1.A.Public Involvement Plan (PIP) For TCAAP Master Plan
Jill Hutmacher, Community Development Director
Documents:MEMO.PDF,ATTACHMENT A.PDF
1.B.Transit Planning For Ramsey County Suburban Communities
Ady Wickstrom, Shoreview City Councilmember
Patrick Klaers, City Administrator
Documents:MEMO.PDF
Community Parks, Trails And Recreation Survey
Nancy O'Malley, PTRC Committee Member
Michelle Olson, Parks and Recreation Manager
Documents:MEMO.PDF,ATTACHMENT A.PDF
Parks And Open Space District And Park Preserve District Discussion
Matthew Bachler, Community Development Intern
Documents:MEMO.PDF,ATTACHMENT A.PDF, ATTACHMENT B.PDF,
C.PDF
If additional time is needed, the work session may reconvene after the regular City Council
meeting.
It is anticipated that Item D will be discussed following the regular City Council meeting.
MEMORANDUM
DATE:
May 28, 2013
TO:
Honorable Mayor and City Councilmembers
FROM:
Jill Hutmacher, Community Development Director
SUBJECT:
Draft Public Involvement Plan
The first task in the master planning process is the development of the public engagement
process. Kimley-Horn has drafted a Public Involvement Plan (PIP) (attached) which describes
the following:
The purpose of the PIP;
The roles and responsibilities of City staff, the Planning Commission, City Council,
RamseyCounty, and the Joint Development Authority;
The goals, objectives, and expected outcomes of the public involvement process;
Project stakeholders;
Public involvement techniques;
Project schedule; and
The evaluation of public involvement techniques and outcomes.
The draft PIP includes a table that provides information on the public involvement activities, the
target audience/participants, the purpose of the involvement event, anticipated tools, timing of
the event, and logistics.
Lastly, the PIP includes a project schedule that defines approximate dates (week of) for meetings
and public involvement events that will occur between May and October 2013. Meetings and
public involvement events that will occur in November 2013 or later will be scheduled later in
the master planning process.
The PIP is a “living document” that will be continually revised and updated throughout the
planning process. According to the Joint Powers Agreement, the Joint Development Authority
(JDA) shall recommend a public process for consideration of the Master Plan to the City and
Ramsey County. The JDA is scheduled to review the PIP at its June 5, 2013, meeting. The City
Council is requested to provide feedback on the PIP prior to its consideration by the JDA. The
City of Arden Hills
City Council Work Session May 28, 2013
12
Page of
City Council will be asked to formally approve the PIP at a regular meeting following the JDA’s
recommendation. Ramsey County will also be asked to approve the PIP.
A representative from Kimley-Horn will be available to answer questions regarding the PIP.
Attachments
Draft Public Involvement Plan, May 2013
Project Schedule dated May 23, 2013
City of Arden Hills
City Council Work Session May 28, 2013
22
Page of
Public Involvement Plan
DRAFT May 2013
Prepared for:
CITY OF ARDEN HILLS, MN
Prepared by:
Revision History
Revision NumberDateDescription
15/22/13Edits based on feedback from city, county staff
Public Involvement Plan1May 2013
List of Acronyms
AUARAlternative Urban Areawide Review
GSAGeneral Service Administration
JDAJoint-Development Authority
PIPPublic Involvement Plan
PMTProject Management Team
TCAAPTwin Cities Army Ammunition Plant
Public Involvement Plan2May 2013
Table of Contents
Revision History ...............................................
List of Acronyms ...............................................
Table of Contents ..............................................
Contacts .......................................................
1.0Purpose of the Public Involvement Plan .........................
1.1Study Overview .................................................
2.0Planning Process Roles and Responsibilities ....................
2.1City Staff .....................................................
2.2Planning Commission ............................................
2.3Ramsey County...................................................
2.4Joint-Development Authority (JDA) ..............................
2.5City Council ...................................................
3.0Public Involvement Process......................................
3.1Goals, Objectives, and Expected Outcomes........................
3.2Stakeholders ...................................................
3.2.1Government Agencies, Institutions, and Representatives .........
3.2.2Organizations ..................................................
3.2.3Business Associations and Their Members ........................
3.2.4Other ..........................................................
4.0Public Involvement Techniques ..................................
5.0Schedule .......................................................
6.0Evaluation of Public Involvement Techniques and Outcomes .......
Appendix A .....................................................
Public Involvement Plan3May 2013
Contacts
Jill Hutmacher, Project ManagerBeth Kunkel, AUAR Task Manager
City of Arden HillsKimley-Horn and Associates, Inc.
(651) 792-7819651-643-0455
jhutmacher@cityofardenhills.orgbeth.kunkel@kimley-horn.com
Brian Smalkoski, Project ManagerAndrew Dresdner, Master Planning Task Manager
Kimley-Horn and Associates, Inc.Cuningham Group Architecture
(651) 643-0472(612) 379-5518
brian.smalkoski@kimley-horn.comadresdner@cuningham.com
Jessica Laabs, Public Involvement Task ManagerBrad Lonberger, Regulations & Policies Task
Kimley-Horn and Associates, Inc.Manager
(651) 643-0437Gateway Planning Group
jessica.laabs@kimley-horn.com(817) 348-9500
brad@gatewayplanning.com
Public Involvement Plan4May 2013
1.0Purpose of the Public Involvement Plan
The purpose of the Public Involvement Plan (PIP) is to provide a
strategy including roles and responsibilities, goals and objecti
living document. As the planning process proceeds, changes to th
response to changing needs, views or priorities. In addition, re
added to the document. At the end of the planning process, the P
involvement in the development of the final plan report.
