2040 Comprehensive Plan - Draft Requests For Proposals
Matthew Bachler, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
Kimley -Horn Master Plan Contract Completion
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:
David Grant
Councilmembers:
Brenda Holden
Fran Holmes
Dave McClung
Jonathan Wicklund
Special City Council
Work Session Agenda
July 25, 2016
6:15 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our
long -standing tradition as a desirable City in which to live, work, and play.
CALL TO ORDER
1.
1.A.
Documents:
1.B.
Documents:
2.
City of Arden Hills
City Council Work Session for July 25, 2016
P:\Planning\Comprehensive Plan\2018 Comprehensive Plan\Memos_Reports_2040 Comp Plan
Page 1 of 2
AGENDA ITEM – 1A
MEMORANDUM
DATE: July 25, 2016
TO: Honorable Mayor and City Councilmembers
Sue Iverson, Acting City Administrator
FROM: Matthew Bachler, Senior Planner
SUBJECT: 2040 Comprehensive Plan – Draft Requests for Proposals
Requested Action
Review and provide comments on the draft Requests for Proposals (RFP) for the City’s
Comprehensive Plan update.
Background
The City Council discussed the Comprehensive Plan update process at their Work Session
meeting on May 16, 2016. Staff was directed to draft an RFP for consultant services to assist
with the update and report back at a future meeting. The City Council supported finding ways to
reduce the consultant costs required to complete the Comprehensive Plan update.
Staff has drafted the RFP to include a scope of work that focuses on completing only the
minimum plan requirements as outlined by the Metropolitan Council (Attachment B). Depending
on staff capacity, there may be opportunities for staff to provide content for the less technical
sections of the plan, such as economic competitiveness, parks and trails, and housing. This would
be an additional way to reduce the overall cost of the update. The RFP notes that staff may assist
in providing plan content, and requests that proposals include separate costs for completing each
of the Comprehensive Plan sections so the City can identify potential areas for cost savings.
Next Steps
Staff is recommending the following next steps for the 2040 Comprehensive Plan:
1. City Council reviews draft RFP and provides comments: July 25, 2016
City of Arden Hills
City Council Work Session for July 25, 2016
P:\Planning\Comprehensive Plan\2018 Comprehensive Plan\Memos_Reports_2040 Comp Plan
Page 2 of 2
2. Staff completes revisions and reviews final RFP with City Attorney
3. City Council approves resolution to release RFP: August 29, 2016
4. RFP submittal deadline: mid October 2016
5. City Council selects a consultant and awards the contract: late November 2016
The City Council will be reviewing the preliminary budget for 2017 in September. Staff will
work on obtaining cost estimates based on the current scope of work included in the RFP so
these costs can be included in the 2017 budget. The expectation is that the majority of the work
on the Comprehensive Plan will be completed in 2017.
Attachments
A. Draft RFP for Comprehensive Plan Update
B. Metropolitan Council – Checklist of Minimum Requirements for Arden Hills
C. City Council Work Session Minutes, May 16, 2016
DRAFT
City of Arden Hills
Requests for Proposals
Comprehensive Plan Update
Introduction
The City of Arden Hills is accepting proposals from consultant firms for an update of its
Comprehensive Plan.
Arden Hills is a community situated in Ramsey County approximately 8 miles north of the
downtown areas of both Minneapolis and St. Paul. The City has an estimated population of 9,600
and over 12,000 employees. The City is home to Boston Scientific, Land O’Lakes, Bethel
University and University of Northwestern. Arden Hills boasts convenient freeway access to I-
35W, I-694, Highway 51/Snelling, and Highway 10.
Major Responsibilities
Major responsibilities for the consultant firm will include:
• Prepare a Comprehensive Plan Update, as further outlined below.
• Develop and maintain effective relationships with the Metropolitan Council, including
early identification of issues and communications with the agency throughout the
Comprehensive Plan Update process.
• Attend public meetings to develop the Comprehensive Plan Update, including regular and
work session Planning Commission meetings, regular and work session City Council
meetings, joint City Council/Planning Commission meetings, Parks, Trails, and
Recreation Committee meetings, Economic Development Commission meetings, and
meetings to obtain public input, such as neighborhood meetings and open houses.
• Conduct regular meetings with City staff for purposes of coordination, consultation, and
input.
• Assemble and coordinate a team of necessary sub-consultants, such as traffic engineers,
civil engineers, and market analysts.
• Submit Comprehensive Plan Update application to the Metropolitan Council and see
entire review process through Metropolitan Council approval.
Scope of Work
The consultant firm will be responsible for assuring the Comprehensive Plan Update complies
with Minnesota Statutes and the Metropolitan Council guidelines, including the relevant
requirements contained in the Thrive 2040 Regional Plan, the Local Planning Handbook, and the
System Statement. The work will include performing research and analysis, conducting public
meetings, developing goals and polies, preparing alternative plans and final plans, and
recommending measures to implement the Comprehensive Plan.
City staff may assist the consultant firm in providing content for certain sections of the
Comprehensive Plan. The consultant firm will be responsible for incorporating content provided
by City staff into the Comprehensive Plan to ensure a consistent format.
The consultant firm, at a minimum, will review, update, and/or analyze the following sections of
the Comprehensive Plan:
Introduction
• Analyze and update City Vision
• Analyze and update Community Profile based on most current U.S. Census data.
Land Use analyze and update:
• Forecasts and Community Designation
• Existing Land Use
• Future Land Use
• Density Calculations
• Staged Development and Redevelopment
• Natural Resources
• Protection Element: Solar, Wind, etc.
• Special Resource Protection
Economic Competitiveness
• Analyze and update the economic development goals and implementation
strategies included in Chapter 8 – Economic Development and Redevelopment of
the Arden Hills Comprehensive Plan 2030
Transportation analyze and update:
• Transportation Analysis Zones
• Roadways
• Transit
• Bicycle and Walking
• Aviation
• Freight
Water Resources analyze and update:
• Wastewater Management Plan
a. Analyze existing Wastewater Management Plan and complete updates as
needed to meet all minimum requirements listed by the Metropolitan Council.
• Surface Water Management Plan
a. Analyze existing Surface Water Management Plan and complete updates as
needed to meet all minimum requirements listed by the Metropolitan Council.
• Water Supply Plan
a. Update the existing Water Supply Plan to meet all minimum requirements
listed by the Metropolitan Council, and complete and submit the
DNR/Metropolitan Council water supply plan template through MPARS.
b. Anticipated Meetings:
- Four with City staff (kick-off and draft review)
- Two with City Council (Work Session and Regular Meeting)
c. Anticipated Deliverables:
- Draft plan for staff review
- Completed template for MPARS submission
- Final plan for City Council approval
- Content for inclusion in the Comprehensive Plan as required by the
Metropolitan Council
Parks and Trails analyze and update:
• Regional Parks and Trails
a. Section should incorporate recommendations included in the Ramsey County
Bicycle & Pedestrian Plan
• Local Parks and Trails
Housing analyze and update:
• Existing Housing Needs
• Projected Housing Need
• Implementation Plan
Implementation
• Prepare Implementation Plan
Project Schedule
It is anticipated that the full Comprehensive Plan Update will be completed and submitted to
adjacent municipalities and other agencies for the required six month review by March 1, 2018.
