Loading...
HomeMy WebLinkAbout10-15-18-WSAGENDA ITEMS Tobacco Vendor Public Comment Julie Hanson, City Clerk MEMO.PDF ATTACHMENT A.PDF 2040 Comprehensive Plan Update Jane Kansier, City Planner Eric Zweber, WSB & Associates  MEMO.PDF ATTACHMENT A.PDF Annual Permanent Sign Renewals Julie Hanson, City Clerk MEMO.PDF Communications Survey Results Dawn Skelly, Communications Coordinator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Hazelnut Park Future Plans Discussion Sue Polka, Public Works Director/City Engineer MEMO.PDF TCAAP Public Forum Planning Discussion Dave Perrault, City Administrator MEMO.PDF TCAAP Negotiator Discussion Dave Perrault, City Administrator MEMO.PDF Council Request Tracker Dave Perrault, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor: David Grant Councilmembers: Brenda Holden Fran Holmes Dave McClung Steve Scott      City Council Work Session Agenda  October 15, 2018 5:00 p.m. City Hall Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651 -792 -7800 Website : www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. CALL TO ORDER 1. 1.A. Documents: 1.B. Documents: 1.C. Documents: 1.D. Documents: 1.E. Documents: 1.F. Documents: 1.G. Documents: 1.H. Documents: 2. AGENDA ITEMSTobacco Vendor Public CommentJulie Hanson, City Clerk MEMO.PDFATTACHMENT A.PDF2040 Comprehensive Plan UpdateJane Kansier, City PlannerEric Zweber, WSB & Associates MEMO.PDFATTACHMENT A.PDFAnnual Permanent Sign RenewalsJulie Hanson, City Clerk MEMO.PDFCommunications Survey ResultsDawn Skelly, Communications Coordinator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Hazelnut Park Future Plans Discussion Sue Polka, Public Works Director/City Engineer MEMO.PDF TCAAP Public Forum Planning Discussion Dave Perrault, City Administrator MEMO.PDF TCAAP Negotiator Discussion Dave Perrault, City Administrator MEMO.PDF Council Request Tracker Dave Perrault, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor:David Grant Councilmembers:Brenda Holden Fran HolmesDave McClungSteve Scott     City Council Work Session Agenda October 15, 20185:00 p.m. City Hall Address:1245 W Highway 96 Arden Hills MN 55112 Phone:651 -792 -7800 Website : www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.CALL TO ORDER1.1.A.Documents:1.B.Documents:1.C.Documents:1.D.Documents: 1.E. Documents: 1.F. Documents: 1.G. Documents: 1.H. Documents: 2. Page 1 of 1 AGENDA ITEM – 1A MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, City Clerk SUBJECT: Tobacco Vendor Public Comment Budgeted Amount: Actual Amount: Funding Source: $ $ $ Council Should Consider Accepting public comment regarding increasing the tobacco sales age to 21 and regulating the sale of flavored tobacco. Background/Discussion At its work session in August, the Council discussed amending City Code pertaining to increasing the tobacco sales age to 21 and regulating the sale of flavored tobacco in the city. Kristen Ackert from the Association for Non-Smokers MN was present at the August work session and provided a presentation and statistics. The Council directed staff to move forward with a proposed ordinance amendment which will be addressed at a public hearing at the November 13, 2018, regular City Council meeting. City staff reached out to the five local businesses that are licensed to sell tobacco in Arden Hills and invited them to the October 15 work session should they wish to provide public comment. Attached is a copy of the letter dated September 27, 2018, that was mailed to the following vendors: Arden Hills Shell, Arden Hills Tobacco, Cub Foods, Holiday Stationstores and Walgreens. Please note the September 27, 2018, letter also provided notice of the public hearing set for November 13 (fulfilling a 30-day notice requirement); however, a “reminder” letter regarding the public hearing will also be provided to these vendors. A Notice of Public Hearing will also be published in the Bulletin ten (10) days prior to the public hearing, as is also required. Attachment Attachment A: September 27, 2018 letter to tobacco vendors City of Arden Hills ▪1245 West Highway 96 ▪ Arden Hills Minnesota 55112 Phone 651.792.7800 ▪ Fax 651.634.5137 ▪ www.cityofardenhills.org September 27, 2018 Dear Tobacco License Holder: The Arden Hills City Council will be conducting a work session on Monday, October 15 at 5:00 pm to discuss the following proposed ordinance amendments related to tobacco: • Increasing the age to purchase tobacco to 21 • Regulating flavored and menthol tobacco sales • Regulating e-cigarettes You are invited to attend the meeting, which will begin promptly at 5:00 pm. This is the first item on the agenda. Note that if no tobacco vendors or its representatives are present at 5:00 pm to provide comment, the City Council will move on to its next scheduled agenda item. Please be on time if you wish to have the opportunity to comment. Please also be advised that the public hearing regarding this proposed amended ordinance will be held on Tuesday, November 13 at 7:00 pm. You are invited to attend the public hearing as well. A reminder regarding the public hearing will be sent to you in October as well. City Hall is located at 1245 Highway 96 West in Arden Hills. If you have any questions, please contact me at jhanson@cityofardenhills.org or 651-792-7811. Sincerely, Julie Hanson City Clerk Page 1 of 1 AGENDA ITEM – 1B MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jane Kansier, City Planner SUBJECT: 2040 Comprehensive Plan Update Budgeted Amount: Actual Amount: Funding Source: $ $ $ Council Should Consider Providing direction regarding the 2040 Comprehensive Plan Update. Background/Discussion Eric Zweber of WSB & Associates will be at this work session. Please see the attached October 15, 2018 memorandum from WSB & Associates. Attachment Attachment A: Memorandum (with noted attachments) 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com K:\03455-200\Admin\Meeting\CC Meetings\10152018\WSB CC Memo 10152018.docx Memorandum To: Honorable Mayor and City Council Dave Perrault, City Administrator From: Eric Zweber, AICP Date: October 15, 2018 Re: Arden Hills 2040 Comprehensive Plan WSB Project No. 03455-200 Background On April 23, the City Council authorized the distribution of the draft 2040 Comprehensive Plan for review. The City has received a preliminary comment letter from the Metropolitan Council (Attachment A). Many of the comments can be addressed at a staff level, but there are seven comment that need City Council direction on how to address: 1. Define goals, policies, strategies for preventing/reducing I/I. 2. Describe existing I/I. 3. Implementation plan for preventing/eliminating excessive I/I. 4. Land Use section must demonstrate future land use plan's ability to accommodate growth. 5. Define expected share of different uses in mixed use categories. 6. Additional description of types of housing needs city would consider using different tools; need to provide sufficient direction for developers. 7. Identify tools for preserving Arden Manor. Requested Action The City Council direction may include: 1. Make the revision requested by Metropolitan Council staff. 2. Direct staff to discuss with Metropolitan Council staff alternatives to addressing their comments. 