HomeMy WebLinkAbout2017-009-A II PEN_ HILLS
City of Arden Hills
Ordinance 2017-009 — Appendix A
2018 Fee Schedule
I. Administrative
... ._.............. ........ _........... - __..--
Dogs/Cats- Licenses Two years (Pro -rated for second $30.00
year @ $13.00)
_
Dogs/Cats - Duplicate Tags
Each
$6.50
Dogs/Cats - Boardin
$22.00 per day
Dogs/Cats - Impoundment Fee
$50.00
Dogs/Cats - Surrender Fee
Each
$25.00
Dogs - Residential Kennel
Annual
$21.00
License
?p&s_- Dangerous Dog Fee
_ _ Annual
_ $500.00
Dogs - Potentially Dangerous
Annual
$250.00
Dog Fee
Copying - Minutes, City Council
! Annual
$69.00
Meetings _
_1111.111.11.11.111.11_
Copying - Minutes, Planning
Annual
$56.00
Commission Meetings
Copying - Agendas, City
Annual
$14.00
Council Meetings
Copying - Agendas, Planning
Annual
$7.00
Commission Meetings
Copying - Agenda Packets, City
Annual
Cost based on per sheet, staff
Council Meetings
labor, and postage
Copying - Agenda Packets,
Annual
Cost based on per sheet, staff
Planning Commission
labor, and postage
- General
Any Size
$0.25 per side
-Copying
Assessment Search
$53.00 per half hour
II. Building Construction
Building Permits - Permit Fee
Fees shall be based according to
the 2017 State Statute 326B.153
and are determined by the City's
Building Official
Building Permits - Plan Review
65% of Building Permit Fee
Fee
Building Permits - Re -inspection
$63.25 per State Statute
326B.153
Building Permits - Manufactured
$55.00 + State Surcharge fee as
Home Location, Swimming
outlined in State Statute
Pools, and Demolition
326B.148
Page 1 of 11
Building Permits — Special
Investigations
100% of Permit Fee
State Surcharge — based on
Fee based on 2017 State Statute
valuation
326B.148
State Surcharge — Fixed Fees
Fee based on State Statute
326B.148
Plumbing Permits — Minimum
$40.00
Fee
_Plumbing Permits — Residential
1.25% of Project Value
Plumbing Permits — Non-
_
(
1.25% of Project Value + $50.00
Residential
Electrical Permits — Minimum
$40.00
Fee
Electrical Permits — Maximum
$150.00
Single Family Dwelling Fee
Electrical Permits — General
See Exhibit "A" attached to fee
schedule
Mechanical Permits — Minimum
$40.00
Fee
Mechanical Permits — Residential
2% of Project Value
Mechanical Permits — Non-
j
1.25% of Project Value + $50.00
Residential
Fire Protection Permits — Permit
Fees shall be based according to
Fee
the 2017 State Statute 326B.153
and are determined by the City's
Building Official
Fire Protection Permits — Plan
65% of Permit Fee
Review Fee___
Fire Protection Permits — Re-
_
$63.25 per State Statute
In spection
326B.153
T _ i_
III. Liquor Licensing
On -sale ��1,999
square feet (SF) or less
$3,465.00
On -sale _
2,000 (SF) — 2,999 (SF)
$4,620.00
On -sale
3,000 (SF) — 3,999 (SF)
$5,775.00
On -sale
4,000 (SF) or more
$6,930.00
On -sale, Sunday
$200.00 (340A.504 Subd. 3(b)
limits $200 fee for Sunday sales
Off -sale
$210.00
Club Fee
$315.00
On -sale, Malt Beverage
$126.00
Off -sale, Malt Beverage
$42.00
On -sale, Wine
$ 2,000.00
(340A.408 Subd. 2(c) limits fee
to $2000 or half of on -sale
license fee, whichever is less)
Strong Beer
No Charge (as part of On -Sale
Wine License)
Page 2 of 11
Investigation Fee
Minor Consumption Violation
with Server Training
Minor Consumption Violation
without Server Training
IV. Maps and Ordinances
Zoning Ordinance
Municipal Code
_ Com rehensive Plan
Color Maps (8.5 x 11)
Color _Maps (I I x 17)
Street Maps
As-Builts (I I x 17)
V. Parks-& Recreation
Youth Athletic Association Field
Rental
Adult Club / Intramural Field
Rental
Ball Field Rental, Unlighted
Ball Field Rental, Lighted
Ball Field Tournament Fee
(Adult), Full Maintenance
Ball Field Tournament Fee
(Adult), Minimum Maintenance
Warming House Rental/Ice Rink
Rental
_Picnic Shelters
Picnic Pavilions — Resident
[-Picnic Pavilions — Non -Resident
Picnic Pavilions —
Resident Non -Profit_
Picnic Pavilions —
Other Non -Profit
First Violation _
Second Violation
Third Violation
Fourth Violation
First Violation
Second Violation
Third Violation
Fourth Violation
Per two hour time block
Per two hour time block
Per two hour time block.
