CITY OF ARDEN HILLS, MINNESOTA
CITY COUNCIL WORK SESSION
FEBRUARY 20, 2018
5:00 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor Grant called to order the City Council
Work Session at 5:00 p.m.
Present: Mayor David Grant, Councilmembers Brenda Holden, Fran Holmes, and
Steve Scott
Absent: Councilmember Dave McClung
Also present: City Administrator Dave Perrault, Public Works Director/City Engineer Sue
Polka, City Planner Matthew Bachler, Deputy Clerk Jolene Trauba, Utility Service
Partners Representative Deryck Freudeman, WSB & Associates Project Manager Steve
Foss, and WSB & Associates Senior Planner Eric Zweber
1. AGENDA ITEMS
A. National League of Cities Service Line Warranty Program
Public Works Director/City Engineer Sue Polka noted that Utility Service Partners provides
residents with insurance for their water and sewer services through the National League of Cities.
There is no cost to the City, but there is a marketing agreement that the City would need to sign.
The City can choose to collect royalties which would raise the cost to residents.
Councilmember Brenda Holden asked for an explanation of what In -Home Plumbing would
cover.
Utility Service Partners Representative Deryck Freudeman responded that included all the
supply and drain lines in the home except fixtures. For example internal lines that burst, a drain
line that clogs, or valve repair. He also noted there is no obligation on the part of the resident to
continue the policy for a specific period of time, but there is a 30 day wait period before they can
file their first claim. There is no pre -inspection and everyone gets the same plan no matter the
length of the service line. They partner with local contractors to do the necessary work.
Mayor Grant noted this is no cost to the City but an advantage to the residents that would like it.
He felt there wasn't a downside risk to the plan and didn't want to charge for the royalties.
ARDEN HILLS CITY COUNCIL WORK SESSION — FEBRUARY 20, 2018 2
Councilmember Fran Holmes asked what more specifically would be covered under the plans.
Mr. Freudeman said he would provide a list of terms and conditions. The goal of the program is
to be affordable and to be sure residents can use it when they need it, so there is a low exclusion
limit and they encourage homeowners to call. Aging infrastructure, education to residents and
cost are three reasons for the City to partner with Utility Services. Residents can choose to enroll
in one, two or all three programs. Campaign letters are sent up to three times a year.
Councilmember Holden noted that some Arden Hills homes have an individual sewer line that
comes to a manhole and the line is shared to the street. She wondered what part of that line would
be covered.
Mr. Freudeman stated that if each property has its own lateral line it could be covered. He said
he will look into that situation to be sure what would be covered.
Councilmember Holmes asked if the City had any marketing responsibilities with the program.
Mr. Freudeman said if the City decides to enroll, there will be an onboarding call with the
contact person at the City, samples of the campaign letter would be provided and edits can be
made, and all campaigns thereafter would also be approved by staff. There are no telesales or
door-to-door sales. All mail and marketing costs are paid for by Utility Services.
Councilmember Holden asked about rate increases.
Mr. Freudeman responded that their rates have been stable for approximately three years. Some
partners that have been with the program for a long time may have higher rates, but most cities are
within a dollar of the costs list provided.
Mayor Grant asked about exclusivity.
Mr. Freudeman said there is an exclusivity provision in the agreement but they are willing to
delete it if that would hold the City back from becoming a part of the program, but they would
want to have the right to terminate the contract if the city partnered with another entity.
Mr. Freudeman will follow up with a marketing letter, terms and conditions, separate
lines/shared lines information, a revised version of the non -royalty marketing agreement and
optional language removing the exclusivity clause.
B. Johanna Marsh Park
Public Works Director/City Engineer Sue Polka noted the Capital Improvement Plan includes
$100,000 for resurfacing the tennis court. Playground equipment was ordered last fall. WSB
provided concept plans that have been reviewed, the latest version shows the playground areas, a
concrete pad with a picnic shelter and two tables, and a viewing platform with seating overlooking
the marsh. Site work is estimated at about $139,000, design and construction services are
$33,000. Total estimated cost is $219,096. She said a suggestion was made to complete the
platform and picnic shelter at a later date, bringing the cost down to $185,000. The installation
ARDEN HILLS CITY COUNCIL WORK SESSION — FEBRUARY 20, 2018 3
cost for the playground equipment is not listed on the estimated cost chart and that will be around
$11,000.
Public Works Director/City Engineer Polka also noted that quotes for demolition of the tennis
courts could be requested and the work could possibly be done right away.
Councilmember Holden asked if maintaining the seeding was included in the estimated cost.
WSB & Associates Project Manager Steve Foss said it would be included. He also noted that
the viewing platform could be expanded in the future. The platform could be raised up to 2 '/2 feet
without railings being necessary that may block the view.
Councilmember Holden asked if any benches near the play areas were included.
Public Works Director/City Engineer Polka said they could be added at a cost of $650 each.
Councilmember Holden and Councilmember Steve Scott felt the project should go ahead as set
forth in the outline, including the shelter and viewing platform.
Councilmember Holmes said a resident had asked about a wood chip entrance that doesn't go
past the lift station.
Public Works Director/City Engineer Polka said that could be an additional trail, but the
current plan is ADA compliant. A wrap could be put on the lift station box to conceal it at a later
time.
