HomeMy WebLinkAboutJanuary-February 2018
The Official City Newsletter for Arden Hills Residents January/February 2018
2018 tax levy unchanged from preliminary 4.0 percent rate set in September
At its December 11, 2017 meeting,
the City Council adopted a 2018
property tax levy of $3,786,942.
This sets the City’s property tax levy
increase for 2018 at 4.0 percent, which is
unchanged from the preliminary levy rate
set in September 2017.
Funding from the City’s share of regional
fiscal disparities has increased for 2018
and will contribute $320,003 toward the
levy total. The City’s tax capacity also has
increased, and taxes paid by City property
owners will account for the remaining bal-
ance, or $3,466,939.
The impact of a 4.0 percent levy increase
– applied to a net tax rate increase – trans-
lates to a $16.15 (or an approximate 2.0
percent) increase in annual taxes paid
by resident owners of median valued
homes (value changing from $308,200 to
$333,800).
In Arden Hills, the entire tax levy goes
toward the General Fund expenditures in
the City’s budget. The property tax levy ac-
counts for approximately 76 percent of the
General Fund revenues. Due to the current
economic environment, $237,225 in re-
serves was used to balance the 2018 budget.
In 2017, the City had a reserves outflow
budgeted of $195,956, but due to various
cost savings the General Fund will likely
end at or under budget for fiscal year 2017.
Revenues
• General Fund revenues in the 2018
budget are set at $4,939,531.
• The most notable revenue line item is
the levy amount, which will result in an
additional $145,652 in revenue over the
previous year.
• Building permits and other revenues are
expected to decrease due to changes in
fees set by the State of Minnesota.
Expenditures
• General Fund expenditures for 2018
total $5,176,756. Public Safety costs
are set to increase by 5.7 percent for
the Lake Johanna Fire Department,
1.2 percent for the Ramsey County
Sheriff’s Department contract, and a
decrease of 5.3 percent for dispatch
services.
• After accounting for the Public Safety
increases, the remaining General Fund
budget increases are primarily due
to employee salary and benefit Cost
of Living Adjustments and budgeted
one-time expenditures.
• Expenditures for City Hall main-
tenance and infrastructure/capital
reserve fund transfers to address in-
creasing repair costs for the City Hall
are included this year.
Other Rate Increases:
• 2018 utility rates have not been adjust-
ed for 2018 yet due to a pending rate
study. The associated utility rates are
expected to change following the rate
study. Residents will receive updated
rates following the completion of the
study (1st Quarter 2018).
You can make a difference
Volunteers are needed to serve on the
City’s Planning Commission and other
committees.
Please visit the committees and commis-
sions page on the City website for more
information and to fill out an application.
Interested residents can also call or stop
by City Hall to learn more.
Dear Citizens of Arden Hills,
I hope everyone had a happy and safe holiday season. I would like to steal a
minute out of your busy day and introduce myself as your new City Administra-
tor. I was appointed by the City Council on November 29, and my appointment began
January 1. This appointment was made at
the recommendation of Bill Joynes, the
City Administrator that served through the
end of 2017.
I take pride in the fact that Bill recom-
mended me; he is commonly known for
setting a high standard in local government
administration and has had a long tenure in
the field. I would also like to congratulate
Bill on retiring from a lengthy, successful
career in local government (Bill will still be
around for six months in an advisory capac-
ity to both myself and the City Council).
Although I am your new City Administrator, I am no stranger to the City. I started at
City Hall in 2015 in a finance role, and have gradually taken on more responsibilities.
Prior to Arden Hills, I was with the State of Minnesota, and before that I served in the
United States Navy. While working with the State and the City, I obtained my Master
of Business Administration and Master of Public Administration degrees from Hamline
University. I am excited to bring my skill set to the City of Arden Hills and play a role in
the City’s bright future.
For most residents, we may never directly cross paths, but I want to lay out two of my
important priorities, customer service and communication. As City Staff, we all work for
both the City Council and the residents of Arden Hills. We will do our best to respond
to questions and comments. We may not always have the answer right away, but we will
work to provide you with the correct answer. I encourage anyone with a question to give
City Hall a call, send an e-mail, or stop by the front desk. My door is always open, so do
not forget to say hello if you do swing by City Hall.
