HomeMy WebLinkAboutJuly 2015�.�'
_
The Official City Newsletter for Arden Hills Residents
i
July 2015
Business Retention and Expansion program begins in Arden Hills hvsu.s�UncUthey
ver the next several months, you
will hear about a program called
Business Retention and Expansion
(BRE), which is being implemented in Ar-
den Hills by the Economic Development
Authoriry (EDA). According to Associate
Planner Matthew Bachler, retaining and
facilitating the expansion of existing busi-
nesses is an important component of any
ciry's strategic plan for economic develop-
ment.
Research supports planning
Last year, the Ciry's Economic Develop-
ment Commission (EDC) spent consider-
able time discussing and researching the
idea of implementing a BRE program in
Arden Hills. The research shows that it is
more efficient to focus on the growth of
existing businesses, which create up to 80
percent of new jobs, rather than on attract-
ing new businesses with some type of pub-
lic subsidy. BRE program goals include:
• Demonstrate to businesses that the
communiry appreciates their presence.
• Help existing businesses solve imme-
diate problems.
• Increase businesses' abiliry to compete
in regional, national, and global
markets.
• Establish a strategic plan for economic
development.
• Build community capacity to sustain
growth and development over the long
terrn.
The planning process
Each city which implements a BRE
program needs to identify targets specific
to that community. The first step is to
gather information on current conditions
by reviewing data on the local economy
and conducting interviews with select
businesses. A volunteer group comprised
of elected officials, city staff, residents,
and members of the business communiry
is usually responsible for completing these
interviews. This group undergoes training
in effective interview skills and use of the
selected survey instrument.
Following the data gathering, the r�
search is analyzed to identify community
strengths and weaknesses. Short-term
problems, such as the imminent prospect of
a business relocating to a different com-
munity, may be addressed at this time. A
summary report includes issue areas and
suggested actions.
The final step of a BRE program is imple-
mentation. The Ciry Council will study
the report and identify priority projects.
The communiry may choose to develop a
business visitation cycle to maintain the
beneficial effects of the program.
After completing a ten-week-long course
with the Universiry of Minnesota Exten-
sion on implementing a local BRE pro-
gram, City staff requested proposals from
the University and from the Saint Paul
Area Chamber of Commerce (SPACC)
to set up and administer a BRE program
in Arden Hills. The EDA accepted the
SPACC proposal in January 2015, at a cost
not to exceed $5,000. Key factors in their
selection were the Chamber's established
relationship with many City businesses and
other local stakeholders and its extensive
experience as one of the founding mem-
bers of the Minnesota Chamber of Com-
merce "Grow Minnesota!" BRE program.
Jonathan Weinhagen, vice president of the
SPACC, has been working with the Ciry to
answer questions and develop the plan.
The interview process
The SPACC has recommended that 30
to 40 interviews be held. The companies
contimred on page 3
Mnke pinns now for Night to Unite on August 4
It s time to get together with the neigh-
bors and plan your annual Night to
Unite event. The Ramsey Counry Sheriff's
Department encourages neighborhoods
to register their events with the Depart-
ment. During Night to Unite, community
officials, fire departments, and Sheriff's
Office representarives will visit neighbor-
hood gatherings.
Unite Registration link (on the right-
hand side)
• E-mail—Complete and email a regis-
tration form to:
crimeprevention@co.ramsey.mn.us
• Fag—Complete and fax a registration
form to 651-266-7337
• US Mail—Mail a registration form to:
Ramsey County Sheriff's Office
Crime Prevention Services
Here are four ways to register your event. 1411 Paul Kirkwold Drive
• Online—visit www.ramseycoun- Arden Hills, MN 55112
rysheriff.us; click on the Night to
. �
Registration forms, resources, and other information
about Night to Unite can be found at: ��'
http://www.co.ramsey.mn.us/sheriff/crimeprevention/ntu.htm � ����
to �� � V I 1� �
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
Summer Office Hours
Monday through Thursday
7.•30 a.m. — 5: 00 p.m.
Friday
7.•30-11:30 a.m.