This will allow time to respond to comments before final submittal to the Metropolitan Council
by December 31, 2018.
Written Proposal
A. Project Approach. The proposal should reflect the consultant firm’s understanding of the
requirements of the project and address how the scope of work is to be accomplished,
including the process and the product. The approach should discuss the roles of the City
Council, Commissions, Committees, staff, and the public in preparing the Comprehensive
Plan Update.
The approach should include three alternatives for providing public participation in the
process. These alternatives should represent different levels of involvement, complexity,
and costs. Examples of possible alternatives include: formal public hearings, open
houses, and other means of technology used for public input such as online surveys,
social media, or a dedicated project website.
B. Project Personnel. The proposal should contain the names of the firm’s assigned
personnel with key responsibilities for the work and the description of their roles and
duties. An organizational chart should be included that designates responsibilities and
lines of authority and communication. The proposal should also include resumes of these
individuals with an emphasis on their involvements and responsibilities with other
comprehensive plan updates.
C. Relative Experience. The proposal should discuss the firm’s experience with other
comprehensive plan updates in the Minneapolis/St. Paul metropolitan area. Relative
experience should include current knowledge of and recent experience with the
Metropolitan Council and the comprehensive plan update approval process.
D. References. Include a list of municipal clients where related services were provided by
the firm’s proposed staff along with contact information for a staff member at that
municipality.
E. Private Clients. Include a list of private clients for whom work has been or is being
performed within the City of Arden Hills, the type of project, the specific activities
performed, and the name of a person who may be contacted at the private firm.
F. Schedule. Provide a proposed schedule from project initiation to final completion. The
schedule should include a list of key tasks within each phase, key milestones and
approximate dates, and deliverables.
G. Costs. The proposal should include a “not to exceed” cost for the project and a schedule
of billing rates for personnel involved. If multiple consultants are collaborating on the
project, please identify the specific segment of the scope for each assign consultant and
the associated pricing.
Costs should be separately provided for completing each of the Comprehensive Plan
sections included in the Scope of Work. Costs for each of the public input alternatives
should also be separately provided.
The City reserves the right to select one or multiple consultants.
H. Issuance of RFP and Award Process. Issuance of this RFP does not compel the City to
award a contract. The City reserves the right to reject any or all of the proposals wholly
or in part and to waive any technicalities, informalities, or irregularities in any proposal at
its sole option and discretion. The City reserves the right to request clarification or
additional information. The City reserves the right to award a contract, re-solicit
proposals, or temporarily or permanently abandon the procurement.
I. Disclosure. All information in a proposal, except fee analysis, is subject to disclosure
under the provisions of Minnesota Statute Chapter 13, “Minnesota Government Data
Practices Act”.
J. Cost Liability. The City of Arden Hills assumes no responsibility or liability for costs
incurred by the consultant prior to signing a contract for this project. Total liability of the
City of Arden Hills is limited to the terms and conditions of this agreement.
K. Submittal. Qualified consultants are required to submit five (5) paper copies and one (1)
electronic copy of the proposal.
Please remit proposals to:
Matthew Bachler
Senior Planner
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Proposals must be received no later than ______on __________ __, 2016.
Questions regarding this RFP can be submitted by email to Matthew Bachler at
mbachler@cityofardenhills.org.
Selection of Consultant
A. Process and Schedule. Based upon its review of the submitted proposals, a selected
number of consultants will be asked to interview with City staff. The City staff will
recommend to the City Council a consultant that is proposed to be retained.
B. Evaluation Criteria. Proposals will be evaluated based on the following criteria:
• Conciseness, clarity, and organization of the proposal
• Relevance and suitability of the project approach
• Qualifications and expertise of the key personnel to be assigned to the project
• Experience of firm, other sub-consultants, and project team with comprehensive
plans and comprehensive plan updates
• Working knowledge and recent experience with the Metropolitan Council
• Demonstrated ability to perform the comprehensive plan update in a timely and
cost effective manner
• Demonstrated familiarity with relevant development, social, and economic issues
impacting communities such as Arden Hills
• Project costs
• Ability to work as a team with the City Council, Commissions, Committees, staff,
and other City consultants
• Ability to interact positively and effectively with the general public
• Innovation and creativity
Contract Terms and Conditions
A. Upon selection of a consultant firm(s), an Agreement or Contract of Services shall be
entered into by the City and the consultant(s). It is expected that the contract will provide
for compensation for actual work completed on a not to exceed basis with the following
conditions:
• Deletion of specific components, such as individual project meetings, will be at
the discretion of the City. Payment or reimbursement shall be made based on
actual hours worked on various tasks required for the project.
• The City shall retain ownership of all documents, plans, maps, reports, and data
prepared under this proposal. The consultant shall provide the City with hard copy
and digital documents throughout the project and a fully electronic file upon
completion of the project.
B. The City reserves the right to negotiate the final terms and conditions of the contract to be
executed. Should the City and a consultant be unable to mutually agree upon the entire
contract, the City reserves the right to discontinue negotiations, select another consultant,
or reject all of the proposals. Upon completion of negotiations agreeable to the City and
consultant (s), a contract shall be executed.
Page - 1 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
CHECKLIST OF MINIMUM REQUIREMENTS FOR ARDEN HILLS
The checklist below was compiled from information on the Plan Elements pages in the Local Planning Handbook under the
“Minimum Requirements” sections of the respective topics. Please note that this information is subject to change. The most
current information can always be found on the website. Also, please remember that additional information may be requested
during the review process for clarification and accuracy by the Technical Review staff. If you have any questions, please contact
your Sector Representative.
LAND USE
Forecasts and Community Designation
□ Include a table of forecasted population, households, and employment for 2020, 2030, and 2040, consistent with the
Council’s forecasts.
□ Remember, Council forecasts must be used consistently throughout your entire comprehensive plan.
□ Your transportation plan needs to allocate forecasts to transportation analysis zones (TAZs).
□ Your water and wastewater plans need to reflect forecasts to plan for urban services.
□ Your land use plan must reflect and be coordinated with your forecasts.
□ Include a map acknowledging your regional Community Designation(s) and acknowledge the overall density expectations
for your Community Designation(s).
□ Each Community Designation identifies both Council and Community Roles in Thrive’s land use policy section. Plans must
be consistent with Community Roles for your Community Designation(s) as well as Community Roles that apply to
everyone.
Existing Land Use
□ Provide an Existing Land Use Map with a land use legend.
□ Provide an Existing Land Use Table. Calculate total acres and percent of total acres for each land use category.
□ Land uses categories on the map and in the table, as well as any text references must all be consistent with one another.
□ Show existing regional parks, park reserves, and special recreation features with a land use of “Park” (or your equivalent)
on your Existing Land Use Map.
