HomeMy WebLinkAbout04-06-15 JDA
AGENDA
Monday, April 6, 2015
5:30 p.m.
Arden Hills City Hall—Council Chambers
1. Roll Call
2. Approval of Agenda
3. Approval of Minutes, 2/2/15
4. Public Inquiries/Informational
a. The intent of the Public Inquiries/Informational part of the agenda is to provide interested
parties with an opportunity to speak to the JDA about an issue or concern about a past or future
agenda item. The current agenda for tonight's meeting is structured to ensure that the JDA
accomplishes their business within that agenda. If there is a public hearing scheduled as an
agenda item, the public will be invited to speak to that agenda item. In addressing the JDA,
please state your name and address for the record, and a brief summary of the specific matter
being addressed. To allow adequate time for each person wishing to address the JDA, individuals
should limit their comments to three (3) minutes. Written documents may be distributed to the
JDA prior to the meeting, or as bench copies, to allow a more timely presentation.
5. Consent Agenda
6. Old Business
7. Public Hearing
a. None
Joint Development Authority
TCAAP Redevelopment Project
8. New Business
a. Election of 2015 Officers
b. Presentation of Energy Integration Resiliency Framework (EIRF) from
Energy Resilience Advisory Board (ERAB)—Lyle Salmela, Chair ERAB; Greg
Mack, Staff Liaison
c. Governance overview—Mike Norton, Attorney for the JDA
9. Development Director’s Report
10. Administrative Director’s Report
11. Commissioner Updates
12. Adjournment
Joint Development Authority
TCAAP Redevelopment Project
DATE: April 6, 2015
TO: Joint Development Authority Board of Commissioners
FROM: Heather Worthington, Administrative Director
SUBJECT: Energy Integration and Resiliency Framework Final Document
Budgeted Amount: Actual Amount: Funding Source:
n/a n/a n/a
Summary
The draft Energy Integration and Resiliency Framework—Final Report is attached. The report includes the analysis of
energy alternatives for the site and an implementation plan.
Background/Discussion
In 2014, the Joint Development Authority (“JDA”) requested an analysis that would set the foundation for approaching
energy related decisions at the TCAAP site so that cost effective, energy efficient alternatives and opportunities are
addressed during initial development while allowing for flexibility to adapt to new opportunities over the next 50 years.
The Energy Resiliency Advisory Board (“ERAB”) was established to provide advice during the project.
Ever-Green Energy was chosen to prepare the TCAAP Energy Integration and Resiliency Framework (“Framework”) with
ERAB providing advice, review and comments. Phase 1 of the project was presented to the JDA on November 3, 2014. It
included an Energy Vison for the TCAAP site, Guiding Principles and a White Paper. The White Paper reviewed a broad
range of energy supply and demand-side management alternatives and assessed their relevance for the TCAAP site.
Alternatives that were most likely to be cost effective and energy efficient were recommended for further analysis.
After presentations to the JDA and the Arden Hills City Council, Phase 2 addressed the recommendations.
Phase 2 included a more detailed review of the energy alternatives recommended in Phase 1. The technical and
financial aspects were analyzed to get a better understanding of what is likely to work with the site’s special
characteristics and whether what works is cost effective. The work was done in consultation with related activities
including infrastructure planning and site land use planning. During the process, the MN Army National Guard / AHATS
AGENDA ITEM 8b
MEMORANDUM
Joint Development Authority
TCAAP Redevelopment Project
and Excel were invited to be ex officio ERAB members because it became clear that they have special information
related to the analysis and have related interests.
The Framework includes the findings from the analyses and next steps to pursue the recommendations and partnerships
that will be important to TCAAP’s energy future. The Framework has been prepared in three formats: a 2-page
summary (attached), the full Energy Integration and Resiliency Framework (attached) and a Brief which is a more
detailed 15 page summary.
On March 11, 2015, the ERAB reviewed the draft EIRF and recommended that the JDA approve the EIRF; recommend
that the JDA sponsor a community outreach program with partnering organizations to share the critical elements of the
EIRF; and, ERAB members expressed their willingness as individual community members to assist the JDA with
implementation of the EIRF.
There will be comments by Project Manager Greg Mack and Energy Resiliency Advisory Board Chair Lyle Salmela,
followed by a presentation by Ever-Green Energy.
Action Requested:
• Discussion
• Adoption of the EIRF
• Direct staff to move forward with the implementation steps outlined in the EIRF in conjunction with the TCAAP
Redevelopment Code and Master Plan, including negotiations with the General Services Administration for
conveyance of the excess portion of the former Primer Tracer Area (PTA) for use as a Solar PV site; secure a
demolition/remediation contract to prepare the PTA for Solar PV installation; prepare a RFP and solicit proposals
for construction and operation of Solar PV; and, continue to work with the Army to secure long term rights to
utilize heat from the ground water treatment system and install a heat exchanger/pumping station within the
ground water filtration building for operation of a low-temperature district energy system.
TCAAP Energy Integration Resiliency Framework Background
The redevelopment of the Twin Cities Army Ammunition
Plant (TCAAP) site in Arden Hills, Minnesota, offers unique
and exciting opportunities to build a vibrant community
that attracts residents and businesses and serves as a
national model for sustainable redevelopment. Ramsey
County, Arden Hills, and local stakeholders are working
together to build a forward-looking community that
optimizes the energy and environmental opportunities of
the next generation.Vision Statement
TCAAP will be a vibrant development that leverages
long-term energy conservation and resilience to attract
investment and partnership, and achieves sustainable
benefits for Arden Hills and the surrounding community.Guiding Principles
Establish TCAAP as a national model for development
of integrated energy systems.
Develop a resilient community for energy and other
utilities.
Implement infrastructure solutions that are flexible
and scalable over the next 50 years.
Deliver a model of efficient energy and water usage
that minimizes TCAAP’s impact on the environment.
Create an economically competitive and attractive
environment for developers and businesses.
Planning for the Future
The redevelopment of the site required an in-depth
analysis of policy and implementable energy source and
energy conservation methods that are implementable for
this site. This work is captured in the Energy Integration
Resiliency Framework. This analysis resulted in the
following key findings:
Energy source recommendations include low-
temperature district energy system, solar photovoltaic
(PV), combined heat and power (CHP), and the
foundation for a future micro-grid
Implementation of Framework opportunities can
reduce greenhouse gas emissions by as much as 70%
and potentially reach net-zero status in some areas.
Solar PV technology is viable and could meet TCAAP
and AHATS needs during peak conditions.
Locally treated groundwater possesses enough energy
to meet all of the thermal needs of the planned TCAAP
residential neighborhoods.
Enhanced building design standards applied in the
request for proposal (RFP) process can attract and
streamline energy efficient development.
Building orientation, co-location of complementary use
buildings, and use of sub-meters can reduce energy
consumption and improve energy efficiency.
The Spine Road presents an opportunity for future
energy infrastructure.
A solar PV array at the Primer Tracer
site could meet the electricity needs of
TCAAP and AHATS when operating at
peak conditions.
v
v
v
v
v
v
v
v
v
v
v
vPartners
Ramsey County, City of Arden Hills (or the Joint Development Authority), Energy Resiliency Advisory Board (ERAB),
Minnesota Army National Guard (MNARNG), the U.S. Army, and Xcel Energy
Energy Integration Resiliency Framework
www.ricecreekcommons.com
Work with the Army and
the appropriate regulatory
authorities to obtain approval to
extract energy from the treated
ground water, and utilize the
existing pump house for the
low-temperature district energy
distribution loop.
Collaborate with Xcel Energy
and other partners to explore a
neighborhood that is independent
of the natural gas system, through
district energy and electric grid
services.
Incorporate the energy savings
design standards for commercial
and residential developments and
educate developers on the various
energy efficiency opportunities.
Develop a utility coordination
program that enables cost-
effective implementation of
initial and future utilities and
infrastructure on the site.
Identify and pursue funding
opportunities for special
initiatives.
Next Steps
To achieve the TCAAP energy vision and achieve sustainable benefits for the City and the surrounding community, he
Project Team recommends the following immediate actions:
Continue partnership discussions with the MNARNG, Xcel Energy, the University of Minnesota Center for Sustainable
Building Research, and other stakeholders as development of the site and the various energy opportunities progress.
Develop an RFP for the development of a solar array on the Primer Tracer site.
Work with prospective developers to identify opportunities for serving energy needs with a CHP facility.
Develop the business plan for the proposed low-temperature district energy system and form the operational
organization in preparation for the site development RFP’s.
The available energy from the treated
groundwater can serve all of the TCAAP
homes with a lower-cost energy source
that reduces GHG emissions by ~30%.
v
v
v
v
v
v
v
v
v
TCAAP Energy Integration Resiliency Framework: Brief
March 31, 2015
TCAAP Energy Integration Resiliency Framework
Brief
2
Acknowledgements
The Project Team would like to thank the City of Arden Hills, Ramsey County, the Energy Resiliency
Advisory Board, and the Joint Development Authority for all of their input and guidance. Their
leadership and insights proved invaluable as the Project Team progressed toward the TCAAP energy
vision. The Project Team is also grateful to the Minnesota Army National Guard, the University of
Minnesota Center for Sustainable Building Research, and Xcel Energy for their cooperation and
partnership through the development of this Framework.
About the Project Team
1.1. Ever-Green Energy
Ever-Green Energy is one of the country’s premier community energy system experts, with decades of
experience in developing, operating, and managing district energy systems. The unique combination of
technical expertise, business acumen, and operations know-how has helped communities, colleges and
universities, and government organizations advance their exploration and implementation of
integrated energy systems.
1.2. Burns & McDonnell
Burns & McDonnell, headquartered in Kansas City, MO, is a full-service engineering, architecture,
construction, environmental and consulting solutions firm. The company’s multidisciplinary staff of
nearly 5,000 employee-owners includes engineers, architects, construction professionals, planners,
estimators, economists, technicians, and scientists, representing virtually all design disciplines.
1.3. Center for Energy and the Environment
The Center for Energy and Environment is a nonprofit organization that promotes energy efficiency to
strengthen the economy while improving the environment. CEE conducts research and develops
programs so that: businesses operate more efficiently and profitably; government agencies and
nonprofits spend less on facilities and functions; utilities achieve their energy-efficiency goals at least-
cost; and households save money and improve comfort.
1.4. Fresh Energy
For more than 20 years, Fresh Energy has transformed widely held economic and environmental ideas
into smart energy policy. Fresh Energy works in the realm of public policy, changing the rules that
govern our energy system. The organization’s efforts focus on energy efficiency, clean energy,
transportation and land use, and carbon reduction.
TCAAP Energy Integration Resiliency Framework
Brief
3
Brief: TCAAP Energy Integration Resiliency Framework
The redevelopment of the Twin Cities Army Ammunition Plant (TCAAP) site in Arden Hills, Minnesota,
offers unique and exciting opportunities to build a vibrant community that attracts residents and
businesses, and serves as a national model for sustainable redevelopment. Ramsey County (County),
Arden Hills (City), and neighboring property owners are working together to build a forward-looking
community that optimizes innovative energy supply systems that can be developed for reliability and
resiliency, increases the use of local renewable energy systems that can reduce the environmental
impact of the community, and develops energy efficient buildings that can provide low-cost energy for
residents and tenants.
TCAAP is a 427-acre site that has recently gone through an extensive demolition and environmental
remediation program. The site is centrally located at the intersection of I-35 E and Highway 10, just ten
miles from downtown Minneapolis and downtown Saint Paul. TCAAP is unique for its size, prime
location, greenfield condition, and potential partnerships. The partnerships between the Minnesota
Army National Guard (MNARNG), the U.S. Army, Xcel Energy, the City, and the County create dynamic
and beneficial opportunities for all entities.
To facilitate TCAAP redevelopment, the County and the City have engaged in a partnership through the
formation of a Joint Development Authority (JDA). For the purposes of energy planning, they have also
established the Energy Resiliency Advisory Board (ERAB) and appointed community stakeholders to
help define an energy vision for TCAAP. The Project Team includes Ever-Green Energy, Center for
Energy and Environment, Fresh Energy, and Burns & McDonnell.
Findings
Given current market drivers and the timing of TCAAP development, implementation of the
opportunities identified in this Framework should begin immediately.
Partnership with Xcel Energy and the Minnesota Army National Guard will be essential to
achieving the vision for TCAAP.
Implementing the opportunities recommended in this Framework can reduce greenhouse gas
emissions by as much as 70%.
A solar photovoltaic (PV) installation at the Primer Tracer site has the potential to provide
sufficient power to TCAAP and AHATS when operating at peak conditions.
TCAAP Energy Integration Resiliency Framework
Brief
4
The City, County, and ERAB have worked with the Project Team to develop a two-part TCAAP Energy
Integration Resiliency Framework that outlines the appropriate planning guidelines and policies with
careful consideration of local resources, stakeholder interests, project goals, and the best available
technologies for implementation over the next 50 years. Phase one of the study was the development
of the Policy White Paper which was accepted by the JDA and the Arden Hills City Council in November
2014. The White Paper helps guide policy and provides a unifying vision for the site’s energy future and
identifies a number of opportunities for energy efficiency and efficient energy supply options.
Phase two of the study focused on the development of this document, the Energy Integration
Resiliency Framework (Framework) which provides more details about how the County, the City, and
the JDA can technically achieve the vision and recommendations put forth in the White Paper. The
Framework considers the TCAAP Redevelopment Plan, which outlines land use, infrastructure planning,
and the site development timeline. The expectation is for TCAAP to be redeveloped as a mixed-use
community with residential, commercial, and retail space. The Framework evaluates the energy supply
alternatives and demand-side management strategies that were the most immediately implementable
concepts from the White Paper. The Framework outlines the energy supply technologies that can be
Combined heat and power (CHP) is an efficient and effective step toward developing a microgrid
at TCAAP and AHATS.
The locally treated groundwater possesses enough energy to meet all of the thermal needs of
the planned TCAAP residential neighborhoods.
Enhanced building design standards applied in the request for proposal (RFP) process can attract
and streamline energy efficient development.
Building orientation, co-location of complementary use buildings, and use of sub-meters can
reduce energy consumption and improve energy efficiency.
Integrating several of these energy opportunities would allow residents of TCAAP to achieve net-
zero energy status.
The County and JDA should allow corridors for future energy infrastructure along the Spine Road
The JDA should begin pursuing funding opportunities that support the strategies in this
Framework.
The strategies identified in this Framework should be incorporated into the developer selection
process.
TCAAP Energy Integration Resiliency Framework
Brief
5
built during the early phases of site development and would be financially beneficial, financeable,
practical, and achievable. The Framework also provides a detailed analysis of the optimal initial energy
efficiency strategies, including site and building planning, demand-side management, advanced
technology, and building design. Energy supply and energy efficiency solutions at TCAAP will also be
influenced by collaboration between partners, including the MNARNG and Xcel Energy. These
partnership opportunities are immediate and implementable to meet the loads of the buildings that
are currently in the area, as well as the future buildings expected to be built within TCAAP and nearby.
During development of the White Paper, the ERAB outlined their vision and guiding principles for
TCAAP energy development.
Partnership Opportunities (Outlined in Section 2)
The Project Team has begun to assess several potential partnerships, including infrastructure and
operations opportunities with the local utility provider, Xcel Energy, and MNARNG. The MNARNG owns
and operates the Arden Hills Army Training Site (AHATS) adjacent to the TCAAP site. The MNARNG has
developed a master plan for the buildings on its site that includes the goals of net-zero energy, water,
and waste, and is currently working on implementation plans to achieve these goals. The MNARNG has
Vision Statement
TCAAP will be a vibrant development that leverages long-term energy conservation and
resilience to attract investment and partnership, and achieves sustainable benefits for Arden
Hills and the surrounding community.
Guiding Principles
Establish TCAAP as a national model for development of integrated energy systems.
Develop a resilient community for energy and other utilities.
Implement infrastructure solutions that are flexible and scalable over the next 50 years.
Deliver a model of efficient energy and water usage that minimizes TCAAP’s impact on
the environment.
Create an economically competitive and attractive environment for developers and
businesses.
TCAAP Energy Integration Resiliency Framework
Brief
6
expressed a strong interest in collaborating with the County and JDA on the development of energy
solutions for the area.
Xcel Energy is committed to reaching energy efficiency and
renewable energy goals, as well as the potential for innovative
demonstration projects that showcase energy efficiency and
resilient energy. Xcel Energy leadership has expressed a
commitment to partnership with the County in the implementation
of the energy plan for TCAAP, and the County should continue to
pursue opportunities that can benefit both parties and achieve the
energy vision for TCAAP.
Additionally, there are two areas for additional partnership. The
Ramsey County Public Works (RCPW) facility on County Highway 96 is an existing facility adjacent to
AHATS and TCAAP. In the Primer Tracer area on the north edge of TCAAP and AHATS, the Department
of Public Safety is contemplating the installation of an emergency operations facility. Both of these
facilities should be considered when planning energy solutions for the area. Through partnership
discussions, a number of immediate and implementable partnership opportunities were identified to
meet the loads of the buildings that are currently in the area, as well as the initial buildings expected to
be built at TCAAP.
Energy Source Recommendations (Outlined in Section 3)
After evaluating a range of possible energy sources and considering the TCAAP goals, timeline, and
resources, the Project Team recommends the development of solar PV, CHP, low-temperature district
energy system, and the foundational components of a future microgrid. Beyond meeting the energy
needs of customers and the goals of stakeholders, these recommendations are customized to the
distinctive features of TCAAP.
When considering the recommended technologies, it is important to consider the potential CO2
reductions that accompany these strategies. In total, over 8510 tons of CO2/year can be avoided, which
is the equivalent of removing 1625 cars from the road each year. The environmental benefits of
reduced greenhouse gas emissions will be further increased through integration with the other energy
supply alternatives recommended and implementation of demand-side management strategies,
ultimately leading to more sustainable redevelopment of TCAAP and the long-term potential of
reaching carbon-neutrality for the site in the future.
Partnerships with Xcel
Energy and MNARNG
could create unique and
exciting opportunities to
optimize energy supply
and energy efficiency at
TCAAP.
TCAAP Energy Integration Resiliency Framework
Brief
7
Solar PV
The utilization of solar technology can enable the generation and utilization of renewable energy at
TCAAP.
Solar PV at Prime Tracer
Based on generally accepted solar generation estimates, a large-scale solar installation on 40-acre of
the Prime Tracer site could generate approximately 8 megawatts of
electricity (MWe) in peak conditions. Conservatively, this could
account for approximately 70% of the peak electric load in the
area. Implementing a solar PV array in the Primer Tracer area will
result in a reduction of greenhouse gas emissions by approximately
7,524 tons of CO2 per year.
Solar PV at AHATS
A 2 MWe solar PV installation at the capped soil area west of the
existing AHATS Field Maintenance Shop would primarily meet a portion of the electric needs of the
AHATS site, but could provide additional renewable electric energy to TCAAP during the non-peak
energy usage times at AHATS.
Combined Heat and Power
The vision for the TCAAP site is for the Thumb, Town Center, and Flex areas to be served electrically
and thermally by a CHP energy system located at or near TCAAP. This localized energy source would
enable achievement of many of the guiding principles established
by the ERAB, potentially reducing greenhouse gas emission
reductions by 20%.
Depending upon the type of business that develops in the Thumb, a
CHP plant located on that property could efficiently serve the
electric and thermal energy needs of that business, as well as the
thermal needs of buildings in the Town. A CHP plant located close
to AHATS and the existing facility at Ramsey County Public Works
could be used to meet the electric needs of MNARNG, while
simultaneously meeting the thermal needs of MNARNG and RCPW
buildings. As TCAAP development progresses, these two CHP
systems could be integrated to serve the majority of the thermal
energy needs of the commercial portion of TCAAP.
A solar PV array at the
Primer Tracer site could
meet the electricity
needs of TCAAP and
AHATS when operating
at peak conditions.
Implementing a CHP
system at the Thumb
could reduce
greenhouse gas
emissions by as much as
20%, reduce energy
costs, increase energy
efficiency, and establish
the foundation of a
future microgrid.
TCAAP Energy Integration Resiliency Framework
Brief
8
Microgrid – There is an opportunity to implement and demonstrate “next generation” electricity grid
technologies that will help achieve the TCAAP energy vision, including development of a microgrid
connected to a CHP plant. It will be important for Xcel Energy, the MNARNG, and the JDA to develop a
plan to expand the scope of the CHP plant and develop a microgrid for the broader area as TCAAP
development proceeds.
Low-Temperature District Energy System
The residential neighborhoods planned for the TCAAP site present
a unique and highly visible opportunity to leverage low-grade
energy from the treated groundwater as an energy supply for the
neighborhoods, distributed via a low-temperature district energy
system. This energy would be sufficient to meet the heating and
cooling needs of the Hill and Creek residential neighborhoods of
TCAAP, with approximately 3 MMBtu/hour of excess capacity
available for additional TCAAP buildings.
For the proposed system to be successfully implemented, it would
need to be constructed as the first homes are being built, so that service can be provided from the
outset of development. To optimize the economic benefits of the system, every home in the selected
neighborhoods should be constructed with a heat pump HVAC system and be connected to the
proposed system. This would provide the most financeable, cost-effective implementation plan, and
also maximize energy efficiency for TCAAP.
One important advantage of a low-temperature district energy system is the reduction of greenhouse
gas emissions. Comparing emission rates between traditional heating ventilation and air-conditioning
(HVAC) systems and the proposed low-temperature district energy system in the Hill and Creek
neighborhoods shows carbon dioxide emissions are could be reduced by almost 30% or 310 tons
CO2/year.
Implementing a low-temperature district energy system in the residential neighborhoods of TCAAP can
deliver several benefits to the site and stakeholders, including the following:
An energy system that is more energy efficient than traditional heating and cooling systems.
Reduced fossil fuel usage and greenhouse gas emissions.
Competitive, stable costs of energy for homeowners.
Xcel Energy could avoid installing gas pipe in the neighborhoods
The available energy
from the treated
groundwater can serve
all of the TCAAP homes
with a lower-cost energy
source that reduces GHG
emissions by ~30%.
TCAAP Energy Integration Resiliency Framework
Brief
9
Installation of an infrastructure network in the neighborhoods will allow for easier integration
of future energy sources or technology advancements as they become available.
Implementation of this system would establish the TCAAP approach to sustainable
neighborhoods as a national model for energy efficiency and innovative site development.
Additional Energy Technology Opportunities
While not recommended for any of the initial options in this Framework, there are two additional
technologies that should be considered for future TCAAP energy system integration:
Thermal Energy Storage – On the AHATS site, there is an existing one million gallon water storage
tank and related water distribution piping. This tank could be used as a thermal energy storage tank to
store water for the heating and cooling needs of the area. This would work like a battery, which would
fill up during non-peak energy hours and be discharged during peak energy usage times to balance out
the energy usage profile for the area.
Solar Thermal – The MNARNG utilizes solar-thermal technology on its buildings and is investigating
further integration of it as their site is built out. This technology should be considered for individual
sites or as part of a larger energy plan for TCAAP development.
Energy Efficiency Strategies through Demand-Side Management (Outlined in Section 4)
To promote energy efficiency at TCAAP, the Project Team recommends a combined approach through
flexible building design assistance, readily available technical resources, planning best practices, and
development RFP criteria that will attract and streamline energy efficient development. High-
performance buildings with a lower energy profile will provide an economically attractive environment
where building owners save money through increased efficiency and lower energy bills. The
implementation of improved building energy efficiency will be as important as the energy sources to
achieving the community’s low-carbon, resiliency goals. Considering demand-side management
alongside development increases the opportunities for demonstration projects and resident, tenant,
and commercial participation. For these efforts, Xcel Energy and the Center for Sustainable Building
Research at the University of Minnesota will be valuable partners.
Throughout the development of TCAAP, the recommended demand-side initiatives will depend
strongly on engaging developers, who can help implement the TCAAP energy vision. These energy
efficiency recommendations make use of the truly unique opportunities at TCAAP, which include:
A greenfield development to minimize the cost of initial installation of energy efficient
systems.
TCAAP Energy Integration Resiliency Framework
Brief
10
The advantage of large scale deployment to optimize economies of scale.
Focus on replicable designs and proven technologies to simplify developer implementation.
Emphasis on building performance based standards, instead of only design conditions.
Important strategic partnerships with Xcel Energy and the Center for Sustainable Building
Research at the University of Minnesota.
High-Efficiency Commercial Buildings
As development moves forward it is recommended that the County, the JDA, and development
consultants utilize building standards, technical resources, planning tactics, and proposal criteria to
attract and streamline energy efficient development.
Utilize SB 2030
Minnesota’s Sustainable Buildings 2030 (SB 2030) is a performance
based building energy standard developed to incrementally move
new commercial building construction to net-zero energy by 2030.
On average, SB 2030 will require commercial buildings to be 35% to
45% more efficient than the new building code (IECC 2012). As
nearly 75% of the energy loads for TCAAP are estimated to be in
the retail, commercial, and flex areas of the development, energy
conservation measures for these areas will be paramount for
successful achievement of the Energy Vision. The key way to
incentivize use of SB 2030 is to give preference during the RFP review process to proposals that plan to
implement these standards.
Sub-metering
Commercial and multi-family building sub-metering is an important consideration because the
additional design cost is relatively low when considered up front, but has the potential to maintain
lower energy use since tenants directly see and pay for their energy use.
Sub-metering has been shown to save up to 21% in leased building spaces.1 The material, software,
and labor cost for each sub-meter ranges from $5,000 to $7,500. Several metering companies provide
sub-metering services by owning, operating, and maintaining the meters. Monthly fees are based on
1 “Tenant Occupants of Green Office Buildings: Driving the Market for Improving Existing Building Stock” McGraw-Hill Construction and
CBRE. September, 2011. www.cbre.com/EN/aboutus/MediaCentre/2011/Pages/10062011.aspx
On average, SB 2030 will
require commercial
buildings to be 35% to
45% more efficient than
the new building code
(IECC 2012).
TCAAP Energy Integration Resiliency Framework
Brief
11
the type of service needed and the quantity of sub-meters served, but costs per sub-meter range from
$150 to $400.
Strategic Building Siting and Co-Location
The County and JDA could facilitate building co-location through the platting and RFP process. Building
energy use types can be identified as potential candidates, and referred to energy design experts to
define the specific energy benefits that could be achieved through co-location. Buildings with
processes that produce hot water or heat could sell their excess to adjacent buildings that have use for
it at different times of day. District energy infrastructure could enhance this load diversity and energy
sharing. Businesses would be interested in this opportunity because it would improve the efficiency of
their consumption, reduce upfront capital equipment and maintenance costs, and increase comfort.2
Low-Load Residential Development
Residential developments at TCAAP could feature homes that do
not require natural gas, by utilizing electric appliances and serving
minimal heating and cooling demands through ground-source heat
pump technology. A low-load home would not require the larger
heating and cooling capacity of traditional systems, but instead
could meet residents’ comfort needs with smaller capacity systems.
The key technologies and strategies include high levels of building
insulation and passive solar design, a tight building shell, and high
efficiency lighting and appliances. These homes do not require significant insulation like a passive
house, but are 40% to 50% more efficient than what is required by the new energy code (IECC 2012).
Incorporation of high-performance technologies that have little to no impact on the up-front costs,
such as efficient appliances and low-flow plumbing, will help minimize hot water use and help
maximize home efficiency.
Building Orientation and Passive Solar
The process for solar-oriented development should be described in residential and commercial building
RFPs and should be integrated as evaluation criteria for development proposals. It should be evaluated
based on lowest total energy load of the homes or buildings to be sited under one proposal and should
consider street orientation, building orientation, and passive solar building envelope design elements.
2 The Primary Energy Factor (PEF) difference between district heating systems and Gas-fired heating (0.8/1.3=0.61)
http://www.euroheat.org/Files/Filer/documents/Publications/District%20Heating%20in%20buildings_final.pdf
Homes built at TCAAP
could be 40% to 50%
more efficient than what
is required by the new
energy code.
TCAAP Energy Integration Resiliency Framework
Brief
12
The thermal loads of homes and commercial buildings will
be impacted by the building envelope, street orientation, lot
and building orientation, and building massing. The likely
locations where street orientation could vary significantly to
accommodate energy implications would be the Creek, the
Hill, and the Transition neighborhood on the periphery of
the Town Center.
By considering these variables prior to the subdivision process, planners and developers have the
opportunity to produce efficient results with little or no-cost impacts.
High-Efficiency Streetlights
The City of Arden Hills has included a site-wide requirement for all streetlights to be “high-efficiency
lighting, such as LED lamps.” This requirement will trigger the inclusion of high efficiency lights in the
development process. Current LED technology saves approximately 50% to 70% of lighting energy use.
Another significant cost savings occurs by additionally reducing maintenance costs, given the longer life
of the bulbs.
Community Participation and Education
Community participation and education have been consistently mentioned as important factors for
TCAAP, both to engage the wider Arden Hills community and to leverage the energy savings potential
from facilitating ongoing awareness of energy use by site tenants and residents. Many details of
community engagement will need to be planned once the site sees its first residents and tenants.
However, certain engagement elements can be planned for or implemented during the early
development stage, including:
A TCAAP or Arden Hills-wide website that tracks energy goals and performance of buildings at
the site, including energy and carbon savings. The website could promote major metrics and
milestones, and issue periodic challenges (e.g. the “lowest user” challenge).
Community-wide open house or showcase events of leading edge technologies on the site,
especially for housing, that will attract and excite potential residents.
Commissioning of design or signage elements in public spaces that connect users to the site’s
energy resiliency goals and their contribution and participation in those goals. A targeted
marketing campaign around community solar development, as an early symbol of community-
driven, low carbon energy use at the site.