3. Request a meeting with Marie McCarthy, the District 10 Metropolitan Council member, at a future City Council meeting to discuss alternatives to address their comments. Summary 1. Define goals, policies, strategies for preventing/reducing I/I. 2. Describe existing I/I. 3. Implementation plan for preventing/eliminating excessive I/I. City Council – Arden Hills October 10, 2018 Page 2 K:\03455-200\Admin\Meeting\CC Meetings\10152018\WSB CC Memo 10152018.docx WSB has worked with Sue Polka, City Engineer to try and address these issues. The redlined revisions to the Sanitary Sewer Plan is included in Attachment B. Inflow and infiltration (I/I) was discussed specifically by the City Council during the development of the Comprehensive Plan by the City Council and therefore we want to provide an opportunity to review what revisions are proposed. 4. Land Use section must demonstrate future land use plan's ability to accommodate growth. The Metropolitan Council is requesting a map to show where growth is anticipated to occur and in which decade. To accommodate this request, Figure 6-7 Areas of Possible Redevelopment (Attachment C) has been prepared. The map shows the County Road E area, the Red Fox/Grey Fox area, the residential area along Parkshore Drive, the properties at the south end of Gateway Parkway, and TCAAP as areas of potential development. These areas are consistent with language in the Land Use Chapter about potential development. The map includes that majority of these areas as available for redevelopment before 2030 with only the Creek neighborhood and part of the Hill neighborhood of TCAAP being identified for development between 2030 and 2040. This map would be used to develop tables of the amount of land uses available for redevelopment by decade. 5. Define expected share of different uses in mixed use categories. WSB has prepared the following table as potential shares of different uses in the mixed-use land use categories: Light Industrial Retail Office High Density Residential Medium Density Residential Low Density Residential Town Center (TC) N/A 5% to 25% 0% to 20 % 50% to 90% 5% to 25% N/A Neighborhood Business (NB) N/A 0% to 100% 0% to 100% 0% to 25% 0% to 50% 0% to 25% Mixed Business (MB) 0% to 50% 0% to 50% 25% to 100% N/A N/A N/A Community Mixed Use (CMU) 10% to 50% 10% to 100% 10% to 100% 10% to 50% 0% to 25% N/A Retail Mixed-Use (RMU) N/A 50% to 100% 0% to 50% N/A N/A N/A Office Mixed-Use – (OMU) N/A 0% to 50% 50% to 100% N/A N/A N/A Light Industrial and Office (I/O) 50% to 100% N/A 0% to 100% N/A N/A N/A The intent of this table is the percentage of uses for the total amount of each land use in the City and not a requirement on a parcel by parcel basis. 6. Additional description of types of housing needs city would consider using different tools; need to provide sufficient direction for developers. The City Council was specific about the language included with the affordable housing tools including specifically excluding Arden Hills from being identified by name in the explanation of the tools. Metropolitan Council provided the following examples of what they would find acceptable for how a City can explain when and how they may use the affordable housing tools: City Council – Arden Hills October 10, 2018 Page 3 K:\03455-200\Admin\Meeting\CC Meetings\10152018\WSB CC Memo 10152018.docx “The City would consider an application/supporting an application/administering (tool) to support (new construction) of housing affordable at (50-80% AMI)” “The City would consider supporting a developer’s application to Minnesota Housing’s Consolidated RFP for new construction of housing units in areas designated high density that are affordable at 51-80% AMI.” 7. Identify tools for preserving Arden Manor. Arden Manor is identified MDR – Medium Density Residential on the draft Land Use Map, which is consistent with the current development of the Arden Manor. The Land Use Chapter also specifically addresses Arden Manor with the following language: “The Arden Manor neighborhood has been identified as an important community and the primary supply of affordable housing options in the City. Bounded by Interstate 35W, Highway 96, and Highway 10, the neighborhood is facing pressure from adjacent highways and land uses. The City anticipates this property will remain as a medium density residential use for the foreseeable future.” WSB believes these two factors are the tools to preserving Arden Manor and no further information is required within the Comprehensive Plan. Requested Action Provide direction on how to address each of the seven areas raised by Metropolitan Council staff. Next Steps Revise the entire Comprehensive Plan to address comments from the Metropolitan Council and from any other agencies followed by the review and approval of the City Council. Thank you, Eric Zweber, AICP Attachments: A. Metropolitan Council Preliminary Review of the City of Arden Hills 2040 Comprehensive Plan Update B. Redlined Draft Sanitary Sewer Plan C. Figure 6-7 Areas of Possible Redevelopment Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Table of Contents TABLE OF CONTENTS INTRODUCTION ........................................................................................ 1 BACKGROUND ......................................................................................... 2 EXISTING SANITARY SEWER SYSTEM .................................................. 2 Service Districts ...................................................................................................................... 2 Gravity Sewer ......................................................................................................................... 2 Lift Stations ............................................................................................................................ 3 Community Treatment Systems .............................................................................................. 3 Intercommunity Flows ............................................................................................................. 3 Individual Sewage Treatment Systems ................................................................................... 6 FORECASTS ............................................................................................. 8 Population .............................................................................................................................. 8 Wastewater Flows .................................................................................................................. 9 SANITARY SEWER DESIGN CRITERIA ................................................. 10 Land Use ...............................................................................................................................10 Estimated Average Flows – Existing ......................................................................................10 Estimated Average Flows – 2040 Build Out ...........................................................................10 Peak Flow Factors .................................................................................................................11 SANITARY SEWER TRUNK RECOMMENDATIONS .............................. 12 Lift Station Analysis ...............................................................................................................12 Trunk Sewer Analysis ............................................................................................................13 MCES Interceptor Facility Forecasts .....................................................................................14 Individual Sewage Treatment Systems ..................................................................................14 INFLOW AND INFILTRATION ................................................................. 