HomeMy WebLinkAboutMay 2015The Official City Newsletter for Arden Hills Residents May 2015
by Susan CatheyTwo vacant buildings on County
Road E2 near the intersection
of New Brighton Road will be
replaced by upscale single-family homes
over the next 18 months. The properties
at 1901 and 1941 County Road E2 have
been sold by Bethel University to Land-
mark of Arden Hills at a purchase price
of $856,000 for the 4.77 acres. Hanson
Builders, a partner of Landmark, has
submitted a proposal to construct seven
two-story homes on the land, to be called
Valentine Bluff.
Several things had to happen before this
development could be approved. City
Planner Ryan Streff presented the pro-
posal to the Planning Commission at its
March 4, 2015, meeting. The developer
requested a Preliminary and Final Plat,
Rezoning, and Comprehensive Plan
Amendment (CPA) in order to subdivide
the two contiguous parcels of land into
seven single-family lots.
The property at 1941 County Road E2 is
the site of the former Arden Hills branch
of the Ramsey County Public Library Sys-
tem, which closed in 2010. It was zoned
R1 (Single-Family Residential). The
building at 1901 was occupied for many
years by the Minnesota Baptist Confer-
ence but is now vacant. It was zoned NB
(Neighborhood Business). In the City’s
2030 Comprehensive Plan, both properties
were guided for NB. The Comprehensive
Plan lays out the future land uses that
are anticipated for all properties within
the City, allowing for planning for future
needs and appropriate land use regulation.
The developer sought a rezoning to R2
(Single and Two-Family Residential). The
property would also be designated Very
Low Density Residential, which is defined
as 1.5 to 3 units
per acre. One of
the conditions
of granting this
request was that
the project be
contingent on
approval from
the Metropolitan
Council, which
has the final say
on whether to al-
low a CPA. The
City must also
allow adjacent
governments,
affected special
districts, and
affected school districts the opportunity to
review the proposed CPA.
The Arden Hills Subdivision Ordinance
requires a park dedication from developers
to the public. Based on the purchase price,
the six percent fee in this case is $51,360.
A 68-foot park, trail, and recreation ease-
ment will be provided by the applicant to
the Ramsey County Parks and Recreation
Department for a future trail connection
through the wetland complex in Tony
Schmidt Regional Park, which borders the
property to the north and east.
Lots in the proposed plan will be devel-
oped to preserve as many of the highest
quality trees as possible. One hundred-
nine new trees will be planted, exceeding
the City’s requirement.
Other information was provided to the
Planning Commission by City staff:
• No new streets are included. There
will be four driveways from County
Road E2, three of them shared by two
homes each, and the easternmost lot
having its own. A traffic study was
Valentine Bluff development to begin
Lot total area (square feet) Width Depth
Zoning Code 11,000 85 120
1 44,483 139 320
2-7 27,202 85 320
This chart shows the size of the proposed lots and how they comply with
zoning codes.
continued on page 5
Valentine Bluff model home design
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
Office Hours
Monday through Friday
8:00 a.m. — 4:30 p.m.
City Contact Information
651-792-7800
www.cityofardenhills.org
Sheriff and Fire
911
Water and Sewer Problems
(During non-business hours)
651-767-0640
Mayor:
David Grant 651-538-0747
dgrant@cityofardenhills.org
Councilmembers:
Brenda Holden 651-636-2987
bholden@cityofardenhills.org
Fran Holmes 651-631-1866
fholmes@cityofardenhills.org
Dave McClung 651-332-0352
davemcclung@comcast.net
Robert Woodburn 651-633-2389
rwood37393@aol.com
City Administrator:
Patrick Klaers 651-792-7810
pklaers@cityofardenhills.org
Communications Committee
Editors/writers: Susan Cathey, Tina
Kulzer
Writer: Emma Theis
Council Liaison: David Grant
Staff Liaison: Amy Dietl
Desktop Publisher: Mary Nosek
Council meetings are held at City Hall
on the second and last Monday of the
month at 7 p.m. Meetings are televised
live on Cable Channel 16. Meetings of
the Planning Commission are televised
as well. Visit www.cityofardenhills.org
for information about taped meeting
playbacks.
Arden Hills Notes is the official news-
letter of the City of Arden Hills, an
equal-opportunity employer.
