Loading...
HomeMy WebLinkAbout02-12-18-SWSAGENDA ITEMS Utility Rate Study Dave Perrault, City Administrator Sue Polka, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor: David Grant Councilmembers: Brenda Holden Fran Holmes Dave McClung Steve Scott      Special City Council Work Session Agenda  February 12, 2018 5:30 p.m. City Hall Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651 -792 -7800 Website : www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. CALL TO ORDER 1. 1.A. Documents: 2. DATE: February 12, 2018 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator Sue Polka, Director of Public Works/City Engineer SUBJECT: Utility Rate Study and Capital Projects Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider The City Council should provide direction on future capital projects as presented in the Ehlers Rate Study. Background The City Council requested a Special Work Session to discuss 2018 capital projects as they relate to the Ehlers Rate Study presented to the City Council at the January 16, 2018 Work Session. Below are the upcoming capital projects, anticipated cost, and the reasoning as to whether or not the project needs to be completed in 2018, or could be delayed. WATER PROJECTS Water Tower Repair & Repainting - $520,000 A contract was awarded to Osseo Construction Co. at the June 26, 2017 City Council meeting. The work is scheduled to begin in May of this year. County Road E2 Water Replacement/Old Hwy 10 Loop - $855,000 The current estimate for this work is $1,046,600. The increase in cost is due to additional watermain replacement that is proposed for CR E2 due to an additional break in the line last year. The estimate for CR E2 watermain replacement is $415,100. CR E2 could be delayed; however, this watermain has had six breaks since 2015, and more are anticipated if not replaced. The estimate for the loop in Old Snelling Avenue is $631,500. The loop is recommended to AGENDA ITEMS –1A MEMORANDUM provide redundancy in the system. While the project could be postponed, Ramsey County is planning an overlay project on Old Snelling in 2019. If this project were delayed the work done on Old Snelling after that time would require more costly pavement restoration. City Staff is also seeking an independent opinion on the necessity of this loop, this information will be provided at the Special Work Session. Booster Station Repair/Upgrade (Roseville) - $400,000 The City is contractually obligated to participate in the Booster Station upgrades. County Road F Water Main Replacement - $300,000 Ramsey County has a project to reconstruct County Road F between Hamline and Lexington in the spring/summer of 2018. The existing watermain is cast iron pipe that was installed in 1969. In addition, with the proposed widening of CR F, the watermain would be located directly beneath the new concrete curb and gutter. The proposed watermain has been designed and included in Ramsey County’s construction plans. If this project is delayed, the City will be responsible for the replacement of the watermain and associated street repairs with the road the County had just reconstructed. Indian Oaks/Floral Dr PMP (2018 PMP) - $751,000 Staff is proposing to replace all of the watermain in the Indian Oaks/Floral Drive neighborhood with the 2018 PMP. The existing pipes are cast iron and were installed in 1971 and 1975. SANITARY SEWER PROJECTS Sewer Lining/Rehabilitation - $400,000 A contract was awarded to Michels Pipe Services. Work is currently underway and should be completed in March. A portion of the funding will be provided by the MCES I/I grant program. This project is a rollover of $200,000 from 2017, the remaining $200,000 could be delayed for a future project. Indian Oaks/Floral Dr PMP (2018 PMP) - $270,000 This work is included in the 2018 PMP and includes sanitary sewer pipe lining, manhole repairs and adjustments. The lining portion of this project will also be partially funded by the MCES I/I grant program providing for a cost savings. STORM WATER PROJECTS Indian Oaks/Floral Dr PMP (2018 PMP) - $560,000 This work is in the 2018 PMP. Due to drainage complaints in the project area, additional storm sewer pipe and pond modifications are required. Surface Water Project (TBD) - $200,000 This is a place holder for a project that has yet to be determined and