HomeMy WebLinkAbout05-08-13 PC Minutes
Approved:
CITY OF ARDEN HILLS, MINNESOTA
PLANNING COMMISSION
WEDNESDAY, MAY 8, 2013
6:30 P.M. - ARDEN HILLS CITY HALL
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Vice Chair Roberta Thompson called to order the regular
Planning Commission meeting at 7:03 p.m.
ROLL CALL
Present were: Vice Chair Roberta Thompson, Commissioners Angela Hames, Andrew Holewa, and
Clayton Zimmerman.
Absent: Chair Clayton Larson, Commissioners Samuel Scott, and Janet Stodola (Alternate).
Also present were: City Planner Meagan Beekman; Councilmember Dave McClung; Community
Development Intern, Matthew Bachler; and Community Development Director Jill Hutmacher.
APPROVAL OF AGENDA MAY 8, 2013
Vice Chair Thompson stated the agenda will stand as published.
APPROVAL OF MINUTES
April 3, 2013 Planning Commission Regular Meeting
Commissioner Zimmermanmoved, seconded by Commissioner Hames, to approve the April
3, 2013, Planning Commission Regular Meeting as presented. The motion carried
unanimously (4-0).
PLANNING CASES
A.Planning Case 13-005; E Street Flats Sign Standard Adjustment: Stuart Companies
Not a Public Hearing.
Community Development Intern Matthew Bachler stated the applicant has requested a site plan
review for a sign standard adjustment that would allow for a deviation from the Sign Code for the
permit length and sign area of temporary wall signage at 1195 County Road E.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 2
Background
Community Development Intern Matthew Bachler explained the property at 1195 County Road E is
owned by TAT properties, represented in this case by Stuart Co. The property is located in the B-2
General Business District on the north side of County Road E directly west of Lexington Avenue.
The applicant is proposing to install two vinyl banners each measuring 216 square feet on the
exterior walls of the property.
Community Development Intern Matthew Bachler stated on December 21, 2012, the City Council
approved a Planned Unit Development (PUD) to remodel the existing structure at 1195 County
Road E and construct 74 residential unit apartments on the site in Planning Case 12-019. The
applicants have concerns about visibility of their advertising signs. The proposed reuse converts the
building from a former hotel into residential apartment units, which is a substantial change in land
use and may not be known by the average person driving by the building. Further, given the size of
the building and the large building setback from Lexington Avenue, advertising signs are not easy to
see. The building is setback approximately 360 feet from Lexington Avenue and 70 feet from
County Road E. The proposed signs include images and text that would better identify the new use
of the property as a residential apartment building and would provide directions on how to obtain
information about the project. The applicant has provided images of the two signs.
Community Development Intern Matthew Bachler indicated one sign would be located on the east
building wall facing Lexington Avenue and the second sign would be located on the south building
wall facing County Road E. Each sign would measure 12 feet by 18 feet, an area of 216 square feet.
The combined area of the two signs would be 432 square feet. A professional sign company would
install the signs. Stuart Co would maintain the signs in like new condition and repair and/or replace
a sign if it is torn or deteriorates during the approved timeline.Section 1250.02 of the Sign
Ordinance regulates the use of temporary on-premise signs. The property fronts Lexington Avenue
and therefore standards for Sign District 5 apply in this case. The Ordinance permits the property to
have no more than one temporary sign not exceeding 40 square feet in area. However, because the
building currently has space for lease the property is allowed one additional temporary sign not
exceeding 25 square feet in area.
Community Development Intern Matthew Bachler commented the applicant has asked to display the
banners from the date the sign permit is issued to 30 days after the residential property receives the
Certificate of Occupancy. Under the Sign Ordinance, the property is allowed to display a permitted
temporary sign for no more than 30 days per calendar year. A sign advertising available space for
lease in a building can be displayed until seven days after the building is leased.
Site Data
Future Land Use Plan: Community Mixed Use
Existing Land Use: Apt 4+ Units
Zoning: B-2 General Business District
Size: 7.65 Acres
Topography: Relatively Flat
Community Development Intern Matthew Bachler reviewed the surrounding area, in addition to the
Plan Evaluation.
