HomeMy WebLinkAbout8A, Renewal of Letter of Support for Arden Village Tax Credit Application� � � � EN HII,LS Request for Council Action � Prepared By: Jill Hutmacher, Community DeveIopment Director : Council Meeting Date: May 9, 2011 Renewal of Letter of Support for Arden Village Tax Credit Application Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Recommendation: . Recommend that the City provide a renewed letter of support for tax credit financing including a commitment for up to $225,000 in TIF assistance. - — ---- -- � Supporting Documents: � l. Memorandum dated May 9, 201 l, from Jill Hutmacher, Community Development Director. 2. Renewed 2011 letter of support for MHFA tax credit funding. 3. Map showing location of 1296 County Road F. 4. June 14, 2010, letter of support for MHFA tax credit funding. 5. June 14, 2010, meeting minutes. 6. February 14, 201 l, meeting minutes. l _J . i� EN HILLS MEMORANDUM DATE: May 9, 2011 TO: Honorable Mayor and City Councilmembers FROM: 3i11 Hutmacher, Community Development Director �/f SUBJECT: Letter of Support for Arden Village MHFA Tax Credit Application Sand Companies, Inc. (SCI) has requested a letter of support for their application for Minnesota Housing Finance Agency (MHFA) t� credit financing for Arden Village. Background Land Use Approvals • SCI has proposed the development of an affordable rental housing development at 1296 County Road F. The proposed 4-story building consists of 55 housing units with one to three bedrooms, a 55-stall underground parking garage, and a 55-stall surface lot. The development would also include a fot lot playground and picnic area for residents. The proposal required the property to be rezoned from the current I-1, Limited Industrial District, to R-4, Multiple Dwelling District. In order to rezone the property, a Comprehensive Plan Amendment was also required. Prior to recent City land use approvals, the 2.76-acre property operated under a Conditional Use Permit (CUP) that was approved in 1972 for a 240-foot communications tower. SCI requested a Preliminary and Final Plat to subdivide the property into two parcels, and a Master and Final PUD for the development itself. Because the CUP encompassed the entire property, a CUP Amendment was needed to reflect the proposed legal description for the newIy subdivided lot. On March 8, 2010, the City Council gave land use approvals for the Arden Village project ineluding Conditional Use Permit Amendment, Rezoning, Comprehensive Plan Amendment, Preliminary and Final Plat, and Master and Final Planned Unit Development. � City ofArden Hills City Council Meeting May 9, 2011 Page 1 of 3 Tax Increment Financin�guest � Subsequent to the land use approvals, SCI requested a letter of support for tax increment assistance. Although the request for tax increment assistance was relatively small in relation to total projects costs, local financial assistance is very important in leveraging t� credits, grants, and loans from other funding providers. SCI needed a letter of support for tax increment assistance prior to its application for t� credits from the Minnesota Housing Finance Agency (MHFA). On June 14, 2010, the Council considered two options for the MHFA letter of support: 1. Letter of support for up to $5�5,000 which would include TIF and a transfer of ownership of the wireless tower; and 2. TIF-only with support of up to $225,OOQ, understanding that City support at this level would leave Arden Village with a financial gap. As stated in the June l4, 2010, memo, "Based on the updated financial data and direction from the May 10 Council meeting, SCI has prepared two possible public subsidy strategies depending on whether or not the City wants to pursue ownership of the tower. The City will need to select one of the two options for the letter of support that is submitted to MHFA for SCI's application. Whichever option is selected, the City would be offering a good faith commitment to provide the requested amount of support to the project provided that SCI receives the housing tax credits and the final financial anatysis demonstrates the need for the requested support." The City Council voted to proceed with Optian 2 above, and a letter of support for up to $225,000 in TIF assistance was provided. • Minnesota Housing Finance Agencv Tax Credit Apnlication SCI was unsuccessful in the last round of MHFA t� credit funding. SCI has been working to fill its funding gaps so that it will be more competitive in the next round of tax credit funding. SCI has been tentatively approved for $250,000 in Ramsey County