dated January 28, 2013, from Terry Maurer,Public Works Director. 2. Resolution 2013-010 Entering into Mn/DOT Agreement No. 02885 for the US 10/Hwy 96 Grade Separation Project and Agreement No. 02885. 3. Resolution 2013-011 Entering into Ramsey County Agreement PW 2013-002 for the US 10/Hwy 96 Grade Separation Project and Agreement PW2013-002. 4. Resolution 2013-012 Entering into Mn/DOT Signal Agreement No. 02212-R for the Signal Systems in the US 10/Hwy 96 Grade Separation Project and Agreement No. 02212-R. lt ,ARZEN HILLS MEMORANDUM DATE: January 28, 2013 TO: Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator FROM: Terry Maurer, Public Works Director �TTA SUBJECT: US 10/Hwy 96 Agreements BacklZround Mn/DOT and Ramsey County are working cooperatively to complete the grade separation of the intersection of US 10 and Highway 96. Ramsey County will be funding the entire construction cost while Mn/DOT has completed the design and will be providing bidding and construction services. The lowering of Highway 96 (approximately 17 feet) to pass under US 10 will affect several of our City utilities, water main and sanitary sewer forcemain, which will have to be replaced at a lower depth. The project will also build a new signal system at the intersection of Highway 96 and Old Highway 10 and rebuild the existing signal system at the intersection of Highway 96 and Round Lake Road, which will also become the new entrance to Arden Manor. The project will also require the reconstruction of Lakeshore Place due to the significant grade changes of the 10/96 intersection. City staff asked for a steel casing pipe to be placed under Highway 96 in the location of Lift Station#I I for a future gravity sewer line when Lift Station#11 is eliminated to save the future cost of "jacking" the casing pipe under the highway. Finally, there will be some improvements, such as a trail and sidewalk along Highway 96, that the City will be asked to share in the cost of construction. With this brief background, the City is being asked to enter into three separate agreements for this project: a Mn/DOT Cooperative Construction Agreement, a Ramsey County Cooperative Agreement and a Mn/DOT/Ramsey County Signal Agreement. The City attorney has reviewed all three agreements. A more detailed discussion of each follows. City Council Meeting P:\Admin\Council\Agendas& Packet Information\2013\01-28-13-R\Packet\1-28-13 Agreements 10-96.doc Page 1 of 3 Mn/DOT Cooperative Construction Agreement Because Mn/DOT is the agency that designed the project and the project involves the relocation/replacement of some City utilities we are being asked to enter into this agreement. There is no cost to the agreement. It simply states that due to the effect on our City utilities, we requested their relocation be included in the project. It also lays out our rights and responsibility during construction to observe and comment to Mn/DOT if we think changes need to be made. It makes clear that the City will be responsible for maintenance of the relocated utilities after the project. Finally, it protects the City should there be any suspension of work, that our utilities will be left in an "acceptable operating condition." A copy of the agreement and a resolution entering into it and authorizing the Mayor and City Administrator to execute the agreement are attached. Ramsey County Cooperative Agreement Since Ramsey County is the funding agency for the project, the Cooperative Agreement deals with the City's costs for items included in the project. Since the project bids will not be opened until February 8t", our costs at this time are based on estimates. After bids are opened a detailed cost split will be prepared. Generally, the City's cost for various items in the project are listed below: • City utility relocations - No cost to the City because the intersection design caused the need for the relocations. • Lakeshore Place reconstruction -No cost to the City because the reconstruction is due to the highway intersection grade changes. • Steel casing pipe for the future elimination of LS #11 - This is 100% City cost because we asked for it to be included in the project. The estimated cost is $20,000 425,000. • New signal at Highway 96 and Round Lake Road - 25% of the cost will be the City's since we have one of the four legs (Ramsey County will be paying for the new Arden Manor entrance). The estimated cost to the City is $35,000-$45,000. • Emergency Vehicle Pre-emption (EVP) - The City's cost of the EVP system for the signal is expected to be less than $5,000. • Trail and sidewalk adjacent to Highway 96 - The City's cost will be calculated by the County's Cost Participation Policy. However, since this project has Federal monies involved, those will be first applied to eligible items prior to the County's split of costs. The current estimate of the City's cost for all trail and sidewalk items is $55,000-$65,000. • Land Acquisition for Parcel #4 - The County provided all land acquisition services for the project. As they were proceeding with this process they City Council Meeting P:\Admin\Council\Agendas&Packet Information\2013\01-28-13-R\Packet\1-28-13 Agreements 10-96.doc Page 2 of 3 discovered a lot on Lakeshore Place (Parcel #4) where the road had some time ago migrated out of the right-of-way and could not be reasonably put back into the existing right-of-way. The County contacted the City and offered to include this small parcel of land acquisition in their process if the City would pay for the cost of the parcel. Since the County was acquiring other small parcels on Lakeshore Place this would make the entire area legally correct after the project. The estimated cost of Parcel #4 is under$10,000. Based upon the above estimates, the City's share of this project is expected to be between $125,000 and 150,000. The City's 2013 CIP actually has an item for this project with an estimated cost of$490,000, as we anticipated many more costs a few years ago when this item was placed in the CIP. Generally the funding source will be: Municipal State Aid funds for the signal, trail and sidewalk items; Sanitary Sewer Utility Funds for the casing pipe; and PIR funds for Parcel #4. A copy of the agreement and a resolution entering