HomeMy WebLinkAbout02-24-04 PTRC i
,-A EN HILLS
AGENDA
PARKS, TRAILS, & RECREATION COMMITTEE MEETING
TUESDAY, FEBRUARY 24, 2004
**7:00 P.M. MEETING**
ARDEN HILLS CITY HALL
1245 WEST HIGHWAY 96
1. Call to Order and Roll Call
2. Approve January 27, 2004 Minutes
3. HCM Presentation on Perry Park Picnic Shelter
• 4. Council Update
5. Parks and Recreation Update
a. Bridge on County Road E
b. Xcel Energy— Clear Cutting Floral Park & Surrounding Area
6. Year in Review Report
7. RV Historical Trail Follow Up
8. Next Meeting Agenda
9. Adjourn
A quorum of the City Council may be present at this meeting.
O & M ACCOMPLISHMENTS FOR 2003
I. Streets, Sanitary Sewer, Water & Storm Water
1. Completed the `Punch list' for the 2002 PMP
2. 2003 PMP(Karth Lake East + Ingerson)
3. Improvements made to the PMP process;
a. Neighborhood meetings(Power Point Technology)
b. Neighborhood Mailing/Notification/Newsletter
c. Assessment Procedures
4. Started the 2004 PMP(Edgewater) Process
5. Seal coated the Floral Park neighborhood
6. Painted City Parking Lots/Crosswalks/Curbs for the first time
-in the City's history.
7. Repaired 253 ft of street curbing.
8. Used 76 tons of asphalt to repair streets.
9. .,Cracked sealed all City Streets & trails all in the same year for
the first time in the City's history. (Past practice had been to
seal coat just in the neighborhood that was to be seal coated.
The trails have never been cracked sealed)
10.Established a new snow plow routes.
I I.Started a Permanent File record retention system for all O & M
projects.
12.Replacement of Lift Station #2
13.Replacement of Lift Station #5
14.Televised and lined the sanitary sewer lines in the Glenpaul
neighborhood.
15. Purchased a TV/video unit for sanitary sewer & storm water
system. City Staff TV'd two neighborhoods.
16.Staff saved the City $100,000 of allocated CIP funding
thorough the use of the TV/video unit.
17.Staff repaired seven sanitary sewer breaks.
18.Staff cleaned and jetted three neighborhoods.
19.Created a map grid system for each Lift Station and then
numbered each manhole that leads into that particular Lift
Station to provide a systematic approach to maintenance and
repair.
20.Established a sanitary sewer CIP.
• 21.Replaced the three water meters that are used to regulate the
water volume from the City of Roseville.
22.Repaired five water main breaks.
23.Established a water system CIP.
24.Storm Water improvements were made at the following sites;
a. Valentine Park Ditch
b. McClung Ditch
c. Indian Oaks Pond
d. Oak Ave Ditch.
25.Repaired eight storm water catch basins.
26.Cleaned and jetted two neighborhoods.
27.Completed Phase One of the federally mandated Storm Water
Pollution Prevention Plan (SWPPP) which involved public
education.
a. Mailed educational literature to every household.
b. Mailed educational literature to every business.
28. Karth Lake pumping station installed to regulate the level of the
lake.
. 29. Storm water management improvements were made in the
Karth Lake East & Ingerson neighborhoods in conjunction
with the PMP process.
II. Parks and Trails
1. New playstructure installed at Royal Hills Park.
2. Park & Trail maps were updated.
3. New Park facility installed at Cummings Park.
4. ADA & field improvements made at Perry Park.
5. New bleachers and safety fences installed at Royal Hills and
Valentine Hills Parks.
6. 18 new trail benches installed.
7. Approximately 1,000 feet of handrails installed along trial
sections.
8. Wood chipped the trails between Venus & Cty Rd E2.
9. Created a new trail entrance off of Old 10, north of Cty Rd E2.
1 O.New trail section installed in Cummings Park.
11.New trail section installed along Hamline Ave( part of 2003
PMP Ingerson project)
12.New trail section installed on the south side of Hwy 96 from
Lexington to N. Snelling Ave.
13.ADA trail entrance installed at Floral Park.
• 14.The Norma Ave- Floral Park trail section was redone & a storm
water management pond created to control water levels in the
area.
15.New trail sections added at Crepeau Park.
16.Six new benches installed in City parks.
17.Three City flower Gardens were converted to Perennials.
18.Completed first year of winter plowing of all paved trails.
19.Installed an ice skating trail at Valentine Park.
20.Second year of the Buckthorn pick-up program. This program
had 59 pickups in 2003, up from 19 in 2002.
21.Planted 27 trees in City Parks.