2
City Park Profiles--a series
Royal Hills Park
4375 Snelling AvenueArden Hills residents in the northern neighborhoods of the City have been enjoy-
ing Royal
Hills Park
since 1986 when
4.57 acres of land on
Snelling Avenue were
conveyed to the City
as satisfaction of the
park dedication re-
quirement for North
Heights Lutheran
Church. With the
exception of one acre
of pond adjacent to
Highway 10, the re-
maining acreage was
considered ideal for
park space. “North
Snelling Park,” as it
was referred to during its acquisition, suitably
filled the need for park space in this part of the
City at that time.
Extensive grading immediately commenced on this long and narrow north-south-
oriented land parcel to establish level ground for a youth softball/baseball diamond and
open field space on the far north end of the park. Installation of playground equipment
and construction of a tennis court and a full-court basketball area south of the ball field
soon followed - in part due to a series of letters sent to the City and signed by dozens
of neighborhood residents, urging consideration of such amenities that would serve the
recreation needs of the young families and children populating the neighborhood.
Royal Hills Park also features a covered picnic shelter next to the playground area
where summer playground programming is offered to City residents. This park is also
utilized for other Parks and Recreation programming, including youth summer tee-ball
and baseball leagues and youth spring/summer soccer mini-camps. Royal Hills Park is
well-utilized in the winter as well, as it boasts a terrific sledding hill on the south end of
the park.
More than a dozen off-street parking spots are available adjacent to the park on the west
side of Snelling Avenue. Crosswalks marked at Royal Hills Drive and at a City trail out-
let between McClung Drive and Briarknoll Drive allow safe crossing of Snelling Avenue
and pedestrian access to Royal Hills Park.
Meeting changing community needs
The “Community Parks and Trails Survey” conducted by the Parks, Trails and Recre-
ation Committee in 2013 reported a 23.3 percent response rate from residents living
nearest to Royal Hills Park—the highest response rate in the City. Survey responses also
by Tina Kulzer
continued on page 4
Correction: In the April Arden Hills Notes, it was incorrectly stated that the tennis
court at Johanna Marsh had been resurfaced last summer. The court was scheduled for
resurfacing, but the work was not completed due to weather conditions. Resurfacing is
being planned for this spring now that MnDOT has lifted the seasonal load restrictions
in that area.
Benchmarks: a review of recent City Council action
3
March 30, 2015
• Approved the North Suburban Cable
Commission (NSCC) Joint and Coop-
erative Agreement. (5-0)
• Approved the purchase of residen-
tial recycling carts, funded mainly
by a Public Entity Innovation Grant
(PEIG) from Ramsey County. (5-0)
• Approved the appointment of Kyle
Lassen and Michael Hands to the
Economic Development Commission.
(5-0)
• Approved a revision to the 2015 Fee
Schedule for electrical inspections.
(5-0)
• Approved the Red Fox Business Cen-
ter Master and Final PUD and CUP
Agreement. This is the final action
required for a two building develop-
ment on Red Fox Road. (5-0)
• Approved an amendment to the Bos-
ton Scientific Master Planned Unit
Development (PUD) Agreement. A
PUD Amendment was required to re-
flect the change in property boundar-
ies and to update the existing Campus
Master Plan. (5-0).
• Approved Planning Case 15-003
for a site plan review and variance
for CSM Properties located at 4293
Lexington Avenue North. A site plan
review was required for parking lot
modifications and a variance was
required to address the encroachment
of the parking lot into the five-foot
setback requirement. (5-0)
• Approved a no parking resolution for
the west side of Lexington Avenue
from County Road F to Cummings
Park Drive, and on County Road F
from Lexington Avenue to Innova-
tion Way. MnDOT requires a resolu-
tion from the City banning parking
in order to utilize County State Aid
funding. (5-0)
• Approved City staff to begin summer
work hours starting on May 26, 2015
and ending on September 4, 2015.
Hours are 7:30 a.m. to 5 p.m. Monday
– Thursday and 7:30 to 11:30 a.m. on
Friday. (5-0)
• Approved the quarterly special as-
sessments for delinquent utilities.