Future Land Use
□ The Future Land Use plan must be consistent with the Council’s forecasts of population, households, and employment and
identify sufficient land to support your community’s forecasted growth.
□ Provide a Future Land Use Map and land use legend, including density ranges for all land uses that allow residential
development.
□ Provide a Future Land Use Table. Calculate total acres and percent of total acres for each land use category for each 10-
year planning period (2020, 2030, and 2040).
□ Define each land use category shown on the Future Land Use Map. Land use categories must be used consistently
throughout your plan.
□ Land use categories must include types of allowed uses and the minimum and maximum densities (“the allowable density
range”) for all categories that allow residential uses. Allowed uses should include a description of allowable housing types
such as single family, detached, duplexes, townhomes, etc.
□ For each “mixed use” category, define an expected share of individual land uses and identify the permitted density range for
residential uses. For example, Mixed Use Downtown might have an expectation of 30% commercial, 40% office, and 30%
residential with a density of 10-15 units per acre.
□ Acknowledge Council-approved master plan boundaries of regional parks, park reserves, and special recreation features by
guiding the properties with a land use of “Park” (or your equivalent) on your Future Land Use Map.
For Communities within the Metropolitan Urban Service Area (MUSA) and Rural Centers:
□ Identify employment locations and provide a measurement of intensity of planned employment. Employment locations
are typically the areas guided for commercial, office, industrial and institutional uses. Acceptable measurements of
intensity include Floor Area Ratio (FAR), building footprint or impervious coverage. Ranges for measuring intensity are
acceptable.
Page - 2 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
For Communities with Special Resources:
□ Identify aggregate resources in your community on the Future Land Use Map.
□ See the Special Resources section within the Land Use Plan Element for requirements for Critical Area Plans, Historic
Preservation, and others.
Density Calculations
□ Identify where forecasted residential growth will happen on your Future Land Use Map. Show expected new development
and re-developed areas.
□ Identify what density range is expected for each residential land use in your community.
□ Identify when residential development or redevelopment is anticipated to happen. See the Handbook section on Staged
Development and Redevelopment.
□ The average net residential density for your community must be consistent with the density requirements for your
community designation.
□ Provide a minimum and maximum value for each residential density range. (Zero is not an acceptable minimum. The
maximum value must be a whole number.)
□ Use the lowest allowed residential density from land use ranges in your calculations. For example, a land use that permits a
density range of 3-5 units per acre must use 3 units per acre in all density calculations for this land use. This ensures that
even at the lowest permitted density, the community will be developing at densities that meet overall density expectations.
□ Focus on areas of change. Show us which planned land uses have changed from your previously approved plan and where
new land uses (change or development intensity) is planned/expected.
□ Provide the net developable acreage for each residential land use. It’s OK to exclude wetlands and natural water bodies,
public parks and open space, arterial road rights-of-way, and natural resource lands protected by local plans and
ordinances (i.e. steep slopes, wetland buffers, tree preservation) from area calculations. Stormwater ponds, utility
easements, local roads, and local rights-of-way cannot be excluded from area calculations.
□ The information you develop in your land use plan carries over to other elements of your comprehensive plan. The areas
and densities in the land use plan must be consistent across elements related to forecasted growth, wastewater, water,
housing, and transportation.
For Communities with an Affordable Housing Allocation:
□ Guide residential land at densities sufficient to create opportunities for affordable housing using one of the following
options outlined in the Housing Plan Element. Refer to the Projected Housing Need section.
Staged Development and Redevelopment
□ Identify potential local infrastructure impacts for each 10-year increment.
□ Demonstrate that the municipality is capable of providing services and facilities that accommodate its planned growth.
□ The staging plan or likely development phasing must be consistent with the volume of anticipated sewer flow identified in
your community’s Local Sewer Plan.
□ The staging plan or likely development phasing must support and be consistent with your community’s share of the
Region’s Need for Affordable Housing for 2021 - 2030.
For Urban Center, Urban, and Suburban Communities:
□ Identify and map the land areas that are available or likely to be available for redevelopment, infill development, or new
development in your community.
□ Provide a table of those areas identified that includes future land uses, acreages, density ranges, and total residential
units in 10-year increments. Use your professional judgment for estimating the timing of development for areas that are
uncertain or do not have plans in process.
Natural Resources
□ Describe your community’s goals, intentions, and priorities concerning preservation, conservation, or restoration of natural
resources in your community.
Special Resource Protection
□ All plans must include a protection element for historic sites.
□ All plans must include policies for the protection and development of access to direct sunlight for solar energy. Solar access
is addressed in depth under the Resilience section.
□ All plans must identify whether or not aggregate resources are available within the community. For communities with
aggregate resources, additional requirements apply.
Page - 3 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
For Communities with Aggregate Resources:
□ Identify aggregate resources in your community on the Future Land Use Map using the Aggregate Resources
Inventory.
□ You must address and minimize potential land use conflicts.
□ Identify planning and regulatory measures to ensure that aggregate resources are extracted prior to urbanization of
aggregate-rich sites.
Page - 4 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
TRANSPORTATION
Transportation Analysis Zones
□ Include a table allocating forecasted population, household, and employment growth by TAZ for 2020, 2030 and 2040.
□ Describe how you have allocated demographic growth based on your plan’s assumptions for guided future land use (e.g.,
density, mix of uses, locations for new development, highway/transit access, redevelopment, etc.).
□ When doing your land use planning, accommodate development densities around transit consistent with density
expectations established in Chapter 3 of the 2040 Transportation Policy Plan (2040 TPP).
Roadways
□ Describe and map the functional classification of all existing and proposed roads within your community, using the
functional classification system described in Appendix D of the TPP and the roadway classification map currently
recognized in the region.
□ Maps must reflect the principal arterials adopted as the metropolitan highway system in the 2040 Transportation Policy
Plan (2040 TPP).
□ If a community determines that a change to the A-minor arterial system in the community is warranted, a request
should be made to the Transportation Advisory Board (TAB) for the change, and TAB’s approval secured, prior to
reflecting the new classification in the community’s plan. Check the council’s website or contact Elaine Koutsoukos at
651-602-1717 for more information.
□ Maps should also show the streets classified by the community as major and minor collectors and local streets.
Changes to these streets from the function shown on the regional map are at a community’s discretion, and do not
need approval from TAB. However, these changes should follow the criteria laid out in Appendix D of the TPP and
maintain system continuity. A map or table highlighting any discrepancies between the community’s map and the
regional functional classification map previously referenced should be submitted to Council staff so the regional map
can be updated.
□ Include the following information for the principal and A-minor arterials:
□ Identify the existing and future number of lanes.
□ Map current traffic volumes, including heavy commercial volumes, which include both ADT and HCADT.
□ Map forecasted 2040 traffic volumes. (This should be done using the Council’s regional model, or another method with
approval from Council forecasting staff.)
□ Identify future rights-of-way that need to be preserved.
□ Identify planned improvements to principal arterials as shown in the Current Revenue scenario of the 2040 TPP.