1.Site Plan Review Section 1260: Sign Standard Adjustment
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 3
Section 1260.01 of the Sign Code permits adjustments to sign height, number, type, lighting, area,
and/or location through the site plan review process if criteria number 1 or 2 is met and the required
criteria number 3 is met. In this case, criteria one and three are most applicable. The criteria are as
follows:
1. There are site conditions which require a sign adjustment to allow the sign to be
reasonably visible from a street immediately adjacent to the site; or,
2. The sign adjustment will allow a sign of exceptional design or a style that will enhance the
area or that is more consistent with the architecture and design of the site; and
3. The sign adjustment will not result in a sign that is inconsistent with the purpose of the
zoning district in which the property is located or the current land use.
2. Purpose of the B-2 District
According to Section 1320.04Subd. 7 of the Zoning Ordinance, the purpose of the B-2 District is as
follows:
1. To be a place in which people can live, work and play.
2. To create a compact, architecturally diverse, pedestrian- and bicycle-friendly community
with a distinct identity.
3. To provide a connected sidewalk system and places for people to gather and socialize.
4. To implement design standards to promote an attractive environment with lasting and
sustainable value.
5. To group compatible retail and service business uses that tend to draw trade that is naturally
interchangeable and promotes business prosperity.
6. To provide an adequate supply of business and professional service areas to meet the needs
of residents.
7. To minimize the effects of traffic congestion, noise, odor, glare and similar safety problems.
8. adopted
by the City Council on October 27, 2008.
Community Development Intern Matthew Bachler provided the Findings of Fact for review:
General Findings:
1. The property is located in the B-2 Zoning District and Sign District 5.
2. The property is a conforming use in the B-2 Zoning District under the approved Planned
Unit Development.
3. In Sign District 5, one temporary sign is permitted up to 40 square feet. The sign may be in
place for up to 30 days per calendar year.
4. In Sign District 5, one temporary sign up to 25 square feet advertising available space in a
building is permitted. The sign may be in place until seven days after the building is leased.
5. The proposed signs would be vinyl banners that would each measure 12 feet by 18 feet, or
216 square feet in size.
6. The proposed signs would be displayed from the date the sign permit is issued to 30 days
after the residential property receive the Certificate of Occupancy.
7. Section 1260 of the Sign Code permits deviation from the Sign Code through the Site Plan
Review process.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 4
8. The location of the building limits the visibility of temporary signage as permitted in the
Sign Code from County Road E and Lexington Avenue.
9.
ability to effectively advertise the availability of apartment units in the building.
10. The sign adjustment will not result in a sign that is inconsistent with the purpose of the B-2
zoning district.
11. The signs would not be visible from residential properties.
12. The sign would not have a negative impact on adjacent properties or the City as a whole
because they are consistent with the size and layout of the property on which they would be
located.
Community Development Intern Matthew Bachler stated based on the submitted plans and findings
of fact, Staff recommends approval of Planning Case 13-005 for a sign standard adjustment under
the Site Plan Review process. Staff recommends the following conditions be included with the
approval:
1. The applicant shall remove all freestanding signs related to the apartment use located on the
property upon the completed installation of the two temporary signs.
2. The two temporary wall signs shall be displayed from the date the sign permit is issued to 30
days after the property receives the Certificate of Occupancy.
3. The two temporary signs shall each measure 12 feet by 18 feet and be 216 square feet in
size.
4. The applicant shall maintain the two signs in like new condition and repair and/or replace a
banner if it is torn or deteriorates during the approved timeline.
Community Development Intern Matthew Bachler reviewed the options available to the Planning
Commission on this matter:
1.Recommend Approval with Conditions
2.Recommend Approval as Submitted
3.Recommend Denial
4.Table
Vice Chair Thompson opened the floor to Commissioner comments.
Vice Chair Thompson questioned the maximum amount of time that the signs would be hung on the
building.
City Planner Meagan Beekman anticipated that the certificate of occupancy would be issued in
August or September of this year. She noted the signs could be hung on the building no more than
30 days after the issuance of the certificate of occupancy.
Commissioner Zimmerman asked if staff knew the square footage of the east and south faces of the
building.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 5
Lisa Moe, Stuart Companies, discussed the sign sizes in detail with the Planning Commission. She
commented the signs were attractive and proportional to the size of the building and provided
maximum visibility.
Commissioner Holewa inquired when the remodeling work would be complete.
Ms. Moe indicated the work should be completed prior to September as she was hoping to have units
available for lease for the upcoming school year. She noted a model unit would be complete on May
nd
22. on of the building.
Commissioner Holewa moved and Commissioner Hames seconded a motion to recommend
approval of Planning Case 13-005 for a Site Plan Review at 1195 County Road E based on
the findings of fact, the submitted plan as amended by the four conditions in the May 8,
2013, Planning Case report. The motion carried unanimously (4-0).
