HomeMy WebLinkAbout01-21-14-WS -A DEN HILLS
14
Approved: February 10 ,2014
CITY OF ARDEN HILLS, MINNESOTA
CITY COUNCIL WORK SESSION
JANUARY 21,2014
5:00 P.M. —MARSDEN ROOM—PUBLIC WORKS FACILITY
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor Grant called to order the City Council work
session at 5:00 p.m.
Present: Mayor David Grant; Councilmembers Brenda Holden (arrived at 5:04 p.m.,
left at 5:30 p.m. and returned at 6:50 p.m.), Fran Holmes, Dave McClung,
and Ed Werner
Absent: None
Also present: City Administrator Patrick Klaers; Public Works Director Terry Maurer;
Assistant City Engineer John Anderson; and City Clerk Amy Died
Public Works Maintenance Workers: Max Arvidson, Scott Freyberger, Jeff Frid, Dave
Winkel, Dave Schifsky, Darien Schifsky, Tony Nolan, Thomas Mikacevich
1. AGENDA ITEMS
A. Public Works Presentation
Public Works Director Maurer introduced the Public Works Maintenance Workers to the
Council and discussed the training provided to public works employees. He provided the Council
with a presentation highlighting the Public Works Department's accomplishments in 2013. He
reviewed the work that was completed at Valentine Park and on the triangle parcel.
Assistant City Engineer Anderson explained how the Public Works Department was migrating
towards the use of technology in their day-to-day operations. He explained that the new system
has been extremely helpful with the utility line locate calls. He reported that the City is receiving
approximately 350 Gopher State One calls per month during the summer, making this work
almost a full-time job.
Tony Nolan described the Korweb program in detail with the Council. He then discussed how
this new technology is assisting to streamline work completed by the Public Works Department.
ARDEN HILLS CITY COUNCIL WORK SESSION—JANUARY 21, 2014 2
Councilmember Holmes thanked the Public Works staff for their work on Valentine Park, stating
the work was nicely done and that the park has been heavily used.
Councilmember Werner thanked the Public Works Department for their assistance and
professionalism with a recent watermain break in his neighborhood.
Jeff Frid discussed the Omni system explaining how it is used to monitor the City's 14 lift
stations. He noted that the program is extremely user friendly and can be viewed by staff on a
smart phone.
Public Works Director Maurer reported that each lift station is still inspected and reviewed each
day by staff to ensure that stations were running properly. Staff will continue this process until
they are more comfortable relying on technology.
Darien Schifsky provided the Council information on the water tower monitoring software. He
discussed how the program is assisting the Public Works Department monitor the water levels
available in the tower.
Councilmember Holmes asked if the City's monitoring system is tied to the water system in St.
Paul.
Public Works Director Maurer explained that the City's system is not coordinated with St. Paul
as St. Paul has a very sophisticated SCADA system. He reviewed the graphics of the water usage
in the north tower for January.
Assistant City Engineer Anderson provided the Council with information on the GIS data that
has been collected by the Public Works Department. He stated that the GIS information collected
covers the City's sewer, water and storm sewer lines, along with park benches, valves and street
locations. The data that has been collected is available through the City's network and to multiple
users on other platforms. The numerous benefits of this system were further discussed.
Public Works Director Maurer explained how the information collected through the GIS system
is used by his department on a daily basis. He indicated that his crew is working to keep the
City's infrastructure map updated.
A brief video titled"Liquid Assets" about infrastructure in the State of Minnesota was presented.
Public Works Director Maurer discussed the condition of the City's infrastructure. He
explained that the City is investing in its infrastructure and these investments are paying off. He
reviewed the efforts the Public Works Department has taken to reduce I&I throughout the City.
He commented that sewer lines are televised, jetted and cleaned on a three year rotating cycle.
He is pleased with the progress his department is making in this area.
Assistant City Engineer Anderson reviewed the work that has been completed on the storm
sewer lines. He explained that catch basins and rain gardens have been created throughout the
City to assist with managing the quality of the City's storm sewer. The City needs to continue to
maintain these areas.
ARDEN HILLS CITY COUNCIL WORK SESSION – JANUARY 21, 2014 3
Councilmember Holmes
questioned if the City needs to install rain gardens on the TCAAP
property.
Public Works Director Maurer
reported that rain gardens are mostly used in reconstruction
projects to assist in managing water runoff. He anticipated that rain gardens will not be installed
on the TCAAP site. He reported that rain gardens are a requirement from the Rice Creek
Watershed. The special projects planned for 2014 were then reviewed.
Mayor Grant
thanked the Public Works Department for their presentation this evening. He is
pleased with the growing efficiencies that have been taken on by the department along with the
great work completed by the crew. He understands that water and sewer services are taken for
granted and he appreciates all of the hard work the Public Works Department accomplishes each
and every day.