Tournament fees are extra.
Per two hour time block.
Tournament fees are extra.
Includes all day maintenance
staff on site
Includes prep for fields and
midday drag of fields
Only allowed during non-public
use hours
Available for reservation
Includes up to five picnic tables
Includes up to five picnic tables
Includes up to five picnic tables
Includes up to five picnic tables
$15 8.00
$105.00
$525.00
$1,050.00
$1,575.00
$525.00
$1,050.00
$1,575.00 _
$2,100.00 and may be subject to
license revocation
$0.25 per side
$2.00
$4.00
$2.00
Based on number of copies and
staff time
$30.00 per time block
+ applicable tax
$50.00 per time block
+ applicable tax
$100.00 per time block
+ applicable tax
$84.00 per time block
+ applicable tax
$525.00 per day + $200.00
lamage deposit + applicable tax
$315.00 per day + $200.00
lamage deposit + applicable tax
$40.00 per hour +
$200.00 damage deposit + key
deposit + applicable tax
$0
$85.00 per day + $200.00
amage deposit + applicable tax
$125.00 per day + $200.00
amage deposit + applicable tax
$55.00 per day + $200.00
$90.00 per day + $200.00
Page 3 of 11
Additional Picnic Tables
Community Garden Plot — One
Plot
Community Garden Plot —
Second Plot _
Room Rental — City Hall,
Community Room
Room Rental — City Hall, Small
Conference Room
For every two extra tables
Annual
Annual
$15.00 + applicable tax*
*fee waived for Night to Unite
and other public events open to
all Arden Hills residents
$40.00 + applicable tax
$20.00 + applicable tax
Regular business hour usage: No
charge
Army National Guard: No charge
City Government: No charge
Resident, Non-profit: $75.00
Resident, For -profit: $100.00
Non -Resident, Non-profit:
$125.00
Non -Resident, For -profit:
$150.00
(includes applicable tax)
Regular business hour usage: No
charge
Army National Guard: No charge
City Government: No charge
Resident, Non-profit: $35.00
Resident, For -profit: $45.00
Non -Resident, Non-profit:
$55.00
Non -Resident, For -profit: $65.00
(includes applicable tax)
$105.00
Equipment Rental — DVD, VCR, $11.00 + applicable tax
T.V.
VI. Planning and Zoning (Each separate land use request shall be charged a separate administrative
fee and escrow even if submitted on the same application. Costs expended in reviewing and processing
an application will be charged against the cash escrow and credited to the City. Charges to the escrow
include planning and engineering staff time, City attorney and consulting fees, and mailing costs. If, at
any time, a required cash escrow is depleted to less than 20% of its original amount, the applicant shall
deposit additional funds in the cash escrow account as determined by the City. The escrow may be
reduced or increased by the Citv Planner on a vroiect by proiect basis.)
Per Day (Scheduling a room after
regular hours is contingent upon
the presence of a city employee;
In the event staff is not available,
the City reserves the right to
deny application).
Per Day (Scheduling a room after
regular hours is contingent upon
the presence of a city employee;
In the event staff is not available,
the City reserves the right to
deny application).
