Municipal State Aid (MSA) System Update
Terry Maurer, Public Works Director
MEMO.PDF
Mounds View High School Trail Update
Terry Maurer, Public Works Director
MEMO.PDF, ATTACHMENT A.PDF
Gateway Sign At Cleveland And County Road D Discussion
Terry Maurer, Public Works Director
MEMO.PDF, ATTACHMENT A.PDF
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:
David Grant
Councilmembers:
Brenda Holden
Fran Holmes
Dave McClung
Robert Woodburn
Special City Council
Work Session Agenda
February 9, 2015
5:30 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our
long -standing tradition as a desirable City in which to live, work, and play.
CALL TO ORDER
1.
1.A.
Documents:
1.B.
Documents:
1.C.
Documents:
2.
Page 1 of 2
DATE: February 9, 2015
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Terry Maurer, Public Works Director
SUBJECT: Municipal State Aid (MSA) System Update
There are a number of projects planned in the City over the next couple of years that are eligible
to use MSA funding. As such, it seems appropriate to give the Council an update on the
financial status of the MSA system. But first, a brief background on the MSA system overall
may be helpful.
The MSA system was established in 1956 as a way to provide funding to counties and cities
(over 5,000 in population) for their use on roadways that make an integrated network of
highways, county roads and city streets. This funding is in recognition that traffic from outside
the communities travel on main streets through the communities and should help to fund these
streets. The funding source is three fold; gas taxes, vehicle license fees and motor vehicle sales
tax. The distribution is established by State Constitution; 62% to the highway system, 29% to
the county system and 9% to cities over 5,000 in population
In 2014 these three funding sources amounted to $1.760 billion dollars. The cities’ 9% share
amounted to $154.6 million dollars. In 2014 there were 148 cities with a population of 5,000 or
greater. The cities’ 9% is then distributed to these 148 cities by two measures; population and
needs (needs is simply a mathematical calculation to determine on an “apples to apples” basis
how much it would cost to build out the entire MSA system which is then used to distribute 50%
of the city’s 9% share). Generally, each city on the MSA system is allowed to designate 20% of
their local mileage as MSA routes (currently the Arden Hills MSA system contains 7.53 miles).
In 2014 funds distribution each person was worth $20.95 and each $1,000 of need was worth
$12.04. Arden Hills’ 2014 MSA allotment was $317,145. A 25% portion ($72,286 in 2014) of
our annual allotment is designated for maintenance and submitted directly to the City in the year
it is allotted. The remaining 75% ($237,859) is placed in the City’s construction account at
MnDOT until it is requested for an MSA eligible project cost.
AGENDA ITEM – 1A
MEMORANDUM
Page 2 of 2
The City can expect to continue to receive annual allotments in the same general range in the
foreseeable future. Recently, our construction funds have been used for two projects: the mill
and overlay of Snelling Avenue North and the reconstruction of Round Lake Road which will be
completed in the early summer of 2015.
Those two projects will essentially empty the City’s construction fund as of the end of 2014.
However, there are several projects coming up, led by the City, County and MnDOT that will
have MSA eligible expenses for the City. These include the following projects with their
estimated MSA eligible amounts:
1. Round Lake Road (estimate remaining MSA eligibility) $267,000
2. Lexington Avenue (Ramsey County) $ 77,700
3. Lexington Avenue Right-of-Way (Ramsey County) $183,600
4. County Road E (City led) $487,000
5. Pine Tree Drive Sidewalk (part of CR E project) $ 43,600
6. I-35W/Hwy 96 Interchange (Ramsey County) $140,000
7. Lake Valentine Road Bridge (MnDOT) $150,000
8. Mounds View High School Trail (City led) $ 400,000
The MSA system does allow cities to ask for an interest free advance for the state wide pool of
construction funds. The limit for a city the size of Arden Hills is five times our annual allotment.
On January 26th the Council adopted the necessary Resolution to ask for an advance in 2015 of
up to $1.1 million. Advances are not provided to cities until MSA eligible expenses are incurred
and reimbursement from MnDOT is requested. Advances are paid back by future year’s
construction allotments.
At Monday’s Work Session I will have a map of the City’s MSA system available and will be
able to answer questions and/or go further into depth on any MSA issues.
Page 1 of 2
DATE: February 9, 2015
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Terry Maurer, Public Works Director
SUBJECT: MVHS Trail Update
MnDOT will be replacing the County Road F (Lake Valentine Road) Bridge over 35W in 2015.
The new bridge will include a 10 foot wide pedestrian facility on the south side. The City of
Arden Hills has had an item in its Capital Improvement Plan (CIP) for several years to construct
a trail from the old bridge over 35W to the Mounds View High School. Last fall the Council
hired Kimley Horn (who was already working with New Brighton on the west side of the bridge)
to complete a final design for this trail working with MnDOT to try to coordinate it with the
bridge replacement.
For the past several months, Kimley Horn, City staff, New Brighton staff, MnDOT staff and
School District staff have been working to coordinate all proposed improvements in this general
area. Tonight’s Work Session item will provide an update of the outcome of these efforts.
