HomeMy WebLinkAbout05-16-06 PTRC i
,-A EN HILLS
PARKS, TRAILS, & RECREATION COMMITTEE
TUESDAY, MAY 169 2006
**7:00 P.M. MEETING**
ARDEN HILLS CITY HALL
1245 WEST HIGHWAY 96
AGENDA
1. Call to Order and Roll Call
2. Approve April 18, 2006 Minutes
3. Council Update — Gregg Larson
4. Parks, Trails, and Recreation Update — Michelle Olson
• 5. PTRC Vision Plan - Strategies (Council Agenda Item for May 22nd _
work session following the Regular City Council Meeting)
6. Dog Park, Disc Golf, and Bocce Ball Discussion
7. Ramsey County Parks Review—Rich Straumann
8. Governor Anderson Naming Policy Discussion
9. PTRC Agenda Packet Distribution Discussion
10. Adjourn
Attachments:
April 18, 2006 minutes
PTRC Strategies for Parks and Trails
PTRC Vision
Email from City Administrator re: Dog Parks and Disc Golf
2005-2009 Priorities
•
A quorum of the City Council may be present at this meeting.
PARKS, TRAILS AND RECREATION COMMITTEE
STRATEGIES FOR PARKS AND TRAILS
STRATEGIES FOR PARKS
1. Disk golf course at Ingerson Park
The PTRC gather information on the popularity of disk golf and found it to be increasingly
popular. Therefore, as one of our strategies,we recommend development of a disk golf
course at Ingerson. The estimated cost is $7,500.
2. Fenced dog park at Parkshore
This currently undeveloped land south of Round Lake would well-serve those who need a
place to run their dogs off-leash. Staff estimates the cost of this development at$15,000.
3. Portable warming houses at Freeway and Valentine Parks
These parks see increased use during the winter months and the current warming houses are
inadequate. We recommend new houses for the 2007 skating season at an estimated cost of
' $9,000 for installation plus $1,800 per year for continued maintenance.
STRATEGIES FOR TRAILS
Trail development has lagged behind our investment in park facilities for a number of years. The
PTRC recommends development of an arterial or"core"trail system that provides access to all
areas of the community and in addition,provides badly needed access to the trail systems in
adjacent communities and to the regional trail system. But more than that, these trail segments
become an integral part of the overall transportation network.
1. Tony Schmidt Park Railroad underpass
This improvement has been scheduled for construction this year and will provide improved
access to the Park from neighborhoods to the north utilizing already completed portions of
the Arden Hills trail network. It will also form a strong connection with other recommended
arterial trails.
2. West side of Old Snelling from Highway 51 on the south to County Road E on the north.
We understand that this portion of highway is scheduled for improvement during 2007. We
urge the council to allocate funds for a trail as part of that reconstruction. This trail segment
is a key link in the major north-south arterial through the city which will eventually connect
. the existing Arden Hills with the new TCAAP development. This trail may be eligible for
municipal state-aid funding. In the future, we envision extending this trail to the south along
the west side of Highway 51.
PTRC Strategies for Parks and Trails
Page 2
•
3. South side of County Road E from Old Snelling to Connelly
You'll remember this is the sidewalk that was before the Council a year or so ago and
included the grant application to MnDOT for completing the walkway over Highway 51.
Unfortunately, the grant application was not re-submitted this past December but we urge the
Council to reapply next year and earmark funds for completing this very important trail link.
In addition to serving as a link to Freeway Park and the commercial development to the east,
this walkway is an important park of a longer east-west arterial transversing the city from
west to east.
4. East side of Old Snelling from County Road E to Highway 96
This is a continuation of trail segment 2 and would include reworking of the railroad
underpass north of Lindey's as well as a grade separation at Highway 10 and 96 to the north.
Again,we feel that this segment is crucial to improved circulation between the existing and
new portions of Arden Hills.
5. North side of Lake Johanna Boulevard from County Road E on the west to Old Snelling on
the east.
• Development of this trail segment would complete the southern east-west arterial through the
city. It is heavily used now—year round—by residents and student from Bethel College and
that use is likely to increase with the growing popularity of Tony Schmidt Park and the
County's completion of the trail link under the railroad(Segment 1). Ramsey County has
requested the Metropolitan Council to designate Tony Schmidt as a regional park which will
further increase its visitor use. As a result, Arden Hills may be eligible for regional park
funds to improve this trail and provide safe access to the park.
6. Traffic signals at County Road E and Old Snelling
This intersection becomes a major connector in the arterial trails system and trails approach
and leave the intersection form different sides of the street. For example, we recommend a
trail on the west side of Old Snelling south of County Road E but on the east side to the north
of County Road E. This same is true of the east-west connector. For this reason, and
because of the high vehicular traffic count, we recommend signalization of this intersection.