Room Rental — Damage Deposit I Required
Preliminary Plat
Final Plat
Lot Split/Minor Subdivision (R-1
and R-2 only)
Rezoning or TCAAP Regulating
Plan Map Amendment
Escrow Fees
Administrative Fee
Escrow
Administrative Fee
Escrow _
Administrative Fee
Escrow
Administrative Fee
Escrow
Initial Application Fees
$500
$1,000
$500
$1,000
$350
$1,000
$350
$1,000
Page 4 of 11
Comprehensive Plan Amendment
Administrative Fee
$500
Escrow
$1,000
Variance or Permitted
Adjustment
Administrative Fee
$350
_
Escrow
_
$1,000
Conditional Use or Interim Use
Permit/CUP or IUP Amendment
Administrative Fee
$350
Escrow
$1,000
Planned Unit Development
Master Plan or Special
Development Plan Master Plan
-.._._..._.. _.__.._.._...--
Administrative Fee
$350
Escrow
$1,000
Final Planned Unit Development
or Final Special Development
Plan
Administrative Fee
$350
_
Escrow
$1,000
Planned Unit Development
Amendment or Special
Development Plan Amendment
Administrative Fee
$350
Escrow
$1,000
Concept Review
I Administrative Fee
$150
i Escrow
$1,000
Vacation of Easement
Administrative Fee
$150
Escrow
$1,000
Site Plan Review
I Administrative Fee
$350
Escrow
$1,000
City Code Amendment
_
Administrative Fee
$350
Escrow
$1,000
Zoning Code or TRC
_Amendment
Administrative Fee
$350
Escrow
$1,000
Zoning Letter
Administrative Fee
$60
Land Use Requests — Not
Already Specified
Administrative Fee
$150
Escrow
$1,000
Zoning Permit — Decks under
30", Driveways, Fences, Sheds
and Temporary Structures
$65
Recreational Vehicle Parking
Permit
7 Day Permit, renewable once
per 12 months
$25
_H_ome Occupation I Permit
No charge
Home Occupation I1 Permit
Administrative Fee
$150
Escrow
$500
Right -of -Way Permit
! Administration Fee
$150
Escrow
To be determined by the
Engineer
Right -of Way Permit — Small
Cell Wireless Facilities
Permit for up to 15 locations;
rent and maintenance per each
location
$150 ROW permit fee, rent $150
per year, maintenance $25 per
year
Grading & Erosion Control Fees
Administrative Fee
$150
Escrow
$3,675 / acre
Commercial Outdoor Display
and Sales Area Permit
$100
Page 5 of 11
Appeal of Administrative Administrative Fee
Zoning, Sign, or Subdivision -
Escrow
Decisions
VII. Utility Hookup Charges
Water Permits — Service Per inspection
Installation/Repairs/Al eration
Water Permits — Interior
Plumbing, New Home
Water Permanent Disconnect _
Curb Box and Service Lead, 1"
Service Connection on
Unsurfaced Street
Restoration of Typical Road Mix
_Street
Restoration of Higher -Type
Street
Larger than 1" Service
Connection
Water Permits — Plan Check Fee
Water Permits — Re -inspection
Hydrant Meter Rental
Water Meter/Spacer Charges —
Customer Requested Water
Meter Accuracy Test
Water Meter/Spacer Charges —
5/8" x 3/4" Meter Model 25
Water Meter/Spacer Charges —
3/4" x 7 ''/z" Meter Model 35
Water Meter/Spacer Charges —
1" Meter
Water Meter/Spacer Charges —
Greater than 1"
Water Connection Fee —
Connection fee for previously
un-served or expanded lots
Fee includes removal of meter,
bench test at maintenance
facility, and returning meter to
residence; Fee will not be applied
if the meter is found to be
inaccurate to a degree exceeding
three percent (3%) from the
result of the bench test
Standard Meter
$150
$1,000
$40.00
$40.00
$215.00
$165.00
$105.00
Set by Engineer
Set by Inspector
Set by Inspector
$40.00
$2,000 deposit, monthly rental of
$30.00, water permit fee of
$170.00, State surcharge of $1.00
plus applicable standard water
usage rate charge for
Based on Meter Size
Contact Public Works for Quote
$450.00
Contact Public Works for Quote
$550.00
Contact Public Works for Quote
$840.00 per acre or portion
thereof
Page 6 of 11
Water Availability Fee — The units are based on the $525.00 per unit
New or Additional Connections Metropolitan Council's formula
for calculating new sewer
availabilitv charae (SAC) units
