Loading...
HomeMy WebLinkAbout03-20-17-Joint WSAGENDA ITEMS North Heights Lutheran And Lyngblomsten Concept Review Eric Zweber, Interim City Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF Higher Education Study Eric Zweber, Interim City Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF 2040 Comprehensive Plan Matthew Bachler, Senior Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF Highway 10 And County Road 96 Intersection Sue Polka, Public Works Director/City Engineer MEMO.PDF Dump Truck Purchase Sue Polka, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor: David Grant Councilmembers: Dave McClung Brenda Holden Fran Holmes Steve Scott      City Council Work Session Joint Meeting with Planning Commission Agenda  March 20, 2017 5:00 p.m. City Hall Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651 -792 -7800 Website : www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. CALL TO ORDER 1. 1.A. Documents: 1.B. Documents: 1.C. Documents: 1.D. Documents: 1.E. Documents: 2. AGENDA ITEMSNorth Heights Lutheran And Lyngblomsten Concept ReviewEric Zweber, Interim City Planner MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFHigher Education StudyEric Zweber, Interim City Planner MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFATTACHMENT F.PDF2040 Comprehensive PlanMatthew Bachler, Senior Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF Highway 10 And County Road 96 Intersection Sue Polka, Public Works Director/City Engineer MEMO.PDF Dump Truck Purchase Sue Polka, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor:David Grant Councilmembers:Dave McClungBrenda Holden Fran HolmesSteve Scott     City Council Work Session Joint Meeting withPlanning CommissionAgenda March 20, 20175:00 p.m. City Hall Address:1245 W Highway 96 Arden Hills MN 55112 Phone:651 -792 -7800 Website : www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.CALL TO ORDER1.1.A.Documents:1.B.Documents:1.C. Documents: 1.D. Documents: 1.E. Documents: 2. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-009 - Lyngblomsten & North Heights Lutheran - Concept Review\Memos_Reports_17-009\CC Memo (03-20-17)_17-009.docx Page 1 of 4 Requested Action Lyngblomsten has requested a Concept Plan Review for a proposed senior housing project on the south end of the North Heights Lutheran Church property. The applicant is seeking feedback from the City Council on the concept. Concept Review Process The concept review process is an opportunity for the City Council to provide comments, questions, and concerns regarding proposed developments. A concept review is considered advisory and is nonbinding to the City and applicant (Section 1320.14 Subd 4 of the Zoning Code). No formal action can be taken at a work session. A formal application will be subject to the full review process, including a public hearing with Planning Commission and City Council review. Background The North Heights Lutheran Church owns a 41 acre site located on the south side of Highway 96 and directly to the east of US Highway 10 with an address of 1700 West Highway 96. The chapel of the church is located roughly in the center of the property and an education wing is extending from the south side of the chapel. The chapel of the North Heights Lutheran Church was constructed in 1986 and the educational wing was constructed in 1998. There is parking constructed to the north of the chapel and to the east of the chapel and educational wing. The remaining portions of the site are wooded or contain wetlands and/or stormwater infrastructure. AGENDA ITEM – 1A MEMORANDUM DATE: March 20, 2017 TO: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator FROM: Eric Zweber, Interim City Planner SUBECT: Lyngblomsten Senior Housing Rezoning, Planned Unit Development, and Plat _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-009 - Lyngblomsten & North Heights Lutheran - Concept Review\Memos_Reports_17-009\CC Memo (03-20-17)_17-009.docx Page 2 of 4 The main access to the site is from Highway 96 across from where the former Twin Cities Army Ammunition Plant (TCAAP) spine road will be constructed and a second access onto Snelling Avenue is located in the northeast corner of the site. Currently, the North Heights and Snelling Avenue intersections with County Road 96 are both unsignalized but the North Heights intersection is planned to become signalized with the construction of the TCAAP spine road. The majority of the North Heights Lutheran Church property is zoned R-1 – Single Family Residential with the 6 acres of the property at the US Hwy 10 and CSAH 96 interchange being zoned B-1 – Limited Business. The property is guided for P/I – Public & Institutional in the Comprehensive Plan. The former TCAAP redevelopment is planned to the north of the North Heights site; there are existing single family neighborhoods to the east and west across US Highway 10; and the Royal Hills Park is located directly to the south. North Heights Lutheran Church Properties to the North Properties to the South Properties to the East Properties to the West Zoning R-1 and B-1 TRC – Flex Office and TRC – Retail Mixed Use Parks and Open Space District R-1 R-1 Comprehensive Plan Land Use Public & Institutional Flex Office and Retail Mixed Use (TCAAP) Parks and Open Space Very Low Density Residential and Low Density Residential Low Density Residential Discussion Lyngblomsten is considering purchasing the southern six plus (6+) acres of North Heights Lutheran Church property for the construction of up to 200 units of senior housing comprised of a full continuum for care from independent living, assisted living and memory/enhanced/skilled nursing care. The building would also be occupied by 2nd Half with Lyngblomsten staff which provides off-site services for individuals whom wish to continue living in their existing homes. This area is currently wooded with a stormwater pond in the middle of the site and small wetlands on the northern and southern edges of the site. The senior housing is proposed to be constructed on the western portion of the new site and be located to the south of the education wing and the southwest of the existing parking lot. The building is proposed to be four stories with a pitched gable roof and will be divided into four portions for the different stages of living. The center portion of the building will be “town center” in which the main entrance and common areas such as dining, cinema, chapel, fitness _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-009 - Lyngblomsten & North Heights Lutheran - Concept Review\Memos_Reports_17-009\CC Memo (03-20-17)_17-009.docx Page 3 of 4 center and gift shop are located. To the north of the town center would be the independent living and to the south would be the assisted living and then the skilled nursing. Parking is proposed to include underground parking stalls for all of the independent living units and 58 surface stalls for guests and employees. Lyngblomsten expects to have 100 employees with approximately 35 staff members (including the 2nd Half with Lyngblomsten staff) at its largest shift. If all of their employees drive to the site, then there would be only 23 parking stalls available for guests. The primary access to the site is proposed from Snelling Avenue and a secondary access would come from a connection to the North Heights’ parking lots and their internal circulation and accesses. The Lyngblomsten access onto Snelling Avenue will be located about 1,000 feet south of the North Heights’ Snelling Avenue access. The North Heights’ Snelling Avenue access is signed to prohibit right turns to limit traffic through the residential neighborhood between Snelling and Hamline Avenues. The Lyngblomsten plans would require six different requests: • Comprehensive Plan Amendment from P/I – Public & Institutional to HDR - High Density Residential • Rezoning from R-1- Single Family Residential District to R-4 – Multiple Dwelling District • Conditional Use Permit for a Nursing Home and Assisted Living Use • Planned Unit Development for Performance Standards Increases (at least height and density) • Preliminary Plat • Final Plat Below is a table of the R-4 – Multiple Dwelling District performance standards and which standards would likely be exceeded. R-4 Standards Lyngblomsten Request Minimum Lot Area per Dwelling Unit 3,630 sq. ft. / d.u. About 1,500 sq. ft. / d.u. Maximum Height 35 feet Between 50 and 60 feet Maximum Floor Area Ratio 0.3 Unable to Determine Maximum Lot Coverage by Structures 25% Unable to Determine Minimum Landscape Lot Area 65% Seems to be Deficient Maximum PUD Density 12 d.u. / net acre More than 30 d.u. / net acre Minimum Principle Building Setback Front Yard 40 feet Complies Rear Yard 30 feet Seems to Comply Side Yard 15 feet total Seems to Comply _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-009 - Lyngblomsten & North Heights Lutheran - Concept Review\Memos_Reports_17-009\CC Memo (03-20-17)_17-009.docx Page 4 of 4 Requested Action Lyngblomsten has requested a Concept Plan Review for a proposed senior housing project on the southern six plus (6+) acres of the North Heights Lutheran Church property. The applicant is seeking feedback from the City Council on the concept. Attachments A. Land Use Application B. Project Narrative C. Preliminary Development Plans and Renderings Page 1 of 3 1245 West Highway 96 Arden Hills, Minnesota 55112 Telephone (651) 792-7800 Fax (651) 634-5137 www.cityofardenhills.org For Office Use Only Planning Case No. 17- Submittal Date Application Completed Date Accepted by Receipt Number Council Decision Council Decision Date 2017 LAND USE APPLICATION Applicant Information Applicant: Address: Telephone No.: Other: Fax No.: Email Address: Property Information Property Owner: Owner Address: Owner Telephone No. Other: Address of Property Involved: Legal Description: Property ID No.: Type of Use: Zone: Property Acreage: Type of Request ‰Comprehensive Plan Amendment (Fee: $500 + Escrow: $1,000) ‰Conditional Use or Interim Use Permit/CUP or IUP Amendment (Fee: $350 + Escrow: $1,000) ‰Preliminary Plat (Fee: $500 + Escrow: $1,000) ‰Final Plat (Fee: $500 + Escrow: $1,000) ‰Concept Plan Review (Fee: $150 + Escrow: $1,000) ‰Master Planned Unit Development (Fee: $350 + Escrow: $1,000) ‰Final Planned Unit Development (Fee: $350 + Escrow: $1,000) ‰Planned Unit Development Amendment (Fee: $350 + Escrow:$1,000) ‰Site Plan Review (Fee: $350 + Escrow: $1,000) ‰Rezoning or TCAAP Regulating Plan Amendment(Fee: $350 + Escrow: $1,000) ‰Zoning Code or TCAAP Redevelopment CodeAmendment (Fee: $350 + Escrow: $1,000) ‰City Code Amendment (Fee: $350 + Escrow:$1,000) ‰Lot Split/Minor Subdivision (R-1 and R-2 Districts Only) (Fee: $350 + Escrow: $1,000)‰Variance or Permitted Adjustment (Fee: $350 +Escrow: $1,000) ‰Vacation of Easement or Right-of-Way (Fee: $150 +Escrow: $1,000) ‰Appeal of Administrative Decision (Fee: $150 +Escrow: $1,000) ‰Land Use Requests – Not Already Specified (Fee:$150 + Escrow: $1,000 Page 2 of 3 Brief Description of Request (please also include a typed, detailed letter explaining the project): Filing & Information Requirements The City requests that you make a pre-application meeting with the City Planner to discuss the application process, requirements, and deadlines. Unless waived by the City Planner or Planning Commission, a certified survey of the property is required for all applications. A checklist with additional application requirements can be found at www.cityofardenhills.org/landuseapplications. Complete/Incomplete Applications An incomplete application will delay the processing of land use requests. The application ap proval time commences and an application is considered officially filed when the City Planner has received and examined the application and determined that the application is complete. A decision on whether the application is complete or incomplete shall be made within fifteen (15) working days following the submittal of the application. When the application is deemed to be “complete” it shall be placed on the agenda of the first possible Planning Commission meeting provided that all required public notices have been sent and published. Payment of Fees and Escrows The undersigned acknowledges that she/he understands that before a land use application can be deemed complete, all required fees and escrows must be paid to the City. Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow may include planning and engineering staff time, City Attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20 percent of its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The City may withhold final action on a land use application, withhold building permits, and/or rescind prior action until all fees have been paid. Unused portions of an escrow are returned to the applicant upon successful implementation of an approved plan. The escrow may be reduced or increased by the City Planner on a project by project basis. Notice of Meeting Attendance In order for the Planning Commission and the City Council to consider any application, the applicant or a designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the next available agenda. *IMPORTANT* • Certain applications are subject to review and approval by the Rice Creek Watershed District. Contact RCWD directly at 763-398-3070 for additional information. • The land use application fees do not cover building, sign, or other permit fees that may be required upon approval of a land use application. • All applications will be subject to additional fees for reimbursement of consultant costs associated with filing, reviewing, and processing of application in the form of an escrow to the City. Page 3 of 3 Agenda Deadline and Meeting Schedule The deadline for submittal of land use applications is required according to the schedule outlined below. There are no exceptions. Failure to submit all application materials by the deadline date may delay the review process. Planning Commission meetings are typically held on the first Wednesday after the first Monday of each month at 6:30 PM, though please contact City Hall to verify the meeting date and time. City Council meetings are held typically the last Monday of the same month at 7:00 PM. Meetings are held in the Council Chambers at the City of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. Applicants are advised that additional meetings and/or workshops are scheduled when necessary upon approval of the Planning Commission. 