By pairing solar heat
gains and window
design strategies,
heating energy savings
can be up to 30%
TCAAP Energy Integration Resiliency Framework
Brief
13
Demonstration Opportunities
Advanced Distribution Grid
TCAAP’s greenfield status, combined with the site’s forward looking energy vision, make it an ideal
opportunity to pilot and demonstrate advanced technologies in the electric distribution grid. Many of
the opportunities outlined in this report, such as high solar PV penetration, advanced commercial
building metering, or responsive electric loads, are all facilitated by
a distribution system with increased communications and control
functions. Implementing an advanced distribution grid can save
customers money and reduce the environmental impact of their
energy use.
Innovative Energy Technologies
In addition to pilot opportunities at the grid level, TCAAP is ideal for
demonstrating innovative energy technologies at scale. The Project
Team recommends that the JDA and County seek and attract
partnerships to demonstrate proven technologies and strategies.
While the technologies may be proven, TCAAP offers scalable and
living demonstration opportunities, where an apartment, house, or
street of homes could serve as a living lab. Additionally, as a cold climate site that can attract multiple
partners, there is great opportunity to demonstrate the synergies that can exist between multiple
innovative technologies and design strategies. This might include piloting new in-road luminescent
street or pedestrian path lighting products in conjunction with high efficiency overhead LED street
lighting, electric vehicle storage and integration, or homes that have on-site electric storage and
remote controlled appliances/electronics that communicate with each other.
Conclusion
The ERAB has adopted a very forward-thinking vision for the TCAAP site. This will be achievable
through strategic partnerships with Xcel Energy, the MNARNG, the University of Minnesota Center for
Sustainable Building Research, environmentally conscious citizens, and developers who see the
economic and environmental value of the TCAAP energy vision. Through these partnerships, TCAAP will
be uniquely poised to be the national model for the development of integrated energy systems.
By laying the
groundwork for an
advanced distribution
system at TCAAP during
the planning phase,
residents and
businesses would have
access to cutting edge
opportunities such as
advanced rate design or
real-time load response.
TCAAP Energy Integration Resiliency Framework
Brief
14
The first steps toward achieving the energy vision include implementing energy supply options that
focus on efficiency, reliability, scalability, and sustainability, such as the low-temperature district
energy system in the residential neighborhoods and the community
solar garden at the Primer Tracer site. These specific opportunities
have been shown to be financially beneficial and financeable.
Developing a CHP that meets the needs of current buildings in the
area and is expandable in the future provides a platform for
establishing a resilient TCAAP microgrid as TCAAP development
progresses.
Implementing a demand-side management strategy that focuses on
building performance through the development RFP process will
build a resilient community for energy use. Focusing on improving
performance in the buildings to reduce the energy needs of the
buildings will provide an economically attractive environment as building owners are able to take
advantage of the financial savings realized by the increased efficiency, compared to traditional energy
expenditures.
Schedule and Next Steps (Outlined in Section 6)
The development schedule that is currently proposed is scheduled
to begin in 2016 with the construction of the interchanges of
County Hwy 96 and County Road H with the Spine Road. The Spine
Road construction is also expected to begin in 2016. Currently, site
development is projected to begin with the residential and retail
areas in the northern region of TCAAP in late 2016 or early 2017.
Development is expected to progress southward from the Town
and Creek neighborhoods as the market allows. The Thumb area is
being actively marketed by the JDA at this time, and could be
developed as soon as the right proposal is received from the
development community. The current development plan is
included in the appendix as Exhibit III.
Given this development timeline, the JDA will need to begin implementation on each of the individual
opportunities presented in this Framework, including immediate focus on the following:
partnerships
solar PV
combined heat and power
Initial focus should be on
energy efficient designs,
the low-temperature
district energy system in
the residential
neighborhoods, and the
community solar garden
at the Primer Tracer site.
Development at TCAAP
will begin in 2016,
therefore development
and implementation of
these recommended
energy strategies will
need to begin
immediately.
TCAAP Energy Integration Resiliency Framework
Brief
15
low-temperature district energy
system
demand-side management
infrastructure planning
funding pursuits
RFP development
education workshops
The TCAAP site is positioned to be a national model for site redevelopment. With planning and
leadership, this area can be developed to meet the bold energy vision of the ERAB to become a vibrant
development that leverages long-term energy conservation and resilience to attract investment and
partnership, and achieves sustainable benefits for Arden Hills and the surrounding community.
TCAAP Energy Integration Resiliency Framework
March 31, 2015
TCAAP Energy Integration Resiliency Framework
Brief
2
Acknowledgements
The Project Team would like to thank the City of Arden Hills, Ramsey County, the Energy Resiliency
Advisory Board, and the Joint Development Authority for all of their input and guidance. Their
leadership and insights proved invaluable as the Project Team progressed toward the TCAAP energy
vision. The Project Team is also grateful to the Minnesota Army National Guard, the University of
Minnesota Center for Sustainable Building Research, and Xcel Energy for their cooperation and
partnership through the development of this Framework.
About the Project Team
1.1. Ever-Green Energy
Ever-Green Energy is one of the country’s premier community energy system experts, with decades of
experience in developing, operating, and managing district energy systems. The unique combination of
technical expertise, business acumen, and operations know-how has helped communities, colleges and
universities, and government organizations advance their exploration and implementation of
integrated energy systems.
1.2. Burns & McDonnell
Burns & McDonnell, headquartered in Kansas City, MO, is a full-service engineering, architecture,
construction, environmental and consulting solutions firm. The company’s multidisciplinary staff of
nearly 5,000 employee-owners includes engineers, architects, construction professionals, planners,
estimators, economists, technicians, and scientists, representing virtually all design disciplines.
1.3. Center for Energy and the Environment
The Center for Energy and Environment is a nonprofit organization that promotes energy efficiency to
strengthen the economy while improving the environment. CEE conducts research and develops
programs so that: businesses operate more efficiently and profitably; government agencies and
nonprofits spend less on facilities and functions; utilities achieve their energy-efficiency goals at least-
cost; and households save money and improve comfort.
1.4. Fresh Energy
For more than 20 years, Fresh Energy has transformed widely held economic and environmental ideas
into smart energy policy. Fresh Energy works in the realm of public policy, changing the rules that
govern our energy system. The organization’s efforts focus on energy efficiency, clean energy,
transportation and land use, and carbon reduction.
TCAAP Energy Integration Resiliency Framework
Brief
3
Brief: TCAAP Energy Integration Resiliency Framework
The redevelopment of the Twin Cities Army Ammunition Plant (TCAAP) site in Arden Hills, Minnesota,
offers unique and exciting opportunities to build a vibrant community that attracts residents and
businesses, and serves as a national model for sustainable redevelopment. Ramsey County (County),
Arden Hills (City), and neighboring property owners are working together to build a forward-looking
community that optimizes innovative energy supply systems that can be developed for reliability and
resiliency, increases the use of local renewable energy systems that can reduce the environmental
impact of the community, and develops energy efficient buildings that can provide low-cost energy for
residents and tenants.
TCAAP is a 427-acre site that has recently gone through an extensive demolition and environmental
remediation program. The site is centrally located at the intersection of I-35 E and Highway 10, just ten
miles from downtown Minneapolis and downtown Saint Paul. TCAAP is unique for its size, prime
location, greenfield condition, and potential partnerships. The partnerships between the Minnesota
Army National Guard (MNARNG), the U.S. Army, Xcel Energy, the City, and the County create dynamic
and beneficial opportunities for all entities.
To facilitate TCAAP redevelopment, the County and the City have engaged in a partnership through the
formation of a Joint Development Authority (JDA). For the purposes of energy planning, they have also
established the Energy Resiliency Advisory Board (ERAB) and appointed community stakeholders to
help define an energy vision for TCAAP. The Project Team includes Ever-Green Energy, Center for
Energy and Environment, Fresh Energy, and Burns & McDonnell.
Findings
Given current market drivers and the timing of TCAAP development, implementation of the
opportunities identified in this Framework should begin immediately.
Partnership with Xcel Energy and the Minnesota Army National Guard will be essential to
achieving the vision for TCAAP.
Implementing the opportunities recommended in this Framework can reduce greenhouse gas
emissions by as much as 70%.
A solar photovoltaic (PV) installation at the Primer Tracer site has the potential to provide
sufficient power to TCAAP and AHATS when operating at peak conditions.
TCAAP Energy Integration Resiliency Framework
Brief
4
The City, County, and ERAB have worked with the Project Team to develop a two-part TCAAP Energy
Integration Resiliency Framework that outlines the appropriate planning guidelines and policies with
careful consideration of local resources, stakeholder interests, project goals, and the best available
technologies for implementation over the next 50 years. Phase one of the study was the development
of the Policy White Paper which was accepted by the JDA and the Arden Hills City Council in November
2014. The White Paper helps guide policy and provides a unifying vision for the site’s energy future and
identifies a number of opportunities for energy efficiency and efficient energy supply options.
Phase two of the study focused on the development of this document, the Energy Integration
Resiliency Framework (Framework) which provides more details about how the County, the City, and
the JDA can technically achieve the vision and recommendations put forth in the White Paper. The
Framework considers the TCAAP Redevelopment Plan, which outlines land use, infrastructure planning,
and the site development timeline. The expectation is for TCAAP to be redeveloped as a mixed-use
community with residential, commercial, and retail space. The Framework evaluates the energy supply
alternatives and demand-side management strategies that were the most immediately implementable
concepts from the White Paper. The Framework outlines the energy supply technologies that can be
Combined heat and power (CHP) is an efficient and effective step toward developing a microgrid
at TCAAP and AHATS.
The locally treated groundwater possesses enough energy to meet all of the thermal needs of
the planned TCAAP residential neighborhoods.
Enhanced building design standards applied in the request for proposal (RFP) process can attract
and streamline energy efficient development.
Building orientation, co-location of complementary use buildings, and use of sub-meters can
reduce energy consumption and improve energy efficiency.
Integrating several of these energy opportunities would allow residents of TCAAP to achieve net-
zero energy status.
The County and JDA should allow corridors for future energy infrastructure along the Spine Road
The JDA should begin pursuing funding opportunities that support the strategies in this
Framework.
The strategies identified in this Framework should be incorporated into the developer selection
process.
TCAAP Energy Integration Resiliency Framework
Brief
5
built during the early phases of site development and would be financially beneficial, financeable,
practical, and achievable. The Framework also provides a detailed analysis of the optimal initial energy
efficiency strategies, including site and building planning, demand-side management, advanced
technology, and building design. Energy supply and energy efficiency solutions at TCAAP will also be
influenced by collaboration between partners, including the MNARNG and Xcel Energy. These
partnership opportunities are immediate and implementable to meet the loads of the buildings that
are currently in the area, as well as the future buildings expected to be built within TCAAP and nearby.
During development of the White Paper, the ERAB outlined their vision and guiding principles for
TCAAP energy development.
Partnership Opportunities (Outlined in Section 2)
The Project Team has begun to assess several potential partnerships, including infrastructure and
operations opportunities with the local utility provider, Xcel Energy, and MNARNG. The MNARNG owns
and operates the Arden Hills Army Training Site (AHATS) adjacent to the TCAAP site. The MNARNG has
developed a master plan for the buildings on its site that includes the goals of net-zero energy, water,
and waste, and is currently working on implementation plans to achieve these goals. The MNARNG has
Vision Statement
TCAAP will be a vibrant development that leverages long-term energy conservation and
resilience to attract investment and partnership, and achieves sustainable benefits for Arden
Hills and the surrounding community.
Guiding Principles
Establish TCAAP as a national model for development of integrated energy systems.
Develop a resilient community for energy and other utilities.
Implement infrastructure solutions that are flexible and scalable over the next 50 years.
Deliver a model of efficient energy and water usage that minimizes TCAAP’s impact on
the environment.
Create an economically competitive and attractive environment for developers and
businesses.
TCAAP Energy Integration Resiliency Framework
Brief
6
expressed a strong interest in collaborating with the County and JDA on the development of energy
solutions for the area.
Xcel Energy is committed to reaching energy efficiency and
renewable energy goals, as well as the potential for innovative
demonstration projects that showcase energy efficiency and
resilient energy. Xcel Energy leadership has expressed a
commitment to partnership with the County in the implementation
of the energy plan for TCAAP, and the County should continue to
pursue opportunities that can benefit both parties and achieve the
energy vision for TCAAP.
Additionally, there are two areas for additional partnership. The
Ramsey County Public Works (RCPW) facility on County Highway 96 is an existing facility adjacent to
AHATS and TCAAP. In the Primer Tracer area on the north edge of TCAAP and AHATS, the Department
of Public Safety is contemplating the installation of an emergency operations facility. Both of these
facilities should be considered when planning energy solutions for the area. Through partnership
discussions, a number of immediate and implementable partnership opportunities were identified to
meet the loads of the buildings that are currently in the area, as well as the initial buildings expected to
be built at TCAAP.
Energy Source Recommendations (Outlined in Section 3)
After evaluating a range of possible energy sources and considering the TCAAP goals, timeline, and
resources, the Project Team recommends the development of solar PV, CHP, low-temperature district
energy system, and the foundational components of a future microgrid. Beyond meeting the energy
needs of customers and the goals of stakeholders, these recommendations are customized to the
distinctive features of TCAAP.
When considering the recommended technologies, it is important to consider the potential CO2
reductions that accompany these strategies. In total, over 8510 tons of CO2/year can be avoided, which
is the equivalent of removing 1625 cars from the road each year. The environmental benefits of
reduced greenhouse gas emissions will be further increased through integration with the other energy
supply alternatives recommended and implementation of demand-side management strategies,
ultimately leading to more sustainable redevelopment of TCAAP and the long-term potential of
reaching carbon-neutrality for the site in the future.
Partnerships with Xcel
Energy and MNARNG
could create unique and
exciting opportunities to
optimize energy supply
and energy efficiency at
TCAAP.
TCAAP Energy Integration Resiliency Framework
Brief
7
Solar PV
The utilization of solar technology can enable the generation and utilization of renewable energy at
TCAAP.
Solar PV at Prime Tracer
Based on generally accepted solar generation estimates, a large-scale solar installation on 40-acre of
the Prime Tracer site could generate approximately 8 megawatts of
electricity (MWe) in peak conditions. Conservatively, this could
account for approximately 70% of the peak electric load in the
area. Implementing a solar PV array in the Primer Tracer area will
result in a reduction of greenhouse gas emissions by approximately
7,524 tons of CO2 per year.
Solar PV at AHATS
A 2 MWe solar PV installation at the capped soil area west of the
existing AHATS Field Maintenance Shop would primarily meet a portion of the electric needs of the
AHATS site, but could provide additional renewable electric energy to TCAAP during the non-peak
energy usage times at AHATS.
Combined Heat and Power
The vision for the TCAAP site is for the Thumb, Town Center, and Flex areas to be served electrically
and thermally by a CHP energy system located at or near TCAAP. This localized energy source would
enable achievement of many of the guiding principles established
by the ERAB, potentially reducing greenhouse gas emission
reductions by 20%.
Depending upon the type of business that develops in the Thumb, a
CHP plant located on that property could efficiently serve the
electric and thermal energy needs of that business, as well as the
thermal needs of buildings in the Town. A CHP plant located close
to AHATS and the existing facility at Ramsey County Public Works
could be used to meet the electric needs of MNARNG, while
simultaneously meeting the thermal needs of MNARNG and RCPW
buildings. As TCAAP development progresses, these two CHP
systems could be integrated to serve the majority of the thermal
energy needs of the commercial portion of TCAAP.
A solar PV array at the
Primer Tracer site could
meet the electricity
needs of TCAAP and
AHATS when operating
at peak conditions.
Implementing a CHP
system at the Thumb
could reduce
greenhouse gas
emissions by as much as
20%, reduce energy
costs, increase energy
efficiency, and establish
the foundation of a
future microgrid.
TCAAP Energy Integration Resiliency Framework
Brief
8
Microgrid – There is an opportunity to implement and demonstrate “next generation” electricity grid
technologies that will help achieve the TCAAP energy vision, including development of a microgrid
connected to a CHP plant. It will be important for Xcel Energy, the MNARNG, and the JDA to develop a
plan to expand the scope of the CHP plant and develop a microgrid for the broader area as TCAAP
development proceeds.
Low-Temperature District Energy System
The residential neighborhoods planned for the TCAAP site present
a unique and highly visible opportunity to leverage low-grade
energy from the treated groundwater as an energy supply for the
neighborhoods, distributed via a low-temperature district energy
system. This energy would be sufficient to meet the heating and
cooling needs of the Hill and Creek residential neighborhoods of
TCAAP, with approximately 3 MMBtu/hour of excess capacity
available for additional TCAAP buildings.
For the proposed system to be successfully implemented, it would
need to be constructed as the first homes are being built, so that service can be provided from the
outset of development. To optimize the economic benefits of the system, every home in the selected
neighborhoods should be constructed with a heat pump HVAC system and be connected to the
proposed system. This would provide the most financeable, cost-effective implementation plan, and
also maximize energy efficiency for TCAAP.
One important advantage of a low-temperature district energy system is the reduction of greenhouse
gas emissions. Comparing emission rates between traditional heating ventilation and air-conditioning
(HVAC) systems and the proposed low-temperature district energy system in the Hill and Creek
neighborhoods shows carbon dioxide emissions are could be reduced by almost 30% or 310 tons
CO2/year.
Implementing a low-temperature district energy system in the residential neighborhoods of TCAAP can
deliver several benefits to the site and stakeholders, including the following:
An energy system that is more energy efficient than traditional heating and cooling systems.
Reduced fossil fuel usage and greenhouse gas emissions.
Competitive, stable costs of energy for homeowners.
Xcel Energy could avoid installing gas pipe in the neighborhoods
The available energy
from the treated
groundwater can serve
all of the TCAAP homes
with a lower-cost energy
source that reduces GHG
emissions by ~30%.
TCAAP Energy Integration Resiliency Framework
Brief
9
Installation of an infrastructure network in the neighborhoods will allow for easier integration
of future energy sources or technology advancements as they become available.
Implementation of this system would establish the TCAAP approach to sustainable
neighborhoods as a national model for energy efficiency and innovative site development.
Additional Energy Technology Opportunities
While not recommended for any of the initial options in this Framework, there are two additional
technologies that should be considered for future TCAAP energy system integration:
Thermal Energy Storage – On the AHATS site, there is an existing one million gallon water storage
tank and related water distribution piping. This tank could be used as a thermal energy storage tank to
store water for the heating and cooling needs of the area. This would work like a battery, which would
fill up during non-peak energy hours and be discharged during peak energy usage times to balance out
the energy usage profile for the area.
Solar Thermal – The MNARNG utilizes solar-thermal technology on its buildings and is investigating
further integration of it as their site is built out. This technology should be considered for individual
sites or as part of a larger energy plan for TCAAP development.
Energy Efficiency Strategies through Demand-Side Management (Outlined in Section 4)
To promote energy efficiency at TCAAP, the Project Team recommends a combined approach through
flexible building design assistance, readily available technical resources, planning best practices, and
development RFP criteria that will attract and streamline energy efficient development. High-
performance buildings with a lower energy profile will provide an economically attractive environment
where building owners save money through increased efficiency and lower energy bills. The
implementation of improved building energy efficiency will be as important as the energy sources to
achieving the community’s low-carbon, resiliency goals. Considering demand-side management
alongside development increases the opportunities for demonstration projects and resident, tenant,
and commercial participation. For these efforts, Xcel Energy and the Center for Sustainable Building
Research at the University of Minnesota will be valuable partners.
Throughout the development of TCAAP, the recommended demand-side initiatives will depend
strongly on engaging developers, who can help implement the TCAAP energy vision. These energy
efficiency recommendations make use of the truly unique opportunities at TCAAP, which include:
A greenfield development to minimize the cost of initial installation of energy efficient
systems.
TCAAP Energy Integration Resiliency Framework
Brief
10
The advantage of large scale deployment to optimize economies of scale.
Focus on replicable designs and proven technologies to simplify developer implementation.
Emphasis on building performance based standards, instead of only design conditions.
Important strategic partnerships with Xcel Energy and the Center for Sustainable Building
Research at the University of Minnesota.
High-Efficiency Commercial Buildings
As development moves forward it is recommended that the County, the JDA, and development
consultants utilize building standards, technical resources, planning tactics, and proposal criteria to
attract and streamline energy efficient development.
Utilize SB 2030
Minnesota’s Sustainable Buildings 2030 (SB 2030) is a performance
based building energy standard developed to incrementally move
new commercial building construction to net-zero energy by 2030.
On average, SB 2030 will require commercial buildings to be 35% to
45% more efficient than the new building code (IECC 2012). As
nearly 75% of the energy loads for TCAAP are estimated to be in
the retail, commercial, and flex areas of the development, energy
conservation measures for these areas will be paramount for
successful achievement of the Energy Vision. The key way to
incentivize use of SB 2030 is to give preference during the RFP review process to proposals that plan to
implement these standards.
Sub-metering
Commercial and multi-family building sub-metering is an important consideration because the
additional design cost is relatively low when considered up front, but has the potential to maintain
lower energy use since tenants directly see and pay for their energy use.
Sub-metering has been shown to save up to 21% in leased building spaces.1 The material, software,
and labor cost for each sub-meter ranges from $5,000 to $7,500. Several metering companies provide
sub-metering services by owning, operating, and maintaining the meters. Monthly fees are based on
1 “Tenant Occupants of Green Office Buildings: Driving the Market for Improving Existing Building Stock” McGraw-Hill Construction and
CBRE. September, 2011. www.cbre.com/EN/aboutus/MediaCentre/2011/Pages/10062011.aspx
On average, SB 2030 will
require commercial
buildings to be 35% to
45% more efficient than
the new building code
(IECC 2012).
TCAAP Energy Integration Resiliency Framework
Brief
11
the type of service needed and the quantity of sub-meters served, but costs per sub-meter range from
$150 to $400.
Strategic Building Siting and Co-Location
The County and JDA could facilitate building co-location through the platting and RFP process. Building
energy use types can be identified as potential candidates, and referred to energy design experts to
define the specific energy benefits that could be achieved through co-location. Buildings with
processes that produce hot water or heat could sell their excess to adjacent buildings that have use for
it at different times of day. District energy infrastructure could enhance this load diversity and energy
sharing. Businesses would be interested in this opportunity because it would improve the efficiency of
their consumption, reduce upfront capital equipment and maintenance costs, and increase comfort.2
Low-Load Residential Development
Residential developments at TCAAP could feature homes that do
not require natural gas, by utilizing electric appliances and serving
minimal heating and cooling demands through ground-source heat
pump technology. A low-load home would not require the larger
heating and cooling capacity of traditional systems, but instead
could meet residents’ comfort needs with smaller capacity systems.
The key technologies and strategies include high levels of building
insulation and passive solar design, a tight building shell, and high
efficiency lighting and appliances. These homes do not require significant insulation like a passive
house, but are 40% to 50% more efficient than what is required by the new energy code (IECC 2012).
Incorporation of high-performance technologies that have little to no impact on the up-front costs,
such as efficient appliances and low-flow plumbing, will help minimize hot water use and help
maximize home efficiency.
Building Orientation and Passive Solar
The process for solar-oriented development should be described in residential and commercial building
RFPs and should be integrated as evaluation criteria for development proposals. It should be evaluated
based on lowest total energy load of the homes or buildings to be sited under one proposal and should
consider street orientation, building orientation, and passive solar building envelope design elements.
2 The Primary Energy Factor (PEF) difference between district heating systems and Gas-fired heating (0.8/1.3=0.61)
http://www.euroheat.org/Files/Filer/documents/Publications/District%20Heating%20in%20buildings_final.pdf
Homes built at TCAAP
could be 40% to 50%
more efficient than what
is required by the new
energy code.
TCAAP Energy Integration Resiliency Framework
Brief
12
The thermal loads of homes and commercial buildings will
be impacted by the building envelope, street orientation, lot
and building orientation, and building massing. The likely
locations where street orientation could vary significantly to
accommodate energy implications would be the Creek, the
Hill, and the Transition neighborhood on the periphery of
the Town Center.
By considering these variables prior to the subdivision process, planners and developers have the
opportunity to produce efficient results with little or no-cost impacts.
High-Efficiency Streetlights
The City of Arden Hills has included a site-wide requirement for all streetlights to be “high-efficiency
lighting, such as LED lamps.” This requirement will trigger the inclusion of high efficiency lights in the
development process. Current LED technology saves approximately 50% to 70% of lighting energy use.
Another significant cost savings occurs by additionally reducing maintenance costs, given the longer life
of the bulbs.
Community Participation and Education
Community participation and education have been consistently mentioned as important factors for
TCAAP, both to engage the wider Arden Hills community and to leverage the energy savings potential
from facilitating ongoing awareness of energy use by site tenants and residents. Many details of
community engagement will need to be planned once the site sees its first residents and tenants.
However, certain engagement elements can be planned for or implemented during the early
development stage, including:
A TCAAP or Arden Hills-wide website that tracks energy goals and performance of buildings at
the site, including energy and carbon savings. The website could promote major metrics and
milestones, and issue periodic challenges (e.g. the “lowest user” challenge).
Community-wide open house or showcase events of leading edge technologies on the site,
especially for housing, that will attract and excite potential residents.
Commissioning of design or signage elements in public spaces that connect users to the site’s
energy resiliency goals and their contribution and participation in those goals. A targeted
marketing campaign around community solar development, as an early symbol of community-
driven, low carbon energy use at the site.
By pairing solar heat
gains and window
design strategies,
heating energy savings
can be up to 30%
TCAAP Energy Integration Resiliency Framework
Brief
13
Demonstration Opportunities
Advanced Distribution Grid
TCAAP’s greenfield status, combined with the site’s forward looking energy vision, make it an ideal
opportunity to pilot and demonstrate advanced technologies in the electric distribution grid. Many of
the opportunities outlined in this report, such as high solar PV penetration, advanced commercial
building metering, or responsive electric loads, are all facilitated by
a distribution system with increased communications and control
functions. Implementing an advanced distribution grid can save
customers money and reduce the environmental impact of their
energy use.
Innovative Energy Technologies
In addition to pilot opportunities at the grid level, TCAAP is ideal for
demonstrating innovative energy technologies at scale. The Project
Team recommends that the JDA and County seek and attract
partnerships to demonstrate proven technologies and strategies.
While the technologies may be proven, TCAAP offers scalable and
living demonstration opportunities, where an apartment, house, or
street of homes could serve as a living lab. Additionally, as a cold climate site that can attract multiple
partners, there is great opportunity to demonstrate the synergies that can exist between multiple
innovative technologies and design strategies. This might include piloting new in-road luminescent
street or pedestrian path lighting products in conjunction with high efficiency overhead LED street
lighting, electric vehicle storage and integration, or homes that have on-site electric storage and
remote controlled appliances/electronics that communicate with each other.
Conclusion
The ERAB has adopted a very forward-thinking vision for the TCAAP site. This will be achievable
through strategic partnerships with Xcel Energy, the MNARNG, the University of Minnesota Center for
Sustainable Building Research, environmentally conscious citizens, and developers who see the
economic and environmental value of the TCAAP energy vision. Through these partnerships, TCAAP will
be uniquely poised to be the national model for the development of integrated energy systems.
By laying the
groundwork for an
advanced distribution
system at TCAAP during
the planning phase,
residents and
businesses would have
access to cutting edge
opportunities such as
advanced rate design or
real-time load response.
TCAAP Energy Integration Resiliency Framework
Brief
14
The first steps toward achieving the energy vision include implementing energy supply options that
focus on efficiency, reliability, scalability, and sustainability, such as the low-temperature district
energy system in the residential neighborhoods and the community
solar garden at the Primer Tracer site. These specific opportunities
have been shown to be financially beneficial and financeable.
Developing a CHP that meets the needs of current buildings in the
area and is expandable in the future provides a platform for
establishing a resilient TCAAP microgrid as TCAAP development
progresses.
Implementing a demand-side management strategy that focuses on
building performance through the development RFP process will
build a resilient community for energy use. Focusing on improving
performance in the buildings to reduce the energy needs of the
buildings will provide an economically attractive environment as building owners are able to take
advantage of the financial savings realized by the increased efficiency, compared to traditional energy
expenditures.
Schedule and Next Steps (Outlined in Section 6)
The development schedule that is currently proposed is scheduled
to begin in 2016 with the construction of the interchanges of
County Hwy 96 and County Road H with the Spine Road. The Spine
Road construction is also expected to begin in 2016. Currently, site
development is projected to begin with the residential and retail
areas in the northern region of TCAAP in late 2016 or early 2017.
Development is expected to progress southward from the Town
and Creek neighborhoods as the market allows. The Thumb area is
being actively marketed by the JDA at this time, and could be
developed as soon as the right proposal is received from the
development community. The current development plan is
included in the appendix as Exhibit III.
Given this development timeline, the JDA will need to begin implementation on each of the individual
opportunities presented in this Framework, including immediate focus on the following:
partnerships
solar PV
combined heat and power
Initial focus should be on
energy efficient designs,
the low-temperature
district energy system in
the residential
neighborhoods, and the
community solar garden
at the Primer Tracer site.
Development at TCAAP
will begin in 2016,
therefore development
and implementation of
these recommended
energy strategies will
need to begin
immediately.
TCAAP Energy Integration Resiliency Framework
Brief
15
low-temperature district energy
system
demand-side management
infrastructure planning
funding pursuits
RFP development
education workshops
The TCAAP site is positioned to be a national model for site redevelopment. With planning and
leadership, this area can be developed to meet the bold energy vision of the ERAB to become a vibrant
development that leverages long-term energy conservation and resilience to attract investment and
partnership, and achieves sustainable benefits for Arden Hills and the surrounding community.