Sewer Connection Fee —
Connection fee for previously
un-served or expanded lots
Sewer Availability Fee —
New or Additional Connections
Sewer Permits — Service
Instal lation/Alternations/Repairs
Sewer Permits — Plan Review
Fee
Sewer Permits — Reinspections
Sewer Access Charge
Sanitary Sewer Utility Prohibited
Sump Pump Connection
Surcharae
The units are based on the
Metropolitan Council's formula
for calculating new sewer
availability charge (SAC) units
Per inspection
Set by Met Council Annually
VIII. Miscellaneous/Retail Activities
Boutique/Garage Sale Application/notification of City
Hall required
Application/notification of City
Hall required
Casual Roadside Stands
Tent Permit
Sidewalk Sales
Business Licensing —
Amusement Facilities
Business Licensing — Wholesale
Bulk Fuel Storage
Business Licensing —
Hotel/Motel
Business Licensing — Courtesy
Bench, Non -advertising
Business Licensing — Courtesy
Business Licensing —
Mechanical/Electronic Devices
Includes arcade, dance hall,
movie theater, pool/billiard
tables, bowling alleys, indoor
tennis, skating facility, outdoor
tenn.i.s,driving ranges, etc.
Liability insurance required
Includes musical devices,
amusement rides, bowling alleys,
etc.
$840.00 per acre or portion
thereof
$525.00 per unit
$40.00
Set by Inspector
$40.00 per hour
$2,485.00
$100.00 per month
No charge
No charge
55.00+ State Surch
$53.00
$105.00
$210.00
$6.50 per room
$26.00
$79.00
$15.00 per location + $15.00 per
machine
(MN Statute 449.15 sets
maximum permit fee at $15 per
location and $15 per machine)
Page 7 of 11
Business Licensing — Retail Sales Includes antique shops, $53.00
beauty/barber shops, boat
i dealers, Christmas tree sales, dry
cleaning, laundry, bakery, candy,
meats, wholesale foods, caterers,
motor vehicle sales, optometrist,
mortuary, video sales/rentals,
over-the-counter tobacco sales,
vending machines (excluding
tobacco), & other retail goods not
listed
Business Licensing —
$21.00 per 1,000 square feet, or
Restaurants, Cafes, Coffee
fraction thereof
Houses, etc.
Business Licensing —
$315.00
Restaurants, Drive-Thru
Business Licensing — Service
$105.00
Stations
Business Licensing — Grocery
$21.00 per 1,000 square feet, or
fraction thereof
Business Licensing — Mobile
$30.00 temporary (7 days or less)
Food Units/Food Trucks
or $100 annual (8 days or more)
Charitable Gambling Permit—
_
i Includes investigation fee
$158.00
Per Minnesota State Statute,
Chapter 349
Local Gambling Tax
3% of organizations' gross
receipts from all lawful
i
gambling, less prizes paid out
Lawful Gambling Fund
10% of net profits
Tobacco Sales License
Includes investigation fee
$300.00
Fireworks Sales
As part of existing business
$100.00 (MN Statute 624.20 sets
maximum permit fee at $100.00)
Fireworks Sales
Exclusive Business
$350.00 (MN Statute 624.20 sets
_
maximumpen-nit fee at $350.00)
Massage Therapist
Annual Fee, Includes
$53.00
investigation fee
_
Massage Therapist Establishment
Annual Fee, Includes
_
$158.00
investigation fee
Recreational Outdoor Archery j $200 first year
Range j _ $50 annual renewal
Solicitors, Peddlers, Transient I Please reference Section 340 of $158.00 background
Permit — For -Profit Organizations the Municipal Code for more investigation + $105.00 per
information month permit fee
Solicitors, Peddlers, Transient Please reference Section 340 of No charge
Permit — Non -Profit the Municipal Code for more
Organizations information
Tree Contractor License 1 1 $50.00 J
Page 8 of 11
— --
IX. Signs
__..._._.._ .m :... _ ......._�.._
Initial Fee
! Per Sin
-
$100.00
Permanent Signs, Annual
Per Sign, 100 square feet or less
_
j $25.00
Renewal
(maximum allowable size)
Temporary Signs
$50.00
Signs, Impoundment
First Offense
$50.00
Signs, Impoundment
Second Offense
$75.00
Signs, Impoundment
Third Offense $150.00 _._ .........
