HomeMy WebLinkAbout06-05-19 PCAPPROVAL OF THE AGENDA
APPROVAL OF MINUTES
May 8, 2019 Planning Commission Regular Meeting
05 -08 -19 PC.PDF
PLANNING CASES
Planning Case 19 -007 –4101 Gale Circle Site Plan Review (No Public Hearing
Required)
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
Planning Case 19 -001 –Brausen Automotive Repair –Site Plan Review And Final
Planned Unit Development (Public Hearing Required)
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
UNFINISHED AND NEW BUSINESS
Zoning Code Amendment
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:
Nick Gehrig
Commissioners:
Steven Jones
James Lambeth
Subbaya
Subramanian
Paul Vijums
Jonathon Wicklund
Clayton
Zimmerman (alt)
Council Liaison:
Dave McClung
Planning Commission
June 5, 2019
6:30 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting,
strong residential neighborhoods, vital business community, well -maintained
infrastructure, fiscal soundness, and our long -standing tradition as a desirable
City in which to live, work, and play.
Agenda
CALL TO ORDER
1.
2.
2.A.
Documents:
3.
3.A.
Documents:
3.B.
Documents:
4.
4.A.
Documents:
5.
5.A.
5.B.
6.
APPROVAL OF THE AGENDAAPPROVAL OF MINUTESMay 8, 2019 Planning Commission Regular Meeting05-08 -19 PC.PDFPLANNING CASESPlanning Case 19 -007 –4101 Gale Circle Site Plan Review (No Public Hearing Required)MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFPlanning Case 19 -001 –Brausen Automotive Repair –Site Plan Review And Final Planned Unit Development (Public Hearing Required)MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
UNFINISHED AND NEW BUSINESS
Zoning Code Amendment
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:Nick GehrigCommissioners:Steven JonesJames LambethSubbaya SubramanianPaul VijumsJonathon WicklundClayton Zimmerman (alt) Council Liaison:Dave McClung Planning Commission June 5, 2019 6:30 p.m. City Hall Address:1245 W Highway 96 Arden Hills MN 55112 Phone:651 -792 -7800 Website : www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. AgendaCALL TO ORDER1.2.2.A.Documents:3.3.A.Documents:3.B.Documents:
4.
4.A.
Documents:
5.
5.A.
5.B.
6.
Approved: June 5, 2019
CITY OF ARDEN HILLS, MINNESOTA
PLANNING COMMISSION
WEDNESDAY, MAY 8, 2019
6:30 P.M. - ARDEN HILLS CITY HALL
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Chair Nick Gehrig called to order the regular Planning
Commission meeting at 6:30 p.m.
ROLL CALL
Present were: Chair Nick Gehrig, Commissioners James Lambeth, Subbaya Subramnian,
Jonathan Wicklund, and Clayton Zimmerman.
Absent: Commissioners Steven Jones and Paul Vijums.
Also present were: City Planner Matthew Mrosla, Planning Consultant Jane Kansier and
Councilmember Dave McClung.
APPROVAL OF AGENDA – MAY 8, 2019
Chair Gehrig stated the agenda will stand as published.
APPROVAL OF MINUTES
April 3, 2019 – Planning Commission Regular Meeting
Commissioner Zimmerman moved, seconded by Commissioner Lambeth, to approve the
April 3, 2019, Planning Commission Regular Meeting as presented. The motion carried
unanimously (5-0).
APPOINTMENTS
A. Planning Commission Reappointment
City Planner Mrosla administered the Oath of Office to Commissioner James Lambeth.
PLANNING CASES
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 2
A. Planning Case 18-014; Mounds View School District 1900 & 1901 Lake Valentine
Road – Final PUD and Comprehensive Plan Amendment – Public Hearing
Planning Consultant Kansier explained Mounds View Public Schools has submitted an
application for a Master and Final Planned Unit Development (PUD). The Applicant is
requesting to construct 27,300 square feet of additional classroom space and a 49,000 square feet
gymnasium addition. The property, located at 1900 Lake Valentine Road, is zoned R-1, Single
Family Residential and is guided as Public and Institutional on the Land Use Plan.
Planning Consultant Kansier stated in addition, the applicant is requesting to amend the 2040
Comprehensive Plan. The Applicant is requesting to modify the future Land Use of 1901 Lake
Valentine Road, the former First Student Bus Garage from Low Density Residential to Public
and Institutional in the 2040 land use plan. This property will be used for high school student and
staff parking. The PUD is required to allow the two non-contiguous parcels to be used as a
single use.
Planning Consultant Kansier commented this item was originally scheduled for a public
hearing on April 3, 2019. However, just prior to the hearing, the Applicant submitted revised
plans that were significantly different than the previous plans reviewed by staff. As a result, the
item was tabled to allow time for additional plan review and a second neighborhood meeting.
Planning Consultant Kansier indicated the last major addition to the high school occurred in
2000 when the track and field stadium was reconstructed and additions were made to the main
entrance, auditorium, orchestra/choir area, storage, computer lab, staff dining area, woodshop,
and classrooms.
Planning Consultant Kansier reported the Applicant is proposing an addition totaling 76,300
square feet, including 49,000 square feet for gymnasiums and 27,300 square feet for a total of
seven classrooms. Interior remodels of the existing building include 65,000 square feet. The
subject property is located at 1900 Lake Valentine Road. The Applicant recently acquired the
former First Student school bus garage located directly north of the high school at 1901 Lake
Valentine Road. The Applicant is proposing to repave and restripe the parking lot for more
efficient car parking. The existing building on the site will be used for cold storage. A more
intensive use of the building may be proposed at a later date.
Site Data
Land Use Plan: PI: Public & Institutional and LRR: Low Density Residential
Existing Land Use: Institutional: High School, and former site of First Transit bus
garage
Zoning: R-1: Single Family Residential District
Current Lot Sizes: 65.65 Acres
Topography: The grades on the south side of Lake Valentine Road (existing
school site) vary about 20’ from the road (low point) to the
south side of the lot (high point). This site has been graded
over the years to accommodate the buildings, athletic fields
and parking lots. The lot on the north side of Lake Valentine
Road slopes towards the north, and has a 6’ variation from the
high point of the lot to the low point.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 3
Planning Consultant Kansier reviewed the surrounding area, the Plan Evaluation and Traffic
Study. She provided the following Findings of Fact for review:
1. The property located at 1900 Lake Valentine Road is designed for Public and Institutional
uses on the 2040 Land Use Plan map.