B.Planning Case 13-006; TCAAP Sign Standard Adjustment: Ramsey County Not a
Public Hearing.
Community Development Intern Matthew Bachler stated the applicant has requested a site plan
review for a sign standard adjustment that would allow for a deviation from the Sign Code for
temporary freestanding signage on the Twin Cities Army Ammunition Plant (TCAAP) site owned
by Ramsey County.
Background
Community Development Intern Matthew Bachler commented Ramsey County is proposing to
install four temporary freestanding signs each measuring 32 square feet in total sign area on the
TCAAP site owned by Ramsey County.
Community Development Intern Matthew Bachler explained the real estate closing for the transfer
of the TCAAP site from the U.S. Army to Ramsey County was completed on April 15, 2013.
Ramsey County has contracted Carl Bolander and Sons Co. to carry out demolition work and site
remediation in order to prepare the site for future development. These activities are scheduled to
commence in May 2013, and take approximately 30 months. The proposed sign includes graphics
and text that help explain to the public the nature of the work being done on the site and how to
obtain more information about the project.
Community Development Intern Matthew Bachler indicated the sign area for each sign would
measure 8 feet by 4 feet, an area of 32 square feet. The signs would be located in four separate
locations around the site. Ramsey County has provided the City with a map showing the precise
location of each sign:
1. Highway 96 between Highway 10 and Snelling Avenue N.
2. Gate 4 on Highway 10
3. Eastern terminus of County Road H
4. Northwestern corner of the Rice Creek Trail Corridor
Section 1250.02 of the Sign Ordinance regulates the use of temporary on-premise signs. The
TCAAP property falls within two separate sign districts. The portion of the property fronting
Highway 96 is in Sign District 6. The remainder of the property is in Sign District 9. One of the
proposed sign locations is within District 6, while the other three are within District 9.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 6
Community Development Intern Matthew Bachler stated the Sign Ordinance permits one temporary
freestanding sign not exceeding 22.5 square feet in area on the portion of the property fronting
Highway 96. Temporary freestanding signs are not permitted on the remainder of the site. The
applicant has proposed to display the signs for the duration of the demolition and remediation project
on the TCAAP site. Under the Sign Ordinance, the property is allowed to display a permitted
temporary sign for no more than 30 days per calendar year.
Site Data
Future Land Use Plan: Mixed Business; Park Preserve
Existing Land Use: Vacant; Parks and Open Space
Zoning: M-B Mixed Business; R-1 Single Family Residential
Size: 427 acres
Topography: Rolling
Community Development Intern Matthew Bachler reviewed the surrounding area and the plan
evaluation.
Plan Evaluation
1. Site Plan Review Section 1260: Sign Standard Adjustment
Community Development Intern Matthew Bachler stated Section 1260.01 of the Sign Code permits
adjustments to sign height, number, type, lighting, area, and/or location through the site plan review
process if criteria number 1 or 2 is met and the required criteria number 3 is met. In this case,
criteria 1 and 3 are most applicable. The criteria are as follows:
1. There are site conditions which require a sign adjustment to allow the sign to be
reasonably visible from a street immediately adjacent to the site; or,
2. The sign adjustment will allow a sign of exceptional design or a style that will enhance the
area or that is more consistent with the architecture and design of the site; and
3. The sign adjustment will not result in a sign that is inconsistent with the purpose of the
zoning district in which the property is located or the current land use.
Staff explained that site conditions on the TCAAP property justify a sign adjustment to allow the
sign in Sign District 6 to be reasonably visible from the roadway adjacent to the site. This proposed
sign would be located on Highway 96, which carries higher speed traffic and where there is a
significant distance between vehicles and the property. Given that the signs are designed to provide
the public with information about the project, an adjustment to the permitted sign area that would
allow this sign to be clearly visible from Highway 96 is warranted.
Additionally, an adjustment to the Sign District 9 regulations that prohibit any freestanding signs
should be granted. The TCAAP property covers a total of 427 acres of land. Under the Sign
Ordinance, Ramsey County would only be able to place signage about the TCAAP project at the
southern end of the site on Highway 96. In order for the County to effectively inform a greater
percentage of the public about the work being done on the TCAAP site, signs will need to be located
at additional sites on the property. It is a benefit to the public for the County to be able to inform
interested people about the activities on the TCAAP site; therefore, an adjustment to the Sign
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 7
District 9 standards to allow an additional three temporary freestanding signs on the TCAAP site is
warranted.