X. Miscellaneous Fees/Permits
Rubbish Hauler
_ — _
Annual
- --
-- $158.00
Recycling Hauler
Annual
$158.00
Contractor License
Annual
$75.00
_Miscellaneous Permit Fee
For all other permits not listed
$40.00
Staff Research
$53.00 per half hour
Penalties for Late Payment
Failure to pay any penalty
10% of license fee or $32.00,
imposed shall be grounds for the
whichever is greater
suspension or termination of any
license issued by the City
Tobacco Sales, Illegal
First Offense
$105.00
Tobacco Sales, Illegal
Second Offense within 24
$525.00
months
Tobacco Sales, Illegal
Third Offense within 24 months
$1,050.00 and 7 business day
!
suspension or 30 day suspension
of license + admin fine of $250
Tobacco Sales, Illegal
Fourth Offense within 24 months
Revocation of the license for a
one year period
Candidate Filing Fee
$2.00
Insufficient Funds/Returned
$35.00
Check Fee
Rental Registration/Renewal Fe-
$45.00 per rental unit
Rental Renewal Late Fee
For renewals received after
$90.00 per rental unit
January 31
Residential Contractor License
$5.00
Check
Business Subsidy Application
Required to reimburse City for
$2,100.00 + $10,500.00 escrow
Fee
full cost of review
Construction Activity Waiver
Per Waiver Application
$263.00
XI. False Alarm Fees
— -- _ _----------- ---_- --- --- -----
False Alarm First two alarms No charge +letter
False Alarm Three through ten alarms $60.00 per alarm
False Alarm Over ten alarms $160.00 per alarm
XII. Investigation Fees
_.............
Tobacco, Liquor, Charitable $158.00
Gambling, & Solicitor's Permits
Page 9 of 11
XIII. fility Use Charges
Water Per Quarter:
... ........ ... ... ._.
-- - ---
Meter Charge
3/4" Meter Size or Smaller
$24.36
Meter Charge
1" Meter Size
$58.84
Meter Charge
1.5" Meter Size
$124.46
Meter Charge
2" Meter Size
$200.51
Meter Charge
3" Meter Size
$436.45
Meter Charge
4" Meter Size
$654.26
Meter Charge _
6" Meter Size
$1,089.82
Meter Charge
8" Meter Size
$2,196.99
Meter Charge _
10" Meter Size
$3,122.56
Meter Charge
12" Meter Size
$4,429.34
Consumption: 1-10,000 gals.
gallons
$2.73 per 1,000 gallons (pro-
rated
Consumption: 10,001-35,000
gals.
gallons
$3.52 per 1,000 gallons (pro -
rated)
Consumption: Over 35,000 gals.
