Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016-002
WREN HILLS City of Arden Hills Ordinance 2016-002 — Appendix A Amended 2016 Fee Schedule I. Administrative Dogs/Cats—Licenses Two years(Pro-rated for second $26.00 ear $13.00) Dogs/Cats—Duplicate Tags Each $6.50 Dogs/Cats—Boarding $22.00 per da Dogs/Cats—Impoundment Fee $50.00 Dogs/Cats.—Surrender Fee Each $25.00 Dogs—Residential Kennel Annual $21.00 License Dogs—Dangerous Do Fee Annual $500.00 Dogs—Potentially Dangerous Annual $250.00 Dog Fee Copying—Minutes, City Council Annual $69.00 Meetings Copying—Minutes, Planning Annual $56.00 Commission Meetings Copying—Agendas, City Annual $14.00 Council Meetings Copying—Agendas,Planning Annual $7.00 Commission Meetings Copying—Agenda Packets, City Annual Cost based on per sheet, staff Council Meetings labor, and postage Copying—Agenda Packets, Annual Cost based on per sheet, staff Planning Commission labor, and postage Copying—General Any Size $0.25 per side Assessment Search $53.00 ner half hour n. Building Construction Building Permits—Permit Fee Fees shall be based according to the 2015 State Statute 326B.153 and are determined by the City's Building Official Building Permits—Plan Review 65%of Building Permit Fee Fee Building Permits—Re-inspection $40.00 Building Permits—Manufactured $55.00+State Surcharge fee as Home Location, Swimming outlined in State Statute Pools,and Demolition 326B.148 Building Permits—Special 100%of Permit Fee Investigations State Surcharge—based on fee based on 2015 State Statute valuation 326B.148 Page 1 of 10 State Surcharge—Fixed Fees fee based on State Statute 326B.148 Plumbing Permits—Minimum $40.00 Fee Plumbing Permits—Residential 1.25%of Project Value Plumbing Permits—Non- 1.25%of Project Value+$50.00 Residential Electrical Permits—Minimum $40.00 Fee Electrical Permits—Maximum $150.00 Single Family Dwelling Fee Electrical Permits—General See Exhibit"A"attached to fee schedule Mechanical Permits—Minimum $40.00 Fee Mechanical Permits—Residential 2%of Project Value Mechanical Permits—Non- 1.25%of Project Value+$50.00 Residential Fire Protection Permits—Permit Fees shall be based according to Fee the 2015 State Statute 326B.153 and are determined by the City's Building Official Fire Protection Permits—Plan 65%of Permit Fee Review Fee Fire Protection Permits—Re- $40.00 inspection III. Liquor Licensing On-sale 1,999 square feet(SF)or less $3,465.00 On-sale 2,000(SF)—2,999 (SF) $4,620.00 On-sale 3,000 (SF)—3,999(SF) $5,775.00 On-sale 4,000(SF)or more $6,930.00 On-sale, Sunday $200.00(340A.504 Subd. 3(b) limits$200 fee for Sunday sales) Off-sale $210.00 Club Fee $315.00 On-sale,Malt Beverage $126.00 Off-sale, Malt Beverage $42.00 On-sale,Wine $ 2,000.00 (340A.408 Subd. 2(c)limits fee to$2000 or half of on-sale license fee,whichever is less) Strong Beer No Charge(as part of On-Sale Wine License) Investigation Fee $158.00 First Violation $105.00 Minor Consumption Violation Second Violation $525.00 with Server Training Third Violation $1,050.00 Fourth Violation $1,575.00 Page 2 of 10 First Violation $525.00 Minor Consumption Violation Second Violation $1,050.00 without Server Training Third Violation $1,575.00 Fourth Violation $2,100.00 and may be subject to license revocation IV. Maps and Ordinances Zoning Ordinance $0.25 per side Municipal Code Comprehensive Plan Color Maps(8.5 x 11) $2.00 Color Maps(11 x 17) $4.00 Street Mas $2.00 As-Builts(11 x 17) Based on number of copies and staff time V. Parks&Recreation Youth Athletic Association Field Per two hour time block $25.00 per time block Rental +applicable.tax Adult Club/Intramural Field Per two hour time block $40.00 per time block Rental +applicable tax Ball Field Rental,Unlighted Per two hour time block. $50.00 per time block Tournament fees are extra. +applicable tax Ball Field Rental, Lighted Per two hour time block. $84.00 per time block Tournament fees are extra. +applicable tax Ball Field Tournament Fee Includes all day maintenance $525.00 per day+$200.00 (Adult), Full Maintenance staff on site damage deposit+applicable tax Ball Field Tournament Fee Includes prep for fields and $315.00 per day+$200.00 (Adult),Minimum Maintenance midday drag of fields damage deposit+applicable tax Warming House Rental/Ice Rink Only allowed during non-public $30.00 per hour+ Rental use hours $200.00 damage deposit+key deposit+applicable tax Picnic Shelters Available for reservation $0 Picnic Pavilions—Resident Includes up to five picnic tables $65.00 per day+$200.00 damage deposit +applicable tax Picnic Pavilions—Non-Resident Includes up to five picnic tables $100.00 per day+$200.00 damage deposit +applicable tax Picnic Pavilions— Includes up to five picnic tables $35.00 per day+$200.00 Resident Non-Profit damage deposit Picnic Pavilions— Includes up to five picnic tables $70.00 per day+$200.00 Other Non-Profit damage de osit Additional Picnic Tables For every two extra tables $10.00+applicable tax* *fee waived for Night to Unite and other public events open to all Arden Hills residents Community Garden Plot—One Annual $36.00+applicable tax Plot Community Garden Plot— Annual $18.00+applicable tax Second Plot Page 3 of 10 Room Rental—City Hall, Per Day(Scheduling a room after Regular business hour usage:No Community Room regular hours is contingent upon charge the presence of a city employee; Army National Guard:No charge In the event staff is not available, City Government:No charge the City reserves the right to Resident,Non-profit: $63 deny application). Resident, For-profit: $74 Non-Resident,Non-profit: $105 Non-Resident, For-profit: $137 (+applicable tax) Room Rental—City Hall, Small Per Day(Scheduling a room after Regular business hour usage:No Conference Room regular hours is contingent upon charge the presence of a city employee; Army National Guard:No charge In the event staff is not available, City Government:No charge the City reserves the right to Resident,Non-profit: $26 deny application). Resident,For-profit: $32 Non-Resident,Non-profit: $42 Non-Resident,For-profit: $53 (+applicable tax) Room Rental—Damage Deposit Required $105.00 Equipment Rental—DVD,VCR, $11.00+applicable tax T.V. VI. Planning and Zoning(Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City.Charges to the escrow include planning and engineering staff time,City attorney and consulting fees, and mailing costs. If,at any time,a required cash escrow is depleted to less than 20%of its original amount,the applicant shall deposit additional funds in the cash escrow account as determined by the City.The escrow may be reduced or increased by the City Planner on a project by project basis.) Description Escrow Fees Initial Application Fees Preliminary Plat Administrative Fee $500 Escrow $1,000 Final Plat Administrative Fee $500 Escrow $1,000 Lot Split/Minor Subdivision(R-1 Administrative Fee $350 and R-2 only) Escrow $1,000 Rezoning or TCAAP Regulating Administrative Fee $350 Plan Map Amendment Escrow $1,000 Comprehensive Plan Amendment Administrative Fee $500 Escrow $1,000 Variance or Permitted Administrative Fee $350 Adjustment Escrow $1,000 Conditional Use or Interim Use Administrative Fee $350 Permit/CUP or IUP Amendment Escrow $1,000 Planned Unit Development Administrative Fee $350 Master Plan or Special Escrow $1,000 Development Plan Master Plan Page 4 of 10 Final Planned Unit Development Administrative Fee $350 or Final Special Development Escrow $1,000 Plan Planned Unit Development Administrative Fee $350 Amendment or Special Escrow $1,000 Development Plan Amendment Concept Review Administrative Fee $150 Escrow $1,000 Vacation of Easement Administrative Fee $150 Escrow $1,000 Site Plan Review Administrative Fee $350 Escrow $1,000 City Code Amendment Administrative Fee $350 Escrow $1,000 Zoning Code or TRC Administrative Fee $350 Amendment Escrow $1,000 Zoning Letter Administrative Fee $60 Land Use Requests—Not Administrative Fee $150 Already Specified Escrow $1,000 Zoning Permit—New Fence $65 Construction or Expansion Zoning Permit—New Driveway $65 Construction or Expansion Recreational Vehicle Parking 7 Day Permit,renewable once $25 Permit per 12 months Home Occupation I Permit No charge Home Occupation II Permit Administrative Fee $150 Escrow $500 Right-of-Way Permit Administration Fee $150 Escrow To be determined by the Engineer -------- _. -----------— ------_ _.., _--------------- - ---__. Grading&Erosion Control Fees Administrative Fee $150 Escrow $3,675 /acre __.... --------------------_____------------------------_..