HOME funds which will be structured as a loan with the terms set by the County. With the City's March 8, 2010, land use approvaIs and the June 14, 2010, good faith commitment for up to $225,000 in TIF assistance, SCI closed on the purchase of land in December 2010. With the tentative award of HOME funds, and having already received Iand use approvals and acquired the land, SCI should be very competitive for this round of MHFA taac credit funding. An updated letter of support is needed for SCPs June 2011, MHFA tax credit funding application. At a future meeting, SCI will request City approval of a ta�c increment district. Prior to approval, the City Council will need to determine whether the final financial analysis demonstrates the need for the requested support. City of Arden Hills City Council Meeting May 9, 2011 � Page 2 of 3 � Recommendation Given the City's March 8, 2010 land use approvals, the June 14, 2010 good faith commitment for up to $225,000 of TIF assistance, and SCPs subsequent land acquisition, staff recominends that the City provide a renewed letter of support for t� credit financing including a commitment for up to $225,000 in TIF assistance. At the February 14, 2011, meeting, the City Council questioned for what length of time is the good faith commitment in place. Staff is not aware of a specific time limitation on commitments. Given the very complicated nature of funding for affordable housing, and the progress that SCI has shown since June 14, 2010, it is reasonable to conclude that the City's pledge of support currently remains in effect. The City Council may choose to withdraw its piedge for TIF assistance andlor its support for the project. In that event, the City Council should be aware that the project may not move forward and the value of its good faith commitment to future developers will be diminished. Attachments• A. Renewed 2011 letter of support for MHFA tax credit funding B. Map showing location of 1296 County Road F C. June 14, 2010, Ietter of support for MHFA tax credit funding D. June 14, 2010, meeting minutes E. February 14, 201 l, meeting minutes � � � City ofArden Hilts Ciry Council Meeting May 9, 201I Page 3 of 3 � Attachment Renewed 2011 Letter of Support for MHFA Tax Credit Funding � �� � �EN HILLS � May 9, 2011, PIanning Commission Meeting � May 9, 2011 - ��i EN i�ILLS �. Minnesota Housing Finance Agency Attn: Multifamrly Underwriting 400 Sib(ey Street, Suite 300 St. Paui, Minnesota 55101 RE: Housing Tax Credit Pragram & Super RFP ARDEN VILLAGE — ARDEN HILL,S Dear Multifami[y Develapment: The City af Arden Hilts is a community made up of residents, businesses and institutions sharing a common history. C?ne of the primary purposes of a community is to serve as a place of residence for its citizens. Assuming this charge, offering a mix of life cycle housing opportunities becomes a chatienge for local governments especialiy in suburban markets. The City has a strang desire ta supparE affordabie and woric-force housing and is an aetive part'tcipant in ihe Livable Communities Pragram. The City's 2430 Comprehensive Plan sets goals that emphasize the development 4f a variety of housing types that are suitabte for a mix of incomes includir►g work-force hausing_ Developers and the City must be partners to cooperatively deve(op housing plans to provide life � cycle housing in Arden Hills. To promote and participate in rentat housing opportunities, the City has provided incentives for affordabie housing developments. As a cost reduction measure to endorse Arden Viilage, ihe City has appraveci the �roj��t wit� a density bQn�s, flexibility �n zoning a�c� fas� track �e�mitting and approv�l. The �ity weli a(sa not be cottecting the approximate $71,560 park dedication fee and also waiving $2,400 in City SACIWAC %es. The City of Arden Hills also prapases significant tocal financial contributions for this project as part of its participatron and ettdorsement. If the project is selected for funding, the City Council supports the use tax increment financing (TIF) for the �roject or other funding means to achieve up to $225,OOQ in assistance. As part of the TIF, the project witi need to meet alt state guide(ines for TIF, including the "but for test"_ The project aiso must be reviewed under the City's 6usiness subsidy poiicy. The proposed development is an excellent apportunity for the City of Arden Hills to ►neet a large partion af its housing goals. This endorsement is based upon the findings that the project wil[ meet locally ideatified housing needs and that the proposed housing is in