HomeMy WebLinkAboutJuly 2014The Official City Newsletter for Arden Hills Residents July 2014
Last of TCAAP buildings is demolished; development plans proceed
Single-sort recycling is coming to
Arden Hills. Beginning on July
15, residents will be able to put
recyclable papers and containers together
in the same bin. Additional types of food
and beverage containers, #4 and #5 plas-
tics, will now be accepted as well. These
include tubs and bowls, such as yogurt,
butter and produce containers, and trans-
parent deli and “to go” containers.
Why is this change occurring?
Many Arden Hills residents have asked for
single-sort recycling, which communities
all over the state and nation are adopt-
ing. According to Eureka Recycling, the
company which holds the current contract
for the City, “Industry reports show that
the number of people who participate will
increase because of the easier sorting and
that single-stream recycling will increase
collection efficiency.” It is also significant
that markets have been developed for ad-
ditional types of plastic because the more
plastic that is recycled, the greater the
savings in energy and resources.
Toward curbside compost collection
Single-sort can also help to bring curbside
collection of composting. According to a
recent report from the Minnesota Pollu-
tion Control Agency, over 35 percent of
what we toss in Minnesota is food waste
by Susan Cathey
Preparations for development of the
former Twin Cities Army Ammuni-
tion Plant site are advancing this
spring and summer, including road fund-
ing, final demolition and plan approvals.
In May, the State Legislature approved
$29 million to help fund transportation
projects providing better access to the
TCAAP site. The improvements include a
new bridge with pedestrian trails at
I-35W and Highway 96, a new inter-
change at I-35W and County Road H,
a new interchange at Highway 96 with
the future spine road, and interior ac-
cess roads. In a joint statement, Ramsey
County Board of Commissioners Chair
Jim McDonough and Arden Hills Mayor
David Grant called the legislative fund-
ing “another important milestone for the
redevelopment of the Twin Cities Army
Ammunition Plant.” The statement also
said: “These interchanges are critical
access points to the former TCAAP site
that need to
be redesigned
to support re-
development
efforts…This
investment
signals the rebirth of this
site as a job creator and
will help return it to the tax
rolls after 70 years.”
The last of the 44 former
ammunition plant build-
ings on the 427-acre
development site was
demolished in June. A
ceremony to mark the oc-
casion, attended by City,
County and other officials,
was held on the 70th an-
niversary of D-Day.
Kimley-Horn and Associates and Wenck
Associates were selected to design the
TCAAP public infrastructure. They will
recommend designs for the spine road and
thumb road connection to County Road I,
the water and sanitary sewer systems, and
the stormwater management systems.
The City Council was expected to finalize
a Master Plan land use map in late June.
The Council is scheduled to vote on the
Alternative Urban Area Review and Miti-
gation Plan in July. See the City website
to view the draft Master Plan and the draft
Alternative Urban Area Review.
(Top) Mayor David Grant was among the ceremo-
ny’s speakers. (Bottom) Council Members Brenda
Holden and Fran Holmes take their turns with the
hammer during the demolition ceremony for the final
TCAAP building.
Photos courtesy of Ramsey County.
Single-sort recycling comes to Arden Hills in July
continued on page 2
by Kristine Goodrich
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
Summer Office Hours
Monday through Thursday
7:30 a.m.--5:00 p.m.
Friday
7:30 a.m.-11:30 a.m.
651-792-7800
www.cityofardenhills.org
Sheriff and Fire Emergency
911
Sheriff (non-emergency)
651-767-0640
Fire (non-emergency)
651-481-7024
Water and Sewer Problems
(During non-business hours)
651-767-9640
Mayor:
David Grant 651-538-0747
dgrant@cityofardenhills.org
Councilmembers:
Brenda Holden 651-636-2987
bholden@cityofardenhills.org
Fran Holmes 651-631-1866
fholmes@cityofardenhills.org
Dave McClung 651-332-0352
davemcclung@comcast.net
Ed Werner 651-636-2547
ewerner@cityofardenhills.org
City Administrator:
Patrick Klaers 651-792-7810
pklaers@cityofardenhills.org
Communications Committee
Kristine Goodrich, editor; Susan
Cathey, Tina Kulzer
Council Liaison: David Grant
Staff Liaison: Amy Dietl
Desktop Publisher: Mary Nosek
Council meetings are held at City Hall
on the second and last Monday of the
month at 7 p.m. Meetings are televised
live on Cable Channel 16. Meetings of
the Planning Commission are televised
live at 7 p.m. on the first Wednesday of
the month. Visit www.cityofardenhills.
org for information about taped meet-
ing playbacks.