1.1Study Overview
The Twin Cities Army Ammunition Plant (TCAAP) site consists of a
a third of the land area within the City of Arden Hills. The fut
within the Arden Hills community for many years, as it presents
within the City limits. For the better part of a decade, the Cit
redevelopment of the southwest portion of the TCAAP property thr
County has recently completed the purchase of the 430-acre weste
available by the General Service Administration (GSA).
The TCAAP AUAR, Master Planning, and Regulations & Policies proj
Urban Areawide Review (AUAR) phase will investigate different de
integrate information from the market study, transportation data
framework that will act as a bridge between the vision for the s
phase will develop tools for the City to achieve the desired dev
phases will have its own public engagement process, integration
project.
2.0Planning Process Roles and Responsibilities
2.1City Staff
City of Arden Hills staff will act in a project management role.
Consultant Team with guidance and oversight throughout the plann
feedback on the technical analysis, project concepts, and projec
Mayor and the Council on the consultants report and follow up a
2.2Planning Commission
The City Planning Commission will work primarily on the Master P
project. The Commission will review and receive input on propose
2.3Ramsey County
Ramsey County has a stake in this project as owner of the TCAAP
as part of the Joint Development Authority, and the County Board
2.4Joint-Development Authority (JDA)
The JDA is a partnership between the City and the County tasked
The JDA will review and receive input on proposed actions and fi
about the process of implementation.
2.5City Council
The City Council is the governing body and will ultimately appro
review and receive input on proposed actions and final elements
Public Involvement Plan2May 2013
3.0Public Involvement Process
3.1Goals, Objectives, and Expected Outcomes
The goal of the public involvement process is to develop a myria
within the community to be educated, engaged in, and enthusiasti
innovative and collaborative public participation process can be
a community, build civic capacity and engagement, and lay the fo
recommendations that result from the planning process.
The objectives of the public involvement process are as follows:
1.To provide clear and comprehensive information on the planning p
community feels educated and able to effectively participate in
2.To reach out to and engage stakeholders in ways which are effect
participants
3.To create a planning process that is open and transparent so the
valued
4.To seek input from the community at key milestones in the planni
recommendations are fully understood and reviewed
5.To lay the groundwork for community knowledge about and support
recommendations, and implementation
The expected outcome from the public involvement process is the
that clearly reflects the communitys input and has the communit
outcome, however, the public involvement process must be collabo
the City Staff and the Consultant Team to continually evaluate t
methods to ensure the process is meeting the needs of the variou
3.2Stakeholders
The TCAAP site represents a very large portion of the City. In o
of the people it will affect, a broad engagement in necessary to
outreach will be a project with strong support.
Anticipated stakeholders are listed below. Not all of these part
receive notices for public meetings, while others will be engage
on type of activities planned, the interest of the stakeholder i
city and county staff. The list is not intended to be all-inclus
the project progresses.
3.2.1Government Agencies, Institutions, and Representatives
Minnesota Department of Transportation
Ramsey County
General Services Administration
Rice Creek Watershed District
Minnesota Pollution Control Agency
Metropolitan Council
City of Arden Hills Planning Commission
Public Involvement Plan3May 2013
City of Arden Hills Economic Development Commission
City of Shoreview
City of Mounds View
City of New Brighton
University of Minnesota
Minnesota State Representative Connie Bernardy
Minnesota State Representative Barb Yarusso
Minnesota Senator Bev Scalze
Minnesota Senator Barb Goodwin
3.2.2 Organizations
Alliance for Metropolitan Stability
Friends of the Parks and Trails of St. Paul and Ramsey County
Active Living Ramsey County
Restoration Advisory Board
North Metro Mayors Association
I-35W Coalition
3.2.3Business Associations and Their Members
Twin Cities North Chamber of Commerce
St. Paul Chamber of Commerce
3.2.4Other
Mounds View School District
Development community
National Guard
Police, fire, and emergency services
4.0Public Involvement Techniques
Table 4-1 describes public outreach techniques and activities th
process. This is a general framework to be used for proactive pl
project phases. It is anticipated that as the phases progress an
the Master Project Schedule and vetted through City staff and Co
Changes may also be made based on public participation and feedb
5.0Schedule
Public involvement activities are tied very closely to other pro
Planning, and Regulations & Policies phases of the project. As s
in Section 4.0 are reflected in the Master Project Schedule, inc
updated periodically to reflect the most up-to-date project info
6.0Evaluation of Public Involvement Techniques and Outcomes
The PIP will be evaluated and updated up to three times over the
the current activities and determine if anything about the proce
feedback. Evaluation of the PIP will be based on the following c
Public Involvement Plan4May 2013
Quantitative:
How many people attended the meeting? (based on sign-in sheets)
How many different entities (neighborhoods, agencies, etc) were
How many additional meetings have taken place since the last PIP
How many meeting notices were sent? Were any returned?
Qualitative:
What kind of feedback was received? Positive or negative? Any co
Was the location of the meeting appropriate?
Have stakeholders expressed any particular challenges regarding
Both quantitative and qualitative measures will be summarized in
each meeting and submitted to the City for review. Qualitative i
meeting, via email following each meeting. Specific measures wil
be made as necessary based on these discussions.