(5-0)
• Approved the transfer of Great China
Liquor License. (5-0)
• Approved the Valentine Bluff redevel-
opment project for a Preliminary and
Final Plat, Rezoning, and Comprehen-
sive Plan Amendment to subdivide
the two parcels of property into seven
single-family lots at 1941and 1901
County Road E2 (the former library
and Baptist Conference sites). (5-0)
• Approved Planning Case 15-002, a
Preliminary and Final Plat and Master
PUD Amendment for Arden Plaza,
minus the proposed Frattallone’s out-
door seasonal sales area. (5-0)
• Tabled the Frattallone’s section of
Planning Case 15-002 to the April 13
regular City Council meeting. (5-0)
• Approved Resolution 2015-015,
declaring cost to be assessed and
ordered the preparation of the Assess-
ment Roll for the 2015 PMP - Venus/
Crystal Neighborhood. (5-0)
• Approved Resolution 2015-016, set-
ting the date for the assessment hear-
ing for the 2015 PMP - Venus/Crystal
Neighborhood as Monday, April 27,
2015. (5-0)
• Approved Resolution 2015-017,
declaring cost to be assessed and
ordered the preparation of the assess-
ment roll for the 2015 PMP - Grant/
Noble/Lake Lane Neighborhood.
(5-0)
• Approved Resolution 2015-018, set-
ting the date for the assessment hear-
ing for the 2015 PMP - Grant/Noble/
Lake Lane Neighborhood as Monday,
May 4, 2015. (5-0)
April 13, 2015
• Approved the appointment of sea-
sonal Public Works employees. (5-0)
• Approved the advertisement of the
Deputy Clerk position. (5-0)
• Approved the contract for this year’s
sewer lining project to Hydro Clean
Inc. (5-0)
• Approved the portion of Planning
Case 15-002, relating to the Arden
Plaza Frattallone’s Garden Center.
This consisted of a Conditional Use
Permit Amendment and Planned Unit
Development Amendment at 3527-
3557 Lexington Avenue North. This
approval enables Frattallone’s Ace
Hardware to construct a more perma-
nent garden center. (3-2) (McClung,
Woodburn).
Spring Cleanup Day!
Saturday, June 6
7 a.m.-1 p.m.
Ramsey County Public Works Facility
1425 Kirkwold Drive
(Highway 96 and Hamline Avenue)
Some things you should know about Cleanup Day:
• There are charges based on vehicle type and load: cars--$10, trailers--$35,
others--$25. Loads larger than 8’x10’ will be subject to extra charges.
• Yard waste, donations, and oversize items will not be accepted.
• The gate will close at 1 p.m.
4
by Emma TheisThe City of Arden Hills welcomes
David Perrault as its new finance
analyst. David will help run the
finance department, supervise the utility
billing clerk and the accounting analyst,
and get ready for audits and perform
reconciliations (making sure money leav-
ing an account matches the actual money
spent). David grew up in St. Paul and
attended the University of Wisconsin -
Madison for his undergraduate degree. He
was also an analyst in the military for four
years.
Still living in the St. Paul area, David is
currently working on his MBA (Master
of Business Administration) and MPA
(Master of Public Administration) from
Hamline University. Before coming to the
City, David worked at the State of Min-
nesota in the Department of Agriculture
doing accounting and finance.
We sat down with David and asked him
some questions so that Arden Hills resi-
dents can get to know him a little better.
What unique skills do you bring to the
table?
“I think I have a critical eye, and leader-
ship skills too.”
What was your first job ever?
“I worked at the Science Museum in St.
Meet Finance Analyst David Perrault
Paul. I helped with the visitors and exhib-
its and stuff. Nothing too exciting.”
What is your dream job?
“End goal is I kind of want to be in the
Director of Finance or City Manager role.
It’s nice that I’m working with the City
now instead of the State, it’s setting me up
to move forward from there.”
What do you do when you’re not work-
ing?
“Going to school. I like to go for runs—
and travel.”
What is something you would like to do
before you die?
“I would like to go to South America
and Antarctica because those are the two
continents I haven’t been to yet—I want to
hit all seven.”
What is the most unusual item in your
office?
“Beef jerky.”
What’s a lesson you live by?
“Treat everyone with respect.”
What would be impossible for you to
live without?
“I’m gonna have to go with my iPhone—
probably should have said my fiancée.”
You may have noticed a different
look in Arden Hills’ neighbor-
hoods on recycling day. Begin-
ning with the May 5 and 6 pickup dates,
homeowners were able to put out their
new 64-gallon single sort recycling carts.