2. The property located at 1901 Lake Valentine Road is designated for Low Density
Residential uses on the 2040 Land Use Plan map.
3. The properties located at 1900 and 1901 Lake Valentine Road are located in the R-1
Single Family Residential District.
4. The R-1 district is consistent with the existing and proposed Public and Institutional
designation.
5. The Applicant has proposed a Master Planned Unit Development in order to include
noncontiguous parcels as a single use. Other components of the proposal are classroom
and gymnasium additions, reconfiguration of the bus parking lot and the staff and student
parking lots, and reconfiguration of athletic fields.
6. The Applicant has submitted a Master and Final Planned Unit Development.
7. The Master PUD is generally consistent with the requirements of the City Code.
8. Where the plan is not in conformance with the City Code, flexibility has been requested
by the Applicant and/or conditions have been placed on an approval that would mitigate
the nonconformity.
9. Flexibility through the PUD process has been requested in the following areas: planting
island coverage, tree replacement, building height, and wall signage.
10. The proposed development plan exceeds the minimum requirements of the City Code in
the following areas: lot size, building coverage, landscape coverage, setbacks, street trees,
perennials and shrubs, tree selection, lighting, screening, location and number of parking
stalls, aesthetics and freestanding signs.
11. The Master PUD is in conformance with the draft Arden Hills 2040 Comprehensive Plan,
as proposed to be amended. The properties at 1900 and 1901 Lake Valentine Road are
zoned R-1, Single Family Residential. Compatible uses such as educational campuses are
also intended for this zoning district.
12. With the applied conditions, the application is not anticipated to create a negative impact
on the immediate area or the community as a whole.
Planning Consultant Kansier stated staff recommends approval of Planning Case 18-014 for an
amendment to the 2040 Comprehensive Plan Land Use Map from the Low Density Residential
designation to the Public and Institutional designation subject to the following condition:
1. Approval of the Comprehensive Plan Amendment is subject to approval by the
Metropolitan Council.
Planning Consultant Kansier stated based on the submitted plans and findings of fact, staff also
recommends approval of a Master and Final PUD at 1900 and 1901 Lake Valentine Road be
subject to the following conditions:
1. The project shall be completed in accordance with the plans submitted as amended by the
conditions of approval. Any significant changes to the plans, as determined by the City
Planner, shall require review and approval by the Planning Commission and City
Council.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 4
2. Prior to the issuance of a Grading and Erosion Control permit, the Applicant shall enter
into a PUD Development Agreement with the City. The Development Agreement shall
outline conditions of approval, required securities and fees, and sequence of events.
3. A letter of credit equal to or 125% of the cost of the required landscaping must be
submitted to the City prior to issuance of a Grading and Erosion Control permit.
4. Prior to the issuance of a Grading and Erosion Control permit, staff shall review and
approve the final landscaping plan.
5. Prior to the issuance of a Grading and Erosion Control permit, the Applicant shall
determine if they will be adding 562 caliper inches of additional trees on the site, off-site
or provide cash in lieu of replacement.
6. A Site Plan Review application shall be required for the reconstruction of the parking lot
on PID 21302334005.
7. Any use of the existing building on the on PID 21302334005 other than cold storage will
require an amendment to the approved PUD. The existing structure shall comply with
City Code Chapter 14 and any other use of the building shall meet all actuatable codes.
8. Overnight vehicle storage is prohibited. All overnight vehicle storage shall be stored in
indoors.
9. No exterior storage shall be permitted onsite.
10. All light poles shall be a maximum of 25 feet in height, including base, and shall be
shoebox style, downward directed, with high-pressure sodium or LED lamps and flush
lens. Other than wash or architectural lighting, attached security lighting shall be shoebox
style, downward directed with flush lens. In addition, any entry lighting under canopies
shall be recessed and use a flush lens. Shields shall also be added as directed by the City.
11. All rooftop or ground mounted mechanical equipment shall be hidden from view with the
same materials used on the building in accordance with City Code requirements.
12. Prior to the issuance of a Grading and Erosion Control permit, trees or tree areas that are
to be preserved shall be visibly marked and City-approved tree protection fencing or other
methods shall be installed and maintained at the critical root zones of the trees to be
protected. The location of the fencing shall be in conformance with the approved tree
preservation plan and approved by staff in writing.
13. The Applicant shall be responsible for obtaining any other permits necessary from other
agencies, MPCA, Rice Creek Watershed District, etc. prior to the start of any site
activities.
14. All disturbed boulevards shall be restored with sod.
15. The Applicant shall be responsible for protecting the proposed on-site storm sewer
infrastructure and components and any existing storm sewer from exposure to any and all
stormwater runoff, sediments and debris during all construction activities. Temporary
stormwater facilities shall be installed to protect the quality aspect of the proposed and
existing stormwater facilities prior to and during construction activities. Maintenance of
any and all temporary stormwater facilities shall be the responsibility of the Applicant.
16. The Applicant shall be responsible for obtaining a land disturbance Grading and Erosion
Control permit from the City’s Engineering Division prior to the commencement of any
land disturbance activities.
17. Heavy duty silt fence and adequate erosion control around the entire construction site
shall be required and maintained by the Developer during construction to ensure that
sediment and storm water does not leave the project site.
18. Prior to the beginning of the 2019-2020 school year, the Applicant shall stripe a
minimum of 334 parking stalls in parking lot located on PID 213023340005. Parking
stalls dimensions shall be 9 feet by 18 feet.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 5
19. Prior to the issuance of a Grading and Erosion Control permit, the School District shall
provide the City in writing how they will staff the pedestrian crossing during student
arrive and release. City staff and the Ramsey County Sheriff shall review and approve the
pedestrian crossing plan prior to August 1, 2019. If the City or the Sheriff make any
recommendation the School District shall implements said recommendations prior to
2019-2020 school year starting.
20. Prior to the issuance of a Grading and Erosion Control permit the Engineering
Department shall approve the Final grading, utility, stormwater and right of way
improvement plans.
21. The Applicant, Ramsey County Sheriff and City staff shall review traffic and pedestrian
operations annually. The Applicant shall implement improvements recommended by the
City Engineer.
22. Prior to the issuance of a land disturbance permit, all items identified in the March 5,
2019 Engineering Review Comments memo shall be addressed. All comments shall be
adopted herein by reference.