TCAAP Energy Integration Resiliency Framework
16
Table of Contents
Energy Integration Resiliency Framework ............................................................................................................... 17
1. Introduction .................................................................................................................................................... 17
2. Partnership Opportunities .............................................................................................................................. 18
2.1. Background .............................................................................................................................................. 18
2.2. Energy Loads ............................................................................................................................................ 19
2.3. AHATS Considerations ............................................................................................................................. 20
2.4. Xcel Energy Considerations ...................................................................................................................... 20
2.5. Near-Term Partnership Opportunities ..................................................................................................... 21
2.6. Future Potential Opportunities ................................................................................................................ 23
3. Energy Source Implementation ....................................................................................................................... 24
3.1. Solar PV .................................................................................................................................................... 24
3.2. Combined Heat and Power ...................................................................................................................... 34
3.3. Low-Temperature District Energy System ............................................................................................... 46
4. Energy Efficiency Strategies (Demand Side Management) ............................................................................. 59
4.1. Energy Resilient Design and Construction ............................................................................................... 59
4.3. Leading Near-Term DSM Opportunities .................................................................................................. 62
4.4. Demonstration Opportunities ................................................................................................................. 73
4.5. Recommended Development Request for Proposal Language ............................................................... 77
5. Schedule .......................................................................................................................................................... 80
5.1. Overall TCAAP Development Schedule .................................................................................................... 80
5.2. Integrating with the TCAAP Development Schedule ............................................................................... 80
6. Next Steps and Conclusion .............................................................................................................................. 82
6.1. Next Steps ................................................................................................................................................ 82
6.2. Conclusion ................................................................................................................................................ 83
Exhibit I – Partnership Opportunities Map .............................................................................................................. 85
Exhibit II – Demand Side Management Recommended Roles Matrix .................................................................... 86
Exhibit III – TCAAP Land Use Map ........................................................................................................................... 90
Exhibit IV – Funding Source Matrix ......................................................................................................................... 91
Exhibit V – Definitions ............................................................................................................................................. 94
TCAAP Energy Integration Resiliency Framework
17
Energy Integration Resiliency Framework
1. Introduction
The Twin Cities Army Ammunitions Plant (TCAAP) site offers an incredible opportunity for Ramsey
County, Arden Hills, and the surrounding community to build a forward-looking community that
optimizes the energy and environmental opportunities of the next generation. Innovative energy
supply systems can be developed for reliability and resiliency, increased use of local renewable energy
systems can reduce the environmental impact of redevelopment, and energy efficient buildings can
provide low-cost energy for residents and tenants. The TCAAP site is positioned to be a national model
for site redevelopment. With planning and leadership, this area can be developed to utilize
economically competitive, low-carbon energy sources, follow exceptional energy and environmental
standards, and engage future residents as stewards of the energy vision.
Beyond being a greenfield, TCAAP has a number of characteristics that make it distinctive. One of the
unique opportunities TCAAP redevelopment offers is the potential to partner with the local utility
provider, Xcel Energy, and the MNARNG on energy supply infrastructure and operations. The MNARNG
owns and operates the AHATS adjacent to the TCAAP site. The MNARNG has developed a master plan
for the buildings on its site that includes the goal of net-zero energy, water, and waste, and are
currently working on implementation plans to achieve this goal. The partnership between the
MNARNG, the City, and County creates dynamic and beneficial opportunities for all entities.
Xcel Energy provides electricity and natural gas to the area in and around Arden Hills. Xcel Energy views
the TCAAP redevelopment as an opportunity to partner with local government and the community to
develop demonstration projects that showcase energy efficiency and resilient energy projects.
To facilitate TCAAP redevelopment, the County and the City have engaged in a partnership through the
formation of a Joint Development Authority (JDA). For the purposes of energy planning, they have also
established the Energy Resiliency Advisory Board (ERAB) and appointed community stakeholders to
help define the TCAAP energy vision. The ERAB has worked with energy experts on the Project Team to
develop a two part TCAAP Energy Integration Resiliency Framework that outlines the appropriate
planning guidelines and policies with careful consideration of local resources, stakeholder interests,
project goals, and the best available technologies for implementation over the next 50 years.
Phase one of the study was the development of the Policy White Paper which was accepted by the JDA
and the Arden Hills City Council in November, 2014. The White Paper provides a unifying vision for the
site’s energy future and identifies the most beneficial opportunities for energy efficiency and efficient
energy supply options. Phase two of the study is to develop this document, the Energy Integration
Resiliency Framework (Framework,) which provides more details about how the County, the City, and
TCAAP Energy Integration Resiliency Framework
18
the JDA can technically achieve the vision and recommendations put forth in the White Paper. The
Framework focuses on determining which energy supply technologies can be built during the early
phases of site development and would be financially beneficial, financeable, practical, and achievable.
The Framework also provides more detailed analysis of the optimal initial energy efficiency strategies,
including demand-side management, advanced technology, and building design. Each of these
opportunities is considered with the goals, benefits, and risks for the County, City, JDA, ERAB, the
MNARNG, and Xcel Energy in mind.
Through the development of the White Paper, the ERAB outlined their vision and guiding principles for
TCAAP energy development.
2. Partnership Opportunities
2.1. Background
The TCAAP EIRF Project Team met with members of the Minnesota Army National Guard staff to
discuss the potential for working together to meet the energy needs and goals of both sites. In those
meetings, it was found that the goals of the MNARNG are very similar to the energy vision established
by the ERAB. Together, the MNARNG and the Project Team identified several energy-supply
opportunities that should be pursued, including solar photovoltaic (PV), combined heat and power
Vision Statement
TCAAP will be a vibrant development that leverages long-term energy conservation and
resilience to attract investment and partnership, and achieves sustainable benefits for Arden
Hills and the surrounding community.
Guiding Principles
Establish TCAAP as a national model for development of integrated energy systems
Develop a resilient community for energy and other utilities
Implement infrastructure solutions that are flexible and scalable over the next 50 years
Deliver a model of efficient energy and water usage that minimizes TCAAP’s impact on
the environment
Create an economically competitive and attractive environment for developers and
businesses
TCAAP Energy Integration Resiliency Framework
19
(CHP) generation, energy capture from treated groundwater, and thermal energy storage. In addition,
the parties identified several opportunities for collaboration on energy efficiency improvements and
demand-side management.
The Project Team has also engaged in discussions between the County, the MNARNG, and Xcel Energy
to gage the utility’s interest in each of these opportunities. Xcel Energy has expressed interest or
support of each option, with further details provided in the following sections.
The remainder of Section 2 provides further details on each of the partnership opportunities identified
in the conceptual map provided in Exhibit I.
2.2. Energy Loads
Following the development of the White Paper, the Project Team refined the estimated loads for the
TCAAP site to reflect the changes to the TCAAP Redevelopment Plan. The Project Team also
collaborated with the MNARNG to understand the energy needs of current and future buildings on the
AHATS site. In addition to the AHATS and TCAAP sites, the Project Team identified one existing campus
and one possible future campus that could be connected to the proposed system. The RCPW facility on
County Highway 96 is an existing facility adjacent to AHATS and TCAAP that could be integrated with
the initial system.
In the Primer Tracer area on the north edge of TCAAP and AHATS, the Department of Public Safety
facility is contemplating the installation of an emergency operations facility that, if built, could be a
strong candidate for connecting to the proposed system.
The Project Team also worked with Xcel Energy to estimate energy loads that were in line with energy
usage in Minnesota. The estimated loads for all prospective customer areas are provided in Table 1.
TCAAP Energy Integration Resiliency Framework
20
Estimated Energy Loads
Electric Thermal Cooling
TCAAP 8.01 MW 38.91 MMBtu/hour 6171 tons
AHATS 3.4 MW 7.3 MMBtu/hour 500 tons
DPS EOC 0.07 MW 0.5 MMBtu/hour 30 tons
RCPW 0.40 MW 4.1 MMBtu/hour 240 tons
Estimated Total 11.9 MW 50.8 MMBtu/hour 1,387 tons
Note:
1 Loads are estimated based upon the current projection of land use.
Table 1: Total estimated energy loads
2.3. AHATS Considerations
Through initial discussions with the MNARNG, the following considerations were identified as being
important components of energy plan development for the MNARNG:
The MNARNG has net-zero goals for energy, water, and waste.
The MNARNG intends to develop an energy resiliency plan for periods of grid outage in order
to meet mission requirements, including the ability to be disconnected from the larger grid.
The MNARNG will need to receive benefit for any opportunity that is developed on its
property.
The development must not be intrusive or obstruct the training at AHATS.
Funding is limited for the MNARNG. Third-party financing is preferred.
Third-party operations and maintenance of the installed systems is preferred.
These fundamental goals will continue to drive much of the partnership discussions with the MNARNG
and have been included in the planning for the options provided in this Framework.
2.4. Xcel Energy Considerations
TCAAP provides an opportunity for Xcel Energy to pilot advanced energy solutions that will help them
meet and exceed their Minnesota energy efficiency and renewable energy goals. Through discussions
with Xcel Energy, the Project Team has identified the following considerations that will be important
through the course of development:
TCAAP Energy Integration Resiliency Framework
21
Consideration should be given to the potential for an Xcel Energy-owned community solar
garden, which could expedite development, minimize potential risks, and visibly demonstrate
partnership linkages at the TCAAP site.
Xcel Energy would be an important support partner in any innovative energy demonstration
projects at the site, and for investments at TCAAP that would help the utility further its
statewide efficiency or renewable energy goals.
As a regulated utility, Xcel Energy’s investments into the TCAAP site are more likely to be
supported if the ERAB, JDA, and other local partners would advocate for these investments
and partnerships with the Public Utilities Commission.
Xcel Energy leadership has expressed a commitment to partnering with the County and the JDA in the
implementation of the TCAAP energy plan, and the County should continue to pursue opportunities
that can benefit both parties and achieve the energy vision for TCAAP.
2.5. Near-Term Partnership Opportunities
Through partnership discussions, a number of immediate and implementable partnership
opportunities were identified to meet the loads of the buildings that are currently in the area, as well
as the initial buildings expected to be built at TCAAP. The related technologies are introduced in this
section and further explored later within the Framework.
2.5.1. Solar PV
2.5.1.1. Primer Tracer
The Primer Tracer area neighboring the AHATS and TCAAP sites is currently an area with soil
contamination that requires remediation to be suitable for development. The Army Corps of Engineers
has shown interest in having this site cleaned up and put to productive use, and it does present a good
opportunity for the construction of a solar PV site because of the limited excavation, maintenance, and
human interaction that is necessary. The site is approximately 60 acres in size, with 20 acres being
considered for the Department of Public Safety State Emergency Operations Center. This would leave
40 acres for a large-scale solar installation. Based on generally accepted solar generation estimates,
this 40-acre site could generate approximately 8 megawatts of electricity (MWe) in peak conditions,
depending on the technology and system installed. Conservatively, this could account for
approximately 70% of the peak electric load for the area.
TCAAP Energy Integration Resiliency Framework
22
2.5.1.2. AHATS Solar PV
The 2009 Master Plan for AHATS produced by Jacobs Engineering identifies a two MWe solar PV
installation at the capped soil area west of the existing Field Maintenance Shop. This installation would
primarily meet a portion of the electric needs of the AHATS site, but could provide renewable electric
energy to TCAAP during the non-peak energy usage times at AHATS.
2.5.2. Combined Heat and Power
Combined heat and power (CHP) could be used to meet the electric needs of TCAAP and adjacent
properties, while simultaneously capturing the thermal energy created from electric generation to
meet the thermal needs of the area. This would provide a local energy generation source to the area
that could be disconnected from the grid in the event of a grid disruption. As the existing electric and
thermal energy loads are based at the AHATS and RCPW buildings, it would be optimal to locate the
initial CHP plant as close to those buildings as possible, with the opportunity of expanding it to meet
future TCAAP energy needs. This initial proposed location provides two advantages. First, having the
plant located near the initial load will reduce the up-front capital cost for the installation of the
distribution network providing thermal energy. Second, this location is near the existing and proposed
AHATS buildings, meaning that training operations (located in the central and northern areas of
AHATS) would not be negatively impacted. Additional CHP facilities could be located in the Thumb area
of TCAAP, or near other concentrated loads at TCAAP as development proceeds. The CHP system
should be designed to allow for expansion to serve the thermal needs of the TCAAP site as it is
developed, to align with the vision of TCAAP as a comprehensive energy program that optimizes
efficiencies, minimizes costs, and reduces greenhouse gas emissions. The initial system should also be
designed for future fuel flexibility, such as biogas integration, and the ability to meet growing thermal
needs of the area.
2.5.3. Groundwater Treatment Station
Approximately two million gallons per day (2 MGD) are pumped to AHATS from the groundwater
treatment station located on TCAAP. This pumping is required to continue until the chemical
remediation goals are reached for the water, which is estimated to be at least another 25-30 years.
This groundwater pumping can be useful to meet the energy goals of both AHATS and TCAAP through
the implementation of a low-temperature district energy system.
In addition, kinetic energy could be captured from the pumped water at the point of discharge at the
gravel pit on the AHATS site. The water is being pumped uphill to a point that provides energy which
potentially could be used for micro-hydroelectric generation. This would provide a small amount of
electric generation, but could be used to offset the power necessary to pump the groundwater.
TCAAP Energy Integration Resiliency Framework
23
The temperature of the water in this loop is close to 52o F throughout the year. Assuming a thermal
energy transfer of 11o F, the energy in the water per hour is estimated to be approximately 10
MMBtu/hour. This energy would be enough to meet the heating and cooling needs of the residential
neighborhoods of TCAAP, with approximately 3 MMBtu/hour of excess capacity available for AHATS or
additional TCAAP buildings. When groundwater remediation is completed, the district energy
infrastructure could be utilized to distribute energy from other sources such as low-grade waste heat
recovery or geothermal wells.
2.6. Future Potential Opportunities
2.6.1. Thermal Energy Storage
On the AHATS site, there is an existing one million gallon water storage tank, and related water
distribution piping, that was originally used during ammunitions manufacturing. The tank was built
with adequate ground cover to prevent water from freezing in the winter. This tank could be used as a
thermal energy storage tank to store water for the heating and cooling needs of the area. This would
work like a battery, which would fill up during non-peak energy hours and be discharged during peak
energy usage times to balance out the energy usage profile for the area. The size, shape, and structural
condition of the tank need to be studied to judge the feasibility of this opportunity. It is likely that the
tank would require the installation of a liner or bladder to be able to hold water. While utilization of
this tank is not included in any of the immediate options detailed in this Framework, it is a valuable
asset that should be contemplated as each energy option is further developed, and as TCAAP
redevelopment progresses.
2.6.2. Solar Thermal
Solar thermal systems are most commonly installed on residential and small commercial buildings,
although larger shared systems are gaining popularity. Solar thermal systems are comprised of solar
collectors and a fluid moving between the collectors and a hot water reservoir. Typically the heated
fluid is pumped from the tank to a heat exchanger where heat is extracted into the air to heat space or
domestic hot water. Solar thermal systems are highly efficient in their ability to capture and transfer
solar energy.
When included as part of a broader energy plan, benefits of a solar-thermal system can be enhanced.
For example, solar thermal can be paired with thermal storage to capture excess energy when it is
available and dispatch to users during higher demand periods. The MNARNG utilizes solar thermal
technology on its buildings and is investigating further integration of it as their site is built out. Solar
thermal is not a priority recommendation for initial implementation, but this technology should be
considered for individual sites or as part of a larger energy plan as TCAAP development progresses.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
24
3. Energy Source Implementation
As outlined in the partnership section, there are immense opportunities for technology development
at TCAAP. The success of their implementation hinges on the effectiveness of partnerships and
incorporating the right technology solution for the right project within the development. The
technologies recommended in the following section were selected to fit the partner interests,
development timeline, and both environmental and economic goals. This includes the reduction of
greenhouse gas emissions. Through the implementation of the energy supply opportunities presented
in this section, the TCAAP development will be poised to reduce the amount of CO2 emitted into the
atmosphere as the equivalent amount of CO2 produced by 1625 automobiles3.
Greenhouse Gas Emissions Reduction Summary
Annual CO2 Reductions % Reduction from traditional scenarios
Solar PV 7,524 (tons CO2/yr) 100%
CHP 676 (tons CO2/yr) 19%
Low Temp District Energy 310 (tons CO2/yr) 29%
Totals 8,510 (tons CO2/yr) 70%
Table 2: Greenhouse Gas Emission Reduction Summary
The environmental benefits shown in Table 2 will be further increased through implementation of
demand-side management strategies outlined in section 4, and will lead to more sustainable
redevelopment of TCAAP. This combination of responsible energy supply opportunities, sustainable
building practices, effective demand side management, continuous commissioning of building systems,
and improving occupant awareness set the stage for the possibility of the entire development being
carbon-neutral in the future.
3.1. Solar PV
As noted in the White Paper, the utilization of solar PV technology can
enable the generation and utilization of renewable energy at TCAAP.
While individual property owners could choose to install roof-mounted
or ground-mounted solar PV systems for some of their site needs,
3 http://www.epa.gov/cleanenergy/energy-resources/calculator.html#results
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
25
another possibility would be to install a large-scale community solar array adjacent to the TCAAP site.
3.1.1. Introduction
The most prime opportunity for solar PV is likely within the Primer Tracer area north east of the
existing TCAAP site. The array, as proposed, would reach a peak of approximately 8MWe of solar PV
generation, which would produce approximately 14,500,000 AC kWh of energy annually. The project
could be financed by Xcel Energy or a third party developer through a combination of debt and equity,
with the land leased from the County or the MNARNG. The project owner could utilize available tax
incentives such as the 30% investment tax credit and 5-year accelerated depreciation to help offset the
cost of the project and lower the cost of energy from the array. Electric energy sales and associated
revenues could be generated from subscribers’ purchases or lease interests of the solar garden system
through Xcel Energy’s existing community solar garden program. Alternatively, Xcel Energy could own,
develop, and sell the energy from the project.
3.1.2. Implementation Strategy
3.1.2.1. Existing Project Site
Between 40 and 60 acres of land are available for the preliminary development of a solar PV array. This
plot of land is relatively flat, with minimal elevation change from north to south or east to west.
Although a detailed siting study was not conducted, the site characteristics determined by a Google
Earth analysis all point to a feasible site with significant potential. This solar array would be built atop
land with existing structures currently in place. These structures would be demolished and removed as
part of the solar project construction. Current structures, above and below grade would need to be
removed to a depth of approximately five feet.
3.1.2.2. Conceptual Solar Plant Site Layout
A conceptual layout of an 8 megawatt alternating current (MWAC) capacity solar PV array was prepared
on the proposed parcel of land to assess feasibility of this installation on a 40 acre site. If all 60 acres
are able to be utilized, the array could be increased to 12 MWAC. The array would consist of eight, 1
MWAC (1.3 megawatts of direct current - MWDC) blocks. Table 3 outlines the high-level plant
characteristics for this potential array.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
26
Characteristic Value
Plant Capacity (AC) 8MW
Plant Capacity (DC) 10.4MW
Block Capacity (AC/DC) 1MWAC/1.3MWDC
Module 310W poly-crystalline
Inverter 1 – 1000kW Central Inverter/block
Racking System Fixed-Tilt @ 30°
Pitch 26.2 ft
Internal Access Roads Inverter Access Roads: 30 ft
All other internal roads: 16 ft
Table 3: Solar plant characteristics
A high-level representation of a potential site configuration is shown in Figure 1. Figure 1 depicts the
manner in which an 8 MWAC capacity plant might be laid out on these 40 acres, but detailed design will
need to confirm this configuration.
Figure 1: Solar PV plant conceptual site layout
1 MWac Block
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
27
3.1.3. Economic Analysis
3.1.3.1. PV System Components
Solar PV power plants are simple in their operation. The main components of a solar PV plant include
PV Modules, racking, inverters, transformers, combiner boxes, DC cabling and AC cabling. The modules
convert the solar irradiance to DC power. A collection of modules are electrically wired together to
form what is referred to as a “string.” Multiple strings are combined together into a single DC output in
a combiner box. All outputs from the combiner boxes in a block are run to a central skid where they
are connected to the inverter. The inverter converts the DC module power into AC power and feeds
the AC output through a medium-voltage (MV) transformer. This transformer steps-up the inverter
voltage to the solar arrays main collection system voltage. The inverters and medium-voltage
transformers are often co-located on a platform referred to as the power conversation station,
sometimes referred to as a skid. If a site has a local substation, then all the outputs from the skids feed
into the substation where a generator step-up unit outputs the main interconnection voltage.
Racking is an integral part of any solar plant as it provides the support for the modules. In addition to
proving a fixed point to which the modules are attached, racking serves as the means to optimize the
angle between module surfaces and the solar irradiance. This angle has significant impacts on a solar
plant’s energy production. There are two main classes of racking systems, tracking and fixed-tilt, the
latter of which was used in this layout.
3.1.3.2. Capital and Operations and Maintenance Costs
The upfront capital construction costs are incurred during the development and construction of the
plant. These costs include material costs, installation costs, contractor markup, and project indirect
costs. The capital costs are impacted by relative system size (larger systems have the benefit of
economies of scale), project location, and a collection of market factors. Project capital costs are
commonly presented as a cost per installed watt basis ($/W). This allows for project costs to be
expressed independently of system size and provides for an easy comparison of costs for systems with
difference characteristics. In addition to the cost of the solar PV array, the existing Primer Tracer site
will need to have the existing infrastructure removed and the site will need to be redeveloped, before
the project can be constructed. The land acquisition is expected to occur through a public benefit sale
from the U.S. Government if the County acquired the property. If the MNARNG took possession it
would be included in their license and remain in the ownership of the U.S. Government. The cost of the
land acquisition is anticipated to be $0 due to the nature of the site and the proposed usage. It is
assumed that there will be no property taxes levied against the properties as the land owner will be a
government entity. The estimated cost to remove the existing infrastructure and redevelop the 40
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
28
acres selected for the solar PV plant project is $1,250,000. For this analysis, the cost has been assumed
to be incurred by the project; however other sources of funding may be available.
Operation and maintenance (O&M) costs are incurred on an annual basis and are the costs associated
with keeping the plant in proper working order. Common tasks associated with annual O&M activities
include preventative maintenance, inspection, and corrective maintenance. O&M costs are often
presented as a cost per installed kilo-Watt ($/kW) to be incurred every year. When presented as a
$/kW cost, it is assumed that this cost will be incurred annually.
Table 4 provides an approximation of capital costs and O&M costs for the proposed 8MWac system.
Solar PV Costs $/W Total
Solar PV Plant Cost $2.10/WDC; $2.73/WAC $21,850,000
Site Redevelopment Cost $0.12/ WDC; $0.13/ WAC $1,250,000
Total Project Capital Cost $2.22/WDC; $2.86/WAC $23,100,000
O&M Cost $16/kWAC/year $128,000/year
Table 4: Proposed solar PV capital, operation, and maintenance costs
3.1.4. Solar Resource Assessment and Energy Production
The annual energy production for the proposed array can be estimated with the use of the National
Renewable Energy Laboratory (NREL) Solar Advisor Model (SAM). SAM uses a collection of input
parameters to construct a model of the PV plant and analyze the energy production characteristics.
These input parameters include: site location and meteorological data, module characteristics, inverter
performance characteristics, solar array dimensions, system losses, and a collection of financial
parameters. Using this information, SAM constructs a model of the solar arrays and then predicts plant
performance over a typical meteorological year. The basic technical assumptions that were utilized to
estimate the solar resource assessment and annual energy production from the solar array are
provided in Table 5.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
29
Modules Parameters
Cell material Multi-c-Si St. Paul, MN Weather Data
Module area 1.9 m² Tilt (deg from horizontal) 30
Module capacity 305 DC Watts Azimuth (deg E of N) 180
Quantity 34,083 Tracking – Fixed
Total capacity 10.4 DC MW / 8.0 AC MW Shading – No
Total area 65,473 m² Soiling – Yes
DC Losses (%) 3.0
Inverters Annual Results (in Year 1)
Custom (Inverter Datasheet Model) Horizontal solar 1,364 kW/m²
Unit capacity 1000 AC kW Incident solar 1,604 kW/m²
Input voltage 620 DC V Net to inverter 15,130,000 DC kWh
Quantity 8 Gross from inverter 14,675,000 AC kWh
Total capacity 8 AC MW Net to grid 14,456,000 AC kWh
DC to AC Capacity Ratio 1.30 Capacity factor 15.9%
AC losses (%) 1.5
Table 5: Solar advisor model solar resource and energy performance assumptions
Figure 2 shows the predicted net AC and DC energy production from the modeled solar resource. The
AC energy levels are indicative of the energy exported to the grid at the point of interconnect. All
system losses, both AC and DC, with the exception of substation and transmission line losses, have
been taken into account.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
30
Figure 2: Solar advisor model solar energy production results
3.1.5. Financial Assumptions and Economics
SAM was used to estimate the levelized cost of energy (LCOE) and estimated price for the energy from the
proposed solar plant project. The project is assumed to be financed by a developer who would be paid
through subscriptions by consumers where the third party (a tax-paying entity) owns the solar plant on land
leased from the County. Subscriptions with Xcel Energy retail customers are assumed to be established
under the Xcel Energy Solar*Rewards® Community® solar program. The developer would utilize the federal
investment tax credit, accelerated depreciation, and a combination of debt and equity to fund the solar
project. The key financial assumptions are provided in Table 6. If Xcel Energy were to own the project, these
financial projections would likely need to be modified.
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
En
e
r
g
y
P
r
o
d
u
c
t
i
o
n
(
k
W
h
)
Monthly Solar Array System Energy Production
Net AC energy (kWh)Net DC energy (kWh)
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
31
Project Costs Project Debt Parameters
Total installed cost $23,100,000 Debt fraction 57%
Salvage value $809,000 Amount $13,600,000
Rate / Term 25 years, 5%
Analysis Parameters Tax and Insurance Rates (% of installed cost)
Project life 25 years Federal income tax 35%/year
Inflation rate 2.5% State income tax 7%/year
Real discount rate 8.2% Sales tax 0%
Insurance 0.5%/year
Property tax (% of assess. val.) 0%/year
Financial Targets and Constraints Incentives
Solution mode Calculate Subscription Price Federal ITC 30% (Expires 12-31-16)
Target IRR 10% in Year 25 Depreciation allocations defined. 5 year MACRS
Table 6: Solar advisor model financial assumptions
Based upon an assumed IRR of 10% for the project developer and other noted assumptions, the Project
Team estimated a subscription price for the solar energy of $0.129 cents/kWh (as shown in Table 7). Xcel
Energy retail customers who subscribe to production from the proposed solar garden under individual
subscriptions would receive a bill credit equal to the energy purchased multiplied by the retail rates.
Solar Economic Results
25-Year Nominal LCOE 13.90 cents/kWh
Solar revenues (year one) $1,865,000
Project 25-year IRR 10%
Subscription price 12.90 cents/kWh1
Note:
1. Subscription price does not include additional $0.02/kWh bill credit provided if RECs
are owned by Xcel Energy
Table 7: Solar advisor model economic results
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
32
3.1.6. Greenhouse Gas Emission Reductions
Implementing a solar PV array in the Primer Tracer area will result in a reduction of greenhouse gas
emissions. Electricity offset by the solar output would be reduced to zero tons of CO2 per year. The
estimated greenhouse gas emission reduction is estimated to be 7,524 tons CO2/year, calculated by
comparing the current Xcel Energy emission rates for the production of electricity in the Upper
Midwest Region (1,041 CO2 lbs/MWh4) as detailed in Table 8.
Solar PV Greenhouse Gas Emissions Reduction
Solar Electric Generation 14,456 MWh
Eliminated Electric Utility Emissions 1,041 lbs CO2/MWh
Total CO2 Emissions Savings per Year 7,524 tons CO2/year
Table 8: Estimated annual carbon dioxide emissions reduction
3.1.7. Community Solar Garden Program Approach
The modeled subscription rate for solar PV assumes that solar garden developers would elect to sell
the Renewable Energy Credits (RECs) to Xcel Energy, for subscribers to receive a $0.02/kWh enhanced
bill credit. If the developer were to retain the RECs for this system, the bill credit would decrease by 2
cents/kWh. The estimated subscription rate is slightly less than the current Xcel Energy average
Residential and General Service bill credits; however that difference will increase over time if Xcel
Energy applicable retail rates increase and the subscription rate remains fixed. Table 9 shows how this
estimated first year subscription price for the electricity generated by the solar garden compares to the
Xcel Energy bill credit rates for three types of Xcel Energy customers. It is assumed that the economic
benefits of the solar garden subscription would improve as the electricity rate increases over the life of
the subscription.
4 https://www.xcelenergy.com/staticfiles/xe/Corporate/CRR2013/environment/emissions-reporting.html
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
33
Rate Category Solar Subscription
($/kWh)
First Year Bill
Credit ($/kWh)
First Year Savings
(Cost) ($/kWh)
Xcel Energy Residential $0.1290 $0.1403 $0.0113
Xcel Energy Small General Service $ 0.1290 $0.1378 $0.0088
Xcel Energy General Service $0.1290 $0.1146 $(0.0144)
Table 9: Solar subscription and Xcel Energy bill credit comparison (REC’s retained by Xcel Energy)
For the solar PV project to be developed under the Xcel Energy Solar*Rewards® Community® solar
program, it will be important for the developer to have several large credit-worthy subscribers secured
to allow the project to be financed at a low cost of debt. This could include the City of Arden Hills,
Ramsey County, the MNARNG, and other credit-worthy businesses in the area. Once the project has
secured a large portion of the revenue stream from project subscribers, the project can be financed
and developed with the potential for future residents and businesses to join as subscribers in the
future. \ process for developing and preparing the necessary applications for the project will need to
follow the guidelines outlined in the Xcel Energy Solar*Rewards® Community® solar program5.
3.1.8. Next Steps
In order to capture the 30% Investment Tax Credit associated with community solar gardens, the
proposed system must be in service by December 31, 2016. As such, implementation of this strategy
must commence as soon as possible, and the following steps should be taken to continue
development:
Step 1 – Begin the land redevelopment process and secure funding approval. The County and the
MNARNG, as potential property owners, will play key roles in this process, as a potential
property owner.