shart supply in t6e local housing market. This need is evidenced by Ehe gap beiween the local supply and demand for the praposed type af housing. The City Council's endarsement is evidenced by this letter of suppart for the propased development. We respectivel}r request €unding approval for ihis needed development in the City of Arden Hiils. Sincerely, �L7avid Grant Nonorable Mayar Cit�� of Arden Hills � 1245 West Highwa�• 96 •:lyden t#iUs, JlIR � 55112-5743 Phone 651.742.7800 � Fax b5l_634.5137 * *�+t+�=.ci.arden-hilEs.mn.ns � Attachment Area Map Showing 1296 County Road F • � �I�EN HILLS � May 9, ZO11, Planning Commission Meeting I.zI Attachment June 14, 2010, Letter of Support for MHFA Tax Credit Funding �� � � �x�.�s r—� � May 9, 2011, Planning Commission Meeting * -�. DEI�i ILLS June 14, 2010 Minnesota Housing Finance Agency 404 Sebley Street, Suite 300 St. Paul, Minnesota 55101 Attention: Multifamily Underwriting RE: Housing Ta�c Credit Pragram & Super RFP. ARDEN VII.LAGE — ARDEN HILLS. Dear Multifamily Develapment: The City of Arden Hiils is a community made up of residents, businesses and institutions sharing a common history. One of the primary purposes of a community is to serve as a place of residence for its cirizens. Assuming this charge, offering a mix of life cycle housing opportunities becomes a challenge for local governments especially in suburban markets. The City has a strong desire to support affordable and �uork-force housing and is an active participant in the Livable Communities Program_ The City's 2030 Comprehensive Plan sets goats that emphasize the development oi a variety of housing types that are suitable for a mix of incomes including work-force � housing. Developers and the City must be pa�-tners to cooperatively develop housing plans to provide life cycle housing in Arden Hills. To promote and participate in rental housing opportunities, the City has provided incentives for affordable housir�g devel��ments. As a cost redu�tion mersur� to er�arse :�.rden Village, the City has approved the project with a density bonus, flexibility in zoning and fast traek permitting and approvat. The City wifl also not be collecting the approximate $71,560 park dedication fee and also waiving $2,000 in City SAC/WAC fees. The City of Arden Hills also proposes significan[ loeal finaneiai contributions for this project as part of its participation and endorsement. If the prolect is selected for funding, the City Council supports the use tax increment financing (TIF) for the project or other funding means to achieve up to $225,004 in assistance. As part of the TIF, the project will need to meet all state guidelines for TIF, including the "but for tesY'. The project also must be reviewed under the City's business subsidy policy. The proposed deve}oprnent is an excellent opportunity for the City of Arden Hills to meet a large portion of its housing goats. This endorsement is based upon the findings that the project will meet locally identified housing needs and that the proposed housing is in short supply in the local housing market. This need is evidenced by the gap between the lacai supply and demand for the proposed type of housing. The City Council's endorsement is evidenced by this letter of support for the propased development. We respectively request funding approval for this needed development in the City of Arden Hills. Since � Ha ead, Honorable Mayor City ofArcfe�i [�itts � 12�t� �Yest tii<� �t;+ti� 9b � Ardez� (iilts, 1}�t � 5il12-57�t3 1'hnnel�I.?42.7A1in e [�'aa65t.G3-k.>fj7 � ��wu_ri.aE-<ien-Itills.mre.us — � Attachment June 14, 2010, Meeting Minutes � � -��.� � May 9, 2011, Planning Commission Meeting ARDEN HILLS CITY COUNC[L —.iUNE 14, 20I0 1� 7F Advertfse for Public Works Maintertcznce 6�Yorker- (contir�rrectj �'" MOTtON: Ca�nciimember Holden moved and Mavor Har stead secUnded a motion to Authorize Staff to proceed with the hirin� of an ei�hth maintenance Fvarker. Cauneilmember Holden st�ted the Public Works department has t�ad an increase in warkload �,vith the I&1, storm pond dredging, trees, field mainienance_ eic. An additianal ��Qrker w�ould assist in compleiing this work. Counciln�ember Grant hopeci Mr_ Maoney woufd be able to inerease the eff`ectiveness of tlie Public Works Department and suggested the eighth hire halc! aff unti! after hicin� a Puhlic Wvrks [�irecior_ Ne stated he wouid not suppc�rt the additional l�ire. Conncilmember McClung indicated he wauld support the additiona! hsre as it ��ouid bring [he Clty baek to its originai Public Works capacit}�- Conncilmetnber Halden