23. The proposed mascot wall sign may be externally illumined and shall be approved by
Planning staff in writing. Internal illumination is prohibited. The proposed mascot sign
shall not exceed 53 square feet. Final location of the proposed mascot wall sign shall be
approved in writing by Planning staff.
24. Findings and recommendations of the March 19, 2019 Traffic memo from Wenck shall
be implemented.
25. A Planned Unit Development Agreement shall be fully executed prior to the prior to the
issuance of a Grading and Erosion Control Permit.
26. The Applicant shall be financially responsible for 100 percent of all Lake Valentine Road
street improvements. These improvements include but shall not be limited to: turn lanes
and other access improvements, trail and sidewalk improvements, pedestrian signal,
signage and striping modifications, and drainage and utility improvements. The City’s
engineering consultant will design construction plans and specifications. These charges
will be identified in the Planned Unit Development Agreement.
27. The Applicant shall perform an analysis of how many trees the parking lot and
surrounding land on PID 21302334005 can accommodate and reserve the said number of
trees from 562 caliper inches required to be replaced.
28. After site grading has been completed, the Applicant shall work with the adjacent
property owners to ensure any screening concerns are addressed. Any trees planted shall
count towards the 562 caliper inches required to be replaced.
Planning Consultant Kansier reviewed the options available to the Planning Commission on
this matter:
1. Recommend Approval with Conditions
2. Recommend Approval as Submitted.
3. Recommend Denial
4. Table
Chair Gehrig opened the public hearing at 6:59 p.m.
Chair Gehrig invited anyone for or against the application to come forward and make comment.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 6
Elizabeth Garsky, 1795 Lake Valentine Road, stated new plans were presented this evening
which was concerning to her. She asked if the crossing lights would be activated by pedestrians
or by vehicles.
Planning Consultant Kansier explained it was her understanding the light would be activated
by pedestrians.
Ms. Garsky expressed concern with the trash pickup at the school. She reported she did not
want to see this occurring at 3:00 a.m. or 4:00 a.m. She feared that the proposed rezoning would
lead to additional trash pickups and earlier pickup times. She explained she supported the
improvements to the school and recommended the safety of students be considered. She
commented further on the proposed new parking stating she would like to see the storm retention
pond shifted on the property.
Joseph Harelick, 1817 Gramsey Road, asked if the PUD was required because the bus garage
property was not contiguous to the school property.
Planning Consultant Kansier reported this was the case.
Mr. Harelick commented on the location of the lacrosse field and stated he had concerns given
the high-water level on this portion of the property. He suggested the lacrosse field be relocated
or that the field direction be rotated.
Jan Buekamime, 1817 Gramsey Road, commented on how the lacrosse field would impact her
home. She stated she has enjoyed the relationship she has with the school and requested a larger
berm or buffer be considered between the lacrosse field and the adjacent neighbors to assist with
absorbing sound.
Mr. Harelick explained the trees currently in place absorb sound and with these trees being
removed, the adjacent neighborhood would be adversely impacted. He understood this field was
an allowed use but requested the City require the school district to provide better screening and
buffering.
There being no additional comment Chair Gehrig closed the public hearing at 7:16 p.m.
Commissioner Zimmerman asked if the penthouse addition would be attached to the
gymnasium.
Paul Apilkowski, Wold Architects and representative for the Mounds View School District,
explained the penthouse would be behind the gymnasium and would be used for mechanical
equipment.
Commissioner Zimmerman questioned if planting islands would be added in the future.
Mr. Apilkowski commented the plan would be to leave this lot as is without planting islands.
He reported at some point in the future when the lot is resurfaced, planting islands would be
added.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 7
Commissioner Subramnian asked if any alternate parking plans had been considered such as a
parking ramp to eliminate the need to remove trees. He stated he would like to see nature and
trees preserved.
Mr. Apilkowski indicated a parking ramp would be too costly for the school district.
Commissioner Zimmerman commented further on the planting islands and stated he
understood the school was currently under parked by 100+ spaces. He recommended the
applicant be required to install planting islands throughout the proposed parking areas that meet
or exceed the required quantity of islands, design specifications and a minimum of one tree per
island, which in whole or in part compensates for the caliper inch deficiency in the mitigation
plan.
Mr. Apilkowski stated he appreciated this feedback and explained the school could aspire to this
recommendation. He reported the City Ordinance does not have language that addresses the
maximum number of trees that can be removed. Rather, it states 10% can be removed without
replacement and has an aggressive replacement plan. He noted the school district would have an
aggressive tree replacement plan. He indicated it was the school districts intent to not disturb the
pavement across the street given the expense for the stormwater management on this property.
Commissioner Zimmerman explained that the planting island trees would make a significant
dent in the mitigation shortage that currently exists in the landscaping plan and the compensation
owed to the City would be less.
Mr. Apilkowski discussed the tree replacement plan noting the placement of some trees was still
being negotiated with staff as it may not make sense to plant an additional 500 trees on the site.
He indicated it would be difficult for the school to have full use of its fields if 500 trees were
required. For this reason, the school district would be making a payment to the City in lieu of the
tree replacement requirement.
Commissioner Wicklund asked why the lacrosse field was placed the way it was by the school
district.
Mr. Apilkowski explained this site was challenged for green space. He reported the proposed
configuration would allow for an extra football practice field in the fall.
Chair Gehrig commented the Planning Commission was tasked with considering the zoning
regulations for a property. He discussed the location of the stormwater pond to the north and
asked why this pond was added.
Mr. Apilkowski stated this stormwater pond has been on the school districts plan but noted the
cost to acquire the land was higher than anticipated. This meant the school district had less
money for the remainder of the project. He apologized to staff for the late changes made to the
plan but indicated these changes would allow the school district to remain on budget for the
overall project.
Chair Gehrig questioned if the school district would be on board to consulting with the
neighbors regarding tree placement. He understood the school could make a payment in lieu of
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 8
trees. However, he encouraged the school district to work with staff and the neighbors to
improve the buffers.
City Planner Mrosla reported staff would recommend adding Condition 27 stating: The
applicant shall perform an analysis of how many trees can be accommodated on the north parking
lot and shall preserve a number of trees to be planted when a Site Plan is approved.
Commissioner Zimmerman requested further information regarding the speed limit signage that
would be posted along Lake Valentine Road.