B.County Road E Bridge Over TH 51 / I-694 MnDOT Landscaping Project
Public Works Director Maurer
presented the Council with information on the current MnDOT
layout for the County Road E Bridge over TH 51. A small scale drawing was reviewed. The
layout shows three 12 foot lanes – one in each direction and a center left turn lane. In addition,
there would be a six foot shoulder on the north side, a six foot shoulder on the south side and a 10
foot raised pedestrian facility on the south side.
Public Works Director Maurer
explained that no formal approvals are needed from the City,
however if the City wants to add anything to the design, such as a pedestrian facility on the north
side, it can be added as long as the City is willing to pay for the cost of the additions. For
budgeting purposes, MnDOT estimates the bridge cost at $150 per square foot. He recommended
the bridge remain as proposed by MnDOT without an additional pedestrian facility on the north
side of the bridge.
City Administrator Klaers
asked how pedestrians would cross from one side of the roadway to
the other in order to cross the bridge.
Public Works Director Maurer
explained that there would be crosswalks at the lights before
and after the bridge in order to allow for pedestrians to cross County Road E.
Councilmember Holmes
commented that she has seen pedestrians walking on the north side of
the bridge. She asked if there would be any space along the north side for pedestrians.
Public Works Director Maurer
reported that the north side of the bridge would have a six foot
shoulder, which is an improvement over the two foot shoulder that is currently present.
Mayor Grant
expressed concern with how emergency services would be provided to the west
side of the City while the bridge is out.
Public Works Director Maurer
commented that he will address this concern with the Fire Chief
or the Fire Marshall.
ARDEN HILLS CITY COUNCIL WORK SESSION—JANUARY 21, 2014 4
Councilmember Holmes expressed concern with the lighting on the County Road E bridge. She
was not concerned with decorative lighting at these intersections, but recommended the lighting
be improved in this area.
Public Works Director Maurer recommended the City work with Xcel Energy on the lights as
this would be less expensive than the City installing and maintaining its own light poles. He
stated that he would discuss this issue with the County as well.
Councilmember Werner questioned how traffic would flow through the City while the bridge is
out.
Public Works Director Maurer indicated that traffic would be rerouted through the City for a
time while the bridge is out.
Further discussion ensued regarding traffic flow and emergency services, and how this would
work with the bridge being out.
Mayor Grant asked if the Council was comfortable with the bridge layout as proposed by
MnDOT.
i
The Council supported the plan as presented by MnDOT.
Public Works Director Maurer discussed the preliminary landscaping plan MnDOT has
prepared for the 1-694 corridor that will follow the recent construction. He reported MnDOT has
budgeted $200,000 for this project and it is scheduled for an August 2014 letting with planting
occurring in the spring of 2015.
Public Works Director Maurer stated that the Council placed a $5,000 item in the 2014 CIP
should they want to make additions to the MnDOT landscaping project. MnDOT would need a
decision on any additions within the next 45-60 days to get this into the final plan. MnDOT has
estimated that additional trees, if added to the project, would cost between $275 and $375
depending on the variety of tree. Therefore, with a $5,000 budget, approximately 15 trees could
be added. He requested direction from the Council on how to proceed.
Councilmember McClung stated that plantings in the Briarknoll area were the main concern. He
questioned how additional tree plantings would impact this area.
Public Works Director Maurer explained that additional trees would provide more of an
aesthetic appeal, but would not fully screen the neighborhood from the roadway.
Mayor Grant recommended that this landscaping information be placed on the City's website.
Public Works Director Maurer commented that this information could be posted by staff.
Councilmember Holden expressed concern with the noise level for the residents living on
Norma Circle.
ARDEN HILLS CITY COUNCIL WORK SESSION—JANUARY 21, 2014 5
Assistant City Engineer Anderson reviewed the plantings proposed for this area of the 1-694
corridor. He noted that the plantings would be decorative in addition to providing some measure
of screening.
Councilmember McClung suggested the Council review where 15 additional trees could be
placed to positively impact the corridor. He recommended this be reviewed after the County hears
back on their grant application and decides what they will do further to the west along TH 10.
Mayor Grant agreed that the Council should wait to hear back from the County.
Public Works Director Maurer commented that he would pass along to MnDOT that the City
does not want to add anything to the landscaping project at this time but may want to add some
plantings in the future depending on what the County's plans are for the rest of the TH 10
corridor. Any added plantings would likely be placed after MnDOT implements its current
proj ect.
2. COUNCIL COMMENTS
Councilmember Holmes discussed an article she read in the Star Tribune from December 31,
2013, regarding water and sewer bills in Belle Plain. She indicated that she will provide staff with
a copy of the article which could then be passed along to the entire Council.
ADJOURN
Mayor Grant adjourned the City Council work session meeting at 7:03 p.m.
din
Amy Died David Grant
City Clerk Mayor