□ Identify any existing or proposed future MnPASS lanes, dedicated busways and bus-only shoulder lanes as shown in
Figure 6-6 of the 2040 TPP.
□ For other proposed interchange improvements, follow the Highway Interchange Request Criteria and Review
Procedure, which can be found in Appendix F of the 2040 TPP.
□ Incorporate access management guidelines of MnDOT, or those of the county in which your community is located, into
your comprehensive plan as well as into your subdivision and zoning ordinances.
□ Describe recommendations from recent corridor studies regarding roadway improvements, changes in land use,
and/or access.
Transit
□ The region has established Transit Market Areas to guide the types and levels of transit service that are appropriate for
efficient and effective services. Transit Market Areas are defined in Appendix G of the 2040 TPP by the demographic and
urban design factors that are associated with successful transit service. Identify your community in relationship to your
transit market area(s). Describe and map the existing and planned transit infrastructure and services in your community,
including those of Metro Transit or other regional transit service providers. Communities should include the identification of
the following basic elements of the transit system in their comprehensive plan:
□ Existing transit routes and dial-a-ride services
□ Existing and planned transit stations and transit centers
□ Existing and planned park-and-rides and express bus corridors
□ Existing and planned transit advantages
□ Existing transit support facilities
Bicycling and Walking
□ Describe and map the existing and planned on-road and off-road bicycle facilities in your community.
□ Map and describe the Regional Bicycle Transportation Network (RBTN) within your community:
□ Show all Tier 1 and Tier 2 RBTN corridors and alignments.
□ Show the relationship of the RBTN to the local bicycle network of off-road trails and on-street bikeways including all
existing and planned connections.
Page - 5 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
□ Include locations of regional employment clusters and activity center nodes (as shown on the RBTN map) and other
local activity centers.
□ For Tier 1 and Tier 2 corridors on the RBTN, describe and map the existing or planned bicycle facility alignments that
are within the established corridors; the purpose of these corridors is as a placeholder for cities/counties to designate a
planned alignment. If there is a planned alignment that would fulfill the intent of the corridor and that lies within and in
line with the corridor’s directional orientation that the community would propose to replace the established corridor,
map that alignment and denote by indicating it as “proposed for the RBTN.”
□ Analyze and address the need for local bicycle and pedestrian facility improvements to provide connections that remove
major physical barriers (i.e., freeways, railroad corridors, rivers and streams) on the regional (RBTN) and local networks.
□ Discuss pedestrian system needs in a manner that responds to your community designation (as described in Thrive MSP
2040) and addresses the needs of your community.
Aviation
□ Identify policies and ordinances that protect regional airspace from obstructions. Include how your community will notify the
FAA of proposed structures.
Freight
□ Identify railways, barge facilities and truck or intermodal freight terminals within the community.
□ Identify other important nodes that may generate freight movement, such as industrial parks and large shopping areas.
□ Map the road network showing volumes of multi-axle trucks (also known as “heavy commercial average annual daily traffic
or HCAADT”) for Principal Arterial and A-Minor functional classifications.
□ Identify any local roadway issues or problem areas for goods movement, such as weight-restricted roads or bridges,
bridges with insufficient height or width clearances, locations with unprotected road crossings of active rail lines, or
intersections with inadequate turning radii.
Page - 6 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
WASTEWATER
Areas Served by the Regional System
□ A table that details the households and employment forecasts in 10-year increments through 2040, based on the Council’s
forecasts and any subsequent negotiated modifications. This should be broken down by areas served by the Metropolitan
Disposal System, locally owned and operated wastewater treatment systems, and Community and Subsurface sewage
treatment systems. The forecasts used in your wastewater plan must be consistent with the forecasts used throughout your
plan, including in land use, transportation, and water supply.
□ Your wastewater plan must be designed to support these forecasts and provide any allocation breakdowns between
sewered and unsewered service for population, households, and employment.
□ An electronic map or maps (GIS shape files or equivalent must also be submitted) that show the following information:
□ Your existing sanitary sewer system identifying lift stations, existing connection points to the metropolitan disposal
system, and future connection points.
□ Local sewer service districts by connection point.
□ Intercommunity connections and any proposed changes in government boundaries based on Orderly Annexation
Agreements.
□ The location of all private and public wastewater treatment plants in your community.
□ Copy of any intercommunity service agreements entered into with an adjoining community after December 31, 2008;
including a map of areas covered by the agreement.
□ A table or tables that contain the following information:
□ Capacity and design flows for existing trunk sewers and lift stations.
□ Assignment of 2040 growth forecasts by Metropolitan interceptor facility. In the absence of this information the Council
will make its own assignments for the purpose of system capacity needs determination.
□ Define your community’s goals, policies, and strategies for preventing and reducing excessive inflow and infiltration (I/I) in
the local sewer system, including:
□ Define the requirements and standards for minimizing inflow and infiltration and for the disconnection of sump pump,
foundation drain, and/or rain leader connections to the sanitary sewer system.
□ Include a copy of or reference to your local ordinance that prohibits the discharge of sump pumps, foundation
drains, and/or rain leaders to the sanitary disposal system.
□ Include a copy of or reference to your local ordinance requiring the disconnection of existing foundation drains,
sump pumps, and roof leaders from the sanitary sewer system.
□ Include a summary of activities or programs related to I/I source mitigation on private sewer services.
□ Describe the extent, source, and significance of existing I/I problems in your community.
□ Analyze the costs for remediating the I/I issues identified in your community.
□ An implementation plan that contains a program strategy, priorities, scheduling, and financing mechanisms for eliminating
and preventing excessive I/I from entering the sanitary sewer system.
For communities with new trunk sewer systems that require connections to the Metropolitan Disposal System, you
also need to include the following:
□ A table that details the proposed time schedule for the construction of the new trunk sewer system in your community.
□ Describe the type and capacity of the treatment facilities, whether municipally or privately owned.
□ Copies of the associated National Pollutant Discharge Elimination System (NPDES) or State Disposal System (SDS)
permits.
Community and Subsurface Treatment Systems
□ Describe your community’s management program for SSTS to comply with MPCA regulations (Minn. Rules Chapters 7080-
7083).
□ Map the locations of all existing public and private treatment systems, if any, including package treatment plants and group
on-site systems.
□ Map the locations of all sub-surface sewage treatment systems. You should also identify the locations of known non-
conforming systems or systems with known problems.
□ Describe the conditions under which private, community treatment systems (ex. package treatment plants, community
drainfields) would be allowed. Examples of such conditions include:
□ allowable land uses and residential densities
□ installation requirements
□ management requirements
□ local government responsibilities
Page - 7 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
SURFACE WATER
The items in the Minimum Requirements section below are consistent with the requirements under the new Minnesota Rules
Chapter 8410, adopted in July of 2015 and Minn. Stat. 103B.235.
Executive Summary, Water Resource Management Related Agreements, and Amendment Process
□ Provide an executive summary that includes the highlights of the local water management plan.