Step 2 – Secure a development partner to move the project through necessary stages of
development. This could be either Xcel Energy or another solar developer, who could be
selected by issuing an RFP for prospective developers.
Step 3 – The solar garden developer will need to obtain letters of commitment from large solar
garden subscribers to initiate the necessary business and financing structure. The
5 (2015, 02 23). Retrieved 02 23, 2015, from Xcel Solar Rewards Community:
http://www.xcelenergy.com/Energy_Solutions/Business_Solutions/Renewable_Solutions/SolarRewards_Community-MN
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
34
County, City, JDA, MNARNG, the school district, and other partners could work with the
selected developer to form an initial coalition of subscribers for the system.
3.2. Combined Heat and Power
3.2.1. Introduction
The vision for TCAAP is that the Thumb, Town Center, and Flex areas could be served by a CHP energy
system located at the TCAAP site or nearby. This localized energy source would enable achievement of
many of the guiding principles established by the ERAB. The MNARNG has a similar energy vision for
the AHATS site, and the partnership potential for a CHP system is very attractive. The Project Team
recommends that the JDA and County collaborate with the MNARNG and Xcel Energy to define a
preferred initial CHP strategy, considering the following:
Collaboration between the JDA, the County, Xcel Energy, and the MNARNG could help identify
an operational strategy and location for the initial CHP that is beneficial for all parties.
Incorporation of a CHP system that meets the energy needs of all three sites would improve
the economic competitiveness of CHP, due to the potential diversity of usage and load
profiles.
Due to regulatory statutes, Xcel Energy has the exclusive authority to distribute and sell
electricity across multiple properties in Arden Hills. If Xcel Energy is the owner, the CHP
system could function as a microgrid system for the area, providing a local energy source for
reliable electric and thermal energy for TCAAP, RCPW, and the MNARNG in the event of a grid
disruption, meeting the goals of each of the sites.
In the event that Xcel Energy is not the owner of the CHP, the proposed system may only
distribute thermal energy across property lines, unless the electricity is sold to the Midwest
Independent System Operators (MISO), in which case there would be an additional cost for
the use of Xcel’s infrastructure, which may prove to be cost prohibitive depending on the
production cost and market dynamics.
While construction of independent CHP systems on both the TCAAP and AHATS sites could potentially
be feasible, the economics of a connected system would be much more beneficial to both sites.
However, the current uncertainty regarding the timing and type of TCAAP development restricts the
opportunity to perform a complete evaluation of a CHP and district energy system for TCAAP at this
time. With the unknown development conditions of TCAAP in mind, the Project Team has evaluated a
scenario for CHP implementation in the Thumb and Town areas of TCAAP based on the assumed
energy loads and envisioning how a CHP system could be implemented in the Thumb.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
35
3.2.2. Initial Proposed CHP
An initial step toward a more comprehensive microgrid could be a small-scale CHP system that serves
the existing loads of the Thumb and Town areas, as shown in Figure 3. The initial CHP plant could be
located within the corporate campus area of the Thumb, which would provide the advantage of
reducing the up-front capital cost for the installation of the distribution network providing thermal
energy to the corporate campus and the Town. The CHP plant could be designed to allow for the
integration of multiple fuel sources in the future to further increase renewable generation and system
sustainability. Additionally, the CHP plant and district heating network, as proposed, could be designed
to allow for expansion to serve additional buildings.
Figure 3: Initial potential CHP location and distribution plan north TCAAP
As TCAAP development progresses southward, those additional properties could also be served from
the CHP facility in the Thumb by extending piping to those buildings in the Spine Road right of way, and
expanding the capacity of the CHP.
In the next stage of CHP development, the design team should carefully analyze the pros and cons of
the CHP application, and work with the JDA, County, and potential Thumb developers to determine the
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
36
optimal location and operational strategy for the initial CHP system. Regardless of the system’s initial
configuration and location, the CHP design should allow for expansion to produce more electricity and
thermal energy as energy demand in the area increases with TCAAP development. Expansion could
also enable the development of a more comprehensive microgrid that would meet the MNARNG’s
resiliency goals and the TCAAP energy vision.
3.2.3. Development Strategy
3.2.3.1. Load Analysis
Before selecting the appropriate technology and size for a proposed CHP plant, a careful review of the
potential electric and thermal loads must be considered. The proposed CHP project would be
developed to serve the future electrical load of the Thumb area as well as the combined thermal loads
of the Thumb and the adjacent Town area. A summary of the potential thermal and electric loads that
the initial plant could serve is shown in Table 10.
Annual Energy
Usage
Annual Electrical
Usage
Peak Energy
Usage
Peak Electrical
Usage
Town 12,485 MMBtu 2,561,111 kWh 4.06 MMBtu/hr 0.41 MW
Thumb 6,096 MMBtu 4,172,302 kWh 3.33 MMBtu/hr 1.19 MW
Table 10: Monthly Projected Energy Usage
The monthly aggregated load profiles are presented in Figure 4 and Figure 5. The Project Team
assumed that the load profile for these areas would follow normal patterns of use for commercial
buildings.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
37
Figure 4: Monthly site gas usage
Figure 5: Monthly total site electric usage
3.2.3.2. CHP Technology Selection
Based on a review of the future electric load of the Thumb area and the thermal loads of the Town and
Thumb areas, the CHP plant should have a maximum generator output no greater than 450 kW. For
CHP applications in this size range, the most efficient and economical technology employed is gas fired
reciprocating engines, with hot water heat recovery. Additionally, due to the limited heating load
available during the summer months, it is generally more economical to employ a generation
technology that has a high simple cycle efficiency resulting in a production cost lower than the utility’s
retail electric rate.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
38
For the proposed initial CHP, the Project Team assumed that a gas-
fired reciprocating engine genset could provide 335 kW of electric
power year round with approximately 1,372 MMBtu/hr of waste
heat that would be available throughout the year. The waste heat
would be utilized to offset hot water production in the existing
buildings’ boilers during the winter, spring, and fall. The waste heat
from the CHP during the summer months would be exhausted and
the plant would run in simple cycle mode at a production cost
lower than the cost of purchased grid power. In the event that a
year-round process heating load is added in the Thumb, additional
thermal energy could be captured from the CHP and utilized,
improving system economics, efficiencies, and environmental
benefits. Figure 6 and Figure 7 provide a representative monthly
dispatch chart showing how the plant would provide power and thermal energy to the site.
Figure 6: Monthly site thermal energy production by resource
In the event that a year-
round process heating
load is added in the
Thumb, additional
thermal energy could be
captured from the CHP
and utilized, improving
system economics,
efficiencies, and
environmental benefits.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
39
Figure 7: Monthly site electric energy production by resource
3.2.3.3. CHP Plant System Components
One new packaged cogeneration unit could meet the energy needs presented above. Waste heat from
the engine cooling water loop and engine exhaust would be recovered to produce 1,372 MMBtu/hr of
hot water at full-load. The hot water would be delivered to a hot water distribution system to provide
heating energy to the Thumb and Town. The engine cooling water loop would produce 180-185 degree
hot water, which would be used to provide the necessary thermal energy for heating the buildings and
heating domestic hot water. A supplementary radiator located atop the CHP unit would remove heat
from the engine cooling water loop when there is no need for building heating during the summer
months.
In addition to the CHP plant, new hot water distribution piping and pumping would need to be installed
to provide hot water supply and return to the connected buildings from the CHP plant. This distribution
piping is assumed to be direct buried and would be routed as efficiently as possible to each of the
buildings’ central mechanical rooms. The district heating building interface, based on initial site
investigations, could be achieved through a direct connect interface allowing for a low-cost installation
at each building. The distribution configurations shown in Figure 8 are possible layouts for the initial
system, but the actual location of the plant and routing of the pipe will need to be determined in the
next stage of system development.
The full-load electric output of the genset is proposed to be 335kW at 480V. The genset power is
assumed to be electrically interconnected to provide power to the future facility located at the Thumb,
with standby and supplemental service provided by the electrical grid. The power from the CHP plant
would be delivered to each of the Thumb buildings behind the meter and would offset retail electric
purchases from Xcel Energy at the existing retail rate. For the economic evaluation, it was assumed the
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
40
genset would be operated at full-load with an availability of 95%. A conceptual process diagram of the
proposed CHP plant is provided in Figure 8.
Figure 8: CHP project conceptual process diagram
The thermal needs of the Town are assumed to be met by the CHP system through the thermal energy
distribution system. For the purposes of the economic model, the Project Team has assumed that Xcel
Energy will not own the CHP facility and the Town will receive electricity from the electric grid. If Xcel
Energy were the owner of the CHP, the initial plant size could be increased to also meet the electric
needs of the Town, as well as the surrounding TCAAP developments.
3.2.4. Economic Analysis
3.2.4.1. CHP Plant System Capital and O&M Costs
Estimated costs for the CHP plant were developed based on major equipment budgetary pricing and a
conceptual distribution system layout. The initial CHP project primarily consists of the CHP plant, the
distribution piping connecting the buildings, and the electric infrastructure required to connect the
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
41
output from the engine generator into the Thumb buildings. For the analysis, the Project Team has
assumed that the CHP plant will be located within the Thumb to minimize the cost of electrical
distribution to the corporate campus. A summary of the costs are provided in Table 11.
CHP Initial Capital Costs
Traditional Scenario CHP Scenario
Heating Plant $800,0001 $1,800,000
HW Distribution Piping $0 $2,000,000
HW Building Connections $0 $120,000
Electric Distribution Infrastructure $0 $700,000
Total Project Cost $800,000 $4,600,000
Note:
1. Includes boiler equipment, mechanical equipment and piping, electrical connections, controls, civil construction, direct and
indirect costs.
Table 11: CHP project initial capital costs
The O&M cost difference associated with the proposed CHP project would consist of a long-term
service agreement for the gas fired engine. Service contracts for small gas engines can be structured on
an hourly basis or annual fixed fee basis. The annual O&M cost assumed for the project is $0.02/kWh
which equals $56,000 per year.
3.2.4.2. Financial Assumptions and Economics
CHP facilities provide energy savings greater than the traditional
scenario of purchasing power from the local electric utility and
generating thermal energy on-site with gas-fired or oil-fired boilers.
The annual life cycle costs of the traditional scenario were
compared to that of the proposed CHP plant to determine the
overall savings provided by the project. At this stage in the
development process, the ultimate owner of the project is yet to be
determined and the capital financing structure and funding source
is unknown. For the purposes of the assessment, the project was
assumed to be structured as a private, non-profit, funded with a
cost of capital of 4.7%, financed over 25 years, with the annual
debt service paid through energy sales revenues. The basic economic assumptions for the project are
provided in Table 12.
CHP facilities provide
energy savings over the
traditional scenario of
purchasing power from
the local electric utility
and generating thermal
energy on-site with gas-
fired or oil-fired boilers.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
42
CHP Economic Assumptions
Traditional Scenario CHP Scenario
Description Purchased Grid Power with Gas Boilers Gas Engine CHP with District Energy
Site Thumb & Town Thumb & Town
Analysis Term 25 years 25 years
Gas Price $7.00/MMBtu1 $5.50/MMBtu2
Electric Price $0.10/kWh $0.10/kWh
Escalation 3% 3%
Project Cost $800,000 $4,600,000
O and M Cost3 $0/yr $56,000/yr
Notes:
1. Firm commercial gas rate
2. Interruptible gas rate
3. Incremental cost difference
Table 12: CHP project economic assumptions
The economic assumptions provided above were coupled with the CHP energy production numbers
developed to estimate the annual savings generated by the CHP project. The annual energy usage,
annual utility costs, and economic performance of the project are provided in Table 13.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
43
CHP Economic Results
Traditional Scenario CHP Scenario
Grid Power 4,172,302 kWh 1,364,734 kWh
CHP Power - 2,807,568 kWh
Total Power 4,172,302 kWh 4,172,302 kWh
Boiler Heating 14,865 MMBtu 5,105 MMBtu
CHP Heating - 9,760 MMBtu
Total Heating 14,865 MMBtu 14,865 MMBtu
Electric Costs $417,000 $136,000
Boiler Gas $130,000 $35,000
CHP Gas $ - $145,000
CHP O and M1 $ - $56,000
Annual Costs $547,000 $372,000
CHP Project Cost $800,000 $4,600,000
25-Year Cost $21,520,000 $21,505,000
25-Year Difference $ - $15,000
Note:
1. Incremental cost difference
Table 13: CHP project economic results
3.2.4.3. Interpretation of the economic analysis
The economics of the CHP system are tied to the energy loads connected to the system. As shown in
Table 13, the annual costs of the initial proposed CHP operations are significantly reduced from the
traditional scenario. The primary factor contributing to the 25-year cost of the CHP is the capital cost
for the initial construction of the system. If additional energy load was connected to the initial system,
the debt service payments could be spread out across more energy consumers, and energy rates could
be decreased. In order to optimize the economic return of a CHP system, the remaining capacity of its
thermal energy output (approximately 1 MMBtu/hr) could be utilized. If the thermal demand of TCAAP
development included higher continuous loads (light manufacturing processes, restaurants, domestic
hot water, etc.), the 25-year savings could be increased by an estimated $900,000.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
44
Additionally, the economic analysis did not take into account any rebates, grants, or savings for which
the project could be eligible. These potential funding sources could be used to offset the cost of the
initial construction, thus making the initial CHP system more economically attractive. The list of
potential funding sources is provided in Exhibit IV.
3.2.5. Greenhouse Gas Reduction
One of the advantages of a CHP system is the reduction of greenhouse gas emissions due to the higher
efficiency of the CHP system. Implementation of a CHP system to meet the energy loads in Section
3.2.2.1 could reduce carbon dioxide emissions by approximately 20%, as shown in Table 14.
Estimated Annual Carbon Dioxide Emissions Reductions
Traditional Scenario CHP Scenario
Natural Gas Usage 18,581 MMBtu/yr 32,772 MMBtu/yr
CO2 Emission Rate1 117 lb/MMBtu 117 lb/MMBtu
CO2 Emissions from Natural Gas Usage 1,087 tons/yr 1,917 tons/yr
Electric Usage 4,172 MWh/yr 1,365 MWh/yr
CO2 Emission Rate1 1,041 lb/MWh 1,041 lb/MWh
CO2 Emissions from Electricity Usage 2,172 tons/yr 710 tons/yr
Total CO2 Emissions 3,259 tons/yr 2,628 tons/yr
Total CO2 Emissions Reduction 631 tons/yr
Note:
1. https://www.xcelenergy.com/staticfiles/xe/Corporate/CRR2013/environment/emissions-reporting.html
Table 14: Estimated annual carbon dioxide emission reductions
The greenhouse gas emission savings presented in Table 14 are based upon a CHP operational strategy
of meeting the Thumb’s electrical needs from a gas-fired generator. In the event that other renewable
energy sources are included in the CHP solution, the greenhouse gas emission reductions would
increase.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
45
3.2.6. Developing a Microgrid for the Area
While an initial CHP approach might be focused on the current campuses of the Thumb and the Town,
the energy vision adopted by the ERAB includes developing a resilient energy system for the greater
community, including the remainder TCAAP and the adjacent properties. The initial CHP plant is one
implementable opportunity. However, to achieve the TCAAP energy vision, it will be important for the
partner organizations to develop a plan to expand the scope of the CHP plant and develop a microgrid
for the broader area as TCAAP development proceeds.
3.2.7. Suggested Next Steps
As part of the Thumb development, the County and JDA could develop a CHP strategy for the
developer selection process, so that the CHP project, electric distribution, and thermal distribution
systems designs can be integrated into the development plans. Several of the initial activities that will
need to occur prior to the RFP are listed below:
The ownership and initial project funding strategy for CHP will need to be established to allow
initial project development activities to commence. An agreement will need to be developed
to establish the initial energy system concept and conduct additional due diligence on the
technical, business, and regulatory issues that are associated with the project. The JDA should
work with Xcel Energy to define Xcel Energy’s interest in owning the proposed CHP. Xcel
Energy ownership will provide the benefit of increasing the plant size and system efficiency as
electric and thermal demand grows.
If Xcel Energy is interested in owning a CHP system, the JDA should collaborate with Xcel
Energy to develop an initial CHP plant that could serve as the foundation of a broader
microgrid strategy for TCAAP, AHATS, and the community. If Xcel Energy is not an owner of
the CHP, the initial electric output could be sized to meet the needs of the Thumb, with
thermal energy distributed to the other sites. Additional electric output could be added on
other sites and integrated into a district energy system as the energy needs of the future
buildings are defined, or the CHP electrical output could be increased if the developer secured
a power-purchase agreement with Xcel Energy.
The JDA should integrate and reserve space within easements and right of way for the future
construction of district energy distribution facilities during the platting of the development
and the design of the Spine Road.
During site marketing, the JDA should emphasize the benefits and opportunities presented by
the incorporation of CHP into the Thumb development, and could pursue businesses that have
coincidental thermal and electric energy needs. Additionally, prioritizing site marketing to
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
46
companies with additional process or domestic hot water load would optimize the efficiency
of the CHP system.
3.3. Low-Temperature District Energy System
3.3.1. Introduction
The residential neighborhoods of TCAAP present a unique and highly visible opportunity to leverage
low-grade energy from the treated groundwater as an energy supply for the neighborhoods,
distributed via a low-temperature district energy system. The proposed system would utilize thermal
energy from the TCAAP Groundwater Treatment station described in section 1.5.4 by transferring
energy from the groundwater to the district energy system. The groundwater, which is consistently
~52o, can be used to transfer energy to and from the closed-loop distribution system to meet heating
and cooling demand in the buildings, while not affecting the quality of the treated groundwater. The
pumped groundwater is estimated to have 9.8 MMBtu of energy available. The Hill and Creek
neighborhoods are projected to demand 68% of this energy. Thus, an additional 3.1 MMBtu could be
available for utilization in other areas of TCAAP or AHATS.
3.3.2. System Description
The proposed energy system would require an energy transfer station to be constructed at, or near,
the current pumping location for the groundwater treatment station. This energy transfer station
would consist of a heat exchanger to separate the groundwater from the system water, pumps to
circulate the distribution loop, controls, metering, and piping.
The existing building that houses the groundwater treatment station was originally the domestic water
treatment plant for the TCAAP site during the ammunitions manufacturing period. This building was
decommissioned, as the groundwater treatment system is housed in a building addition, and is now
largely vacant. The facility is more than adequate to house the proposed energy transfer station. The
building is owned by the Army, and will remain in the custody of the Army until the groundwater
treatment operations cease. Given these conditions, there would need to be an agreement between
the district energy district energy business and the Army for the use of this building.
As noted in Section 1.5.3, the operations of the groundwater treatment system are anticipated to
continue for a minimum of 30 years. By the end of this period, an alternative energy source may need
to be identified should the groundwater pumping be discontinued or unavailable for energy transfer.
At that stage, there would be multiple technologies that could be incorporated:
A separate field of geothermal heat exchange wells could be constructed in the vicinity of the
energy transfer station.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
47
Construction of a solar thermal garden in the vicinity of the energy transfer station.
Installation of a commercial size heat pump at the energy transfer station.
Future technologies that are currently unavailable in the market.
The proposed distribution system would consist of two pipes, supply and return, spanning from the
energy transfer station to the homes. To prevent the pipes from freezing, and to efficiently transfer the
energy, these pipes can be insulated and buried at shallow depths, or uninsulated, and buried at
greater depths. To keep the initial construction costs of the distribution system to a minimum, the
proposed district energy business could construct the distribution system and service extensions to the
homes, in coordination with site development.
Figure 9: Distributed ground source heat pump schematic
A set of two pipes would span between each home and the distribution system, one delivering water
to the home and one returning water to the distribution system. Each home would be equipped with a
water source heat pump unit, powered by electricity. This would replace the need for traditional
forced-air furnaces and electrically-driven air-conditioners. During the winter months, the heat pump
would take heat from the distribution system water and use it to heat the air inside the home.
Conversely, during the summer months, the heat pump will take heat from inside the home and reject
it to the distribution system, which is how the home is cooled. Figure 10 shows how home heat pump
systems operate inside the homes.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
48
Figure 10: Ground source heat pump operation
3.3.3. Greenhouse Gas Reduction
One important advantage of a low-temperature district energy system is the reduction of greenhouse
gas emissions. Carbon dioxide is the primary greenhouse gas emission that is monitored and measured
for the heating and cooling of buildings. The carbon dioxide emission rates used to calculate the
savings of the low-temperature district energy system are included in Table 15.
Carbon Dioxide Emission Rates
Natural Gas1 117 CO2 lb/MMBtu
EPA MROW Emission Factor2 1,536 CO2 lb/MWh
Electric Utility1 1,041 CO2 lb/MWh
Notes:
1.https://www.xcelenergy.com/staticfiles/xe/Corporate/CRR2013/environment/emissi
ons-reporting.html ttp://www.epa.gov/climateleadership/documents/emission-
factors.pdf
2. http://www.epa.gov/climateleadership/documents/emission-factors.pdf
Table 15: Carbon dioxide emission rates
When comparing emission rates between traditional HVAC systems and the proposed low-
temperature district energy system in the Hill and Creek neighborhoods, carbon dioxide emissions are
reduced by almost 30%. The comparison of the estimated greenhouse gas emissions is shown in Table
16.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
49
Estimated Annual Carbon Dioxide Emission Reductions for Low-Temperature District Energy
Gas Furnace - Heating 15,874 MMBtu/yr 929 tons C02/yr
Air conditioner - Cooling 836 MMBtu/yr 128 tons C02/yr
Total Conventional Emissions 1,057 tons C02/yr
Heat Pump - Heating 3562 MMBtu/yr 544 tons C02/yr
Heat Pump - Cooling 484 MMBtu/yr 74 tons C02/yr
Pumping Station (kWh) 247,280 MMBtu/yr 129 tons C02/yr
Total Heat Pump Loop Emissions 747 tons C02/yr
Savings 310 tons C02/yr
% Emissions Reduction 29%
Table 16: Estimated annual carbon dioxide emissions reduction
This calculation does not take into account the opportunities for carbon-neutral electricity production
that would be available to the TCAAP development. These calculations use the base emissions rate
from the electric grid, published by Xcel Energy for the Upper Midwest service territory. As the local
electricity sources become less dependent on the primary grid, through implementation of community
solar gardens or other technologies, the carbon dioxide emissions could be further reduced.
3.3.4. Financial Analysis
The initial cost of the low-temperature district energy system was estimated based on the Project
Team’s historical data for installation of piping and equipment. The pumping station, heat pumps,
furnaces, and air conditioning units were estimated based on major equipment budgetary pricing that
is readily available from manufacturers. The distribution piping was estimated based on historical data
for similar material installations in Minnesota. The low-temperature of the water allows for flexibility
of the piping system construction. The Project Team evaluated the material costs for a number of
materials and based the estimate on a high-density polyethylene piping system, due to the material
cost and ease of installation. A summary of the initial capital costs are provided in Table 17.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
50
Total System Capital Cost Comparison
District Energy Capital Costs Traditional System Capital Costs
Pump Station $375,950
Xcel Energy Infrastructure $0 Distribution Pipe $2,527,500
Service Laterals $533,200
Domestic Water Heaters $493,000 Domestic Water Heaters $591,600
Heat Pumps $2,563,000 High Efficiency Furnaces $1,005,720
AC Units $1,135,872
Total $6,493,250 Total $2,733,192
Table 17: Total system capital cost comparison
For the economic analysis, the Project Team assumed that the district energy facilities at the energy
transfer station and the distribution piping would not be paid for by the TCAAP developer. Typically,
the district energy entity pays for the production and distribution facilities. The Project Team did
assume that the developer would pay for the procurement and installation of the heat pumps, and hot
water heaters in the homes. The Project Team also assumed that the developer would pass the
minimal additional cost of the heat pump installation on to the homeowner through an increased
mortgage amount, and would be able to use the eco-friendly aspects of the system as a selling point.
The analysis was completed for straight costs, and did not include any rebates or tax credits that may
be applicable for these energy efficient homes. A summary of the initial costs to be paid by the
developer is shown in Table 18.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
51
Developer Capital Cost Comparison
Heat Pump Capital Costs Traditional System Capital Costs
Domestic Water Heaters $493,000 Domestic Water Heaters $591,600
Heat Pump Units $2,563,600 High Efficiency Furnaces $1,005,720
AC Units $1,135,872
Total $3,056,600 Total $2,733,192
Per Unit Cost1 $9,102 Per Unit Cost1 $6,930
Note:
1. 394 homes based on density projections for Hill and Creek neighborhoods available at time of publication
Table 18: Developer capital cost comparison
The capital costs for the construction of the district energy system are shown below in Table 19 and
are assumed to be financed over a period of 30 years.
District Energy System Capital Costs
Pump Station Construction $375,950
Distribution Mainline Construction $2,527,500
Distribution Service Laterals $533,200
Total $3,436,650
Note:
1. Includes engineering and indirect costs for the service laterals to each home.
Table 19: District energy system capital costs
The proposed low-temperature district energy system is modeled as a private, non-profit business,
with cost-based energy rates. The model assumptions are provided in Table 20.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
52
Financial Assumptions
Energy and Demand Rates Escalation Rates
Summer Residential Electricity Rate
($/kWh)1 $ 0.0867 Inflation Rate 2.0%
Winter Residential Electricity Rate
($/kWh)1 $ 0.0739 Natural Gas Rate Acceleration
(EERC Real)2 3.93%
Electric Service Charge per Unit
Annually1 $ 96.00 Electricity Rate Acceleration3 2.53%
Sales Tax4 $ 0.0763 Water and Sewage Acceleration 3.00%
Natural Gas Rate ($/MMBtu)1 $ 8.3983 Cost of Capital - Developer 6%
Natural Gas Service Charge per Unit
Annual5 $ 108.00 Cost of Capital – District Energy
Entity 4%
Payment Periods 30
Equipment Efficiency Unit Costs
Air Conditioning (SEER5) 14.00 Housing Units 394
Air Conditioning (EER6) 11.76 High-Efficiency Furnace Unit Cost
with Install $ 2,550
Air Conditioning COP7 3.45 Natural Gas Water Heater Cost with
Install $ 1,500
Air Conditioning kW/ton 1.02 Air Conditioner Unit Cost with
Install $ 2,880
High Efficiency Furnace8 92% Operation and Maintenance
Annually per Unit $ 400
Heat Pump Cooling EER9 20.30 Heat Pump Unit Cost with Install10 $ 6,500
Heat Pump Heating COP11 4.10 Hot Water Heater with Heat
Pump12 $ 1,250
Heat Pump Maintenance Per Unit
Annually $150
Expected Unit Life Expectancy
High-Efficiency Furnace 18-20 Years
Air Conditioner 12-15 Years
Heat Pump 18-20 Years
Franchise Fees/Easements $0
Notes:
1. http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/rates/MN/MNResRateCard.pdf
2. Energy Escalation Rate Calculator - 2% inflation, start date is 2015, duration is 30 years. Annual energy escalation rate is
1.89% (Real) and 3.93% (Nominal).
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
53
3. Energy Escalation Rate Calculator - 2% inflation, start date is 2015, duration is 30 years. Annual energy escalation rate is
0.52% (Real) and 2.53% (Nominal).
4. Sales tax not applied to heating due to state heating fuels law.
5. Seasonal Energy Efficiency Ratio (Btu/Watt-hr) – the cooling output during a typical cooling season divided by the total
electric energy input during the same period.
6. Energy Efficient Ratio (Btu output/Watt input) – the ratio of output cooling energy (in Btu) to input electrical energy (in
W).
7. Coefficient of Performance – the ratio of output energy (in Btu or W) to input electrical energy (in the same units).
8. http://apps1.eere.energy.gov/buildings/publications/pdfs/building_america/highefficiency_gas_furnaces.pdf
9. http://www.waterfurnace.com/literature/3series/SC2300AL.pdf
10. http://www.homeadvisor.com/cost/heating-and-cooling/install-a-heat-pump/#,
http://home.costhelper.com/geothermal-heat-pump.html , Estimate for 4-loop heat pump provided by S&B Geothermal
(adjusted for economies of scale and 1 loop unit)
11. http://www.waterfurnace.com/literature/3series/SC2300AL.pdf
12. Heat pump to supply DHW to tank, electric element in tank as redundant source.
Table 20: Financial assumptions
Using the energy usage estimates prepared as part of this study, the Project Team estimated the
annual cost of providing heating and cooling to the areas homes under a traditional scenario
(independent high efficiency furnaces and AC units) and under a low-temperature district energy
scenario (energy transfer station, distribution system, heat pump HVAC units). The life cycle cost
analysis for the low-temperature district energy system, including the costs covered by the developer,
was compared to the traditional scenario. The 30-year costs include systems operation, maintenance,
and equipment replacement, but do not account for any profit for the district energy business. This
analysis is summarized in Table 21.
District Energy Life Cycle Cost Comparisons for Connected Homes
Initial Cost 30-Year Cost Average Annual Costs Per Home
Traditional Service $ 2,733,192 $20,288,675 $1,715
District Service $3,056,600 $18,482,181 $1,562
District Service
Savings (Cost) $(323,408) $1,806,494 $153
Table 21: District energy system life cycle cost comparison for all homes connected
As shown, the district system is lower in cost over the-30 year period than a traditional gas-fired
furnace and electric A/C unit; however, it is assumed that the benefits beyond the 30-year initial
agreement would be significantly greater as the debt payment for the initial system construction is
completed.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
54
Lastly, to validate that this system is the optimal means of capturing ground-source energy, the Project
Team compared the life-cycle cost for the low-temperature district energy system to a scenario where
homeowners would install independent geothermal systems that would serve each home. In this
comparison, both homes would have heat pumps to meet their comfort needs. Because this would add
initial cost to the developer, it was assumed that the developer would pass this cost along to the home
owner in the form of a premium added to the mortgage amount. This analysis is summarized in Table
22.