into it and authorizing the Mayor and City Administrator to execute the agreement are attached. Mn/DOT/Ramsey County Signal Agreement The final agreement is a Signal Agreement for operation and maintenance of the two new signal systems. The City's role in the ongoing maintenance and operation of the signal systems will be to paint them when needed because we asked for them to be the same green color as the rest of the Highway 96 corridor signal systems rather than just galvanized poles. We will also be responsible for the electrical charges to operate the signal at Round Lake Road. The County is responsible for electrical service for the other signal system. A copy of the agreement and a resolution entering into it and authorizing the Mayor and City Administrator to execute the agreement are attached. Council Action Requested The Council is requested to individually: 1. Adopt Resolution 2013-010 Entering into Mn/DOT Agreement No. 02885 for the US 10/Hwy 96 Grade Separation Project 2. Adopt Resolution 2013-011 Entering into Ramsey County Agreement PW 2013-002 for the US 10/Hwy 96 Grade Separation Project 3. Adopt Resolution 2013-012 Entering into Mn/DOT Signal Agreement No. 02212-R for the Signal Systems in the US 10/Hwy 96 Grade Separation Project City Council Meeting P:\Admin\Council\Agendas&Packet Information\2013\01-28-13-R\Packet\1-28-13 Agreements 10-96.doc Page 3 of 3 Mn/DOT Contract No: 02885 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION And CITY OF ARDEN HILLS COOPERATIVE CONSTRUCTION AGREEMENT State Project Number(S.P.): 6205-38 Estimated Amount Receivable Trunk Highway Number(T.H.): 10=062 [$0.001 State Project Number(S.P.) 6205-62071 State Project Number(S.P.) 6205-62072 State Project Number(S.P.): 062-696-026CTB State Project(S.P.): 187-020-014 Federal Project Number: STP-HSIP 6213 (007) This Agreement is between the State of Minnesota, acting through its Commissioner of Transportation("State")and City of Arden Hills acting through its City Council("City"). Recitals 1. The State,at the request of and on behalf of Ramsey County,will perform grading,bituminous and concrete surfacing,retaining walls,noise walls, signals,lighting and bridge No.'s 62071, 62072 construction and other associated construction upon, along and adjacent to Trunk Highway No. 10 from 650'south of C.S.A.H. 96 to 400' south of Prior Ave. and on C.S.A.H. 96 from I-35W to 1600' east of T.H. 10,in the City of Arden Hills according to State prepared plans, specifications and special provisions designated by the State as State Project No. 6205 38 (T.H. 10=062) ("Project"); and 2. In response to Project construction impacts to existing City utilities,the City,through Ramsey County,has requested the State include in its Project construction of utilities consisting of,but not limited to,watermain, water services, sanitary sewer and forcemain,casing for future sanitary sewer("utility construction")within the Project; and 3. A separate agreement,Agreement No. 02300,between the State and Ramsey County will address the cost of the utility construction; and 4. Minnesota Statutes § 161.45, subdivision2, allows for City-owned utility relocation to be included in a State construction contract; and 5. Minnesota Statutes § 161.20, subdivision 2 authorizes the Commissioner of Transportation to make arrangements with and cooperate with any governmental authority for the purposes of constructing, maintaining and improving the trunk highway system. Agreement 1. Term of Agreement; Survival of Terms;Plans; Incorporation of Exhibits 1.1. Effective date. This Agreement will be effective on the date the State obtains all signatures required by Minnesota Statutes § 16C.05, subdivision 2. 1.2. Expiration date.This Agreement will expire when all obligations have been satisfactorily fulfilled. 1.3. Survival of terms. All clauses which impose obligations continuing in their nature and which must survive in order to give effect to their meaning will survive the expiration or termination of this Agreement, -1- Receivable Standard(Municipal Agreements) Mn/DOT Contract No: 02885 including,without limitation,the following clauses: 3.Maintenance by the City; 7.Liability;Worker Compensation Claims; 9. State Audits; 10. Government Data Practices; 11.Governing Law; Jurisdiction; Venue; and 13.Force Majeure. 1.4. Plans,Specifications,Special Provisions.Plans, specifications and special provisions designated by the State as State Project No. 6205-38 (T.H. 10)are on file in the office of the Commissioner of Transportation at St.Paul,Minnesota,and incorporated into this Agreement by reference. ("Project Plans") 2. Construction by the State 2.1. Contract Award. The State will advertise forbids and award a construction contract to the lowest responsible bidder according to the Project Plans. 2.2. Direction,Supervision and Inspection of Construction. A. Supervision and Inspection by the State. The State will direct and supervise all construction activities performed under the construction contract, and perform all construction engineering and inspection functions in connection with the contract construction. All contract construction will be performed according to the Project Plans. B. Inspection by the City. The City utility construction covered under this Agreement will be open to inspection by the City. If the City believes the City participation construction covered under this Agreement has not been properly performed or that the construction is defective,the City will promptly inform the State's Project Engineer and District Engineer's authorized representative of those defects. In the event those defects cannot be remedied readily as a field adjustment,the City shall notify the State's Project Engineer and District Engineer's authorized representative in writing of the defect(s)and make recommendations for correction.Any recommendations made by the City will be thoroughly analyzed and discussed with the City in a good faith effort to resolve problems and reach mutual agreement prior to the State making a final decision. The State will seek concurrence from the City in its determination whether the State's contractor has satisfactorily performed the City utility construction. 