Planning Consultant Kansier stated staff was still working to determine what type of signage
would be posted. She noted the school speed zone has to be approved by the State.
Commissioner Wicklund discussed Condition 19 and asked if the school district was ready to
assume the recommendations that were passed along from the County.
Mr. Apilkowski indicated the school district was not able to negotiate these items. He noted his
main goal was to get the development of the high school proper to start. He reported the school
districts priority would always be to the safety of its students during and after the construction
project.
Commissioner Wicklund questioned what the expense would be to create a pedestrian tunnel
system.
Mr. Apilkowski estimated this expense would be $250,000 to $500,000.
Commissioner Wicklund requested staff speak to the Commission further regarding the lighting
plan surrounding the crosswalk area.
City Planner Mrosla reported cobra head lights would be installed on both sides of the road.
Commissioner Wicklund recommended the City strengthen the lighting at the crosswalks for
improved pedestrian safety.
Commissioner Subramnian questioned if school would consider rotating the lacrosse field in
order to save trees.
Mr. Apilkowski stated the school district would like to keep the lacrosse field in its proposed
location as this maximizes the playability and function of the school district site.
City Planner Mrosla commented he could revisit this issue with the applicant to see if a slight
shift in the field could assist in saving more trees.
Jeff ___________, Assistant Superintendent for Mounds View Schools, thanked the residents
that came forward to speak tonight. He thanked them for being great neighbors to the school
district and commented the school district would work with them to address their concerns.
Chair Gehrig discussed the charge of the Planning Commission with respect to land use cases.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 9
Commissioner Zimmerman moved and Commissioner Wicklund seconded a motion to
recommend approval of Planning Case 18-014 for a Comprehensive Plan Amendment and
a Master and Final PUD at 1900 Lake Valentine Road, based on the findings of fact and
the submitted plans, as amended by the conditions in the May 8, 2019, report to the
Planning Commission, and amended by the recommendations of the Planning Commission.
Commissioner Zimmerman asked when the former school bus barn would be addressed.
City Planner Mrosla reported this would occur in the next two years. He reported the school
district was proposing to complete a phased project.
The motion carried unanimously (5-0).
B. Planning Case 19-005; Boston Scientific – Site Plan Review – Public Hearing Not
Required
City Planner Mrosla stated the Boston Scientific Corporation has submitted an application for
Site Plan Review. The Applicant is requesting approval to reconstruct and expand the existing
parking lot adjacent to Lexington Avenue. The property is located at 4100 Hamline Ave North.
The property is zoned I1, Limited Industrial District and is guided as I/O, Light Industrial and
Office on the Land Use Plan.
City Planner Mrosla reported Boston Scientific has recently announced that the Minnetonka
Boston Scientific campus will be shutting down and transferring all product, processes, and
employees to the Arden Hills Campus. There will be approximately 400-500 employees
transferring to the Arden Hills campus by 2020. The relocated jobs include approximately 100-
200 manufacturing jobs and 300 office staff. In preparation for this move, the Applicant is
requesting to reconstruct the existing parking lot adjacent to Lexington Avenue and add an
additional 387 additional parking stalls. The Applicant is also requesting to make other
pedestrian and vehicular safety improvement along existing parking areas on Lexington Avenue
and Cummings Park Drive.
City Planner Mrosla explained the Applicant is currently remodeling the existing office space
in buildings 7 and 9 to accommodate the relocated employees. City Code Section 1325.06 Subd.
1 (G) states that any commercial or industrial buildings for a use, or uses, which is proposed to
be converted, remodeled, or modified to accommodate another allowable use, or uses, which has
a greater off-street parking requirement shall be required to apply for Site Plan Review and
approval to assure the adequacy of off-street parking. Boston Scientific currently has 2,653
parking spaces and has approximately 3,000 plus employees. The additional parking is needed to
ensure parking is provided for the new employees.
City Planner Mrosla indicated the existing eastern parking lot consists of 213 parking stalls.
However, prior to 2005 the lot was larger with 295 stalls and was setback 17 feet from the
property line and the Ramsey County right of way. The previous property owner reduced the
eastern parking field from 295 stall to its current configuration in 2004. The intent of the
removal was to create a main entrance to the campus. The main entrance concept was not
implemented, as Boston Scientific purchased the former company and the property in 2006. As
part of this application, the Applicant is proposing to improve upon the exiting landscaping
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 10
theme at the Lexington Avenue access. The proposed landscaping will include ornamental trees,
grasses and shrubs to create a welcoming environment. The image below shows how the site has
changed from 2003 to the current proposal.
City Planner Mrosla reported the existing Boston Scientific Lexington Avenue access drive is
currently 48 feet wide. The east bound movement onto Lexington Avenue currently consists of
two turn lanes. The Applicant is requesting to reduce the drive lane width to 24 feet. The
reduction in the drive lane width will reduce the speeds of vehicles entering and exiting the site.
In addition, the reduction in lane width will reduce the number of vehicles exiting onto
Lexington Avenue and increase the efficiency of the intersection. The Applicant has discussed
the proposed access modifications with Ramsey County, and they have determined that no
improvements to Lexington Avenue are necessary as part of this project.
City Planner Mrosla stated north of the exiting eastern parking field is an existing wooded area.
The Applicant is requesting to expand the existing parking area into this area. The proposed
expansion would increase the number of parking stalls by 173 for a total of 387 spaces in the
eastern parking field. The intent of locating additional parking in this area as opposed to other
areas of the campus is to better accommodate the majority of the employees relocating from the
Minnetonka campus, most of whom will be working in the adjacent building.
Site Data
Land Use Plan: Light Industrial and Office
Existing Land Use: Light Industrial and Office
Zoning: I-1: Limited Industrial
Current Lot Sizes: Lot 1 – 77.41 Acres
Topography: Level
City Planner Mrosla reviewed the surrounding area and the Plan Evaluation. Staff provided the
following Findings of Fact for review:
General Findings:
1. The Boston Scientific corporate campus is located at 4100 Hamline Avenue North.
2. The Boston Scientific corporate campus is guided as I/O, Light Industrial and Office on
the Land Use Plan.
3. The Boston Scientific corporate campus and the proposed site plan is a conforming use in
the I-1 Limited Industrial Zoning District and operates under an approved PUD.
4. The proposed parking lot expansion and site improvements are anticipated to be
constructed in fall 2019 or spring of 2020.