City Contactlnformafion
651-792-7800
www. cityofardenhills. org
Sheriff and Fire
911
Water and Sewer Problems
(During non-business hours)
651-767-0640
Mayor:
David Grant 651-538-0747
dgrant@cityofardenhills. org
Councilmembers:
Brenda Holden 651-636-2987
bholden@cityofardenhills. org
Fran Holmes 651-631-1866
fholmes@cityofardenhills. org
Dave McClung 651-332-0352
davemcclung@comcast. net
Robert Woodburn 651-633-2389
rwood37393@aol. com
CityAdministrator:
Patrick Klaers 651-792-7810
pklaers@cityofardenhills. org
Communicafions Commiftee
Editors/writers: Susan Cathey, Tina
Kulzer
Writer: Emma Theis
Council Liaison: David Grant
Staff Liaison: Amy Dietl
Desktop Publisher: Mary Nosek
Council meetings are held at City Hall
on the second and lastMonday of the
month at 7 p. m. Meefings are televised
live on Cable Channel 16. Meetings of
the Planning Commission are televised
aswell. Vsitwww.cityofardenhills.org
for information about taped meeting
playbacks.
Arden Hills Notes is the o�ficial news-
letter of the City ofArden Hills, an
equal-opportunity employer.
City Park Profiles--a series
Valentine Park hyT=nUKu�ZeY
1650 Lake Ualentine Road
his month marks the two-year anniversary of the Grand Re-opening of Ualentine
Park. The park's transformation following an extensive
redevelopment proj ect is as impressive today as it was when
it was unveiled in 2013. This is a well-conceived, naturally inte-
grated, cohesive, functional, and fun neighborhood park in which
both the City and its residents can take great pride.
Persistent flooding and poor drainage
A quit claim deed signed in January 1955 by S.J. Krannak and Erna
B. Krannak donated a parcel of land on the corner of Old Highway
10 and County Road F(now Lake Ualentine Road) to the City of
Arden Hills. More than ten years passed until any significant devel-
opment began on the three acres that would become known as Valentine Park: a wooden
playground set in 1966, a warming house in 1967 (Ualentine Park inherited the shelter
that had been used for years at the Lake Johanna skating area); and hard court areas for
basketball and volleyball in 1974.
Storm water drainage issues and frequent flooding plagued Ualenrine Park for decades,
which inhibited the park space from reaching its full potential as a recreational area for
residents. The first amenity established at Ualentine Park was a ball field, and it was often
under water and unusable during the spring and summer baseball seasons.
In an attempt to remedy this problem, the layout of amenities at Valentine Park was
rearranged in the late 1990s. However, this tactic did not provide the resolution that was
needed. Park conditions necessary for winter ice skating soon began to deteriorate, which
forced the City to close the general skating rink in 1999, despite the demand for that am�
nity in the neighborhood at that time. Finally, in 2008, the planning stages of a complete
park redevelopment got underway.
Necessary renovations begin
Residents in the Ualentine Hills neighborhood had opportunities to weigh in on the rede-
velopment plan both at public meetings and via survey. A common sentiment reported by
residents was the desire to exercise restraint in making the needed improvements, so as to
preserve the natural beauty and tranquility of the residential neighborhood. The park was
often referred to by residents as "the gateway" into the neighborhood, but many felt that
the state of Ualenrine Park at that time did not reflect the strong feelings of commitment to
and pride in the community that they shared.
Several years of planning, designing, and implementation followed. In 2013 the renova-
tion of the park was complete. An improved storm drainage system was conceived and
constructed, featuring a detention pond on the southeast corner and a rain garden running
from the pond along the south and west sides of the park. This
element provides both necessary storm water drainage and a
natural buffer between the park and neighboring homes.
r•-
-�--, .. ��=i
_ �,�„�,��.� fi � j. �'
I�^'� ^' � `�i �` � ,
��� �
� � ��
��
� � : H,�; �
' `�n a:a�. '�
Park amenities and play equipment are centrally located and
include a half-court basketball area, playground equipment and
swings for both toddlers and school-age children, and a picnic
shelter with multiple picnic tables. Natural open space, dotted
with new tree plantings, extends east from the play area to Old
Highway 10 and offers an unobstructed view of Lake Ualentine.
contimred on page 3
2
Benchmarks: a review of recent City Council action
May 11, 20I S
(Holden excused)
• Approved a Planned Unit Develop-
ment amendment agreement and Con-
ditional Use Permit amendment for
Frattallone's Ace Hardware in Arden
Plaza to construct an outdoor garden
center. (3-1, Woodburn)
• Approved an extension of the Arden
Plaza phase two submittal deadline to
June 1, 2017. (4-0)
• Denied the authorization to appoint
an additional Public Works Seasonal
Maintenance Worker. (4-0)
notice for the public hearing regarding
the proposed issuance of conduit debt
financing for Presbyterian Homes.