Community Development Intern Matthew Bachler noted the Sign Ordinance permits a property to
display a temporary sign for 30 days per calendar year. However, the demolition and site
remediation work on the TCAAP property is expected to take 30 months. Allowing Ramsey County
to display the temporary signage until work on the site is completed would ensure that a source of
information about the project was available to the general public for its duration.
Community Development Intern Matthew Bachler provided the Findings of Fact for review:
General Findings
1. The property is located in the Mixed Business and Single Family Residential Zoning
Districts.
2. The property is located in Sign District 6 and Sign District 9.
3. In Sign District 6, one temporary freestanding sign is permitted up to 22.5 square feet. The
sign may be in place for up to 30 days per calendar year.
4. In Sign District 9, no temporary freestanding signs are permitted.
5. Ramsey County is proposing four temporary signs.
6. The proposed signs would measure 8 feet by 4 feet with a sign area of 32 square feet.
7. The proposed signs would be displayed for the duration of the demolition and remediation
project on the TCAAP site.
8. Section 1260 of the Sign Code permits deviation from the Sign Code through the Site Plan
Review process.
9. Site conditions limit the visibility of signs from adjacent roadways.
10. to
share information about the TCAAP project with the public.
11. Sign Code regulations on the permit length of temporary signage would limit Ramsey
12. The sign adjustment will not result in a sign that is inconsistent with the purpose of the
Mixed Business and Single Family Residential Zoning Districts.
13. The sign would not have a negative impact on adjacent properties or the City as a whole
because providing information about the TCAAP project is a public benefit.
Community Development Intern Matthew Bachler stated based on the submitted plans and findings
of fact, Staff recommends approval of Planning Case 13-006 for a sign standard adjustment under
the Site Plan Review process.
Community Development Intern Matthew Bachler reviewed the options available to the Planning
Commission on this matter:
1.Recommend Approval with Conditions
2.Recommend Approval as Submitted
3.Recommend Denial
4.Table
Vice Chair Thompson opened the floor to Commissioner comments.
Commissioner Holewa questioned where the northernmost sign would be located.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 8
Community Development Intern Matthew Bachler explained this sign would be on the Rice Creek
Trail and would inform the public that the area was now a construction site.
Commissioner Holewa asked when the signs would be removed.
City Planner Meagan Beekman indicated Ramsey County would remove the signs when the
remediation work was complete. She stated this could be added as a condition.
Vice Chair Thompson requested another condition be added to assure the signs remain in good
condition.
Commissioner Holewa moved and Commissioner Hames seconded a motion to recommend
approval of Planning Case 13-006 for a Site Plan Review at the Ramsey County TCAAP site
based on the finds of fact, the submitted plan, and the May 8, 2013, Planning Case report
with two conditions. The motion carried unanimously (4-0).
UNFINISHED AND NEW BUSINESS
A.B-2 District Design Standards Discussion.
Community Development Intern Matthew Bachler requested the Planning Commission review
initial recommendations for amendments to the B-2 District Design Standards and provide further
direction to staff.
Background
Community Development Intern Matthew Bachler stated that on October 27, 2008, the City
Council adopted the Guiding Plan for the B-2 District. The plan included design guidelines for
development and redevelopment in the B-2 District. These guidelines addressed fundamental site
planning and design principals and proposed standards for building height and density, façade
treatment, pedestrian circulation, parking, and landscaping.
Community Development Intern Matthew Bachler noted the City Council subsequently approved
ordinance amendments on November 24, 2008, that adapted the design guidelines contained in the
Guiding Plan for the Zoning Code. These guidelines are located in Section 1325.05 of the Zoning
Code, Subd. 8 Additional Design Standards for New Development, Redevelopment, and
Modifications to Existing Sites in the B2 and B3 Districts.
Community Development Intern Matthew Bachler explained that the B-2 design standards have not
been revised since their adoption in 2008. During this period, three development projects in the B-2
District have been required to meet the design standards:
Planning Case 09-011: Arden Plaza Master Planned Unit Development
Planning Case 11-
Planning Case 12-019: 1201 County Road E Master Planned Unit Development
Through the process of both reviewing these development proposals and seeing the projects built
out, Staff has had the opportunity to identify components of the B-2 design standards that may
require adjustments or additions. Staff is currently drafting changes to design standard provisions on
bicycle parking, building materials, and commercial transparency; however, additional amendments
may be necessary as Staff continues its review of the existing design standards. These revisions are
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 9
needed in order to update the design standards to reflect new practices and standards, to provide
developers wit development review process, and to
ensure that future development in the B-2 District is well designed.