16 General .................................................................................................................................16 I/I Analysis .............................................................................................................................17 I/I Reduction ..........................................................................................................................18 COST ESTIMATES AND FINANCING ..................................................... 20 SUMMARY AND OUTCOMES ................................................................. 20 FIGURES Figure 1 Existing Sanitary Sewer System Figure 2 Sanitary Sewer Districts Figure 3 Individual Sewage Treatment Systems Figure 4 MCES Peak Factors Figure 5 2040 Sanitary Sewer System APPENDIX Appendix A I/I Study Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 1 INTRODUCTION The City of Arden Hills is required to prepare a Comprehensive Plan that aligns with the Metropolitan Council’s Metropolitan System Plan every ten years per Minnesota Rule 473.858. One component of the Comprehensive Plan is the Sanitary Sewer Plan, which describes the existing sanitary sewer system and outlines the timing and sequence of future improvements. The Sanitary Sewer Plan allows the City and the Metropolitan Council to build and improve their sanitary sewer collection and treatment systems in the most efficient and cost-effective manner. The City of Arden Hills is entirely within the 2040 Metropolitan Urban Service Area (MUSA), so sanitary sewer interceptors and treatment are provided by the Metropolitan Council Environmental Services (MCES) system. The City is responsible for local wastewater collection and conveyance, which has historically been self-supporting through fees paid by users. The City of Arden Hills’ Sanitary Sewer Plan was developed to conform to the Metropolitan Council’s Thrive MSP 2040 Water Resources Policy Plan. The Thrive MSP 2040 Plan was approved in May 2015 and outlines regional goals for the wastewater system, including environmental sustainability, water reuse, and water conservation. Additionally, the Thrive MSP 2040 Plan includes population, household, and employment projections, and projected wastewater flows. As a result of projected population and land use changes in Arden Hills, the Metropolitan Council estimates that sanitary sewer flows will increase approximately 19 percent between now and 2040. The greatest increase in flow is expected from the development of the Twin Cities Army Ammunition Plant (TCAAP) site in the north part of the City. This Sanitary Sewer Plan outlines the locations in which the Metropolitan Council can expect to see increased wastewater flows, allowing the Council to determine if capacity upgrades will be required at regional wastewater treatment plants and interceptors. This plan also serves as a guiding document for City infrastructure improvements and expansion. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 2 BACKGROUND The City of Arden Hills is located in Ramsey County north of the Twin Cities. Arden Hills is bordered by the Cities of Shoreview, Roseville, New Brighton, and Mounds View. Much of Arden Hills is residential, with commercial, industrial, and office development located along its eastern border and Interstate Highway 694. Approximately 11 percent of the area of the City is occupied by lakes and wetlands. Arden Hills has been designated entirely as a suburban community. This designation indicates that the City experienced continued growth through the 1980s and 1990s. The Metropolitan Council expects Arden Hills to, “plan for forecasted population and household growth at average densities of at least 5 units per acre for new development and redevelopment … and to target opportunities for more intensive development near regional transit investments.” EXISTING SANITARY SEWER SYSTEM The City of Arden Hills’ sanitary sewer system is a collection system only, as described previously. The existing sanitary sewer system is shown in Figure 1. The system collects and conveys the City’s wastewater to five MCES Meters (M051, M052, M054, M059, and M203) and their associated MCES Interceptors (1-RV-432, 1-RV-432, 1-RV-431, 2-NB-100, and 4-NS-524), as shown in Figure 2. MCES Meter M203 does not currently receive flow from Arden Hills, but is planned to receive future flows from the TCAAP development. All of the wastewater collected in the City of Arden Hills is conveyed through the MCES system to the MCES Metropolitan Wastewater Treatment Plant (WWTP) located southeast of St. Paul on the Mississippi River. The Metropolitan WWTP has a capacity of 251 MGD, provides advanced secondary treatment with chlorination/dechlorination, and discharges treated effluent to the Mississippi River. It also generates energy from the residual biosolids for in-plant use. Service Districts The sanitary sewer system has been divided into eighteen (18) sewer districts. These districts, shown in Figure 2, correspond to the fourteen (14) lift stations, two existing gravity networks (MCES 54, MCES 59), and two future networks for the TCAAP development (North, South). The Arden Hills Army Training Site (AHATS) discharges via a private forcemain into district MCES 59. Gravity Sewer The City of Arden Hills’ gravity sewer system consists of 8-inch to 21-inch diameter polyvinyl chloride (PVC) pipe, reinforced concrete pipe (RCP), vitrified clay pipe (VCP), and cured-in- place pipe (CIPP). Nearly the entire system has been televised over the last twenty years, and approximately one quarter of the pipes in the system have been lined over the last fifteen years. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 3 Lift Stations The City’s current system includes fourteen lift stations, as summarized in Table 1. All but one of the City’s lift stations are either new or have been rehabilitated since 1990; the rehabilitation of Lift Station 11 was completed in 2017. Table 1. Existing Lift Station Summary Lift Station Location Year Built Pump Rehab. Wet Well Rehab. Controls Rehab. LS 1 Cleveland Ave N near Elmer L. Anderson Memorial Tr 1961 2012 2012 2012 LS 2 New Brighton Rd in Charles Perry Park 1983 2011 2003 2011 LS 3 Lake Johanna Blvd near Siems Court 1999 - - - LS 4 Ridgewood Rd and Arden Pl 1998 2013 2005 2013 LS 5 Tony Schmidt Regional Park and Lake Johanna Blvd 1977 2011 2003 2011 LS 6 Lake Johanna Blvd south of Stowe Ave Unknown 1996 - 1996 LS 7 Shorewood Dr Unknown 2004 2004 2013 LS 8 Ingerson Rd 1976 2011 2001 2011 LS 9 Ridgewood Rd and Edgewater Ave Unknown 2013 2005 2013 LS 10 Cleveland Ave N and County Rd E2 1989 - - - LS 11 Hwy 96 and Prior Ave N near Arden Manor Park 1971 2017 2017 2017 LS 12 Thom Dr and New Brighton Rd 1970 2012 2012 2012 LS 13 Karth Lake Dr and Pleasant Dr Unknown 2012 2012 2012 LS 14 Hamline Ave N and Paul Kirkwood Dr 1995 - - - Community Treatment Systems There are no public or private community treatment system within the City of Arden Hills. All properties within the City are served by the public collection system or by individual sewage treatment systems. Intercommunity Flows The City of Arden Hills has intercommunity sanitary sewer connections with three other communities, as listed in Table 2 and indicated in Figure 2. The City has not entered into any intercommunity service agreements since Dec. 31, 