Ground-Source Loop System Life Cycle Cost
Initial Cost 30-Year Cost Average Annual Costs Per Home
Individual Geothermal1 $9,6002 $45,596 $1,521
District Service $ - $46,862 $1,562
District Service Savings (Cost) $9,600 $(1,266) $(41)
Notes:
1. Assumes that home owners would be required to pay a premium to the developer for the construction of geothermal well field.
2. Estimate provided by S&B Geothermal, $2,400/well, assumed four wells.
Table 22: Independent geothermal loop system life cycle cost comparison
Independent geothermal systems could be built for the residents in TCAAP, and would be less costly
than the district energy system capturing energy from the treated groundwater. However, the
relatively small gains in cost over 30 years would be offset by the volatility of natural gas markets,
inconvenience of maintaining independent systems in each home, the initial cost of the systems, and
the future flexibility provided by installing district energy infrastructure.
3.3.5. Potential Savings Opportunities
Under the assumptions provided in this Framework, the implementation of a low-temperature district
energy system that utilizes energy from the treated groundwater appears to be technically and
financially implementable. The economic benefits of this system could be improved by realizing one or
more of the following cost reduction opportunities.
The distribution piping is the single largest cost for the implementation of the low-
temperature system. The primary opportunity to reduce this cost is through coordinating the
distribution piping construction with the construction of the public utilities. This coordinated
construction has been assumed in the financial model.
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
55
Additional savings could be realized if the piping were installed in a joint trench with the water
main, meaning that the distribution piping and water main would be constructed at the same
depth and in the same trench. This would eliminate the need for a second trench excavation
for the distribution piping, and would only require a marginal increase in the size of the
excavation of the water main trench.
Xcel Energy could partner with the County, JDA, and the City to further evaluate and promote
a neighborhood development that does not utilize natural gas. This promotion would include
providing technical assistance, contributing electric vehicle charging stations, or promoting the
efficiency and low-carbon possibilities of the neighborhood.
Energy efficiency savings related to micro-hydro, community solar garden subscription, or
other renewable electric generation were not included in the model for the energy transfer
station or customer properties. Utilization of these technologies could improve the payback
time for the system.
Equipment rebates and tax credits were not included into the model, though Xcel Energy
offers rebates on high efficiency equipment and variable frequency drives, for which the
energy transfer station will be eligible. Xcel Energy also has a number of other energy
conservation programs that could be leveraged to offset initial capital costs of the system.
None of these rebates were assumed in the current model.
The Federal Government offers a 30% tax credit to home owners who install a groundwater
heat pump that is applicable from the date of occupancy by the homeowner for new homes.
However, this tax credit is only applicable if the home is used as a residence by the taxpayer,
and is scheduled to end on December 31, 2016.6 The inherent ambiguity regarding
construction date and owner usage, the Project Team has not included this tax credit in the
model.
3.3.6. Implementation Planning and Suggested Next Steps
Implementing a low-temperature district energy system in the residential neighborhoods of TCAAP can
deliver several benefits to the site and stakeholders, including the following.
An energy system that is more energy efficient than traditional heating and cooling systems.
Reduced fossil fuel usage and greenhouse gas emissions.
Competitive, stable costs of energy for homeowners.
6 http://energy.gov/savings/residential-renewable-energy-tax-credit
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
56
Xcel Energy could avoid gas pipe distribution infrastructure costs in the neighborhoods, saving
rate payers money.
Installation of a flexible infrastructure network in the neighborhoods will allow for easier
integration of future energy sources or technology advancements as they become available.
Implementation of this system would establish the TCAAP approach to sustainable
neighborhoods as a national model for energy efficiency and innovative site development.
For the proposed system to be successfully implemented, it would need to be constructed as the first
homes are being built, so that service can be provided from the outset of development. To optimize
the economic benefits of the system, every home in the selected neighborhoods should be constructed
with a heat pump HVAC system and be connected to the proposed system. This would provide the
most financeable, cost-effective implementation plan, and also maximize energy efficiency for TCAAP.
Implementing the low-temperature district energy system requires several areas of focus, including the
following next steps.
3.3.6.1. Develop the System Business Plan
Before beginning the implementation of the proposed system, a business will need to be formed to
facilitate the distribution of energy to the customers it will serve. As part of determining the ownership
structure, a business plan should be developed to resolve a number of organizational preferences for
the business. Resolving these items will be important to help guide development of the proposed
system. Among those preferences, the following should be determined:
The mission of the organization
The organizational structure
Governance of the business
The energy sales rate structure
The system financing strategy
The expected structure of energy
service agreements with customers
The engineering strategy
The construction contracting strategy
The system operational strategy
The system management strategy
The energy transfer station location
strategy
Permitting and regulatory strategy
Developer outreach and education
strategy
Easement and franchise agreement
strategy, needs, or restrictions
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
57
The City, County and JDA should resolve these items prior to commencing with the site development
RFP process. While all of the items listed above are important for development, the following items will
likely require the most attention.
Forming the Business
Unless Ramsey County or Arden Hills is the owner of the low-temperature district energy system, an
ownership entity should be developed, based upon the system mission. The ownership entity will
handle the system operations, maintenance, and billings. The business could be best served by one of
the following structures: Municipally Owned, Private Non-Profit, Private For-Profit, or a Hybrid
Publically-Owned Infrastructure/Private Non-Profit Company. Each structure has inherent benefits and
detriments, which will need to be evaluated as the business structure is determined.
The private, non-profit model operational structure is the business structure that was assumed in the
financial analysis. This business structure operates under the governance of local stakeholders and
customers. This type of business model has several advantages, the most prominent being that the
rates would be cost-based, meaning that the rates would cover the cost of operating the system and
debt service, without mark-ups for profit or return on investment.
Developer Outreach and Education
A critical aspect of this system is that each home in the system service area should be connected to the
system. This will require developers to install heat pump units in each home, instead of traditional
forced air furnaces and air conditioner units. The developers should be properly educated on this
opportunity and this direction should be clearly stated in the RFP language, so that the developers can
understand and implement the strategy from the onset.
Reach Agreement with U.S. Army for use of Existing Building and Treated Groundwater
The ownership entity will need to negotiate with the Army for the use of energy from the treated
groundwater and the existing building to which the groundwater treatment station is attached. This
agreement will, at a minimum, need to provide for access to and operation of the energy transfer
station equipment. Ideally, an agreement would include ownership transfer of the building and
groundwater pumping system at the termination of the groundwater treatment operations, so that the
heat pump loop can continue to meet the heating and cooling needs of the development.
System Financing
Depending upon the preferred ownership structure, the financing strategy for the system could be very
different. If the system is publicly owned, it could be financed through the public institution or in
private markets. If a private, non-profit, the system could be 100% debt-financed based upon long-
TCAAP Energy Integration Resiliency Framework
Energy Source Implementation
58
term agreements with homeowners. Under this scenario, the phasing of housing development may
require City or County backing of the debt as not all homes will be occupied when the system begins
operation.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
59
4. Energy Efficiency Strategies (Demand Side Management)
Given the pressing timeline of near-term infrastructure investments, much of the Framework is
focused on energy supply options for TCAAP and the Arden Hills community. However, implementation
of improved building energy efficiency will be necessary to achieve the community’s low-carbon,
resiliency goals. The following are the leading opportunities for near-term, low energy use
development at the site. Unlike many next steps for energy supply and infrastructure, the demand-side
initiatives will strongly depend on engaging developers who can help implement the TCAAP energy
vision. These recommendations make use of the truly unique opportunities at TCAAP, which include:
Availability of a local, renewable ground heat energy source via the site remediation process.
Advantages of both greenfield development and large scale deployment to optimize
economies of scale.
Focus on replicable designs and technologies to simplify developer implementation.
Emphasis on actual building performance, beyond prescriptive design requirements.
Important strategic partnerships with Xcel Energy and the Center for Sustainable Building
Research at the University of Minnesota.
4.1. Energy Resilient Design and Construction
To meet the energy resilience goals for TCAAP, building design verification and benchmarking will be
needed on an ongoing basis. As development moves forward it is recommended that the County, the
JDA, City Staff, and development consultants utilize the following building standards, technical
resources, planning tactics, and proposal criteria to attract and streamline energy efficient
development.
4.1.1. Meeting SB 2030 Guidelines
All commercial developments on the TCAAP site can be measured against the requirements of
Minnesota’s Sustainable Buildings 2030 (SB 2030), a performance based building energy standard
developed to incrementally move new construction to net zero energy design by 2030. The standing
program is not only a standard for design and construction, but an ongoing energy performance
benchmarking program and guideline. The standard is designed specifically for Minnesota’s climate, is
administered by the Center for Sustainable Building Research (CSBR), and is supported by both the
State of Minnesota’s Division of Energy Resources and Xcel Energy.
SB 2030 has several advantages as a consistent site standard, as outlined in the Policy White Paper. To
recap:
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
60
SB 2030 is designed and tailored for Minnesota buildings.
SB 2030 is a performance based standard, providing guidance for the design of energy
efficient buildings beyond prescriptive requirements, giving developers site-specific flexibility,
however prescriptive guidelines are available.
It has building use based standards that cover all development types applicable to TCAAP:
commercial, multi-family, and detached residential.
As a comprehensive, performance-based energy standard, SB 2030 looks at all of the systems in a
building and how they collectively impact its efficiency. Systems that are modeled or calculated under
the standard are:
Building Envelope
Equipment Energy Efficiency
Lighting Power Density & Controls
Domestic Hot Water
Mechanical Systems
Use of Renewables
Resources & Benefits
Xcel Energy’s Energy Design Assistance Program is a free resource for designers and
developers to help meet some of the SB 2030 requirements and will help developers navigate
rebate opportunities. (Additional assistance is available when design teams commit to
designing at 30% more efficient than typical design.)
Xcel Energy’s custom efficiency program allows large users to obtain tailored, performance
based efficiency assessments and rebates.
On average, SB 2030 will require commercial buildings to be 35 to 45% more efficient than the new
building code (IECC 2012). Table 23 outlines specific efficiency improvements for a few building types
relevant for TCAAP.7
7 For single-family homes and townhomes, SB 2030 will be more efficient than the residential IECC 2012 code, but not to the extent of
commercial building requirements.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
61
Increase in Energy Efficiency Above Commercial Building Code (IECC 2012)
Medium Office Stand-Alone Retail Small Hotel Restaurant Warehouse
42% 29% 50% 55% 60%
Table 23: SB 2030 (70% benchmark) Energy Efficiency Improvement over Code8
The key way to incentivize use of SB 2030 is to give preference to proposals designing to these
standards during the RFP review process (outlined below). Development teams would have access to
SB 2030 tools and case studies that outline recommended cost-effective design approaches. During
schematic design and design development phases, the design team will set goals and targets for the
project with guidance from the SB 2030 team. When construction documents are nearly complete, the
SB 2030 team provides a full plan review with course corrections and feedback to achieve the project
targets. After construction, the SB 2030 team will again work with project stakeholders to initiate the
energy benchmarking and tracking process. The cost to the developer/builder for all of these program
services is approximately $8,000 to $10,000 per commercial site, a greater value than comparable
certification programs that do not provide review services.
Given the scale and visibility of TCAAP, there are potential adjustments that can be made to streamline
this process for developers.
Targeted education and design guidelines that are site specific and assist developers to quickly
identify what major design features to focus on for a specific site and building type.
Potential cost buy-down for the upfront cost of the study and review
SB 2030 may face a challenge in that while it is relevant for Minnesota buildings it does not yet have
the market visibility of other national standards such as LEED. Marketing of the TCAAP site could
include a marketing campaign around the benefits of SB 2030, to increase awareness, acceptance, and
a value reflection in the market. The County or City may also consider sharing review costs with
developers to help grow collaboration and buy-in.
8 Analyzed by comparing improvements in ASHRAE 90.1 and applying the 70% reduction compared to the 1989 baseline by building use
type (CEE).
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
62
4.3. Leading Near-Term DSM Opportunities
4.3.1. Low-Load Residential Development
Section 6.4.1.1 (p. 34-35) of the Policy White Paper outlined the concept of a residential development
featuring low-energy, all electric homes, fed by the ground source heat for heating and cooling needs.
A low-load home would not require the larger heating and cooling capacity of traditional systems, but
instead could meet residents’ comfort needs with smaller capacity systems. A low-load home does not
have to cost significantly more than a traditionally built home, and can be valued more in the
marketplace.9
The Project Team estimates that low-load homes in Minnesota could obtain a maximum combined
space heating and cooling load of less than 10 Btu/hour/square foot (conditioned floor area).10 The key
technologies and strategies include high levels of building insulation and passive solar design, a tight
building shell, and high efficiency appliances. These homes do not require significant insulation like a
passive house, but are 40% to 50% more efficient than what is required by the new IECC 2012 code.
The primary opportunity for implementing low-load homes at TCAAP is the integration of a low-
temperature district energy system fed by the treated groundwater on-site. This energy source could
be implemented in homes in the Creek, Hill and eastern Town residential developments, given their
proximity to the treated ground water. This opportunity deserves significant consideration since the
homes at TCAAP have the unique ability to tap the renewable resource of the pumped ground water
through a district energy system combined with in-home water-to-air heat pumps.
Incorporation of high-performance technologies that have little to no impact on the up-front costs,
such as efficient appliances and low-flow plumbing, will help minimize hot water use and help
maximize home efficiency. The following is a summary of the specific technologies and design
elements that can be considered for a low-load, all electric home at TCAAP:
9 Multiple recent housing market studies have shown that homebuyers are willing to pay a 9-15% premium for homes that perform more
efficiently. (CA Housing Study 2012; NHBA Market Study 2013)
10 http://www.nrel.gov/docs/fy14osti/60712.pdf
Recommendation:
The JDA should consider all residential neighborhoods as eligible areas for development of low-
load homes and utilization of a shared ground source water loop for retrieving low-cost heat.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
63
Insulation, air sealing, and passive solar design to reduce space conditioning load to 10
Btu/hr/square foot
Ground source heat pump technology (electric driven)
High-efficiency appliances such as refrigerators, dishwashers, washer/dryers (with additional
consideration of low water use)
Consideration of heat pump dryers
Propane on localized natural gas stoves and grills
Magnified benefit from rooftop PV electricity or purchase of community solar shares
Some marketing benefits of implementing these solutions include:
Availability of high-tech, low maintenance equipment
Cutting edge all-electric design
True net-zero or net-zero ready potential
Low-cost energy living
Low Load Home Performance Verification
Coordination between ground water system capacity and home design will be necessary up-front and
on an ongoing basis. This will provide developers and users with the necessary assurance that the
designed loads will be compatible with the capacity of the system. Verification of home energy design
and performance can most easily be achieved by a third-party with design and construction expertise.
The County and JDA could specify building standards to help homes reach these performance targets,
such as SB 2030, which has standards for single-family homes that could be personalized for TCAAP.
This program could be administered between utility energy-efficiency verification programs like Energy
Star for New Homes and coordination help from the City’s inspection division.
4.3.1.1. Case Studies
Zero Carbon Residential Development | Bainbridge Island, Washington
Bainbridge Island is a mixed residential development of 24 single-family homes, rental apartments,
senior-living, and condos. Buildings were designed to meet the criteria of a stringent building
certification program, the Living Building Challenge, and included “ultra-insulated” envelopes, high-
efficiency appliances, and an opt-in opportunity to buy or finance roof-top solar. Mini-split heat pumps
with energy recovery ventilators provide high-efficiency heating. Additionally, all parking is
underground and broader sustainability innovations are woven in such as walkability, water
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
64
conservation, and edible landscapes. All of the single family homes sold out quickly and all home
buyers opted to install solar PV systems.
Low Load Housing Development | Townsend, Massachusetts
A premiere example of low-load homes being built at scale is the 35 single-family houses on
Coppersmith Way in Townsend, MA. These homes, each 1,700 square feet, were built to meet a strict
efficiency standard with an additional cost of approximately $8.40 per square foot (incorporating a
$4,550 Massachusetts rebate).11 The resulting thermal load was served by two efficient “mini-split”
systems – one on each floor – and homes continue to be reported by residents as a comfortable and
responsive living environment.
Carbon Zero Residential Development | Issaquah, Washington
At a built cost of about $375,000 each, the 10 townhome development outside of Seattle (started in
2008) sold out completely within the first year with homebuyers showing a willingness to pay $20 to
$40 more per square foot than less efficient homes of similar size and location.12 The neighborhood,
similar to what is being proposed at TCAAP, successfully utilized a community-based ground source
system in combination with in-home heat pumps. The shared walls between townhomes contributed
to reduced heating loads that made it financially viable. The builder/developer attests that the visible
elements of the net zero energy homes, such as the in-floor radiant heating, heat pump technology,
roof-top solar, and triple pane windows were key to the value that homebuyers saw. The developer
(Ichijo U.S.A.) continuous to build low-load homes and sees ROI that makes sense in the market.
Ground Source Heat Pump Housing Development | Kennewick, Washington
SouthCliffe is a 400+ lot residential development in southeastern Washington that is comprised of low-
load homes serviced by a ground source water loop and heat pumps, very similar to what is being
proposed at TCAAP. Heating and hot water needs of each home are both serviced by this combination
of technologies. The ground source water loop added approximately 5% to the cost of each lot, but led
to immediate monthly energy cost savings. Milo Bauder and Grant Young were the developers of this
project, and have worked with ThermLink in Duluth: a pioneer in ground source installations and
equipment.13
11 Homes achieved a HERS score of 40. The exterior walls were built to R-46, the basement walls were R-20, the attic was insulated to R-
63 and the under basement slab was insulated with 2 inches of rigid foam with an R-value of 10.
12 Conversation with Nick Neid, project manager with Ichijo USA, the developer and builder (February 2015)
13 http://www.distinctiveprop.com/files/files/soiuthcliffepressrelease.pdf
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
65
4.3.2. Building orientation and passive solar
The TCAAP Policy White Paper included the recommendations for the TCAAP subdivision review
process to assess the energy implications of street and building orientation on solar heat gain and loss.
Beyond the building envelope, street orientation, lot and building orientation, and building massing, all
impact the thermal loads of homes and commercial buildings. By jointly considering these variables
prior to the subdivision process, planners and developers have the opportunity to make tradeoff
decisions while still producing efficient results. Site orientation is potentially a no-cost way to reduce
building energy loads and improve daylighting when considered in site planning.
In line with solar oriented design, homes should be designed and sited so that the longest sides of a
house face south and southern faces have the greatest window area.14 This general window
orientation is a proven strategy to reduce a home’s heating energy by approximately 4% and cooling
costs by 2%, without affecting any other parts of the design. Figure 11 shows the energy savings
achieved from southern window orientation, assuming that the largest exterior walls are facing north
and south, but without optimizing any other window characteristics or the window to wall ratio on
each side.
Alone, window orientation results in moderate energy savings, but when paired with improved
window insulation, higher solar heat gain coefficients, and optimum window to wall ratios, the heating
energy savings will be 20% to 30%.15 Proper building and window orientation magnify the impact of the
remaining window decision. When aligned, homes with a well-insulated double or triple pane windows
14http://www.energy.ca.gov/title24/2013standards/prerulemaking/documents/current/Reports/Residential/Water_Heating/2013_CASE
_R_Solar_Ready_Solar_Oriented_Developments_Sept_2011.pdf
15 http://www.efficientwindows.org/downloads/ColdDesignGuide.pdf
Recommendation:
The process for solar oriented development should be described in residential and commercial
building RFPs and should be integrated as evaluation criteria for development proposals. It should
be evaluated based on lowest total energy load of the homes or buildings to be sited under one
proposal and should consider street orientation, building orientation, and passive solar building
envelope design elements. As part of the platting process, the County could plat the land and
maximize building orientation prior to sale to developers.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
66
and optimum window to wall ratios, annual energy cost savings for homes in central Minnesota have
been shown to be approximately $300 annually.
Figure 11: Thermal Load with Respect to House Orientation
The likely locations where street orientation could vary significantly to accommodate energy
implications would be the Creek, the Hill, and the Transition neighborhood on the periphery of the
Town. It is important to remember that in order to utilize building orientation and passive solar at
TCAAP; two mutually dependent factors are required:
Optimizing street orientation during the subdivision process
Designing homes to take advantage of the passive solar resource
Optimizing orientation during the subdivision process would be appropriate to solicit during the RFP
process. These goals can be included as RFP evaluation criteria.
4.3.3. High efficiency commercial buildings
4.3.3.1. Utilizing SB 2030
As shown in the White Paper, the primary energy loads for TCAAP are estimated to be in the retail,
commercial, and flex areas of the development. Thus DSM energy conservation measures for these
areas of the development will be paramount for successful achievement of the Energy Vision.
However, until specific use types are more clearly defined during the RFP process, specific commercial
building efficiency strategies are challenging to define. The Project Team recommends that the JDA
1000
11000
21000
31000
41000
51000
61000
71000
81000
91000
Broad side facing South Broad side facing North
Cooling
Heating
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
67
establish the SB 2030 process into the commercial development RFPs, as the SB 2030 process provides
an overarching framework for pursuing high commercial efficiency performance. The process for how
to use SB 2030 is described above.
4.3.4. Sub-metering
Commercial and multi-family building sub-metering (Policy White Paper, p. 31) is included as an
important consideration because it is a relatively low additional design cost when considered up front,
but has the potential to help maintain low energy use since tenants directly see and pay for their
energy use.
Sub-metering has been shown to save up to 21% in leased building spaces.16 The material, software,
and labor cost for each sub-meter point ranges from $5,000 to $7,500. Several metering companies
provide sub-metering services by owning, operating, and maintaining the meters. Monthly fees are
based on the type of service needed and the quantity of sub-meters served, but costs per sub-meter
range from $150 to $400.
Value Add for Sub-Metering
Item Application Level(s) Primary Use
Energy Procurement and billing Building Management
Baselining & optimizing building performance Building; System Management; Diagnostics
Project energy measurement & verification System; Circuit Management; Diagnostics
Equipment and plug-load diagnostics Tenant; Circuit; Device Management; Diagnostics;
Utility efficiency programs
Occupant awareness and behavior change Tenant; Circuit; Device
Management; Diagnostics;
Utility efficiency programs;
Research
Table 24: Value add for sub-metering17
16 “Tenant Occupants of Green Office Buildings: Driving the Market for Improving Existing Building Stock” McGraw-Hill Construction and
CBRE. September, 2011. www.cbre.com/EN/aboutus/MediaCentre/2011/Pages/10062011.aspx
17 http://www.gsa.gov/portal/mediaId/181031/fileName/Sub-metering_Business_Case_How_to_calculate_cost-
effective_solutions_in_the_building_context
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
68
Estimated Savings from Sub-Metering
Action Observed Savings
Sub-meter bills allocated to all tenants 2.5% - 5% (improved occupant awareness)
Building tune-up & load management 5% - 15% (improved awareness, identification of
simple O&M improvements, and load management)
Ongoing commissioning 15% - 45% (improved awareness and ongoing
monitoring & commissioning)
Table 25: Estimated savings from sub-metering (DOE 2006)18
4.3.4.1. Case Study
Legrand North America | Better Building, Better Plants Challenge19
Legrand, an international provider of information networks, installed sub-meters in its 14 largest
manufacturing and assembly facilities in North America.
The Company had to achieve energy savings of 1.5% of total energy consumption for the
dashboard to pay for itself in just 1.5 years. Project ROI was 83%.
Actions enabled by sub-metering dropped the minimum (baseload) usage by a factor of two.
The systems empowered Lagrand to engage in conservation competition across facilities,
something that TCAAP businesses could do across the site.
Building sub-metering should be considered by architects and engineers at the building design stage.
While SB 2030 guidelines require minimum sub-metering, additional sub-metering would offer
business opportunities like those capitalized on at Legrand properties. Once sub-meters are in place,
ongoing energy feedback program opportunities could also be pursued in coordination with the
electric utility.
18 FEMP, Guidance for Electric Metering in Federal Buildings. 2006. www1.eere.energy.gov/femp/pdfs/adv_metering.pdf.
19 http://www4.eere.energy.gov/challenge/sites/default/files/uploaded-files/submeter-guide.pdf
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
69
4.3.6. Co-location and strategic siting strategies
One opportunity for energy supply alternatives that has been recommended in the White Paper is the
development of a district energy system, possibly fed from a CHP plant. Planned siting and co-location
can bring increased efficiency to a district system or create opportunities for miniature district systems
in areas that are not connected (e.g. some of the Flex areas).
Figure 12: Building co-location examples
Because of the greenfield advantage, high energy use businesses and building use types could be
motivated to develop at TCAAP because of the future energy cost savings. For those on the district
Recommendation:
Attract high energy use businesses and building types through RFP materials and developer
workshops, and help facilitate energy savings opportunities for these projects through strategic
siting.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
70
system, they may be able to benefit from the efficiency that they bring to the system through lower
rates or even bill credits when they decrease their return temperature.
For businesses that may not be in proximity to a future district energy system, the County and JDA
could facilitate building co-location. Certain project types can be identified as potential candidates for
co-location. Table 26 outlines business and building types that are high users of hot water or have
concentrated periods of high electricity use. As proposals are reviewed, the County and JDA should
identify projects that are the same use as those listed in Table 26. Such candidates could be grouped
and referred to energy design experts as to the specific energy benefits that could be achieved through
co-location. For example, a hotel development could be sited adjacent to a laundromat to make their
combined hot water load more even throughout the day and surface the opportunities to share hot
water heating and recovery equipment.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
71
Solar Thermal Sharing Opportunities Peak Times Hot Water1
Hotels and lodging Mornings 31.4 kBtu/SF
Multifamily buildings Morning/Night na
Health Care (inpatient) All Day 48.4 kBtu/SF
Bars and restaurants Afternoon/Night 40.4 kBtu/SF
Laundromats/cleaning services Daytime na
Car washes Late afternoons na
Small manufacturing Night/All Day variable
Gardens/Nurseries na
Photovoltaics Sharing Opportunities Peak Times Total Electric2
Education facilities3 Morning/ Afternoon 11.01 kWh/SF
Offices Daytime 17.3 kWh/SF
Health Care (inpatient) All Day 27.5 kWh/SF
Restaurants Night 38.4 kWh/SF
Grocers/Food sales All Day 49.4 kWh/SF
Retail (malls in particular) Afternoon/ Night 22.3 kWh/SF
Data Centers All Day na
Notes:
1. E2A base on historic CBECS 2003 data
2. E3A base on historic CBECS 2003 data
3. Education facilities are seasonal, but high demand 9 out of 12 months.
Table 26: Applicable Business Types for Building Co-Location
Co-locating buildings does not require the sharing of exterior walls. The proximity to one another may
even render opportunities to create unique outdoor employee or community spaces. The hot water or
heat producers could sell their excess to adjacent buildings that have use for it at different times of
day. Shared decentralized hot water storage units could even be used in some cases. Businesses would
be interested in this opportunity because it would improve the efficiency of their consumption, reduce
upfront capital equipment and maintenance costs, and increase comfort.20
20 The Primary Energy Factor (PEF) difference between district heating systems and Gas-fired heating (0.8/1.3=0.61)
http://www.euroheat.org/Files/Filer/documents/Publications/District%20Heating%20in%20buildings_final.pdf
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
72
Co-location opportunities will require coordination on the part of the JDA and County, but
communicating the interest to facilitate co-location upfront for developers and business will make
coordination easier. High energy use project types may be motivated to propose a project at TCAAP if
efforts are being make to facilitate energy savings. Marketing materials and RFP language that
highlights appropriate co-location building use types can help attract these projects.
4.3.7. Streetlights
The City of Arden Hills has included a site-wide requirement for all streetlights to be “high-efficiency
lighting, such as LED lamps” in the TCAAP Redevelopment Code. This requirement will trigger the
inclusion of high efficiency lights in the development process. Current LED technology saves
approximately 50% to 70% of lighting energy use. A significant cost savings occurs by additionally
reducing maintenance costs, given the longer life of the bulbs. The City can work with Xcel Energy to
utilize any future high efficiency streetlight program offerings that support this effort in a manner that
is timely and commensurate with current development staging.
4.3.8. Community participation and education
Community participation and education have been consistently mentioned as important factors at
TCAAP, both to engage the wider Arden Hills community and to leverage the energy savings potential
from facilitating ongoing awareness of energy use by site tenants and residents. Many details of
community engagement will need to be planned once the site sees its first residents and tenants.
However, certain engagement elements can be planned for or implemented during the early
development stage, including:
A TCAAP or Arden Hills-wide website that tracks energy goals and performance of buildings at
the site, including energy and carbon savings. The website could promote major metrics and
milestones, and issue periodic challenges (e.g. the “lowest user” challenge).
Community-wide open house or showcase events of leading edge technologies on the site,
especially for housing, that will attract and excite potential residents (e.g. cook a meal in an
all-electric kitchen)
Commissioning of design or signage elements in public spaces that connect users to the site’s
energy resiliency goals and their contribution and participation in those goals. A targeted
marketing campaign around community solar development, as an early symbol of community-
driven, low carbon energy use at the site.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
73
4.4. Demonstration Opportunities
4.4.1. Advanced Distribution Grid
TCAAP’s greenfield status, combined with the site’s forward looking energy vision, make it an ideal
opportunity to pilot and demonstrate advanced technologies in the electric distribution grid. Many of
the opportunities outlined in this report, such as high solar PV penetration, advanced commercial
building metering, or responsive electric loads, are all facilitated by a distribution system with
increased communications and control functions.
Features that could be piloted at the site might include increased reliability testing, or load
management strategies that rely on advanced metering and communications throughout the
distribution network. Load management—the real-time increase or reduction of electric demand in
response to external signals—can change customer electricity use in response to signals such as
physical constraints or environmental signals, such as an excess renewable energy capacity. The results
can save customers money and reduce the environmental impact of their energy use.
