Loading...
HomeMy WebLinkAbout2017-009-A II PEN_ HILLS City of Arden Hills Ordinance 2017-009 — Appendix A 2018 Fee Schedule I. Administrative ... ._.............. ........ _........... - __..-- Dogs/Cats- Licenses Two years (Pro -rated for second $30.00 year @ $13.00) _ Dogs/Cats - Duplicate Tags Each $6.50 Dogs/Cats - Boardin $22.00 per day Dogs/Cats - Impoundment Fee $50.00 Dogs/Cats - Surrender Fee Each $25.00 Dogs - Residential Kennel Annual $21.00 License ?p&s_- Dangerous Dog Fee _ _ Annual _ $500.00 Dogs - Potentially Dangerous Annual $250.00 Dog Fee Copying - Minutes, City Council ! Annual $69.00 Meetings _ _1111.111.11.11.111.11_ Copying - Minutes, Planning Annual $56.00 Commission Meetings Copying - Agendas, City Annual $14.00 Council Meetings Copying - Agendas, Planning Annual $7.00 Commission Meetings Copying - Agenda Packets, City Annual Cost based on per sheet, staff Council Meetings labor, and postage Copying - Agenda Packets, Annual Cost based on per sheet, staff Planning Commission labor, and postage - General Any Size $0.25 per side -Copying Assessment Search $53.00 per half hour II. Building Construction Building Permits - Permit Fee Fees shall be based according to the 2017 State Statute 326B.153 and are determined by the City's Building Official Building Permits - Plan Review 65% of Building Permit Fee Fee Building Permits - Re -inspection $63.25 per State Statute 326B.153 Building Permits - Manufactured $55.00 + State Surcharge fee as Home Location, Swimming outlined in State Statute Pools, and Demolition 326B.148 Page 1 of 11 Building Permits — Special Investigations 100% of Permit Fee State Surcharge — based on Fee based on 2017 State Statute valuation 326B.148 State Surcharge — Fixed Fees Fee based on State Statute 326B.148 Plumbing Permits — Minimum $40.00 Fee _Plumbing Permits — Residential 1.25% of Project Value Plumbing Permits — Non- _ ( 1.25% of Project Value + $50.00 Residential Electrical Permits — Minimum $40.00 Fee Electrical Permits — Maximum $150.00 Single Family Dwelling Fee Electrical Permits — General See Exhibit "A" attached to fee schedule Mechanical Permits — Minimum $40.00 Fee Mechanical Permits — Residential 2% of Project Value Mechanical Permits — Non- j 1.25% of Project Value + $50.00 Residential Fire Protection Permits — Permit Fees shall be based according to Fee the 2017 State Statute 326B.153 and are determined by the City's Building Official Fire Protection Permits — Plan 65% of Permit Fee Review Fee___ Fire Protection Permits — Re- _ $63.25 per State Statute In spection 326B.153 T _ i_ III. Liquor Licensing On -sale ��1,999 square feet (SF) or less $3,465.00 On -sale _ 2,000 (SF) — 2,999 (SF) $4,620.00 On -sale 3,000 (SF) — 3,999 (SF) $5,775.00 On -sale 4,000 (SF) or more $6,930.00 On -sale, Sunday $200.00 (340A.504 Subd. 3(b) limits $200 fee for Sunday sales Off -sale $210.00 Club Fee $315.00 On -sale, Malt Beverage $126.00 Off -sale, Malt Beverage $42.00 On -sale, Wine $ 2,000.00 (340A.408 Subd. 2(c) limits fee to $2000 or half of on -sale license fee, whichever is less) Strong Beer No Charge (as part of On -Sale Wine License) Page 2 of 11 Investigation Fee Minor Consumption Violation with Server Training Minor Consumption Violation without Server Training IV. Maps and Ordinances Zoning Ordinance Municipal Code _ Com rehensive Plan Color Maps (8.5 x 11) Color _Maps (I I x 17) Street Maps As-Builts (I I x 17) V. Parks-& Recreation Youth Athletic Association Field Rental Adult Club / Intramural Field Rental Ball Field Rental, Unlighted Ball Field Rental, Lighted Ball Field Tournament Fee (Adult), Full Maintenance Ball Field Tournament Fee (Adult), Minimum Maintenance Warming House Rental/Ice Rink Rental _Picnic Shelters Picnic Pavilions — Resident [-Picnic Pavilions — Non -Resident Picnic Pavilions — Resident Non -Profit_ Picnic Pavilions — Other Non -Profit First Violation _ Second Violation Third Violation Fourth Violation First Violation Second Violation Third Violation Fourth Violation Per two hour time block Per two hour time block Per two hour time block. Tournament fees are extra. Per two hour time block. Tournament fees are extra. Includes all day maintenance staff on site Includes prep for fields and midday drag of fields Only allowed during non-public use hours