2008. However, the City does plan to enter into a new Joint Powers Agreement with Mounds View and MCES for TCAAP sewer ownership, maintenance, and billing. Table 2. Intercommunity Flows City Flow TO Arden Hills Flow FROM Arden Hills Mounds View - TCAAP Area Roseville 58 services 53 services Shoreview - 2 services Total 58 services 55 services + TCAAP Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 4 FIGURE 1 Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 5 FIGURE 2 Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 6 Individual Sewage Treatment Systems Nearly all properties within the City of Arden Hills are served by the public collection system. Currently, there are only two (2) individual sewage treatment systems (ISTS) in operation in the northwest corner of the City. The locations of these ISTS are shown in Figure 3. The two properties are: • 5400 Highway 8 (State of Minnesota) • 5420 Highway 8 (State of Minnesota) These two State of Minnesota properties are exempt from City requirements. The TCAAP development includes a proposed sanitary sewer extension which will be able to serve these two facilities, enabling the abandonment of their ISTS. The City Code requiring connection to the public collection system is excerpted below. 1010.02 Connections Required. Subd. 1 Existing Buildings. Any building used for human habitation and located on property adjacent to a sewer main, or in a platted block through which the system extends, shall be connected to the municipal sanitary sewer system within two (2) years from the date on which a connection is available to the building. Subd. 2 New Buildings. All buildings constructed after the adoption of this code within the City on property adjacent to a sewer main or in a platted block through which the municipal sanitary sewer system extends, shall be provided with a connection to the sewer system for the disposal of all human wastes. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 7 FIGURE 3 Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 8 FORECASTS Population The Metropolitan Council publishes population and sewer usage forecasts for each city in the Metropolitan Area. These forecasts serve to help cities prepare infrastructure for growth and to promote continued maintenance of municipal infrastructure. The forecast data in Table 3 is from the Metropolitan Council’s Local Planning Handbook Community Page for Arden Hills and includes the total and sewered population, number of households, and employment. In the case of Arden Hills, where effectively the entire City is sewered, these values are the same. Table 3. Population Projections Total & Sewered Year Population Households Employment 2010 9,552 2,957 12,402 2020 10,000 3,200 15,000 2030 12,000 4,100 16,300 2040 13,500 4,600 17,500 These projections are separated by MCES Meter Service Area in Tables 4-A and 4-B. Table 4-A. Projections by Meter Service Area & Interceptor M051 1-RV-432 M052 1-RV-432 M054 1-RV-431 Year Pop. Hhds. Empl. Pop. Hhds. Empl. Pop. Hhds. Empl. 2010 1,999 619 7,158 264 82 1,579 3,334 1,032 1,361 2020 1,999 619 7,258 264 82 1,579 3,334 1,032 1,361 2030 2,184 682 7,278 264 82 1,579 3,334 1,032 1,361 2040 2,184 682 7,298 264 82 1,579 3,334 1,032 1,361 Table 4-B. Projections by Meter Service Area & Interceptor M059 2-NB-100 M203 4-NS-524 Year Pop. Hhds. Empl. Pop. Hhds. Empl. 2010 3,955 1,224 2,304 0 0 0 2020 3,956 1,264 2,324 447 203 2,478 2030 4,008 1,368 2,414 2,210 936 3,668 2040 4,008 1,368 2,504 3,710 1,460 4,758 Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 9 Wastewater Flows All of the wastewater flow from the City of Arden Hills is treated at the Metropolitan WWTP, and any increase in wastewater flow will be treated at the Metropolitan WWTP as well. Table 5 lists the projected total average wastewater flow for Arden Hills from MCES and from this Sanitary Sewer Plan. Note that the projections used in this report are greater than the MCES projections since they rely on flow estimates for each parcel of developable land. Table 5. Total Wastewater Projections 2020 Average Flow (MGD) 2030 Average Flow (MGD) 2040 Average Flow (MGD) MCES 0.93 1.04 1.09 Sanitary Sewer Plan 0.90 1.13 1.37 MGD = millions of gallons per day Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 10 SANITARY SEWER DESIGN CRITERIA Land Use The City’s existing and 2040 land use maps were used in the development of this plan. Detailed information and figures regarding Arden Hills’ land use is included in the City’s 2040 Comprehensive Land Use Plan. Using existing land use, metering data, and future land use information, current and future flows were calculated and divided by service area as described below. Estimated Average Flows – Existing To estimate the flows in trunk mains throughout the City, metering data was obtained from the Metropolitan Council. Flows were assigned proportionally to each service district based on the acreage of residential, mixed use, commercial/industrial/office, and institutional land within each area and typical flows per acre for each particular land use. Estimated Average Flows – 2040 Build Out Once average flows were estimated, future flows were projected based on the planned 2040 land use from the Land Use Plan. Parcels that are planned to be developed were assigned wastewater flow rates in accordance to their land use type. Table 6 lists the assigned flows, which include design considerations for inflow and infiltration (I/I). Refer to the Inflow and Infiltration section of this report for more information about I/I as it relates to Arden Hills’ sanitary sewer system. Table 6. Assumed Wastewater Generation by Land Use Type Land Use Average Flow (gpd/acre) Low Density Residential 720 Neighborhood Residential 900 Medium Density Residential 1,350 High Density Residential 1,890 Town Center 7,380 Public/Institutional 250 Commercial/Industrial/Office 800 Future flows from areas of redevelopment were added to existing flows to determine if existing pipe capacities will be sufficient. In locations in which development will lead to pipes that are under capacity, recommendations are made to address the issue. Areas that will need to be served in the future were evaluated to determine the required sewer diameters and improvements to serve these areas. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 11 Peak Flow Factors To ensure that the sanitary sewer system is capable of handling flow fluctuations throughout the day, peak flow factors are assigned based on average flows. The peak factors are provided by the Metropolitan Council and are based on average flow volumes. Pipes that serve small generator customers are more likely to experience large fluctuations in flows. Therefore, the peak factor decreases as average flow increases. The Metropolitan Council peak flow factors used in this report are shown in Figure 4 below. These factors include consideration of inflow and infiltration. Figure 4. MCES Peak Factors for Sanitary Sewer Design 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 0 5 10 15 20 25 30MCES Peak Flow FactorAverage Flow (MGD) Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 12 SANITARY SEWER TRUNK RECOMMENDATIONS The proposed future sewer system for the City of Arden Hills, including gravity mains, forcemains, and lift stations, is shown in Figure 5, as follows. The required infrastructure additions were determined based on the areas that the City is planning to redevelop by 2040. This report includes