2017 SCHEDULE (*subject to change) APPLICATION DEADLINE DATE* TENTATIVE PLANNING COMMISSION MEETING DATE* (Generally held on the first Wednesday after the first Monday at 6:30 p.m.) TENTATIVE CITY COUNCIL MEETING DATE* (Generally held on the fourth Monday at 7:00 p.m.) December 5 (2016) January 4 January 23 January 3 February 8 February 27 February 6 March 8 March 27 March 6 April 5 April 24 April 3 May 3 May 22 May 1 June 7 June 26 June 5 July 5 July 24 July 3 August 9 August 28 August 7 September 6 September 25 September 5 October 4 October 23 October 2 November 8 November 27 November 6 December 6 December 26 December 4 January 3 (2018) January 22 (2018) Acknowledgement and Signature I acknowledge that I have read all of the information listed in the City of Arden Hills Land Use Application and fully understand that I am responsible for all costs incurred by the City related to the processing of this application. __________________________________________________ ________________ Property Owner Signature (Required) Date ________________________________________________ ________________ Applicant Signature (If different than the property owner) Date Please contact the City Planner at 651-792-7800 if you have any questions regarding this application. Additional copies of this application form are available on the City’s website: www.cityofardenhills.org/landuseapplications City of Arden Hills  1245 West Highway 96  Arden Hills, MN  55112-5743 _________________________________________________________________________________________________________________________________________________________________________________________ Phone 651-792-7800  Fax 651.634.5137  www.cityofardenhills.org Escrow Account Set Up Form Date: _______________________ Site Address: __________________________________________________________________ Deposit made by: _______________________________________________________________ Amount: $___________________ Address to send statements: _______________________________________________________ Contact Person: ________________________________________________________________ Telephone No.: ____________________ Email Address: ____________________________ Purpose of Escrow Account: ______________________________________________________ ______________________________________________________________________________ Arden Hills Finance Department policy requires that escrow deposits be held for six months once a permit has been closed in order to ensure all costs associated with the project have been covered. Please note: Land Use Applications may be required to maintain a minimum balance as established by the City, and will require replenishment when balances fall below the minimum balance. I acknowledge that I have read this policy and fully understand that any remaining escrow balance will be released after a six-month waiting period. ___________________________________ __________________ Applicant Signature Date Office Use Only Staff Name: _______________________________ Department: ________________________ Type of Escrow: … Landscaping … Grading & Erosion (PW#______________) … Site Improvements (PW#______________) … Security Deposit – Do Not Charge … Land Use Application (PC#____________) … Temporary Certificate of Occupancy … Other: _____________________________ Additional Notes: _______________________________________________________________ ______________________________________________________________________________ The Site: The property is nestled in the southeast quadrant at Highway 96 and Highway 10 in Arden Hills, Minnesota. Situated on the northern portion of the property is the sanctuary, education wing, and parking lots for the congregation of North Heights Lutheran Church. Several acres of undeveloped land are at the southern edge of the property. This land has varied terrain and a fair amount of mature tree coverage. Royal Hills Park borders the southern property boundary and was deeded to the City by Northern Heights. Round Lake is visible across Highway 10. The faith community of St. Katherine Orthodox Church borders much of the western edge of the property. The inactive Twin Cities Army Ammunition Plant (TCAAP) site to the north of Highway 96 is slated for a mixed-use development in the coming years. Lyngblomsten proposes to purchase approximately 6.24 acres on the southern portion of the property owned by North Heights Lutheran Church located at 1700 West Highway 96 in Arden Hills, Minnesota, for the purpose of developing a senior living community. The vision is to create a vibrant continuum-of-care campus offering up to a total of 200 units comprised of a mix of independent living, assisted living, and memory care/enhanced care suites/skill nursing care plus complementary campus amenities. The Project: In alignment with the mission of Lyngblomsten and the demand for more senior housing in the area, Lyngblomsten seeks to create a second campus offering a full continuum of services for older adults. The majority of units would be independent and assisted living for those age 62+. The market-rate units are planned to be mid-range in price, amenities, and size (variety of 1- and 2- bedroom units), with a goal of serving people from a variety of income levels. Overall, like we’ve done on our Como Park campus (St. Paul), Lyngblomsten seeks to create a comfortable Christian home for older adults of all faiths and cultures that is welcoming, creates community, values individual preferences, and promotes dignity. Not only will this development address the shortage of senior housing in the area, but for those wishing to continue living in their existing homes, services through 2nd Half with Lyngblomsten that would be part of the Arden Hills campus can help support their decision to remain and their needs associated with that decision. The preliminary plan for the site positions the building south of the North Heights education wing and parking lots. Underground parking spaces would be provided to accommodate the parking needs of the residents in the independent living units. Parking for guests and staff would be provided via a new surface lot, positioned between the building and Snelling Avenue. Most likely a landscaped retention pond would be created to manage water drainage, although other options are also being explored. Vehicular access to the property would be from a new entrance on Snelling Avenue. The building plan does not physically connect the Lyngblomsten building with the North Heights buildings. However, we anticipate a sidewalk or pathway between the two properties so that Lyngblomsten residents and North Heights congregants will have access for use of common spaces or participation in activities as agreed upon by both parties. The proposed development is anticipated to provide: • A four-story, continuum-of-care building that includes a Life Enrichment Center (2nd Half with Lyngblomsten), Independent Senior Housing, Assisted Living, Memory Care, Short- term Transitional Care, and Enhanced Care Suites or Long-Term Skilled Nursing Care. The apartments would be a combination of one- and two-bedroom units. • Courtyards and balconies will afford fresh air, nice views, and enjoyment of the outdoors • Main floor town center offering amenities such as bistro style or fine dining, a pub, a cinema, a chapel, a fitness center and a gift shop. • Planned events and activities, including concerts with professional local musicians • Heated underground parking for tenants • Surface-level parking lot for visitors and staff • Vehicular entrance from Snelling Avenue • Professionally landscaped grounds; outdoor spaces for tenants and visitors to enjoy • Possible shuttle service to Lyngblomsten’s Como Park campus for additional amenities— concerts, art classes, etc. • Sidewalk for pedestrian passage between Lyngblomsten campus and North Heights campus • Pathway around the building for emergency vehicle access when needed but designed for daily use as a walking path by both Lyngblomsten tenants and North Heights congregants • Professional on-site management and service coordination staff We have attached to this narrative a concept drawing, a site plan, as well as a photo of our current market-rate independent (with services) senior apartments (The Heritage at Lyngblomsten) in St.Paul. The plans show the proposed parcel, boundaries, and preliminary site plan. Lyngblomsten will use quality materials to produce a solid structure that is timeless in appearance and complements the natural beauty of the site. It will be built to last and be well maintained as Lyngblomsten plans to own and manage the property in perpetuity. Project Timeline: Due Diligence Completed 01/31/2018 Close on Land Acquisition 04/01/2018 Construction Commencement 04/01/2018 Construction Completion 07/01/2019 About Lyngblomsten: Lyngblomsten is a Christian nonprofit social ministry organization serving older adults and their families through healthcare, housing, and community-based services. Partnered in ministry with more than two dozen Christian congregations across the Twin Cities of Minneapolis and Saint Paul, Lyngblomsten provides a continuum of care to meet the needs of adults as they travel the later years of their life’s journey. Our services nurture the whole person—body, mind, and spirit. For more than a century, Lyngblomsten has been caring for the elderly and providing support for their loved ones while engaging the hearts of generous volunteers and donors who help carry out our mission: Influenced by Christ, Lyngblomsten provides a ministry of compassionate care and innovative services to older adults in order to preserve and enhance their quality of life. Our first building opened in 1912 on the same property from where we serve today at Midway Parkway and Pascal Street (referred to as our Como Park campus), 7¾ miles from North Heights’ Arden Hills campus. We are rooted deeply in the Saint Paul community and expect to be so for at least another century. The women who dreamed of Lyngblomsten and incorporated in 1906 set out to build a Christian home for the elderly. Today we still honor that vision and additionally offer a robust continuum of care to help older adults receive the services they need while staying close to the communities and congregations they love. We embrace the whole person and strive to provide as much independence and access to options as possible, with a goal of promoting dignity and purpose. While we believe that our early predecessors engaged area churches in their endeavor to create a Christian home for the elderly, we know that a formal partnership with area congregations was created in 1960 when Lyngblomsten gifted the organization to what is now the Evangelical Lutheran Church in America, and area congregations were invited to become members of Lyngblomsten. North Heights became a member congregation in 1975 and remains active as one of our 27 member churches. Over the years, in addition to members of North Heights serving on the boards of directors for Lyngblomsten and serving as delegates for North Heights, Lyngblomsten has enjoyed hosting many events at North Heights’ beautiful Arden Hills facilities. In addition to the formal member partnerships with churches, Lyngblomsten also collaborates with area congregations to support ministry to, with, and for older adults. Today this is accomplished primarily through 2nd Half with Lyngblomsten, supporting the ministries of congregations and enriching the lives of older adults through a variety of caregiver services, memory loss respite care, coaching, training (such as older adult ministry forums and congregational care volunteers via Care Team Ministry), and leading/sponsoring the Parish Nurse Ministry Resource Group. These services in collaboration with St. Paul area congregations have been a hallmark of Lyngblomsten for two decades. As we look to the future, Lyngblomsten’s goal is to develop a second campus that will become a vital part of the Arden Hills community. Just like our century-old Como Park campus, the development will remain Lyngblomsten owned and managed for generations to come. 2 _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 1 of 11 Requested Action Review the Bethel University and University of Northwestern Campus Master Plans; and the current commercial and industrial zones’ purposes and uses. Background On October 10, 2016, the City Council adopted Ordinance No. 2016-008 An Interim Ordinance Temporarily Prohibiting Land Use Applications and Reviews for Higher Education Uses in Residential, Business, Industrial and Other Zones (moratorium, Attachment A). The moratorium can last up to one year to prepare a study to determine the impacts and benefits from higher education land uses and provide recommendations for possible Zoning Code and/or Comprehensive Plan amendments regarding higher education uses. On February 13, 2017, the City Council approved a proposal from WSB and Associates to complete a study focusing on the economic impact of higher education uses within the commercial and employment zones The study is comprised of seven components:  Background gathering and analysis of the existing Campus Master Plans for the University of Northwestern and Bethel University.  Analysis of the Commercial and Employment Uses currently allowed in the various Commercial and Industrial Zones.  Analysis of the Employment and Economic Activity that results from the allowed Commercial and Employment Uses.  The regulation of Higher Education Uses within other communities.  Analysis of existing parcels and buildings within the Commercial and Industrial zones.  Preparation of a Final Report.  