Lastly, I would also like to congratulate Sue Polka, our new Public Works Director/City
Engineer. Sue has been with the City via a consulting contract, but was recently appoint-
ed by the City Council to a full-time position. Congratulations, Sue!
Thank you,
Dave Perraultdperrault@cityofardenhills.org
Office: 651-792-7824
Cell: 651-755-0227
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
www.cityofardenhills.org
651-792-7800
Office Hours
Monday through Friday
8:00 am-4:30 pm
Sheriff and Fire
911
Water and Sewer Problems
(During non-business hours)
651-767-0640
Mayor
David Grant 651-538-0747
dgrant@cityofardenhills.org
Councilmembers
Brenda Holden 651-636-2987
bholden@cityofardenhills.org
Fran Holmes 651-631-1866
fholmes@cityofardenhills.org
Dave McClung 651-332-0352
davemcclung@cityofardenhills.org
Steve Scott 651-604-0919
sscott@cityofardenhills.org
City Administrator
Dave Perrault 651-792-7824
dperrault@cityofardenhills.org
Communications Coordinator
Dawn Skelly 651-792-7817
dskelly@cityofardenhills.org
Communications Committee
Council Liaison
Fran Holmes
Council meetings are held at City Hall
on the second and fourth Mondays
of the month at 7 p.m. Meetings are
televised live on Cable Channel 16.
Meetings of the Planning Commis-
sion are televised as well. Please visit
cityofardenhills.org for information
about archived meeting playbacks.
Arden Hills Notes is the official news-
letter of the City of Arden Hills, an
equal-opportunity employer.
A letter from your new City Administrator
City Administrator Dave Perrault
The City of Arden Hills gives special thanks to Susan Cathey and Mary Nosek, who
have served on the City’s Communications Committee for many years and have
written, edited, and produced this City newsletter. Their time and talents have been
greatly appreciated. With this issue, the newsletter is now being produced in-house.
If you have an article you would like to write or have considered as a story idea,
please contact Dawn Skelly, communications coordinator, at 651-792-7817, or at
dskelly@cityofardenhills.org.
Arden Hills Notes newsletter update
November 13, 2017
Absent: Holmes (excused)
Consent Items Approved (all by 4-0 vote):
• Approved Comcast cable franchise
agreement to continue City services
for a 10-year period
• Approved application by Catholic
United Financial to hold a charity
raffle in March, 2018
• Approved Resolution 2017-043 to re-
duce 2018 curbside and non-curbside
recycling fees
• Approved final payment of $63,485 to
Allied Blacktop for 2017 project
• Approved Planning Case 17-026 for
PUD Amendment with Boston Sci-
entific for expansion of Bldg. 9 and
parking lot
New Business Item:
• Approved City contribution levels for
employee health insurance benefits
with Health Partners
November 27, 2017
Absent: McClung (excused)
Consent Items Approved (all by 4-0 vote):
• Approved Resolution 2017-044 au-
thorizing an insurance agreement for
City staff with Health Partners
• Approved City Administrator and
Public Works Director/Engineer em-
ployee contracts
• Approved Intergovernmental Agree-
ment with Ramsey County and Rice
Creek Watershed for Green Infrastruc-
ture and Stormwater Reuse Feasibility
Study
New Business Items:
• Approved Planning Case 17-024 for
a PUD Amendment at 1160 County
Road E with The Commers Com-
pany for a new Dunn Brothers Coffee
Franchise
Benchmarks: a review of City Council action
December 11, 2017
Absent: none
Consent Items Approved (all by 5-0 vote):
• Approved 2018 Compensation Plan
for non-union City employees to
include a 2.1% COLA
• Approved Resolution 2017-046 for
2018 City contribution to employee
monthly benefits to include 100%
for single coverage, 80% for family
coverage and contributing $1,650 to a
Health Savings Account
• Approved Resolution 2017-047 ac-
cepting liability coverage limits from
League of MN Cities Insurance Trust
of $2.5 million
• Approved changes to position de-
scriptions and salary step levels for
City Clerk, City Planner, and Public
Works Superintendent positions
• Approved 2017 Budget Amendment
reduction of $5.4 million to reflect
budgeted capital improvement proj-
ects deferred to 2018
• Approved payment to Lake Johanna
Fire Department of $10,781 as City’s
share of a new Ford 550 Rescue Truck
• Approved Amendment to outgoing
City Administrator William Joynes
consulting services contract in 2018
• Approved annual salary increases for
Mayor (+$1,400) and City Council
(+$1,050) to align salary levels with
neighboring cities of similar size.