5. The proposed parking lot expansion is in compliance with the lot, structure, and
landscaping coverage of the underlaying zoning district and PUD.
6. Boston Scientific has provided a Campus Parking Plan that identifies existing parking
stalls and proof of parking areas to meet the current needs of the approximately 2,200
employees on the property.
7. The proposal is not expected to adversely affect the surrounding neighborhood or the
community as a whole.
8. The proposed site plan will not negatively impact the parking, loading, or circulation
demands of the campus and should improve overall pedestrian and vehicle safety.
9. The proposed site plan has significant landscaping to assist in screening the parking area
from the adjacent roadways and properties.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 11
10. The proposal tree replacement exceeds ordinance requirements.
City Planner Mrosla stated recommended the Commission approve the Site Plan Review at
4100 Hamline Avenue North, based on the findings of fact and the submitted plans, as amended
by the conditions in the May 8, 2019, Report to the Planning Commission.
1. The project shall be completed in accordance with the plans submitted as amended by the
conditions of approval. Any significant changes to the plans, as determined by the City
Planner, shall require review and approval by the Planning Commission and City
Council.
2. All conditions of the original Planned Unit Development and Master Plan Amendment
shall remain in full force and effect.
3. This approval does not include signs. A separate sign permit is required for all proposed
signage.
4. Prior to the issuance of a building permit, a landscape financial security of $5,000.00
dollars shall be submitted. Landscape financial security is held for two full growing
seasons.
5. Before construction, grading, or land clearing begins, trees or tree areas that are to be
preserved shall be visibly marked and city-approved tree protection fencing or other
method shall be installed and maintained at the critical root zones of the trees to be
protected. The location of the fencing shall be in conformance with the approved tree
preservation plan and approved by staff in writing.
6. The Applicant shall be responsible for obtaining a Grading and Erosion Control permit
from the City’s Engineering Division prior to the commencement of any land disturbance
activities.
7. Heavy duty silt fence and adequate erosion control around the entire construction site
shall be required and maintained by the Developer during construction to ensure that
sediment and stormwater do not leave the project site.
8. The Applicant shall be responsible for obtaining any other permits necessary from other
agencies, MPCA, Ramsey County, Rice Creek Watershed District, etc. prior to the start of
any site activities.
9. The Applicant shall be responsible for protecting the proposed on-site storm sewer
infrastructure and components and any existing storm sewer from exposure to any and all
stormwater runoff, sediments, and debris during all construction activities. Temporary
stormwater facilities shall be installed to protect the quality aspect of the proposed and
existing stormwater facilities prior to and during construction activities. Maintenance of
any and all temporary stormwater facilities shall be the responsibility of the Developer.
City Planner Mrosla reviewed the options available to the Planning Commission on this matter:
1. Recommend Approval with Conditions
2. Recommend Approval as Submitted.
3. Recommend Denial
4. Table
Chair Gehrig opened the floor to Commissioner comments.
ARDEN HILLS PLANNING COMMISSION – May 8, 2019 12
Commissioner Zimmerman questioned how many works shifts were occurring at Boston
Scientific.
Brig Anderson, Boston Scientific representative, explained his company had three shifts. He
commented further on the number of individuals that worked at each shift.
Commissioner Zimmerman moved and Commissioner Wicklund seconded a motion to
recommend approval of Planning Case 19-005 for a Site Plan Review at 4100 Hamline
Avenue North based on the findings of fact and the submitted plans, as amended by the
conditions in the May 8, 2019, report to the Planning Commission. The motion carried
unanimously (5-0).
UNFINISHED AND NEW BUSINESS
None.
REPORTS
A. Report from the City Council
Councilmember McClung provided the Planning Commission with an update from the City
Council. He reported the Council received an update from MnDOT regarding the MNPASS
project and approved the request from Bethel University.
B. Planning Commission Comments and Requests
Councilmember Wicklund encouraged staff to request the speed limit be lowered to 20 miles
per hour by the Mounds View High School and that stronger lighting be installed near the
crosswalks for pedestrian safety.
C. Staff Comments
City Planner Mrosla updated the Planning Commission on future Planning Cases.
ADJOURN
Commissioner Zimmerman moved, seconded by Commissioner Lambeth, to adjourn the
May 8, 2019, Planning Commission Meeting at 8:21 p.m. The motion carried unanimously
(5-0).
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-007 - 4101 Gale Cir – SP
Page 1 of 4
MEMORANDUM
DATE: June 5, 2019 PC Agenda Item 3.A
TO: Planning Commission Chair and Commissioners
FROM: Sarah Strain, Consultant City Planner
SUBJECT: Planning Case #19-007 – No Public Hearing Required
Applicant: Laura and Marsha Jensen
Property Location: 4101 Gale Circle
Request: Site Plan Review
Requested Action
The Applicant has requested a Site Plan Review in order to add 703 square feet to an existing
detached garage. The property is located at 4101 Gale Circle. The property is zoned R-1 Single
Family Residential and is guided as Low Density Residential on the Land Use Plan.
Background
1. Overview of Request:
The applicant has requested a Site Plan Review in order add approximately 703 square feet onto
an existing detached garage. The Zoning Code requires a site plan review for all detached
structures exceeding 728 square feet, up to 1,458 square feet. The current garage is 753 square
feet. The proposed garage addition would create a total area of 1,456 square feet.
2. Surrounding Area:
Direction Future Land Use Plan Zoning Existing Land Use
North Low Density Residential R-1 Single Family Residential Single Family Residential
South Right-of-Way/Public & Institutional Right-of-Way/ B-1 Limited
Business District Single Family Residential/Institutional
East Low Density Residential/ R-1 Single Family Residential Single Family Residential
West Low Density Residential R-1: Single Family Residential Single Family Residential
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-007 - 4101 Gale Cir – SP
Page 2 of 4
3. Site Data:
2040 Land Use Plan: Low Density Residential
Existing Land Use: Single Family Residential
Zoning: R-1 Single Family Residential
Size: 0.6 acres
Topography: The lot slopes 16 feet downward from the high point in the southwest corner of the lot to the northeast
corner.
Plan Evaluation
1. Zoning Regulations
Section 1320.06 – District Provisions
A. Proposed Use (Section 1320.05)
The garage will be used for the storage of vehicles. The garage is the only accessory structure on
the property.
B. Setbacks (Section 1320.06)
The minimum detached structure setbacks in the R-1 Single Family Residential District are 10 feet
in the rear yard and 10 feet in the side yard. The detached structure must be located behind the
principal structure. The garage will be located behind the single-family dwelling on the property.