□ Describe the water resource management related agreements that have been entered into by your community. This
includes joint powers agreements related to water management that the community may be a party to between itself and
watershed management organization(s), adjoining communities, or private parties.
□ Include a section on amendment procedures that defines the process by which amendments may be made. The
amendment procedure must be consistent with the amendment procedures in the watershed organization(s) plans that
affect your community.
Physical Environment and Land Use
□ Describe the existing physical environment and existing land use. You may be able to incorporate data by reference if
allowed by the appropriate watershed organization(s) plan. You should be aware that not all watershed plans contain the
level of detail needed and in those cases, you will be required to provide this information directly in your local water
management plan.
□ Describe the proposed physical environment and future land use.
□ Include a map and/or description of drainage areas that includes path and flow directions of the stormwater runoff in your
community.
□ Describe the volumes and rates of flow for those defined drainage areas.
Existing and Potential Water Resource-Related Problems
□ Include an assessment of the existing water resource related problems in your community.
□ Include an assessment of the potential water resource related problems in your community.
□ Include a list or map of impaired waters within your community as shown on the most current 303d impaired waters list.
Local Implementation Plan/Program
□ Include prioritized nonstructural, programmatic, and structural solutions to identified problems.
□ Describe the areas and elevations for stormwater storage adequate to meet performance standards or official controls in
watershed organization(s) plan.
□ Define the water quality protection methods that would be adequate to meet performance standards or official controls.
□ Clearly define the roles and responsibilities of the community from that of the WMO(s) for carrying out implementation
components.
□ Describe the official controls and any changes needed to official controls.
□ Include a table briefly describing each component of the implementation program that clearly details the schedule,
estimated cost, and funding sources for each component, including annual budget totals.
□ Include a table describing the capital improvement program that sets forth by year, details of each contemplated capital
improvement that includes the schedule, estimated cost, and funding source.
Page - 8 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
WATER SUPPLY
Local Water Supply Plan for Municipal Public Water Suppliers
□ If the community has a municipal community public water supply system, complete all information in the DNR &
Metropolitan Council water supply plan template. Information must be submitted in the template provided and submitted
through the MnDNR Permit and Reporting System (MPARS).
□ Include extended water demand projections for 2020, 2030, 2040 and ultimate build-out that are consistent with population
forecasts in the community’s system statement.
Water Conservation & Reuse
□ If the community has a municipal community public water supply system, complete all information in the DNR &
Metropolitan Council water supply plan template. Information must be submitted in the template provided and submitted
through the MnDNR Permit and Reporting System (MPARS).
Assessing & Protecting Source Water
□ If the community has a municipal community public water supply system, complete all information in the DNR &
Metropolitan Council water supply plan template. Information must be submitted in the template provided and submitted
through the MnDNR Permit and Reporting System (MPARS).
Sub-Regional Collaboration
□ If the community has a municipal community public water supply system, complete all information in the DNR &
Metropolitan Council water supply plan template. Information must be submitted in the template provided and submitted
through the MnDNR Permit and Reporting System (MPARS).
Page - 9 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
PARKS AND TRAILS
Regional Parks and Trails
□ Describe, map, and label the Regional Parks System facilities that are located in your community.
□ Depict existing regional parkland with a land use of “Park” (or your community’s equivalent) on your Existing Land Use map.
□ Acknowledge the Council-approved master plan boundaries of regional parks, park reserves, and special recreation
features by guiding the properties with a land use of “Park” (or your community’s equivalent) on your Future Land Use map.
Local Parks and Trails
□ Describe and map your existing and proposed local parks, trails, and recreation facilities.
□ Include a capital improvement program for parks and open space facilities as part of your implementation program.
Page - 10 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
HOUSING
Existing Housing Needs
□ Complete an existing housing assessment, including:
□ A table of existing local conditions, including the following information:
□ 1. Total number of housing units.
□ 2. Number of housing units affordable to households with incomes at or below 30% Area Median Income (AMI),
between 31 and 50% AMI, and between 51 and 80% AMI.
□ 3. Number of housing units that are owner occupied.
□ 4. Number of housing units that are rental.
□ 5. Number of single family homes.
□ 6. Number of multi-family homes.
□ 7. Number of publicly subsidized housing units by the following types: senior housing, housing for people with
disabilities, and all other publicly subsidized units. Include expiration dates of affordability requirements when
applicable.
□ Number of existing households that are experiencing housing cost burden with incomes at or below 30% Area Median
Income (AMI), between 31 -50% AMI, and 51 -80% AMI. A map of owner-occupied housing units identifying their assessed
values. At a minimum, differentiate the values above and below $211,500.
□ A narrative analysis of existing housing needs. At a minimum address the components of the existing housing assessment
within the local context of your community. Plans consistent with Council policy will clearly identify existing housing needs
and priorities for the community.
Projected Housing Need
□ Discuss how the land use plan addresses the future housing need for your forecasted growth.
For Those Communities With An Affordable Housing Need Allocation:
□ Acknowledge your community’s allocation of the region’s need for affordable housing at three levels of affordability:
<30% AMI, 31-50% AMI, and 51-80% AMI.
□ Guide residential land at densities sufficient to create opportunities for affordable housing using one of the following
options:
□ Option 1: Guide sufficient land at minimum residential densities of 8 units/acre to support your community’s total
allocation of affordable housing need for 2021 – 2030. This option may be best for communities that find it difficult
to support densities of 12 units/acre (per Option 2), or prefer simplicity over flexibility in their density minimums.
□ Option 2: Guide sufficient land at minimum residential densities of:
□ 12 units/acre to address your community’s allocation of affordable housing need at <50% AMI. This
combines your community’s allocation at <30% AMI and 31-50% AMI.
□ 6 units/acre to address your community’s allocation of affordable housing need at 51-80% AMI.
□ Option 2 may be best for communities that feel they can achieve affordable housing needs at 51-80% AMI with
less than 8 units/acre. It also allows the affordable housing need to be addressed with less actual land, as is the
case if communities choose to use even higher densities than are required. Furthermore, communities using
Option 2 may guide land to meet their allocation of affordable housing need at 51-80% AMI using a minimum
density range of 3-6 units/acre if they have demonstrated in the last 10 years the application of programs,
ordinances, and/or local fiscal devices that led to the development of housing affordable at 51-80% AMI in their
community. Examples include: density bonuses for affordable housing unit inclusion, local funding programs such
as TIF, etc.
Implementation Plan
□ A description of public programs, fiscal devices, and other specific actions that could be used to meet the existing and
projected housing needs identified in the housing element. Include in what circumstances and in what sequence they would
be used.
□ Plans consistent with Council policy will clearly and directly link identified needs to available tools. Needs are identified
within the three levels of affordability, and tools should therefore be addressed within the levels of affordability as well.
□ Plans consistent with Council policy will consider all widely accepted tools to address their housing needs. A list of widely
accepted tools is provided, however, this list is not exhaustive. Communities are strongly encouraged to include any
additional tools at their disposal when identifying how they will address their housing needs.