only oversized sewer lines (greater than 8-inch) and does not depict lateral lines. The design and siting for lateral lines should be completed in conjunction with development plans and platting. The location of such lines will be dependent on parcel layout and the design of new roads. It is possible that small scale lift stations will be required within developments. The exact alignment of the proposed mains and lift stations may change during the design phase of each project. The purpose of this report is to provide the City with a document that can be used to plan for large infrastructure additions and replacements. Lift Station Analysis The estimated 2040 peak flows and subsequent remaining capacity for each of the City’s fourteen (14) lift stations are shown in Table 7. The peak flows listed include the pumping rates of any lift stations directly upstream in order to be conservative. All lift stations are projected to have adequate pumping capacity to convey peak wastewater flows through the year 2040. Table 7. Projected 2040 Peak Flows by Lift Station Lift Station Pumping Capacity (gpm) 2040 Peak Flow (gpm) Remaining Capacity (gpm) LS 1 240 28 212 LS 2 970 647 323 LS 3 240 52 188 LS 4 240 218 22 LS 5 660 473 187 LS 6 80 3 77 LS 7 220 86 134 LS 8 1,170 1,050 120 LS 9 280 81 199 LS 10 80 21 59 LS 11 350 204 146 LS 12 120 33 87 LS 13 460 87 373 LS 14 180 16 164 LS 15 * 1,010 * gpm = gallons per minute *Future lift station to serve the TCAAP development south of County Road H. The 2040 peak flow projected in this report is less than that listed in the TCAAP Site Redevelopment Infrastructure Preliminary Design Report from June 2015 because a lower flow per SAC unit of 180 gallons per day was used. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 13 Trunk Sewer Analysis The estimated 2040 peak flows and subsequent remaining capacity in the City’s trunk sewer lines are shown in Table 8. Trunk sewers of sub-districts served by a small network of 8-inch gravity main are not included in this analysis. None of the trunk gravity sewers are expected to exceed their capacity by the year 2040. Table 8. Trunk Sewer Capacity Analysis District Location Diameter Capacity (gpm) 2040 Peak Flow (gpm) Remaining Capacity (gpm) LS 2 Perry Park 15" 1,120 647 473 LS 5 Yard Waste Collection Site 15" 1,120 473 647 LS 8 Ingerson Rd 18" 1,630 1,050 580 LS 9 Ridgewood Rd 10" 520 81 439 MCES 54 N Prior Ave 21" 2,250 605 1,645 MCES 59 Gateway Blvd 18" 1,630 1,223 407 gpm = gallons per minute Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 14 MCES Interceptor Facility Forecasts The MCES Interceptors used by the City of Arden Hills and the 2040 forecasted flows to those interceptors are listed in Table 9. The wastewater flow projections listed include only the flow generated within the City of Arden Hills. Table 9. Projected 2040 MCES Interceptor Use MCES Meter MCES Interceptor 2040 Average Flow (MGD) 2040 Max Flow (MGD) M051 1-RV-432 0.37 1.34 M052 1-RV-432 0.03 0.12 M054 1-RV-431 0.19 0.73 M059 2-NB-100 0.31 1.13 M203 4-NS-524 0.46 1.61 Individual Sewage Treatment Systems As future development occurs and the sanitary sewer system is expanded to cover the northern portion of the City, the two (2) remaining State of Minnesota ISTS in the northwest corner of the City can be disconnected and properly abandoned. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 15 FIGURE 5 Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 16 INFLOW AND INFILTRATION General Inflow is water, typically stormwater, which enters the sewer system through broken manhole covers, sewer cleanouts, sump pumps, foundation drains, and rain leaders. Infiltration is water, typically groundwater, which leaks into the sewer system through cracks in the sewer mains, laterals, joints, and manholes. Water from inflow and infiltration (I/I) can consume available capacity in the wastewater collection system and increase the flow into treatment facilities. In extreme cases, the added flow can cause bypasses or overflows of raw wastewater. This extra flow also requires a larger capacity in the city’s collection and treatment components, which results in increased capital, operation and maintenance, and replacement costs. As a sewer system ages and deteriorates, I/I can become an increasing burden on a City’s system. Therefore, it is imperative that I/I be reduced whenever it is cost effective to do so. In 2006, the MCES began an Ongoing I/I Program which requires communities within their service area to eliminate excessive I/I. The MCES establishes annual I/I goals for each community discharging wastewater into the Metropolitan Disposal System (MDS) based on average daily flows, adjustments for community growth, and I/I mitigation peaking factors. The City of Arden Hills was assessed a surcharge in 2007 and initiated an I/I identification program that year to diagnose the extent and location of the I/I and to prepare a reduction plan. The City also had exceedances in MCES Metershed M051 from a June 21, 2013 storm and in MCES Metersheds M051 and M054 from a June 19, 2014 storm. Over the past ten years, the City has performed flow monitoring, smoke testing, televising, manhole rehabilitation, sump pump inspections, sewer lining, and sewer replacement. More details on these activities is provided in the I/I Reduction section. Flow metering data is available for the MCES Meters that measure the City’s wastewater flow, and an analysis of this data as it relates to I/I is presented on the following page. The City’s strategies, programs, investments, and goals for reducing I/I are listed in this section as well. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 17 I/I Analysis Arden Hills’ sanitary sewer system currently consists of approximately 49 miles of gravity main, 14 lift stations, and 3.6 miles of forcemain. Approximately 26 percent of the gravity mains have been lined in the last fifteen years, primarily in the southern half of the system. Approximately 38 percent of the residential housing in the City was constructed before 1970. The only I/I evaluation that has been done for pre-1970 era private services is the televising of their wye connection during the trunk main televising listed in Table 11 in the next section. I/I reduction activities are discussed in greater detail in the next section. The amount of clearwater flow generated within the City was estimated by calculating the average annual and peak month I/I rates, equal to the average wastewater flow minus the base wastewater flow, using data from 2012-2016. The average flow, both annual and monthly, was calculated from MCES meter data. The peak month flow was determined for each year from 2012-2016, and then those peak month flows were averaged to give the value listed in Table 10. The base flow was calculated as the difference between average dry weather flow and groundwater infiltration, based on hourly meter data from a period of nine days of dry weather (three days since a rain event) and high groundwater level (spring) in March 2017. The groundwater infiltration rate was calculated as the average flow from 1:00-6:00 AM over the same nine-day period. Table 10. Estimated I/I Rate Metershed M051 M052 M054 M059 Total Average Flow (MGD) 0.345 0.029 0.192 0.261 0.826 Peak Month Flow (MGD) 0.498 0.039 0.278 0.318 1.134 Base Flow (MGD) 0.142 0.015 0.078 0.108 0.344 Average Annual I/I Rate (MGD (%)) 0.202 (59%) 0.014 (48%) 0.114 (59%) 0.153 (58%) 0.482 (58%) Peak Month I/I Rate (MGD (%)) 0.356 (71%) 0.024 (62%) 0.201 (72%) 0.210 (66%) 0.790 (70%) There are approximately 11 miles of vitrified clay pipe (VCP) in the City that have not yet been lined, located primarily in the residential areas east of Lake Johanna and west of Valentine Lake. These pipe segments are more susceptible to infiltration and are likely the most significant public I/I source. All of these pipes are planned to be lined over the next five years. Private sources, such as leaking service laterals or unidentified, illicit sump pump or foundation drain connections, likely contribute a minimal portion of the remaining I/I. The City televises the wye connection of service laterals in conjunction with its sewer lining and rehabilitation projects in an effort to identify private I/I sources, however there may be faults in private systems that are not captured at the time of televising. The City may consider conducting flow monitoring immediately before and after its sewer lining projects to quantify the impact of the lining and to identify private I/I sources. Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 18 I/I Reduction The City’s strategy for preventing excess I/I includes requiring all development to conform to City standards. Arden Hills City Code prohibiting the discharge of stormwater to the sanitary sewer system and requiring the disconnection of existing I/I sources is excerpted below. Subd. 8 Prohibited Connections of Surface Water and Ground Water Discharge Facilities to the City's Sanitary Sewer System. A. No person, owner, lessee or occupant of any parcel of land, building, or premises shall discharge, or permit to be discharged, directly or indirectly, into the sanitary sewer system any surface water or groundwater including water from roofs, yards, lawns, streets, alleys, groundwater sump pumps, footing tile, or other natural precipitation. … Subd. 10 Removal of Prohibited Connections; Surcharge; City Reimbursement. Any person, owner, lessee or occupant, and any plumber or building contractor who has presently made or permitted to be made, or shall make or permit to be made, any connection or installation in violation of subdivision 8, shall immediately remove such connection or correct such an installation. … The City has several programs in place to both identify and reduce I/I and has completed projects nearly every year since 2007 to that end. A summary of these I/I reduction projects and their costs, as known, is given in Table 11. Table 11. I/I Reduction Activities Year Project Cost (if known) 2008 I/I Investigation, I/I Study by Bonestroo Flow monitoring, smoke testing, televising, lift station pump calibration Manhole Rehabilitation Project Sewer Lining Project 2009 Sump pump inspections, manhole inspections, televising Manhole Rehabilitation Project Sewer Lining Project $82,989.50 2010 Sump pump inspections, manhole inspections Sewer Lining & Replacement Project (chimney seals) $111,765.00 2011 Sump pump inspections Sewer Lining Project $399,444.50 2012 Grant applications for 2013 Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 19 2013 Sewer Lining Project $625,526.05 2014 Grant applications for 2015 2015 Sewer Lining Project $507,465.50 2017 Sewer Lining Project $200,000.00 2018 Street & Utility Project (sewer lining and spot repairs) Est. $285,600 I/I Implementation The City will continue to implement the investigation and rehabilitation activities listed in Table 12. The City has ongoing reviews of flows and discussions with consulting engineers to develop the next stage of improvement plans and has planned for the I/I reduction investments listed in Table 13. As mentioned previously, the approximately 11 miles of remaining unlined VCP pipe will be a priority for rehabilitation over the next five years. In addition, the system will continue to be televised and repaired every other even year in conjunction with the City’s street improvement projects. As noted above, project areas have been identified for 2018. Significant improvements have been made over the last ten years, and the City of Arden Hills remains committed to identifying and eliminating sources of I/I in its sanitary sewer system. Table 12. I/I Implementation Investigation Rehabilitation Smoke testing to reveal direct inflow sources Disconnect catch basins, realign manholes covers Physical survey of manholes Properly seal manholes Internal televising of sewers CIPP line or replace sewers Rain leader inspections Reroute roof drains to ground Sump pump inspections Reroute sump pump discharge to ground Foundation drain inspections Reroute to sump pump discharging to ground Service lateral inspections Repair or replace leaking services Follow up inspections As necessary Comprehensive Sanitary Sewer Plan City of Arden Hills, MN WSB Project No. 3455-20 Page 20 COST ESTIMATES AND FINANCING The bulk of the improvements to the City’s sanitary sewer system will be made in conjunction with TCAAP development, including new trunk gravity mains and one lift station. The City has also budgeted for routine I/I reduction work and other system maintenance and rehabilitation. The proposed capital improvements to the sanitary sewer system and their estimated costs are listed in Table 1213. Table 1213. Capital Improvements Year Item Estimated Cost Biennial Sewer Lining and Rehabilitation $400,000 2019 Sewer Lining and Rehabilitation $200,000 2019 TCAAP Spine Rd Trunk Sewer & Lift Station $1,200,000 2020 Sewer Lining and Rehabilitation $200,000 2021 Sewer Lining and Rehabilitation $400,000 SUMMARY AND OUTCOMES The analysis provided in this Sanitary Sewer Plan is aimed to provide the City of Arden Hills and the Metropolitan Council assistance in planning for wastewater collection and treatment, including the planned development of the TCAAP area. It is anticipated that the design flows and criteria outlined will be used for utility planning as development continues within the City. Tables and figures can be utilized to create budget-level estimates and schematic representations of infrastructure improvements, with specific sizing and routing to be determined during the design phase. %&d( %&d( %&d( %&h( %&h( )m ?ÖA@ GâWX GiWX ?ÖA@ RosevilleNew BrightonShoreviewMounds ViewShoreview County Rd I WCounty Rd I W Lexington AveLexington AveCleveland Ave SWCounty Rd E2 Lake Valentine R d Sn e l l i n g A v e N County Rd EHamline AveCounty Rd 96 W Old Highway 8 NWCounty Rd D W County Rd F W SunfishLake BrennansPond Lake EmilyLake Marsden Lake MarthaLake Turtle Lake Johanna Lake LangtonLake PolynesianLake Rush Lake LittleJosephineLake OwassoLake GramsiePond Lake Long Lake Round Lake Farrel's Lake ValentineLake PoplarLake JosephineLake Island Lake LittleJohannaLake JonesLake Snail Lake Karth Lake ShoreviewLake Judy Lake PikeLake 2030 2040 2040 2030 2030 2030 2030 1 inch = 2,000 feet Document Path: K:\03455-200\GIS\Maps\CompPlan\Figure6-7_AreasOfPossibleRedevelopment.mxd Date Saved: 9/4/2018 10:35:41 AMFigure 6-7 Areas of Possible Redevelopment Arden Hills, MN VLDR - Very Low DensityResidential LDR - Low Density Residential MDR - Medium DensityResidential HDR - High Density Residential NR - Neighborhood Residential TC - Town Center NB - Neighborhood Business MB - Mixed Business COM - Commercial CMU - Community Mixed Use CC - Campus Commercial RMU - Retail Mixed Use OMU - Office Mixed Use FO - Flex Office IND - Light Industrial & Office PI - Public & Institutional UTL - Utility POS - Park & Open Space PP - Park