Zoning Code and Comprehensive Plan Amendments based on the Report’s recommendations. AGENDA ITEM – 1B MEMORANDUM DATE: March 20, 2017 TO: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator FROM: Eric Zweber, Interim City Planner SUBECT: Planning Case #17-006: Higher Education Moratorium Study _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 2 of 11 Eric Zweber, WSB Senior Planner and Arden Hills Interim City Planner, will be leading the study efforts with the Planning Commission with assistance from Hannah Rybak, WSB Planner and Arden Hills Interim Planner. The Economic Development Commission will also provide assistance on the study. On March 8, 2017, the Planning Commission reviewed the first two subjects of the study: background of the existing Campus Master Plans for the Bethel University and University of Northwestern; and the analysis of the Commercial and Employment Uses currently allowed in the various Commercial and Industrial Zones. Bethel University and University of Northwestern Campus Master Plans Arden Hills has approved a Campus Master Plan (CMP) for Bethel University in 2012 (Attachment B) and a CMP for the University of Northwestern in 2007 (Attachment C). Both CMPs show opportunities for additional buildings and classrooms on the respective campuses, but both universities have requested the development of higher educational facilities off of their campuses. Bethel has classrooms and administrative offices at the Anderson Center located at 2 Pine Tree Drive, formerly occupied by Country Financial. In October 2016, Northwestern submitted an application to convert the former Smiths Medical buildings at Grey Fox Road and Snelling Avenue into a STEM (science, technology, engineering and math) facility. The Planning Commission and the City Council have both questioned why the colleges are looking for facilities off of their campuses when their CMPs show that they can build facilities on campus. To help answer that question, Arden Hills staff has interviewed the President of Northwestern and the President and other staff from Bethel. A summary of their responses are described below. Priorities To understand the universities’ future plans, staff asked for each board’s top priorities. TOP PROIRTIES BETHEL UNIVERSITY UNIVERSITY OF NORTHWESTERN Raise $150,000,000 Fulfill Their Mission Increase Use of the Anderson Center by Adding Health Care Programs Enrollment Growth to 7,000 Students Build the Endowment Add Programs Grow College of Adult and Professional Studies to 4,000 Students Additional Resources and Money The priorities for both universities include growing enrollment which will require additional facilities. To build additional facilities, they both will need to raise significant resources and funds. Bethel stated that they can accommodate their growth expectations through new buildings on their campus and the expansion of the Anderson Center. However, they did state that they _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 3 of 11 would like to be able to pursue opportunities for building new or acquiring existing buildings off of their campus as well. Northwestern stated they cannot meet their growth expectations on their current campus. Northwestern is looking for sites in Arden Hills, Roseville or Shoreview to build additional facilities which would be designed for adult and graduate students and would not include student housing. Costs During the Planning Commission’s review of the application from Northwestern regarding the Smiths Medical property on November 9, 2016, the President of Northwestern stated that it would cost about $150 per square foot to renovate the Smiths Medical buildings into a STEM facility while new construction would be closer to $400 per square foot. Staff at Bethel noted similar experiences with the cost savings associated with renovation versus new construction. Both universities stated that the cost savings outweighs the separation for their existing campus, particularly if they intend to use the facilities for adult or graduate courses in which the students typically would not live on campus. End of the Joint Engineering Program with the University of Minnesota The University of Minnesota recently ended its 3-2 engineering program with all of its partner colleges and universities. The 3-2 program allowed students to attend three years of college at their first college or university (including Bethel and Northwestern) and then transfer to the University of Minnesota for the final two years of the engineering program. The University of Minnesota has terminated these agreements, but has agreed to honor any students that have started the program before the agreement expired. This means that Bethel and Northwestern will need to have their own junior and senior level engineering programs established by Fall 2018. The President of Northwestern stated that the university will need to find a temporary facility by May 2018 and a permanent facility to house the engineering program by Fall 2019. Increasing Student Enrollment through Technology and Graduate Programs Bethel has a total of 4,267 students, of which 1,153 are graduate level. Northwestern has a total 3,231 students, of which 213 are graduate level. Bethel plans on increasing the Continuing Adult and Professional Programs enrollment to 4,000 students. Northwestern plans on growing their total enrollment to 7,000 students while they have room for only about 2,500 full time traditional students on campus. Both universities plan on adding enrollment through increasing the number of programs that they offer. These new programs are expected to include a significant amount of online instruction. In addition to the mathematic, science, and engineering courses, Bethel plans on adding physical therapy, occupational therapy, athletic training and doctorate of nursing programs at the Anderson Center within the next five years. Northwestern plans on adding bachelor of science in data analytics, master of biology, master of data analytics, master of nursing, engineering, _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 4 of 11 physical therapy, occupational therapy, physician’s assistant and nurse practitioner programs and hopes to eventually have a medical college. Northwestern does not currently have facilities for these new programs and there is not enough room to accommodate all of the new programs on their campus. CURRENT STUDENT POPULATION BETHEL UNIVERSITY UNIVERSITY OF NORTHWESTERN POST SECONDARY 21 1,290 TRADITIONAL UNDERGRADUATE 2,548 1,556 ADULT UNDERGRADUATE 172 GRADUATE 1,153 213 SEMINARY 545 N/A TOTAL 4,267 3,231 Due to the desire of both universities to grow their programs and enrollment, and the cost savings from converting existing building into higher education facilities, Arden Hills should continue to expect requests from both Bethel and Northwestern to expand their facilities into the existing business and industrial zones. Commercial and Industrial Zones For the purposes of this study, all applicable land uses within the City were assigned a North American Industry Classification System (NAICS) code. The NAICS is used by businesses and governments throughout North America, and is also used for industry information in the United States Census. It is being used for this study so that the land uses within districts correlate and can be evaluated in the same manner as employment and income by industry. The following discussion will center on the two tables below. The first table is an evaluation of the Purpose Statements for each individual district. The statements were grouped by topic to show the intended purpose or areas of emphasis of each zoning district. The complete list of each zoning district’s purpose statements are provided in Attachment D. The second table shows which industries (based on NAICS code) are currently allowed in each zoning district. The table breaks down whether the uses are permitted, accessory, conditional, conditional accessory or allowed by Planned Unit Development. The complete list of uses allowed in each zoning district is provided in Attachment E. To evaluate these tables, we have grouped two or three zoning districts together based on overall similarity. The discussion will focus on where the uses and purpose statements are similar between the districts, as well as where they are different. The Arden Hills Zoning Map is provided as Attachment F. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 5 of 11 Group 1: Neighborhood Business (NB) & Limited Business (B-1) Neighborhood Business (NB) zoning is located at the former City Hall site and the neighboring daycare business, Lindey’s Prime Steak House at Old Snelling Avenue and County Road E, and the businesses at the southeast corner of County Road E2 and Cleveland Avenue. Limited Business (B-1) zoning is located at the main campus of Bethel University and the northeast portion of the North Heights Lutheran Church property at US Highway 10 and CSAH 96. The North Heights B-1 property is vacant and is occupied by trees and wetlands. Purpose Topics:  Residential Transition: Both of these districts discuss residential transition in their purpose statements. Some characteristics of this purpose include: to be located at the edge of residential neighborhoods, to provide goods and services to adjacent residents, and to limit the type, size and intensity of use, so as not to be disruptive to residents nearby.  Pedestrian, Bicycle & Public Transport: This topic is discussed in the purpose statement for NB, but not B-1. Goals include making access safe and convenient to pedestrians and bicyclists, to have connected sidewalks, and access to public transportation.  Sense of Place: Again, this topic is included in the purpose statement for NB, but not B-1. The statement discusses having a public commons so people have a place to gather, as well as to comply with the City’s gateway requirements. Uses Allowed: The uses allowed in the NB and B-1 districts are generally very similar. There are ten industries that are allowed in both districts and only three industry codes that are allowed, in some form, in B-1 but not in NB. These industries include: Transportation and Warehousing, Educational Services, and Arts, Entertainment and Recreation. These three industries typically require larger development areas that would not necessarily fit well within a more residential setting. Group 2: General Business (B-2), Service Business (B-3) and Retail Center District (B-4) General Business (B-2) zoning is located on both sides of County Road E between Highway 51 and Lexington Avenue. Service Business (B-3) zoning is located generally on the west side of Lexington Avenue between the railroad tracks on the south and I-694 to the north. Retail Center (B-4) zoning is located along both sides of Dunlap Avenue between the B-3 and I-Flex zoning districts. Purpose Topics:  Mixed Use District: Of the three districts, only B-2 has encouraging mixed use development where people can live, work and play as a purpose  Pedestrian, Bicycle & Public Transport: Again, only B-2 has this emphasized in its purpose statement.  Sense of Place: A place to gather and socialize is in the purpose statement of only the B-2 district. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 6 of 11  Architectural/Identity Elements: All three districts have this topic in their respective purpose statements. This shows that all districts are meant to be visually attractive, and in some cases, have a distinctive look.  Nuisances/Traffic: Again, all three districts include language in their purpose statements regarding preventing nuisances to neighboring properties and minimizing traffic.  Implementation of City Plans: The City has adopted a guiding plan for the B-2 district, and one of the purposes of the district is to implement that plan. The B-3 and B-4 districts do not have guiding plans.  Flexibility in Land Uses & Site Development Standards: The B-3 district promotes more flexibility in these areas than in other districts in order to achieve the ultimate goals of the district.  Grouping/Critical Mass: All three of these districts emphasize the importance of grouping similar and mutually supportive businesses together.  Business Prosperity: This topic is in the purpose statements of the B-3 and B-4 districts.  Redevelopment: Redevelopment is stated as a priority within the B-3 and B-4 districts. It discusses allowing transitional reuse of buildings until they can be redeveloped and prohibiting uses that would impede redevelopment.  Surrounding Communities: Allowing for uses that serve not only residents, but surrounding communities is a priority in the B-4 district.  Serving the Community and Motorists: Maintaining an adequate supply of different businesses to serve residents, and having businesses with easy access to arterial streets and highways is emphasized in the B-3 district. Uses Allowed: These three districts have fourteen industries that are allowed in all of them. The only industry that is not universally allowed is Real Estate and Rental Leasing, which is only allowed by Conditional Use Permit in B-3. Group 3: Gateway Business (GB) and I-FLEX Gateway Business (GB) zoning is located on the west and south shores of Round Lake between Highway 96 and I-694. The I-Flex zoning is located on the east side of Highway 51between the railroad tracks to the south and I-694 to the north. Purpose Topics:  Architectural/Identity Elements: This topic is present in the purpose statement for the GB district. The GB district is an entry point to the City and highly visible to motorists passing through.  Nuisances/Traffic: Both of the districts emphasize only allowing uses that will not create traffic issues on surrounding roads.  Natural Resources/Environmental Elements: A purpose of the GB district is to protect the site’s natural resources. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 7 of 11  Implementation of City Plans: The City has adopted a Comprehensive Development Plan called the I-694/I-35W Plan that pertains to the GB area, and a purpose of the district is to implement that plan.  Flexibility in Land Uses & Site Development Standards: One purpose of the I-FLEX district is to allow flexibility in standards. This item is not present in the GB purpose statement.  Maintain Existing Character: This topic is repeated several times in the purpose statements for the I-FLEX district. The goal is to protect and enhance existing development, while also allowing for new development that fits with the existing character of the area. Uses Allowed: The uses allowed within these two districts are almost identical. The only industry that is allowed in GB and not in I-FLEX is Accommodation and Food Services. Group 4: Limited Industrial (I-1) and General Industrial (I-2) Limited Industrial (I-1) zoning is generally located north of I-694 and between Lexington and Hamline Avenues. General Industrial (I-2) zoning is located at the southeast corner of US Highway 10 and I-35W. Purpose Topics:  Compatibility with Existing Development/Surrounding Uses: Both of these districts have this element in their purpose statements. This topic aims to mitigate the negative effects that can sometimes accompany industrial uses, and ensure that all the businesses in the district fit well together.  Provides an Area for Industrial Uses to Locate: o For the I-1 district, this refers to keeping the intensity of land utilization lower than in the I-2 district. o For the I-2 district, the intent is to provide an area where more intense industrial uses can locate. Uses Allowed: There are eleven industries that are permitted in both industrial districts. The only industry permitted in the I-1 district that is not permitted in the I-2 district is Arts, Entertainment and Recreation. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 8 of 11 Commercial and Industrial Zones’ Purpose Statements Table   NB B‐1 B‐2 B‐3 B‐4 GB I‐1 I‐2 I‐FLEX  Residential Transition  X X                         Mixed Use District      X                     Pedestrian, Bicycle & Public  Transport  X    X                     Sense of Place X    X                     Architectural/Identity  Elements      X X X X            Nuisances/Traffic      X X X X       X  Natural  Resources/Environmental   Elements               X            Implementation of City Plans       X       X            Flexibility in Land Uses & Site  Development Standards         X             X   Grouping/Critical Mass      X X X                 Business Prosperity          X X                 Compatibility with Existing  Development/Surrounding  Uses                  X X     Maintain Existing Character                        X  Redevelopment         X X                 Provides an Area for  Commercial to Locate   X X X                  Provides an Area for Industrial  to Locate                   X X     Surrounding Communities            X                 Serving the Community &  Motorists         X                  _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 9 of 11 Commercial and Industrial NAISC Table NAISC # NAISC Classification NB B‐1 B‐2 B‐3 B‐4 GB I‐1 I‐2 I‐FLEX  11  Agriculture, Forestry,  Fishing and Hunting                            21  Mining, Quarrying, and  Oil and Gas Extraction                            22 Utilities P, C P, C P, C P, C P, C P, C P, C P, C P, C  23 Construction                            31‐33 Manufacturing      C, A C, A C, A P, C P P P, C  42 Wholesale Trade                            44‐45 Retail Trade P A P, C P, C P, A C, A C, A C, A A  48‐49  Transportation and  Warehousing   A A A A C P, C  P,  C,  CA C  51 Information C, CA C, CA P, CA P, CA P, CA CA CA CA CA  52 Finance and Insurance P P P P P P P P P  53  Real Estate and Rental  and Leasing         C                   54  Professional, Scientific,  and Technical Services P, C P P, C P, C P, C P P, C P, C P  55  Management of  Companies and  Enterprises                            56  Administrative and  Support and Waste  Management and  Remediation Services P P, A P P P P P P P  61 Educational Services   C C, D C C               62  Health Care and Social  Assistance P P  P, C,  A  CA, D P P P P P P  71  Arts, Entertainment,  and Recreation   P, A P, C P P P P    P  72  Accommodation and  Food Services C A P, C P, C P, C  P,  C,  A C C     81  Other Services (except  Public Administration) C C, A  P, C,  A  P, C,  A P, C P, A        A  92 Public Administration C C C C C C C C C  _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 10 of 11 LEGEND P Permitted Use C Conditional Use A Accessory Use CA Conditional Accessory Use D Planned Unit March 8, 2017 Planning Commission Discussion During their March 8, 2017 meeting, the Planning Commission reviewed the Campus Master Plans, Universities’ Missions and the Purpose Statement and Uses within the business and industrial zoning districts. Discussion after the review centered on the following topics:  Can the missions and short term goals of the Universities be achieved within their existing campuses and Campus Master Plans? Staff responded that it is unlikely that the University of Northwestern will be able to achieve their mission within their existing campus and that the President of the University has stated that he is looking into purchasing property in Arden Hills, Roseville or Shoreview. Bethel University may be able to accommodate their growth goals using both the Anderson Center and their existing campus property, but an amendment to their existing Campus Master Plan would likely be required to deviate from the lot coverage and landscape coverage standards. The President of Bethel University would also like to have the option to purchase additional property off campus, but that their current focus is on increasing the efficiency of their use of the Anderson Center.  Would addition classrooms, student housing and other facilities be needed to attract new adult continuing education students? Neither Bethel nor Northwestern are looking to expand their residence halls or their on- campus full time student services to accommodate their growth. Many of the additional programs will include online instruction and require in-person classroom attendance one night a week or less. Many of these courses can be accommodated in their existing facilities or, in Bethel’s case, the use of the Anderson Center. The exception is the new STEM programs that both Universities are looking to expand. Those STEM programs will require laboratory facilities that cannot be replicated online and are not accommodated within the existing classrooms at either campus. Additional laboratory facilities would need to be constructed or acquired to accomplish the growth goals of the Universities.  Are all the different business and zoning districts needed? The Planning Commission reviewed the groupings of zoning districts provided earlier in this memorandum. The Planning Commission discussed if there is a clear difference between the NB and B-1 districts; or the B-3 and B-4 districts. Staff stated that the purpose statement of the B-2 district is different than the B-3 and B-4 districts and that this study does not include the residential or mixed uses allowed in the B-2 district. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Planning\Planning Cases\2017\PC 17-006 - Higher Education Study\CC Packet_03202017_17-006\Memo.docx Page 11 of 11  Do the purpose statements and uses within the zoning districts match the existing businesses that are operating within these districts? The Planning Commission did observe that the I-1 and I-2 zoning districts have very similar purposes and uses, but that the existing businesses are quite different. The I-1 district is the area generally located north of I-694 and between Lexington and Hamline Avenues. This I-1 area has office uses like Lake O’Lakes and Gradient, research such as Boston Scientific and has even been consider for retail with the proposed Bremer Bank renovation. The only I-2 properties in Arden Hills are the Scherer Bros. Lumber at US Highway 10 and I-35W and the railroad spur to the south of Scherer Bros. The Planning Commission discussed that the uses in these two districts should be reviewed so that I-1 has more office and less industrial and opposite for the I-2 district. Requested Action 1. That the City Council provides any direction or guidance to the Planning Commission regarding the scope and extent of effort for the Higher Education Study. 2. Review the Campus Master Plans, Universities’ Missions and the Purpose Statement and Uses within the business and industrial zoning districts. Provide comments or direction to the Planning Commission regarding this information. Attachments A. Ordinance No. 2016-008 B. Bethel University 2012 Campus Master Plan Map C. University of Northwestern 2007 Campus Master Plan Map D. Business and Industrial District Purpose Statements E. Arden Hills Land Use Chart F. Arden Hills Zoning Map ATTACHMENT A 1 Benson Great Hall 2 Lundquist Community Life Center 3 Academic Center (AC) 4 Brushaber Commons (BC) 5 Clauson Center (CC) 6 Hagstrom Center (HC) 7 Robertson Physical Education Center (RC) 8 Heritage Residence Hall 9 Edgren Residence Hall 10 Bodien Residence Hall 11 Getsch Residence Hall 12 Sports and Recreation Center (SRC) EXISTING A Lake Valentine B Ona Orth Athletic Complex C Hargis Park D Field Sports E Royal Stadium F West Parking Lot G Heritage Hall Parking Lot H SoHo Parking Lot I East Parking Lots 13 Facilities 14 Arden Village East Townhouses 15 Nelson Residence Hall 16 Lissner Residence Hall 17 Scandia Church 18 Seminary Complex 19 Chalberg Residence Hall 20 Turnwall Residence Hall 21 Danielson Residence Hall 22 Wessman Residence Hall 23 Widen Residence Hall 24 Wingblade Residence Hall and Campus Child Development Center (CDC) 1 K 11 2 B L 12 3 C 13 D N E 6 F 26 G Q 27 8 H R 28 929 29 10 J ATTACHMENT B PROPOSED FUTURE J Track K Multi-Purpose Turf Field L Bethel Drive Redesign M Courtyard N Parking Garage (Option 1) O Parking Garage (Option 2) P Parking Lot Q Lake Valentine Foot/Bike Path R Ring Road and Bridge 25 Wellness Center 26 Business and Economics 27 HC Expansion 28 Edgren-Bodien Connector 29 SRC Expansion 30 Nelson Residence Hall Additions 31 Science Center 32 Seminary Addition 33 Residence Hall 34 Learning Commons/Library Campus Master Plan A 21 31 22 32 M 23 33 4 14 24 34 5 O 15 P 16 26 7 17 18 I 19 30 25 20 North ATTACHMENT C 1  Purpose Statements  Residential Transition (NB & B‐1)  To be located at the edge of residential neighborhoods (NB) To provide a limited range of over‐the‐counter, convenience, retail and service uses to accommodate the needs of the adjacent residents (NB) To place limitations on the type, size and intensity of uses within this district, given its proximity to residential uses. (NB) To ensure adequate buffering is provided on these sites for the adjacent residential uses (NB) To provide a district which is related to and may reasonably adjoin high density or other residential districts (B‐1) To establish a business district in which there is limited contact with the public and no exterior display or  selling of merchandise to the general public (B‐1) Mixed Use District (B‐2)  To be a place in which people can live, work and play (B‐2) Pedestrian, Bicycle and Public Transport (NB & B‐2)  To place emphasis on convenience for pedestrian, bicycle and public transportation access to the use (NB) To create a compact, architecturally diverse, pedestrian‐ and bicycle‐friendly community1 with a distinct identity (B‐2) To provide a connected sidewalk system1 and places for people to gather and socialize (B‐2) Sense of Place (NB & B‐2)  To accommodate, where possible, a public commons giving residents a place to gather and interact with one another (NB) To require, where applicable, compliance with the City’s gateway requirements (NB) To provide a connected sidewalk system and places for people to gather and socialize1 (B‐2) Architectural/Identity Elements (B‐2, B‐3, B‐4 & GB)  To create a compact, architecturally diverse, pedestrian‐ and bicycle‐friendly community with a distinct identity1 (B‐2) To implement design standards to promote an attractive environment with lasting and sustainable value (B‐2) To establish a high standard of development and design that produces a positive visual image1 and minimizes the effects of traffic congestion, noise, odor and glare (B‐3) 1Bold denotes that the statement is repeated under two topics. The bolded text is the portion of the statement  that applies to the topic above.  ATTACHMENT D 2     To produce a positive visual image by establishing a high standard of design and development  (B‐4)   To allow only development that will create an attractive environment and a positive image for  this site, which is one of the most visible in the community and represents the City’s last major  development site (GB)   To promote high quality, unified, large‐scale development in a manner similar to a planned unit  development (GB)    Nuisances/Traffic (B‐2, B‐3, B‐4, GB & I‐FLEX)   To minimize the effects of traffic congestion, noise, odor, glare and similar safety problems (B‐2)   To establish a high standard of development and design that produces a positive visual image  and minimizes the effects of traffic congestion, noise, odor and glare1 (B‐3)   To ensure acceptable traffic operations on local streets (B‐3)   To alleviate potential traffic congestion on local streets by the design of the circulation pattern  and arrangement of uses (B‐4)    To allow development that will ensure reasonable traffic operation on the internal and  surrounding transportation systems (GB)   To permit only those uses that will have traffic generation characteristics that are compatible  with existing development in the district and that will ensure reasonable traffic operation on  streets in the vicinity (I‐FLEX)  Natural Resources/Environmental Elements (GB)   To protect the site’s natural resources (GB)  Implementation of City Plans (B‐2 & GB)   To implement the plan known as the “Guiding Plan for the B‐2 District,” which was adopted by  the City Council on October 27, 2008 (B‐2)   To implement that part of Arden Hills Comprehensive Development Plan known as the I‐694/I‐ 35W Plan (GB)   To take full advantage of the site’s location as documented and described in the NE I‐694/I‐35W  Plan (GB)    To promote flexibility in land uses and development standards to achieve the objectives of the I‐ 694/I‐35W Plan (GB)  Flexibility in Land Uses and Site Development Standards (B‐3 & I‐FLEX)   To promote flexibility in land uses and site development standards to achieve the purposes of  the district (B‐3)   To promote flexibility in land uses and site development standards to achieve the objectives of  the I‐FLEX District (I‐FLEX)  3    Grouping/Critical Mass (B‐2, B‐3 & B‐4)   To group compatible retail and service business uses that tend to draw trade that is naturally  interchangeable and promotes business prosperity (B‐2)   To encourage grouping of compatible and mutually supportive business uses and services (B‐3)   To provide an integrated retail trade center that groups compatible retail uses in one or more  multiple‐occupancy buildings. Free standing, single‐occupancy buildings will be allowed if  planned and constructed as part of a unified development that contains a retail center or is  developed after such a retail center is developed (B‐4)   To encourage grouping of uses that are mutually supportive and have similar requirements for  vehicular and pedestrian accessibility and exposure (B‐4)  Business Prosperity (B‐3 & B‐4)   To promote business prosperity (B‐3)  To promote business prosperity by creating an attractive and functional retail center (B‐4)Compatibility  with Existing Development/Surrounding Uses (I‐1 & I‐2)   To allow only those types and intensities of industrial uses that do not detract from the  surrounding area (I‐1)   To present the least deleterious effect to adjacent, less intensive land uses (I‐2)  Maintain Existing Character (I‐FLEX)   To preserve, protect, enhance and perpetuate existing development in the district (I‐FLEX)   To attract new development that is compatible with existing development in the district in  terms of use, performance, character, quality and appearance of buildings and sites (I‐FLEX)   To encourage new site development that will be compatible with existing site development  standards of existing development in the district (I‐FLEX)   Redevelopment (B‐3 & B‐4)   To allow a transitional reuse of existing buildings until market conditions warrant  redevelopment (B‐3)   To enhance redevelopment potential by prohibiting uses that would impede redevelopment (B‐ 3)   To allow transitional uses that will allow an orderly phasing out of existing uses and  development that are not appropriate in a contemporary retail center and a phasing in of uses  and development as warranted by market conditions (B‐4)  Provides an Area for Commercial (office, retail) to Locate (B‐1, B‐2 & B‐3)   To establish areas for the location and development of administrative office buildings and  related office uses which are subject to more restrictive controls (B‐1)   4     To provide an adequate supply of businesses and professional service areas to meet the needs  of the residents (B‐2)To provide locations for uses that may be incompatible with retail centers,  thereby keeping the retail centers compact and convenient (B‐3)  Provides an Area for Industrial to Locate (I‐1 & I‐2)   To maintain performance standards to keep the intensity of land utilization lower than in the  general Industrial District (I‐1)   To provide an area where more intensive light industrial land uses may locate (I‐2)   Surrounding Communities (B‐4)To meet retail shopping needs of the surrounding community by  providing a district that will accommodate a wide range of retail goods and services (B‐4)   Serving the Community and Motorists (B‐3)   To accommodate an adequate supply of businesses and services that serve the community and  motorists traveling through the community with a