Changes will not take place until after
the 2018 elections and have not been
adjusted since 2007
• Approved 2018 Fee Schedule for City
services and rates
• Approved 2018 liquor license renew-
als for nine City businesses conduct-
ing sales
• Approved Ordinance 2017-011 ex-
tending hours for on-sale City liquor
establishments during the 2018 Super
Bowl
• Approved 2018 tobacco license
renewals for five City businesses
conducting sales
• Approved Ordinance 2017-010 allow-
ing mobile food vendors at special
events
• Approved Planning Case 17-024 to
The Commers Company for a new
Dunn Brothers Coffee franchise at
1160 County Road E
• Approved payment of $14,250 to City
of Roseville for water booster station
upgrades
New Business Items:
• Approved 2018 proposed tax levy of
4%. This rate can be reduced but can-
not be increased.
• Approved Joint Powers Agreement
with 11 other municipalities for pave-
ment maintenance activities
Did you know?
Plastic bags can accumulate rapidly,
and many people wonder what to
do with them. You should know that
plastic bags are not accepted with your
curbside recycling. However, you are
encouraged to reuse or recycle plastic
bags.
Most Cub Foods, Target, and Walmart
locations have recycling receptacles
for bags. Visit www.plasticfilmrecy-
cling.org for a drop-off directory.
Before you take your bags to a drop-
off location, please remember the
following:
• Make sure bags are clean and dry.
• Do not include compostable or de-
gradable bags, pre-washed salad
bags, frozen food bags, mulch
bags or material that has been
painted or glued.
• The above locations will also
accept newspaper sleeves/bags,
grocery and retail bags, plastic
packaging from non-food items,
bread bags, dry cleaning bags,
water bottle case wrapping and
fresh produce bags.
For more information, check out
RamseyRecycles.com, or call 651-633
EASY (3279) answered 24/7.
Smart salting saves the environment
Reduce the risk of frozen pipes and learn to identify water main breaks
Free Fix-It Clinics
Pipes and water mains can freeze and
break in cold weather. The risk in-
creases during long stretches of extremely
cold weather. Residents are encouraged to
consider the following tips to help avoid
frozen pipes:
• Ensure the furnace’s cold air return is
pointed away from the water service,
which enters most homes in the base-
ment through the floor
• Leave kitchen and bathroom cup-
board doors open to allow heat in
• Keep the furnace above 55 degrees F
• Shut off and drain pipes leading to
outside faucets
• Wrap foam insulation around pipes
most susceptible to freezing
• Seal air leaks in the home and garage
• Have someone check on the house
while away
• In extreme cold conditions, purchase
Winter is here to stay and we all know
that salt can be a good tool to melt
ice on our driveways and sidewalks. But
while salt can help prevent accidents on
the road and around buildings, it comes at
an environmental cost.
When the snow melts, the de-icing salt,
which contains chloride, runs into nearby
lakes and can harm fish, ducks, and other
aquatic wildlife.
How can you make a difference? Here are
a few ideas to reduce your salt use this
winter:
• Check the temperature – is it too
cold for salt? Most salts stop work-
ing around 15 degrees (F). When the
temperatures drop, use sand for trac-
tion, but remember that sand doesn’t
melt ice.
• Apply less than you think. Adding
more salt does not equal more melt-
ing. Try to use less than four pounds
of salt per 1,000 square feet. Keep in
mind one pound of salt is about the
same as one 12-ounce coffee mug.
• Clean-up any extra salt. If you can see
sand or salt on dry pavement, it means
that it is no longer working and could
be washed away. Try to reuse salt or
sand somewhere else or sweep it up
and throw it away.
Source: Minnesota Pollution Control Agency
Ramsey County Fix-it Clinics pro-
vide attendees with opportunities
to get household items fixed for free
and to learn valuable repair skills.