(4-0)
May 26, 201 S
• Approved a Conditional Use Permit
amendment for Bethel Universiry to
construct a soccer facility building on
the Ona OrthAthletic Field. (5-0)
• Approved a minor subdivision for
3517 Siems Court enabling the sale of
5,540 square feet of residential land
to the adj acent residential property
owner. (5-0)
• Accepted the resignation of a full-time
Public Works Maintenance Worker
and authorized advertisement for the
Public Works Maintenance Worker
vacancy. (4-0)
• Approved the payment for improve-
ments to County Road E and Pine Tree
Drive. (4-0)
• Approved entering into a Joint Pow-
ers Agreement with the Ciry of New
Brighton and Ramsey County for the
construction of the Mounds View High
School Trail over I-35W to Mounds
View High SchooL (4-0)
Approved entering into an Agreement
with Mounds View Public Schools
(District 621) for their contribution
of $120,000 towards construction of
the Mounds View High School Trail.
(4-0)
• Approved the public hearing date of
June 8 and authorized publication of a
Va�@Iltl ll@ PaP�( contimred from page 2
A paved parking lot is accessible from
Lake Ualentine Road at the north end of
the park and offers approximately ten off-
street parking spaces. Enclosed portable
bathroom facilities and refuse disposal
and recycling containers are available as
well. A paved walkway provides pedes-
trian access to the parking lot from Crystal
Avenue/Glenview Avenue. Ualentine Park
is fully ADA (Americans with Disabilities
Act) compliant.
• Approved quotes for the Oak Avenue
storm sewer repair. (5-0)
• Denied a Planned Unit Development
amendment for Holiday Station, 1920
Highway 96 West, to install blue LED
lighting on the gas station canopy and
building. (4-1, Holmes)
• Approved a Planned Unit Develop-
ment amendment for Caribou Coffee,
3673 LexingtonAvenue North, to
install a drive-through. (5-0)
• Approved preliminary approval of the
TCAAP Redevelopment Code. (4-1,
McClung)
June 8, 2015
Approved the Findings of Fact and
decision regarding the application
of Holiday Station Stores, Ina This
action approves the findings from the
May 26 meeting. (4-1, Holmes)
�'�"f�`� +t' ��'� .'�%�,'�F
.:�� � tl�
_ �� � ;�,.
;:y;� ., ;.�.
. ? ,.3h "A �:• 1 . � �1, r�J
�,
� �J
� � �� �� ���
h�� �
� � � �$�:��+ `�,y �, f ti� � ' , ,
�_ �� '�' r J, r d ' �';�
•. � A� _ M.�_I � i�� i.
� ��' � , �, `�`'
'�a"r�, � ,�n�,�'�+i., ` ,
' .,, a�� '� v,,
�-` c!.�.R�, c��,��r'y�i �;�` , a
� ���J�-i , . � : � : �
3
• Approved payment number eight for
the Round Lake Road area improve-
ment. (5-0)
• Approved payment number two for
the Counry Road E- Pine Tree Drive
improvements. (5-0)
• Approved payment number one for the
2015 Pavement Management Program.
(5-0)
• Approved the requested Lake Johanna
Fire Department capital expenditures.