Results of the quantitative and qualitative evaluation criteria
considered when subsequent updates to the PIP are made. Any sche
master project schedule, which will also be updated in the PIP a
Public Involvement Plan5May 2013
Table 4-1. Anticipated Public Outreach Activities
Target
ActivityPurposeAnticipated ToolsFrequency/TimingLogistics
Audience/Participant
Staff MeetingsCityof Arden Hills staffUp to 12 throughout allArden Hills City Hall
ConfirmAgenda
Ramsey County staffthree phases of the
methodologies and
Graphics/layouts
Ehlersproject
approach
Action item list
Consultant Team
Review analysis and
Meeting summary
Approx. monthly with
deliverables
some exceptions (see
Establish direction
Master Project
regarding next steps
Schedule).
Agency andGovernment AgenciesUp to 8 throughout allArden Hills City Hallor
Identify and addressAgenda
Stakeholder(including Ramseythree phases of thespecific agency
any issues early
PowerPoint presentation (if
MeetingsCounty Board)projectlocations
Facilitate a noappropriate)
Business Groups
surprises review
Graphics/layouts
Citizen Groups
during the AUAR
Facilitated discussion
comment period
Meeting summary
(those with direct
Collect input and
interest in the outcome
discuss
of the project)
recommendations
WebsiteGeneral PublicOctober2013Utilizes existing TCAAP
Inform the public onSimple graphics
UpdatesFebruary 2014page on City website;
project progress
Concise text highlighting
June 2014other web updates may
Share plans andkey points
be done by the City at
graphics
other times
DeveloperPotential developers2 seriesover the courseArden Hills City Hallor
Solicit input onAgenda/questions
interviews(one at a time)of the project; 1 seriesother location depending
scenarios and
Graphics/layouts
early in the Masteron participants
processes; draft
Facilitated discussion
Planning phase; 1 series
regulations
Meeting summary
in the Regulations &Scheduled back-to-back
specific to a
Policies phasefor efficiency
developers point of
view
Public Involvement Plan6May 2013
Table 4-1. Anticipated Public Outreach Activities
Target
ActivityPurposeAnticipated ToolsFrequency/TimingLogistics
Audience/Participant
DeveloperPotential developers,1 early in MasterArden Hills City Hallor
Educate/inform Panel where developers
Panel withtargeted invite list ofPlanning processother location depending
Economicspeak; followed by
Citizenresidents/organizationson # of participants
Development 101audience Q&A or breakout
Participationin the area
groups for discussion
Citizens develop
understanding of the
development
process/challenges
City CouncilCity Council membersUpto 8over the courseHeld as part of standing
Inform the Council ofHandout for each City
Meetingsand the general publicof the projectCouncil meeting or work
progressCouncil Member
session
(electronic)
Solicit input on
milestone decisions
and deliverables
PlanningCity PlanningUp to 5over the courseArden Hills City Hall
Receive input onHandout for each
CommissionCommissionof the project
proposed and finalCommission Member
Meetings
Master Plan(electronic)
elements and
proposed
Regulations &
Policies
JDA MeetingsJDAUp to 2 over the courseArden Hills City Hall
Receive input onAgenda
of the project
proposed and final
PowerPoint presentation (if
Master Plan
appropriate to group/issue)
elements and
Graphics/layouts
proposed
Facilitated discussion
Regulations &
Policies
Educate on the
process of
implementation
Public Involvement Plan7May 2013
Table 4-1. Anticipated Public Outreach Activities
Master PlanInterested stakeholdersAugust2013Arden Hills City Hallor
Educate the publicDisplay boards/maps
Open Houseand the general publicalternate location TBD
about the master
Smaller scale layouts on
#1
plan
tables so people can
Solicit feedback ongather and discuss, mark
plan elementsmaps
Master PlanInterested stakeholdersJanuary2014Arden Hills City Hallor
Active listening by project
Education the public
Open Houseand the general publicalternate location TBD
reps
on implementation
#2
of the plan
Comment cards
Solicit final feedback
on plan elements
R&P DesignStakeholders(includingMarch 2014Arden Hills City Hall
Generate aDaily agendas
and Policyagencies) and City staffWill take place over 3
Regulations and
Presentations
Workshopdays
Policy Plan to align
Small and large group
with the Master Plan
facilitated discussions
for TCAAP and input
Draft plan language for
for development
review
guidelines,
Workshop summary
regulations, policies
and standards
Public Involvement Plan8May 2013
Appendix A
Public Involvement Plan A May 2013
TCAAP AUAR, Master Plan, and Regulations & Policies
City of Arden Hills
ay,
M 23 2013
MayJuneJulyAugustSeptemberOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecemberJanuaryFebruary
61320273101724181522295121926291623307142128411252930613273102431031714285122629307142841125182961327310241829512262923
City Staff Meetings7 additional meetings
gency/Stakeholder Meetings5 additional meetings
A
Developer Interviews1 additional series
Developer Panel with Citizen Participation
Public Open House1 additional open house
Planning Commission Meetings4 additional meetings
JDA Meetings3 meetings
City Council Meetings5 additional meetings
Design and Policy Workshop1 workshop
Website Update
AUAR
Requirements and Timeline
Draft AUAR and Mitigation Plan
Revised AUAR and Mitigation Plan
Distribution of Decision
AUAR Public Engagement Process
Master Plan
Master Plan Public Engagement Process
Environmental Conditions Component
Land Use Component
Circulation and Movement Component
Utilities Component
Parks and Open Space component
Implementation Plan
Regulations & Policies
Regulations & Policies Public Engagement Process
Existing Regulations Analysis and Goal Setting
Regulations Principles and Protocols for TCAAP
Regulation Plan
Implementation of the Regulation Plan
AGENDA ITEM
MEMORANDUM
DATE: May 28, 2013
TO: Honorable Mayor and City Councilmembers
FROM: Patrick Klaers, City Administrator
SUBJECT: Suburban Transit Discussion
Background/Discussion
Shoreview City Council member Ady Wickstrom contacted me earlier this month and requested
to be on a Council work session agenda to discuss transit needs in the Ramsey County Suburban
Communities.