could be used for the 2018 PMP improvements. Attachment Attachment A: Capital Projects – Water Fund Attachment B: Capital Projects – Sewer Fund Attachment C: Capital Projects – Storm Water Fund Ca p i t a l P r o j e c t s – W a t e r F u n d 15 • S i g n i f i c a n t p r o j e c t s i n 2 0 1 8 • W a t e r F u n d d o e s n o t h a v e s u f f i c i e n t c a s h t o p a y f o r c a p i t a l p r o j e c t s w i t h o u t ex t e r n a l b o r r o w i n g Pr o j e c t s Pr o j e c t Nu m b e r 20 1 8 2 0 1 9 2 0 2 0 2 0 2 1 2 0 2 2 EX I S T I N G I N F R A S T R U C T U R E & P R O J E C T S W a t e r T o w e r R e p a i r & R e p a i n t i n g 1 2 - W - 0 0 1 5 2 0 , 0 0 0 CR E 2 W a t e r R e p l a c e m e n t / O l d H w y 1 0 L o o p 1 7 - W - 0 0 1 8 5 5 , 0 0 0 Bo o s t e r S t a t i o n R e p a i r / U p g r a d e ( R o s e v i l l e ) 1 8 - W - 0 0 1 4 0 0 , 0 0 0 1 5 4 , 0 0 0 Co u n t y R o a d F W a t e r m a i n R e p l a c e m e n t 1 8 - W - 0 0 2 3 0 0 , 0 0 0 Fu t u r e P M P 1 8 - S t r - 0 0 5 4 0 0 , 0 0 0 4 0 0 , 0 0 0 In d i a n O a k s / F l o r a l D r P M P - 2 0 1 8 P M P 1 8 - S t r - 0 6 5 7 5 1 , 0 0 0 W a t e r m a i n R e p l a c e m e n t 2 5 0 , 0 0 0 2 5 0 , 0 0 0 2 5 0 , 0 0 0 2 5 0 , 0 0 0 To t a l E x i s t i n g I n f r a s t r u c t u r e & P r o j e c t s 2 , 8 2 6 , 0 0 0 4 0 4 , 0 0 0 6 5 0 , 0 0 0 2 5 0 , 0 0 0 6 5 0 , 0 0 0 Ac t u a l C I P ( 2 0 1 7 D o l l a r s ) 20 1 7 2, 8 2 6 , 0 0 0 4 0 4 , 0 0 0 6 5 0 , 0 0 0 2 5 0 , 0 0 0 6 5 0 , 0 0 0 P e r c e n t I n f l a t i o n 3 % 3 % 3 % 3 % 3 % 2, 9 1 0 , 7 8 0 4 2 8 , 6 0 4 7 1 0 , 2 7 3 2 8 1 , 3 7 7 7 5 3 , 5 2 8 T o t a l P r o j e c t s t o b e B o n d e d f o r : 5 - Y e a r T e r m 0 0 0 0 0 10 - Y e a r T e r m 3 , 0 0 0 , 0 0 0 0 1 , 2 0 0 , 0 0 0 0 1 , 1 0 0 , 0 0 0 1 5 - Y e a r T e r m 0 0 0 0 0 Ca p i t a l P r o j e c t s – S e w e r F u n d • S e w e r f u n d d o e s n o t h a v e s u f f i c i e n t c a s h t o p a y f o r pr o j e c t s w i t h o u t e x t e r n a l b o r r o w i n g 25 Pr o j e c t s Pr o j e c t Nu m b e r 20 1 8 2 0 1 9 2 0 2 0 2 0 2 1 2 0 2 2 EX I S T I N G I N F R A S T R U C T U R E P R O J E C T S S e w e r L i n i n g / R e h a b i l i t a t i o n 0 9 - S e w - 0 0 2 4 0 0 , 0 0 0 4 0 0 , 0 0 0 4 0 0 , 0 0 0 Re c o n s t r u c t L i f t S t a t i o n 1 1 1 0 - S e w - 0 0 3 Fu t u r e P M P 1 8 - S t r - 0 0 5 4 0 0 , 0 0 0 4 0 0 , 0 0 0 In d i a n O a k s / F l o r a l D r P M P - 2 0 1 8 P M P 1 8 - S t r - 0 6 5 2 7 0 , 0 0 0 Li f t S t a t i o n s 1 2 5 , 0 0 0 1 2 5 , 0 0 0 Ac t u a l C I P ( 2 0 1 7 D o l l a r s ) 20 1 7 79 5 , 0 0 0 5 2 5 , 0 0 0 4 0 0 , 0 0 0 4 0 0 , 0 0 0 4 0 0 , 0 0 0 P e r c e n t I n f l a t i o n 3 % 3 % 3 % 3 % 3 % I n f l a t e d P r o j e c t C o s t s 8 1 8 , 8 5 0 5 5 6 , 9 7 3 4 3 7 , 0 9 1 4 5 0 , 2 0 4 4 6 3 , 7 1 0 To t a l P r o j e c t s t o b e B o n d e d f o r : 5 - Y e a r T e r m 0 0 0 0 0 10 - Y e a r T e r m 8 0 0 , 0 0 0 0 1 , 1 0 0 , 0 0 0 0 9 0 0 , 0 0 0 15 - Y e a r T e r m 0 0 0 0 0 Ca p i t a l P r o j e c t s – S t o r m W a t e r F u n d • S t o r m W a t e r f u n d h a s s u f f i c i e n t c a s h t o p a y f o r p r o j e c t s . 33 Pr o j e c t s Pr o j e c t Nu m b e r 20 1 8 2 0 1 9 2 0 2 0 2 0 2 1 2 0 2 2 EX I S T I N G I N F R A S T R U C T U R E P R O J E C T S St o r m P o n d M a i n t e n a n c e 0 9 - S t o r m - 0 0 1 5 0 , 0 0 0 St o r m W a t e r I n l e t / O u t l e t R e p a i r s 1 3 - S t o r m - 0 0 1 2 5 , 0 0 0 St o r m W a t e r B M P S t u d y / C o n s t r u c t i o n 1 7 - S t o r m - 0 0 1 Ol d S n e l l i n g A v e P M P w / B r i d g e R e c o n s t r u c t i o n 1 7 - S t r - 0 0 4 5 0 , 0 0 0 Fu t u r e P M P 1 8 - S t r - 0 0 5 2 0 0 , 0 0 0 2 0 0 , 0 0 0 In d i a n O a k s / F l o r a l D r P M P - 2 0 1 8 P M P 1 8 - S t r - 0 6 5 5 5 5 , 0 0 0 Su r f a c e W a t e r P r o j e c t ( U n d e t e r m i n e d ) 1 8 - S t o r m - 0 0 1 2 0 0 , 0 0 0 Ac t u a l C I P ( 2 0 1 7 D o l l a r s ) 20 1 7 75 5 , 0 0 0 1 2 5 , 0 0 0 2 0 0 , 0 0 0 0 2 0 0 , 0 0 0 Pe r c e n t I n f l a t i o n 3% 3 % 3 % 3 % 3 % In f l a t e d P r o j e c t C o s t s 7 7 7 , 6 5 0 1 3 2 , 6 1 3 2 1 8 , 5 4 5 - 2 3 1 , 8 5 5 To t a l P r o j e c t s t o b e B o n d e d f o r : 5 - Y e a r T e r m 0 0 0 0 0 1 0 - Y e a r T e r m 0 0 0 0 0 1 5 - Y e a r T e r m 0 0 0 0 0