You can bring your broken household
goods and clothing in need of repair,
along with any tools and supplies you
think might help with the job and get
assistance with repair.
Events are first come, first served. For
more information, check out Ramsey-
Recycles.com, or call 651-633 EASY
(3279) answered 24/7.
Saturday, February 24
10 a.m. to 1:00 p.m.
North Haven Church
2240 15th Ave. East
North St. Paul
Saturday, March 24
11 a.m. to 2:00 p.m.
West Minnehaha Recreation Center
685 West Minnehaha Ave.
Saint Paul
Saturday, April 28
10:30 a.m. to 1:30 p.m.
Ramsey County Library, White Bear
Lake
2150 2nd St.
White Bear Lake
a thermometer to monitor water
temperature. If the water drops below
38 degrees F, leave a cold water tap
running at a steady stream of about a
quarter-inch in diameter, or approxi-
mately the diameter of a No. 2 pencil.
Water main breaks
Water main breaks are identified by water
running out of the ground, through cracks
in the pavement or from behind curbing.
If you see any of these signs, call Arden
Hills City Hall at 651-792-7800. After
hours, call 651-767-0640.
Photo credit: Minnesota Pollution Control Agency
A 4,200 square-foot Dunn Broth-
ers Coffee shop is coming to
Arden Hills and will share
the building at 1160 County Road E
with the American Red Cross. The site
is under construction and will include a
drive-through service, conference rooms,
family-friendly area, and outdoor patio. It
is scheduled to open in April.
Greta and Adam Dvorak, Arden Hills’
residents and owner-operators of the
proposed shop, are brewing big plans for
the space. They see their franchise venture
as an opportunity to bring the community
together for conversation and sharing of
time and talents over cups of coffee.
“I grew up with coffee and what it repre-
sents—a willingness to sit with someone
and have a conversation,” Greta said. “It’s
symbolic of gathering, sitting, and being
present with others.”
Greta is a graduate of Bethel University
and holds a master’s degree in student
development, and Adam is a Bethel
residence hall director. They envision
the shop serving college students and the
community in multiple ways.
“We plan to hire Bethel and
Northwestern students to work
here and we want to link them
with residents to help them once
they graduate,” Adam said. “We
want to bring the citizens of Arden
Hills together with the students to
reduce the isolation students can
sometimes feel during this transi-
tion.”
In addition to college students, the
Dvoraks plan to target working
professionals and parents. “Our
drive-through can accommodate
our fast-paced society, including
commuters on their way to Land
O’Lakes, and parents on their
way to school to drop off kids,”
Greta added. “We want to create
a family-friendly space with toys
and books. We can’t wait for
families to come.”
Conference rooms will be
available for business and community
meetings, and plans are underway for an
outdoor patio, Greta said. “The average
New Dunn Brothers Coffee owners seek to build community one cup at a time
coffee shop is 2,000 square
feet. We are doubling this, because we see
this as an opportunity to gather and serve
the whole community.”
Dunn Brothers Owner-Operators Adam and Greta Dvorak
Ramsey County Commissioners Rafael E. Ortega and Blake Huffman,
along with Mayor David Grant, Ramsey County Commissioner Mary
Jo McGuire, Alatus Arden Hills LLC Executive Project Manager Tom
Shaver and Alatus Development Associate Carla Dunham
Mayor David Grant and officials from
Ramsey County celebrated the
completion of roundabouts on the Ramsey
County road system, as well as other con-
struction improvements to County Roads
TCAAP/Rice Creek Commons Redevelopment progresses in the new year
H and I near the Rice Creek Commons
redevelopment in mid-December. These
roadway improvements will enhance traf-
fic flow, increase pedestrian safety, and
provide access to the mixed-use develop-
ment for new residents and
visitors.
The Rice Creek Commons
site was cleaned to residen-
tial standards, clearing the
way for a cohesive mix of
residential and commercial
neighborhoods surround-
ing a vibrant, pedestrian-
focused town center.
Construction of surround-
ing highway infrastructure
and site access is currently
underway or completed.
Internal site construc-
tion is expected to be put
out for bids in 2018 and
work would begin in 2019, with the first
phase focusing on mass grading and
development of the site’s infrastructure,
including roads, sewers, and water lines.