stated the additianal hire �vould reduce the increased oz�ertime that the departinent has seen in the past severai years. Councitmember Grant questioned if ali c�vertime wouid be eliminated with this hire. � ioance Director Iverson stated the overtime wouid nat be eiiminated but should be less as tl�ere � stili are emerge:ncies witt�in the City_ Counciimember Hoiden expected that overtime shautd �e reduced and used oniy for emergencies or stanclhy time. $_ UNFIIYISNED BUSINESS A. Arden Village Workforce Housi�g Pro�osal — Updated Letter of Support for the Housing Tax Creciit Application Community Develapment Direc[or James Lehnhoff stated the Council was being asked to consider approving an updated Ietter of support for Sand Companies, Inc.'s hc>usin� tax credit �tpplication to Ehe Minnesota Hc�usin� Finance Agency for the a_5�-unit t�orkfcsrce housing unit calied Arder� Village at 1296 County Raad F for an amount nc�t ta exceed $22�.000 or $S75,OQ0. 5arYd Companies was seeking local funding at one t�f the t�vo amounts, Gption 1 would not include the comrrtunica[ions low�er, while Option 2 would_ An additional waiver was being requested to reduee the SAC/WAC fees by $2,000 as this �yould add �n additiona! point �o the tax credit application. Ramsey Caunty would cc7ntribute $3i.Q00 to the project_ He explained the (=inance Pianning and Analysis C'ommittee revie�ued both options a��d felt both �vere viable aptions for the Cst�_ � ARDEN I�ILLS CITY COUNCIL — JUNE 14, 2010 11 8A_ Arden Village Workfot-ce Housing Proposa! — Updated Letter of Support for the Housing � Tcix Credit Application (continued) MOTION: Ma��or Harpstead moved and Councilmember Grant seconded a motion to Approve the updated Letter of Support for Sand Companies, Inc.'s housin� tax credit application to the Minnesota Housin� Finance Agencv for the Arden Villa�e project at 1296 County Road F for an amount not to exceed �22�,000, alon� with the $2,000 waiver in the SAC/WAC fees. Councilmember ��olden questioned what other funding �vould be used beyond TIF. Community Development Director Lehnhoff clarified that this would allow the City to waive bui(ding permit fees or other fees in lieu of TI�. Councilmember McClung stated he wiil support Option 1 but feit Option 2, with the communication tower would provide the City a great opportunity_ Councilmember Grant indicated he would have supported the communication tower as well; however time did not permit a full review_ He explained he would be supporting Option l. The motion carried on a 3-1 vote. (Hoiden opposed) B. Elmer L. Andersen Memoriat Trail Signage Approval � Parks and Recreation Manager Otson revieti�ed the signage history of the Eimer L. Andersen Memorial Trait (EAMT) with the Council. She indicated staff budgeted $1 �,000 for the trail signs fram the SY�c�al Reveriue gar[c �'ur�d. i1uoies were received from three sign companies and the low bid came in at $19,645 with the City's portion being $1 �,36�. This inciuded two pillars at County Road E and [ndian Place. Ramsey County has agreed to purchase one smalter pilIar at the Lake Johanna Boulevard entrance for a construction and installation price of $4,300. Design costs totaling $2,170 would aiso be due to Derrek Hames. The Parks, Trai( and Recreation Committee recommends the final design to Council. The Elmer L_ Andersen family has expressed their appreciation for dedicating this trail to their father and is honored to have been included in the design process for this signage. The signs production and installation will take approximately 2`/2 to three months from approval and the PTRC expressed interest in planning a dedication ceremony for the Memorial Signage this fall. Councilmember Holden questioned how many signs �vere being purchased and asked the expected Iife expectancy of these signs_ Parks and Recreation Manager Otson indicated four signs were heing purchased for three different locations. She stated the sign company recommended a high end product to resist graffiti and outdoor vvear and tear_ Derrek Hames, sign designer commented the signs would be fixed to concrete tubes with bolts_ � The proposed material is the best technology available and was used at the new TCF Stadium. � Attachment � F ebruary 14, 2011, Meeting Minutes � -i�1j�EN HILLS � May 9, 2011, Planning Commission Meeting ARDEN HILLS CITY COLTNCIL — February 14, 2011 5 S.A. Adopt Resolution 2011-006: Accepting Work Completed and Authorizing Finad Payment • of $18, 862. ZS for the 2010 Sewer Lining Project (continued) quantity was due to an increase in linear feet being done or if it was the result of increased pipe sizes. He requested that in the future an explanation outlining the exact reason for the increases be provided to the Council. The project was under the budgeted amount even with this increase. He requested Staff provide additional information in the next Administrator's Update. MOTION: Councilmember Holden moved and Mavor Grant seconded a motion to Adopt Resolution 2011-006: Acceptin� Work Completed and Authorizing Final Pavment of $18,862.25 for the 2010 Sanitary Sewer Lining Proiect. The motion carried unanimouslv (4-0). 