2.3. Plan Changes,Additional Construction,Etc. A. The State will make changes in the Project Plans and contract construction,which may include the City utility construction covered under this Agreement, and will enter into any necessary addenda, change orders and supplemental agreements with the State's contractor that are necessary to cause the contract construction to be performed and completed in a satisfactory manner. B. The City may request additional work or changes to the work in the plans as part of the construction contract. Such request will be made by an exchange of letter(s)with the State. If the State determines that the requested additional work or plan changes are necessary or desirable and can be accommodated without undue disruption to the project,the State will cause the additional work or plan changes to be made. 2.4. Satisfactory Completion of Contract.The State will perform all other acts and functions necessary to cause the construction contract to be completed in a satisfactory manner. 2.5. Permits A. The City will submit to the State's Utility Engineer an original permit application for all utilities owned by the City/County to be constructed hereunder that are upon and within the trunk highway right-of-way. Applications for permits will be made on State form"Application For Utility Permit On Trunk Highway Right-Of-Way" (Form TP2525). B. If required,the City will submit to the Minnesota Pollution Control Agency the plans and specifications for the construction or reconstruction of its sanitary sewer facilities to be performed under the construction contract and obtain,under Minnesota Statutes § 115.07 or Minnesota Rules 7001.1030, subpart 2C, either a permit or written waiver from that agency for that construction or reconstruction. -2- Receivable Standard(Municipal Agreements) Mn/DOT Contract No: 02885 The City is advised that under Minnesota Rules 7001.1040, a written application for the permit or waiver must be submitted to the Minnesota Pollution Control Agency at least 180 days before the planned date of the sanitary sewer facility construction or reconstruction. 2.6. Replacement of Castings.Adjustments to certain City-owned facilities,including but not limited to,valve boxes and frame and ring castings,may be performed by the State's contractor under the construction contract. The City will furnish the State's contractor with new units and/or parts for those in place City- owned facilities when replacements are required and not covered by a contract pay item,without cost or expense to the State or the contractor, except for replacement of units and/or parts broken or damaged by the contractor. 3. Maintenance by the City. Upon completion of the project,the City will provide the following without cost or expense to the State: Municipal Utilities. Maintenance of any municipal-owned utilities construction,without cost or expense to the State. 4. City Requested Construction Cost Plan Changes,Additional Construction,Etc. The City may share in the costs of construction contract addenda, change orders and supplemental agreements that are necessary to complete the City participation construction covered under this Agreement, including any City requested additional work and plan changes. Such work relating to the utility construction,and associated costs will be included in Ramsey County Agreement No.PW2013-01 with the City. The State reserves the right to invoice the City for the cost of any additional City requested work and plan changes, change orders and supplemental agreements,and associated construction engineering before the completion of the contract construction. 5. Authorized Representatives Each party's Authorized Representative is responsible for administering this Agreement and is authorized to give and receive any notice or demand required or permitted by this Agreement. 5.1. The State's Authorized Representative will be: Name/Title: Maryanne Kelly-Sonnek,Municipal Agreements Engineer (or successor) Address: 395 John Ireland Boulevard,Mailstop 682, St.Paul,MN 55155 Telephone: (651)366-4634 Fax: (651)366-4769 E-Mail: maryanne.kellysonnek @state.mn.us 5.2. The City's Authorized Representative will be: Name/Title: Terry Maurer,Public Works Director (or successor) Address: 1245 West Highway 96 Arden Hills,Mn 55112-5743 6. Assignment; Amendments; Waiver; Contract Complete 6.1. Assignment. Neither party may assign or transfer any rights or obligations under this Agreement without the prior consent of the other party and a written assignment agreement, executed and approved by the same parties who executed and approved this Agreement, or their successors in office. 6.2. Amendments. Any amendment to this Agreement must be in writing and will not be effective until it has been executed and approved by the same parties who executed and approved the original Agreement,or their successors in office. -3- Receivable Standard(Municipal Agreements) r Mn/DOT Contract No: 02885 6.3. Waiver. If a party fails to enforce any provision of this Agreement,that failure does not waive the provision or the party's right to subsequently enforce it. 6.4. Contract Complete. This Agreement contains all prior negotiations and agreements between the State and the City.No other understanding regarding this Agreement,whether written or oral,may be used to bind either party. 7. Liability;Worker Compensation Claims 7.1. Each party is responsible for its own acts,omissions and the results thereof to the extent authorized by law and will not be responsible for the acts and omissions of others and the results thereof. Minnesota Statutes § 3.736 and other applicable law govern liability of the State. Minnesota Statutes Chapter 466 and other applicable law govern liability of the City. 7.2. Each party is responsible for its own employees for any claims arising under the Workers Compensation Act. 8. Nondiscrimination Provisions of Minnesota Statutes § 181.59 and of any applicable law relating to civil rights and discrimination are considered part of this Agreement. 9. State Audits Under Minnesota Statutes § 16C.05, subdivision 5,the City's books,records,documents,and accounting procedures and practices relevant to this Agreement are subject to examination by the State and the State Auditor or Legislative Auditor, as appropriate, for a minimum of six years from the end of this Agreement. 