___. - -- - - — Appeal of Administrative Administrative Fee $150 Zoning, Sign, or Subdivision ---------- Decisions Escrow $1,000 VII. Utility Hookup Charges Water Permits—Service Per inspection $40.00 Installation/Repairs/Alteration Water Permits—Interior $40.00 Plumbing,New Home Water Turn On/Off,Temporary $40.00 Water Permanent Disconnect $215.00 Curb Box and Service Lead, 1" $165.00 Service Connection on Unsurfaced Street Page 5 of 10 Restoration of Typical Road Mix $105.00 Street Restoration of Higher-Type Set by Engineer Street Larger than 1" Service Set by Inspector Connection Water Permits—Plan Check Fee Set by Inspector Water Permits—Re-inspection $40.00 Water Meter/Spacer Charges— Fee includes removal of meter, Based on Meter Size Customer Requested Water bench test at maintenance Contact Public Works for Quote Meter Accuracy Test facility, and returning meter to residence; Fee will not be applied if the meter is found to be inaccurate to a degree exceeding three percent(3%)from the result of the bench test Water Meter/Spacer Charges— Standard Meter $435.00 5/8"x 3/4"Meter Model 25 Water Meter/Spacer Charges— Contact Public Works for Quote 3/4"x 7 ''/z"Meter Model 35 Water Meter/Spacer Charges— $540.00 1"Meter Water Meter/Spacer Charges— Contact Public Works for Quote Greater than 1" Water Connection Fee— $840.00 per acre or portion Connection fee for previously thereof un-served or expanded lots Water Availability Fee— The units are based on the $525.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availability charge(SAC)units Sewer Connection Fee— $840.00 per acre or portion Connection fee for previously thereof un-served or expanded lots Sewer Availability Fee— The units are based on the $525.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availability charge(SAC)units Sewer Permits— Service Per inspection $40.00 Installation/Alternations/Repairs Sewer Permits—Plan Review Set by Inspector Fee Sewer Permits—Reins ections $40.00 per hour Sewer Access Charge Set by Met Council Annually $2,485.00 Sanitary Sewer Utility Prohibited $100.00 per month Sump Pump Connection Surcharge Page 6 of 10 VIII. Miscellaneous/Retail Activities Boutique/Garage Sale Application/notification of City No charge Hall required Casual Roadside Stands Application/notification of City No charge Hall required Tent Permit $55.00+State Surcharge Sidewalk Sales $53.00 Business Licensing— Includes arcade,dance hall, $105.00 Amusement Facilities movie theater, pool/billiard tables,bowling alleys, indoor tennis, skating facility,outdoor tennis,driving ranges,etc. Business Licensing—Wholesale Liability insurance required $210.00 Bulk Fuel Storage Business Licensing— $6.50 per room Hotel/Motel Business Licensing—Courtesy $26.00 Bench,Non-advertising Business Licensing—Courtesy $79.00 Bench,Advertising Business Licensing— Includes musical devices, $15.00 per location+$15.00 per Mechanical/Electronic Devices amusement rides,bowling alleys, machine etc. (MN Statute 449.15 sets maximum permit fee at$15 per location and$15 per machine) Business Licensing—Retail Sales Includes antique shops, $53.00 beauty/barber shops,boat dealers,Christmas tree sales, dry cleaning, laundry,bakery,candy, meats, wholesale foods,caterers, motor vehicle sales,optometrist, mortuary,video sales/rentals, over-the-counter tobacco sales, vending machines(excluding tobacco), & other retail goods not listed Business Licensing— $21.00 per 1,000 square feet,or Restaurants, Cafes, Coffee fraction thereof Houses,etc. Business Licensing— $315.00 Restaurants,Drive-Thru Business Licensing—Service $105.00 Stations Business Licensing—Grocery $21.00 per 1,000 square feet, or fraction thereof Page 7 of 10 Charitable Gambling Permit— Includes investigation fee $158.00 Per Minnesota State Statute, Chapter 349 Local Gambling Tax 3%of organizations' gross receipts from all lawful gambling, less prizes paid out Lawful Gambling Fund 10%of