Ady along with Ramsey County Board Commissioner Jim McDonough, White Bear Lake Mayor
Jo Emerson, and St. Paul Area Chamber of Commerce Regional Director Jonathan Weinhagen
are meeting with Ramsey County suburban City Councils to discuss transit needs and how the
suburban community can work together to address these needs.
nd
In a late development, Ady called me on Wednesday, May 22 and told me that she could not
th
attend the May 28 meeting due to a funeral, but that at a minimum she anticipated that both Jim
and Jonathan would be at the work session.
11
Page of
AGENDA ITEM
MEMORANDUM
DATE: May 28, 2013
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Michelle Olson, Parks and Recreation Manager
SUBJECT: Community Parks, Trails and Recreation Survey
Background
One of the work items that the PTRC requested of Council at the March 18, 2013 joint meeting
was input on the possibility of the committee drafting a survey using Survey Monkey to seek
input from the residents of Arden Hills on parks, recreation and trails. The Council consensus
was to allow the PTRC the opportunity to put a survey together and bring back to Council for
review and approval. The committee put together a draft survey (Attachment A) and
st
recommended by motion (9-0) at their May 21 meeting to bring the survey forward for Council
consideration. The Committee discussed advertising the survey on the website, newsletter and
present at the meeting to discuss and answer questions.
Requested Action
The Parks Trails and Recreation Committee (PTRC) provided a draft survey for Council review
and is looking for approval to proceed with the survey.
staff also have one other small park project at Freeway Park they would like to discuss briefly
with Council.
Attachment A
Attachment A
Attachment A
Attachment A
AGENDA ITEM
MEMORANDUM
DATE:
May 28, 2013
TO:
Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM:
Matthew Bachler, Community Development Intern
SUBJECT: Parks and Open Space District and Park Preserve District
Action Requested
Review draft Parks and Open Space (P/OS) Ordinance and Park Preserve (PP) Ordinance and
provide further direction.
Background
In September of 2009, the City Council adopted the Arden Hills 2030 Comprehensive Plan. The
priorities, and decision-making processes. Several policies and goals contained in the plan
address the protection of open space and outdoor recreational amenities:
Chapter 6 - Land Use:
Evaluate and amend the land use regulations to achieve the highest possible development
standards, enhance the natural environment, protect public health, support a vital mix of
land uses, and promote flexible approaches to implement the Comprehensive Plan.
Provide a balanced mix of residential, park, open space, and commercial land uses
Chapter 9 Parks and Recreation:
Develop, maintain, and encourage the use of a system of neighborhood parks and
pathways that are safe and engaging.
City of Arden Hills
City Council Meeting for May 28, 2013
Page 1 of 4
Chapter 10 Protected Resources:
lakes, wetlands, and other unique or significant natural resources.
The Comprehensive Plan identifies a total of 576 acres of park and open space land, and
(P/OS) as an existing and future land use designation. Park
and open spaces are defined in the plan as The City owns
and maintains 15 of these parks, which cover 145 acres. Ramsey County Parks and Recreation
manages the remaining 431 acres of park and open space land. This land is contained in two
regional parks Tony Schmidt Regional Park and Rice Creek North Regional Trail.
Park Preserve (PP) is an additional existing and future land use designation applied to open
space areas in the City. Park preserves
designated as natural or scenic areas that are to be
total of 1,472 acres are categorized as park preserve in the plan, all of which are located on the
Arden Hills Army Training Site (AHATS), which consists of the eastern portion of the former
TCAAP property.
Currently there is not a distinct district set aside for parks or open space areas within the Zoning
Code. These facilities are integrated into residential or business-oriented zoning districts as
permitted or conditional uses. One way that the City could better protect its parks and open
spaces is through the creation of separate districts for these uses. This would allow the City to
provide clearer guidance for the regulation of such areas. A park and open space district and park
preserve district would also assist in the implementation of the 2030 Comprehensive Plan by
solidifying its objectives within the Zoning Code. The outcome would be greater consistency
between the adopted Comprehensive Plan, future land use map, and zoning regulations.
Staff looked at several other cities across the Twin Cities metropolitan region to gain a sense of
how other communities regulate park and open space land. Burnsville, Brooklyn Park, Roseville,
Shoreview, White Bear Lake, and Mounds View are examples of cities that regulate parks and/or
open space through the zoning code:
Burnsville
has two open space districts: a Park District and a Conservancy District.
Brooklyn Park
zones parks separately in their Conservancy District.
Roseville
has a Park and Recreation District.
Shoreview
has an Open Space District.
White Bear Lake
has an Open Space Conservation District and a Public Facilities
District.