10. Government Data Practices The City and State must comply with the Minnesota Government Data Practices Act,Minnesota Statutes Chapter 13,as it applies to all data provided under this Agreement,and as it applies to all data created,collected,received, stored,used,maintained,or disseminated by the City under this Agreement.The civil remedies of Minnesota Statutes §13.08 apply to the release of the data referred to in this clause by either the City or the State. 11. Governing Law; Jurisdiction;Venue Minnesota law governs the validity,interpretation and enforcement of this Agreement. Venue for all legal proceedings arising out of this Agreement, or its breach,must be in the appropriate state or federal court with competent jurisdiction in Ramsey County, Minnesota. 12. Termination; Suspension 12.1.By Mutual Agreement.This Agreement may be terminated by mutual agreement of the parties. 12.2. Termination for Insufficient Funding. The State may immediately terminate this Agreement if it does not obtain funding from the Minnesota Legislature,or other funding source; or if funding cannot be continued at a level sufficient to allow for the performance of contract construction under the Project.Termination must be by written or fax notice to the City.Any utilities disrupted by construction at the time of termination shall be functionally restored to an acceptable operating condition. 12.3.Suspension. In the event of a total or partial government shutdown,the State may suspend this Agreement and all work,activities and performance of work authorized through this Agreement. 13. Force Majeure Neither party will be responsible to the other for a failure to perform under this Agreement(or a delay in performance),if such failure or delay is due to a force majeure event. A force majeure event is an event beyond a party's reasonable control,including but not limited to,unusually severe weather, fire, floods, other acts of God, labor disputes, acts of war or terrorism,or public health emergencies. -4- Receivable Standard(Municipal Agreements) Mn/DOT Contract No: 02885 [The remainder of this page has been intentionally left blank] I -5- Receivable Standard(Municipal Agreements) Mn/DOT Contract No: 02885 CITY OF ARDEN HILLS DEPARTMENT OF TRANSPORTATION The undersigned certify that they have lawfully Recommended for Approval: executed this contract on behalf of the Governmental Unit as required by applicable charter provisions, resolutions or ordinances. By: (District Engineer) By: Date: Title: Approved: Date: By: (State Design Engineer) By: Date: Title: Date: COMMISSIONER OF ADMINISTRATION By: (With delegated authority) Date: INCLUDE COPY OF RESOLUTION APPROVING THE AGREEMENT AND AUTHORIZING ITS EXECUTION. -6- Receivable Standard(Municipal Agreements) Agreement PW 2013-02 January 18, 2013 RAMSEY COUNTY COOPERATIVE AGREEMENT WITH CITY OF ARDEN HILLS Agreement between State Project Number(S.P): 6205-38 the County of Ramsey Trunk Highway Number(T.H.): 10=062 and the City of Arden Hills State Project Number(S.P.): 6205-62071 State Project Number(S.P.): 6205-62072 State Project Number(S.P.): 062-696-026CTB State Project(S.P.): 187-020-014 Federal Project Number: STP-HSIP 6213(007) Reconstruction of Highway 96 and TH 10 Attachments: Exhibit A-Estimated Cost Participation Summary THIS AGREEMENT,by and between the City of Arden Hills, Minnesota, a municipal corporation,hereinafter referred to as the "City," and Ramsey County, a political subdivision of the State of Minnesota,hereinafter referred to as the "County"; WITNESSETH: WHEREAS,the County has identified a project involving grading,bituminous and concrete surfacing, retaining walls,noise walls,traffic signals, lighting, and bridge No. 62071 and 62072 construction, and other associated construction upon, along and adjacent to Trunk Highway No. 10 from 650' south of C.S.A.H. 96 to 400' south of Prior Ave. and on C.S.A.H. 96 from I- 35W to 1600' east of T.H. 10, and on Lakeshore Place in the City; and WHEREAS,this segment of Highway 96 and TH 10 has been designated by Minnesota Department of Transportation as eligible for funds from the County State Aid Highway Turnback Account and designated as eligible for a grant of Federal Funds as Federal Project Number STP-HSIP 6213(007); and WHEREAS,this segment of Highway 96 and TH 10 has been designated as State Project Number (S.P.): 187-020-014 and State Project Number(S.P.): 062-696-026 CTB WHEREAS, this subject road segment is located within the City of Arden Hills; and WHEREAS,plans for reconstruction of Highway 96 and TH 10 showing proposed alignment, profiles, grades and cross sections for the improvement of Highway 96 and TH 10, as defined herein have been presented to the City; and Page 1 of 5 WHEREAS,the grading and widening provisions require acquisition of certain right of way and temporary construction and slope easements prior to construction; and WHEREAS, the Minnesota Department of Transportation will take bids for the project,prepare an abstract of bids and cost participation summary, award a contract and pay the contractor from Federal Aid, State Aid and County State Aid Highway Turnback Account identified for the project. NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AS FOLLOWS: 1. Minnesota Department of Transportation shall prepare the necessary plans, specifications and proposal. Cost of project revisions after completion of the plans and specifications will be paid for by the party requesting the revisions or as defined by supplemental agreement. Revisions must be consistent with State Aid requirements and are subject to County approval. 2. Minnesota Department of Transportation shall take bids and award a contract for construction of the subject project. 3. The County shall administer the acquisition of all rights of way and easements required for the construction of the project in accordance with State Aid requirements and all applicable Federal and State Statutes. The County shall provide all compensation to property owners for acquired rights of way and easements. In the event the City requests work not included within the original plans, the City will be responsible for costs for additional rights of way required. 