By laying the groundwork for an advanced distribution system at TCAAP during the planning phase,
residents and businesses would have access to cutting edge opportunities such as advanced rate
design or real-time load response. Moving forward on these opportunities would likely require the
collaboration of Xcel Energy, the Public Utilities Commission, and the Minnesota Department of
Commerce, Division of Energy Resources.
4.4.2. Innovative Energy Technologies
In addition to pilot opportunities at the grid level, TCAAP is ideal for demonstrating innovative energy
technologies at scale. The Project Team recommends that the JDA and County seek and attract
partnerships to demonstrate proven technologies and strategies. While the technologies may be
proven, TCAAP offers scalable and living demonstration opportunities, where an apartment, house, or
street of homes could serve as a living lab. Additionally, as a cold climate site that can attract multiple
partners, there is great opportunity to demonstrate the synergies that can exist between multiple
innovative technologies and design strategies. This might include piloting new in-road luminescent
street or pedestrian path lighting products in conjunction with high efficiency overhead LED street
lighting or homes that have on-site electric storage and remote controlled appliances/electronics that
communicate with each other.
The following case studies outline how demonstration opportunities can make economic sense for
developers, the partnerships that brought opportunities to life, and key technologies that could be
demonstrated at scale.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
74
4.4.3. Technology Demonstration: Case Studies
4.4.3.1. Builders Leading with Home Connectivity | Standard Pacific Homes, KB Homes, TruMark Co.
A number of leading home builders in the U.S. are capitalizing on the benefits of developing homes
that are connected – to the internet, to smart phones, cars, on-site renewables, thermostats, lighting,
and other home electronics and appliances. Basic network capabilities are being installed in homes as a
new standard feature and then buyers can specify additional features they want making buyer costs
incremental and personalized. Control capability for homeowners may range from remote control of
lights and programmable thermostats, to automatic shutoff of leaky faucets and geofencing
capabilities as users approach home. Networks and devices need to achieve this have dropped
significantly in price and developers are starting to see these home features as low-cost ways to
improve market value. Costs to developers start around $200 and top out around $2,000.
Figure 13: Geofencing enabled demand-side management
Examples of Potential Demonstration Technologies:
Smart home appliances (e.g. Samsung)
In-home network hubs, software and apps (e.g. SmartThings)
Smart switches, plugs, and plug switching capabilities (e.g. Belkin WEMO)
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
75
Connect light bulbs (e.g. Philips Hue)
In-home energy storage/fuel cells and car-to-car charging (e.g. Honda’s Home Energy
Management System21)
In-home zoned temperature controls (e.g. Honeywell)
4.4.3.2. Net Zero Energy Commercial Building Envelopes | Guardian Industries Detroit, MI
Guardian Industries, a glass and building products manufacturer demonstrated a PV spandrel panel
system on its new Science and Technology Center in suburban Detroit. The 12,000 square foot building
showcases a cutting edge building panel system that brings solar power generation capability to the
vertical surfaces of one or two story commercial buildings. The panels convert sunlight in to electricity
at an efficiency of 17% allowing each square foot of panel to produce eight watts of power. Builder
Turner Construction also incorporated Guardian’s own transparent PV glass to demonstrate ease of
integration into the panel system. Eligible for federal modified accelerated cost-recovery System
depreciation and a first year federal tax credit of 30% (available through 2017), the 2014 built project
expects to achieve 100% payback in two years.
Figure 14: Building integrated PV panel systems
21 http://www.hondasmarthome.com/
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
76
Examples of Potential Demonstration Technologies:
Building integrated photovoltaic panel systems (e.g. BISEM)
Photovoltaic or electrochromatic glass (e.g. Guardian Ecoguard glass)
Vehicle & Storage Integration Demonstration | SMUD Sacramento, CA
Many major automakers have been working with Sumitomo Electric to demonstrate the value of a
cloud-based communication system between electric vehicles and utilities.22 The communication
software allows the utility to ask charging cars if they want to temporarily stop charging, based on how
much charge a user has programmed in to the charger. Users can opt into this program to receive
discounted electricity rates or other incentives while the utility would see less stress on the grid and
achieve greater service reliability.23 Most recently this two-way communication system was
demonstrated at the Sacramento Municipal Utility District’s (SMUD) Service Center.
There are opportunities to demonstrate these grid benefits and customer incentives in Minnesota at
TCAAP. The integration of these communication capabilities into the grid could be demonstrated
across multiple individual EV users or a fleet (from a future TCAAP business or other TCAAP neighbors
such as Ramsey County or AHATS). The synergy of additional technologies, such as on-site electric
storage and renewables and in-home DC power access could be incorporated as part of such a grid
integration project. Such an effort could be achieved in partnership with Xcel Energy with the
opportunity for the University of Minnesota or other third-parties to play a role in research and
community learning.
22 http://www.epri.com/Press-Releases/Pages/EPRI,-Utilities,-Automakers-to-Demonstrate-Technology-Enabling.aspx
23 http://www.af.mil/News/ArticleDisplay/tabid/223/Article/554343/af-tests-first-all-electric-vehicle-fleet-in-california.aspx
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
77
Figure 15: Integrating electric vehicles & storage with utility communication software
Examples of Potential Demonstration Technologies:
Cloud-based communication software for a utility (e.g. Sumitomo Electric)
Electric vehicles (e.g. Honda, BMW, Nissan)
Intelligent electric vehicle integration software (e.g. Nuvve, EURISCO)
On-street charging stations (e.g. AeroVironment EV Solutions)
4.5. Recommended Development Request for Proposal Language
In order to embed the energy resilience principals of TCAAP into the fabric of the site, it is
recommended that the JDA incorporate evaluation language as part of the Request for Proposal (RFP)
for all commercial development projects. The language below presents conservation guidelines as
criteria by which each proposal could be evaluated. In the cases where it is possible to provide direct
incentives or funnel state economic development fund to developers, these standards could be made
requirements for these resources.
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
78
4.5.1. Energy Resilience Proposal Evaluation Criteria
Sustainable Buildings 2030 Design Standards – HIGHLY RECOMMENDED
Commercial and residential development proposals will be evaluated based on a demonstrated
commitment to building to meet or exceed the State of Minnesota’s Sustainable Building 2030 (SB
2030) energy standards. Proposals should highlight design and constructing team experience in
developing high-performance buildings and sites. Proposals should also outline preliminary strategies
and processes that will be used to meet higher energy performance.
This would include:
Early design phase energy modeling to inform building orientation, daylighting, passive solar
heating, and building envelope decisions
Specification of high efficiency lighting, operator controls, and mechanical systems/district
energy connection
Integration of tenant and equipment level sub-meters that will monitor ongoing building
performance and opportunities for demand response
Further Sub-metering – RECOMMENDED
Beyond meeting SB 2030, it is recommended that all commercial buildings on the TCAAP site be
equipped with local sub-metering. Proposals should describe generally the plans for installing circuit or
equipment level sub-meters within each tenant space (e.g. individual building or tenant building
systems such as lighting or venting) and power monitoring systems to inform behavior and ongoing
commissioning efforts.
Innovative Energy Demonstrations & Partnerships – RECOMMENDED
The RFP should state the interest in TCAAP servings as a national model and demonstrating proven
energy innovations that will help make renewables, energy efficiency, and energy awareness more
visible at TCAAP.
Proposals may describe a unique energy technology to be incorporated at the building or site
level.
Proposals that layout collaboration opportunities with other TCAAP developers or the
community will receive additional consideration (e.g. building co-location interest)
Advanced Metering – RECOMMENDED
TCAAP Energy Integration Resiliency Framework
Energy Efficiency Strategies
79
This infrastructure will help track and report detailed building performance data to building operators
and the utility. It would also allow for the potential of rate programs that give building owners more
control of their energy costs and savings (dynamic pricing). All electric utility meters should have two-
way, real-time communication capabilities. Xcel Energy could work with developers to help specify and
install any advanced meters, and the site development partners could help Xcel Energy obtain the
necessary regulatory approvals for piloting these installations.
Solar Oriented Development -- RECOMMENDED
While SB 2030 guidelines will encourage building orientation and site planning that optimizes load
minimizing solar heat gains, developers that show intent to incorporate passive solar design will be
given additional consideration or even site location preference. This may include conceptual drawings,
plans, and other documentation that show how building orientation, building massing, window
placement, and site landscaping will utilize passive solar heating and achieve solar access for
immediate or future on-site renewables.
TCAAP Energy Integration Resiliency Framework
Schedule
80
5. Schedule
5.1. Overall TCAAP Development Schedule
The development schedule that is currently proposed is likely to begin in 2016 with the construction of
the interchanges of County Hwy 96 and County Road H with the Spine Road. The Spine Road
construction is also expected to begin in 2016. Currently, site development is projected to begin with
the residential and retail areas in the northern region of TCAAP in late 2016 or early 2017.
Development is expected to progress southward from the Town and Creek neighborhoods as the
market allows. The Thumb area is being actively marketed by the JDA at this time, and could be
developed as soon as the right proposal is received from the development community. The current
development plan is included in the appendix as Exhibit III.
5.2. Integrating with the TCAAP Development Schedule
Given the development timeline in section 5.1, development of the concepts presented in this
Framework will need to follow varying schedules, as provided below.
5.2.1. Future Thermal Energy Grid
While the most cost-effective time to install thermal energy grids is in coordination with initial site
development, this is likely not feasible given the uncertainty of when and what will be developed at
TCAAP. Alternatively, a corridor for future energy infrastructure (i.e. district energy piping) could be
preserved in the engineering and construction plans for the Spine Road. The Project Team is in
discussions with Ramsey County staff to include that corridor in the Spine Road design.
5.2.2. Community Solar
The proposed community solar garden is technically not located on the TCAAP site, rather it is
recommended for the Primer Trace site. As such, TCAAP development will not necessarily have an
impact on the schedule for this opportunity. Rather, the community solar garden will need to be
completed and in service by December 31, 2016 to be eligible for the 30% income tax credits, assuming
they are not extended. If the tax credit is not needed in the developer’s business model, this schedule
is driven more by market conditions than the TCAAP development schedule.
5.2.3. Low-Temperature District Energy
Construction of the low-temperature district energy system in the residential neighborhoods will need
to coincide with development in order to be ready to serve the initial neighborhood development,
avoid any unnecessary developer costs, and minimize the cost of pipe installation. RFPs are likely to be
TCAAP Energy Integration Resiliency Framework
Schedule
81
issued in late 2015, so the business plan for this system will need to be fully developed in early to mid-
2015.
5.2.4. Combined Heat and Power
Development of the initial CHP system is more directly related to the needs of the existing buildings
than to the development timeline of TCAAP. Therefore, construction of the initial CHP system should
be coordinated with the MNARNG’s plans for site expansion, so that the proposed future buildings
could be served by the system from the initial construction and unnecessary equipment costs can be
avoided. Connection to the other buildings should be completed at this time to take advantages of the
economies of scale and optimize thermal energy capture. Expansion of the CHP system to serve
development of TCAAP should coincide with that development, and the JDA should engage early with
selected developers to identify how the CHP system can be expanded to meet their buildings’ needs.
5.2.5. Demand-Side Management
The JDA should work with partner organizations to develop greater comprehension of SB 2030
guidelines by hosting informational gatherings for the development companies that are interested in
the TCAAP site. Builders and contractors familiar with the SB 2030 process could be asked to provide
insight and feedback about the process. Developer education will build developer acceptance and
understanding of process to make the site more attractive.
The JDA should also assess current residential market potential in Twin Cities region by conducting
market research and outreach on all-electric, low load home concept. This will help to assuage
developer and future resident concerns about unfamiliar technologies and utility structure.
The JDA should lastly work with the site marketing team to market energy conservation concepts to
potential developers, builders, and tenants, focusing on the business opportunities available through
these concepts.
TCAAP Energy Integration Resiliency Framework
Next Steps and Conclusion
82
6. Next Steps and Conclusion
6.1. Next Steps
To achieve the TCAAP energy vision and achieve sustainable benefits for the City and the surrounding
community, the JDA will need to begin implementation on each of the individual opportunities
presented in this Framework. The Project Team recommends the following immediate actions related
to each opportunity.
6.1.1. Partnerships
Continue partnership discussions with the MNARNG, Xcel Energy, the University of Minnesota Center
for Sustainable Building Research, and other stakeholders as development of the site and the various
energy opportunities progress.
6.1.2. Solar PV
Develop an RFP for the development of a solar array on the Primer Tracer site. The RFPs could be sent
to Xcel Energy and local community solar developers. In parallel to the site development RFP process,
the County and the MNARNG should begin the process needed to secure the Primer Tracer land for a
solar development.
6.1.3. Combined Heat and Power
As part of the developer selection process, the JDA should work with prospective developers to identify
opportunities for serving those buildings’ electric and thermal energy needs with a CHP facility. The
JDA and County should also coordinate with the MNARNG and Xcel Energy to define an initial CHP
facility that can serve the current loads in the area, align with the energy goals of the MNARNG, and be
expanded in the future to meet the emerging TCAAP energy loads as they occur.
6.1.4. Low-Temperature District Energy System
The JDA should develop the business plan for the proposed low-temperature district energy system
and form the operational organization in preparation for the site development request for proposals.
In addition, the County should work with the Army and the appropriate regulatory authorities to obtain
approval to extract energy from the treated ground water, and utilize the existing pump house for the
low-temperature district energy distribution loop. Lastly, the JDA should continue collaboration with
Xcel Energy to explore a neighborhood that is independent of the natural gas system, through district
energy and electric grid services.
TCAAP Energy Integration Resiliency Framework
Next Steps and Conclusion
83
6.1.5. Demand-Side Management
The JDA should adopt the energy savings design standards it would like to incorporate into the site
development RFP process, both for commercial and residential developments. The JDA should also
inform developers on the various energy efficiency opportunities that are available to them by
developing informational and educational material for prospective developers. Lastly, the JDA should
collaborate with developers and Xcel Energy to identify opportunities for an advanced distribution grid
and meters, building co-location, and passive-solar design deployment.
6.1.6. Infrastructure Planning
The County should develop a utility coordination program that enables cost-effective implementation
of initial utilities and infrastructure on the site, while allowing for future infrastructure to be added as
opportunities come available. The County should also incorporate solar orientation into the platting
process.
6.1.7. Funding Pursuits
The JDA should identify the funding opportunities that it could be the most successful in pursuing, and
collaborate with the City, County, MNARNG and other stakeholders, as appropriate, to develop funding
requests for each selected opportunity. In parallel, the stakeholders should develop and implement an
outreach campaign to inform decision makers on the energy opportunities that are available at TCAAP.
6.1.8. RFP Development
The JDA and the County should include energy planning in the development of RFPs for the site, and
through negotiations and discussions with individual developers. Opportunities for co-location, waste
energy capture, energy efficiency improvements, district energy integration, and other options
discussed in the White Paper and the Framework should be discussed with developers throughout
TCAAP development process to achieve the energy vision.
6.2. Conclusion
The ERAB has adopted a very forward-thinking vision for the TCAAP site. This will be achievable
through strategic partnerships with Xcel Energy, the MNARNG, the University of Minnesota Center for
Sustainable Building Research, environmentally conscious citizens, and developers who see the
economic and environmental value of the TCAAP energy vision. Through these partnerships, TCAAP will
be uniquely poised to be the national model for the development of integrated energy systems.
The first steps toward achieving the energy vision include implementing energy supply options that
focus on efficiency, reliability, scalability, and sustainability, such as the low-temperature district
TCAAP Energy Integration Resiliency Framework
Next Steps and Conclusion
84
energy system in the residential neighborhoods and the community solar garden at the Primer Tracer
site. These specific opportunities have been shown to be financially beneficial and financeable.
Developing a CHP approach that meets the needs of current buildings in the area, and is expandable in
the future as development proceeds, provides a platform for establishing a resilient TCAAP microgrid in
the future.
Implementing a demand-side management strategy that focuses on building performance through the
development RFP process will build a resilient community for energy use. Focusing on improving
performance in the buildings to reduce, or even eliminate, the energy needs of the buildings will
provide an economically attractive environment as building owners are able to take advantage of the
financial savings realized by the increased efficiency, compared to traditional energy expenditures.
TCAAP Energy Integration Resiliency Framework
Exhibits
85
Exhibit I – Partnership Opportunities Map
TCAAP Energy Integration Resiliency Framework
Exhibits
86
Exhibit II – Demand Side Management Recommended Roles Matrix
County/City JDA Development Broker Development
Engineer
Xcel
Energy
Fiber (Spine
Road)
Support the
installation of
TCAAP-wide fiber
optic infrastructure.
Coordinate with the
appropriate utilities
so that this
infrastructure is
installed at the most
cost effective
development
phases.
Convey to
developers the
benefits of having
fiber optic hooked
up.
Plan for the
installation of
TCAAP-wide fiber
optic infrastructure.
Coordinate with the
appropriate utilities
so that this
infrastructure is
installed at the most
cost effective
development
phases.
Snow melt
piping (Spine
road)
Invest in this
infrastructure as a
future maintenance
cost savings
measure and draw
for businesses and
residents in the
more populated
neighborhoods and
the Town.
Support the
installation of a low-
grade heat piping
system.
Convey to
developers
considering Town
Center sites the
convenience benefits
of the street snow
melt system.
Plan for the
installation of a low-
grade heat piping
system by keeping
green space
available along the
spine road.
Low load
homes
Help to build a
constituency for
low-load
developments.
Also, facilitate the
formation of a low
temperature
district energy
business for
integration of low-
load homes.
Communicate the
attractiveness of
low-load homes for
future home buyers
and share the status
of constituency
interest.
TCAAP Energy Integration Resiliency Framework
Exhibits
87
County/City JDA Development Broker Development
Engineer
Xcel
Energy
Save on
natural gas
extension
trunklines
Support residential
development RFPs
with preferences
for low-load homes
and the benefits of
not extending
natural gas
trunkline
infrastructure in
these
neighborhoods.
Coordinate the
location of the low-
load neighborhoods
so that natural gas
infrastructure costs
can be avoided.
Include in residential
development RFPs
the preference for
low-load homes and
the benefits of not
extending natural
gas trunkline
infrastructure in
these
neighborhoods.
Include cost saving
information from not
having to extend
natural gas trunklines
onto specific plats or
subdivisions.
Help to visually
communicate the
location of the low-
load neighborhoods
as they are
determined by
proposals and the
JDA.
Attracting
businesses
with electric
vehicle fleets
Help identify (with
3rd party help)
appropriate
locations for such
businesses if there is
interest.
Market TCAAP to MN
and national
businesses that have
or may have electric
vehicle fleets. Convey
that TCAAP would
help demonstrate
reliable EV charging
infrastructure at scale
through microgrid
and local renewables
integration.
Energy
Resilience
RFP language
Help structure
incentive
opportunities that
would motivate
developers to
implement options
presented in the
EIRF and White
Paper. This may
include being the
arbiter of standing
federal, state or
local incentives for
job creation or tax
benefits.
Integrate
recommended
Energy Resilience
criteria into proposal
evaluation.
Include
recommended RFP
language in RFP
packets, including
sell-sheets that
describe the benefits
of these preferences.
Pursue developers
with experience
implementing energy
efficient
developments.
TCAAP Energy Integration Resiliency Framework
Exhibits
88
County/City JDA Development Broker Development
Engineer
Xcel
Energy
Street
Planning and
House
Orientation
Be stewards of
energy resilient
street planning and
platting. Work with
developers to
maximize solar heat
gain potential by
siting lots that allow
for the longer sides
of houses to be
oriented East/West.
Include RFP
language that
requests for solar
isolation
optimization (land
grading and building
orientation), passive
solar house design,
passive ventilation,
and PV-ready roof
size and direction
(west or southwest).
Support the County
and City in dividing
up residential
neighborhoods with
lots that are
North/South
oriented, or within
15 degrees.
Developer
Education
Help coordinate developer education sessions
to help inform developers of TCAAP Energy
Resilience goals and opportunities for support
services. Discuss potential partnerships, and
cost benefits before proposal submission.
After developer selection, share information
on specific building or home technologies,
answer questions, discuss opportunities for
integrating with district systems, and initiate
design support.
Sharing costs:
SB 2030 &
ENERGY STAR
Home
certifications
Support the
development of
high-performance
design and
development by
sharing the
administrative costs
of the SB 2030
certification with
developers (50/50
split).
Provide
additional
technical
support
for those
projects
committed
to meeting
SB 2030.
Co-locating
buildings
Facilitate building
co-location by
making developers
aware of the energy
cost benefits of
siting on a particular
plot of land and
even offering
potential incentives
for doing so.
Communicate to
developers what co-
location is, why it
would be
advantageous, and
what building use
types best leverage
this opportunity.
Make a special effort
to market to
developers or
businesses that
building these types of
projects.
TCAAP Energy Integration Resiliency Framework
Exhibits
89
County/City JDA Development Broker Development
Engineer
Xcel
Energy
Advanced
Meters
Make
advanced
meters the
standard
offering
for
buildings
and homes
built on
the TCAAP
site.
TCAAP Energy Integration Resiliency Framework
Exhibits
90
Exhibit III – TCAAP Land Use Map
TCAAP Energy Integration Resiliency Framework
Exhibits
91
Exhibit IV – Funding Source Matrix
Fu
n
d
i
n
g
N
a
m
e
Ty
p
e
o
f
Fu
n
d
i
n
g
Fu
n
d
i
n
g
So
u
r
c
e
Fu
n
d
i
n
g
D
e
s
c
r
i
p
t
i
o
n
Fu
n
d
i
n
g
C
r
i
t
e
r
i
a
Li
m
i
t
a
t
i
o
n
s
De
a
d
l
i
n
e
Su
g
g
e
s
t
e
d
N
e
x
t
St
e
p
s
No
t
e
s
a
n
d
Ad
d
i
t
i
o
n
a
l
I
n
f
o
Pr
o
p
e
r
t
y
As
s
e
s
s
e
d
C
l
e
a
n
En
e
r
g
y
(
P
A
C
E
)
Fi
n
a
n
c
i
n
g
th
r
o
u
g
h
Pr
o
p
e
r
t
y
As
s
e
s
s
m
e
n
t
Mu
n
i
c
i
p
a
l
Fi
n
a
n
c
i
n
g
Di
s
t
r
i
c
t
Re
v
e
n
u
e
b
o
n
d
s
b
a
c
k
e
d
b
y
s
p
e
c
i
a
l
as
s
e
s
s
m
e
n
t
s
a
n
d
m
a
d
e
a
v
a
i
l
a
b
l
e
t
o
pr
o
p
e
r
t
y
o
w
n
e
r
s
t
h
r
o
u
g
h
l
o
a
n
s
,
wh
i
c
h
a
r
e
r
e
p
a
i
d
t
h
r
o
u
g
h
a
n
a
n
n
u
a
l
sp
e
c
i
a
l
t
a
x
o
n
i
n
d
i
v
i
d
u
a
l
p
r
o
p
e
r
t
y
bi
l
l
s
.
1.
E
n
e
r
g
y
e
f
f
i
c
i
e
n
c
y
im
p
r
o
v
e
m
e
n
t
s
;
2.
R
e
n
e
w
a
b
l
e
en
e
r
g
y
s
y
s
t
e
m
s
,
a
n
d
3.
E
l
e
c
t
r
i
c
V
e
h
i
c
l
e
ch
a
r
g
i
n
g
s
y
s
t
e
m
s
.
Lo
a
n
c
a
n
n
o
t
b
e
l
o
n
g
e
r
t
h
a
n
t
h
e
us
e
f
u
l
l
i
f
e
o
f
i
m
p
r
o
v
e
m
e
n
t
s
(m
a
x
.
2
0
y
e
a
r
s
)
,
a
s
s
e
s
s
e
d
o
v
e
r
1
0
ye
a
r
s
.
L
i
m
i
t
e
d
t
o
t
h
e
c
o
s
t
o
f
t
h
e
im
p
r
o
v
e
m
e
n
t
o
r
1
0
%
o
f
p
r
o
p
e
r
t
y
,
wh
i
c
h
e
v
e
r
i
s
l
e
s
s
.
E
n
e
r
g
y
a
u
d
i
t
o
r
fe
a
s
i
b
i
l
i
t
y
s
t
u
d
y
r
e
q
u
i
r
e
d
.
M
u
s
t
de
m
o
n
s
t
r
a
t
e
a
b
i
l
i
t
y
t
o
r
e
p
a
y
(c
u
r
r
e
n
t
o
n
t
a
x
e
s
a
n
d
m
o
r
t
g
a
g
e
)
.
Mu
s
t
d
e
m
o
n
s
t
r
a
t
e
c
o
s
t
ef
f
e
c
t
i
v
e
n
e
s
s
,
a
n
d
r
e
c
e
i
v
e
co
n
s
e
n
t
o
f
f
i
r
s
t
m
o
r
t
g
a
g
e
l
e
n
d
e
r
.
No
n
e
Ar
d
e
n
H
i
l
l
s
C
i
t
y
Co
u
n
c
i
l
s
h
o
u
l
d
wo
r
k
w
i
t
h
t
h
e
Sa
i
n
t
P
a
u
l
P
o
r
t
Au
t
h
o
r
i
t
y
(
S
P
P
A
)
to
d
e
v
e
l
o
p
a
J
o
i
n
t
Po
w
e
r
s
Ag
r
e
e
m
e
n
t
f
o
al
l
o
w
S
P
P
A
t
o
ad
m
i
n
i
s
t
e
r
P
A
C
E
pr
o
g
r
a
m
.
ht
t
p
:
/
/
m
n
.
g
o
v
/
co
m
m
e
r
c
e
/
e
n
e
rg
y
/
i
m
a
g
e
s
/
P
A
CE
-
M
i
n
n
e
s
o
t
a
-
Pr
e
s
e
n
t
a
t
i
o
n
.
p
df
ww
w
.
p
a
c
e
n
o
w
.
or
g
Le
g
i
s
l
a
t
i
v
e
-
Ci
t
i
z
e
n
Co
m
m
i
s
s
i
o
n
o
n
Mi
n
n
e
s
o
t
a
Re
s
o
u
r
c
e
s
Gr
a
n
t
En
v
i
r
o
n
m
e
n
t
an
d
N
a
t
u
r
a
l
Re
s
o
u
r
c
e
s
Tr
u
s
t
F
u
n
d
Pe
r
m
a
n
e
n
t
f
u
n
d
i
n
t
h
e
s
t
a
t
e
tr
e
a
s
u
r
y
e
s
t
a
b
l
i
s
h
e
d
f
o
r
t
h
e
p
u
b
l
i
c
pu
r
p
o
s
e
o
f
t
h
e
c
o
n
s
e
r
v
a
t
i
o
n
o
r
en
h
a
n
c
e
m
e
n
t
o
f
n
a
t
u
r
a
l
r
e
s
o
u
r
c
e
s
.
Al
i
g
n
m
e
n
t
w
i
t
h
LC
C
M
R
s
t
r
a
t
e
g
i
c
pl
a
n
,
m
u
l
t
i
p
l
e
be
n
e
f
a
c
t
o
r
s
,
ou
t
c
o
m
e
s
,
kn
o
w
l
e
d
g
e
b
a
s
e
o
f
ap
p
l
i
c
a
n
t
,
e
x
t
e
n
t
o
f
im
p
a
c
t
s
,
i
n
n
o
v
a
t
i
o
n
,
sc
i
e
n
t
i
f
i
c
o
r
te
c
h
n
i
c
a
l
b
a
s
i
s
,
ur
g
e
n
c
y
,
c
a
p
a
c
i
t
y
an
d
r
e
a
d
i
n
e
s
s
,
a
n
d
le
v
e
r
a
g
e
.
Na
t
u
r
a
l
r
e
s
o
u
r
c
e
e
d
u
c
a
t
i
o
n
,
ca
p
i
t
a
l
p
r
o
j
e
c
t
s
f
o
r
t
h
e
p
r
o
t
e
c
t
i
o
n
of
u
n
i
q
u
e
n
a
t
u
r
a
l
r
e
s
o
u
r
c
e
s
,
ac
t
i
v
i
t
i
e
s
t
h
a
t
p
r
e
s
e
r
v
e
i
m
p
a
i
r
e
d
na
t
u
r
a
l
r
e
s
o
u
r
c
e
s
.
4:
3
0
P
M
o
n
Mo
n
d
a
y
,
Ma
y
1
1
,
2
0
1
5
Im
m
e
d
i
a
t
e
l
y
re
v
i
e
w
2
0
1
6
pr
o
j
e
c
t
s
f
o
r
al
i
g
n
m
e
n
t
w
i
t
h
LC
C
M
R
e
l
i
g
i
b
i
l
i
t
y
an
d
c
r
i
t
e
r
i
a
a
n
d
pr
o
c
e
e
d
w
i
t
h
ap
p
l
i
c
a
t
i
o
n
.
Fu
n
d
s
f
r
o
m
t
h
e
20
1
5
ap
p
l
i
c
a
t
i
o
n
pr
o
c
e
s
s
w
o
u
l
d
be
a
v
a
i
l
a
b
l
e
Ju
l
y
1
,
2
0
1
6
.
ht
t
p
:
/
/
w
w
w
.
l
c
c
mr
.
l
e
g
.
m
n
/
p
r
o
po
s
a
l
s
/
2
0
1
6
/
2
0
16
_
l
c
c
m
r
_
r
f
p
.
p
df
Re
n
e
w
a
b
l
e
De
v
e
l
o
p
m
e
n
t
Fu
n
d
Pu
b
l
i
c
Be
n
e
f
i
t
s
F
u
n
d
Xc
e
l
E
n
e
r
g
y
Mi
n
n
e
s
o
t
a
L
e
g
i
s
l
a
t
u
r
e
h
a
s
r
e
q
u
i
r
e
d
Xc
e
l
E
n
e
r
g
y
t
o
c
o
n
t
r
i
b
u
t
e
t
o
w
a
r
d
s
th
e
d
e
v
e
l
o
p
m
e
n
t
o
f
r
e
n
e
w
a
b
l
e
-
en
e
r
g
y
r
e
s
o
u
r
c
e
s
f
o
r
e
a
c
h
c
a
s
k
o
f
nu
c
l
e
a
r
f
u
e
l
s
t
o
r
e
d
a
t
P
r
a
i
r
i
e
I
s
l
a
n
d
an
d
M
o
n
t
i
c
e
l
l
o
n
u
c
l
e
a
r
p
o
w
e
r
pl
a
n
t
s
.