Mounds View
has a Conservancy, Recreation, and Preservation District
There is variety in the purpose, length, and specificity of these ordinances, with some regulations
having greater relevance than others in terms of their alignment land use
City of Arden Hills
City Council Meeting for May 28, 2013
Page 2 of 4
objectives. Staff inventoried and consolidated permitted uses, conditional uses, accessory uses,
procedures, and other provisions outlined in the sample of communities. Using the objectives of
the 2030 Arden Hills Comprehensive Plan in conjunction with the inventory of other
communities, Staff prepared working drafts for the possible adoption of a new Parks and Open
Space (P/OS) and Park Preserve (PP) zoning district to guide the regulation of parks and open
space areas in the city of Arden Hills.
Discussion
The drafts for the proposed Park and Open Space Ordinance and Park Preserve Ordinance
include three primary sections:
1.A description of the intent of the ordinance;
2.A subdivision outlining permitted and conditional uses; and
3.A subdivision listing special regulations.
The intent of the ordinances and the list of permitted uses were designed to give the City
.
sufficient fl
Staff is requesting additional guidance on the following questions:
Do the ordinances adequately address privately-owned park and open space land uses?
Should the ordinance language on permitted uses be more prescriptive or more general?
Are stronger development and design standards needed to adequately protect sensitive
natural areas?
Staff has included a working draft of the Parks and Open Space (P/OS) Ordinance and the Park
Preserve (PP) Ordinance for Council review (Attachment A). The Planning Commission
reviewed a previous version of the draft P/OS and PP Ordinance on April 3, 2013 (Attachment
B). The ordinances were also presented to the Parks, Trails, and Recreation Committee (PTRC)
on April 16, 2013 (Attachment C). Comments provided by the Planning Commission and the
PTRC have been incorporated into the current drafts.
Staff is requesting that the City Council review the attached black-lined versions of the drafts
and provide comment and direction. Based on the discussion this evening, staff will revise the
draft ordinances before bringing them back to the Planning Commission. In order to adopt the
new Districts, the Planning Commission will need to hold a public hearing and make a formal
recommendation to the City Council.
City of Arden Hills
City Council Meeting for May 28, 2013
Page 3 of 4
Action Requested
Review draft Parks and Open Space (P/OS) Ordinance and Park Preserve (PP) Ordinance and
provide further direction.
Attachments
A. Working Draft of Section 1320.13 Special Requirements for the Parks and Open Space
District and Working Draft of Section 1320.14 Special Requirements for the Park Preserve
District
B. April 3, 2013, Draft Planning Commission Minutes
C. April 16, 2013, Draft Parks, Trails, and Recreation Committee Minutes
City of Arden Hills
City Council Meeting for May 28, 2013
Page 4 of 4
Attachment A
1320.13 Parks and Open Space (P/OS) District
Special Requirements for the .
The Parks and Open Space District is intended to apply to publicly or privately owned lands that
provide recognized outdoor recreational or open space resources for public use. Areas included
in the district are to be kept undeveloped due to their value as recreational land, surrounding land
uses, restrictive water tables, drainage and soil conditions, topography, significant and valuable
vegetation and/or wildlife habitat. A comprehensive system of parks and open space is meant to
contribute to public wellbeing by enhancing active and passive outdoor recreational
opportunities, preserving sensitive natural areas and wildlife habitat, and preventing the
overcrowding of land.
Subd. 1
Permitted Uses. The following uses are permitted within the P/OS District:
A.City-owned park facilities and recreational uses.
B.Trail systems.
C.Gardens, public or community (flower or vegetable)
D.City-sponsored events.
E.Essential services, renewable energy systems, and utilities.
Subd. 2.
Conditional Uses. The administrative and review procedures established in
Section 1355.04 Subd. 3, Conditional Use Permits shall be followed for any proposed
building, structure, or land use that is considered conditional in the P/OS District.
A.The following uses are conditional within the P/OS District:
1)Privately-owned park facilities and recreational amenities.
2)Public uses other than those specified in Section 1320.13, Subd. 1.
B.Proposed conditional uses will be evaluated by the City Council based
on the following considerations:
1)The effect of the proposed use upon the health, safety, convenience
and general welfare of the owners and occupants of surrounding
land.
2)The compatibility of the proposed use with the natural features and
recreational amenities of the Parks and Open Space District area.
Subd. 3.
Special Regulations in the P/OS District:
A.The City shall strive to protect and enhance the parks and open space
system, and shall seek to increase the amount of park and open space land,
considering the public needs along with acquisition and maintenance
costs.
B.Uses within the P/OS District may not impede the use of adjoining
properties.
C.If the City determines in its review of site and building plans for
developments within the P/OS District that the protection of natural
features requires certain performance standards, the City may require
additional development standards to protect those features.
D.All renovations must be in compliance with the Americans with
Disabilities Act (ADA) requirements.
1320.14 Park Preserve (PP) District
Special Requirements for the .
The Park Preserve District is intended to apply to valuable natural and scenic areas which are to
be preserved for public use or private open space. The park preserve district may be applied to
either publicly or privately owned land. Areas included in the district are to be kept undeveloped
due to restrictive water tables, drainage and soil conditions, topography, significant and valuable
vegetation or wildlife habitat, and/or unique natural features.
Subd. 1
Permitted Uses. The following uses are permitted within the PP District:
A.Public and private permanent open space.
B.Public and private natural conservation and wildlife management
areas.
C.Nature study areas and arboretums.
D.Recreational trail systems.
E.Any facility, building, or structure controlled by either the Minnesota
National Guard or Army Reserve located on the Arden Hills Army
Training Site.