Arden Hills Notes is the official news-
letter of the City of Arden Hills, an
equal-opportunity employer.
2
and non-recyclable paper that could be
composted. “One of the biggest benefits
of single sort is that it creates the oppor-
tunity to co-collect (collect in separate
compartments on the same truck) recy-
clables with compostables (food waste and
non-recyclable papers),” explained Chris
Goodwin, Customer Relations Manager at
Eureka. “Single-sort collection will make
it much less expensive to add composting
to the program in the future, should the
decision be made.”
At its April 21 work session, the City
Council examined and discussed two op-
tions prepared by staff for moving forward
with single sort-recycling. One option
involved waiting to begin the program
until the current contract with Eureka
is up, in March 2015. The other option,
which Council Members selected, required
amending the contract to begin implemen-
tation of single-sort this summer, which
includes the additional plastics, while
Single sort recycling continued from page 1
using residents’ current bins. Nothing else
will change at this time, including pickup
days. Meanwhile, the City will imple-
ment the Request for Proposals process to
examine recycling services and consider
further changes to the program, signing
a new contract to go into effect March 1,
2015. This plan was formally approved at
the May 27 City Council meeting.
Watch for a flier from Eureka with
details about what can and cannot be
recycled. If you have questions, you may
call Eureka’s Zero-Waste Hotline at 651-
222-7678 or go to its website:
www.eurekarecycling.org.
Want to learn more?
There’s lots of additional information about recycling and its benefits at
www.RethinkRecycling.com
Benchmarks: a review of recent City Council action
3
ment to extend the deadline for final
plan submission of Phases 2 and 3 of
the Arden Plaza development (5-0)
June 9, 2014
• Approved a temporary permit for
grading along County Road E by
Freeway Park for a future trail (5-0)
Take a stroll along Johanna Shores
May 27, 2014
• Approved tennis court maintenance
for the Johanna Marsh tennis court
(5-0)
• Approved planning case 14-015—a
Planned Unit Development amend-
ment for Boston Scientific to con-
struct a 730 square-foot addition onto
building 10 (5-0)
• Approved an addendum to the recy-
cling contract to include single-sort
collection of recyclables (5-0)
• Denied the purchase of a Building
Department vehicle (5-0)
• Approved a contract with Xcel En-
ergy to install 31 light poles on Gate-
way Boulevard as part of the Round
Lake Road improvement project (5-0)
• Tabled planning case 14-014—for a
side yard setback variance at 1850
Venus Avenue (5-0)
• Approved planning case 14-018 a
Planned Unit Development amend-
Still a work in progress after more than
two years of construction, Presby-
terian Homes & Services is building a
redeveloped senior living community at
Johanna Shores, located at 3200 Lake Jo-
hanna Boulevard. The project has already
significantly changed the face of Johanna
Shores; however, Presbyterian Homes &
Services’ almost-60-year commitment to
serving older adults in Arden Hills remains
unchanged.
Since its inception as the original Pres-
byterian Home in 1955, Johanna Shores
has served more than 24,000 older adults.
In 2011, Presbyterian Homes & Services
embarked upon a three-phase redevelop-
ment of Johanna Shores. Phases one and
two, completed during 2012 and 2013,
included the demolition of outdated build-
ings and facilities and the construction of a
new campus that aims to accommodate the
expected increase in need for housing for
older adults in the community.
The timeline for the third and final phase
of the redevelopment project is yet to be
finalized, but is anticipated to begin in
2015. Phase three will see the
construction of brownstone
row-style townhomes that will
offer additional independent
living accommodations.
The redeveloped 23-acre
site now includes 54 senior
apartments, 72 assisted living
apartments, 36 memory care
suites and 208 care center
suites. The campus features
a 38,000-square-foot “Town
Center,” which provides a bevy of activi-
ties and services, including a conservatory,
wellness center, business center, movie
theater, chapel, classrooms, physicians,
library, salon, and bistro.
Outdoor amenities include extensive
landscaping, featuring flower gardens,
ponds, and a gazebo; an outdoor chapel;
a boat dock with pontoon launch; and
fully-accessible walking trails. The entire
project embraces the premiere location on
the shore of Lake Johanna.
The community is welcome to enjoy the
walking trails at Johanna Shores, which
can be accessed by the public at Sandeen
Road (southeast of site) and Shorewood
Drive (northwest of site). The Johanna
Shores walking trails connect with the
larger trail system that winds around Lake
Johanna and through the neighborhood.
This summer, plan a bike ride or leisurely
stroll along this route and take in this
extraordinary addition to the Arden Hills
community.
Primary Election Day is August 12
Polls will be open from 7 a.m. to 8 p.m.