4. All acquired road rights of way and temporary easements adjacent to CSAH 96 will be in the name of the County, and other regulations will be controlled by the County. Right of way acquired adjacent to Lakeshore Place shall be controlled by the City. Any right of way acquisition which cannot be negotiated,will be acquired through eminent domain proceedings by the County, or eliminated through design revisions, as determined most appropriately by the County. 5. The County and City shall participate in the costs of construction in accordance with the Estimated Cost Participation Summary, attached as Exhibit A and incorporated herein, except as modified below. Concrete walk,bituminous trail, and signal systems are paid according to the County cost participation policy. If the Ramsey County Board of Commissioners adopt a new cost participation policy the City and County through mutual The city shall a 100%of the 28" steel casing may use the amended olic g agreement policy. Y pay Y pipe. The City shall pay 25%of the signal system and emergency vehicle preemption at ° cost of acquisition of 100/o of the Round Lake Road and Prior Ave. The City shall pay q right of way from Parcel 4. 6. Upon completion of the project the County shall own and maintain all storm sewer catch basins, leads and outfalls which are located within County road rights of way and directly Page 2 of 5 serve the paved portion of Highway 96. The main trunk storm sewer in the portion of Highway 96 within the City shall be owned and maintained by the City. 7. Any utilities or facilities modified or added to those provisions presently made in the plans and specifications may be incorporated in the construction contract by supplemental agreement and shall be paid for as specified in the supplemental agreement. Design and construction engineering fees for additions shall be negotiated at the time of supplemental agreement preparation. 8. Throughout project design and construction, the County shall prepare partial cost and payment estimates for construction costs at appropriate intervals, notify the City of its share of the costs for the City's items of work. City shall pay its share of construction costs within twenty one calendar days of receipt of County invoice. 9. The City shall pay to the County all additional remaining costs for its share of the work upon notification by the County of the final amounts due to the contractor. 10. All payments by the City shall be to the Treasurer of Ramsey County,Minnesota. 11. The City and County shall indemnify, defend and hold each other harmless against any and all liability,losses, costs, damages, expenses, claims, or actions, including attorney's fees, which the indemnified party, its officials, agents, or employees may hereafter sustain, incur, or be required to pay, arising out of or by reason of any act or omission of the indemnifying party, its officials, agents or employees, in the execution,performance, or failure to adequately perform the indemnifying party's obligation pursuant to this Agreement. Nothing in this Agreement shall constitute a waiver by the County or the City of any statutory or common law immunities, limits, or exceptions on liability. Page 3 of 5 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed. THE COUNTY OF RAMSEY By Chair Board of County Commissioners Attest: Chief Clerk-County Board Date Approved as to Form: Assistant County Attorney Recommended for Approval: James Tolaas, P.E. Public Works Director and County Engineer Page 4 of 5 CITY OF ARDEN HILLS, MINNESOTA By Its By Its Date Approved as to Form: City Attorney Page 5 of 5 MINNESOTA TRANSPORTATION DEPARTMENT TRAFFIC CONTROL SIGNAL AGREEMENT NO. 02212-R BETWEEN THE STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION AND THE COUNTY OF RAMSEY AND THE CITY OF ARDEN HILLS TO Remove the existing Traffic Control Signals on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) and on County State Aid Highway No. 96 at Round Lake Road; and Install two (2) new Traffic Control Signals with Signal Pole Mounted Luminaires, Emergency Vehicle Pre-emption, Interconnect and Signing on Trunk Highway No. 10 at County State Highway No. 96 (County Road G) , West Ramp, and on County State Highway No. 96 (County Road G) at Round Lake Road/Prior Avenue; and Install four (4) new Underpass Lights between the East and West Ramps on Trunk Highway No. 10 at County State Highway No. 96 (County Road G) , in the City of Arden Hills, Ramsey County, Minnesota. S. P. 6205-38 S. P. 187-020-014 System I . D. ' s 20232 and 39344 Prepared by Metropolitan District Traffic Engineering ESTIMATED AMOUNT RECEIVABLE AMOUNT ENCUMBERED NONE None Otherwise Covered 02212-R -1- PARTIES THIS AGREEMENT is entered into by the Minnesota Department of Transportation, (State) , the County of Ramsey (County) , and the City of Arden Hills, (City) . RECITALS Minnesota Statutes Section 161 . 20 authorizes the Commissioner of Transportation to enter into agreements with any governmental authority for the purposes of constructing, maintaining and improving the Trunk Highway system. The parties have determined that there is justification and it is in the public' s best interest to remove the existing traffic control signals on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) and on County State Aid Highway No. 96 (County Road G) at Round Lake Road; and install two (2) new traffic control signals with signal pole mounted luminaires, interconnect and signing (Traffic Control Signal (s) ) on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) , West Ramp, and on County State Aid Highway No. 96 (County Road G) at Round Lake Road/Prior Avenue; and install four (4) new underpass lights (Underpass Lights) between the East and West Ramps on Trunk Highway No. 10 at County State Highway No. 96 (County Road G) in accordance with the plans, specifications and special provisions designated as State Project No. 6205-38 (T.H. 10=062) and State Aid Project No. 187- 020-014 . The cost participation for this Project is covered in 02212-R -2- Cooperative Agreement No. 02300, between the County and the State. The City requests and the County and the State agree to the installation of Emergency Vehicle Pre-emption Systems (EVP System(s) ) , as a part of the new Traffic Control Signal installations . It is considered in the public' s best interest for the Contractor to provide two new traffic control cabinets and control equipment using County provided specifications . The County, the City, and the State will participate in the maintenance and operation of the new Traffic Control Signals, EVP Systems, and Underpass Lights . CONTRACT 1 . The State will prepare the necessary plan, specifications and proposal, (Preliminary Engineering) and also perform all necessary construction inspection, (Construction Engineering) . 