Page - 11 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
RESILIENCE
Energy Infrastructure and Resources
□ Local governments in the seven-county metropolitan area are required by state law to include an element in their Plan for
protection and development of access to direct sunlight for solar energy systems.
Page - 12 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
ECONOMIC COMPETITIVENESS
Redevelopment
□ Minnesota Statutes § 473.859 Subd. 1 states that local comprehensive plans “shall contain objectives, policies, standards,
and programs to guide… redevelopment and preservation for all lands and waters within the jurisdiction of the local
governmental unit”. The information provided in this section of the handbook is intended to assist communities as they
grapple with the opportunities and challenges associated with development sites that are declining in value, viability, and
marketability.
Page - 13 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK
Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills
IMPLEMENTATION
Implementation
□ Describe all public programs, fiscal devices, and other actions that your community will use to implement your plan.
□ Define a timeline as to when actions will be taken to implement each required element of your comprehensive plan.
□ Include a Capital Improvement Program (CIP) for transportation, sewers, parks, water supply, and open space facilities.
Specify the timing and sequence of major local public investments.
□ The CIP must align with development staging identified in other parts of your plan and include budgets and expenditure
schedules.
□ Describe all relevant official controls addressing at least zoning, subdivision, water supply, and private sewer systems.
□ Include a schedule for the preparation, adoption, and administration of needed changes to official controls.
□ Include your local zoning map and zoning category descriptions. Identify what changes are needed to ensure zoning is not
in conflict with your new land use plan and consistent with regional system plans and policies.
□ Review and update official controls within 9 months of adopting your 2040 plan. Official controls must not be in conflict with
your updated plan. You must provide copies of all revised official controls to us.
□ The Housing Plan Element has implementation requirements as well. Refer to that section to ensure that implementation
requirements for the Housing Action Plan are met.
Approved: June 13, 2016
CITY OF ARDEN HILLS, MINNESOTA
CITY COUNCIL WORK SESSION
MAY 16, 2016
5:00 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
1. AGENDA ITEMS
C. 2040 Comprehensive Plan Update
City Planner Streff stated that all cities in the seven county metropolitan area are required by the
Metropolitan Land Planning Act to update their comprehensive plan every ten years to ensure
consistency with the Metropolitan Council’s regional development plan. The current plan is
Thrive MSP 2040 and was adopted in May 2014. Local comprehensive plans must also conform
to the metropolitan system plans for transportation, water resources, housing, and regional parks
and trails. The last Comprehensive Plan update was completed in 2008 and approved by the City
Council and the Metropolitan Council in 2009. Although the next update to the City’s
Comprehensive Plan is not due until December of 2018, staff will begin working on the update in
2016, in order to prepare for the Metropolitan Council submittal deadline. The Metropolitan
Council and State Statutes require the Comprehensive Plan to address land use, transportation,
water resources, parks & trails, housing, resilience, economic competitiveness, and
implementation.
City Planner Streff explained that the comprehensive planning process is an opportunity for the
City to review the goals, policies, and strategies from the 2008 Comprehensive Plan; evaluate the
progress the City has made; determine what policies should continue; and address new issues and
concerns. This process is not meant to solve every problem in the City or prescribe a specific
strategy for every issue; however, it will help the City set and prioritize policies and projects as
well as inform the overall term decision-making process for the City. The planning process for
this update will involve public meetings, workshops, and the review of all plan components,
which will require involvement from the Planning Commission and the City Council.
City Planner Streff reported that the majority of the work on the 2040 Comprehensive Plan
would need to be completed by April of 2018, in order to provide a six-month review period by
adjacent and affected jurisdictions before the December 2018 submittal deadline. Staff has
provided a general draft timeline that outlines the work to be completed in each of the following
years.
• 2016 o Define scope of work for professional services
o Consider and approve professional services contract
o Define and implement the public engagement strategy
ARDEN HILLS CITY COUNCIL WORK SESSION – MAY 16, 2016 2
o Organize, define, and prepare data
o Review the City’s vision
• 2017 o Develop draft Comprehensive Plan
o Determine implementation strategies
• 2018 o Seek approvals and finalize the Plan
o Adjacent governmental review
o Submit to the Metropolitan Council
City Planner Streff stated that the 2040 Comprehensive Planning process is scheduled to begin
in the summer of 2016, with work continuing through 2018. City staff will be very involved with
all aspects of the 2018 update and will draft many of the Plan’s components. However, consultant
services will still be required for the more technical components of the Plan such as protected
resources, transportation, resiliency, and infrastructure planning.
City Planner Streff indicated that City staff has completed preliminary research on the cost to
contract professional services to assist in the Comprehensive Plan update and has found that these
services could range from $80,000 - $150,000, depending on the defined scope of services and the
elements of the Plan that can be completed in-house. The work is expected to include updates to
specific technical plan elements, helping plan and implement a public engagement strategy, and
providing general project management services to ensure the update is completed on schedule and
complies with Metropolitan Council requirements. At this time, the City is not eligible for grant
funding for planning assistance through the Metropolitan Council and staff is not aware of any
other funding sources for 2016. The City has budgeted $20,000 for professional services in the
Community Development Department budget for 2016. Staff is expecting the majority of the
additional consultant costs needed to complete the update to be paid out during 2017.
City Planner Streff reported that for the 2008 Comprehensive Plan update, the City approved
two consultant contracts to assist with the planning process. The City contracted with HKGi for
professional planning services to prepare most of the components within the Plan. For
transportation related components, the City contracted with Bolton & Menk. Between the two
contracts, the City spent approximately $55,000 for the services provided. However, the City did
receive two grants that totaled $44,193.80 to help offset these costs. The City received an Active
Community Living Grant from Blue Cross Blue Shield of Minnesota in the amount of $24,193.80
to incorporate active living principals into the Plan. A grant from the Metropolitan Council was
also received in the amount of $20,000 for planning assistance. Staff is recommending the
following next steps for work on the 2040 Comprehensive Plan:
1. Staff reviews the Metropolitan Council submittal requirements and prepares a scope of
work for professional services. Staff expects consultant services to include at a minimum
the following:
a) Updates to specific technical plan elements
b) Community engagement planning and implementation
c) General project management services
2. Staff drafts RFP based on the defined scope of work.
3. City Council approves resolution to release RFP.
4. Staff reviews submittals and prepares a summary memo for City Council consideration.
ARDEN HILLS CITY COUNCIL WORK SESSION – MAY 16, 2016 3
5. City Council selects a consultant and awards the contract.
Councilmember Holden asked if staff would be applying for any grants.
City Planner Streff explained there were no grants available to the City of Arden Hills. He
indicated staff would continue to monitor the grants available.
Councilmember Holmes understood the Comprehensive Plan Update was a requirement.
However, she believed the Comp Plan was a huge waste of staff time and resources. She
supported only the minimum amount of staff time and consultants being used for the update.
Councilmember McClung and Councilmember Holden agreed especially given the level of
changes that would be coming to the City as TCAAP develops.