net profits Tobacco Sales License Includes investigation fee $300.00 Fireworks Sales As part of existing business $100.00(MN Statute 624.20 sets maximum permit fee at$100.00) Fireworks Sales Exclusive Business $350.00(MN Statute 624.20 sets maximum permit fee at$350.00) Massage Therapist Annual Fee,Includes $53.00 investigation fee Massage Therapist Establishment Annual Fee,Includes $158.00 investigation fee Recreational Outdoor Archery $200 first year Range $50 annual renewal Solicitors,Peddlers, Transient Please reference Section 340 of $158.00 background Permit—For-Profit Organizations the Municipal Code for more investigation+ $105.00 per information month permit fee Solicitors, Peddlers,Transient Please reference Section 340 of No charge Permit—Non-Profit the Municipal Code for more Organizations information IX. Signs Initial Fee Per Sin $100.00 Permanent Signs,Annual Per Sign, 100 square feet or less $25.00 Renewal (maximum allowable size) Temporary Signs $50.00 Signs,Impoundment First Offense $50.00 Signs,Impoundment Second Offense $75.00 Signs, Impoundment Third Offense $150.00 X. Miscellaneous Fees/Permits Rubbish Hauler Annual $158.00 Recycling Hauler Annual $158.00 Contractor License Annual $75.00 Miscellaneous Permit Fee For all otherpen-nits not listed $40.00 Staff Research $53.00 per half hour Penalties for Late Payment Failure to pay any penalty 10%of license fee or$32.00, imposed shall be grounds for the whichever is greater suspension or termination of any license issued by the City Tobacco Sales,Illegal First Offense $105.00 Tobacco Sales, Illegal Second Offense within 24 $525.00 months Page 8 of 10 Tobacco Sales, Illegal Third Offense within 24 months $1,050.00 and 7 business day suspension or 30 day suspension of license+admin fine of$250 Tobacco Sales,Illegal Fourth Offense within 24 months Revocation of the license for a one year period Candidate Filing Fee $2.00 Insufficient Funds/Returned $35.00 Check Fee Rental Registration Fee $45.00 per rental unit Rental Registration Penal Fee $90.00 per rental unit Residential Contractor License $5.00 Check Business Subsidy Application Required to reimburse City for $2,100.00+$10,500.00 escrow Fee full cost of review Construction Activity Waiver Per Waiver Application $263.00 XI. False Alarm Fees False Alarm First two alarms No charge+letter False Alarm Three through ten alarms $60.00 per alarm False Alarm Over ten alarms $160.00 per alarm XIL Investigation Fees Tobacco,Liquor, Charitable $158.00 Gambling, & Solicitor's Permits XIII. Utility Use Charges Water Per Quarter: Meter Charge 3/4"Meter Size or Smaller $23.88 Meter Charge 1"Meter Size $57.69 Meter Charge 1.5"Meter Size $122.02 Meter Charge 2"Meter Size $196.58 Meter Charge 3"Meter Size $427.89 Meter Charge 4"Meter Size $641.43 Meter Charge 6"Meter Size $1,068.45 Meter Charge 8"Meter Size $2,153.91 Meter Charge 10"Meter Size $3,061.33 Meter Charge 12"Meter Size $4342.49 Consumption: 1-10,000 gals. gallons $2.65 per 1,000 gallons(pro- rated) Consumption: 10,001-35,000 gallons $3.45 per 1,000 gallons(pro- gals. rated) Consumption: Over 35,000 gals. gallons $6.10 per 1,000 gallons(pro- rated) Water Test Fee set by MN State Health De t $1.59 Sanitary Sewer Per Quarter: Base Charge—Single Family per lot $90.79 Base Charge—Multiple Family per dwelling $90.79 Usage Over 15,000 gals.—Single gallons $5.23 per 1,000 gallons (pro- Family/Multiple pro- Famil /Multi le Family rated) Page 9 of 10 Sanitary Sewer—Commercial gallons $5.66 per 1,000 gallons(pro- rated Apartment/Condominium ) Sanitary Sewer-Mobile Home per unit $98.20 Surface Water Per Quarter: Residential - Single Family per lot $14.29 Residential— Multiple Family per dwelling $18.52 Apartment/Condominium per acre $116.61 Industrial/Commercial per acre $182.06 Undeveloped per acre $21.42 Standby Per Quarter: Standby 1" Service Line or smaller $8.16 Standby 1.25" Service Line $11.78 Standby 1.5" Service Line $16.24 Standby 2" Service Line $24.81 Standby 3" Service Line $55.97 Standby 4" Service Line $99.81 Standby 6" Service Line $223.80 Standby 8" Service Line $398.29 Standby 10" Service Line $623.02 Standby 