gallons
$6.22 per 1,000 gallons (pro-
rated)
Water Test
Fee set by MN State Health Dept
$1.59
Sanitary Sewer Per Quarter:
Base Charge - Single Family
per lot
$92.61
Base Charge - Multiple Family
per dwelling
$92.61
Usage Over 15,000 gals. - Single
Family/Multiple Family
gallons
$5.33 per 1,000 gallons (pro-
rated)
Sanitary Sewer - Commercial
Apartment/Condominium
gallons
$5.77 per 1,000 gallons (pro-
rated)
Sanita Sewer - Mobile Home
per unit
$100.16
Surface Water Per Quarter:
Residential - Single
per lot
$14.72
Residential - Multiple Family
per dwelling
$19.08
Apartment / Condominium
per acre
$120.11
Industrial / Commercial
_per acre
$187.52
Undeveloped
per acre
$22.06
Standby Per Quarter:
Standby
1" Service Line or smaller
$8.32
Standby
1.25" Service Line
$12.02
Standby
1.5" Service Line
$16.56
Standby_
2" Service Line
$25.31
Standby
3" Service Line
$57.09
Standby4"
Service Line
$101.81
Standby _
6" Service Line
$228.28
Standby
8" Service Lin
$406.26
Standby
10" Service Line
$635.48
Standby
12" Service Line
$913.31
Page 10 of I l
Page 11 of 11
MINNESOTA STATUTES 2017 32613.153
326B.153 BUILDING PERMIT FEES.
Subdivision 1. Building permits. (a) Fees for building permits submitted as required in section 32613.107
include:
(1) the fee as set forth in the fee schedule in paragraph (b) or as adopted by a municipality; and
(2) the surcharge required by section 32613.148.
(b) The total valuation and fee schedule is:
(1) $1 to $500, $21;
(2) $501 to $2,000, $21 for the first $500 plus $2.75 for each additional $100 or fraction thereof, to and
including $2,000;
(3) $2,001 to $25,000, $62.25 for the first $2,000 plus $12.50 for each additional $1,000 or fraction
thereof, to and including $25,000;
(4) $25,001 to $50,000, $349.75 for the first $25,000 plus $9 for each additional $1,000 or fraction
thereof, to and including $50,000;
(5) $50,001 to $100,000, $574.75 for the first $50,000 plus $6.25 for each additional $1,000 or fraction
thereof, to and including $100,000;
(6) $100,001 to $500,000, $887.25 for the first $100,000 plus $5 for each additional $1,000 or fraction
thereof, to and including $500,000;
(7) $500,001 to $1,000,000, $2,887.25 for the first $500,000 plus $4.25 for each additional $1,000 or
fraction thereof, to and including $1,000,000; and
(8) $1,000,001 and up, $5,012.25 for the first $1,000,000 plus $2.75 for each additional $1,000 or fraction
thereof.
(c) Other inspections and fees are:
(1) inspections outside of normal business hours (minimum charge two hours), $63.25 per hour;
(2) reinspection fees, $63.25 per hour;
(3) inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per
hour; and
(4) additional plan review required by changes, additions, or revisions to approved plans (minimum
charge one-half hour), $63.25 per hour.
(d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than $63.25, then the greater
rate shall be paid. Hourly cost includes supervision, overhead, equipment, hourly wages, and fringe benefits
of the employees involved.
[See Note.]
Subd. 2. Plan review. Fees for the review of building plans, specifications, and related documents
submitted as required by section 32613.106 must be paid based on 65 percent of the building permit fee
required in subdivision 1.
Copyright 0 2017 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.
326B.153 MINNESOTA STATUTES 2017 2
Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including public
buildings and state licensed facilities as required by section 326B.148.
Subd. 4. Distribution. (a) This subdivision establishes the fee distribution between the state and
municipalities contracting for plan review and inspection of public buildings and state licensed facilities.
(b) If plan review and inspection services are provided by the state building official, all fees for those
services must be remitted to the state.
(c) If plan review services are provided by the state building official and inspection services are provided
by a contracting municipality:
(1) the state shall charge 75 percent of the plan review fee required by the state's fee schedule in
subdivision 2; and
(2) the municipality shall charge 25 percent of the plan review fee required by the municipality's adopted
fee schedule, for orientation to the plans, in addition to the permit and other customary fees charged by the
municipality.
(d) If plan review and inspection services are provided by the contracting municipality, all fees for those
services must be remitted to the municipality in accordance with their adopted fee schedule.
History: 2009 c 78 art 5 s 11; 2017 c 94 art 2 s 5
NOTE: The amendments to subdivision 1, paragraph (b), by Laws 2017, chapter 94, article 2, section
5, expire October 1, 2021. Laws 2017, chapter 94, article 2, section 5, the effective date.
Copyright 0 2017 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.