Preserve WAT - Water RR - Railroad ROW - Right of Way Areas of Possible Redevelopment 2030 2040 Arden Hills Comprehensive Plan 0 2,000Feet¯ Page 1 of 2 AGENDA ITEM – 1C MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, City Clerk SUBJECT: Annual Permanent Sign Renewals Budgeted Amount: Actual Amount: Funding Source: $ $ $ Council Should Consider Providing direction regarding annual renewal of permanent signs. Background/Discussion The adopted Fee Schedule includes a $25.00 fee per sign for the annual renewal of permanent signage. An average of 150 businesses are licensed/registered with the City each year, but compliance regarding this particular fee has been low. For the past six years, the following number of businesses have been in compliance regarding payment of the permanent sign renewal fee: 32 in 2018; 32 in 2017; 41 in 2016; 36 in 2015; 32 in 2014; and 42 in 2013. Staff discussed the low compliance rate with the City Planner, who had indicated that City Code states “The Sign Code requires that the Council set fees annually but not that the City has to charge an annual renewal fee”. In other words, City Code does not include language that specifically relates to the requirement of an annual permanent sign renewal (as it does for pet licensing, City contractor licensing, business licensing, etc.). Staff also consulted the City Attorney who concurred that City Code language does not reference requiring this type of annual renewal. Based on current code language ambiguity and historical low compliance rates, City staff is requesting Council feedback and direction regarding the following: • Does Council recall the history/background regarding the implementation of the annual permanent sign renewal charge? Page 2 of 2 • Should staff strive to increase the compliance rate and if so, how to accomplish this? (Note staff would likely have to amend the ordinance language regarding collection of these fees and a system or inventory would need to be created and maintained with code enforcement to follow for future non-compliance issues) • Based on a low compliance rate and the lack of verbiage in City Code allowing this fee, would the Council be agreeable to removing this fee? Should the Council recommend removal of the fee, this will be noted in the proposed draft 2019 Fee Schedule, which will be presented to the Council at the November work session. Staff is asking for guidance at this time due to the fact that staff is preparing annual business license/registration renewal notification letters, which traditionally are mailed out by the end of October/beginning of November. It should be noted that staff is asking for direction as it relates strictly to the annual renewal for permanent signs and would not affect the City’s requirements regarding an actual permit for a permanent sign erection (the initial sign permit) or a permit for a temporary sign. Page 1 of 1 AGENDA ITEM – 1D MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Dawn Skelly, Communications Coordinator SUBJECT: Communication and Information Survey Results and Recommendations Budgeted Amount: Actual Amount: Funding Source: $ $ Council Should Consider Developing additional communication vehicles for residents by investing in a more robust communications infrastructure to meet the needs of current and future resident populations. Background A survey was sent to all residents with their utility bills. Additionally a link to the survey was included on Facebook and in the City’s newsletter and News Alerts. The response rate was good at 12 percent. Discussion Review survey results, observations, recommendations and discuss next steps. Attachments A. Communication and Information Survey Results B. Copy of the Printed Survey Arden Hills City Council Work Session October 15, 2018 Communication & Information Survey Results Presented by Dawn Skelly Mayor David Grant Councilmembers: Brenda Holden, Fran Holmes, Dave McClung, and Steve Scott City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well-maintained infrastructure, fiscal soundness, and our long- standing tradition as a desirable City in which to live, work, and play. Communication and Information Survey In June, the Council authorized sending a communication and information survey to all households to get data on communication channels, vehicles and preferences. The survey was developed and sent in mid July in utility billing envelopes to 2,429 households. Additionally, it was sent in utility billing electronic statements using Survey Monkey links to 393 households, for a total of 2,822 households receiving the survey. The survey was open July 12-October 1. The City received 251 responses via paper and 76 responses via online links and garnered a total response rate of 12 percent (Unique links to the survey were posted on Facebook and totaled just 13 responses). Data, observations, recommendations and next steps follow. The data is broken down by those who completed the paper survey vs. those who completed the survey via an online link. Communication Survey-Paper Responses This group primarily reads the monthly newsletter when it is mailed. Communication Survey-Paper Responses Road construction, recycling, public works projects, eco--living, Council benchmarks, and business expansion news are the most useful. They access news via print, but 30 percent have a computer or laptop that they also use. Communication Survey-Paper Responses This group is open to receiving emails or texts about emergency notifications, road construction and public works projects (hydrant flushing, plowing, etc.) Communication Survey-Paper Responses Just under 50 percent say the never visit the City website. Comments show satisfaction with printed newsletter, but also the desire to receive news via emails and Facebook. Communication Survey-Paper Responses How can we improve the way you get your news and information responses continued. 1 2 Communication Survey-Paper Responses How can we improve the way you get your news and information responses continued. Communication Survey-Paper Responses Communication Survey-Electronic Responses Respondents included the following: 57 via electronic utility bill, 13 from Facebook and 6 from the News Alert. That’s 76 responses, which represents ~ 3 percent of all households, but 20 percent of those who receive an electronic bill. This audience likes to receive news at various times, primarily weekly and monthly, via the newsletter and Facebook. Communication Survey-Electronic Responses Respondents are often at a computer or using a mobile device. They prefer newsletter information in both print and email formats. Road construction, public works, recycling, Parks and Rec and business news are important to them They are open to receiving emails or texts about road construction, city development projects, public works projects, and emergency notices Communication Survey-Electronic Responses They visit the City website quarterly or monthly, and are likely parents between the ages 36-45, who have lived in Arden Hills for 1 -20 years. Observations Good participation, as far as surveys go! 327 people completed the survey out of 2,822 households, which is about a 12% response rate. People who were engaged electronically had a higher response rate, nearly double that of paper responders. Arden Hills residents are generally satisfied with the newsletter. Nearly everyone reads it! Arden Hills residents would like to receive the newsletter in both print and