A
n
n
u
a
l
c
o
n
t
r
i
b
u
t
i
o
n
t
o
t
h
e
fu
n
d
i
s
a
p
p
r
o
x
i
m
a
t
e
l
y
$
2
6
m
i
l
l
i
o
n
.
Up
t
o
$
1
0
.
9
m
i
l
l
i
o
n
a
n
n
u
a
l
l
y
m
u
s
t
be
a
l
l
o
c
a
t
e
d
t
o
s
u
p
p
o
r
t
r
e
n
e
w
a
b
l
e
en
e
r
g
y
p
r
o
d
u
c
t
i
o
n
.
Re
q
u
e
s
t
f
o
r
pr
o
p
o
s
a
l
s
i
s
s
u
e
d
,
an
d
a
w
a
r
d
s
b
a
s
e
d
on
p
r
o
p
o
s
a
l
s
re
c
e
i
v
e
d
.
P
U
C
m
u
s
t
ap
p
r
o
v
e
R
D
F
g
r
a
n
t
aw
a
r
d
s
.
Fu
n
d
s
i
n
t
h
e
R
D
F
a
c
c
o
u
n
t
m
a
y
on
l
y
b
e
u
s
e
d
f
o
r
:
i
n
c
r
e
a
s
i
n
g
t
h
e
ma
r
k
e
t
p
e
n
e
t
r
a
t
i
o
n
o
f
r
e
n
e
w
a
b
l
e
el
e
c
t
r
i
c
e
n
e
r
g
y
r
e
s
o
u
r
c
e
s
i
n
Mi
n
n
e
s
o
t
a
a
t
a
r
e
a
s
o
n
a
b
l
e
c
o
s
t
,
pr
o
m
o
t
i
n
g
t
h
e
s
t
a
r
t
-
u
p
,
ex
p
a
n
s
i
o
n
,
a
n
d
a
t
t
r
a
c
t
i
o
n
o
f
re
n
e
w
a
b
l
e
e
l
e
c
t
r
i
c
e
n
e
r
g
y
pr
o
j
e
c
t
s
a
n
d
c
o
m
p
a
n
i
e
s
w
i
t
h
i
n
Mi
n
n
e
s
o
t
a
,
s
t
i
m
u
l
a
t
i
n
g
i
n
-
s
t
a
t
e
re
s
e
a
r
c
h
a
n
d
d
e
v
e
l
o
p
m
e
n
t
i
n
t
o
re
n
e
w
a
b
l
e
e
l
e
c
t
r
i
c
e
n
e
r
g
y
te
c
h
n
o
l
o
g
i
e
s
,
a
n
d
d
e
v
e
l
o
p
i
n
g
ne
a
r
-
c
o
m
m
e
r
c
i
a
l
a
n
d
de
m
o
n
s
t
r
a
t
i
o
n
s
c
a
l
e
e
l
e
c
t
r
i
c
in
f
r
a
s
t
r
u
c
t
u
r
e
d
e
l
i
v
e
r
y
p
r
o
j
e
c
t
s
i
f
th
o
s
e
d
e
l
i
v
e
r
y
p
r
o
j
e
c
t
s
e
n
h
a
n
c
e
th
e
d
e
l
i
v
e
r
y
o
f
r
e
n
e
w
a
b
l
e
el
e
c
t
r
i
c
e
n
e
r
g
y
.
Ne
x
t
c
y
c
l
e
da
t
e
s
n
o
t
pu
b
l
i
s
h
e
d
Mo
n
i
t
o
r
f
o
r
an
n
o
u
n
c
e
m
e
n
t
s
o
f
ne
x
t
f
u
n
d
i
n
g
a
n
d
re
v
i
e
w
c
y
c
l
e
.
ht
t
p
:
/
/
w
w
w
.
x
c
el
e
n
e
r
g
y
.
c
o
m
/
E
nv
i
r
o
n
m
e
n
t
/
R
e
ne
w
a
b
l
e
_
E
n
e
r
g
y/
R
e
n
e
w
a
b
l
e
_
De
v
e
l
o
p
m
e
n
t
_
Fu
n
d
In
v
e
s
t
m
e
n
t
T
a
x
Cr
e
d
i
t
Co
r
p
o
r
a
t
e
t
a
x
cr
e
d
i
t
In
t
e
r
n
a
l
Re
v
e
n
u
e
Se
r
v
i
c
e
Th
e
I
T
C
i
s
a
3
0
p
e
r
c
e
n
t
t
a
x
c
r
e
d
i
t
f
o
r
so
l
a
r
s
y
s
t
e
m
s
o
n
r
e
s
i
d
e
n
t
i
a
l
(
u
n
d
e
r
Se
c
t
i
o
n
2
5
D
)
a
n
d
c
o
m
m
e
r
c
i
a
l
(u
n
d
e
r
S
e
c
t
i
o
n
4
8
)
p
r
o
p
e
r
t
i
e
s
.
el
i
g
i
b
l
e
f
o
r
s
o
l
a
r
Ev
a
l
u
a
t
e
t
h
i
s
op
p
o
r
t
u
n
i
t
y
i
f
a
so
l
a
r
g
a
r
d
e
n
ag
r
e
e
m
e
n
t
i
s
n
o
t
re
a
c
h
e
d
.
TCAAP Energy Integration Resiliency Framework
Exhibits
92
Fu
n
d
i
n
g
N
a
m
e
Ty
p
e
o
f
Fu
n
d
i
n
g
Fu
n
d
i
n
g
So
u
r
c
e
Fu
n
d
i
n
g
D
e
s
c
r
i
p
t
i
o
n
Fu
n
d
i
n
g
C
r
i
t
e
r
i
a
Li
m
i
t
a
t
i
o
n
s
De
a
d
l
i
n
e
Su
g
g
e
s
t
e
d
N
e
x
t
St
e
p
s
No
t
e
s
a
n
d
Ad
d
i
t
i
o
n
a
l
I
n
f
o
Pr
o
d
u
c
t
i
o
n
T
a
x
Cr
e
d
i
t
Co
r
p
o
r
a
t
e
t
a
x
cr
e
d
i
t
In
t
e
r
n
a
l
Re
v
e
n
u
e
Se
r
v
i
c
e
Th
e
f
e
d
e
r
a
l
r
e
n
e
w
a
b
l
e
e
l
e
c
t
r
i
c
i
t
y
pr
o
d
u
c
t
i
o
n
t
a
x
c
r
e
d
i
t
(
P
T
C
)
i
s
a
p
e
r
-
ki
l
o
w
a
t
t
-
h
o
u
r
t
a
x
c
r
e
d
i
t
f
o
r
el
e
c
t
r
i
c
i
t
y
g
e
n
e
r
a
t
e
d
b
y
q
u
a
l
i
f
i
e
d
en
e
r
g
y
r
e
s
o
u
r
c
e
s
a
n
d
s
o
l
d
b
y
t
h
e
ta
x
p
a
y
e
r
t
o
a
n
u
n
r
e
l
a
t
e
d
p
e
r
s
o
n
du
r
i
n
g
t
h
e
t
a
x
a
b
l
e
y
e
a
r
.
el
i
g
i
b
l
e
f
o
r
ge
o
t
h
e
r
m
a
l
Re
s
e
a
r
c
h
el
i
g
i
b
i
l
i
t
y
a
n
d
ap
p
l
i
c
a
b
i
l
i
t
y
o
f
th
i
s
f
u
n
d
f
o
r
a
gr
o
u
n
d
-
s
o
u
r
c
e
he
a
t
p
u
m
p
d
i
s
t
r
i
c
t
en
e
r
g
y
s
y
s
t
e
m
a
n
d
de
t
e
r
m
i
n
e
wh
e
t
h
e
r
t
h
i
s
pr
o
g
r
a
m
i
s
s
t
i
l
l
fu
l
l
y
f
u
n
d
e
d
.
ht
t
p
:
/
/
e
n
e
r
g
y
.
g
ov
/
s
a
v
i
n
g
s
/
r
e
n
ew
a
b
l
e
-
el
e
c
t
r
i
c
i
t
y
-
pr
o
d
u
c
t
i
o
n
-
t
a
x
-
cr
e
d
i
t
-
p
t
c
Qu
a
l
i
f
i
e
d
En
e
r
g
y
Co
n
s
e
r
v
a
t
i
o
n
Bo
n
d
s
(
Q
E
C
B
)
Ta
x
a
b
l
e
B
o
n
d
s
De
p
a
r
t
m
e
n
t
o
f
En
e
r
g
y
Ta
x
a
b
l
e
b
o
n
d
t
h
a
t
e
n
a
b
l
e
s
qu
a
l
i
f
i
e
d
s
t
a
t
e
,
t
r
i
b
a
l
,
a
n
d
l
o
c
a
l
go
v
e
r
n
m
e
n
t
i
s
s
u
e
r
s
t
o
b
o
r
r
o
w
mo
n
e
y
a
t
a
t
t
r
a
c
t
i
v
e
r
a
t
e
s
t
o
f
u
n
d
en
e
r
g
y
c
o
n
s
e
r
v
a
t
i
o
n
p
r
o
j
e
c
t
s
(
e
.
g
.
ca
p
t
i
a
l
e
x
p
e
n
d
i
t
u
r
e
s
r
e
l
a
t
e
d
t
o
re
d
u
c
i
n
g
e
n
e
r
g
y
c
o
n
s
u
m
p
t
i
o
n
i
n
pu
b
l
i
c
b
u
i
l
d
i
n
g
s
,
i
m
p
l
e
m
e
n
t
i
n
g
gr
e
e
n
c
o
m
m
u
n
i
t
y
p
r
o
g
r
a
m
s
,
de
s
i
g
n
i
n
g
/
r
u
n
n
i
n
g
d
e
m
o
n
s
t
r
a
t
i
o
n
pr
o
j
e
c
t
s
t
o
p
r
o
m
o
t
e
t
h
e
co
m
m
e
r
c
i
a
l
i
z
a
t
i
o
n
o
f
t
e
c
h
n
o
l
o
g
i
e
s
to
r
e
d
u
c
e
p
e
a
k
u
s
e
o
f
e
l
e
c
t
r
i
c
i
t
y
,
et
c
.
)
At
l
e
a
s
t
7
0
p
e
r
c
e
n
t
o
f
t
h
e
al
l
o
c
a
t
i
o
n
s
m
u
s
t
b
e
u
s
e
d
f
o
r
go
v
e
r
n
m
e
n
t
p
r
o
j
e
c
t
s
.
N
o
m
o
r
e
th
a
n
3
0
p
e
r
c
e
n
t
m
a
y
b
e
us
e
d
f
o
r
p
r
i
v
a
t
e
a
c
t
i
v
i
t
i
e
s
.
P
r
i
v
a
t
e
ac
t
i
v
i
t
y
Q
E
C
B
p
r
o
c
e
e
d
s
m
a
y
o
n
l
y
be
u
s
e
d
f
o
r
c
a
p
i
t
a
l
e
x
p
e
n
d
i
t
u
r
e
s
.
Ad
d
i
t
i
o
n
a
l
l
y
,
1
0
0
p
e
r
c
e
n
t
o
f
t
h
e
av
a
i
l
a
b
l
e
p
r
o
j
e
c
t
p
r
o
c
e
e
d
s
o
f
QE
C
B
s
a
r
e
t
o
b
e
u
s
e
d
f
o
r
o
n
e
o
r
mo
r
e
q
u
a
l
i
f
i
e
d
c
o
n
s
e
r
v
a
t
i
o
n
pu
r
p
o
s
e
s
.
Se
p
t
e
m
b
e
r
10
,
2
0
1
0
o
r
Ex
p
i
r
a
t
i
o
n
o
f
fu
n
d
s
ht
t
p
:
/
/
m
n
.
g
o
v
/
mm
b
/
i
m
a
g
e
s
/
N
ot
i
c
e
-
o
f
-
Gu
i
d
a
n
c
e
-
5
B
1
-
5D
.
p
d
f
ht
t
p
:
/
/
p
r
o
g
r
a
m
s.
d
s
i
r
e
u
s
a
.
o
r
g
/
s
ys
t
e
m
/
p
r
o
g
r
a
m
/d
e
t
a
i
l
/
3
0
9
8
Ma
d
e
i
n
Mi
n
n
e
s
o
t
a
S
o
l
a
r
In
c
e
n
t
i
v
e
Pe
r
f
o
r
m
a
n
c
e
In
c
e
n
t
i
v
e
De
p
a
r
t
m
e
n
t
o
f
Co
m
m
e
r
c
e
In
c
e
n
t
i
v
e
f
o
r
c
u
s
t
o
m
e
r
s
o
f
i
n
v
e
s
t
o
r
ow
n
e
d
u
t
i
l
i
t
i
e
s
t
o
u
t
i
l
i
z
e
s
o
l
a
r
P
V
mo
d
u
l
e
s
o
r
s
o
l
a
r
t
h
e
r
m
a
l
p
a
n
e
l
s
,
up
t
o
4
0
k
W
-
D
C
s
y
s
t
e
m
,
ma
n
u
f
a
c
t
u
r
e
d
a
t
a
r
e
g
i
s
t
e
r
e
d
fa
c
i
l
i
t
y
l
o
c
a
t
e
d
i
n
M
i
n
n
e
s
o
t
a
.
Ma
n
u
f
a
c
t
u
r
e
r
fa
c
i
l
i
t
y
m
u
s
t
b
e
lo
c
a
t
e
d
i
n
t
h
e
s
t
a
t
e
an
d
b
e
r
e
g
i
s
t
e
r
e
d
an
d
a
u
t
h
o
r
i
z
e
d
t
o
ma
n
u
f
a
c
t
u
r
e
i
n
t
h
e
st
a
t
e
.
U
t
i
l
i
t
y
m
u
s
t
pr
o
v
i
d
e
m
e
t
e
r
,
a
n
d
ut
i
l
i
t
y
o
w
n
s
t
h
e
RE
C
S
.
40
k
W
-
D
C
s
y
s
t
e
m
m
a
x
i
m
u
m
Fe
b
r
u
a
r
y
2
9
of
e
v
e
r
y
y
e
a
r
Ev
a
l
u
a
t
e
t
h
i
s
op
p
o
r
t
u
n
i
t
y
i
f
a
so
l
a
r
g
a
r
d
e
n
ag
r
e
e
m
e
n
t
i
s
n
o
t
re
a
c
h
e
d
.
O
r
i
f
s
o
l
a
r
th
e
r
m
a
l
i
s
p
u
r
s
u
e
d
fo
r
d
e
v
e
l
o
p
m
e
n
t
.
Tr
i
l
l
i
o
n
B
T
U
Re
v
o
l
v
i
n
g
Lo
a
n
F
u
n
d
Sa
i
n
t
P
a
u
l
P
o
r
t
Au
t
h
o
r
i
t
y
Mo
n
e
y
s
a
v
i
n
g
o
p
p
o
r
t
u
n
i
t
i
e
s
a
r
e
id
e
n
t
i
f
i
e
d
b
y
en
e
r
g
y
a
u
d
i
t
s
a
n
d
e
n
g
i
n
e
e
r
i
n
g
st
u
d
i
e
s
(
X
c
e
l
E
n
e
r
g
y
co
-
f
u
n
d
i
n
g
a
n
d
C
E
E
t
e
c
h
n
i
c
a
l
as
s
i
s
t
a
n
c
e
a
v
a
i
l
a
b
l
e
)
.
S
P
P
A
i
s
u
s
i
n
g
Fe
d
e
r
a
l
s
t
i
m
u
l
u
s
m
o
n
i
e
s
t
h
r
o
u
g
h
th
e Mi
n
n
e
s
o
t
a
D
e
p
a
r
t
m
e
n
t
o
f
Co
m
m
e
r
c
e
t
o
c
r
e
a
t
e
th
i
s
p
r
o
g
r
a
m
f
o
r
M
i
n
n
e
s
o
t
a
bu
s
i
n
e
s
s
e
s
.
C
u
s
t
o
m
e
r
c
h
o
o
s
e
s
t
h
e
pr
o
j
e
c
t
a
n
d
c
o
n
t
r
a
c
t
o
r
s
,
Xc
e
l
E
n
e
r
g
y
p
r
o
v
i
d
e
s
t
h
e
r
e
b
a
t
e
,
SP
P
A
p
r
o
v
i
d
e
s
th
e
f
i
n
a
n
c
i
n
g
.
1
0
0
%
f
i
n
a
n
c
i
n
g
av
a
i
l
a
b
l
e
.
Mu
s
t
b
e
a
n
X
c
e
l
En
e
r
g
y
c
o
m
m
e
r
c
i
a
l
or
i
n
d
u
s
t
r
i
a
l
cu
s
t
o
m
e
r
w
i
t
h
a
qu
a
l
i
f
i
e
d
r
e
b
a
t
e
pr
o
j
e
c
t
.
Mu
s
t
b
e
i
n
X
c
e
l
s
e
r
v
i
c
e
t
e
r
r
i
t
o
r
y
Re
v
o
l
v
i
n
g
De
t
e
r
m
i
n
e
n
e
e
d
fo
r
t
h
i
s
me
c
h
a
n
i
s
m
.
ht
t
p
:
/
/
s
p
p
a
.
c
o
m/
w
p
-
co
n
t
e
n
t
/
u
p
l
o
a
d
s/
s
e
l
l
s
h
e
e
t
_
0
3
.
08
.
p
d
f
TCAAP Energy Integration Resiliency Framework
Exhibits
93
Fu
n
d
i
n
g
N
a
m
e
Ty
p
e
o
f
Fu
n
d
i
n
g
Fu
n
d
i
n
g
So
u
r
c
e
Fu
n
d
i
n
g
D
e
s
c
r
i
p
t
i
o
n
Fu
n
d
i
n
g
C
r
i
t
e
r
i
a
Li
m
i
t
a
t
i
o
n
s
De
a
d
l
i
n
e
Su
g
g
e
s
t
e
d
N
e
x
t
St
e
p
s
No
t
e
s
a
n
d
Ad
d
i
t
i
o
n
a
l
I
n
f
o
En
e
r
g
y
S
a
v
i
n
g
s
Pa
r
t
n
e
r
s
h
i
p
Re
v
o
l
v
i
n
g
Lo
a
n
F
u
n
d
Sa
i
n
t
P
a
u
l
P
o
r
t
Au
t
h
o
r
i
t
y
-
M
N
De
p
a
r
t
m
e
n
t
o
f
Co
m
m
e
r
c
e
Es
t
a
b
l
i
s
h
e
d
b
y
a
g
r
a
n
t
f
r
o
m
t
h
e
M
N
De
p
a
r
t
m
e
n
t
o
f
C
o
m
m
e
r
c
e
,
a
mu
n
i
c
i
p
a
l
l
e
a
s
i
n
g
p
r
o
g
r
a
m
w
i
t
h
U.
S
.
B
a
n
k
t
h
a
t
o
f
f
e
r
s
r
e
d
u
c
e
d
in
t
e
r
e
s
t
r
a
t
e
l
o
a
n
s
t
o
p
a
r
t
i
c
i
p
a
n
t
s
.
An
y
p
r
o
j
e
c
t
t
h
a
t
pr
o
v
i
d
e
s
e
n
e
r
g
y
ef
f
i
c
i
e
n
c
i
e
s
,
e
n
e
r
g
y
sa
v
i
n
g
s
,
o
r
re
n
e
w
a
b
l
e
e
n
e
r
g
y
i
s
el
i
g
i
b
l
e
.
Mi
n
i
m
u
m
l
o
a
n
s
i
z
e
i
s
$
5
0
,
0
0
0
.
Mu
s
t
b
e
a
c
i
t
y
c
o
u
n
t
i
e
s
,
p
u
b
l
i
c
sc
h
o
o
l
s
,
o
r
r
e
g
i
o
n
a
l
g
o
v
e
r
n
m
e
n
t
en
t
i
t
y
.
Re
v
o
l
v
i
n
g
De
t
e
r
m
i
n
e
n
e
e
d
fo
r
t
h
i
s
me
c
h
a
n
i
s
m
.
ht
t
p
:
/
/
s
p
p
a
.
c
o
m/
w
p
-
co
n
t
e
n
t
/
u
p
l
o
a
d
s/
2
0
1
4
/
0
3
/
n
e
w
ES
P
2
0
1
4
.
p
d
f
Ne
w
M
a
r
k
e
t
T
a
x
Cr
e
d
i
t
s
Ta
x
C
r
e
d
i
t
El
i
g
i
b
l
e
Fi
n
a
n
c
i
n
g
Ag
e
n
c
y
Th
e
N
e
w
M
a
r
k
e
t
s
T
a
x
C
r
e
d
i
t
Pr
o
g
r
a
m
(
N
M
T
C
P
r
o
g
r
a
m
)
w
a
s
es
t
a
b
l
i
s
h
e
d
b
y
C
o
n
g
r
e
s
s
i
n
2
0
0
0
t
o
sp
u
r
n
e
w
o
r
i
n
c
r
e
a
s
e
d
i
n
v
e
s
t
m
e
n
t
s
in
t
o
o
p
e
r
a
t
i
n
g
b
u
s
i
n
e
s
s
e
s
a
n
d
r
e
a
l
es
t
a
t
e
p
r
o
j
e
c
t
s
l
o
c
a
t
e
d
i
n
l
o
w
-
in
c
o
m
e
c
o
m
m
u
n
i
t
i
e
s
.
T
h
e
N
M
T
C
Pr
o
g
r
a
m
a
t
t
r
a
c
t
s
i
n
v
e
s
t
m
e
n
t
c
a
p
i
t
a
l
to
l
o
w
-
i
n
c
o
m
e
c
o
m
m
u
n
i
t
i
e
s
b
y
pe
r
m
i
t
t
i
n
g
i
n
d
i
v
i
d
u
a
l
a
n
d
co
r
p
o
r
a
t
e
i
n
v
e
s
t
o
r
s
t
o
r
e
c
e
i
v
e
a
t
a
x
cr
e
d
i
t
a
g
a
i
n
s
t
t
h
e
i
r
F
e
d
e
r
a
l
i
n
c
o
m
e
ta
x
r
e
t
u
r
n
i
n
e
x
c
h
a
n
g
e
f
o
r
m
a
k
i
n
g
eq
u
i
t
y
i
n
v
e
s
t
m
e
n
t
s
i
n
s
p
e
c
i
a
l
i
z
e
d
fi
n
a
n
c
i
a
l
i
n
s
t
i
t
u
t
i
o
n
s
c
a
l
l
e
d
Co
m
m
u
n
i
t
y
D
e
v
e
l
o
p
m
e
n
t
E
n
t
i
t
i
e
s
(C
D
E
s
)
.
A
n
o
r
g
a
n
i
z
a
t
i
o
n
w
i
s
h
i
n
g
t
o
re
c
e
i
v
e
a
w
a
r
d
s
u
n
d
e
r
t
h
e
N
M
T
C
Pr
o
g
r
a
m
m
u
s
t
b
e
c
e
r
t
i
f
i
e
d
a
s
a
C
D
E
by
t
h
e
F
u
n
d
.
Mu
s
t
b
e
l
o
c
a
t
e
d
i
n
an
e
l
i
g
i
b
l
e
di
s
t
r
e
s
s
e
d
z
o
n
e
.
T
h
e
cr
e
d
i
t
t
o
t
a
l
s
3
9
pe
r
c
e
n
t
o
f
t
h
e
or
i
g
i
n
a
l
i
n
v
e
s
t
m
e
n
t
am
o
u
n
t
a
n
d
i
s
cl
a
i
m
e
d
o
v
e
r
a
pe
r
i
o
d
o
f
s
e
v
e
n
ye
a
r
s
(
f
i
v
e
p
e
r
c
e
n
t
fo
r
e
a
c
h
o
f
t
h
e
f
i
r
s
t
th
r
e
e
y
e
a
r
s
,
a
n
d
s
i
x
pe
r
c
e
n
t
f
o
r
e
a
c
h
o
f
th
e
r
e
m
a
i
n
i
n
g
f
o
u
r
ye
a
r
s
)
.
T
h
e
i
n
v
e
s
t
m
e
n
t
i
n
t
h
e
C
D
E
ca
n
n
o
t
b
e
r
e
d
e
e
m
e
d
b
e
f
o
r
e
t
h
e
en
d
o
f
t
h
e
s
e
v
e
n
-
y
e
a
r
p
e
r
i
o
d
.
Di
s
p
a
t
c
h
e
d
an
n
u
a
l
l
y
De
t
e
r
m
i
n
e
n
e
e
d
fo
r
t
h
i
s
me
c
h
a
n
i
s
m
a
n
d
a
fi
n
a
n
c
i
n
g
p
a
r
t
n
e
r
.
Th
e
R
e
s
i
l
i
e
n
t
El
e
c
t
r
i
c
i
t
y
De
l
i
v
e
r
y
In
f
r
a
s
t
r
u
c
t
u
r
e
(R
E
D
I
)
I
n
i
t
i
a
t
i
v
e
Gr
a
n
t
De
p
a
r
t
m
e
n
t
o
f
En
e
r
g
y
(
N
E
T
L
)
DO
E
i
n
i
t
i
a
t
i
v
e
t
h
a
t
f
o
c
u
s
e
s
o
n
te
c
h
n
o
l
o
g
y
t
r
a
n
s
f
e
r
o
f
s
m
a
r
t
g
r
i
d
ad
v
a
n
c
e
s
t
o
s
u
p
p
o
r
t
t
h
e
W
h
i
t
e
Ho
u
s
e
a
c
t
i
o
n
s
t
o
r
e
s
p
o
n
d
t
o
t
h
e
ne
e
d
s
o
f
c
o
m
m
u
n
i
t
i
e
s
n
a
t
i
o
n
w
i
d
e
th
a
t
a
r
e
d
e
a
l
i
n
g
w
i
t
h
t
h
e
i
m
p
a
c
t
s
o
f
cl
i
m
a
t
e
c
h
a
n
g
e
.
M
a
x
i
m
u
m
a
w
a
r
d
s
ra
n
g
e
f
r
o
m
$
6
0
0
,
0
0
0
t
o
$
1
,
0
0
0
,
0
0
0
by
t
o
p
i
c
a
r
e
a
.
1)
i
m
p
l
e
m
e
n
t
a
t
i
o
n
an
d
d
e
p
l
o
y
m
e
n
t
o
f
th
e
b
e
s
t
,
p
r
e
-
co
m
m
e
r
c
i
a
l
a
n
d
/
o
r
co
m
m
e
r
c
i
a
l
s
m
a
r
t
gr
i
d
te
c
h
n
o
l
o
g
i
e
s
/
t
o
o
l
s
(T
o
p
i
c
A
r
e
a
1
)
a
n
d
2
)
ut
i
l
i
z
i
n
g
s
m
a
r
t
g
r
i
d
te
c
h
n
o
l
o
g
i
e
s
/
t
o
o
l
s
fr
o
m
t
h
e
D
O
E
Na
t
i
o
n
a
l
La
b
o
r
a
t
o
r
i
e
s
(
T
o
p
i
c
Ar
e
a
2
)
.
On
l
y
a
v
a
i
l
a
b
l
e
t
o
u
n
i
t
s
o
f
l
o
c
a
l
go
v
e
r
n
m
e
n
t
.
T
h
e
i
m
p
r
o
v
e
m
e
n
t
s
mu
s
t
b
e
m
e
a
s
u
r
a
b
l
e
,
t
a
n
g
i
b
l
e
wi
t
h
i
n
2
4
m
o
n
t
h
s
o
f
p
r
o
j
e
c
t
s
t
a
r
t
,
su
b
s
t
a
n
t
i
a
l
o
v
e
r
a
l
o
n
g
p
e
r
i
o
d
o
f
ti
m
e
,
a
c
c
o
u
n
t
a
b
l
e
f
o
r
r
e
s
i
l
i
e
n
c
e
to
e
n
v
i
r
o
n
m
e
n
t
a
l
s
t
r
e
s
s
o
r
s
(
e
.
g
.
,
mo
r
e
f
r
e
q
u
e
n
t
e
x
t
r
e
m
e
w
e
a
t
h
e
r
ev
e
n
t
s
a
n
d
o
t
h
e
r
c
l
i
m
a
t
e
c
h
a
n
g
e
im
p
a
c
t
s
)
.
4-
M
a
y
-
1
5
De
t
e
r
m
i
n
e
i
f
a
n
y
pr
o
j
e
c
t
s
a
r
e
pr
e
p
a
r
e
d
a
n
d
el
i
g
i
b
l
e
t
o
p
r
o
c
e
e
d
wi
t
h
a
p
p
l
i
c
a
t
i
o
n
.
ht
t
p
s
:
/
/
w
w
w
.
f
e
dc
o
n
n
e
c
t
.
n
e
t
/
F
ed
C
o
n
n
e
c
t
/
?
d
o
c=
D
E
-
F
O
A
-
00
0
1
2
1
9
&
a
g
e
n
c
y=
D
O
E
TCAAP Energy Integration Resiliency Framework
Exhibits
94
Exhibit V – Definitions
Air Handling Unit (AHU) – A central unit consisting of a blower, heating and cooling elements, filter racks or
chamber, dampers, humidifier, and other central equipment in direct contact with the airflow. This does not
include the ductwork through the building.