6. PUBLIC HEARINGS None. 7. NEW BUSINESS A. Cable Franchise Agreement City Administrator Klaers stated the 15-year franchise agreement with Comcast is up for � renewal in 2013. The North Suburban Communications Commission (NSCC) is requesting approval of a Resolution which wilI reinforce the City's permission to allow NSCC to renegotiate the franchise renewal on behalf of Arden Hills. This Resolution will make it ciear that NSCC has the authority to negotiate this renewal. MOTION: Councilmember Holden �oved and Councilmember Holmes seconded a motion to Aanrove Resolution 2011-007 Which Reinforces the Citv's Approval to Have North Su6urban Communications Commission Renegotiate the Franchise Renewal on Behalf of Arden Hills. The motion carried unanimouslv (4-0). B. Approve Resolution 2011-008 in Support of Arden Village HOME/CDBG Application Community Development Director Jill Hutmacher stated Sand Companies, Inc. (SCI} has requested support of their application for the Ramsey County HOME Investment Partnership Program (HOME) or Community Development Block Grant (CDBG) funds for Arden Village. SCI has proposed the development of an affordable rental housing development at 1296 County Road F. The proposal required the property to be rezoned and that the City's Comprehensive Plan be amended. On March 8, 2010, the City Council gave land use approvals for the Arden Village project including Conditional Use Permit Amendment, Rezoning, Comprehensive Pian Amendment, Preliminary and Final Plat, and Master and Final Planned Unit Development. SCI �was unsuccessful in the last round of Minnesota Housing Finance Agency (MHFA) tax credit funding. SCI is now trying to fill its funding gaps so that it wilI be more competitive in the next ARDEN HILLS CITY COLINCIL — February 14, 2011 6 7.B. Approve Resolution 2011-008 in Support of Arden Village HOME/CDBG Application • (continued) round of taY credit funding. SCI intends to apply for $300,000 in Ramsey County HOME or CDGB funds. Applications are accepted annually and are due on February 25, 2011. The application requires a resotution of support from the City. With the City's March 8, 2010, land use approvals and the June 14, 2010, good faith commitment for up ta $225,000 in TIF assistance, SCI closed on the purchase of Iand in December 2010, and is currently pursuing funding to fill its funding gaps. If SCI is awarded HOME or CDGB funds, and having already received land use approvals and acquired the land, they should be quite competitive for the next round of MHFA tax credit funding. An updated letter of support including a restatement of the City's good faith commitment for TIF assistance will be needed for SCPs June 2011, MHFA t� credit funding application, which will be requested at a later date. Mayor Grant clarified the deadline for this application is different from the deadline for the Housing Tax Credit grant application. Community Development Director Hutmacher clarified the grant that is being applied for at this time is the Ramsey County HOME/CDBG and the deadline for this is February 25, 2011. The MHFA tax credit funding has two funding cycles with the majority of their funds being allocated in the June cycle. SCI did receive a small amount of $35,000 from Ramsey County in November. Mayor Grant asked if th�s project was classified as work force housing or affordable housing. � Community Development Director Hutmacher stated the project is classified as work force housing but the ierm affordable housing in general includes work force housing. Work force housing is exclusively for those individuals that are working or have some form of income. Mr. Jamie Thelen, CEO for Sand Companies, Inc. stated the project is for individuaIs that have some form of income and this can include seniors. In other facilities they have built, the one bedroom design has been popular for seniors and the two and three bedrooms are designed more for families. He clarified seniors do not have to be working but they must have a