broad range of services and goods (B‐3)   To keep services in close proximity to arterial streets or highways in areas that are appropriately  designated on the Comprehensive Plan (B‐3)     1320.05 Land Use Chart. (revised 11125113) Zoning Districts: Uses: R-1 R-2 R-3 R-4 NB B-1 B-2 B-3 B-4 CC GB 1-1 1-2 FLEX POS Antenna,Dish or Tower CA CA CA CA CA CA CA CA CA CA CA CA I CA CA CA CA Boarding house C C ! C C C m Brew pub C ` C C Business service A i P P P C P P P P Ginic,medical office P P P P P C P iij P ,. P P Club or lodge(non-profit) P P P C Club,sports&fitness A P P P C P P P Commercial recreation-indoor P P P P Daycare Facility,over 10 P P P P P P P P P Daycare,family- 10 or less A A A A A A Daycare,group farrily-14 or less CA I CA CA CA CA CA Dog kennel Dog run A A A Drive-up windows C C C A Dry cleaning&laundry,pick-up station C A A A Dry cleaning&laundry,self-service C C C NOMElaundry Dwelling: density zoning D D D D Dwelling: multiple family C C C C C C Dwelling: single-family attached C C D D Dwelling:single-farrily detached P P P P Dwelling: two-family C C P P C Dwelling:live-work unit Financial institution&service P P P P j P C P P P P Garage,truck C C - Home occupation: Class I A A A A A A Home occupation: Gass II CA CA CA CA CA C Hospital Hotel/motel C P C C C - C -- House of worship C C C j C C C C C j C C Manufactured home park C nufacturing&processing: Gass 1 A A ! A PMaP P P Manufacturing&processing: Gass II P Nicrobrewery C C C C C Nicrodistillery C C C C C Mortuary,funeral home P P C Multiple occupancy building C C C C C C C C C C Nursery C C C i C Nursing home and assisted living C C C C Em 9 186721v2 ATTACHMENT E Zoning Districts:R-1 R-2 R-3 R-4 NBB 1 i B-2 B-3 B-4 CC GB 1-1 I-2 FLEX CD POSUses:Office p P P P P P P P ' P ` PParkFacilitiesMM-------- P Pawn shop Personal services C A P PP C I P -- A Public use C C C C C C C C C C I C C C C C C Research and development facility C P C C , C P P P P - Research animals C C C Residence Hall,dormitory C C D Residential facility,state licensed, P P serving 1-6 P P P P Residential facility,state licensed,serving 7 C C C C C C 16 Restaurant and restaurant-fast food C A P P P C P C C Retail sales&service P A P P P C A A A A School,general education C C C C C School, higher education p C C C C School,specialized education C C C - C C Service station C C C C C Storage,exterior CA Studio C C I P P P C Theater,indoor A C P C Utility distribution line p pl p p p p p p p P P }' P ; P A P Utility substation C ; C Utility transmission C C C C C C C C C C 3 C C j C C C Vehicle—motorized,leasing and rentals C Vehicle-motorized,service C C Warehousing A A A A C P P C P"=Permitted; "D"=Planned Unit, ""=Not Permitted; C"=Conditional Use Permit; "A"=Accessory; "CA"=Conditional Accessory Use Permit,"I"=Interim Use Permit 1320.06 District Requirements Chart (NEXT PAGE) (revised 11125113) 10 186721 Q The zoning district designations represented on this map correspond to the City of Arden Hills official Zoning Map. Questions concerning the Zoning Map should be directed to City Hall. Zoning designations are subject to change. Please refer to the Zoning Code for complete information. Adopted: April 12, 1993Printed: April 1, 2016 Zoning Map ¯0 1,750 3,500Feet TRC CC- Campus Commercial TRC C- Civic TRC FO- Flex Office TRC RMU- Retail Mixed Use TRC NR-1- Residential TRC NR-2- Residential TRC NR-3- Residential TRC NR-4- Residential TRC OMU- Office Mixed Use TRC OS- Open Space TRC TC-1- Town Center TRC TC-2- Town Center TRC TC-3- Town Center TRC- Water Infrastructure R-1 - Single Family Residential District R-2 - Single & Two Family Residential District R-3 - Townhouse & Low Density Multiple Dwelling District R-4 - Multiple Dwelling District B-1 - Limited Business District B-2 - General Business District B-3 - Service Business District B-4 - Retail Center District NB - Neigborhood Business District CC - Civic Center District GB - Gateway Business I-1 - Limited Industrial District I-2 - General Industrial District I-FLEX District POS - Parks and Open Space District CD - Conservation District Railroad ROW WATER ATTACHMENT F _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Admin\Council\Agendas & Packet Information\2017\03-20-17-WS\Matthew\1C 2040 Comp Plan\Memo.docx Page 1 of 4 Background Every ten years, all communities within the seven county metropolitan area are required to updates their Comprehensive Plans to be compliant with the Metropolitan Council requirements. The City now has until the end of 2018 to complete its 2040 Comprehensive Plan. The checklist of the requirements that will need to be addressed is included in Attachment A. The City Council approved a contract with WSB and Associate to complete the update on March 13, 2017. The joint Work Session of the City Council and Planning Commission on March 20, 2017 will be the beginning of an eleven month process to prepare the Comprehensive Plan update for neighboring jurisdiction review and Metropolitan Council approval. Discussion Plan Topics State Statute and the Metropolitan Council regulations require that the Comprehensive Plan address the following topics: • Land Use • Housing • Transportation • Wastewater • Surface Water • Water Supply • Parks and Trails AGENDA ITEM – 1C MEMORANDUM DATE: March 20, 2017 TO: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator FROM: Matthew Bachler, Senior Planner SUBECT: 2040 Comprehensive Plan Update _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Admin\Council\Agendas & Packet Information\2017\03-20-17-WS\Matthew\1C 2040 Comp Plan\Memo.docx Page 2 of 4 • Implementation The Scope and Budget for the Comprehensive Plan is provided in Attachment C. The Scope shows the individual tasks that will be conducted to meet the minimum requirements for the Comprehensive Plan shown in Attachment A. Scheduling and Public Engagement The WSB proposal schedule is provided in Attachment B and shows the timeline for the creation of the Comprehensive Plan and the individuals who will be involved in the review and approval process. The Planning Commission will review the Comprehensive Plan at four upcoming meetings covering the following topics: Planning Commission Meeting Topic June 7, 2017 Land Use and Housing September 6, 2017 Implementation and Capital Improvement Program November 8, 2017 Draft Comprehensive Plan review December 6, 2017 Public Hearing for Comprehensive Plan adoption The City Council is scheduled to review the Comprehensive Plan at the following three meetings: City Council Meeting Topic July 17, 2017 Land Use and Housing October 16, 2017 Draft Comprehensive Plan review January 2018 Comprehensive Plan approval The Parks, Trails and Recreation Committee and the Economic Development Commission will also be reviewing the draft Comprehensive Plan before the public hearing. To allow for public review and comment of the Comprehensive Plan, a mySidewalk page will be set up exclusively for the Comprehensive Plan that will be linked to the City’s website and linked to and posted on the City’s Facebook page. City Council Direction on the Scope and Effort of the Update The City Council provided direction for staff and WSB to prepare a scope of work that will complete the minimum requirements for the 2040 Comprehensive Plan update. The Councilmembers have stated a number of reasons for limiting the effort to only the minimum requirements, including: _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Admin\Council\Agendas & Packet Information\2017\03-20-17-WS\Matthew\1C 2040 Comp Plan\Memo.docx Page 3 of 4 • The existing 2030 Comprehensive Plan is a useful document in its current form. • A number of significant amendments have recently been made to the 2030 Comprehensive Plan, including an amendment in December 2016 for the TCAAP development. • The Higher Education Study currently underway will be completed in time to provide recommendations for any economic development updates needed in the 2040 Comprehensive Plan. City Vision and Chapter Goals Since the City has determined that the 2030 Comprehensive Plan is a useful document for guiding future decisions regarding community development, it would be helpful for the City Council and Planning Commission to review the existing City Vision and Goals for each chapter of the Comprehensive Plan and determine if any revisions are needed: • City Vision: Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well-maintained infrastructure, fiscal soundness, and our long-standing tradition as a desirable City in which to live, work, and play. • Active Living: Enhance the health, safety, and well-being of all who live, work, and play in the City. • TCAAP Redevelopment: Develop TCAAP in a way that accommodates a mix of land uses that is sensitive to the natural environment, economically sustainable, and of benefit to the community. • Land Use: Develop and maintain a land use pattern that strengthens the vitality, quality, and character of our residential neighborhoods, commercial districts, and industrial areas while protecting the community’s natural resources and developing a sustainable pattern for future development. • Housing: Develop and maintain a strong, vital, diverse and stable housing supply for all members of the community. • Economic Development and Redevelopment: Promote the development, redevelopment, and maintenance of a viable, innovative, and diverse business environment serving Arden Hills and the metropolitan area. _____________________________________________________________________________________________ City of Arden Hills City Council Meeting for March 20, 2017 P:\Admin\Council\Agendas & Packet Information\2017\03-20-17-WS\Matthew\1C 2040 Comp Plan\Memo.docx Page 4 of 4 • Parks and Recreation: Create a comprehensive, maintained, and interconnected system of parks, pathways, and open spaces as well as a balanced program of recreational activities for residents of all ages, incomes, and abilities. • Protected Resources: Preserve, protect, and restore the community’s natural resources, including open spaces, lakes, wetlands, other significant natural features, and historic resources. • Transportation: Provide a transportation system that has convenient and effective multi- modal connections within Arden Hills and to adjacent municipalities, the remainder of the Twin Cities Metropolitan Area, and greater Minnesota. • Environmental Conservation and Sustainability: Promote conservation and sustainable design practices in the preservation, development, redevelopment, and maintenance of the City’s natural and built environment. • Public Facilities, Infrastructure, and Services: Provide efficient and high-quality public facilities, services, and infrastructure. Requested Action 1. That the City Council provides any direction or guidance to the Planning Commission regarding the scope and extent of effort into the 2040 Comprehensive Plan Update. 2. Review the existing City Vision and Goals of the various Comprehensive Plan chapters. Please consider if any revisions or updates need to be made to the City Vision or Goals. Attachments A. Metropolitan Council Comprehensive Plan Minimum Checklist for Arden Hills B. 2040 Comprehensive Plan Update Proposal, WSB & Associates, March 8, 2017 C. Proposed Scope and Budget to Provide Services to Complete the 2040 Update to the Arden Hills Comprehensive Plan Page - 1 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills CHECKLIST OF MINIMUM REQUIREMENTS FOR ARDEN HILLS The checklist below was compiled from information on the Plan Elements pages in the Local Planning Handbook under the “Minimum Requirements” sections of the respective topics. Please note that this information is subject to change. The most current information can always be found on the website. Also, please remember that additional information may be requested during the review process for clarification and accuracy by the Technical Review staff. If you have any questions, please contact your Sector Representative. LAND USE Forecasts and Community Designation 伫伫Include a table of forecasted population, households, and employment for 2020, 2030, and 2040, consistent with the Council’s forecasts. 伫Remember, Council forecasts must be used consistently throughout your entire comprehensive plan. 伫Your transportation plan needs to allocate forecasts to transportation analysis zones (TAZs). 伫Your water and wastewater plans need to reflect forecasts to plan for urban services. 伫Your land use plan must reflect and be coordinated with your forecasts. 伫Include a map acknowledging your regional Community Designation(s) and acknowledge the overall density expectations for your Community Designation(s). 伫Each Community Designation identifies both Council and Community Roles in Thrive’s land use policy section. Plans must be consistent with Community Roles for your Community Designation(s) as well as Community Roles that apply to everyone. Existing Land Use 伫Provide an Existing Land Use Map with a land use legend. 伫Provide an Existing Land Use Table. Calculate total acres and percent of total acres for each land use category. 伫Land uses categories on the map and in the table, as well as any text references must all be consistent with one another. 伫Show existing regional parks, park reserves, and special recreation features with a land use of “Park” (or your equivalent) on your Existing Land Use Map. Future Land Use 伫The Future Land Use plan must be consistent with the Council’s forecasts of population, households, and employment and identify sufficient land to support your community’s forecasted growth. 伫Provide a Future Land Use Map and land use legend, including density ranges for all land uses that allow residential development. 伫Provide a Future Land Use Table. Calculate total acres and percent of total acres for each land use category for each 10- year planning period (2020, 2030, and 2040). 伫Define each land use category shown on the Future Land Use Map. Land use categories must be used consistently throughout your plan. 伫Land use categories must include types of allowed uses and the minimum and maximum densities (“the allowable density range”) for all categories that allow residential uses. Allowed uses should include a description of allowable housing types such as single family, detached, duplexes, townhomes, etc. 伫For each “mixed use” category, define an expected share of individual land uses and identify the permitted density range for residential uses. For example, Mixed Use Downtown might have an expectation of 30% commercial, 40% office, and 30% residential with a density of 10-15 units per acre. 伫Acknowledge Council-approved master plan boundaries of regional parks, park reserves, and special recreation features by guiding the properties with a land use of “Park” (or your equivalent) on your Future Land Use Map. For Communities within the Metropolitan Urban Service Area (MUSA) and Rural Centers: 伫Identify employment locations and provide a measurement of intensity of planned employment. Employment locations are typically the areas guided for commercial, office, industrial and institutional uses. Acceptable measurements of intensity include Floor Area Ratio (FAR), building footprint or impervious coverage. Ranges for measuring intensity are acceptable. ATTACHMENT A Page - 2 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills For Communities with Special Resources: 伫伫Identify aggregate resources in your community on the Future Land Use Map. 