The containers are black with green lids
and the Arden Hills logo on the sides.
The carts, which were purchased in large
part with a $100,000 Public Entity Innova-
tion Grant through Ramsey County, were
scheduled for delivery to all single-family
dwellings in Arden Hills between April 27
and May 1. The City’s five-year contract
with Republic Residential Recycling Ser-
vices went into effect on May 4.
If, after a trial period
of three months, resi-
dents feel they need a
smaller cart, a 32-gal-
lon size will be available
for exchange.
A mailing from Republic
to all residents encour-
ages participation in the recycling pro-
gram, which has been made easier with the
single sort approach. Additional informa-
tion is available on Republic’s website,
www.republicservices.com/recyclingand-
disposal.
About those new recycling carts
indicated Royal Hills Park (in a tie with
Perry Park) as the second most-regularly-
visited park in the City.
Many additional survey comments refer-
ring to Royal Hills Park strongly favored
and requested park updates—especially
in playground equipment upgrades and
additions—to accommodate the explosion
of kids in the neighborhood due to the ad-
dition of the 39 single-family homes in the
Fox Ridge development. As one survey
respondent put it: “Need a bigger playset
for the Fox Ridge community which has
over 90 children that will utilize this park
and there is insufficient play area for this
growing community.”
These numbers, combined with a new
generation of young children and families
in the surrounding original neighborhoods,
will certainly put the park’s amenities to
the test in the years to come. As with all
other City parks, Royal Hills Park is on
a 20-year equipment replacement sched-
ule and is scheduled for new playground
equipment in 2022.
Royal Hills Park
continued from page 2
5
done, which helped staff determine
there would be minimal impact on the
County Road E2 and New Brighton
Road intersection.
• The Very Low Density Residential
designation is compatible with adja-
cent land use.
• The Metropolitan Council has indi-
cated to City staff its support for the
proposed CPA.
Hanson Builders has been in business for
35 years and has constructed many homes
in the north suburbs. Owner Dean Hanson
told the Planning Commission that he
believed this would be a special develop-
Valentine Bluff development continued from page 1
ment of seven unique homes with a price
range of $750,000-950,000.
The Planning Commission unanimously
recommended approval of Planning Case
15-004 subject to a number of conditions.
The case was then presented to the City
Council on March 30. Mr. Hanson was
again present to share information and
answer questions. The motion to approve
the proposal was amended to allow the
construction of a model home before all
permits are issued, at the developer’s
risk. The City Council also approved the
proposal unanimously, subject to the con-
ditions stipulated by the Planning Com-
mission.
New bridge to improve County Road E corridor
Replacement of the County Road E
bridge over Snelling Avenue began
in mid-April. It was the start of a much
needed upgrade that has been in the works
for several years and is a culmination of
years of planning. The City Council, City
staff, City commissions, and especially
citizen advisory groups have worked hard
to make sure these needed upgrades will
benefit all the residents of Arden Hills.
The project should last about four months.
When it is complete, County Road E will
have improved turn lanes, attractive light-
ing, and boulevard trees. The road surfaces
will also be upgraded. The new bridge will
be much wider and include an improved
bicycle pedestrian crossing that will con-
nect existing sidewalks and trails. It will
also be a better looking, longer lasting
structure than the previous bridge.
Arden Hills has worked to maximize the
aesthetic appeal of the bridge, which will
fit in well with the newly upgraded County
Road E Corridor. The pedestrian lanes
on the south side of the bridge will allow
Arden Hills to extend the walking trails
down to Bethel College in the future.
The traffic between the east side of County
Road E and Snelling and the west side of
County Road E and Snelling will be cut
off during construction. The ramps will be
closed for up to two weeks during
construction. There will also be
full closures of Snelling Avenue
for bridge removal and placement
of beams for the new bridge on
some weekends.
Detour information
Traffic east of Snelling Avenue:
Travel east on County Road E, north on
Lexington Avenue, west on County Road
F and south on Hamline/Snelling Avenue
to reach the west side of Snelling Avenue.
Traffic west of Snelling Avenue:
Travel west on County Road E, south on
Old Snelling Avenue/Old Highway 10,
south on Hamline Avenue and east on
County Road C to reach the east side of
Snelling Avenue.
Current information and detour maps can
be found at the MnDOT website: www.
mndot.gov//metro/projects/creoverhwy-
51ardenhills//.