F.Any use or activity carried out by either the Minnesota National Guard
or the Army Reserve on the Arden Hills Army Training Site.
Subd. 2
Special Regulations in the PP District:
A.Uses within the PP District may not impede the use of adjoining
properties.
B.All renovations must be in compliance with the Americans with
Disabilities Act (ADA) requirements.
ARDEN HILLS PLANNING COMMISSION APRIL 3, 2013 6
B.Planning Case 13-004 Zoning Code Amendment; Parks and Open Space Zoning
District Discussion
Community Development Intern Matthew Bachler reviewed the Planning Commission is
requested to review the draft Parks and Open Space (P/OS) Ordinance and Park Preserve (PP)
Ordinance and provide further direction. They will also review the Diversion and Disposal of
Recreation Areas Ordinance and recommend amendments, if necessary.
Community Development Intern Matthew Bachler stated the City completed its Parks, Trails,
and Open Space (PTOS) Plan in 2002. The PTOS Plan addresses demographic and recreational
trends that affect the Citys park, trail, and recreation needs. Several recommendations entail
renovating existing park space, as well as improving the accessibility of these resources. The
Parks, Trails, and Recreation Committee and City staff have since made significant progress in
implementing the goals listed in the PTOS Plan.
In September 2009, the City Council adopted the Arden Hills 2030 Comprehensive Plan. The
plan outlines the communitys vision and goals, which are intended to guide the Citys programs,
priorities, and decision-making processes. Several policies and goals contained in the plan
address the protection of open space and outdoor recreational amenities:
Chapter 6 Land Use
Evaluate and amend the land use regulations to achieve the highest possible
·
development standards, enhance the natural environment, protect public health,
support a vital mix of land uses, and promote flexible approaches to implement the
Comprehensive Plan.
Provide a balanced mix of residential, park, open space, and commercial land uses.
·
Chapter 9 Parks and Recreation
Develop, maintain, and encourage the use of a system of neighborhood parks and
·
pathways that are safe and engaging.
Chapter 10 Protected Resources
Develop or enhance regulations to protect the Citys natural resources, including
·
trees, lakes, wetlands, and other unique or significant natural resources.
Community Development Intern Matthew Bachler showed the 2030 Future Land Use Map
indicating Park and Open Space and Park Preserve Lands. The Park Preserve area is entirely
located on the Training Site. He showed the Current Zoning Code and noted there is not a
distinct district set aside for parks or open space areas within zoning regulations.
Community Development Intern Matthew Bachler stated the Comprehensive Plan identifies a
total of 576 acres of park and open space land, and categorizes P/OS as an existing and future
land use designation. Park Preserve (PP) is an additional existing and future land use designation
applied to open space areas in the City. Currently there is not a district set aside for parks or
open space areas within zoning code regulations.
Community Development Intern Matthew Bachler reviewed the drafts for the proposed Park and
Open Space Ordinance and Park Preserve Ordinance currently include three primary sections:
ARDEN HILLS PLANNING COMMISSION APRIL 3, 2013 7
1. A description of the intent of the ordinance
2. A subdivision outlining permitted uses, and
3. A subdivision listing special regulations.
Community Development Intern Matthew Bachler suggested additional points of discussion:
Do the current draft adequately address privately-owned park and open space land
·
uses;
Should the ordinance language on permitted uses be prescriptive or general
·
Is an additional section needed for acceptable conditional uses and an approval
·
process for such uses;
Given that much of the Citys open space and recreational land contains sensitive
·
natural areas, are more stringent development and design standards needed to
regulate any development that might occur on these lands
Other special regulations that might be appropriate.
·
Community Development Intern Matthew Bachler stated also under discussion at the November
9, 2011 meeting was whether to include a provision in the Parks and Open Space Ordinance that
would require the City to replace any converted or transferred park space with an equivalent
amount of park land within city limits. Upon further research, Staff found that such an ordinance
already exists in the Arden Hills City Code (Section 720.09 Diversion and Disposal of
Recreation Areas). A copy is attached for Commission review.
Community Development Intern Matthew Bachler requested the Planning Commission review
the draft Parks and Open Space (P/OS) Ordinance and Park Preserve (PP) Ordinance and provide
further direction. Review Diversion and Disposal of Recreation Areas Ordinance and
recommend amendments, if necessary.
Community Development Intern Matthew Bachler suggested separate zoning districts should be
created for the Park and Open Space and Park Preserve land uses.
Community Development Intern Matthew Bachler provided drafts of Special Requirements for
the Parks and Open Space (P/OS) District and Special Requirements for the Park Preserve (PP)
District.
Community Development Intern Matthew Bachler provided discussion questions:
1. Do the current drafts adequately address privately-owned park and open space land uses?
2. Should the ordinance language on permitted uses be prescriptive or more general?
3. Is an additional section needed for acceptable conditional uses and an approval process
for such uses?
4. Given that much of the Citys open space and recreational land contains sensitive natural
areas, are more stringent development and design standards needed to regulate any
development that might occur?
ARDEN HILLS PLANNING COMMISSION APRIL 3, 2013 8
Community Development Intern Matthew Bachler reviewed Chapter 7 Recreation Areas, 720.09
Diversion and Disposal of Recreation Areas. Key provisions:
1. Park and Recreation Committee review and recommendation
2. Public hearing held by City Council
3. City Council approval
4. Commitment of resources to acquire substitute recreational areas.
Staff does not see a need to amend the Citys existing ordinance.