伫See the Special Resources section within the Land Use Plan Element for requirements for Critical Area Plans, Historic Preservation, and others. Density Calculations 伫Identify where forecasted residential growth will happen on your Future Land Use Map. Show expected new development and re-developed areas. 伫Identify what density range is expected for each residential land use in your community. 伫Identify when residential development or redevelopment is anticipated to happen. See the Handbook section on Staged Development and Redevelopment. 伫The average net residential density for your community must be consistent with the density requirements for your community designation. 伫Provide a minimum and maximum value for each residential density range. (Zero is not an acceptable minimum. The maximum value must be a whole number.) 伫Use the lowest allowed residential density from land use ranges in your calculations. For example, a land use that permits a density range of 3-5 units per acre must use 3 units per acre in all density calculations for this land use. This ensures that even at the lowest permitted density, the community will be developing at densities that meet overall density expectations. 伫Focus on areas of change. Show us which planned land uses have changed from your previously approved plan and where new land uses (change or development intensity) is planned/expected. 伫Provide the net developable acreage for each residential land use. It’s OK to exclude wetlands and natural water bodies, public parks and open space, arterial road rights-of-way, and natural resource lands protected by local plans and ordinances (i.e. steep slopes, wetland buffers, tree preservation) from area calculations. Stormwater ponds, utility easements, local roads, and local rights-of-way cannot be excluded from area calculations. 伫The information you develop in your land use plan carries over to other elements of your comprehensive plan. The areas and densities in the land use plan must be consistent across elements related to forecasted growth, wastewater, water, housing, and transportation. For Communities with an Affordable Housing Allocation: 伫Guide residential land at densities sufficient to create opportunities for affordable housing using one of the following options outlined in the Housing Plan Element. Refer to the Projected Housing Need section. Staged Development and Redevelopment 伫Identify potential local infrastructure impacts for each 10-year increment. 伫Demonstrate that the municipality is capable of providing services and facilities that accommodate its planned growth. 伫The staging plan or likely development phasing must be consistent with the volume of anticipated sewer flow identified in your community’s Local Sewer Plan. 伫The staging plan or likely development phasing must support and be consistent with your community’s share of the Region’s Need for Affordable Housing for 2021 - 2030. For Urban Center, Urban, and Suburban Communities: 伫Identify and map the land areas that are available or likely to be available for redevelopment, infill development, or new development in your community. 伫Provide a table of those areas identified that includes future land uses, acreages, density ranges, and total residential units in 10-year increments. Use your professional judgment for estimating the timing of development for areas that are uncertain or do not have plans in process. Natural Resources 伫Describe your community’s goals, intentions, and priorities concerning preservation, conservation, or restoration of natural resources in your community. Special Resource Protection 伫All plans must include a protection element for historic sites. 伫All plans must include policies for the protection and development of access to direct sunlight for solar energy. Solar access is addressed in depth under the Resilience section. 伫All plans must identify whether or not aggregate resources are available within the community. For communities with aggregate resources, additional requirements apply. Page - 3 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills For Communities with Aggregate Resources: 伫伫Identify aggregate resources in your community on the Future Land Use Map using the Aggregate Resources Inventory. 伫You must address and minimize potential land use conflicts. 伫Identify planning and regulatory measures to ensure that aggregate resources are extracted prior to urbanization of aggregate-rich sites. Page - 4 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills TRANSPORTATION Transportation Analysis Zones 伫伫Include a table allocating forecasted population, household, and employment growth by TAZ for 2020, 2030 and 2040. 伫Describe how you have allocated demographic growth based on your plan’s assumptions for guided future land use (e.g., density, mix of uses, locations for new development, highway/transit access, redevelopment, etc.). 伫When doing your land use planning, accommodate development densities around transit consistent with density expectations established in Chapter 3 of the 2040 Transportation Policy Plan (2040 TPP). Roadways 伫Describe and map the functional classification of all existing and proposed roads within your community, using the functional classification system described in Appendix D of the TPP and the roadway classification map currently recognized in the region. 伫Maps must reflect the principal arterials adopted as the metropolitan highway system in the 2040 Transportation Policy Plan (2040 TPP). 伫If a community determines that a change to the A-minor arterial system in the community is warranted, a request should be made to the Transportation Advisory Board (TAB) for the change, and TAB’s approval secured, prior to reflecting the new classification in the community’s plan. Check the council’s website or contact Elaine Koutsoukos at 651-602-1717 for more information. 伫Maps should also show the streets classified by the community as major and minor collectors and local streets. Changes to these streets from the function shown on the regional map are at a community’s discretion, and do not need approval from TAB. However, these changes should follow the criteria laid out in Appendix D of the TPP and maintain system continuity. A map or table highlighting any discrepancies between the community’s map and the regional functional classification map previously referenced should be submitted to Council staff so the regional map can be updated. 伫Include the following information for the principal and A-minor arterials: 伫Identify the existing and future number of lanes. 伫Map current traffic volumes, including heavy commercial volumes, which include both ADT and HCADT. 伫Map forecasted 2040 traffic volumes. (This should be done using the Council’s regional model, or another method with approval from Council forecasting staff.) 伫Identify future rights-of-way that need to be preserved. 伫Identify planned improvements to principal arterials as shown in the Current Revenue scenario of the 2040 TPP. 伫Identify any existing or proposed future MnPASS lanes, dedicated busways and bus-only shoulder lanes as shown in Figure 6-6 of the 2040 TPP. 伫For other proposed interchange improvements, follow the Highway Interchange Request Criteria and Review Procedure, which can be found in Appendix F of the 2040 TPP. 伫Incorporate access management guidelines of MnDOT, or those of the county in which your community is located, into your comprehensive plan as well as into your subdivision and zoning ordinances. 伫Describe recommendations from recent corridor studies regarding roadway improvements, changes in land use, and/or access. Transit 伫The region has established Transit Market Areas to guide the types and levels of transit service that are appropriate for efficient and effective services. Transit Market Areas are defined in Appendix G of the 2040 TPP by the demographic and urban design factors that are associated with successful transit service. Identify your community in relationship to your transit market area(s). Describe and map the existing and planned transit infrastructure and services in your community, including those of Metro Transit or other regional transit service providers. Communities should include the identification of the following basic elements of the transit system in their comprehensive plan: 伫Existing transit routes and dial-a-ride services 伫Existing and planned transit stations and transit centers 伫Existing and planned park-and-rides and express bus corridors 伫Existing and planned transit advantages 伫Existing transit support facilities Bicycling and Walking 伫Describe and map the existing and planned on-road and off-road bicycle facilities in your community. 伫Map and describe the Regional Bicycle Transportation Network (RBTN) within your community: 伫Show all Tier 1 and Tier 2 RBTN corridors and alignments. 伫Show the relationship of the RBTN to the local bicycle network of off-road trails and on-street bikeways including all existing and planned connections. Page - 5 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills 伫伫Include locations of regional employment clusters and activity center nodes (as shown on the RBTN map) and other local activity centers. 伫For Tier 1 and Tier 2 corridors on the RBTN, describe and map the existing or planned bicycle facility alignments that are within the established corridors; the purpose of these corridors is as a placeholder for cities/counties to designate a planned alignment. If there is a planned alignment that would fulfill the intent of the corridor and that lies within and in line with the corridor’s directional orientation that the community would propose to replace the established corridor, map that alignment and denote by indicating it as “proposed for the RBTN.” 伫Analyze and address the need for local bicycle and pedestrian facility improvements to provide connections that remove major physical barriers (i.e., freeways, railroad corridors, rivers and streams) on the regional (RBTN) and local networks. 伫Discuss pedestrian system needs in a manner that responds to your community designation (as described in Thrive MSP 2040) and addresses the needs of your community. Aviation 伫Identify policies and ordinances that protect regional airspace from obstructions. Include how your community will notify the FAA of proposed structures. Freight 伫Identify railways, barge facilities and truck or intermodal freight terminals within the community. 伫Identify other important nodes that may generate freight movement, such as industrial parks and large shopping areas. 伫Map the road network showing volumes of multi-axle trucks (also known as “heavy commercial average annual daily traffic or HCAADT”) for Principal Arterial and A-Minor functional classifications. 伫Identify any local roadway issues or problem areas for goods movement, such as weight-restricted roads or bridges, bridges with insufficient height or width clearances, locations with unprotected road crossings of active rail lines, or intersections with inadequate turning radii. Page - 6 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills WASTEWATER Areas Served by the Regional System 伫伫A table that details the households and employment forecasts in 10-year increments through 2040, based on the Council’s forecasts and any subsequent negotiated modifications. This should be broken down by areas served by the Metropolitan Disposal System, locally owned and operated wastewater treatment systems, and Community and Subsurface sewage treatment systems. The forecasts used in your wastewater plan must be consistent with the forecasts used throughout your plan, including in land use, transportation, and water supply. 伫Your wastewater plan must be designed to support these forecasts and provide any allocation breakdowns between sewered and unsewered service for population, households, and employment. 伫An electronic map or maps (GIS shape files or equivalent must also be submitted) that show the following information: 伫Your existing sanitary sewer system identifying lift stations, existing connection points to the metropolitan disposal system, and future connection points. 伫Local sewer service districts by connection point. 伫Intercommunity connections and any proposed changes in government boundaries based on Orderly Annexation Agreements. 伫The location of all private and public wastewater treatment plants in your community. 伫Copy of any intercommunity service agreements entered into with an adjoining community after December 31, 2008; including a map of areas covered by the agreement. 伫A table or tables that contain the following information: 伫Capacity and design flows for existing trunk sewers and lift stations. 伫Assignment of 2040 growth forecasts by Metropolitan interceptor facility. In the absence of this information the Council will make its own assignments for the purpose of system capacity needs determination. 伫Define your community’s goals, policies, and strategies for preventing and reducing excessive inflow and infiltration (I/I) in the local sewer system, including: 伫Define the requirements and standards for minimizing inflow and infiltration and for the disconnection of sump pump, foundation drain, and/or rain leader connections to the sanitary sewer system. 伫Include a copy of or reference to your local ordinance that prohibits the discharge of sump pumps, foundation drains, and/or rain leaders to the sanitary disposal system. 伫Include a copy of or reference to your local ordinance requiring the disconnection of existing foundation drains, sump pumps, and roof leaders from the sanitary sewer system. 伫Include a summary of activities or programs related to I/I source mitigation on private sewer services. 伫Describe the extent, source, and significance of existing I/I problems in your community. 伫Analyze the costs for remediating the I/I issues identified in your community. 伫An implementation plan that contains a program strategy, priorities, scheduling, and financing mechanisms for eliminating and preventing excessive I/I from entering the sanitary sewer system. For communities with new trunk sewer systems that require connections to the Metropolitan Disposal System, you also need to include the following: 伫A table that details the proposed time schedule for the construction of the new trunk sewer system in your community. 伫Describe the type and capacity of the treatment facilities, whether municipally or privately owned. 伫Copies of the associated National Pollutant Discharge Elimination System (NPDES) or State Disposal System (SDS) permits. Community and Subsurface Treatment Systems 伫Describe your community’s management program for SSTS to comply with MPCA regulations (Minn. Rules Chapters 7080- 7083). 