Available for reservation Includes up to five picnic tables Includes up to five picnic tables Includes up to five picnic tables Includes up to five picnic tables $15 8.00 $105.00 $525.00 $1,050.00 $1,575.00 $525.00 $1,050.00 $1,575.00 _ $2,100.00 and may be subject to license revocation $0.25 per side $2.00 $4.00 $2.00 Based on number of copies and staff time $30.00 per time block + applicable tax $50.00 per time block + applicable tax $100.00 per time block + applicable tax $84.00 per time block + applicable tax $525.00 per day + $200.00 lamage deposit + applicable tax $315.00 per day + $200.00 lamage deposit + applicable tax $40.00 per hour + $200.00 damage deposit + key deposit + applicable tax $0 $85.00 per day + $200.00 amage deposit + applicable tax $125.00 per day + $200.00 amage deposit + applicable tax $55.00 per day + $200.00 $90.00 per day + $200.00 Page 3 of 11 Additional Picnic Tables Community Garden Plot — One Plot Community Garden Plot — Second Plot _ Room Rental — City Hall, Community Room Room Rental — City Hall, Small Conference Room For every two extra tables Annual Annual $15.00 + applicable tax* *fee waived for Night to Unite and other public events open to all Arden Hills residents $40.00 + applicable tax $20.00 + applicable tax Regular business hour usage: No charge Army National Guard: No charge City Government: No charge Resident, Non-profit: $75.00 Resident, For -profit: $100.00 Non -Resident, Non-profit: $125.00 Non -Resident, For -profit: $150.00 (includes applicable tax) Regular business hour usage: No charge Army National Guard: No charge City Government: No charge Resident, Non-profit: $35.00 Resident, For -profit: $45.00 Non -Resident, Non-profit: $55.00 Non -Resident, For -profit: $65.00 (includes applicable tax) $105.00 Equipment Rental — DVD, VCR, $11.00 + applicable tax T.V. VI. Planning and Zoning (Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow include planning and engineering staff time, City attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20% of its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The escrow may be reduced or increased by the Citv Planner on a vroiect by proiect basis.) Per Day (Scheduling a room after regular hours is contingent upon the presence of a city employee; In the event staff is not available, the City reserves the right to deny application). Per Day (Scheduling a room after regular hours is contingent upon the presence of a city employee; In the event staff is not available, the City reserves the right to deny application). Room Rental — Damage Deposit I Required Preliminary Plat Final Plat Lot Split/Minor Subdivision (R-1 and R-2 only) Rezoning or TCAAP Regulating Plan Map Amendment Escrow Fees Administrative Fee Escrow Administrative Fee Escrow _ Administrative Fee Escrow Administrative Fee Escrow Initial Application Fees $500 $1,000 $500 $1,000 $350 $1,000 $350 $1,000 Page 4 of 11 Comprehensive Plan Amendment Administrative Fee $500 Escrow $1,000 Variance or Permitted Adjustment Administrative Fee $350 _ Escrow _ $1,000 Conditional Use or Interim Use Permit/CUP or IUP Amendment Administrative Fee $350 Escrow $1,000 Planned Unit Development Master Plan or Special Development Plan Master Plan -.._._..._.. _.__.._.._...-- Administrative Fee $350 Escrow $1,000 Final Planned Unit Development or Final Special Development Plan Administrative Fee $350 _ Escrow $1,000 Planned Unit Development Amendment or Special Development Plan Amendment Administrative Fee $350 Escrow $1,000 Concept Review I Administrative Fee $150 i Escrow $1,000 Vacation of Easement Administrative Fee $150 Escrow $1,000 Site Plan Review I Administrative Fee $350 Escrow $1,000 City Code Amendment _ Administrative Fee $350 Escrow $1,000 Zoning Code or TRC _Amendment Administrative Fee $350 Escrow $1,000 Zoning Letter Administrative Fee $60 Land Use Requests — Not Already Specified Administrative Fee $150 Escrow $1,000 Zoning Permit — Decks under 30", Driveways, Fences, Sheds and Temporary Structures $65 Recreational Vehicle Parking Permit 7 Day Permit, renewable once per 12 months $25 _H_ome Occupation I Permit No charge Home Occupation I1 Permit Administrative Fee $150 Escrow $500 Right -of -Way Permit ! Administration Fee $150 Escrow To be determined by the Engineer Right -of Way