Chair Larson asked how much privately owned park space is there and City Planner Meagan
Beekman stated she is not aware of any.
Commissioner Hames stated she believes according to the map there are many privately owned
park areas. City Planner Meagan Beekman stated the first thing needed is to create the districts
after which the rezoning could be done. The property owners would be notified of the new
zoning districts. Commissioner Hames asked if a separate designation would be needed for
private park land. City Planner Meagan Beekman stated that would not be necessary. The park
plan would not be amended. Only the zoning designation would be changed.
Commissioner Holewa asked if rezoning of private park land would remove it from the tax rolls
and City Planner Meagan Beekman stated it would still be taxed but at a lower rate. Pulte will be
building a park within the development.
Commissioner Hames asked if the designations would be recognized by Ramsey County. City
Planner Meagan Beekman stated there are many cities that have different zoning for parks and
open space.
Chair Larson asked if each parcel would need a PID number and City Planner Meagan Beekman
stated it would. City Planner Meagan Beekman stated even unplatted properties have PID
numbers. She noted one parcel can have multiple zoning designations.
Commissioner Zimmerman stated developments have generated fees for park dedication rather
than land. In looking at TCAAP there may be a large amount of land for park dedication. He
asked if we are coordinated well enough with this ordinance that we could realize the park space
that is planned. City Planner Meagan stated there is a system in place regarding park dedication.
For TCAAP there is one owner the County. A cohesive master plan will be needed that will
identify the open space and park land. The zoning code has a lot of detail regarding the park
land and open space requirements. Commissioner Zimmerman asked who the gate-keeper will
be to ensure this happens. City Planner Meagan Beekman stated the City will develop the
Master Plan. The joint development authority will be the gate-keeper based on documents
created by the City of Arden Hills.
Commissioner Hames stated the discussion is getting off topic. She stated she approves of the
two designations and the drafts provided by staff.
Commissioner Holewa thanked Community Development Intern Matthew Bachler and City
Planner Meagan Beekman for their work on this.
ARDEN HILLS PLANNING COMMISSION APRIL 3, 2013 9
Commissioner Holewa suggested rewording of 1320.13 Subd 2. A. striking practical and
inserting considering the public needs and the cost of maintenance.
Community Development Intern Matthew Bachler stated the City cannot dictate on Federal
owned property. He referred to 1320.14 Subd 1 #E & F.
Commissioner Hames stated Commissioner Holewa had asked about buildings on parkland that
are used to maintain the parkland. Commissioner Holewa stated if a building is constructed in a
park that was not used for the park, it would have to be mitigated by the City Council.
Chair Larson stated the drafts seem sufficiently flexible. Chair Larson asked if tools are in place
for eliminating encroachment. Community Development Intern Matthew Bachler stated the City
of Roseville has a Park and Recreation District with detailed design standards. He stated there is
a provision that talks about requiring any building that goes into a park, have a setback. Chair
Larson stated he is more concerned about properties adjoining open space. City Planner Meagan
Beekman stated the tools are in place to manage that.
Commissioner Thompson referred to Attachment F and Community Development Intern
Matthew Bachler stated that is from Brooklyn Park.
Community Development Intern Matthew Bachler stated all questions were addressed by
commissioners.
UNFINISHED AND NEW BUSINESS
None
COMMENTS AND REPORTS
A.Report from the City Council
Councilmember McClung reviewed at the March 11, 2013, City Council Meeting, Matthew
Bachler was appointed to the position of Community Development Intern. Matthew comes to
the City with a Masters of City Planning from the University of Pennsylvania in Philadelphia.
He also worked for a year, during his Masters program, as an intern for the City of Philadelphia.
He recently moved to Minneapolis. Matthew will make an excellent addition to the Community
Development Department as we proceed with the AUAR and Master Planning of the TCAAP
property. It is anticipated that Matthew will assist Community Development Staff with zoning
code amendment, economic development activities, and day to day planning tasks.
March 18, 2013, City Council Work Session
The City Council held a joint meeting with the Planning Commission to discuss the 2013 Work
Plan, and other planning related items.
March 25, 2013, City Council Regular Meeting
The City Council unanimously approved Planning Case 13-001 for a variance request at 1455
Skiles Lane. This item was previously approved by the Planning Commission at their March 6,
2013, regular meeting.
Attachment C
CITY OF ARDEN HILLS
PARKS, TRAILS AND RECREATION COMMITTEE MEETING
TUESDAY, APRIL 16, 2013
ARDEN HILLS CITY HALL
CALL MEETING TO ORDER
April 16, 2013, meeting of the Parks, Trails, and Recreation Committee to
order at 6:30 p.m.
MEMBERS PRESENT:
Committee Members Cindy
Garretson (arrived at 6:36 p.m.), Phil Kramlinger (arrived at 6:33 p.m.), Don Messerly, Chuck
Michaelson, Harold Petersen, Steve Scott, Matt Trites, and John Van Valkenburg.
OTHERS PRESENT:
Parks and Recreation Manager Michelle Olson, Council Liaison Fran
Holmes, City Planner Meagan Beekman and Community Development Intern Matthew Bachler.
ABSENT:
Committee Member Rich Straumann (excused), Committee Member John Peck
(excused) and Jane Larson.
1. APPROVAL OF AGENDA
MOTION:
Committee Member Michaelson motioned to approve the agenda seconded by
Committee Member Petersen. The motion carried unanimously (8-0).
