My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 2013
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2010-2019
>
2013
>
November 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2013 3:18:25 PM
Creation date
11/7/2013 3:18:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water tower gets a makeover <br />by Susan Cathey <br />A <br />Tower Tidbits <br />s you traveled along Snelling The bowl of the tower, which serves resi- <br />Avenue or I-694 during Septem-dents and businesses south of I-694, holds <br />Some things you may not know <br />ber, your attention one million gallons <br />about the Arden Hills water tower: <br />may have been caught by the of water. It also <br />tent covering the Citys provides a reservoir <br />" The tower is about 145 feet high. <br />south water tower. Now you from which to draw <br />" The bowl of water at the top is 74 feet in <br />will notice the new paint job for the north tower. <br />diameter and 40 feet deep when full. <br />and City logo beautifying For this project, it <br />" The logos are approximately 46 feet wide <br />this structure.was drained and <br />by 19 feet tall. <br />painted inside as <br />" Arden Hills gets its water from Roseville <br />The contract was awarded to well as out. Minor <br />who gets it from St. Paul. <br />Classic Protective Coatings, structural improve- <br />" The bottom of the tower provides room <br />whose workers applied a ments were made, <br />for storage. Public Works stores off- <br />new color to the formerly and the bowl was <br />season equipment there. <br />light blue tower, erected disinfected before <br />in 1987. The City Council being put back into <br />agreed to use the shade of service. The total <br />tan called Barbados, the cost for the work <br />Learn about the Citys most recent <br />same color used on the north was just under <br />drinking water report on page 4 of this <br />tower. The two City logos, $800,000 plus engi- <br />newsletter. <br />positioned to be visible from each direc-neering and inspection fees of $48,800. <br />tion of the freeway, are painted in a green <br />called Serpentine. <br />Community members offer ideas and opinions during TCAAP open hou <br />by Jessica Luther <br />This is very important insight that the <br />Attendees participated in discussions and <br />Attendees participated in discussions and <br />C <br />consultants will take into account as they <br />planning activities to inform consultants <br />TCAAP Master Plan Open House planning activities to inform consultants <br />draft the Master Plan, Hutmacher said. <br />of the community preferences for the mix <br />on Tuesday, September 17, to learn, ask of the community preferences for the mix <br />questions, and share ideas about the and placement of land uses. Those who <br />and placement of land uses. Those who <br />Hutmacher concluded, We are on sched <br />TCAAP development process before the weighed in revealed diverse opinions of <br />weighed in revealed diverse opinions of <br />- <br />ule with the master planning process. The <br />Master Plan was drafted. This open house what the land should be used for. <br />what the land should be used for. <br />Planning Commission and City Council <br />marked the end of the discovery phase <br />of the Public Involvement Plan and began <br />Plan in December. Residents will be asked <br />the work to draft the Master Plan.what the City has heard in previous plan <br />what the City has heard in previous plan <br />- <br />to provide feedback on the draft Master <br />ning efforts, said Hutmacher. Common <br />ning efforts, said Hutmacher. Common <br />Plan at an open house in January 2014. <br />We were very pleased with the open themes included: <br />house, Jill Hutmacher, City of Arden concentrate commercial uses on the <br />concentrate commercial uses on the <br />" <br />Hills Community Development Direcwestern side and residential uses on <br />western side and residential uses on <br />- <br />tor, said. The attendees seemed very the eastern side of the site, <br />the eastern side of the site, <br />engaged and were willing to provide parks, green space, and trails are <br />parks, green space, and trails are <br />" <br />comments and participate in the land use important, <br />exercise.retail should be located near the access <br />retail should be located near the access <br />" <br />points to the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.