Discussion
Bicycle Parking
Community Development Intern Matthew Bachler stated Section P of the B-2 District design
standards addresses pedestrian and bicycle circulation improvements. Specifically, the section states
that projects which are required to meet the design standards must comply with the following
ear a public
additional guidance is given regarding the design, dimensions, or location of bicycle parking on the
site. Further, a minimum number of bicycle parking spaces is not specified.
Staff has drafted an amendment to the design standards to provide detailed specifications on bicycle
parking (Attachment A). These revisions address what qualifies as bicycle parking, where bicycle
parking should be located in relation to buildings and the overall site, dimension and installation
requirements, and the total number of bicycle parking spaces required.
Staff reviewed bicycle parking regulations used in other municipalities to inform the draft
revisions. Municipalities consulted included Roseville, St. Paul, and Minneapolis. Additionally,
information on dimension criteria for bicycle parking was obtained from the Minnesota Department
of Transportation Bikeway Facility Design Manual.
Building Materials
Community Development Intern Matthew Bachler commented Section D of the B-2 District design
standards specifies acceptable and undesirable exterior building materials. Staff has revised this
section to expand and refine the list of permitted and discouraged materials as well as to build in
more flexibility for Staff in the development review process.
Staff has conducted research on high-quality building materials that are not currently on the
acceptable materials list and which meet B-2 design guidelines. Many of these materials are also
permitted by municipalities in the metro that have established similar design standards for their
primary commercial centers or downtowns. Design guidelines for Roseville, Shoreview, Burnsville,
and Hopkins were reviewed. Staff has relied on industry standards and aesthetic considerations in
determining which materials are appropriate as principal building materials as opposed to trim and
accent materials. The draft revision to the building materials section incorporates these new
materials.
Community Development Intern Matthew Bachler stated the section on undesirable building
materials has been revised to include more stringent restrictions on the use of mirrored or reflective
glass in the B-2 District. Previously, the extensive use of mirrored glass on the first floor of a
building was listed as undesirable. Staff believes the City should discourage the use of this material
entirely in the district. Given the pace at which building material technology evolves, Staff believes
a provision should be included in the section that allows the Community Development Department
to approve new materials of equal quality other than those listed. An example of how this provision
could be worded is included in the current draft.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 10
Commercial Façade Transparency
Community Development Intern Matthew Bachler indicated Section F of the B-2 District design
standards includes specifications on the configuration and transparency of windows and doors for
commercial properties. The section does not address window transparency for multi-family
residential uses, which are allowed in the B-2 District within a Planned Unit Development.
Additionally, specific guidelines on the arrangement of windows on a building and the permitted
materials for windows and doors are not included.
Staff has revised Section F to include transparency requirements for residential facades. These
specifications are intended to keep with the established design principals while also recognizing that
commercial façade transparency requirements are not necessarilyappropriate for residential
buildings. Guidelines on how windows and doors should be arranged along a building wall are
included in the draft revisions. These specifications are meant to ensure consistency between the
overall design of the building façade and the placement of window and door openings. The list of
acceptable materials for windows and doors is based on industry standards and complements the
permitted building wall materials for the district.
Further Points of Discussion
Community Development Intern Matthew Bachler stated the drafts that Staff are currently working
on represent initial recommended revisions to the B-2 District design standards. Staff is hoping to
start an on-going discussion with the Planning Commission about the existing design standards and
areas within the standards that could be improved. Additional points of discussion might include the
following:
Do the draft bicycle parking space requirements accurately reflect the demand for bicycle
parking facilities in Arden Hills?
Are the new materials added to the acceptable building materials list enduring, timeless, and
well-detailed? Are there additional types of materials that should be added to the list?
concerns regarding the quality of building materials?
Are the residential façade transparency requirements appropriate?
What additional sections of the B-2 District design standards need to be revised? Staff has
identified the provisions on parking and franchise architecture as areas that should be studied
further.
Community Development Intern Matthew Bachler requested the Planning Commission review the
initial recommendations for amendments to the B-2 District Design Standards and provide further
direction to staff.
Vice Chair Thompson opened the floor to Commissioner comments.
Commissioner Zimmerman questioned if Chair Larson had provided comment on these points of
discussion.
Community Development Intern Matthew Bachler stated staff planned to have a discussion with
Chair Larson to gain additional feedback.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 11
Commissioner Zimmerman was pleased that the City was reviewing this document further as it
would greatly assist in creating a redevelopment vision for the County Road E corridor.