2. APPROVAL OF MINUTES February 26, 2013
MOTION:
Committee Member Petersen motioned to approve the February 26, 2013, minutes as
presented, seconded by Committee Member Kramlinger. The motion carried
unanimously (8-0).
3. UNFINISHED BUSINESS
A. Parks and Open Space and Park Preserve Ordinances
Community Development Intern Bachler asked that the PTRC review the draft Parks and
Open Space Ordinance and Park Preserve Ordinance which was included in their packets
and then provide further direction. He explained the Parks, Trails and Open Space Plan
addresses demographi
recreation needs and that the Comprehensive Plan addresses the issue of protecting open
space and outdoor recreation space in the City. He indicated the Comprehensive Plan
also created a 2030 future land use map which shows the two districts. There are 576
acres identified as park and open space and a total of 1,472 acres categorized as park
reserve, which are all located on the Arden Hills Army Training site on the eastern
portion of the TCAAP property. He indicated that staff recommended the separate
zoning districts be created for the park and open space and park reserve land uses,
because the zoning code did not provide enough guidance on use of park and open space
areas. The drafts were created by reviewing what other communities in the metro region
have done in their zoning codes to regulate parks and open spaces and also based on
Parks, Trails & Recreation Committee Meeting Minutes April 16, 2013
Page 2
work that was previously done in 2011. He stated that feedback from the Planning
Commission has been incorporated.
Committee Development Intern Bachler indicated further points of discussion include
whether any types of uses or facilities should be permitted that are not currently listed in
the draft ordinances, do they contain enough guidance to effectively evaluate potential
conditional uses and their potential impact on park and open space land, and any special
regulations that might be appropriate. Previously, the Planning Commission had
requested that staff include a provision in the Parks and Open Space Ordinance that
would require the City to replace any converted or transferred park space with an
equivalent amount of park land within city limits. Upon further research staff found that
such an ordinance already existed in the City Code. In such cases where the City is
looking to transfer park and recreation land to a private entity that would use that land for
a different use the proposal would be brought to the PTRC. If the PTRC supported the
proposal a public hearing would be held by the City Council and the City Council would
need to approve such an agreement by a majority vote. At that point there would need to
be a commitment of resources to acquire substitute recreational land so that in the end a
substitute amount of land would replace the land that was taken. He reported the existing
ordinance adequately addresses this issue.
Committee Member Michaelson questioned if a publicly owned golf course would
qualify under the permitted uses for either of these areas. Mr. Bachler stated he believed
that Attachment C - City Owned Park Facilities and Recreational Facilities under the
parks and open space district could be interpreted to include a publicly owned golf
course.
Committee Member Kramlinger stated he did not feel an owner of privately held land
would want the value of the land controlled by the City. Mr. Bachler indicated the City
is not proposing that staff retroactively rezone privately held land as parks and open
space land use because that would directly diminish the value of that land. Ms. Beekman
indicated if the City wanted to dispose of a City owned park or open space they could not
just do that but would need to follow the process in place. She stated, the park preserve,
however, is owned by the Army and if they want to rezone it, the City has no authority
over that land.
Committee Member Kramlinger asked whether land is gifted to the City when a new
development is made. Ms. Beekman stated the way that park dedication works is the
City gets a percentage of the land or value of the land and the City is statutorily required
to use that toward the creation of new trails or park connections.
Committee Member Michaelson questioned whether the City would have some control
over uses if the Army decided to sell some of the land. Ms. Beekman indicated since the
land is owned by the Federal Government, if the Army wanted to do something with the
land, the City would not have much say in the matter.
Parks, Trails & Recreation Committee Meeting Minutes April 16, 2013
Page 3
MOTION:
Committee Member Garretson motioned to proceed with the draft
ordinances as presented seconded by Committee Member Scott. The
motioned carried (9-0).
B. Don Messerly Dedication Plaque
Ms. Olson asked for input on the specific wording for the Don Messerly Picnic Shelter
Plaque. Discussion ensued on the wording. It was the consensus to have the wording
making Arden Hills a great place to live and raise a family, by Council Resolution,
MOTION:
Committee Member Petersen motioned to approve the wording as
amended, seconded by
unanimously (9-0).
C. Other Unfinished Business
None
4. NEW BUSINESS
A. Joint Meeting Debrief 2013 Work Plan Discussion
the joint meeting went well.
Ms. Olson thanked the committee for their work and commended those that presented at the
meeting.
B. Survey Monkey Question Discussion
Ms. Olson recapped that Council had consented to allow the PTRC to put together a survey
in order to seek input from the residents on parks and trails. Ms. Olson stated that Chair
the committee to brainstorm potential questions for the resident survey.
o review. Discussion
ensued regarding what questions to include in the survey and the formatting. The Committee
made a few revisions to the questions and the consensus was to move forward on those
questions. Ms. Olson indicated she would create the survey in Survey Monkey, the
committee could review the survey at the next meeting and it could possibly go to Council
for final review in June.
C. Off-Site Meeting Discussion
Ms. Olson asked the committee for input on where and when to have the off-site
meeting. Ms. Olson suggested Floral Park and asked the committee if they were interested in
inviting residents. It was suggested having an invite on the website and sending a
flyer to the surrounding residents. After further discussion, the consensus of the committee
st
was to have a meeting at Floral Park on May 21 and to also have a meeting at Hazelnut Park
in September and to invite residents in the surrounding areas via a mailing.