Housing and early commercial construc-
tion could begin as early as 2020.
Rice Creek Commons was included as a
possible site in Minnesota’s regional bid
for Amazon’s second headquarters, but
Amazon chose to narrow its selection to
20 other metropolitan areas outside of
Minnesota.
Army staff shared that the optimization
study, which looks at groundwater treat-
ment, is currently underway and will not
be released until the first quarter of 2018.
In the meantime, Ramsey County, the
City of Arden Hills, Alatus LLC, and the
Joint Development Authority continue to
move forward with a mixed-use develop-
ment as originally planned.
needed to connect pedestrians from the
Valentine Elementary School trail to the I-
35W bridge. It is a short segment, but will
increase safety by removing all pedestrian
traffic from walking on the shoulder of
County Road E2.
Rice Creek Commons
Last December a road almost one mile
long and utilities were constructed on the
northern 47 acres of the TCAAP redevel-
opment site. This also included the con-
struction of roundabouts on County Road
H and County Road I. The next step for
this project is the completion of a master
development agreement that will outline
the developer’s purchase of the property
and development schedule. It is antici-
pated that the agreement will be finalized
in the first half of 2018.
Other Projects
The projects listed above are just some of
the many large efforts currently underway.
As we get into 2018, there will be many
more, including road-paving projects, sew-
er lining and televising, park projects and
maintenance, a 2040 Comprehensive Plan
amendment, and a host of other annual
and new efforts that are needed to keep the
City moving forward.
Sincerely,
David Grant
Mayor
Postal Customer
ECR-WSS
PRST STD
U.S. Postage Paid
Twin Cities MN
Permit #1962
I
n
s
i
d
e
Arden Hills, MN . 55112-5734
SpringHill Suites by Marriott
A demolition permit has been issued for
the former Aerotek building on North-
woods Drive facing I-694. A 139-room
SpringHill Suites hotel by Marriott will
be constructed in its place. SpringHill
Suites is the largest all-suites style hotel
brand in the Marriott upscale tier that de-
livers industry-leading service. The brand
ranks highly with consumers on J.D.
Power’s annual list of hotels with the
highest guest satisfaction levels.
Land O’Lakes
Construction of the 155,000 sq. ft. Land
O’Lakes corporate campus addition is
almost finished. The building is sched-
uled to open this May. The addition will
position Land O’Lakes for future job
growth.
County Road F Improvements
The section of County Road F between
Hamline Avenue and Lexington Avenue
will be redesigned and rebuilt. Intersec-
tion improvements, including a traffic
signal, will be added at the entrance to
the Land O’Lakes and Boston Scientific
campuses. In addition, a trail section will
be added on the south side of the road
completing the trail section from Ham-
line to Lexington.
County Road E2 Trail Segment
The trail segment between New Brighton
Road and Cleveland Avenue will be com-
pleted this year. This is the last segment
From the MayorA new year is here and 2017 is
now part of history. As we look
forward to the rest of 2018 there
are some interesting projects underway.
These projects will have a lasting impact
on our city. I want to share a few of our
2018 projects.
Lexington Station Phase 2
Last year we saw the expansion of the
parking lot for the current Lexington Sta-
tion tenants. This year Lexington Station
Phase 2 will consist of construction of 12
tenant spaces located directly to the west
of the current building. The new build-
ing will bring additional business to our
city. An even larger phase 3 is approved
and anticipated to happen in the next five
years.
Major Trail Segment
A new trail is planned from the County
Road E Bridge west to Old Snelling.
It also will include a segment from the
intersection of County Road E and Old
Snelling north to McCracken Lane and
possibly as far as County Road E2. This
small segment is part of a long-term plan
that has been a priority for the Parks,
Trails and Recreation Committee and the
City Council.
Dunn Brothers
Dunn Brothers will move into the vacant
tenant space next to the American Red
Cross at 1160 County Road E. This new
business will provide another option for
coffee and sandwiches.
2018 City tax levy and budget
Letter from new City Administrator
Dunn Brothers is coming
How to prevent frozen pipes
Rice Creek Commons update
Recent City Council action