2 . The State, with its own resources or by contract, will remove the existing traffic control signals on Trunk Highway No. 10 at County State Aid Highway nTO. 96 (County Road G) and on County State Aid Highway No. 96 (County Road G) at Round Lake Road; and install two (2) new Traffic Control Signals and EVP Systems on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) , West Ramp (System "A") , and on County State Aid Highway No. 96 (County Road G) at Round Lake Road/Prior Avenue (System "B") , and install four (4) new Underpass Lights 02212-R -3- between the East and West Ramps on Trunk Highway No. 10 at County State Highway No. 96 (County Road G) , pursuant to the plans and specifications for State Project No. 6205-38 (T.H. 10=062) and State Aid Project No. 187-020-014 . 3 . The County will, for System "A", be responsible for the cost and application to secure an adequate power supply to the service pad or pole . Upon completion of this project, the County will thereafter pay all monthly electrical service expenses necessary to operate the new Traffic Control Signal and EVP System. 4 . The City will, for System "B", be responsible for the cost and application to secure an adequate power supply to the service pad or pole. Upon completion of this project, the City will thereafter pay all monthly electrical service expenses necessary to operate the new Traffic Control Signal and EVP System. S . The City will, for the Underpass Lights, be responsible for the cost and application to secure an adequate power supply to the service pad or pole. Upon completion of this project, the City will thereafter pay all monthly electrical service expenses necessary to operate the new Underpass Lights . Upon completion of this project, the City will also be responsible for all maintenance, operation and replacement of the Underpass Lights . 6. Upon completion of this project, the responsibility for the new Traffic Control Signal (System "A") is as follows: 02212-R -4- a) The City will, at its cost and expense, clean and paint the traffic control signal and the luminaire mast arm extensions . Painting will be in accordance with Mn/DOT Standard Specification 2565 . 3T, unless approved by the State' s District Traffic Engineer. b) The County will, at its cost and expense: (1) maintain the signal pole mounted luminaires and all their components, including re-lamping and replacement of the luminaire if necessary; (2) replace the signal system L.E. D. indications; (3) clean the controller and service cabinets; and (4) maintain the new interconnect, including Gopher State One Call; and c) The County will maintain the traffic signal cabinet and control equipment, repair knockdowns of the Traffic Control Signal, and perform all other traffic control signal and signal pole mounted luminaire circuit maintenance, all on a reimbursable basis with the State. 7 . Upon completion of this project, the responsibility for the new Traffic Control Signal (System "B") is as follows : a) The City will, at its cost and expense, (1) clean and paint the traffic control signal and the luminaire mast arm extensions . Painting wl ll l 'D e in accordance wit-h. Mn./ Standard rd Specification 2565 . 3T, unless approved by the State' s District Traffic Engineer. and (b) The County will, at its cost and expense: (1) maintain the signal pole mounted luminaires and all their components, including re-lamping and replacement of the luminaire if necessary; (2) replace the signal system L.E. D. indications; (3) clean the controller and service cabinets; (4) 02212-R -5- maintain the new interconnect, including Gopher State One Call; and (5) maintain the traffic signal cabinet and control equipment, repair knockdowns of the Traffic Control Signal, and perform all other traffic control signal and signal pole mounted luminaire circuit maintenance. 8 . The EVP Systems will be installed, operated, maintained, or removed in accordance with the following conditions and requirements : a) For System "A", all maintenance of the EVP System will be the responsibility of the State, which will be performed by the County on a reimbursable basis . b) For System "B", all maintenance of the EVP System will be the responsibility of the County. c) Emitter units may be installed only on authorized emergency vehicles, as defined in Minnesota Statutes Section 169. 011, Subdivision 3 . Authorized emergency vehicles may use emitter units only when responding to an emergency. For System "A", the City will provide the State' s Metropolitan District Engineer or his designated representative a list of all vehicles with emitter units, upon request. For System "B", the City will provide the 02212-R -6- County' s Engineer or his designated representative a list of all vehicles with emitter units, upon request . d) Malfunction of the EVP Systems must be reported to the County immediately. e) For System "A", in the event the EVP System or its components are, in the opinion of the State, being misused or the conditions set forth in Paragraph b i above are violated, and such misuse or violation continues after the City receives written notice from the State or County, the State may remove the EVP System. Upon removal of the EVP System pursuant to this Paragraph, all of its parts and components become the property of the State. f) For System "B", in the event the EVP System or its components are, in the opinion of the County, being misused or the conditions set forth in Paragraph b above are violated, and such misuse or violation continues after the City receives written notice from the County, the County may remove the EVP System. Upon removal of the EVP System pursuant to this Paragraph, all of its 02212-R -7- parts and components become the property of the County. g) All timing of the EVP Systems will be determined by the County' s Traffic Engineer. 