Vice Chair Thompson was in favor of reviewing franchise architecture further.
Commissioner Hames thanked staff for the high level of detail and photos provided this evening
presentation.
Commissioner Holewa questioned if the photos would be added to the Zoning Code.
City Planner Meagan Beekman commented this has not been done in the past but could be added as
an addendum to the code for staff to review with future developers.
Commissioner Holewa inquired if the B-2 design standards would come before the Planning
Commission for approval.
Community Development Intern Matthew Bachler stated this would take place after revisions were
made to the code.
Vice Chair Thompson did not approve of having lists within the code as this could limit future
developers and their creativity. Commissioner Hames agreed with this comment.
Community Development Intern Matthew Bachler indicated there was a provision within the code
that stated other new building materials of equal quality may be approved by the Community
Development department.
Commissioner Holewa supported the bicycle rack requirements stating one rack per twenty parking
spaces seemed adequate. Commissioner Hames agreed.
Vice Chair Thompson commented the City may want to consider motorcycle and scooter parking in
this B-2 district.
Commissioner Zimmerman stated plug-in ports for electric cars should also be considered.
Vice Chair Thompson thanked staff for his work on the B-2 Design Standards and for taking
comments from the Commission this evening.
No action is requested.
REPORTS
A.Report from the City Council
April 15, 2013, City Council Work Session
Councilmember McClung reviewed that the City Council directed staff to move forward with the
purchase of the tax forfeited property located at 3208 Hamline Avenue N. The property was
formally approved for subdivision by the Planning Commission in 2008, as the Christianson Estates
Plat.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 12
The City has closed on the triangle parcel located at 3151 Lake Johanna Boulevard. The City
Council directed staff to move forward with instal
and landscaping the site. Staff is working with a landscape architect to design the landscaping plan
and it is anticipated that work will be completed on the site and the gateway sign installed in June.
April 29, 2013, City Council Meeting
Councilmember McClung stated the City Council unanimously approved a contract with Kimley-
Horn for the AUAR, Master Planning, and Regulations and Policies for the TCAAP site in an
amount not to exceed $426,004.
The City Council awarded a contract to repaint the south water tower located on Red Fox Road. The
Council directed staff to move forward with adding logos to the tower as part of the repainting
process.
B.TCAAP Update
Community Development Director Jill Hutmacher stated Ramsey County closed on the purchase of
TCAAP on April 15. The full Notice to Proceed has been issued to Bolander and Sons. Installation
of erosion control and the pre-demolition removal of hazardous materials (i.e., fluorescent
bulbs/ballasts, asbestos) has begun. Building demolition will begin in approximately two weeks.
Community Development Director Jill Hutmacher explained the gate at Highway Avenue/County
Road H will be the main gate, and everyone entering the site will need to check in at the Bolander
construction office. The area outside of the perimeter at Highway Avenue/County Road H will be
signed No Parking to eliminate conflicts with construction traffic. Barriers will be placed to separate
Rice Creek trail users from construction traffic.
It was noted the Ramsey County sheriff will be patrolling the property. Trespassing and theft of
building materials will be prosecuted.
Staff reported Ramsey County will hold a public informational meeting for the demolition and
remediation project on Tuesday, May 7, 5:00 to 7:00 pm in the Marsden Room at the Ramsey
County Public Works Facility. Postcards have been mailed to residents in Arden Hills and
surrounding communities.
Community Development Director Jill Hutmacher commented the City has contracted with Kimley-
Horn to complete the AUAR, Master Plan, and Regulations and Policies for development. This
process is anticipated to take 14-18 months.
Vice Chair Thompson requested an update on the JDA.
Community Development Director Jill Hutmacher indicated the JDA met this past Monday and
review. She noted the Master Planning process was being discussed by the JDA at this time.
C. Commission and Staff Comments
Vice Chair Thompson wished City Planner Meagan Beekman all the best in her new position stating
she would be missed by all.
ARDEN HILLS PLANNING COMMISSION MAY 8, 2013 13
Commissioner Holewa requested the Council discuss the Ramsey County patrolling efforts
borhoods. He stated in the past several months there has been no
police presence in his neighborhood.
City Planner Meagan Beekman announced that the Community Clean-Up Day would be held on
May 18, 2013 at the Public Works Facility.
ADJOURN
Commissioner Holewa moved, seconded by Commissioner Hames, to adjourn the May 8,
2013, Planning Commission Meeting at 8:16 p.m. The motion carried unanimously (4-0).