伫Map the locations of all existing public and private treatment systems, if any, including package treatment plants and group on-site systems. 伫Map the locations of all sub-surface sewage treatment systems. You should also identify the locations of known non- conforming systems or systems with known problems. 伫Describe the conditions under which private, community treatment systems (ex. package treatment plants, community drainfields) would be allowed. Examples of such conditions include: 伫allowable land uses and residential densities 伫installation requirements 伫management requirements 伫local government responsibilities Page - 7 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills SURFACE WATER The items in the Minimum Requirements section below are consistent with the requirements under the new Minnesota Rules Chapter 8410,adopted in July of 2015 and Minn. Stat. 103B.235. Executive Summary, Water Resource Management Related Agreements, and Amendment Process 伫伫Provide an executive summary that includes the highlights of the local water management plan. 伫Describe the water resource management related agreements that have been entered into by your community. This includes joint powers agreements related to water management that the community may be a party to between itself and watershed management organization(s), adjoining communities, or private parties. 伫Include a section on amendment procedures that defines the process by which amendments may be made. The amendment procedure must be consistent with the amendment procedures in the watershed organization(s) plans that affect your community. Physical Environment and Land Use 伫Describe the existing physical environment and existing land use. You may be able to incorporate data by reference if allowed by the appropriate watershed organization(s) plan. You should be aware that not all watershed plans contain the level of detail needed and in those cases, you will be required to provide this information directly in your local water management plan. 伫Describe the proposed physical environment and future land use. 伫Include a map and/or description of drainage areas that includes path and flow directions of the stormwater runoff in your community. 伫Describe the volumes and rates of flow for those defined drainage areas. Existing and Potential Water Resource-Related Problems 伫Include an assessment of the existing water resource related problems in your community. 伫Include an assessment of the potential water resource related problems in your community. 伫Include a list or map of impaired waters within your community as shown on the most current 303d impaired waters list. Local Implementation Plan/Program 伫Include prioritized nonstructural, programmatic, and structural solutions to identified problems. 伫Describe the areas and elevations for stormwater storage adequate to meet performance standards or official controls in watershed organization(s) plan. 伫Define the water quality protection methods that would be adequate to meet performance standards or official controls. 伫Clearly define the roles and responsibilities of the community from that of the WMO(s) for carrying out implementation components. 伫Describe the official controls and any changes needed to official controls. 伫Include a table briefly describing each component of the implementation program that clearly details the schedule, estimated cost, and funding sources for each component, including annual budget totals. 伫Include a table describing the capital improvement program that sets forth by year, details of each contemplated capital improvement that includes the schedule, estimated cost, and funding source. Page - 8 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills WATER SUPPLY Local Water Supply Plan for Municipal Public Water Suppliers 伫伫If the community has a municipal community public water supply system, complete all information in the DNR & Metropolitan Council water supply plan template.Information must be submitted in the template provided and submitted through the MnDNR Permit and Reporting System (MPARS). 伫Include extended water demand projections for 2020, 2030, 2040 and ultimate build-out that are consistent with population forecasts in the community’s system statement. Water Conservation & Reuse 伫If the community has a municipal community public water supply system, complete all information in the DNR & Metropolitan Council water supply plan template.Information must be submitted in the template provided and submitted through the MnDNR Permit and Reporting System (MPARS). Assessing & Protecting Source Water 伫If the community has a municipal community public water supply system, complete all information in the DNR & Metropolitan Council water supply plan template.Information must be submitted in the template provided and submitted through the MnDNR Permit and Reporting System (MPARS). Sub-Regional Collaboration 伫If the community has a municipal community public water supply system, complete all information in the DNR & Metropolitan Council water supply plan template.Information must be submitted in the template provided and submitted through the MnDNR Permit and Reporting System (MPARS). Page - 9 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills PARKS AND TRAILS Regional Parks and Trails 伫伫Describe, map, and label the Regional Parks System facilities that are located in your community. 伫Depict existing regional parkland with a land use of “Park” (or your community’s equivalent) on your Existing Land Use map. 伫Acknowledge the Council-approved master plan boundaries of regional parks, park reserves, and special recreation features by guiding the properties with a land use of “Park” (or your community’s equivalent) on your Future Land Use map. Local Parks and Trails 伫Describe and map your existing and proposed local parks, trails, and recreation facilities. 伫Include a capital improvement program for parks and open space facilities as part of your implementation program. Page - 10 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills HOUSING Existing Housing Needs 伫伫Complete an existing housing assessment, including: 伫A table of existing local conditions, including the following information: 伫1. Total number of housing units. 伫2. Number of housing units affordable to households with incomes at or below 30% Area Median Income (AMI), between 31 and 50% AMI, and between 51 and 80% AMI. 伫3. Number of housing units that are owner occupied. 伫4. Number of housing units that are rental. 伫5. Number of single family homes. 伫6. Number of multi-family homes. 伫7. Number of publicly subsidized housing units by the following types: senior housing, housing for people with disabilities, and all other publicly subsidized units. Include expiration dates of affordability requirements when applicable. 伫Number of existing households that are experiencing housing cost burden with incomes at or below 30% Area Median Income (AMI), between 31 -50% AMI, and 51 -80% AMI. A map of owner-occupied housing units identifying their assessed values. At a minimum, differentiate the values above and below $211,500. 伫A narrative analysis of existing housing needs. At a minimum address the components of the existing housing assessment within the local context of your community. Plans consistent with Council policy will clearly identify existing housing needs and priorities for the community. Projected Housing Need 伫Discuss how the land use plan addresses the future housing need for your forecasted growth. For Those Communities With An Affordable Housing Need Allocation: 伫Acknowledge your community’s allocation of the region’s need for affordable housing at three levels of affordability: <30% AMI, 31-50% AMI, and 51-80% AMI. 伫Guide residential land at densities sufficient to create opportunities for affordable housing using one of the following options: 伫Option 1: Guide sufficient land at minimum residential densities of 8 units/acre to support your community’s total allocation of affordable housing need for 2021 – 2030. This option may be best for communities that find it difficult to support densities of 12 units/acre (per Option 2), or prefer simplicity over flexibility in their density minimums. 伫Option 2: Guide sufficient land at minimum residential densities of: 伫12 units/acre to address your community’s allocation of affordable housing need at <50% AMI. This combines your community’s allocation at <30% AMI and 31-50% AMI. 伫6 units/acre to address your community’s allocation of affordable housing need at 51-80% AMI. 伫Option 2 may be best for communities that feel they can achieve affordable housing needs at 51-80% AMI with less than 8 units/acre. It also allows the affordable housing need to be addressed with less actual land, as is the case if communities choose to use even higher densities than are required. Furthermore, communities using Option 2 may guide land to meet their allocation of affordable housing need at 51-80% AMI using a minimum density range of 3-6 units/acre if they have demonstrated in the last 10 years the application of programs, ordinances, and/or local fiscal devices that led to the development of housing affordable at 51-80% AMI in their community. Examples include: density bonuses for affordable housing unit inclusion, local funding programs such as TIF, etc. Implementation Plan 伫A description of public programs, fiscal devices, and other specific actions that could be used to meet the existing and projected housing needs identified in the housing element. Include in what circumstances and in what sequence they would be used. 伫Plans consistent with Council policy will clearly and directly link identified needs to available tools. Needs are identified within the three levels of affordability, and tools should therefore be addressed within the levels of affordability as well. 伫Plans consistent with Council policy will consider all widely accepted tools to address their housing needs. A list of widely accepted tools is provided, however, this list is not exhaustive. Communities are strongly encouraged to include any additional tools at their disposal when identifying how they will address their housing needs. Page - 11 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills RESILIENCE Energy Infrastructure and Resources 伫伫Local governments in the seven-county metropolitan area are required by state law to include an element in their Plan for protection and development of access to direct sunlight for solar energy systems. Page - 12 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills ECONOMIC COMPETITIVENESS Redevelopment 伫伫Minnesota Statutes § 473.859 Subd. 1 states that local comprehensive plans “shall contain objectives, policies, standards, and programs to guide… redevelopment and preservation for all lands and waters within the jurisdiction of the local governmental unit”. The information provided in this section of the handbook is intended to assist communities as they grapple with the opportunities and challenges associated with development sites that are declining in value, viability, and marketability. Page - 13 | METROPOLITAN COUNCIL LOCAL PLANNING HANDBOOK Print Date: 3/10/2016 Checklist of Minimum Requirements for Arden Hills IMPLEMENTATION Implementation 伫伫Describe all public programs, fiscal devices, and other actions that your community will use to implement your plan. 伫Define a timeline as to when actions will be taken to implement each required element of your comprehensive plan. 伫Include a Capital Improvement Program (CIP) for transportation, sewers, parks, water supply, and open space facilities. Specify the timing and sequence of major local public investments. 伫The CIP must align with development staging identified in other parts of your plan and include budgets and expenditure schedules. 伫Describe all relevant official controls addressing at least zoning, subdivision, water supply, and private sewer systems. 伫Include a schedule for the preparation, adoption, and administration of needed changes to official controls. 伫Include your local zoning map and zoning category descriptions. Identify what changes are needed to ensure zoning is not in conflict with your new land use plan and consistent with regional system plans and policies. 伫Review and update official controls within 9 months of adopting your 2040 plan. Official controls must not be in conflict with your updated plan. You must provide copies of all revised official controls to us. 伫The Housing Plan Element has implementation requirements as well. Refer to that section to ensure that implementation requirements for the Housing Action Plan are met. Schedule / 19 A Proposal to Provide a 2040 Comprehensive Plan Update for the City of Arden Hills Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 mySidewalk City Council Kick-Off Land Use and Housing Draft Comprehensive Plan Approval Planning Commission Land Use and Housing Implementation and CIP Draft Comprehensive Plan Public Hearing Economic Development Commission Draft Comprehensive Plan Parks, Trails and Recreation Committee Draft Parks and Trails Chapter Schedule The schedule below provides a timeline from project initiation to final completion. ATTACHMENT B March 13 Mr. William City Admi City of Ard 1245 Wes Arden Hill RE: P C Dear Mr. J We appre Arden Hill BACKGR Per the di services t multi-face Transport Environm and plans PROJECT Below is a completin Task 1: B Collectio C O 1.1 E 1.2 E 1.3 P P ch em Cost: $4,8 Building  , 2017 m S. Joynes, nistrator den Hills st Highway 96 ls, MN 55112 roposed Scop Comprehensiv Joynes, eciate the opp ls’ Comprehen ROUND rection from t o assist the c eted Compreh tation Plannin ental Service s. T APPROAC a listing of the g these tasks Background a n of Informa Collect informa Ordinance, Cit xamination o        xamine Build reparation o repare exhibi harts of demo mployment da 800 a legacy – your leg Sr. 6 pe and Budge ve Plan portunity to pre nsive Plan. the February city in complet hensive Plann ng, Traffic Mod es, and Lands H/SCOPE OF e required com s. We are ha and Demogr ation ation on previ ty Code, and of Demograp Historic and Population Household Net worth b Household Household Race and e ding Permit of Exhibits its including o ographic infor ata. gacy.   