The garage is setback nearly 44 feet from the eastern side property line and 13.4 feet from the rear
property line. The detached garage will be located approximately 20 feet from the principal
structure.
C. Lot Coverage (Section 1320.06)
The R-1 Single Family District standards have a 25 percent maximum for the lot that may be
covered by structures. The property is 0.6 acres or approximately 25,700 square feet. The footprint
of the house is 1,870 square feet, and the proposed garage addition will increase the total garage
footprint to 1,456 square feet. The total proposed structure coverage on the property is 3,326 square
feet, which is about 13 percent of the total property area.
Along with the proposed garage addition, the Applicant is planning to expand the driveway the
width of the garage to provide driveway access to the garage addition. The driveway expansion
would tie into the existing driveway. The existing driveway is about 1,359 square feet, and the site
plan indicates the expansion would add about 912 square feet of driveway.
The proposed addition and driveway expansion, along with existing lot coverage, would result in
a total of 5,597 square feet of impervious coverage on the property. District standards limit the
total impervious surface coverage to 35 percent and requires a minimum landscape lot area of 65
percent. The impervious surface coverage for the property including the proposed addition would
be 21.8 percent and the landscape lot area would be 78.2 percent, meeting district standards.
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-007 - 4101 Gale Cir – SP
Page 3 of 4
Section 1325 – General Regulations
A. Accessory Structures
Properties in the R-1 Single Family Residential District are permitted up to two (2) accessory
structures. The proposed garage will be the only accessory structure on the property.
1) Structure Height
City Code requires accessory structures to not exceed 15 feet in height or the height of the principal
structure. The proposed height of the garage is 15 feet.
2) Structure Size
The maximum square floor area of an accessory structure in the R-1 zoning district without a site
plan review is 728 square feet. With a site plan review and approval, an accessory structure may
be up to 1,458 square feet in the R-1 zoning district. The garage with the proposed addition is
1,456 square feet.
B. Landscaping and Tree Preservation – Section 1325.05 and Section 1325.055
No trees will be removed or are anticipated to be impacted by the expansion and construction
activities. No mitigation is required for this proposed addition.
C. Aesthetics - Section 1325.01, Subd. 5.B
The zoning code requires exterior finish of accessory structures shall be compatible in appearance
and material used with the principal structure. The proposed addition will match the existing
garage structure, the Applicant is proposing to install new siding, trims, windows, and shingles,
giving the garage a seamless finish.
Findings of Fact
The Planning Commission must make a finding as to whether or not the proposed application
would adversely affect the surrounding neighborhood or the community as a whole based on the
aforementioned factors. Staff offers the following six (6) findings for consideration:
General Findings:
1. The property at 4101 Gale Circle is located in the R-1 Single Family Residential District.
2. Detached accessory garages are permitted in the R-1 Single Family Residential District.
3. The proposed addition to the existing garage would be in compliance with the setback and
lot coverage requirements of the R-1 Single Family Residential District.
4. The proposed addition is generally in conformance with the design standard requirements
included in Section 1325.05 of the Zoning Code.
5. The total square footage of the proposed garage structure is permissible by City Code
subject to site plan approvals.
6. The proposed addition is not expected to adversely affect the surrounding area of the
community as a whole.
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-007 - 4101 Gale Cir – SP
Page 4 of 4
Options and Motion Language
Staff has provided the following options and motion language for this case. The Planning
Commission should consider providing additional findings of fact as part of the motion to support
their recommendation for approval or denial.
1) Recommend Approval with Conditions: Motion to recommend approval of Planning Case
19-007 for a Site Plan Review at 4101 Gale Circle, based on the findings of fact and the
submitted plans, as amended by the three (3) conditions in the June 5, 2019, Report to the
Planning Commission.
1. The project shall be completed in accordance with the plans submitted as amended by the
conditions of approval. Any significant changes to the plans, as determined by the City
Planner, shall require review and approval by the Planning Commission and City Council.
2. The Applicant shall be responsible for obtaining a land disturbance permit from the
City’s Engineering Division prior to the commencement of any site activities.
3. The Applicant shall be responsible for obtaining any other permits necessary from other
agencies, MPCA, Rice Creek Watershed District, etc. prior to the start of any site
activities.
2) Recommend Approval without Conditions: Motion to recommend approval of Planning Case
19-007 for a Site Plan Review at 4101 Gale Circle, based on the findings of fact and the
submitted plans in the June 5, 2019, Report to the Planning Commission.
3) Recommend Denial: Motion to recommend denial of Planning Case 19-007 for a Site Plan
Review at 4101 Gale Circle, based on the following findings of fact: findings to deny should
specifically reference the reasons for denial and why those reasons cannot be mitigated.
4) Table: Motion to table Planning Case 19-007 for a Site Plan Review at 4101 Gale Circle for
the following reasons: a specific reason and/or information request should be included with a
motion to table.
Public Notice and Comments
Although a Site Plan Review does not require a public hearing, a public hearing notice was mailed
to all properties within 350 feet of the subject property. Staff has not received any letters, e-mails,
or telephone calls from property owners or occupants concerning this planning case.