When this much-needed project is
completed, Arden Hills will have a more
attractive and usable bridge to connect
with the new and improved County Road
E Corridor.
by Ed von Holtum, Economic Development Commission
City Hall moves
to summer hours
on May 26
Summer office hours at City Hall begin
on May 26 and end on
September 4.
Hours for City Hall staff:
• Monday-Thursday: 7:30 a.m.-5 p.m.
• Friday: 7:30-11:30 a.m.
Hours for Public Works staff:
• Monday-Thursday: 6:30 a.m.-4 p.m.
• Friday: 6:30-10:30 a.m.
There she goes! The County Road E bridge over Snelling Avenue was demolished in
mid-April to make way for a new and improved structure.
photo by Susan Cathey
Postal Customer
ECR-WSS
PRST STD
U.S. Postage Paid
St. Paul, MN
Permit #1962
I
n
s
i
d
e
Arden Hills, MN . 55112-5734
Valentine Bluff development
Royal Hills Park
Meet David Perrault
County Road E corridor improvements
News from the City Council
Since the summer of 2013, rail
traffic has increased in Arden
Hills due primarily to the crude
oil production at the Bakken oil
fields in North Dakota. As the rail traffic
increased, quality of life issues emerged
in Arden Hills, primarily relating to
increased noise, vehicular street traffic
congestion at rail grade crossings, and
safety concerns.
Train traffic is regulated by the inter-
state commerce clause and is within the
jurisdiction of the federal government.
Consequently, there is little local, county,
and state government can do to regulate
the amount of train traffic. However, since
there is every indication that the train
traffic will not decrease in the foreseeable
future, Ramsey County and the cities in
Ramsey County are working on solutions
to improve our quality of life.
What is being done currently
Ramsey County and its cities have found
that working with the railroads themselves
has been an effective way to reach some
solutions. The Canadian Pacific Rail (CP
Rail) and Canadian National Rail (CN
Rail) are the main railroad lines that run
through Ramsey County. With cooperation
from these rail lines and under the author-
ity of the Federal Railroad Administration,
a Quiet Zone was established at the grade
crossing on Lexington Avenue, just north
of County Road E in Arden Hills. (There
are other Quiet Zones in place or being
proposed in Ramsey County.) A Quiet
Zone is an exception to the federal law
which mandates trains to blow their horns
at grade crossings. Additionally, the tracks
in Ramsey County are being improved, es-
pecially at and near the grade crossings, to
allow trains to move faster to comply with
Minnesota state law requiring that trains
be restricted from stopping vehicular street
traffic for more than ten minutes. CP Rail
and CN Rail also have been working with
Arden Hills residents who live close to
railroad tracks to address concerns with
noise created when trains stop or back up.
Addressing safety concerns
The fire departments in Ramsey County,
including the Lake Johanna Fire Depart-
ment which serves Arden Hills, are receiv-
ing increased training on how to manage
and control fires in the event there is a rail
emergency involving crude oil or an-
other flammable liquid. This training also
focuses on pipeline and storage tank spills
and semi-tractor trailer truck emergen-
cies, other ways that flammable liquids are
transported throughout Ramsey County.
The safety training includes enhanced
communication within the emergency
response community, safe evacuation
methodologies, and fire control using both
water and foam. In addition to the rail-
road companies that have highly-trained
responders, the fire and police departments
throughout the Twin Cities area have mu-
tual aid agreements—all of which increase
the rapid response should an emergency
occur.
Dealing with increased traffic in Arden Hills
Looking to the future
Other initiatives to improve rail traf-
fic issues are more long-term solutions.
The federal government is now mandat-
ing improved tank cars carrying volatile
liquids, to provide for stronger sides that
are more resistant to expansion and explo-
sion. There are also proposals for federal
legislation to treat flammable liquids to
make them less volatile before shipment.
Efforts continue to improve the tracks to
move all products faster and safer. Finally,
there are initiatives to increase the number
of oil and gas pipelines, which most safety
experts agree are safer than rail or truck
transport. However, the timeline for pipe-
line construction can be a number of years.
The Arden Hills City Council and our City
staff are always willing to listen to your
concerns and will try to assist to improve
the quality of life in Arden Hills with
regard to rail traffic or any other concerns
you may have.
Fran Holmes
Fran Holmes
City Council