Equal Op w et to Provide esent this pro 21 City Coun tion of the 20 ning team incl deling, Water scape Architec F SERVICES mponents to c ppy to refine raphic Comp ous planning Capital Impro phic Informa d projected po age distributi incomes by a by age of hou tenure by ag type ethnicity and Valuatio overview, regi rmation and h pportunity Employ wsbeng.com  P:\Plann Services to C oposal to prov ncil Work Ses 40 Update to ludes profess r/Wastewater cture to offer S complete a C this scope if d onent studies, exis ovement Plan tion opulation and ion age of househ seholder e of househo on Data ional context, historical, curr yer  ning\Personal\Eric Zweber\Co Complete the vide services sion, the follo the Arden Hi sionals in Com Infrastructure our Integrate omprehensiv directed by th sting Compreh . d household g holder older year built, an rent, and futur 7 S M T F omp Plan\AH 2040 Comp Pla 2040 Update for the compl owing is a pro ills Comprehe mmunity Plann e Planning an d Design App ve Plan Updat he City Counc hensive Plan, growth nd regional de re housing, p 701 Xenia Avenue  Suite 300  Minneapolis, MN 5 Tel:  763‐541‐4800 Fax:  763‐541‐1700 an WSB Scope of Services 031 e to the Arden letion of the C oposal to prov ensive Plan. ning, nd Design, proach to proj te, and a cost cil. Zoning esignation ma opulation, an South  55416  0     0  132017.docx  n Hills City of vide Our jects t for aps; d ATTACHMENT C Mr. Joynes  March 13, 2017  Page 2        Task 2: Public Participation 2.1 Finalize Public Participation Plan 2.2 Joint City Council/Planning Commission Kick-Off Meeting (1) Finalize roles and schedule, review Vision and convey responsibilities. 2.3 Planning Commission Meetings (4) This includes attendance at four Planning Commission meetings to discuss housing and land use requirements; implementation and capital improvement plan (CIP); draft Comprehensive Plan and the required Public Hearing. 2.4 City Council Meetings (3) This includes attendance at three City Council meetings to reviewing the draft housing and land use chapters, draft Comprehensive Plan and approval of the Plan. 2.5 Parks, Trails and Recreation Committee Meeting (1) This includes attendance at one Park Commission meeting to review the draft Parks and Recreation chapter. 2.6 Online Engagement (My Sidewalk) Program and implement an online interface to engage effectively with the public. Cost: $6,800 Task 3: Housing Component 3.1 Housing Data Compile all appropriate GIS and other data on housing. 3.2 Preparation of Exhibits Prepare exhibits including charts of the existing housing stock by age, type, tenure and value and a map of owner occupied housing value. 3.3 Affordable Housing Tools List of City of Arden Hills affordable housing tools and list the barriers to implementing additional tools in compliance with the Metropolitan Council’s Housing Policy Plan. 3.4 Housing Goals and Implementation Steps Create goals and implementation steps regarding housing based on the community vision and with Planning Commission assistance. 3.5 Draft and Revision of Housing Chapter Create one (1) draft of the housing chapter and one (1) revision to the housing chapter. Cost: $5,100 Task 4: Land Use Component 4.1 Land Use Data Compile all appropriate GIS and other data on existing land uses. 4.2 Demand Compatibility Analysis Determine residential demand based on the Housing Chapter. Evaluate if the demand determine is compatible with the population and housing forecasts provided in Thrive 2040. Mr. Joynes  March 13, 2017  Page 3        4.3 Land Use Requirements per Policy Determine the amount and type of residential land uses needed to meet the requirements of the Housing Policy Plan’s affordable housing allocation. 4.4 Land Use Category Analysis Examine the 2030 Comprehensive Plan land use categories and determine if those land use categories can be carried over into the 2040 Comprehensive Plan. Modify existing land use categories or create new land use categories as needed. 4.5 Chart Preparation Prepare charts of 2010 generalized land uses, the 2016 zoning districts, the existing 2030 land use designations, the 2040 land use designations. Using these charts, determine the amount of land that would be required to redevelop to meet the Housing Policy Plan’s affordable housing allocation. 4.6 Map Preparation Prepare maps of Aggregate Resources, the 2010 generalized land uses, the existing 2030 Land Use Map, and the 2040 Land Use Map. 4.7 Land Use Goals and Implementation Steps Create goals and implementation steps for land use and growth management based on the community vision, the meetings and feedback gathered during task 2.2 through 2.5, and with Planning Commission and City Council assistance. 4.8 Statutory Requirements Address the statutory requirements regarding aggregate resources and solar access. 4.9 Draft and Revision of Land Use Chapter Create one (1) draft of the land use chapter and two (2) revisions to the land use chapter. Cost: $8,500 Task 5: Parks and Trails Component 5.1 Regional Parks System Describe, map, and label the Regional Parks System facilities within and directly adjacent to Arden Hills. 5.2 City Parks and Trails Describe and map Arden Hills’ existing and proposed parks, trails, and recreation facilities. Include planned parks and trail capital expenditures into the capital improvement plan (CIP). 5.3 Revise the Existing Parks and Recreation Chapter Update the appropriate text of the 2008 Parks and Recreation chapter as update and amended in December 2016. Cost: $6,000 Task 6: Surface Water Management Component 6.1 Arden Hills and Rice Creek Watershed District Plans Review the existing Arden Hills Surface Water Management Plan (SWMP) and the newly adopted Rick Creek Watershed District (RCWD) SWMP. Address requirements of the RCWD SWMP. Mr. Joynes  March 13, 2017  Page 4        6.2 Identify Problems and Corrective Actions Indentify problems list in the RCWD SWMP and based on interviews with City staff. Develop corrective actions for each problem. This task includes updates relating to the NOAA Atlas 14 precipitation frequency estimates. 6.3 Goals, Policies, and Priorities Identify and describe goals and policies and set priorities based on input from the City staff and City Council. 6.4 Implementation Plan Create an implementation plan based on the SWMP priorities including identifying potential funding sources. 6.5 Draft and Revision of SWMP One draft of the SWMP and one revision to the SWMP. Cost: $22,000 Task 7: Transportation Component 7.1 Transportation Analysis Zones Run the Metropolitan Council transportation model and assign population, household, and employment by Transportation Analysis Zone (TAZ). 7.2 Roadways Describe and map existing/future volumes, function class, lanes, capacity needs and arterial routes. Incorporate MnDOT and Ramsey County access guidelines and planned improvements. Indentify right-of-way preservation needs and short and long range projects and studies to identify needs. 7.3 Transit Describe transit market area and existing and planned transit infrastructure and services. 7.4 Aviation Identify policies that protect regional airspace from obstructions. 7.5 Freight Identify and map heavy commercial average daily trips on arterial routes, railroads, and freight terminals. Identify freight generating nodes and freight bottlenecks. 7.6 Draft and Revision of Transportation Chapter One draft of the transportation chapter and one revision to the transportation chapter. Cost: $16,900 Task 8: Water Supply Component 8.1 Existing Water Supply Plan Compile and review all appropriate GIS and other data including the City Code, Fee Schedule, Capital Improvement Plan (CIP). 8.2 System Routing Evaluate existing water mains and record of water main breaks and repairs. Recommend necessary water main replacements, expansions, and/or extensions. Mr. Joynes  March 13, 2017  Page 5        8.3 Draft and Revision of Water Supply Chapter One draft of the water supply chapter and one revision to the water supply chapter. Cost: $7,000 Task 9: Wastewater Component 9.1 Existing Wastewater Supply Plan Compile and review all appropriate GIS and other data including the City Code, Fee Schedule, Capital Improvement Plan (CIP). 9.2 Capacity Analysis Calculate wastewater demands and evaluate existing wastewater mains, lift stations, and record of failures. Recommend necessary lift station reconstruction or wastewater main replacements, expansions, and/or extensions. 9.3 Maps and Figures Exhibits including maps and charts of the existing and proposed wastewater demand and infrastructure. 9.4 Goals and Policies Create goals and implementation steps based on wastewater demand and the age and quality of the existing infrastructure. 5.5 Draft and Revision of Wastewater Chapter One draft of the wastewater chapter and one revision to the wastewater chapter. Cost: $19,000 Task 10: Implementation Component 10.1 Existing Ordinances and Regulations Compile all appropriate GIS and other data including the Zoning Ordinance, City Code, Fee Schedule, Capital Improvement Plan (CIP). 10.2 City Code Implications Provide recommendations on zoning districts, rezonings, development fees and CIP amendments to implement the goals and implementation steps from the land use chapter. 10.3 Land Use and Zoning Intersection Exhibits including charts of zoning district standards and the existing zoning map. 10.4 Goals and Policies Create goals and implementation steps for implementation based on the community vision, the meetings and feedback gathered during Task One and with Planning Commission and City Council assistance. 10.5 Draft and Revision of Implementation Chapter One draft of the implementation chapter and one revision to the implementation chapter. Cost: $3,900 Mr. Joynes  March 13, 2017  Page 6        Task 11: Metropolitan Council Meetings and Other Required Components 11.1 Distribution of Draft Distribute the draft Comprehensive Plan to the affected jurisdictions per the Metropolitan Council requirements. Cost: $300 Total Not to Exceed Project Costs of Tasks 1 through 11 - $100,300 ADDITIONAL SERVICES Due to the extensive scope and length of time in the development of a Comprehensive Plan, there are times when additional services beyond the proposed scope of service could be desired by the City. Should the City Council chose for additional services, the following costs are provided: Public Open Houses: $2,000 each meeting Additional Council/Commission/Committee Meetings: $1,250 each meeting Water Supply Model: $6,000 These additional services will not be provided without specific direction from the City Council. CONCULSION On behalf of the entire WSB team, thank you for the opportunity to submit this proposal to provide services to update the Arden Hills Comprehensive Plan. This proposal is a not to exceed cost proposal. If City staff chooses to complete any of the tasks described, that amount will be deducted from the total cost of the proposal. The proposal cost will be honored for 90 days from March 13, 2017. Sincerely, WSB & Associates, Inc. Eric Zweber, AICP Senior Planner ACCEPTED BY: CITY OF ARDEN HILLS, MINNESOTA The City of Arden Hills hereby accepts the WSB proposal of $100,300 for the services outlined in this letter proposal, as well as the additional fees for components below by initialing behind those selected for inclusion in this proposal. Signature: N a m e / T i t l e : D a t e :   Page 1 of 1 DATE: March 20, 2017 TO: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator FROM: Sue Polka, Public Works Director/City Engineer SUBJECT: Highway 10 and County Road 96 Intersection BACKGROUND In early December 2016, a crash occurred on County Road 96 at the intersection of Highway 10 resulting in two fatalities. DISCUSSION I’ve spoken with the Ramsey County Traffic Engineer regarding the intersection and potential operational changes that may occur due to the recent event. She has given me the following information: • The state DPS has completed a crash investigation but the report is still pending. • After the incident, the county hired a consultant to review the signal timing at the intersection. The timing was also reviewed with MnDOT and it has been determined that the current timing is still appropriate. No revisions have been made. • If the permissive left (flashing yellow arrow) is not allowed, the traffic backs up into the through lane. • The County is currently planning to update all traffic signals on County Road 96 with the flashing yellow arrows. AGENDA ITEM – 1D MEMORANDUM Page 1 of 2 DATE: March 20, 2017 TO: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator FROM: Sue Polka, Public Works Director/City Engineer SUBJECT: Dump Truck Purchase Budgeted Amount: Actual Amount: Funding Sources: $240,000 $197,352.40 Equipment Replacement Fund Requested Action Authorize the purchase of a 2018 Mack chassis from Nuss Truck & Equipment ($87,808.40) and Towmaster dump truck body, including plow and de-icing equipment ($109,544.00) for a total cost of $197,352.40, which includes the trade in of the City’s 2001 Sterling dump truck in the amount of $18,000.00. Background In 2011 the City purchased a used 2001 Sterling dump truck with plow and de-icing equipment from Ramsey County. While the possibility of purchasing another used truck from the County was considered. However, they currently do not have any trucks available and will not until 2019. In addition, many replacement parts for the Sterling chassis are no longer available due to the line not being produced for several years which not only affects the City’s current truck but also the next available Ramsey County truck. The County is currently replacing the old Sterling trucks with Mack trucks and has the equipment to complete the repairs. The dump truck is used for plowing in the winter and to haul materials for paving projects in the summer as well as for hauling materials during utility repairs. If this truck were to become inoperable, the level of service for snow removal would decline. The City’s 2001 dump truck currently has mileage of 47,630 with 3,870 hours of operation. AGENDA ITEM – 1E MEMORANDUM Page 2 of 2 Discussion The 2017/18 Capital Improvement Plan (CIP) includes an item for the replacement of the 2001 dump truck (Unit 116). A copy of the detailed sheet from the CIP is attached (Attachment A). repair costs for parts and labor between 2003 and 2016 total $16,146. As previously mentioned, parts for the 16-year-old Sterling chassis are no longer available as Sterling is out of business. Ramsey County staff has indicated that they are already experiencing trouble getting replacement parts for some of the units. The County would not recommend that the City purchase any of their old Sterling units. Their International Trucks will become available in 2021. Staff is concerned about future repair costs due to the truck’s age and also down-time that would be the result of such repairs. The 2017/18 CIP has an estimated budget for the purchase of the new dump truck of $250,000 and a trade in value of $10,000 for a net budget of $240,000 for this purchase. The truck was initially budgeted over two years due to an 18-month build out process. TowMaster has indicated that the truck can be completed in 2017 with and estimated delivery date in October. The pricing quote (Attachment B) shows a purchase price from Nuss Truck & Equipment of $87,808.40, with the $18,000.00 trade-in of the 2001 truck, and 109,544.00 from TowMaster. the total purchase price of the unit is $197,352.40 including tax and licensing, well below the estimated budget. The pricing provided in the quotes are as listed in the Minnesota State contract. Attachments ATTACHMENT A: Equipment CIP ATTACHMENT B: Quotes from Nuss Truck & Equipment and TowMaster ATTACHMENT C: Photos of 2001 Sterling dump truck (Unit 116) Dump Truck – Unit 116