7. South side of Highway 96 from North Heights Church on the east to Old Highway 8 and
Long Lake Regional Park on the west.
This rail segment would complete the northern east-west arterial through the city by linking
with the existing trails along Highway 96. It would provide better access to city hall and the
development in TCAAP as well as providing safe access to the land and water-based
recreational opportunities afforded by Long Lake Regional Park and the Rice Creek trail
system leading to the Mississippi River.
•
VISION
For Parks and Trails in
Arden Hills
Parks and trails in Arden Hills enhance the health and well-being of citizens,
improve the value of citizens' property, and increase the desirability of the
city as a place to live or work. The city's parks and trails compose a coherent
network that:
• Provides land and water-based recreation, as well as convenient and
safe access to parks, trails and recreation facilities in the region.
• Develops and maintains a system of neighborhood parks and trails.
• Encourages non-motorized transportation and commuting.
• Supports and encourages access to lakes, marshes and wooded areas.
• Provides connections between the portions of Arden Hills south of
Highway 96 and new development to the north, as well as among other
neighborhoods otherwise separated by roads.
• Provides important resources to schools, colleges, employers and other
organizations in the region.
• Strengthens community among citizens.
This vision will be achieved with the leadership of the City Council and the
support of the community. That leadership and support are critical to
generating the financial resources necessary to develop, operate and maintain
Arden Hills' parks and trails.
Michelle Olson
Dom: Michelle Wolfe
nt: Friday, April 14, 2006 4:18 PM
o: Tom Moore
Cc: Michelle Olson; Schawn Johnson
Subject: Disc Golf and Dog Parks
When PTRC presented their Vision they mentioned both of the above. I know you said the
committee has done a lot of research, but for my own background I contacted my old
stomping grounds because I knew we had a disc golf course and had researched the dog park.
Below is the response from the City Administrator.
"The disc golf was put in primarily by volunteers, it was volunteer designed as
well. We supplied capital costs for the concrete and baskets and I'd guess we spent under
$5,000. However, now that we are redoing Oakwood Park we are redesigning the course and
it turns out that in my opinion it was very poorly designed the first time. . .used too much
of the park needlessly. . .although that is probably because we didn't care about Oakwood at
that time so they probably thought they could use the whole thing. Among the costs,
however, ongoing litter and tree damage is kind of a big deal.
On the dog Park there is a town in Oregon that has 3 dog parks and last year they
closed one down to totally reconstruct it due to over use, damage and had to reconstruct
the park so I think costs are under estimated on those as well. We don't have good Vs I
don't think and have estimated something in the $10-$20,000 range for fencing and the
like. We have said it has to be completely volunteer generated and fund raised before we
will consider it.
There is an extensive network of dog park enthusiasts as well as disc
organizations. . .google them both and you will be amazed. I have a bunch of stuff I could
end you on the disc stuff but it would be more educational if you just surfed for a
uple of hours. "
Also - Schawn had a done a little follow-up as well which I believe he forwarded to you.
My hope is that this information could be added to that already done and be helpful to
staff and the committee. I saw the item was on the agenda which reminded me to forward
the info to you.
Michelle Wolfe
City Administrator
City of Arden Hills, MN
1245 West Highway 96
Arden Hills, MN 55112
Office: (651) 634 5127
Cell: (612) 716-3295
1
2005-2009 PRIORITIES
Priority Cost Completion Date
1. Elmer Anderson Trail Naming Policy $1,500 Completed in 2005
2. Walkway under railroad connecting
Tony Schmidt Park to Perry Pak and $32,000 Completed in 2005
trails
None
3. Trail along Old Snelling from County (if State Aid is used)
Road E to Highway 51,Highway 51 to
Highway 96 $168,000
if State Aid is not used)
4. Trail through Northwestern College $101,000
5. Trail from Northwestern College to
Old Snelling $72,000
6. Trails within the Highway 10 and None.
Highway 96 re-construction
7. Trail/sidewalk along west side of
Lexington from County Road E to $98,000
Interstate 694
8. Trail along North Snelling from $79,000
Briarknoll to Highway 96
9. Bridge and trail on County Road E (State Aid Funding)
North side $465,000
South side $250,000
10. Off Leash Dog Park $25,000
11. Trail along Lake Valentine Road
(Valentine Park to Mounds View High $74,000
School)
12. Trail from upper/lower Freeway Park $330,000
13. Buckthorn Removal Program $5,000
Cost Estimates reflect current(2006)prices.