On the primary ballot
• US Senator
• Governor and Lieutenant Governor
• Secretary of State
• State Auditor
• Attorney General
In-person absentee voting is available at
City Hall August 7-11 from 7:30 a.m. to
5 p.m. and on Saturday, August 9, from
10 a.m. to 3 p.m. Request a ballot online
at www.mnvotes.org
Election season is on the horizon!
• Denied the CTV franchise renewal
proposed by Comcast (Arden Hills is
one of 10 member cities on the North
Suburban Cable Commission, and
the City’s denial means that it cast
a negative vote on the proposal as a
Commission member.) (5-0)
Interested in
running for City
office? The Mayor’s
seat and two Council
Member seats are
open in Arden Hills.
You can file an affidavit of candidacy from
July 29 to August 12. The cost is $2, and
filing packets are available at City Hall.
If you have questions
or want to know to where to vote,
visit www.co.ramsey.mn.us/elections
or call the County at 651-266-2717
or the City of Arden Hills at 651-792-7800.
by Tina Kulzer
Postal Customer
ECR-WSS
PRST STD
U.S. Postage Paid
St. Paul, MN
Permit #1962
I
n
s
i
d
e
Arden Hills, MN . 55112-5734
TCAAP’s future
Single-sort recycling is here!
Visit Johanna Shores
Night to Unite is August 5
Notes from the City Council The last three-and-a-half years have
been very eventful for the City of
Arden Hills with the Viking stadi-
um discussion; road and bridge redevelop-
ment with I-694, Highway 96 and I-35W;
redevelopment of properties such as the
Holiday Inn and Lexington Station; and
the construction of the Fox Ridge housing
development and new apartment building
on County Road F.
The most significant project is the future
development of the TCAAP property.
The City of Arden Hills is working with
Kimley-Horn and Associates, LLC, to
complete a Master Plan, Alternative Urban
Areawide Review, and regulations and
policies for the TCAAP site. This work is
expected to be complete by fall of 2014.
Bonding for TCAAP road improvement
The 2014 bonding bill recommendation
of $29 million is for road improvements
needed around the TCAAP property. The
funding to replace a bridge at I-35W and
County Road 96 and a new interchange at
I-35W and County Road H will increase
the site’s traffic capacity and will have
regional significance beyond TCAAP.
I-35W interchange bridge at Highway 96
A diverging diamond interchange (DDI) is
a recommended alternative for the bridge
at Highway 96. A DDI, also called a
double crossover diamond interchange, is
a diamond interchange in which the two
directions of traffic on the non-freeway
road cross to the opposite side on both
sides of the bridge at the freeway. It is
unusual in that it requires traffic on the
freeway overpass (or underpass) to briefly
drive on the opposite side from what is
customary. A DDI helps reduce delay and
risk of accidents and improves safety. A
disadvantage is drivers may not be familiar
with configuration, particularly with merg-
ing maneuvers along the left side of the
roadway or the crossover flow of traffic.
Additional bridge projects in 2015
Reconstruction is tentatively scheduled in
2015 for two additional bridges. They are
the County Road F bridge over I-35W and
the County Road E bridge over Snelling
Avenue. These bridges are old and are
sorely in need of replacement.
County Road F bridge over I-35W
This bridge is scheduled to be replaced
in 2015. This road, just west of Mounds
View High School, is also referred to as
Lake Valentine Road.
County Road E bridge at Snelling
This bridge is located west of McDon-
ald’s on County Road E. Those who used
this bridge on foot or bicycle know how
dangerous the bridge is. Plans have been
discussed for a pedestrian sidewalk on
the south side of the bridge and space for
bicycles on the north side of the bridge.
County Road E improvements
The Council has ordered preparations of
final plans and specifications anticipating
a 2015 construction. Project includes new
street lighting, boulevard trees, and con-
crete sidewalk repairs. Also included is the
widening of County Road E at Lexington
Avenue to provide for a dual left turn lane
to northbound Lexington, reconstruction
of the County Road E median and a mill
and overlay of County Road E.
Have a wonderful and safe summer.
Ed Werner, City Council
Register your neighborhood for Night to Unite on August 5Night to Unite is 5-9 p.m. on Tuesday, August 5. The annual celebration gathers neighbors and public safety personnel together
to promote safe communities. The Ramsey County Sheriff’s Office encourages Arden Hills neighborhoods to hold block par-
ties. Sheriff’s Office representatives visit each registered party. To register, go to www.co.ramsey.mn.us/sheriff/crimepreventuion/
ntu. The website also has activity ideas, downloadable invites and other resources. Residents also can call the Crime Prevention
Unit at 651-266-7338 with questions.