Permit — Small Cell Wireless Facilities Permit for up to 15 locations; rent and maintenance per each location $150 ROW permit fee, rent $150 per year, maintenance $25 per year Grading & Erosion Control Fees Administrative Fee $150 Escrow $3,675 / acre Commercial Outdoor Display and Sales Area Permit $100 Page 5 of 11 Appeal of Administrative Administrative Fee Zoning, Sign, or Subdivision - Escrow Decisions VII. Utility Hookup Charges Water Permits — Service Per inspection Installation/Repairs/Al eration Water Permits — Interior Plumbing, New Home Water Permanent Disconnect _ Curb Box and Service Lead, 1" Service Connection on Unsurfaced Street Restoration of Typical Road Mix _Street Restoration of Higher -Type Street Larger than 1" Service Connection Water Permits — Plan Check Fee Water Permits — Re -inspection Hydrant Meter Rental Water Meter/Spacer Charges — Customer Requested Water Meter Accuracy Test Water Meter/Spacer Charges — 5/8" x 3/4" Meter Model 25 Water Meter/Spacer Charges — 3/4" x 7 ''/z" Meter Model 35 Water Meter/Spacer Charges — 1" Meter Water Meter/Spacer Charges — Greater than 1" Water Connection Fee — Connection fee for previously un-served or expanded lots Fee includes removal of meter, bench test at maintenance facility, and returning meter to residence; Fee will not be applied if the meter is found to be inaccurate to a degree exceeding three percent (3%) from the result of the bench test Standard Meter $150 $1,000 $40.00 $40.00 $215.00 $165.00 $105.00 Set by Engineer Set by Inspector Set by Inspector $40.00 $2,000 deposit, monthly rental of $30.00, water permit fee of $170.00, State surcharge of $1.00 plus applicable standard water usage rate charge for Based on Meter Size Contact Public Works for Quote $450.00 Contact Public Works for Quote $550.00 Contact Public Works for Quote $840.00 per acre or portion thereof Page 6 of 11 Water Availability Fee — The units are based on the $525.00 per unit New or Additional Connections Metropolitan Council's formula for calculating new sewer availabilitv charae (SAC) units Sewer Connection Fee — Connection fee for previously un-served or expanded lots Sewer Availability Fee — New or Additional Connections Sewer Permits — Service Instal lation/Alternations/Repairs Sewer Permits — Plan Review Fee Sewer Permits — Reinspections Sewer Access Charge Sanitary Sewer Utility Prohibited Sump Pump Connection Surcharae The units are based on the Metropolitan Council's formula for calculating new sewer availability charge (SAC) units Per inspection Set by Met Council Annually VIII. Miscellaneous/Retail Activities Boutique/Garage Sale Application/notification of City Hall required Application/notification of City Hall required Casual Roadside Stands Tent Permit Sidewalk Sales Business Licensing — Amusement Facilities Business Licensing — Wholesale Bulk Fuel Storage Business Licensing — Hotel/Motel Business Licensing — Courtesy Bench, Non -advertising Business Licensing — Courtesy Business Licensing — Mechanical/Electronic Devices Includes arcade, dance hall, movie theater, pool/billiard tables, bowling alleys, indoor tennis, skating facility, outdoor tenn.i.s,driving ranges, etc. Liability insurance required Includes musical devices, amusement rides, bowling alleys, etc. $840.00 per acre or portion thereof $525.00 per unit $40.00 Set by Inspector $40.00 per hour $2,485.00 $100.00 per month No charge No charge 55.00+ State Surch $53.00 $105.00 $210.00 $6.50 per room $26.00 $79.00 $15.00 per location + $15.00 per machine (MN Statute 449.15 sets maximum permit fee at $15 per location and $15 per machine) Page 7 of 11 Business Licensing — Retail Sales Includes antique shops, $53.00 beauty/barber shops, boat i dealers, Christmas tree sales, dry cleaning, laundry, bakery, candy, meats, wholesale foods, caterers, motor vehicle sales, optometrist, mortuary, video sales/rentals, over-the-counter tobacco sales, vending machines (excluding tobacco), & other retail goods not listed Business Licensing — $21.00 per 1,000 square feet, or Restaurants, Cafes, Coffee fraction thereof Houses, etc. Business Licensing — $315.00 Restaurants, Drive-Thru Business Licensing — Service $105.00 Stations Business Licensing — Grocery $21.00 per 1,000 square feet, or fraction thereof Business Licensing — Mobile $30.00 temporary (7 days or less) Food Units/Food Trucks or $100 annual (8 days or more) Charitable Gambling Permit— _ i Includes investigation fee $158.00 Per Minnesota State Statute, Chapter 349 Local Gambling Tax 3% of organizations' gross receipts from all lawful i gambling, less prizes paid out Lawful Gambling Fund 10% of net profits Tobacco Sales License Includes investigation fee $300.00 Fireworks Sales As part of existing business $100.00 (MN Statute 624.20 sets maximum permit fee at $100.00) Fireworks Sales Exclusive Business $350.00 (MN Statute 624.20 sets _ maximumpen-nit fee at $350.00) Massage Therapist Annual Fee, Includes $53.00 investigation fee _ Massage Therapist Establishment Annual Fee, Includes _ $158.00 investigation fee Recreational Outdoor Archery j $200 first year Range j _ $50 annual renewal Solicitors, Peddlers, Transient I Please reference Section 340 of $158.00 background Permit — For -Profit Organizations the Municipal Code for more investigation + $105.00 per information month permit fee Solicitors, Peddlers, Transient Please reference Section 340 of No charge Permit — Non -Profit the Municipal Code for more Organizations information Tree Contractor License 1 1 $50.00 J Page 8 of 11 — -- IX. Signs __..._._.._ .m :... _ ......._�.._ Initial Fee ! Per Sin - $100.00 Permanent Signs, Annual Per Sign, 100 square feet or less _ j $25.00 Renewal (maximum allowable size) Temporary Signs $50.00 Signs, Impoundment First Offense $50.00 Signs, Impoundment Second Offense $75.00 Signs, Impoundment Third Offense $150.00 _._ ......... X. Miscellaneous Fees/Permits Rubbish Hauler _ — _ Annual - -- -- $158.00 Recycling Hauler Annual $158.00 Contractor License Annual $75.00 _Miscellaneous Permit Fee For all other permits not listed $40.00 Staff Research $53.00 per half hour Penalties for Late Payment Failure to pay any penalty 10% of license fee or $32.00, imposed shall be grounds for the whichever is greater suspension or termination of any license issued by the City Tobacco Sales, Illegal First Offense $105.00 Tobacco Sales, Illegal Second Offense within 24 $525.00 months Tobacco Sales, Illegal Third Offense within 24 months $1,050.00 and 7 business day ! suspension or 30 day suspension of license + admin fine of $250 Tobacco Sales, Illegal Fourth Offense within 24 months Revocation of the license for a one year period Candidate Filing Fee $2.00 Insufficient Funds/Returned $35.00 Check Fee Rental Registration/Renewal Fe- $45.00 per rental unit Rental Renewal Late Fee For renewals received after $90.00 per rental unit January 31 Residential Contractor License $5.00 Check Business Subsidy Application Required to reimburse City for $2,100.00 + $10,500.00 escrow Fee full cost of review Construction Activity Waiver Per Waiver Application $263.00 XI. False Alarm Fees — -- _ _----------- ---_- --- --- ----- False Alarm First two alarms No charge +letter False Alarm Three through ten alarms $60.00 per alarm False Alarm Over ten alarms $160.00 per alarm XII. Investigation Fees _............. Tobacco, Liquor, Charitable $158.00 Gambling, & Solicitor's Permits Page 9 of 11 XIII. fility Use Charges Water Per Quarter: ... ........ ... ... ._. -- - --- Meter Charge 3/4" Meter Size or Smaller $24.36 Meter Charge 1" Meter Size $58.84 Meter Charge 1.5" Meter Size $124.46 Meter Charge 2" Meter Size $200.51 Meter Charge 3" Meter Size $436.45 Meter Charge 4" Meter Size $654.26 Meter Charge _ 6" Meter Size $1,089.82 Meter Charge 8" Meter Size $2,196.99 Meter Charge _ 10" Meter Size $3,122.56 Meter Charge 12" Meter Size $4,429.34 Consumption: 1-10,000 gals. gallons $2.73 per 1,000 gallons (pro- rated Consumption: 10,001-35,000 gals. gallons $3.52 per 1,000 gallons (pro - rated) Consumption: Over 35,000 gals. gallons $6.22 per 1,000 gallons (pro- rated) Water Test Fee set by MN State Health Dept $1.59 Sanitary Sewer Per Quarter: Base Charge - Single Family per lot $92.61 Base Charge - Multiple Family per dwelling $92.61 Usage Over 15,000 gals. - Single Family/Multiple Family gallons $5.33 per 1,000 gallons (pro- rated) Sanitary Sewer - Commercial Apartment/Condominium gallons $5.77 per 1,000 gallons (pro- rated) Sanita Sewer - Mobile Home per unit $100.16 Surface Water Per Quarter: Residential - Single per lot $14.72 Residential - Multiple Family per dwelling $19.08 Apartment / Condominium per acre $120.11 Industrial / Commercial _per acre $187.52 Undeveloped per acre $22.06 Standby Per Quarter: Standby 1" Service Line or smaller $8.32 Standby 1.25" Service Line $12.02 Standby 1.5" Service Line $16.56 Standby_ 2" Service Line $25.31 Standby 3" Service Line $57.09 Standby4" Service Line $101.81 Standby _ 6" Service Line $228.28 Standby 8" Service Lin $406.26 Standby 10" Service Line $635.48 Standby 12" Service Line $913.31 Page 10 of I l Page 11 of 11 MINNESOTA STATUTES 2017 32613.153 326B.153 BUILDING PERMIT FEES. Subdivision 1. Building permits. (a) Fees for building permits submitted as required in section 32613.107 include: (1) the fee as set forth in the fee schedule in paragraph (b) or as adopted by a municipality; and (2) the surcharge required by section 32613.148. (b) The total valuation and fee schedule is: (1) $1 to $500, $21; (2) $501 to $2,000, $21 for the first $500 plus $2.75 for each additional $100 or fraction thereof, to and including $2,000; (3) $2,001 to $25,000, $62.25 for the first $2,000 plus $12.50 for each additional $1,000 or fraction thereof, to and including $25,000; (4) $25,001 to $50,000, $349.75 for the first $25,000 plus $9 for each additional $1,000 or fraction thereof, to and including $50,000; (5) $50,001 to $100,000, $574.75 for the first $50,000 plus $6.25 for each additional $1,000 or fraction thereof, to and including $100,000; (6) $100,001 to $500,000, $887.25 for the first $100,000 plus $5 for each additional $1,000 or fraction thereof, to and including $500,000; (7) $500,001 to $1,000,000, $2,887.25 for the first $500,000 plus $4.25 for each additional $1,000 or fraction thereof, to and including $1,000,000; and (8) $1,000,001 and up, $5,012.25 for the first $1,000,000 plus $2.75 for each additional $1,000 or fraction thereof. (c) Other inspections and fees are: (1) inspections outside of normal business hours (minimum charge two hours), $63.25 per hour; (2) reinspection fees, $63.25 per hour; (3) inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per hour; and (4) additional plan review required by changes, additions, or revisions to approved plans (minimum charge one-half hour), $63.25 per hour. (d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than $63.25, then the greater rate shall be paid. Hourly cost includes supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. [See Note.] Subd. 2. Plan review. Fees for the review of building plans, specifications, and related documents submitted as required by section 32613.106 must be paid based on 65 percent of the building permit fee required in subdivision 1. Copyright 0 2017 by the Revisor of Statutes, State of Minnesota. All Rights Reserved. 326B.153 MINNESOTA STATUTES 2017 2 Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including public buildings and state licensed facilities as required by section 326B.148. Subd. 4. Distribution. (a) This subdivision establishes the fee distribution between the state and municipalities contracting for plan review and inspection of public buildings and state licensed facilities. (b) If plan review and inspection services are provided by the state building official, all fees for those services must be remitted to the state. (c) If plan review services are provided by the state building official and inspection services are provided by a contracting municipality: (1) the state shall charge 75 percent of the plan review fee required by the state's fee schedule in subdivision 2; and (2) the municipality shall charge 25 percent of the plan review fee required by the municipality's adopted fee schedule, for orientation to the plans, in addition to the permit and other customary fees charged by the municipality. (d) If plan review and inspection services are provided by the contracting municipality, all fees for those services must be remitted to the municipality in accordance with their adopted fee schedule. History: 2009 c 78 art 5 s 11; 2017 c 94 art 2 s 5 NOTE: The amendments to subdivision 1, paragraph (b), by Laws 2017, chapter 94, article 2, section 5, expire October 1, 2021. Laws 2017, chapter 94, article 2, section 5, the effective date. Copyright 0 2017 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.