(5-0)
• Approved an amendment to the Joint
Cooperation Agreement for the Com-
muniry Development Block Grant Pro-
gram. The amendment makes grants
no longer transferrable or saleable
from one city to another. (5-0)
Approved conduit debt financing for
Presbyterian Homes in the amount of
$10 million dollars to construct inde-
pendent living units on the corner of
Lake Johanna Boulevard and Counry
Road D. This amount is not City
funded, and the City is not finan-
cially responsible for repayment of the
amount. (5-0)
Business Retention continuedfrom page 1
targeted for interviews fall into four cat-
egories:
• Businesses in high-growth industries
(Construction, Professional and Busi-
ness Services, Education, and Health
Services)
• Businesses that are not in high-growth
industries but which have experienced
significant growth over the past few
years
• Large employers
• Legacy businesses (long-term Arden
Hills businesses closely identified with
the local business communiry)
Measuring results
When Mayor David Grant, in his role as
EDA president, inquired how Arden Hills
would measure the success of this program,
Mr. Weinhagen replied that identifying and
developing relationships with the targeted
businesses would be a success. He indi-
cated that over the long term, the program
would provide the Ciry with a sustainable
business retention strategy.
-�.-
I
n
S
.
l
d
e
Arden Hills, MN • 55112-5734
Business Retention and Expansion program
Postal Customer
Night to Unite
T�alentine Park
Benchmarks
Flaherty's gets creative during bridge construction project
by Susan Cathey
eague participants at Flaherty's
Arden Bowl have an extra chal-
lenge this suininer — getting through
construction to the bowling alley and Irish
Pub, located since the 1960s on Counry
Road E near the Highway 51 bridge.
Although business tends to slow down
anyway when the weather turns nice, Fla-
herty's hosted a tournament recently, which
people l�ad to figure out how to get to.
Operations Manager Adam Flaherty checks
the MnDot website regularly and prints out
updated maps for patrons.
In the spirit of making lemonade from this
summer's lemons, Flaherty's is offering
a`Bridge, Bowling, and Burger SpeciaP'
in honor of the County Road E bridge
replacement. Running Monday-Friday until
the end of August, the promotion includes
deals on bowling and food from 11:00 a.m.
to 4:00 p.m.
�w�mr !,'A�IIRILI
� .
�..� + �' ., / . �J
�-
-
1 � p -
R� ,
`� �� � ��r
. ,..� �
� '
�� �
�
� 1_ , `
� ,� � �i
���1 1 � ���'' I'��� ����,��� �
� ���
r � ���..
. . . �:. � :'
ECR-WSS
PRST STD
U.S. Postage Paid
St. Paul, MN
Permit #1962
"Green" camping tips from
Ramsey A to Z
Looking forward to sleeping under the
stars? Here are some great tips:
Get the gear: Browse secondhand stores,
garage sales and Craigslist.com to find
backpacks, lanterns and tents. Buying a
new sleeping bag? Look for one made from
recycled materials.
� �� Minimize trash: Use dish towels rather
__ _ .__.
rlrrr...�,_
Flaherty's is not only a longtime fia�lure in
Arden Hills, it has the distinction of being
the longest operating family-owned bowl-
ing center in the United States, since 1938
There are several employees who have
been with the business for many years,
including Brian Hove, bowling manager
for close to 50 years.
A goal for Flaherty's is to be recognized
not just for bowling, but as a communiry
gathering place. It is promoting a full
menu, which Adam says is superior to ste-
reotypical bowling alley food. Flaherty's is
planning to add craft beers to the chef-driv-
en menu. A variety of games and a bowling
pro shop are part of the operation.
Sign-up for fall bowling, which caters
to seniors and kids as well as meds and
womeds leagues, begins in August. Adam
stressed that being a good bowler is not
a requirement. Just come and have fun.
Information about everything Flaherty's
Arden Bowl offers can be found at the
website, www.flahertysbowl.com.
than paper towels. Pack cutlery and utensils
rather than disposable plastic. Bring reus-
able water bottles and containers. Don't
forget trash bags to gather any trash and
recyclables and dispose of it appropriately.
Propane tanks/canisters: Empry propane
canisters must be kept out of landfills.
Spent propane canisters are considered
hazardous waste while still under pressure,
but once they are relieved of pressure they
can be recycled as scrap metal.
To make sure the canister is completely
empty, attach the canister to the device
(usually stove or lantern). Turn the gas on
and light the device, allowing the gas to
completely run out. Write "empry" on the
side of the small canister.
• Call the retailer where you purchased
your propane tank, and inquire about
"take back" and recycling options.
• Some counries accept refillable or
single-use propane tanks at their haz-
ardous waste drop-off sites.
For other green tips, visit RamseycounryA-
toZ.com or ca11651-633-EASY (3279).
(Answered 24/7.)