22.Completed five Boy Scout Eagle Award projects which resulted
in the following park/trail improvements;
a. 75 bird/habitat house built & installed
b. 400+ perennial flowers planted.
c. Buckthorn removal at Crepeau Park.
23.Completed two prairie grass controlled burns at Crepeau Park &
City Hall.
III. Staff Training
1. The following Staff acquired new Licenses;
Scott Freyberger- City Water
Aaron Andrews - City Water
2. The following Staff renewed their Licenses;
Joe Mooney- Sanitary Sewer & City Water
Pete Saxe- City Water
Dave Winkel- Tree Inspector
Scott Freyberger- Tree Inspector
Jim Perron- Sanitary Sewer & City Water
3. The following training seminars were attended by Staff;
Traffic work zone safety
Sweeper School
Vactor School
Sanitary Sewer TV/Video
Storm Water Management Practices
Lift Station Management
Hazardous Material Handling
Asphalt Repair/Pot Hole Patching
4. In addition, 26 safety videos were viewed by Staff.
5. Third year for the Labor Management Committee(LMC)
O & M Goals for 2004
1. Completion of 2003 PMP `Punch List'.
2. Completion of 2004 Edgewater PMP.
3. Begin planning process for 2005 PMP.
4. Update the Pavement Condition Index (PCI) for all City streets.
5. Develop a Unit assessment policy for the PMP process.
6. Completion of the following projects;
a. Lift Station #7.
b. Develop a pumping model for Karth Lake.
c. Booster Station redesign.
d. SCADA for all Lift Stations & Booster station.
e. New Park facility at Perry Park.
f. Trail segment on the Cty Rd E Bridge.
g. New trail section connecting Perry Park to Chatham
neighborhood.
h. Trail underpass at Tony Schmidt Park.
i. Installation of new City Street Signs.
. j. Smooth transition into the new RC/AH O&M facility.
k. Phase two of the SWPPP.
1. New trail section at Cleveland & Cty Rd E2
in. Field improvements to Perry Park.
n. Trail section on the north side of Hwy 96.
7. Successful (Win/Win) outcome of the Union Contract
negotiations.
8. Create seven new Park perennial flower gardens.
9. Successful outcome for the `Day in the Park' celebration.
10.Develop a plan for the the TV/cleaning of sanitary sewer lines
based on the new grid map.
11.13egin negotiations with MSI for a new trail connection with the
existing Hamline Ave. trail.
12.Improve PTRC relationship with the City Council.
13.Increase the percentage of License holders in O & M.
14.Improve the managerial skill levels of Jim & Michelle.
15.Stay Healthy.
•
r Recreation Accomplishments — 2003
• The Recreation Program Supervisor coordinated the City Annual Celebration—
Celebrating Arden Hills—Beach Barbecue.
• Statistically, the Recreation Department had a very successful 2003:
o We offered 30 programs in winter. Four programs were cancelled due to
low enrollment. This is a 87% success rate. We had 285 participants.
o We offered 96 programs in spring/summer. Thirteen programs were
cancelled due to low enrollment. This is an 86% success rate. We had
1,095 participants.
o We offered 39 programs in fall. Eight classes were cancelled due to low
enrollment. This is a 79% success rate. We had 534 participants.
o Overall,we offered 165 programs in 2003. Twenty five classes were
cancelled due to low enrollment. This is a 85% success rate. Our goal
. for 2003 was at least an 82% success rate. We had 1,914 participants
which is+249 participants from 2002.
• We trained and certified all of our Playground Leaders in CPR/First Aid through
the Red Cross. This was feasibly possible through a cooperation with the
Northwest YMCA.
• Our Playground Programs in 2003 were very successful. Our enrollment went
from 84 participants in 2002 to 115 participants in 2003. The evaluations from
the program were overwhelmingly positive.
• We have made numerous improvements in our parks. These improvements will
be helpful in increasing our participants in programs and also improve the quality
of the programs we offer. In particular,the Perry Park Improvements and the
addition of the Cummings Park Picnic Shelter will be tremendous for
programming in both parks.
01
RECREATION GOALS — 2004
• 85 % success rate on classes for the year.
• Increase in program participation by at least 10%.
• Research three different Recreation Software Products for
possible inclusion in next year's budget.
• Attend Minnesota, Parks, and Recreation Programming
Meetings atleast 5 times this year. Attend the annual
conference in November.
• Coordinate with Tom Moore (Co-Chair) and Staff Event
Committee to produce a successful 2004 Celebrating Arden
Hills Event.
• Increase my understanding and knowledge of Parks and
Trails Issues as they relate to the City of Arden Hills.
• Evaluate our relationships with local sports associations.
Research possible user fees.