Attachments
A. Land Use Application
B. Location Map
C. Plan Set
127' 2"
9' 11"
22' 2-1/2"
Garage Addition
Je nsen Resi de nce
4101 Gale Circle
Arden Hills MN
Home and Earth LLC
Brett Lundgren
612-718-7091
BC # 720992
Scale: 1/16" = 1'
House
22' 6"
1870 sf
Garage Addition
45' 6-1/2"
32' 0"
Plan View
New Slab= 825sf
Existing Slab
23' 6"
45' 6"
32' 0"
9' 11"
New Foundation= 105 lf
(Thick black line)
43' 11"
Expanding garage 23' East and 8' North
Adding 703 sf to existing 753 sf
Total square footage = 1456sf
Project will require 109' new foundation
Garage roof will be built with new trusses
Shed roof will be built to keep height under 15'
New shingles, vents, and soff its
New siding, trim, windows, doors, drywall
and insulation will be installed
New concrete apron will be installed
237' 6-1/4"
203' 1"
200' 7-5/8"
45' 6"
Plan View
New Slab= 907sf
Existing Garage
23' 6"
45' 6"
32' 0"
New walls andFoundation
(Thick black line)
Existing Wall
13' 4"
Existing Driveway
Cul du Sac
Property Line
Property Line
Property Line
22' 1"
Plan View
22' 2-1/2"
1' 10"
15' 11"
0' 11-1/2"
2' 7"
0' 11"
22' 1"
12' 1"
Existing Front Elevation
10' 4-3/4"
34' 3-1/2"
14' 0"
Existing Garage
Project Notes:
Lot = 0.59 acres which equals 25,700sf
25% of 25,700sf = 6425sf
House footprint equals 1870sf
Garage with addition equals 1456 sf
Total structure coverage on lot = 3326sf
Area within property lines on this plan= 0.60 acres
Lot Coverage:
Retaining wall
15' 0"
45' 6"
Front Elevation
Side Elevation
15' 0"
32' 0"
12' 6-5/8"
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 1 of 11
Requested Action
Brausen Automotive Repair has submitted an application for a Final Planned Unit Development
and Site Plan Review. The Applicant is requesting to remove the existing service station and car
wash. The Applicant is proposing to replace the old structures with a new car wash and a 7,978
square foot convenience store. In addition, the Applicant is requesting to construct a 4,505 square
foot addition on to the existing repair garage. The property is located at 1310 County Road E. The
property is zoned B-2, General Business District and is guided as Community Mixed Use on the
Land Use Plan.
Background
1. Existing Site Conditions:
Brausen Automotive Repair has been serving the community for over 20 years. The existing
motorized vehicle service center consists of six (6) repair bays in their garage. Also onsite is
approximately a 3,000 square foot service station, with five (5) fuel islands and an associated
carwash. The Applicant is requesting to remove the existing service station and carwash.
The Applicant is requesting to construct a new 7,978 square foot convenience store and a 1,600
square foot carwash. The proposed car wash will include a unique conveyor belt system to pull
cars efficiently through the car wash and reduce wait times. A typical car wash only allows one
vehicle to enter the wash bay and thus requires significant vehicle stacking. The proposed conveyor
belt system, which runs non-stop, will reduce wait times and vehicle stacking as vehicles can enter
the car wash five (5) to ten (10) feet apart. The Kwik Trip Gas Station Located at 1756 Bunker
MEMORANDUM
DATE: June 5, 2019 PC Agenda Item 3.B
TO: Planning Commission
FROM: Mike Mrosla – City Planner
SUBECT: Planning Case # 19-001 – Public Hearing Required
Applicant: Brausen Family Automotive Repair
Property Location: 1310 W County Road E
Request: Site Plan Review; Final Planned Unit Development
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 2 of 11
Lake Blvd in Andover has a similar conveyor belt car wash. Staff visited the site and observed the
car wash. On average vehicles took about two (2) minutes to go through the wash and had limited
vehicle queuing to enter the wash.
In addition, the applicant is proposing a 4,505 square feet garage and repair bay addition. The
proposed addition is highlighted on the image above. The proposed addition will add six (6)
additional repair bays. The existing garage, which is about 4,540 square feet, will remain, as will
the existing fuel islands and canopy. However, the façade of the existing garage will be updated
as part of this application. The Applicant is not proposing any modification to the existing accesses
on County Road E.
2. B-2, General Business District - Planned Unit Development (PUD) Process:
Proposals for new construction, redevelopment of a site, and significant modifications to existing
sites shall use the Planned Unit Development (PUD) process in the B-2, General Business District.
The PUD proposal shall identify any requested modifications from the applicable zoning
requirements and from the "Guiding Plan for the B2 District" as well as the reasons why the
modifications would be in the public interest and would be consistent with the purpose of the B-2
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 3 of 11
District. Modifications to these requirements may be granted by the City without a variance
through the PUD process.
The PUD process is a tool that provides additional flexibility for development that an underlying
zoning district would not otherwise allow. For example, a PUD may make exceptions to setbacks,
lot coverage, parking requirements, signage, building materials, or landscaping requirements. It is
intended to overcome the limitations of zoning regulations and improve the overall design of a
project. While the PUD process allows the City to negotiate certain aspects of the development,
any conditions imposed on the PUD must have a rational basis related to the expected impact of
the development.
1. Surrounding Area:
Direction Existing Land Use Zoning 2040 Land Use
North County Road E and Flaherty’s Arden
Bowl B-2: General Business CMU - Community Mixed Use
South Bethel University B-2: General Business CMU - Community Mixed Use
East Chiropractic and Dental Office B-2: General Business CMU - Community Mixed Use
West Snelling Avenue Right-of-way Road Right-of-way Road Right-of-way
2. Site Data:
2040 Future Land Use Plan: CMU - Community Mixed Use
Existing Land Use: CMU - Community Mixed Use
Zoning: B-2: General Business
Lot Size: 1.89 Acres
Topography: Approx. 10 feet height difference between edge of buildable lot area (low point) and center of lot
(high point) – the west edge of the lot slopes down to a stormwater basin and road right-of-way.
Plan Evaluation
1. Chapter 13, Zoning Code Review
Section 1320 – District Provisions
A. Lot Size, Building Coverage, and Landscaping – Meets Requirements
The minimum lot size in the B-2 District is 13,000 square feet. The total lot area of the subject
property is 1.89 acres. No more than 45 percent of the total lot area may be covered by structures.
In this case, the proposed renovations and additions would have a total footprint of 18,623 square
feet, approximately 23 percent of the total site area.
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 4 of 11
The Zoning Code requires properties in the B-2 District to maintain a minimum landscaped lot
area of 20 percent. Landscaping is defined as all plantings, including trees, grass, and shrubs. The
proposed PUD would provide a total of 22 percent coverage.
B. Height – Meets Requirements
The height of the proposed buildings range between 17.5 feet (convenience store) and 22 feet
(office/sales). Maximum height in the B-2 district is 50 feet.
C. Setbacks – Meets Requirements
Setbacks in the B-2 District are 20 feet for both the front and rear yard. Proposed front and rear
setback are 120 feet and 45 feet, respectively. Side yard setbacks in the B-2 District are 10 feet.
The proposed side setback on the east side of the lot is 10 feet. Setbacks on the west side will be
approximately 70 feet.
Section 1325 – General Regulations
A. Accessory Structures – Section 1325.01
No accessory structures are proposed as part of this application.