Councilmember Holmes agreed that the plan should move forward as presented, and as soon as
possible.
Mayor Grant felt the viewing platform was reasonably priced and was in favor of moving ahead
as designed, and directed staff to put the item on the Council agenda.
Public Works Director/City Engineer Polka said she could bring back a demolition price
separately and once the plans and specs are ready she can bring it back for authorization for bids.
Councilmember Holden stated that she'd like to see benches included in build, with the
possibility of donations from residents or the Arden Hills Foundations.
Mayor Grant said the concrete pads for the benches could be put in during construction, whether
or not the benches were actually available.
A resident in the audience offered to pay for a bench and suggested that some savings could be
made in cement costs. Another resident asked how long this current plan had been available for
viewing, and also wondered about possible changes.
Public Works Director/City Engineer Polka said the Parks, Trails and Recreation Committee
favored this concept. She also said there are safety zones that are required to be placed around
playground equipment.
ARDEN HILLS CITY COUNCIL WORK SESSION — FEBRUARY 20, 2018 4
C. 2018 Vehicle Purchase
Public Works Director/City Engineer Polka noted that the building inspection vehicle was
purchased in 2004 and she provided a document with the repair history. Two quotes were
received, one for an all -wheel drive 2018 Ford Escape and one for a two -wheel drive 2018 Ford
Escape. The all -wheel drive vehicle is lower because of incentives being offered.
Councilmember Holden suggested that because work was done on the vehicle in 2017 another
use be found for the vehicle within the City and to not use it as a trade-in.
Councilmember Holmes said she didn't think a new vehicle was necessary, that we could repair
it and continue to use it until it was irreparable. She did agree that all -wheel drive was needed.
City Administrator Dave Perrault said that from a finance perspective, they should also
consider at what point a decision would be made to replace the vehicle, if more repairs necessary.
Councilmember Scott said he is in favor of replacing the vehicle at this time.
Councilmember Holden was concerned about the downtime that staff would have if the vehicle
need repairs again and felt it should be replaced.
City Administrator Perrault it wouldn't make much sense to keep the current vehicle because it
would be used so infrequently.
Mayor Grant was also in favor of replacing the vehicle.
D. TCAAP Plat
City Planner Matthew Bachler provided a verbal update on the TCAAP Plat, noting a land use
application has been received from Ramsey County for a preliminary and final plat for the
TCAAP property. The plat is to define the boundaries of the site and clean up the legal
description which is currently very complicated. The plat would transfer some land as right-of-
way to MnDOT for the County Road H interchange, and to Ramsey County for the new roadway
connecting County Road H and County Road I. A small outlot would be transferred to Ramsey
County Parks and Recreation and two large outlots would be defined to help facilitate the transfer
of land to the master developer. This will be presented to the Planning Commission March 7 and
City Council March 26.
E. Draft Comp Plan
City Planner Matthew Bachler noted that the City has until December 31, 2018 to submit the
final Comp Plan update to the Metropolitan Council, but there needs to be a six month review
period for adjacent and affected jurisdictions to review the Draft before submittal. The public
hearing is anticipated to be at the April 4 Planning Commission meeting with the final
Draft Plan to be brought to the City Council on April 23.
WSB & Associates Senior Planner Eric Zweber gave a summary of the updates that have been
made to the Housing and Land Use chapters of the Comprehensive Plan. He mentioned that the
ARDEN HILLS CITY COUNCIL WORK SESSION — FEBRUARY 20, 2018 5
Metropolitan Council had updated its housing requirements from ten years ago, and Arden Hills
now has to have an average density of five units an acre for new development. Adding housing in
TCAAP will bring the City well over that. The second component is affordable housing —
existing and future affordable housing needs have to be addressed.
Review continued of the draft Land Use, Housing, and Implementation Chapters and Council
provided recommendations on changes. A page by page review was also done of the entire 2040 draft
Comp Plan.
City Planner Bachler stated the next steps for the draft 2040 Comp Plan include the Planning
Commission and Economic Development Commission reviewing the entire draft on March 7. He
noted that a red -lined version of the draft plan would be brought back to the March 19 work session
based on the changes the Council provided this evening. On April 4, the Planning Commission will
hold a public hearing, and the draft will be presented again to the Council on April 23 for approval.
2. COUNCIL COMMENTS AND STAFF UPDATES
Councilmember Holden mentioned that Betty McCullum's office is meeting with EPA and
MPCA and the Army about Round Lake soon.
Councilmember Holden asked if the TCAAP roads would be designed to work with autonomous
cars.
City Administrator Perrault said that Public Works Director/City Engineer Polka went to a
presentation on autonomous vehicles, and it is difficult to plan for that because we don't know
what those vehicles will actually consist of or what the needs will be.
Councilmember Holden said a Colonel from Fort Ripley spoke with the Rotary Club about the
new Readiness Center. The funding isn't in place but they hope to start yet this year, and
completed in 2020.
UMIAK
K
Mayor Grant adjourned the City Council
4W 2j4'V1A_ a
o ne Trau
Deputy Clerk
Work Session at 8:53 p.m.
David Grant
Mayor