HomeMy WebLinkAbout5E, Letter of Support for Ramsey County�
�N HTLLS
Request for Cauncil ACtion
Frepared Sy: Terry Niaurer, Puh�ic Warks �����rl Meeting T�ate: Marc� �6, �Oi2
Diz•ectt��'
Lei#er of 5up�aort for Ramsey Caunty
Bud�e#ed Amc�unt: �ctual Am�unt. F`u�ading Saurce:
I�J=.1
Rec�mmendatia�:
1'�iiA
NlA
Appror�e proViding a Ietter of support to R.arnse� �aua�ty foc the TED fi.�nding appYicatior� �r�r ihe
Lexin�tc�n A�enu�e impro�ements.
Su��t�orti�n� Dac_um,ent�:
1. Memora�du�n dated March 2�, 2012, from Ter�-y Maurer, Public Warks Director.
Z. March 16, 2Qi2, le�ter fro�n Jae Lux addressed tc� Public Wo�ks Direetc�r Terry Maurer.
3. �Vlarch 26, 2012, letier ad�ressed te� .1�e Lux frarn Paiblic Wc�rks Director T�rry M�urer.
�
�i D�ENl�HILLS
MEMORANDUM
DATE: March 26, 2012
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Terry Maurer, Public Works Director .��
SUBJECT: Letter of Support for Ramsey County
Background
Ramsey County is submitting another Transportation and Economic Development (TED)
application for funding for Lexington Avenue Improvements from just south of I-694 to
north of County Road F. The County did apply for this funding once before but was not
selected because of a more strict criteria. Apparently this year's solicitation is less
interchange specific so the County thinks Lexington Avenue is a good project. They are
asking for a letter of support from the City for their application. The City provided a
similar letter of support for the last unsuccessful application.
Attached is the e-mail from Joe Lux asking for the letter of support and the letter I have
prepared. Given City Council approval I will forward the letter to Ramsey County.
Council Action Requested
Approve providing a letter of support to Ramsey County for the TED funding application
for the Lexington Avenue improvements.
City Council Meeting
C:\Users\sonja.klingberg\Desktop\3-26-12Letterof SupportRamseyCo.doc
Page 1 of 1
Ter Maurer
Fr�am: �ux, Jc�seph [Jc�s�ph.Lux�aCC}.RAMSEY.MN.USj
S�nt: Friday, M�rch 9 Fi, 2(]12 9'[ :22 AM
Ta: Ji91 Hutmacher; zOM SIMC7NS�3N
Cc: Terry Ma�acer; MARK MALONEY
Suhje�t: Lexingforr Aver�ue lmpra�emenfs- {-fi�4. ta County Rvad F
Attachments: M�jor �mplQyers Ad3acent to ! 694 2�1�.dticx; Lexington CR F Cancept l.ayout- crapped.�df
Hi, �ill and T�m:
MN/�t�i and aEED haWe annc�unced anc�ther sfllicitaLic�n forTrarrspartaris�� and Economic Developmetrt (T�d} fund�ng
i4r trans�ortatian prc,ject�. This year's salicitatic�n is less ir�terchange-specific, so we ihink Lexingtan A�enue, from just
sauth of I-694 tt� lust rtorth c�# C�u�ty Rflad F, is a gar�d eanc�isdate. (We've alsfl s�bmitted it as SurFace Trarssportatian
Pr[�gt�art� project anci ii scnred well enaugh to� �ie funded in a"�ormal" cyde, f��'t probably not in the current economic
climate, uniess Cangress drastically ehanges the current trar�sportatior� bi4is.}
Tra surrima�rize r�uhat we're �rapc�sing, ihe project would add righ�-turr� lanes at each af the Lexingtan Rwenue ratr+ps tQ
sc�pplernent the was'k MN/RDT is daing there this sur�mer to add dual left-tufn lanes. At the Lexingtor� Aver�uejCounty
Rcaad F intersectior�, we'd add duai left-turr� lanes fc�r n9�'thhaund tr�ffic and dedicat�d left-turri and right-turn lar��s frar
east and w�stbaund traffic. A s�conc� s�se�ti��raund left-turn {ane cauld Ea� add�d, and would impro�e s6gnal o�eratio�s a
b�t, F�ut is c�p#i�r�al. Pedestriara facilities wcr�ld be upgrad+�d to �ae cQrr�p�iant with A[7A requir�m�e�ts a�d to
aceQmmadate the r�eeds 4f the cammunity. An impartant c�smpanen# af �F�e praposal, and c�n�e that we'�e das�ussed
with t�re Share�iew sCafF, is t�e prapQse€i �rohibi'�iar� af westt�ound fefr turr�s at Gramsi� SireeS. �his wc�uld need p�biic
invc�laerraertt, hut would represer�t a signif�carut ap�rational anci sa�ety im�rc��erner�t.