12" Service Line $895.40 Standby Shared 6.95 $26.68 XIV.Recycling Fee Per Residential Parcel with Annual $48.00 curbside recycling Per Residential Parcel without Annual $2.50 curbside recycling i Park Development Fee Per residential unit $5,300.00 Page 10 of 10 I MINNESOTA STATUTES 2015 32613.153 326B.153 BUILDING PERMIT FEES. Subdivision 1. Building permits. (a) Fees for building permits submitted as required in section 32613.106 include: (1)the fee as set forth in the fee schedule in paragraph(b)or as adopted by a municipality; and (2)the surcharge required by section 326B.148. (b)The total valuation and fee schedule is: (1) $1 to$500, $29.50; (2) $501 to $2,000, $28 for the first $500 plus $3.70 for each additional $100 or fraction thereof, to and including$2,000; (3) $2,001 to $25,000, $83.50 for the first $2,000 plus $16.55 for each additional $1,000 or fraction thereof,to and including$25,000; (4) $25,001 to $50,000, $464.15 for the first $25,000 plus $12 for each additional $1,000 or fraction thereof,to and including$50,000; (5)$50,001 to$100,000, $764.15 for the first$50,000 plus$8.45 for each additional $1,000 or fraction thereof,to and including$100,000; (6) $100,001 to $500,000, $1,186.65 for the first $100,000 plus $6.75 for each additional $1,000 or fraction thereof,to and including$500,000; (7) $500,001 to $1,000,000, $3,886.65 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof,to and including$1,000,000; and (8) $1,000,001 and up, $6,636.65 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereof. (c)Other inspections and fees are: (1) inspections outside of normal business hours(minimum charge two hours), $63.25 per hour; (2)reinspection fees, $63.25 per hour; (3) inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per hour; and (4) additional plan review required by changes, additions, or revisions to approved plans (minimum charge one-half hour), $63.25 per hour. (d)If the actual hourly cost to the jurisdiction under paragraph(c)is greater than$63.25,then the greater rate shall be paid.Hourly cost includes supervision,overhead,equipment,hourly wages,and fringe benefits of the employees involved. Subd. 2. Plan review. Fees for the review of building plans, specifications, and related documents submitted as required by section 32613.106 must be paid based on 65 percent of the building permit fee required in subdivision 1. Copyright©2015 by the Revisor of Statutes,State of Minnesota.All Rights Reserved. 32613.153 MINNESOTA STATUTES 2015 2 Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including public buildings and state licensed facilities as required by section 326B.148. Subd. 4. Distribution. (a) This subdivision establishes the fee distribution between the state and mu- nicipalities contracting for plan review and inspection of public buildings and state licensed facilities. (b)If plan review and inspection services are provided by the state building official, all fees for those services must be remitted to the state. (c)If plan review services are provided by the state building official and inspection services are provided by a contracting municipality: (1)the state shall charge 75 percent of the plan review fee required by the state's fee schedule in sub- division 2; and (2)the municipality shall charge 25 percent of the plan review fee required by the municipality's adopted fee schedule, for orientation to the plans, in addition to the permit and other customary fees charged by the municipality. (d)If plan review and inspection services are provided by the contracting municipality,all fees for those services must be remitted to the municipality in accordance with their adopted fee schedule. History: 2009 c 78 art S s 11 Copyright©2015 by the Revisor of Statutes,State of Minnesota.All Rights Reserved. ELECTRICAL PERMIT FEES - Exhibit A HOMEOWNERS AND ELECTRIC CONTRACTORS - Complete an electrical permit form available from the Building Inspections Division. Add $5.00 for State surcharge to total cost of each permit. Residential panel replacement is$100.00 sub panel $40.00. New service or power supply is. Circuits and Feeders 0 to 300 Amp $50.00 0 to 30 