form of income. Councilmember Werner stated there was $1.6 million available with the HOME/CDBG funds. He asked what the chances were that SCI would be able to secure the $300,000 they would be requesting. Mr. Thelen stated he did not know what requests there would be this year. He stated it has been several years since Arden Hills has received any funds so this may increase the chances that they are able to receive funds. He stated this application with Ramsey County is the second time SCI has applied and in June it will be third application for MFHA with last year's application being the first application in the Iarge allocation round. Councilmember Holden clarified the only time a person needs to prove income for this � development is at the time of application for an apartment. ARDEN HILLS CITY COLJNCIL — February 14, 2011 7 7.B. Approve Resolution 2011-008 in Support of Arden Village HOME/CDBG Application � (continued} Mr. Thelen stated this was correct. Councilmember Holden stated when the TIF run was originally done it was set at a m�imum of up to $225,000, which was based on the cost of the land and other factors. She asked if the price that SCI paid for the properiy when they closed on it in December was the same as the amount that was used in the TIF run. Community Development Director Hutmacher answered that she did not have the amount that was paid at closing available and was not sure at this time if it was the same number that was used in the TIF run. In order to determine TIF eligibility a new TIF run would need to be reviewed. Mr. Thelen stated he did not have the exact amount but a purchase agreement had been provided to the City when the original TIF run was performed. The price that SCI paid for the property is the same as the amount that was on the purchase agreement. Councilmember Holmes asked for clarification regarding how the SCI project that was completed in White Bear Lake would support additional TIF funding in Arden Hills. Community Development Director Hutmacher stated the prior TIF runs had been based on the � estimated assessed value of the property and the projected t� revenue the properiy would generate. The t�-assessed values were lower than what was expected. The SCI project in White Bear Lake is similar to the one being proposed in Arden Hills and the values are higher on this property. SCI is questioning if the values that were being estimated for the Arden Hills development were lawer thari they ought to be, especially when compared to a similar project that has been completed. SCI would like to have this reviewed. Mayor Grant clarified the City was being asked to endorse up to $225,000 in funding but not committing to a TIF District. Councilmember Holden clarified that even if the TIF runs show the project was eligible for $225,000 the City could approve any amount they wished up to this maximum. Community Development Director Hutmacher stated the City had previously approved a Ietter of support for up to $225,000 in TIF funding, based on the but/for analysis and SCI receiving funding from MFHA. SCI is requesting support from the City for their application to Ramsey County for the HOME/CDBG funds. City Administrator Klaers stated the letter of support provided to SCI in June for up to $225,000 in funds is not a guarantee but is a good faith commitment and it would be difficult for the City to back out of this. � Councilmember Holden clarified that by supporting the application to Ramsey County the City was providing a commitment to up to $225,000 in TIF because the project is based on this amount. ARDEN HILLS CITY COLTNCIL — February 14, 2011 g 7.B. Approve Resolution 2011-008 in Support of Arden Village HOME/CDBG Application � (continued) Community Development Director Hutmacher stated the City made a good faith commitment in June for up to $225,000 in TIF funding and SCI has invested time and money into this project based on this information. SCI has also used this information when applying for other funding for the project. The City can choose to provide a lesser amount and the City would need to approve a TIF District. Councilmember Holden stated the June 14, 2010 Resolution was support for the MFHA application in June. She asked how long this letter would be in effect. Community Development Director Hutmacher stated it is not unusual for this process to take a long time but she could not say if there was a set time frame for expiration. City Attorney Jerry Filla stated SCI was asking for this resolution to clarify the support the City offered nine months ago with its June 