9 . All timing of the new Traffic Control Signals will be determined by the County Traffic Engineer. 10 . The County will, for System "A", invoice the State for the actual costs it incurs in maintaining and keeping in good repair the new Traffic Control Signal and EVP System, as specified in Paragraphs 6, 8, and 9 excluding the following: maintenance of the signal pole mounted luminaires and all its components, including replacement of the luminaires and lamps if necessary; replacing the L.E. D. signal indications; cleaning and painting the new traffic control signal and luminaire mast arm extensions; cleaning the new controller and service cabinets, and maintain the new interconnect, including Gopher State One Call; assigned to the City and County by this Agreement. 11 . The State or the County, for System "A' , may terminate the terms and conditions covering maintenance and operation contained in Paragraphs 6, 8, 9, and 10 upon providing 30 days notice to the other party. The County' s termination must be accomplished by a resolution of the County Board. The State' s termination must be accomplished by a letter from Mn/DOT' s Metropolitan District Engineer. Upon termination, responsibility for the Traffic Control Signal, and EVP System will be as follows: a) The County will, at its cost and expense: (1) 02212-R -8- maintain the signal pole mounted luminaires and all their components, including re-lamping and replacement of the luminaire if necessary; (2) replace the signal system L.E. D. indications; (3) clean the controller and service cabinets; and (4) maintain the new interconnect, including Gopher State One Call; and b) The State will maintain the traffic signal cabinet and control equipment, repair knockdowns of the Traffic Control Signal, and perform all other traffic control signal and signal pole mounted luminaire circuit maintenance, excluding painting of the signal system assigned to the City. In addition, all timing of the new Traffic Control Signal and EVP System will be determined by the State, and no changes may be made except with the approval of the State. 12 . By signing this agreement, each party authorizes the other party to enter upon their respective public right of way to install and maintain the new Traffic Control Signals and EVP Systems . 13 . Each party will be solely responsible for its own acts and omissions, and the results thereof, to the extent authorized by law. The State ' s liability is governed by the Minnesota Tort Claims Act, Minnesota Statutes Section 3 . 736. The County' s and City' s liability is governed by Minnesota Statutes Chapter 466. Each party will be solely responsible for its own employees for any Workers Compensation Claims . 14 . Upon execution and approval by the County, the City, and the State and completion of the construction work provided for herein, this agreement will supersede and terminate 02212-R -9- Agreement No. 89510R, dated July 14, 2006 between the County and the State, for the intersection of Trunk Highway No. 10 and County State Aid Highway No. 96. 15. Any amendment to this Agreement must be in writing and will not be effective until it has been executed and approved by the same parties who executed and approved the original Agreement, or their successors in office. 16. If any party fails to enforce any provisions of this Agreement, that failure does not waive the provision or its right to enforce it . 17 . This Agreement contains all negotiations and agreements between the parties. No other understanding regarding this Agreement, whether written or oral, may be used to bind either party. 18 . Minnesota law governs this contract. Venue for all legal proceedings arising out of this Agreement, or its breach, must be in the appropriate state or federal court with competent jurisdiction in Ramsey County, Minnesota. 19 . This Agreement is effective on the date the State obtains all required signatures under Minnesota Statutes 16C. 05, Subdivision 2, and will remain in effect until terminated by written agreement of the parties. 20 . The State ' s obligation to perform any work, or to let a Contract for the performance of the work, on the State Project referenced above, is subject to the availability of funding from the Minnesota Legislature or other funding source. 02212-R -10- 21. Authorized Agents a. The State ' s Authorized Agent for the purpose of the administration of this Agreement is Allan Espinoza, Metropolitan District Traffic Engineering, or his successor. His current address and phone number are 1500 County Road B2 West, Roseville, MN 55113, (651) 234-7812 . b. The County' s Authorized Agent for the purpose of the administration of this Agreement is Erin Laberee, Ramsey County Traffic Engineer, or her successor. Her current address and phone number are 1425 Paul Kirkwold Drive, Arden Hills, MN 55112, (651) 266-7105 . C. The City' s Authorized Agent for the purpose of the administration of this Agreement is Terry Maurer, City of Arden Hills Public Works Director or his successor. His current address and phone number are 1245 West Highway 96, Arden Hills, MN 55112, (651) 792-7847 . 