Active solar – As an energy source, energy from the sun collected and stored using mechanical pumps or fans to
circulate heat-laden fluids or air between solar collectors and a building.
Alternating Current (AC) – An electric current that reverses its direction at regularly recurring intervals. AC is the
form in which electric power is delivered to businesses and residences.
Alternative-rate Energy Efficiency program assistance – An Energy Efficiency (demand-side management)
program assistance that offers special rate structures or discounts on the consumer's monthly electric bill in
exchange for participation in Energy Efficiency programs aimed at cutting peak demands or changing load shape.
These rates are intended to reduce consumer bills and shift hours of operation of equipment from on-peak to
off-peak periods through the application of time-differentiated rates. For example, utilities often pay consumers
several dollars a month (refund on their monthly electric bill) for participation in a load control program. Lar ge
commercial and industrial customers sometimes obtain interruptible rates, which provide a discount in return
for the consumer's agreement to cut electric loads upon request from the utility (usually during critical periods,
such as summer afternoons when the system demand approaches the utility's generating capability).
Arden Hills Army Training Site (AHATS) – A military training area of Minnesota National Guard and the
Minnesota Department of Military Affairs that is directly adjacent to the Rice Creek Commons Project to the
east.
ASHRAE Bin temperature data – Temperature frequency in 5 F intervals available from American Society of
Heating, Refrigerating and Air-Conditioning Engineers.
Boiler – A device for generating steam for power, processing, or heating purposes; or hot water for heating
purposes or hot water supply. Heat from an external combustion source is transmitted to a fluid contained
within the tubes found in the boiler shell. This fluid is delivered to an end-use at a desired pressure,
temperature, and quality.
British Thermal Unit (Btu) – The amount of heat required to raise the temperature of one pound of water 1
degree Fahrenheit. The Btu is a small amount of heat equivalent to the heat released by a burning matchstick.
For district heating systems, heat is often measured in million Btus (MMBtu) which is equivalent to one million
Btu’s.
Building Commissioning - a building performance quality assurance process that begins during design and
continues through construction, occupancy, and operations. Commissioning ensures that the new building
operates initially as intended by design and that building staff are prepared to operate and maintain its systems
and equipment.
TCAAP Energy Integration Resiliency Framework
Exhibits
95
Capacity – The maximum output, commonly expressed in megawatts (MW), that generating equipment can
supply to system load, adjusted for ambient conditions.
Chiller – Any centrally located air conditioning system that produces chilled water in order to cool air. The chilled
water or cold air is then distributed throughout the building, using pipes or air ducts or both. These systems are
also commonly known as “central chillers," "centrifugal chillers," "reciprocating chillers," or "absorption
chillers." Chillers are generally located in or just outside the building they serve. Buildings receiving district
chilled water are served by chillers located at central physical plants.
Chilled Water – The product of a Chiller that is distributed through a building or, in the case of a District Cooling
system, other adjacent buildings for the purposes of air conditioning.
Coefficient of Performance (COP) – Ratio of work or useful output to the amount of work or energy input, both
represented in the same unit. Used generally as a measure of the energy-efficiency of chillers and heat pumps.
Combined Heating and Power (CHP) – A plant designed to produce both heat and electricity from a single heat
source.
Conservation – A reduction in energy consumption that corresponds with a reduction in service demand. Service
demand can include buildings-sector end uses such as lighting, refrigeration, and heating; industrial processes;
or vehicle transportation. Unlike energy efficiency, which is typically a technological measure, conservation is
better associated with behavior. Examples of conservation include adjusting the thermostat to reduce the
output of a heating unit, using occupancy sensors that turn off lights or appliances, and car-pooling.
Constant Air Volume (CAV) – A system designed to provide a constant air flow. This term is applied to HVAC
systems that have variable supply-air temperature but constant air flow rates. Most residential forced-air
systems are small CAV systems with on/off control.
Consumer (energy) – Any individually metered dwelling, building, establishment, or location using natural gas,
synthetic natural gas, and/or mixtures of natural and supplemental gas for feedstock or as fuel for any purpose
other than in oil or gas lease operations; natural gas treating or processing plants; or pipeline, distribution, or
storage compressors.
Cooling Degree Days – A degree day is the difference in temperature between the outdoor mean temperature
over a 24-hour day and a given base temperature. Cooling degree days occur when the outdoor mean
temperature is above 65 F.
Cubic Feet per Minute (CFM) – A common means of assigning quantitative values to volumes of air or fluid in
transit.
Customer conversion – The equipment in a customer building mechanical room that transfers thermal energy
from the district heating system to the building systems to allow the heat to be distributed throughout the
building. The customer conversion usually consists of heat exchangers, pumps, piping, control sensors, and
control valves to enable heat to be efficiently transferred from the higher temperature district heating system to
the lower temperature building system.
TCAAP Energy Integration Resiliency Framework
Exhibits
96
Daylighting – Designing buildings to maximize the use of natural daylight to reduce the need for electricity.
Demand-Side Management (Energy Efficiency) – A utility action that reduces or curtails end-use equipment or
processes. Energy Efficiency is often used in order to reduce customer load during peak demand and/or in times
of supply constraint. Energy Efficiency includes programs that are focused, deep, and immediate such as the
brief curtailment of energy-intensive processes used by a utility's most demanding industrial customers, and
programs that are broad, shallow, and less immediate such as the promotion of energy-efficient equipment in
residential and commercial sectors.
Demand-side management costs – The costs incurred by the utility to achieve the capacity and energy savings
from the Demand-Side Management Program.
Differential temperature (dT, delta T) – The difference between the supply temperature and return temperature
of the district heating water delivered to users. This is an indication of the amount of energy delivered to the
customer.
Direct Current (DC) – The unidirectional flow of electric charge. Direct current is produced by sources such as
batteries, thermocouples, and solar cells. The electric current flows in a constant direction, distinguishing it from
alternating current (AC).
Distributed Control System (DCS) – A control system of an energy production plant and process wherein control
elements are not only located in central location but are also distributed throughout the system with each
component sub-system controlled by one or more controllers so the intelligence is distributed across the
sections of the system.
Distribution – The delivery of energy to retail customers.
District energy – A thermal energy delivery system that connects energy users with a central production facility.
Diversified load – The actual peak load on an energy system. The diversified load is less than the sum of the peak
loads of individual users due to the difference in time of day that each individual user realizes their peak load.
Distribution system – The underground piping network that delivers hot water from an energy production facility
to the customer buildings. Hot water is circulated through this distribution system using pumps that are located
at the production facility.
Domestic hot water – Potable water that is heated for use in faucets, showers, laundry, and similar uses.
Energy Conservation Measure (ECM) – This includes building shell conservation measures, HVAC conservation
measures, lighting conservation measures, any conservation measures, and other conservation measures
incorporated by the building. However, this category does not include any Energy Efficiency program
participation by the building. Any Energy Efficiency program participation is included in the Energy Efficiency
Programs.
TCAAP Energy Integration Resiliency Framework
Exhibits
97
Energy Transfer Station – Equipment installed at the point of customer connection to the district energy system.
The energy transfer station is utilized to transfer and measure the thermal energy delivered from the district
energy distribution network to the customer’s building(s) or other thermal loads.
Energy Usage Intensity - The quantity of total energy that a building consumes per square foot per year. Energy
is usually expressed in terms of thousand British thermal units (KBtu/SF/year).
Energy Utilization Index (EUI) – Measure of the total energy consumed in cooling or heating of a building or
facility in a period, expressed as British thermal unit (Btu) per (cooled or heated) gross square foot.
Equivalent Full Load Hours – Annual energy usage divided by the peak capacity used.
Fixed Operations and Maintenance (FOM) – Costs other than those associated with capital investment that do
not vary with the operation, such as maintenance and payroll.
Fuel Cell CHP – Electrochemical power generation process generating both electricity and thermal energy
suitable for making steam or hot water.
Geothermal energy – Hot water or steam extracted from geothermal reservoirs in the earth's crust. Water or
steam extracted from geothermal reservoirs can be used for geothermal heat pumps, water heating, or
electricity generation.
Geothermal plant – A plant in which the prime mover is a steam turbine. The turbine is driven either by steam
produced from hot water or by natural steam that derives its energy from heat found in rock.
Green Spine – The corridor through the Rice Creek Commons development that will be designated green space
for the use of stormwater management, recreational trails, and parks.
Greenhouse gases (GHG) – Those gases, such as water vapor, carbon dioxide, nitrous oxide, methane,
hydrofluorocarbons (HFCs), perfluorocarbons (PFCs) and sulfur hexafluoride, that are transparent to solar (short-
wave) radiation but opaque to long-wave (infrared) radiation, thus preventing long-wave radiant energy from
leaving Earth's atmosphere. The net effect is a trapping of absorbed radiation and a tendency to warm the
planet's surface.
Ground Source Heat Pump – A heat pump in which the refrigerant exchanges heat (in a heat exchanger) with a
fluid circulating through an earth connection medium (ground or ground water). The fluid is contained in a
variety of loop (pipe) configurations depending on the temperature of the ground and the ground area available.
Loops may be installed horizontally or vertically in the ground or submersed in a body of water.
Heat pump – Heating and/or cooling equipment that, during the heating season, draws heat into a building from
outside and, during the cooling season, ejects heat from the building to the outside. Heat pumps are vapor-
compression refrigeration systems whose indoor/outdoor coils are used reversibly as condensers or
evaporators, depending on the need for heating or cooling.
TCAAP Energy Integration Resiliency Framework
Exhibits
98
Heating Degree Days – A degree day is the difference in temperature between the outdoor mean temperature
over a 24-hour day and a given base temperature. Heating degree days occur when the outdoor mean
temperature is below 65 F.
Heat exchanger – A pressure vessel that contains plates or tubes and allows the transfer of heat through the
plates or tubes from the district heating system water to the building heat distribution system. A heat exchanger
is divided internally into two separate circuits so that the district heating system water and the building heat
distribution system fluids do not mix.
Heating coil – A heating element made of pipe or tube that is designed to transfer heat energy to a specific area
or working fluid.
Hot water supply and return lines – The district heating system piping that distributes hot water for heating
purposes to customers (supply) and returns the cooler water to the Plant for reheating (return).
Kilowatt (kW) – A unit of power equal to one thousand Watts (W)
Kilowatt-hour (kWh) – A measure of electricity defined as a unit of work or energy, measured as 1 kilowatt
(1,000watts) of power expended for 1 hour. One kWh is equivalent to 3,412 Btu.
Load – The amount of energy used by a customer. Typically refers to the Peak Load on the system.
Levelized Cost of Energy (LCOE) – The present value of the total cost of building and operating a generating plant
over its economic life, converted to equal annual payments. LCOE is determined by dividing the project’s total
cost of operation by the energy generated.
Medium temperature hot water – Thermal heat transferred via hot water at a temperature between 190 °F and
250 °F.
Megawatt (MW) – One million Watts (W)
Megawatt-hour (MWh) – One thousand kilowatt-hours
Microgrid – A group of interconnected loads and distributed energy resources within clearly defined electrical
boundaries that act as a single controllable entity with respect to the grid and can connect and disconnect from
the grid to enable it to operate in both grid-connected or island-mode.
Million BTU (MMBTU) –One million British Thermal Units (BTU). One MMBTU is equivalent to 293.07 kWh.
Net Present Value (NPV) – The difference between the present value of the future cash flows from an
investment and the amount of investment. Present value of the expected cash flows is computed by discounting
them at the required rate of return. A zero net present value means the project repays original investment plus
the required rate of return. A positive net present value means a better return, and a negative net present value
means a worse return, than the return from zero net present value.
Non-diversified load – The sum of the peak loads of individual users. This is a theoretical maximum system peak
load.
TCAAP Energy Integration Resiliency Framework
Exhibits
99
Normalized – Adjusted annual data of monthly building usage values measured on different monthly heating
degree scales to a common scale prior to averaging.
N+1 Redundancy – A measure of system component redundancy to provide backup in the event of failure of any
one component. N+1 refers to the number of units installed to carry normal load plus one additional unit as
backup. For example, if a system has three chillers to achieve the total design load, each is rated at 33% of the
total load, or N=3. For this example, an N+1 system will have a total of four chillers of 33% capacity for a total
installed capacity of 133% with one chiller providing backup in the event of failure of any one chiller.
Operations and Maintenance (O&M) – The activities related to the performance of routine, preventive,
predictive, scheduled, and unscheduled actions aimed at preventing equipment failure or decline with the goal
of increasing efficiency, reliability, and safety.
Outside Air Temperature (OAT) – A measure of the air temperature outside a building. The temperature and
humidity of air inside and outside the building are used in enthalpy calculations to determine when outside air
can be used for free heating or cooling.
Passive solar heating – A solar heating system that uses no external mechanical power, such as pumps or
blowers, to move the collected solar heat.
Peak load/ Peak demand– The maximum load during a specified period of time
Photovoltaic and solar thermal energy – Energy radiated by the sun as electromagnetic waves (electromagnetic
radiation) that is converted at electric utilities into electricity by means of solar (photovoltaic) cells or
concentrating (focusing) collectors.
PSI – An abbreviation for pounds per square inch. PSI is a unit of pressure measurement.
Rice Creek Commons (RCC) – The name of the land development project that is being led by Ramsey County, as
the land owner, on the site formerly known as the Twin Cities Army Ammunitions Plant (TCAAP).
Recommissioning - A type of commissioning that occurs within an existing, operating building to identify ways
the building operation is sub-optimal. The decision to recommission may be triggered by a change in building use
or ownership, the onset of operational problems, or some other need. Renewable energy resources – Energy
resources that are naturally replenishing but flow-limited. They are virtually inexhaustible in duration but limited
in the amount of energy that is available per unit of time. Renewable energy resources include biomass, hydro,
geothermal, solar, wind, ocean thermal, wave action, and tidal action
Resiliency – The ability to withstand disruptions to the regional or national energy grids or significant volatility to
the market price for energy sources.
Return on Investment (ROI) – The earning power of assets measured as the ratio of the net income (profit less
depreciation) to the average capital employed (or equity capital) in a company or project. Expressed usually as a
percentage, return on investment is a measure of profitability that indicates whether or not a company is using
its resources in an efficient manner. For example, if the long-term return on investment of a company is lower
TCAAP Energy Integration Resiliency Framework
Exhibits
100
than its cost-of-capital, then the company will be better off by liquidating its assets and depositing the proceeds
in a bank.
Seasonal energy efficiency ratio (SEER) – Ratio of the cooling output divided by the power consumption. It is the
Btu of cooling output during its normal annual usage divided by the total electric energy input in watt hours
during the same period. This is a measure of the cooling performance for rating central air conditioners and
central heat pumps.
Service line/service piping/customer connection – The segment of the district heating distribution system that
extends from the main lines to the inside of the customer building. The service line is typically sized to meet the
peak hot water flow requirements for the individual building served by the piping.
Square Foot (SQ FT or ft2) – Unit of measure to quantify the footprint area of a customer building, used to
estimate the Load of a building based on the usage of the building.
Source Energy - The total amount of raw fuel that is required to operate an energy-using device or facility.
Source energy includes all transmission, delivery, and production losses, thereby enabling a complete
assessment of energy efficiency in a building. On the other hand, “Site Energy” is the amount of heat and
electricity consumed by a building as reflected in utility bills.
Solar cooling – The use of solar thermal energy or solar electricity to power a cooling appliance.
Solar Photovoltaic Systems (PV) – Systems that directly convert sunlight into electricity either for use locally or
for delivery to the electric grid.
Solar Thermal – Systems that directly convert sunlight into heat, generally for domestic hot water though they
can also be used to produce space heating.
Substation – Facility equipment that switches, changes, or regulates electric voltage.
Sustainability - Meeting the needs of the present generation without compromising the ability of future
generations to meet their own needs.
Therm – One hundred thousand (100,000) Btu
Thermal energy – Energy that is generated and measured in the form of heat.
Thermal Energy Storage – The storage of heat energy during utility off-peak times at night, for use during the
next day without incurring daytime peak electric rates.
Thumb – That portion of the Rice Creek Commons development that is at the extreme northwest of the site, and
is separated from the remainder of the site by Rice Creek.
Transit Oriented Development (TOD) – Land development that takes into account transportation choices as a
means of reducing oil and other energy use. Typically it would combine public transit with walkable, mixed-use
communities, and approaches to minimize the impact of individual vehicles and commuting.
TCAAP Energy Integration Resiliency Framework
Exhibits
101
Waste Heat Recovery – An energy conservation system whereby some space heating or water heating is done by
actively capturing byproduct heat that would otherwise be ejected into the environment. In nonresidential
buildings, sources of waste heat include refrigeration/air-conditioner compressors, manufacturing or other
processes, data processing centers, lighting fixtures, ventilation exhaust air, and the occupants themselves. Not
to be considered is the passive use of radiant heat from lighting, workers, motors, ovens, etc., when there are
no special systems for collecting and redistributing heat.
Water source heat pump – A type of (geothermal) heat pump that uses well (ground) or surface water as a heat
source. Water has a more stable seasonal temperature than air thus making for a more efficient heat source.
Variable Air Volume (VAV) – An HVAC system that has a stable supply-air temperature, and varies the air flow
rate to meet the temperature requirements. Compared to constant air volume (CAV) systems, these systems
conserve energy through lower fan speeds during times of lower temperature control demand.
Variable frequency drive – an electronic controller that controls the speed of an electric motor by modulating
input frequency and voltage to match motor speed to the specific demands of the work being performed.
Joint Development Authority
TCAAP Redevelopment Project
DATE: April 1, 2015
TO: Joint Development Authority Board of Commissioners
FROM: Michael T. Norton
Legal Counsel
SUBJECT: Draft JDA Development Review Process
Budgeted Amount: Actual Amount: Funding Source:
n/a n/a n/a
Requested Action: JDA Board review and discussion.
Discussion
The following lists the suggested steps in the JDA development process which attempts to flesh out
the earlier chart provided in Chapter 3 of the TRC:
Staff: prepares JDA forms ‘library’ for staff and JDA processes including: RFP process, RFP document
forms, staff forms (acknowledgment of document received, 60 day process etc.) for JDA consideration
JDA approves/adopts RFP process and related documents/forms
RC: develops purchase agreement form (PA) (PA contains references to TRC compliance, design
guidelines among other elements)
JDA: issues RFP
Staff: reviews responses to RFP based on agreed-to criteria from JDA;
recommends preferred developer to JDA
JDA: considers staff recommendation;
recommends RC enter into PA with preferred developer
RC: enters into PA with preferred developer
AGENDA ITEM
MEMORANDUM
Joint Development Authority
TCAAP Redevelopment Project
Developer: submits development application to staff
Staff: reviews development application and determines application is “complete” for purposes of
application of “60 Day Rule”; recommends JDA concept plan review
JDA: conducts concept plan review
provides comments to developer and staff
Staff: completes application review
develops recommendation to JDA
JDA counsel prepares development agreement (DA)
JDA: considers staff recommendation/DA
Approves DA subject to land sale
RC: completes land sale
1
Joint Development Authority
TCAAP Redevelopment Project
DATE: April 6, 2015
TO: Joint Development Authority Board of Commissioners
FROM: Jill Hutmacher, JDA Development Director
SUBJECT: Development Director’s Report
Budgeted Amount: Actual Amount: Funding Source:
n/a n/a n/a
Requested Action
Discuss and provide any Commissioner comments.
TCAAP Redevelopment Code
At a special work session on February 24, 2015, the City Council completed its review of the draft TCAAP
Redevelopment Code (TRC) and authorized the Fit Test to move forward. The City Council reviewed Fit
Test Option #1 at the March 30, 2015, work session meeting. Option 1 focuses on the design and layout
of the Town, Hill, and Creek neighborhoods with strict adherence to the regulations and policies of the
draft TRC and the land use and development densities previously approved by the City Council. The
results of the Option 1 analysis are attached.
Kimley-Horn and City and County staff continue to meet on Option 2 which will be presented to the City
Council on April 13, 2015.
Attachments
Memo – Michael Lamb, Kimley-Horn; March 30, 2015
Fit Test Option 1 Design Layouts
Fit Test Option 1 Development Summary
AGENDA ITEM 9
MEMORANDUM
Memorandum
Date:March 30, 2015
To:Jill Hutmacher, Arden Hills Community Development Director
Terry Maurer, Arden Hills Public Works Director
From:Michael Lamb, Kimley-Horn
Copy:Beth Engum, Ramsey County
Subject:TCAAP TRC Design and Development Study
The purpose of this memo is to provide the City Council with an update on the status of the TRC Design and
Development Study (also referred to as the “Code Fit Test”). The study is focused on the TCAAP
Redevelopment Code (TRC) to determine (or “test”) build-ability and overall residential unit yield based on
the vision as defined in the TRC (as follows).
The purpose of the TCAAP Redevelopment Code (TRC) is to implement the vision for a
walkable, mixed-use, resilient, and vibrant TCAAP development (hereinafter, “Plan Area”)
by: (a) Creating regulations that realize market potential and promote the creation of jobs
and economic development;
(b) Developing a regulatory process that encourages quality growth and saves time in
development process; and
(c) Focusing on predictability for both developers and the community.
The study is organized around a two-step process. Step one focuses on the design and layout of each of
three neighborhoods (Town, Creek and Hill) strictly adhering to the regulations and policies of the TRC, as
well as the land use guidance and development densities as supported by the Council on January 26, 2015.
The second step is to prepare a “test” that also adheres to the TRC but in a way that represents how
development patterns and unit yields might be delivered more from a market-based approach. This step
would rely on current conditions in the market place; a general understanding what is being developed in
nearby communities; recent residential development precedents; and to some extent how the
development community would approach design and implementation.
Step one of the study has been completed working in conjunction with City and County staff. We have
developed the attached design layouts for the Town, Creek and Hill neighborhoods adhering to the
regulations and policies of the TRC and the land use and development densities approved by the Council.
Each of these layouts and the resulting unit counts will be reviewed with the Council at the work session.
The following methodology and assumptions were used to develop the design layouts:
Methodology & Assumptions
Option 1
·Land Use Plan and corresponding density boundaries and guidance (January 26, 2015)
·Street and block patterns based (approximately) on most recent Master Plan illustrations
·Based on TRC and land use plan density boundaries
Lot Size
·NB-1 lot:110’ x 150’ (16,500 sf)
·NB-2 lot:60-65’ x 150’ (9,000 - 9750 sf)
·NB-3 lot:50-55’ x 130’ (6500-7,150 sf)
·Twin home 95’ x 130’ (12,350)
Lot Size variables
·pocket neighborhood
·detached townhouse
·manor apartment
·attached rowhouse
·multi-family
Street Type (typical, unless designated as a Town Street or Collector)
·Neighborhood: 50’ ROW/28-32’ pavement/6’ planting/5’ walk (each side)
Block Size (per the TRC)
·Modified grid system; min. block 200’; max. 400’; may be adjusted no more than 50% (600’); use of
cul de sacs shall be minimized
Parking (per the TRC)
Retail: 1 space per 200 sf
Multi-family: 1 space per bedroom; 2 spaces per two bedroom or greater
Option 1 assumes 50% units are 1 bedroom; 50% units are 2 bedroom
Precedents and Local Comparables
·The Reserve at Medina, Astor Model, by Toll Brothers, Medina
·Compass Pointe Twinhome development, by Ryland, Woodbury
·Attached Rowhouse & small lots based on the Enclave at New Brighton, by Pulte, New Brighton
·Liberty on the Lake, small lot model, Stillwater
·Detached townhouse based on Summit Hill subdivision, Eagan
We are currently in the process of developing design layouts for step two of the Code Fit Test and are
planning to present them to the City Council at a work session on April 13, 2015.
Attachments
·Option 1 Layout – Creek
·Option 1 Layout – Hill
·Option 1 Layout – Town
·Option 1 Graphic Summary- All neighborhoods
·Option 1 Unit Count Summary
0 150
Scale in Feet
300
Park
Trail Connection
Trail Connection
1. NB-1 lots loosely based on the “Reserve” at Medina “Astor”
model; Toll Brothers.
2. Twinhome based on Compass Pointe development by
Ryland, Woodbury, MN.
Option 1Creek Neighborhood
March 26, 2015
TCAAP Site
Design & Development Study
Lot Type Units/Lots Area du/ac
NB-1 (2 du/ac)51 25.1 ac 2.0
NB-2 (2-4 du/ac)37 11 ac 3.4
NB-3 (4-6 du/ac) Twinhome 23 5.4 ac 4.3
Total 111 41.5 ac 2.7
Right-of-Way 9.1 ac
Net 111 32.4 ac 3.4
Development Summary
Buildable Area by Lot Type
Notes:
NB-2: 60’x150’
NB-1: 110’x50’
Lot Area: 16,500 sf
Buildable Area: 13,500 sf
Building Height: 30 ft
Example: 4,020 sf
Lot Area: 9,000 sf
Permeability: 6,351 sf
Buildable Area: 6,750 sf
Front Setback: 20 ft
Porch: 7 ft
Side & Rear Setback: 5 ft
Building Height: 30 ft
Example: 2,950 sf
NB-3: Twinhome
Lot Area: 6,175 sf
Buildable Area:
Building Height: 30 ft
0 200
Scale in Feet
400
Park
Trail Connection
Pedestrian
Connection
Option 1 TCAAP Site
Design & Development StudyHill Neighborhood
March 26, 2015
Lot Type Units/Lots Area du/ac
NB-1 (2 du/ac)29 14.6 ac 2.0
NB-2 (2-4 du/ac)80 23.5 ac 3.4
NB-3 (4-6 du/ac)85 24.1 ac
NB-3 Twin home 29 24.1 ac 4.7
Total 223 62.2 ac 3.6
Right-of-Way 15.1 ac
Net 223 47.1 ac 4.7
Development Summary
Buildable Area by Lot Type
NB-3: 55’x130’
Notes:NB-2: 60’x150’
NB-1: 110’x150’
Lot Area: 16,500 sf
Buildable Area: 13,500 sf
Building Height: 30 ft
Example: 4,020 sf
Lot Area: 9,000 sf
Buildable Area: 6,750 sf
Building Height: 30 ft
Example: 2,950 sf
Lot Area: 7,150 sf
Buildable Area: 5,175 sf
Building Height: 30 ft
Example: 2,500 sf
NB-3: Twinhome
Lot Area: 6,175 sf
Buildable Area:
Building Height: 30 ft
1. NB-3 lots loosely based on Pulte “Enclave” at New Brighton
Exchange and “Liberty on the Lake” small lot.
2. Twinhome based on Compass Pointe development by
Ryland, Woodbury, MN.
3. Minor adjustment to park boundaries to accommodate lot
size and density.
Park
0 200
Scale in Feet
400
Lot Type Units %Area du/ac
NT-1: Detached Townhome (6-9 du/ac)24
NT-1: Rowhouse (6-9 du/ac)87
Subtotal 111 11.3%15 ac 7.4
NT-2: Rowhouse (9-12 du/ac)127
NT-2: Manor Apartment (9-12 du/ac)60
NT-2: Detached Townhome (9-12 du/ac)6
Subtotal 193 19.8%22.5 ac 8.7
TC/MF: Multi-Family (40 du/ac)644
TC/MF: Rowhouse (40 du/ac)36
Subtotal 680 67.1%17 ac 40
Total 984 100%54.5 ac
Right of Way 12.6 ac
Net 984 100%41.9 23.5
Option 1 TCAAP Site
Design & Development Study
Notes:
Town Neighborhood
March 26, 2015
Retail 42,000 sf
Development Summary
Creek
Town
Hill
Option 1 TCAAP Site
Design & Development StudyTCAAP
March 26, 2015
Development Summary
Town AC L.U.P.AC Option 1
NT-1 (6-9 du/ac)15 135 15 111
NT-2 (9-12 du/ac)22.5 270 22.5 193
TC (40 du/ac)17 680 17 680
Subtotal 1,085 984
Retail 2.6 42,000 sf
Creek
NB-1 (2 du/ac)25.1 50 25.1 51
NB-2 (2-4 du/ac)11 44 11 37
NB-3 (4-6 du/ac)5.4 33 5.4 23
Subtotal 127 111
Hill
NB-1 (2 du/ac)14.6 29 14.6 29
NB-2 (2-4 du/ac)23.5 94 23.5 80
NB-3 (4-6 du/ac)24.1 145 24.1 114
Subtotal 268 223
Total 1,480 1,318
0 250
Scale in Feet
500
TCAAP Design & Development Study March 30 2015
Summary Comparison
Unit Count, Density & %Land Use Plan Option 1
acres units du/ac %acres units du/ac %
Creek
NB -1 (2 du/ac)25.1 50 39.4%25.1 51 2 46.0%
NB-2 (2-4 du/ac)11.0 44 34.6%11 37 3.4 33.3%
NB-3 (4-6 du/ac)5.4 33 26.0%5.4 23 4.3 20.7%
Total 41.5 127 3.1 41.5 111 2.7
ROW -9.1 21.9%
Net Density 32.4 111 3.4
Hill
NB -1 (2 du/ac)14.6 29 10.8%14.6 29 2 13.0%
NB-2 (2-4 du/ac)23.5 94 35.1%23.5 80 3.4 35.9%
NB-3 (4-6 du/ac)24.1 145 54.1%24.1 114 4.7 51.1%
Total 62.2 268 4.3 62.2 223 3.6
ROW -15.1 24.3%
Net Density 47.1 223 4.7
Town
TC/Multi-family (40 du/ac)17 680 62.7%17 680 39.9 69.1%
NT-1 (6-9 du/ac)15 135 12.4%15 111 7.4 11.3%
NT-2 (9-12 du/ac)22.5 270 24.9%22.5 193 8.6 19.6%
Total 54.5 1085 19.9 54.5 984 18.1
ROW -12.6 23.2%
Net density 41.9 984 23.5
Total 158.2 1480 9.4 158.2 1318 8.3