City Planner Streff commented that because the City has made many adjustments to the Comp
Plan for TCAAP, less work would be required in the end.
Community Development Director Hutmacher discussed the budgeting process for the Comp
Plan. She explained that staff would do as much of the text changes in house as possible, but
understood that parts of the Comp Plan would require assistance. She indicated staff would begin
a scope of work and would request proposals. Staff would report back to the Council at a future
work session meeting.
Page 1 of 1
DATE: July 25, 2016
TO: Honorable Mayor and City Councilmembers
FROM: Sue Iverson, Interim City Administrator/Finance & Admin Services Director
John Anderson, Acting Public Works Director
SUBJECT: Kimley-Horn Master Plan Contract Completion
Discussion
The Kimley-Horn Master Plan contract was approved by the City Council on April 29, 2013.
The Council discussed this contract at its December 21, 2015, work session as Kimley-Horn was
requesting final payment on the contract in the amount of $5,650.28. At that time, the contract
had three primary components which had been satisfactory completed. Some of the
subcomponents had not been completed and the direction from the City Council was to have the
final two items completed before the final payment was made.
Attached are the invoice from Kimley-Horn, final two subcomponents, and a memo from Stacie
Kvilvang addressing these items.
Requested Action
Staff would like direction from the City Council as to whether the requirements have been met
and final payment can be made.
Attachment A: Invoice 6946329 from Kimley-Horn
Attachment B: TCAAP Maintenance Matrix
Attachment C: Annual Infrastructure Operating Costs
Attachment D: Memo from Stacie Kvilvang dated July 25, 2016
AGENDA ITEM – 1B
MEMORANDUM
CITY OF ARDEN HILLS Invoice No: 6946329
ATTN:MS. JILL HUTMACHER Invoice Date:
1245 WEST HIGHWAY 96 Invoice Amount: $5,650.28
ARDEN HILLS, MN 55112
Project No: 160593006.3
Project Name: TCAAP
Project Manager: SMALKOSKI, BRIAN
PLEASE REMIT TO:
KIMLEY-HORN AND ASSOCIATES, INC
P.O. BOX 75557
BALTIMORE, MD 21275-5557
For Services Rendered through Jul 31, 2015
Federal Tax Id: 56-0885615
COST PLUS MAX
Est Contract Amount Billed Previous Amount Current Amount
Value to Date Billed Due
AUAR 97,370.00 121,461.75 121,461.75 0.00
MASTER PLAN 215,140.00 219,148.37 219,148.37 0.00
REGULATIONS & POLICIES 92,720.00 94,732.75 89,405.25 5,327.50
EXPENSES 9,000.00 6,664.47 6,664.47 0.00
ALLOCATION 11,774.00 14,189.08 13,866.30 322.78
ADJUSTMENT FOR CONTRACT MAX 0.00
Subtotal 426,004.00 426,004.00 420,353.72 5,650.28
TOTAL COST PLUS MAX 5,650.28
$5,650.28
If you have any questions or concerns regarding this invoice, please call (651) 645-4197
Invoice for Professional Services
Description
Total Invoice:
July 31, 2015
CITY OF ARDEN HILLS
ATTN: MS. JILL HUTMACHER
1245 WEST HIGHWAY 96
ARDEN HILLS, MN 55112
Invoice No: 6946329
Invoice Date: Jul 31, 2015
Project No: 160593006.3
Project Name: TCAAP
Project Manager: SMALKOSKI, BRIAN
COST PLUS MAX 004020160593006.32086573160593006.3CPTG-2GCPM
Task Category Description/Name Hrs/Qty Rate
Current Amount
Due
MASTER PLAN GRADUATE ENG/PLANNER ERWIN, STEPHANIE 6.0 100.00 600.00
SENIOR PROJECT MANAGER LAMB, MIKE 26.5 155.00 4,107.50
SMALKOSKI, BRIAN 4.0 155.00 620.00
TOTAL MASTER PLAN3G 36.5 5,327.50
ALLOCATION EXPENSES ALLOCATION 322.78
TOTAL ALLOCATION1G 322.78
TOTAL LABOR AND EXPENSE DETAIL 5,650.28
This page is for informational purposes only. Please pay amount shown on cover page.
23AO
TCAAP INFRASTRUCTURE MAINTENANCE MATRIX
JUNE 26, 2015
COUNTY CITY OTHERS
ROADWAY
SPINE ROAD
SNOW PLOWING X
REPAIR/MAINTENANCE X
FUTURE RECONSTRUCTION X
BRIDGE X
HIGHWAY 96 TRAFFIC SIGNAL X
FUTURE TRAFFIC SIGNALS X
THUMB ROAD
SNOW PLOWING X
REPAIR/MAINTENANCE X
FUTURE RECONSTRUCTION X
TRAILS
SPINE ROAD X
THUMB ROAD X
NATURAL RESOURCES CORRIDOR X
REGIONAL TRAIL X Maintenance by Ramsey County Parks.
LANDSCAPE
SPINE ROAD X
THUMB ROAD X
GATEWAYS X
TOWN CENTER X
ADDITIONAL SNOW REMOVAL X
GREEN CROSSINGS (ALONG SPINE ROAD)X
IRRIGATION (IF ANY)X
STREET LIGHTING
SPINE ROAD INTERSECTIONS X
SPINE ROAD PEDESTRIAN SCALE X X Pedestrian scale lighting could be maintained by City or private entity.
THUMB ROAD INTERSECTIONS X
THUMB ROAD PEDESTRIAN SCALE X X Pedestrian scale lighting could be maintained by City or private entity.
I-35W/COUNTY ROAD H BRIDGE X
COUNTY ROAD H (WEST OF I-35W)
SOUTHBOUND I-35W RAMP ROUNDABOUT X
HIGHWAY 10 INTERSECTION X
OFF ROAD TRAIL LIGHTING (IF ANY)
NATURAL RESOURCE CORRIDOR TRAIL No lighting proposed. Lighting could be provided in the future by adjacent roadway lighting.
REGIONAL TRAIL No lighting proposed.
STORM DRAINAGE
NATURAL RESOURCE CORRIDOR PONDS X County may have some cost responsibilities based on the County's cost participation policy.
NATURAL RESOURCE CORRIDOR WETLANDS X
TRUNK STORM SEWER AND MANHOLES X City to maintain per County policy.
LATERAL STORM SEWER AND MANHOLES X County to maintain per County policy.
SANITARY SEWER
TRUNK SANITARY SEWER AND MANHOLES X
LIFT STATION X
WATER SYSTEM
TRUNK WATER MAIN X
WATER TOWER X
BOOSTER STATION X
OTHER
TGRS SYSTEM/TREATMENT FACILITIES X
County will maintain for up to the first 5 years. City will assume maintenance responsibilities after
the required maintenance period.
Ownership and maintenance of the emergency water main connection under I-35W to the Mounds
View system needs to be resolved.