❑ne crit�rion that will affect the scc�rir�g Qf the prc�posaVs is how t�e fUnds wiil fae ie�er�aged. A greater percentage nf
I�rcal or private fun�s will help cr�r score. Ta that end, we psan tQ al�+at a 5igni�cantly �igher prcrpart�an �f CSAH i�unds ta
the prole�t than we ha�e in th� �ast. Muni�ipai funding of this praject, aceordirrg to o�r cost part�ci�atian pafTcy w�ruld
be very limited- tF�e tanly things we've identi�ed sa far would be if th� e`st�es wanied to add tra�l €�r sid�walk- �existing
sidewalk afFectec� Fty the project wt�u[ci �e replaGed at Ccaunty cQSt. Hawe�er, �ihe a�se are� �f private irsvestrnent we
want to seek is the donation c�f r9gfat af way. We`re working c�n guantifyirtg hc�w mu�h will '�e needed far tt�e prt�ject,
an� it is r�c�t a{�rg� ar�caunt, but we wc�uld �e ai�4e t� credit ti�e assessed �alue af the prc�perty donated to the praject
and the dc�nars would be ab�e ta wri�e the value off. Ir� the previous TED cycie, Bostan 5c�enti�c indicater� that they
wcauid consi�er this (no c�rrtmitment, jusi cons�dera�ia€�}.
What we'd !ilce frorn the Cities are the folla�n+9ng:
A As�y �contaci yQu may have at the� prcrperties we'd f�e askir�g t€� dcanate cig6�t crfi way: Brerner gank, Lan�d C}'Lakes,
and Bc�stars Scne�tific in Arden Hi�ls and at the Sh�reu�ew Car�arate Center, Reiling Properties �Red Rabin) and
ihe apartrnents in Sh❑review.
➢ i'�e attached a list a$the lausinesses we iden#ified as bectefitting frarn this �roject. Any adde#ia�s, carreetions,
deletic�n5 tti this list that you'r� aware of, �s well a� any contacts at t�tem that yau cQuld �r'c�r��de wo�ld f�e
helpir�l.
� City Co�ancil resa�lutit�ns suppr�rting the project, �r let�ers c�f supp�rt, as appropriate, wauld be help#uf.
I've attaehed a simple l�yout s�f the prt�je�t area fcar yaur reference, bui it dc�es not shaw tnuch- please let rr�e knar�v if
yau haWe questic�ns, ccrmrnents, or if we car� proVide anything. FrQpt�sals are due April Z7t�', sa we're c�n lcind Qf a fast
track- thank5 in adva�ce far your help.
�o� ���
� EN HILLS
March 26, 2012
Mr. Joe Lux
Planning Specialist
Ramsey County Public Works
1425 Paul Kirkwold Drive
Arden Hills, MN 55112
RE: Lexington Avenue (CSAH 51)
TED Funding Application
Dear Mr. Lux:
The City of Arden Hills strongly supports the County's application for Transportation and
Economic Development (TED) funding for capacity and turn lane improvements on
Lexington Avenue from approximately 500 feet south of I-694 to 600 feet north of
County Road F. As you are aware, Mn/DOT is under construction on an interstate
project on I-694 that will eliminate eastbaund I-694 access at Hamline Avenue thus
forcing more traffic to the Lexington Avenue interchange. This issue was a key point in
our City's negotiation with Mn/DOT over granting Municipal Consent. As you know, it
took almost nine months for our City Council to adopt a Municipal Consent resolution.
This was done only after Mn/DOT agreed to include capacity and turn lane
improvements on the Lexington Avenue bridge in their project. Your project will
continue these very important improvements.
Once again, the City strongly supports the County's application. If we can be of any
further assistance, do not hesitate to contact us.
Sincerel
� r«u��.�
Terry aurer, P.E.
Public Works Director
City of Arden Hills � 1245 West Highway 96 � Arden Hills, MN � SSll2-5743
Phone 651.792.7800 � Fax 651.634.5137 � www.ci.arden-hills.mn.us