Amp $8.00 400 Amp $58.00 31 to 100 Amp $10.00 500 Amp $72.00 101 to 200 Amp $15.00 600 Amp $86.00 300 Amp $20.00 800 Amp $114.00 400 Amp $25.00 1000 Amp $142.00 500 Amp $30.00 1100 Amp $156.00 600 Amp $35.00 1200 Amp $170.00 700 Amp $40.00 Add $14.00 for each additional 100 amps Add $5.00 for each additional 100 amps Minimum Fee Maximum Fee Minimum permit fee is$40.00 plus$5.00 State Maximum fee for single family dwelling or surcharge. This is for one inspection only. townhouse not over 200 amps is$175.00 plus Minimum fee for rough-in inspection and final is $5.00 State surcharge. Maximum of 3 $80.00 plus$5.00 State surcharge. inspections. Apartment Buildings Fee per unit of an apartment or condominium complex is$70.00. This does not cover service, unit feeders or house panels. Swimming Pool $80.00 plus circuits. This includes 2 inspections Additions, Remodels or $80.00 this includes up to 10 circuits and 2 inspections Basements Finishes $50.00 for panel plus$8 per circuit. Accessory Structures Traffic Signals $7.00 per each standard Street and Parking Lot Lights $4.00 per each standard Transformers and Generators $10 up to 10KVA, $40 11 to 75KVA, $60 75KVA to 299 KVA, over 299 KVA is$150. Retro Fit Lighting $.65 cents per fixture Sign Transformer $8.00 per transformer Remote Control and Signal $.75 cents per device Circuits Re-Inspection Fee $40.00 THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED Affidavit ®f Publication State of Minnesota l 1} SS County of Ramsey JANINE GAFFNEY being duly sworn, on oath, says that he/she is the publisher or authorized agent and employee of the publisher of the newspaper known as SHOREVIEW BULLETIN and has full knowledge of the facts which are stated below: (A) The newspaper has complied with all of the requirements constituting qualification as a qualified newspaper, as provided by Minnesota Statute 331A.02, 331A.07, and other applicable laws, as amended. (B) The printed SUMMARY OF ORDINANCE NO. 2016-002 which is attached was cut from the columns of said newspaper, and was printed and published once each week, for I successive weeks; it was first published on WEDNESDAY, the 17TH day of FEBRUARY, 20 16 , and was thereafter printed and published on every to and including , the day of , 20 ; and printed below is a copy of the lower case alphabet from A to Z, both inclusive, which is hereby acknowledged as being the size and kind of type used in the composition and publication of the notice: 'ABCD EFGHIJ KLMNOPQRSTUVW XYZ 'ABCD EFGH IJ KLMNOPQRSTUVW XYZ abcdefghijklmnopqrstuvwxyz BY: Subscribed and sworn to before me on TITL�LEGAL COORDINATOR this 17TH day of FEBRUARY 20 16 Notary Public *Alphabet should be in the same size and kind of type as the notice. TONNA R WHI T EHEQ,CI Notary Public-Minnesota RATE INFORMATION My commission Expires JGn 31,2020 (1) Lowest classified rate paid by commercial users for comparable space............................................................$25.00 per col. inch (2) Maximum rate allowed by law for the above matter...........................................$25.00 per col. inch (3) Rate actually charged for the above matter.......................................................$ per col. inch 1/16 CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA SUMMARY OF ORDINANCE NO.2016-002 On the 8th day of February, 2016, the Arden Hills City Council adopted Appendix A of Ordinance No.2016- 002, and by five affirmative votes pursuant to Minn. Stat. §412.191, Subd.4,directed that a summary of Appendix A of Ordinance 2016-002 be published. Appendix A of Ordinance 2016- 002 entitled "Amended 2016 Fee Schedule" an Ordinance Relating to Fees Payable within the City of Arden Hills for 2016. The primary purpose of the ordinance amendment is to update the Municipal. Code to reflect fees for the calendar year of 2016. A full copy of Appendix A of Ordinance 2016-002 is available for inspection by any person during regular business hours at the office of the City Administrator, 1245 West Highway 96, Arden Hills, Minnesota 55112,The Ordinance is also available online at http:tlwww. GQjVQfardetliij$&Qm (Bulletin:Feb.17,2016)