Maintained by the Army. Easements need to be established for this system since some of the
system falls outside of existing and proposed roadway and utility right-of-way/easements.
County will have jurisdiction for and provide all maintenance for the Thumb Road.
Maintenance of any landscape/streetscape amenities within the public right-of-way (above and
beyond typical street maintenance) will be the responsibility of a third party outside of County or
City maintenance forces.
City may have some operation/maintenance cost responsibilities based on the County's cost
participation policy.
City may have some operation/maintenance cost responsibilities based on the County's cost
participation policy.
MAINTENANCE RESPONSIBILITIES NOTESITEM
County will have jurisdiction for and provide all maintenance for the Spine Road. City may have
some operation/maintenance cost responsibilities for traffic signals based on the County's cost
participation policy.
TCAAP INFRASTRUCTURE
ARDEN HILLS MAINTENANCE/OPERATIONAL COSTS
JUNE 2016
INFRASTRUCTURE QUANTITY
MAINTENANCE/
OPERATIONAL TASK
MAINTENANCE/
OPERATIONAL INTERVAL
MAINTENANCE/
OPERATIONAL UNIT COST
ANNUALIZED MAINTENANCE/
OPERATIONAL COST ASSUMPTIONS
TRAILS
SPINE ROAD 17,000 LF
THUMB ROAD 4,500 LF
NATURAL RESOURCES CORRIDOR 7,000 LF
TOTAL 28,500 LF PLOWING ANNUAL $2,000/YEAR $2,400 8 SNOW EVENTS, 2 MILES/HOUR, $100 PER HOUR = $300 PER EVENT
CRACK SEALING EVERY 5 YEARS $0.50/LF OF TRAIL $14,250 $0.50/FOOT OF CRACK, 10 FEET OF CRACKS EVERY 10 FEET OF TRAIL = $0.50 PER TRAIL FOOT
REPLACEMENT EVERY 25 YEARS $10/LF OF TRAIL $11,400
ANNUAL TRAIL COST $28,050
STREET LIGHTING
SPINE ROAD PEDESTRIAN SCALE 60
THUMB ROAD PEDESTRIAN SCALE 20
TOTAL 80 MAINTENANCE/POWER MONTHLY $7.00/LIGHT $6,720 BASED ON XCEL ENERGY MONTHLY PRE-PAY RATES
REPLACEMENT EVERY 25 YEARS $5,000/LIGHT $16,000
ANNUAL LIGHTING COST $22,720
STORM DRAINAGE
NATURAL RESOURCE PONDS 15 PONDS MAINTENANCE ANNUAL $500/POND $7,500 MOWING, INSPECTION/DEBRIS REMOVAL, = $250/YEAR
SEDIMENT REMOVAL $10/CY - ASSUME 25 CY/YEAR = $250/YEAR
TRUNK STORM SEWER 15,000 LF MAINTENANCE ANNUAL $0.50/LF $7,500 CLEAN AND TELEVISE EVERY 10 YEARS - $5/LF = ANNUAL COST = $0.50/LF
ANNUAL STORM DRAINAGE COST $15,000
SANITARY SEWER
TRUNK SANITARY SEWER 10,500 LF MAINTENANCE ANNUAL $0.50/LF $5,250 CLEAN AND TELEVISE EVERY 10 YEARS - $5/LF = ANNUAL COST = $0.50/LF
LIFT STATION 1 MAINTENANCE ANNUAL $7,500 $7,500 ASSUMES MOTOR REPLACEMENT EVERY 10 YEARS, IMPELLER REPLACEMENTS 7 YEARS
(500 GPM, PEAK 1600 GPM)AND ANNUAL ELECTRICAL COST
MAJOR OVERHAUL EVERY 20 YEARS $75,000 $3,750 INCLUDES PUMP AND CONTROLS REPLACEMENT
ANNUAL SANITARY SEWER COST $16,500
WATER SYSTEM
TRUNK WATER MAIN 27,000 LF MAINTENANCE ANNUAL $0.10/LF $2,700 HYDRANT FLUSHING, VALVE MAINTENANCE, MINIMAL WATER MAIN BREAKS (NEW SYSTEM)
1.0 MG WATER TOWER 1 MAINTENANCE ANNUAL $10,000 $10,000 INCLUDES MAINTENANCE, ELECTRICAL POWER, AND ANNUAL INSPECTION
PAINTING EVERY 30 YEARS $650,000 $21,600
BOOSTER STATION 1 MAINTENANCE ANNUAL $5,000 $5,000 INCLUDES MAINTENANCE AND ELECTRICAL POWER
(12" Water Main)
MAJOR OVERHAUL EVERY 15 YEARS $50,000 $3,300 INCLUDES PUMP REPLACEMENT
ANNUAL WATER SYSTEM COST $42,600
Item Annual Cost
Spine Road Trails
Thumb Road Trails
Natural Resouces Corridor Trails
Spine Road Pedestrian Scale
thumb Road Pedestrian Scale
Natural Resources Corridor Ponds 7,500$
TOTAL 58,270$
28,050$
22,720$
Enhanced Improvement Costs
Memo
To: Sue Iverson – Interim City Administrator
From: Stacie Kvilvang, Ehlers
Date: July 25, 2016
Subject: Maintenance Costs of TCAAP Infrastructure
As part of their master planning contract, Kimley-Horn was to provide a matrix of
responsible entities for the maintenance of infrastructure within TCAAP and an estimate
of the annual costs the City would be responsible for.
In review of the matrix provided, the maintenance requirements can be broken down
into two (2) categories:
1. Standard Improvement City Costs which are typical maintenance costs any city
expects to pay through their various utility funds as part of development (i.e.
trunk utility maintenance, lift and booster stations and water tower); and
2. Enhanced Improvement costs which are maintenance costs that may or may not
be paid by the city (trails, lighting, plantings)
For purposes of this memo, I am going to concentrate on the costs in #2 above since
those are costs that a city may or may not expect to pay.
As noted in the Matrix provided by Kimley-Horn, it was noted that the City would likely
have the following annual financial responsibilities:
It should be noted that they did not include costs associated with the landscaping in the
spine and thumb roads and gateways (stated to be completed by outside 3rd party). As
Sue Iverson
Maintenance Costs of TCAAP Infrastructure
July 25, 2016
Page 2
the Council is aware, it was assumed that the City would be responsible for the
landscaping costs in accordance with the County’s road maintenance policy.
As we have discussed previously, there are options available to the City to have
benefitting property owners pay the costs outlined in the chart as well as the
landscaping costs mentioned above. These options include creation of Special Service
Districts for the commercial areas and maintenance agreements with the various home
owners associations. City Staff, with the support of County Staff have included these
concepts as deal points to be negotiated as part of the Master Development Agreement.
In discussions with the master developer team, they generally agree to the principles of
the concepts because they want to assure that the quality of the improvements and
infrastructure that is installed is maintained to high standards for a long period of time.
Staff will keep the Council informed as negotiations begin and progress regarding the
development of TCAAP.
Please contact me at 651-697-8506 with any questions.