24101etter. He asked Mr. Thelen if this was correct. Mr. Thelen stated SCI was looking at adding another funding source to cover the $1.7 million gap for the project and this would provide for additional points when they reapply for MFHA funds in June. SCI is not asking the City to change its commitment at this time. They may come back to the City in a couple of months to review this commitment but at this time SCI is asking for the City's support in applying for the Ramsey County HOME/CDBG funds. � City Attorney Filla clarified the resolution was for support of the grant funding application only and not a change in the TIF commitment. Councilmember Holden stated the whole foundation of the resolution rests on the commitment of TIF. Mr. Thelen stated he did not know if Ramsey County would be asking if there was any local participation in the project and so he did not know if the 3une 14, 2010, letter of support would need to be included in the application. The letter from June 14, 2010, providing a good faith commitment from the City for up to $225,000 in TIF funding is completely separate from the request to support SCI's grant application to Ramsey County. SCI will ask the City for an updated letter of support, including TIF funding, for the grant application to MFHA in June. SCI understands that the City is under no obligation to support or approve an increase in the TIF support previously approved. Councilmember Holmes stated at this time she would not be comfortable with not agreeing to the TIF support at this time. SCI purchased the property for the development based on the City's commitment. The City has a commitment to stand by the June 14, 2010, letter for a reasonabie length of time. Mr. Thelen stated SCI has done a market study for the project. The recently completed project in � White Bear Lake has been successful. SCI has gotten the approvals from the Planning Commission and the City Council for the project. SCI purchased the property in hopes of continuing the project. ARDEN HILLS CITY COLINCIL — February 14, 2011 9 7.B. Approve Resolution 2011-008 in Support of Arden Village HOME/CDBG Application • (continued) Councilmember Holden agreed the City has made a commitment up to $225,000 in TIF funding but not an increased amount even if the TIF run supported more. She asked how much funding the developer had invested in the project. Mr. Thelen stated the owner and developer have equity, related to the ta�c credits, into the development in the amount of $5.6 million of $IO milIion total project cost and this amount is not reimbursed back to the owner or developer. MOTION: Councilmember Holden moved and Councilmember Holmes seconded a motion to Approve Resolution #2011-008 in SuppOt't of Arden Village HOME/CDBG Application. Mayor Grant stated the record should reflect the Council referenced the previous memo of June 14, 2010, which indicated up to $225,000 in TIF funding as part of the discussion on approving the request to support the grant application to Ramsey County. The motion to approve Resolution #2011-008 was called to a vote. The motion carried (3-1: Councilmember Holdenl • City Administrator Klaers stated the TIF commitment is not good forever. He stated FPAC is aware of this issue. The length of time may be a matter of legal issue and should be discussed. City Attarney Fi�la stated the approvals that were granted in March 2010 might be close to expiring. He asked if the City has received extension requests for this project. Mr. Thelen stated the county just f nalized review of the final plat so SCI should be able to complete the filing next week. The PUD approval expires in the spring and he would check the exact date. SCI would be coming back to the City with a request for extension on the building permits. 8. UNFINISHED BUSINESS A. Senator Goodwin Meeting Update Councilmember Holmes stated on February 9 there had been a meeting facilitated by Senator Goodwin. Representative Knuth, 2 representatives from Ramsey County, 5 representatives from MnDOT, City Administrator Klaers, Public Works Director Maurer, Councilmember Holden and Chris Chromey from Bolton & Menk were in attendance. The timing for the I-694 improvements at Snelling Avenue had been discussed. The improvements are scheduled to start in August 2011 and be completed by August 2013 and I-694 will not close during the improvements at Snelling �Avenue. Additionally, the Highway 10 and County Road 96 project wilI be starting in 2012. The State has indicated agreement that due to the I-694 and Snelling project, there will be additional