02212-R -11- IN TESTIMONY WHEREOF the parties have executed this Agreement by their authorized officers . RAMSEY COUNTY Recommended for approval: By: Julie Kleinschmidt,County Manager Dated: APPROVED BY By: James Tolaas,Public Works Director Dated: APPROVED AS TO FORM By: Assistant County Attorney Dated: 02212-R -12- CITY OF ARDEN HILLS By: Mayor Date: By: Title: Date: DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION i i RECOMMENDED FOR APPROVAL: By: Metropolitan District Engineer State Design Engineer Date: COMMISSIONER OF ADMINISTRATION As to form and execution: As delegated to Materials Management Division By: Contract Management By: Date: Date: 02212-R -13- RAMSEY COUNTY RESOLUTION IT IS RESOLVED that the County of Ramsey enter into MnDOT Agreement No. 02212-R with the State of Minnesota, Department of Transportation for the following purposes: To remove the existing Traffic Control Signal on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) and on County State Aid Highway No. 96 at Round Lake Road; and Install two (2)new Traffic Control Signals with Signal Pole Mounted Luminaires, Emergency Vehicle Pre-emption, Interconnect and Signing on Trunk Highway No. 10 at County State Highway No. 96 (County Road G), West Ramp, and on County State Highway No. 96 (County Road G) at Round Lake Road/Prior Avenue; and Install four(4) new Underpass Lights between the East and West Ramps on Trunk Highway No. 10 at County State Highway No. 96 (County Road G), under State Project No. 6205-38 (T.H. 10=062) and State Aid Project No. 187-020-014,within the corporate city limits of Arden Hills. IT IS FURTHER RESOLVED that the and the (Title) are authorized to execute the Agreement and any (Title) amendments to the Agreement. CERTIFICATION I certify that the above Resolution is an accurate copy of the Resolution adopted by the Board of the County of Ramsey at an authorized meeting held on the day of 2013, as shown by the minutes of the meeting in my possession. Subscribed and sworn to before me this day of 12013 (signature) Notary Public (Type or Print Name) My Commission Expires (Title) CITY OF ARDEN HILLS RESOLUTION IT IS RESOLVED that the City of Arden Hills enter into MnDOT Agreement No. 02212-R with the State of Minnesota, Department of Transportation for the following purposes: To remove the existing Traffic Control Signal on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) and on County State Aid Highway No. 96 at Round Lake Road; and Install two (2)new Traffic Control Signals with Signal Pole Mounted Luminaires, Emergency Vehicle Pre-emption, Interconnect and Signing on Trunk Highway No. 10 at County State Highway No. 96 (County Road G),West Ramp, and on County State Highway No. 96 (County Road G) at Round Lake Road/Prior Avenue; and Install four(4) new Underpass Lights between the East and West Ramps on Trunk Highway No. 10 at County State Highway No. 96 (County Road G),under State Project No. 6205-38 (T.H. 10=062) and State Aid Project No. 187-020-014, within the corporate city limits. IT IS FURTHER RESOLVED that the Mayor and the are (Title) authorized to execute the Agreement and any amendments to the Agreement. CERTIFICATION I certify that the above Resolution is an accurate copy of the Resolution adopted by the Council of the City of Arden Hills at an authorized meeting held on the day of 2013, as shown by the minutes of the meeting in my possession. Subscribed and sworn to before me this day of , 2013 (signature) Notary Public (Type or Print Name) My Commission Expires (Title) It' ,,-A EN HILLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2013-010 A RESOLUTION ENTERING INTO MN/DOT AGREEMENT NO. 02885 FOR THE US 10/HWY 96 GRADE SEPARATION PROJECT WHEREAS, Mn/DOT and Ramsey County are working on a project to grade separate US 10/Hwy 96, and WHEREAS, the grade separation of US 10/Hwy 96 will require the relocation of City utilities, THEREFORE, BE IT RESOLVED that the City of Arden Hills enter into Mn/DOT Agreement No. 02885 with the State of Minnesota, Department of Transportation, for the following purposes: To provide for the responsibility for utility design and construction to be performed upon, along and adjacent to Trunk Highway No. 10 from 650' south of C.S.A.H. 96 to 400' south of Prior Avenue and on C.S.A.H. 96 from I-35W to 1600' east of T.H. 10 within the corporate City limits under State Project No. 6205-38 and S.A.P. 187-020-014. BE IT RESOLVED that the Mayor and the City Administrator are authorized to execute the Agreement and any amendments to the Agreement. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 28TH DAY OF JANUARY, 2013. David Grant, Mayor ATTEST: Patrick Klaers, City Administrator It' ,-A EN HILLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2013-011 A RESOLUTION ENTERING INTO RAMSEY COUNTY AGREEMENT PW2013-02 FOR THE US 10/HWY 96 GRADE SEPARATION PROJECT WHEREAS, Mn/DOT and Ramsey County are working on a project to grade separate US 10/Hwy 96, and WHEREAS,the City of Arden Hills will have some cost for the project according to the Ramsey County Cost Participation Policy, THEREFORE, BE IT RESOLVED that the City of Arden Hills enter into Ramsey County Agreement PW2013-02, BE IT RESOLVED that the Mayor and the City Administrator are authorized to execute the Agreement and any amendments to the Agreement. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 28TH DAY OF JANUARY,2013. David Grant, Mayor ATTEST: Patrick Klaers, City Administrator It' ,- S EN HILLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2013-012 A RESOLUTION ENTERING INTO MN/DOT SIGNAL AGREEMENT NO. 02212-R FOR THE SIGNAL SYSTEMS IN THE US 10/HWY 96 GRADE SEPARATION PROJECT WHEREAS, Mn/DOT and Ramsey County are working on a project to grade separate US 10/Hwy 96, and WHEREAS, the grade separation of US 10/Hwy 96 will include the construction of two new signal systems, THEREFORE, BE IT RESOLVED that the City of Arden Hills enter into Mn/DOT Signal Agreement No. 02212-R with the State of Minnesota, Department of Transportation, for the following purposes: To remove the existing traffic control signal on Trunk Highway No. 10 at County State Aid Highway No. 96 (County Road G) and on County State Aid Highway No. 96 at Round Lake Road; and install two (2) new traffic control signals with signal pole mounted luminaries, emergency vehicle pre-emption, interconnect and signing on Trunk Highway No. 10 at County State Highway No. 96 (County Road G), west ramp, and on County State Highway No. 96 (County Road G) at Round Lake Road/Prior Avenue; and install four (4) new underpass lights between the east and west ramps on Trunk Highway No. 10 at County State Highway No. 96 (County Road G), under State Project No. 6205-38 (T.H. 10-062) and State Aid Project No. 187-020-014, within the corporate City limits. IT IS FURTHER RESOLVED that the Mayor and the City Administrator are authorized to execute the Agreement and any amendments to the Agreement. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 28TH DAY OF JANUARY,2013. David Grant, Mayor ATTEST: Patrick Klaers, City Administrator