electronic formats. Of those who responded to the survey via snail mail, 30 percent use a computer to access news. Arden Hills residents (both paper based and electronic respondents) are interested in receiving news alerts about emergency notices, road construction, public works projects (i.e. hydrant flushing, plowing) and development projects. Council columns and feature articles are not seen as useful as other news topics for both paper and electronic respondents. Older residents also did not find Parks and Rec news as useful, while younger residents did not find recent Council action as useful. The individual comments regarding ways to improve communication focus on multiple channels that include mailed newsletter, emailed newsletter, email notices and social media. They want all of these news channels. Arden Hills residents who responded have primary representation from two demographic groups: Those 66 and older who have lived in Arden Hills for 30 or more years Those 36-45 who have lived in Arden Hills 11-20 years. Interestingly, this group is equally bookended by those ages 26-35, 46-55 and 66-75—a diverse range of age groups to serve. Recommendations Continue producing, printing and mailing a print version of the newsletter And Develop an e-letter version by posting news alerts and collating items into an html email with active web links. Email weekly to residents. Develop, promote and regularly send e-news alerts related to emergency notices, road construction, public works projects (i.e. hydrant flushing, plowing), development projects. This requires list management and permission-based marketing, as well as the ability to notify by geographic area in a timely manner. Develop calendar of annual public works maintenance projects and communicate about these via email and social media. Requires prior knowledge of public works activities. Post more information to Facebook Create links back to website news alerts. Consider additional informational mailers to residents. Audit what is currently postmarked (i.e. postcards, flyers, construction newsletters, utility bill inserts). Although 30 percent of older respondents indicate they use a computer to access news, more than 50 percent do not use a computer. Are we reaching them with timely news? Develop a City page on the neighborhood social networking app called Nextdoor. Although this wasn’t in the survey,there are numerous residents on social neighborhood networks. This could greatly increase the visibility of the City’s messages and drive outreach with residents. Next Steps Decide whether to take action on the recommendation(s). If answer is yes, develop plan and timeline for roll out of the recommendation(s). To provide additional communication vehicles requires additional resources. Decide whether to commit to additional resources. City of Arden Hills Communication and Information Survey Please complete this survey online at https://www.surveymonkey.com/r/AHcommunication or fill it out below to help us improve our City news and information services. 1. How often do you prefer to receive City news? As soon as possible Weekly Monthly Quarterly 2. Which City news vehicles do you read, watch or subscribe to? City Newsletter, Arden Hills Notes City News Notifications (emailed or texted to you or viewed on the City website) The City’s Facebook page The City’s Twitter feed Cable Channel 16 Council and Planning & Zoning meetings City website livestream or playback of Council meetings 3. Which device(s) do you use to access City news? Desktop or laptop computer Mobile phone Tablet Television None 4. Which types of news are most useful? Business expansion stories City Council Benchmarks action City Council columns Eco living (yard waste, lawn care) Feature stories Parks & Recreation program information Public Works projects Recycling news and information Road and construction news Other_______________________ 5. Which format of newsletter do you prefer? Printed Newsletter Emailed Newsletter Both 6. Are there notifications you would like to receive by email or text messaging? If yes, which types? General City News City Council Agendas and Minutes City Council Action News about City road construction News about City development projects News about Planning & Zoning action Public hearing notices and meetings Public Works projects in your area (hydrant flushing, snow plowing) Parks and Recreation offerings Parks and Recreation program cancellations Business News Emergency Notifications Other ______________________ 7. How often do you visit the City website? Weekly Monthly Quarterly Yearly Never 8. How can we improve the way you get your City news and information? Please tell us more about you. 9. What is your age? 18-25 26-35 36-45 46-55 56-65 66-75 76-85 86+ 10. How long have you lived in Arden Hills? Less than five years 6-10 years 11-20 years 21-30 years 30+ years Thank you! Please place in your utility bill return envelope and mail to City Hall. Created 6/25/18 Page 1 of 1 AGENDA ITEM – 1E MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Sue Polka, Public Works Director/City Engineer SUBJECT: Hazelnut Park Future Plans Discussion Budgeted Amount: Actual Amount: Funding Source: $ $ $ A verbal update will be provided at the work session. DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: TCAAP Public Forum Planning Update Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider The Council should provide further direction on the planning of the upcoming TCAAP Public Forum. Background The City Council gave direction to staff to plan a TCAAP Public Forum to provide residents with an update on TCAAP, and allow residents to provide feedback to the City Council. Council directed staff to work with current consultants to compile the necessary materials, and presentations would be made by staff and/or their respective consultants. In collaboration with our communications consultant, staff is recommending the forum begin with a thirty minute long presentation on the areas of interest, and then have different stations set up for the different topics and allow attendees to ask questions based on their area of interest. Staff is planning on requesting written feedback from attendees on the topics to provide to Council. The topics to be discussed are: -A brief TCAAP history -Infrastructure overview -Met Council SAC overview -City planning cost recovery -Special Taxing District v. Association -TCAAP parks overview -Civic Space overview Attachment N/A AGENDA ITEM –1F MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: TCAAP Negotiator Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider The Council should provide further direction on moving forward with a TCAAP negotiator. Background At the Special City Council Work Session on October 8, 2018 the City Council gave direction to begin vetting candidates to assist the City with the TCAAP negotiations. Staff will have talked to candidates by October 15, 2018, and a verbal update will be provided at the work session. Attachment N/A AGENDA ITEM –1G MEMORANDUM DATE: October 15, 2018 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Council Tracker Update Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider The Council should provide further direction on items presented on the Council Request Tracker. Background City Council will receive a verbal update on items the Council has previously directed staff to research and/or bring forward. Attachment N/A AGENDA ITEM –1H MEMORANDUM