As previously mentioned to the Council, MnDOT will be building the new bridge slightly north
of the current alignment. The slight shift to the north helps with trail construction by reducing
the size of the retaining wall needed due to the steep slope just off the south side of the road.
MnDOT will also be rebuilding approximately 500 feet of Lake Valentine Road to have it match
in to the new bridge. MnDOT has agreed to rebuild the segment of Lake Valentine Road with
curb and gutter on the south side. This will allow the new trail to be built immediately behind
the curb thus reducing the size of the needed retaining wall even further.
The total length of the trail from the new bridge to the first MVHS driveway is about 1200 feet.
The trail project will have to continue the addition of curb and gutter on the south side of Lake
Valentine Road the remainder of the way. In addition, this approximately 700 foot segment of
Lake Valentine Road will be overlaid to blend in the new curb and the MnDOT bridge project.
AGENDA ITEM - 1B
MEMORANDUM
Page 2 of 2
The estimated project cost for these improvements is in the $400,000 range; approximately split
half curb and gutter and overlay and half retaining wall and trail construction. The total cost is
Municipal State Aid (MSA) eligible. Staff has also been talking with School District staff about
participating in the cost of the trail. We believe that the School District is willing to participate
at a $80,000-100,000 level (approximately half of the trail cost).
With regard to construct, MnDOT will not allow this work to be added to their project because it
goes outside their Federally described project limits. However, New Brighton is planning a large
street improvement project on the west side of the bridge and has agreed to add the trail to their
project. This should provide the City of Arden Hills some cost effectiveness by being part of a
much larger project.
Staff is looking for Council consensus to proceed to bidding with the project and to start the
agreement process with the School District for funding and a Cooperative Agreement with New
Brighton for inclusion in their project for construction.
Attachments
Attachment A: Site Layout
Page 1 of 3
DATE: February 9, 2015
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Terry Maurer, Public Works Director
SUBJECT: Gateway Sign at Cleveland/D Discussion
Last fall the Council directed staff to work on a gateway sign installation at the corner of
Cleveland Avenue and County Road D. At the September 29, 2014, Work Session staff
presented Council with their findings and a quote for the sign installation. The staff findings
included the reduced size of the sign (4½’ X 7’) due to restrictions in the original easement
document and the need to internally light the sign due again to the small easement area that is not
large enough for an external light to be mounted in front of the sign. The consensus of the
Council was (attached are the September 29, 2014, minutes) the sign should be internally lit and
the item should be brought back to a regular meeting for Council action.
The gateway sign item was present at the October 13, 2014, regular Council meeting (attached
are the October 13, 2014, minutes). At that meeting the Council passed the following motion
after discussion on the issue:
MOTION: Councilmember Holden moved and Councilmember Holmes seconded a
motion to recommend staff proceed with the installation of a 4 ½ foot high, 7
foot wide, internally lit gateway sign at the northeast corner of Cleveland
Avenue and County Road D with a cost not to exceed $10,300 with a tan and
green color scheme. The motion carried 3-1 (McClung opposed).
After the meeting staff told Fourth Dimension the sign was authorized by the Council and they
could proceed. However, staff did ask to see a mockup of the final color scheme prior to
completion of the sign. Unfortunately, due to some internal issues at Fourth Dimension this did
not happen. So staff immediately contacted Fourth Dimension when the sign was installed and
told them the final color scheme had not been approved as requested. Fourth Dimension has
been working with staff since to get some resolution to this issue.
The sign has been installed and lit since late last year. Hopefully, all Council Members have had
an opportunity to view the sign at night and during the day. Below is a picture of the sign during
daylight hours.
AGENDA ITEM – 1C
MEMORANDUM
Page 2 of 3
As can be seen in the above photo, the face of the sign is Arden Hills green and the Plexiglas
logo has a tan covering. Due to the thickness of the Plexiglas, when lit there appears to be a
small “halo” around the logo. Fourth Dimension believes this “halo” effect can be diminished or
eliminated by installing the same tan film on the inside of the Plexiglas without substantially
reducing the illumination.
During the discussion at the Council meeting on October 13, 2014, there was some discussion
about having the face of the sign Arden Hills tan and the lettering green, although the motion
passed does not specifically direct this color scheme. Fourth Dimension has provided a graphic
of this color scheme which is below.
Page 3 of 3
Fourth Dimension has indicated they will, at their cost, remove the sign and repaint it if the
Council wants this color scheme. This work would have to wait for warmer spring weather to be
completed.
Staff is concerned that a tan background with green lettering may not provide enough color
contrast since the base of the sign is surrounded by “tan colored” rock. Staff’s recommendation
would be to have the tan sheeting installed on the inside of the logo to reduce the “halo” effect
but to leave the face of the sign Arden Hills green to provide a color contrast.
Staff is looking for direction from the Council to pass on to Fourth Dimension.
Attachments
Attachment A: September 29, 2014, Special City Council Work Session Minutes