B. Landscaping and Tree Preservation – Section 1325.05 Subd. 1 and 1325.055
Minimum Caliper Inches and Tree Ratio – Flexibility Requested
The Zoning Code requires that a minimum number of caliper inches of trees be provided based on
the gross square footage of the building on the property. Based on the total 18,623 square feet of
additions, a minimum of 58 caliper inches is required. The existing site has 101 caliper inches.
The Applicant is proposing to remove 131 caliper inches. The removal of 131 caliper inches
requires replacement at one (1) per every two (2) lost or 65.5 caliper inches. Due to the reduction
in green space the applicant is requesting flexibility to plant 50.4 caliper inches. However, the
applicant is planting 10 juniper trees and is exceeding the requirements for Perennials and
Shrubberies.
Trees along Street Frontage – Meets Requirements
The existing trees along the County Road E. right-of-way will not be removed or altered by the
proposed project.
Proposed
Master PUD
(Sq. Ft.)
Proposed
Master PUD
(PCT)
Permitted
(B-2 District)
Structure Coverage 18,623 sq. ft. 22.6% Max. of 45%
Landscape Coverage 18,243 sq. ft. 22% Min. of 20%
Total area within Master PUD: 1.89 acres
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 5 of 11
Perennials and Shrubberies – Exceeds Requirements
The Zoning Code requires a minimum of 10 percent of the total landscaped area to be covered
with perennials and/or shrubbery. The total landscaped area on the site is 18,243 square feet,
meaning a minimum of 1,824 square feet of perennial and shrubbery cover is required. The
proposed landscape plan includes new landscaping on the north and west sides of the building,
separating the building from surrounding parking lots. The proposed perennial and shrub planting
beds total 1,979 square feet, which is 11 percent of the total landscaped area. Underground
irrigation will be provided for these planting beds.
Planting Islands – Meets Requirements
All proposed parking will be along the sides of the building. There will not be rows or large
expanses of parking. The perennial and shrub planting beds will separate the building from the
parking areas.
Tree Selection – Meets Requirements
The proposed landscape plan includes a variety of tree species, including maples, oaks and
evergreens, ranging in size from 2-3 caliper inches. This is consistent with ordinance requirements.
The Applicant is proposing to plant six (6) to eight (8) foot tall evergreens.
C. Drainage Wetlands and Flood Plain – Section 1325.05 Subd. 2 – Meets Requirements
Currently, stormwater on the site flows to a detention basin located on the southwest corner of the
property. The proposed drainage plan includes improvements to the detention basin, including
riprap, berms on the western edge of the basin, and a retaining wall on the east side of the basin.
The banks of the basin will be lined with an erosion control blanket and seeded with a low
maintenance turf grass mix.
D. Lighting – Section 1325.05 Subd. 3 – Meets Requirements
Many existing lighting fixtures will be salvaged and reinstalled. Accent lighting will be included
on the north side of the building. The Applicant is proposing LED architectural lighting along the
roof line. As a condition of approval, other than wash or architectural lighting, attached security
lighting shall be shoebox style, downward directed with flush lens. In addition, any entry lighting
under canopies shall be recessed and use a flush lens.
E. Screening – Section 1325.05 Subd. 4 - Meets Requirements
The Zoning Code requires mechanical operating equipment located on the ground or roof to be
screened from adjacent streets. All operating equipment, except gas pumps, will be located inside
the proposed building.
F. Requirements for Parking, Loading, and Circulation – Section 1325.06 - Exceeds Requirements
The proposed project will host retail, office, and service station uses. Each use is subject to
minimum parking requirements in the Zoning Code, detailed in the table below. Between the retail,
office, and service station uses, a total of 76 parking stalls are required for the site. A total of 56
surface parking stalls will be provided. An additional 10 parking stalls are available at the gas
pumps, and another 12 parking stalls are provided as repair bays in the garages as well as seven
(7) proof of parking stalls. This is six (6) more spaces than required by Zoning Code. It is
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 6 of 11
anticipated that many cars parking on the site will utilize the spaces provided and the installation
of the proof of parking spaces will not be necessary. All proposed parking stalls meet the setback
requirements in the Zoning Code.
B-2 Parking Requirements
Land Use
Total Square
Footage
Required
Stalls
Number of
Stalls Provided
Parking
Deficiency/Surplus
Retail - 1 space per 150 SF (Gas
Station Retail Sales Area) 2,704 sq. ft. 18
85
(56 surface, 10
gas pump, 12
repair bay and 7
proof of parking)
+9
Office - 1 for each 250 sq. ft.
(Repair Garage and Auxiliary
Uses)
3,485 sq. ft 14
Service Station - 3 spaces for
each enclosed bay plus 1 for each
employee on peak work shift
12 bays, 8
employees 44
76
The Applicant is proposing car wash entry stacking for four (4) vehicles. As stated previously the
proposed conveyor belt system runs non-stop, thus reducing wait times and vehicle stacking as
vehicles can enter the car wash five (5) to ten (10) feet apart. As a condition of approval, the
Applicant and staff shall review traffic operations after three (3) months of car wash operation.
The Applicant shall implement any improvements recommended by the City Engineer at that time.
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 7 of 11
2. Design Standards – Section 1325.05 Subd. 8
Building Materials –Flexibility Requested
For new development, redevelopment, or modifications in the B-2 District, at least 75 percent of
the exterior building materials shall be of brick masonry, tile masonry, natural stone (or synthetic
equivalent), decorative concrete plank, transparent glass or any combination thereof.
Flexibility in exterior building materials is requested to better incorporate the addition into the
existing garage structure. Based on the submitted site plan, 59 percent of the building exterior will
be comprised of materials required by the Zoning Code.
The east and south sides of the building are proposed to include concrete block in various patterns
and colors to match the existing repair garage. The east and south sides of the building are the least
visible to the public. The south side of the building faces a wooded landscaped area belonging to
Bethel University. The east side of the building faces neighboring businesses. However, the
majority of the existing tree screening/buffer between the site and the eastern neighbor will be
maintained, minimizing the appearance of the building.
The two most visible sides of the building, the north and west, have proposed exterior materials
that to comply with the 75 percent exterior building materials requirement.
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 8 of 11
Building Design – Meets Requirements
The Zoning Code requires 50 percent of all first level building facades that front a public street to
be comprised of transparent windows or doors within the B-2 District. 50 percent of the building
façade will be glass, as viewed from County Road E.
Screening –Meets Requirements
All trash and recycling equipment and containers are required to be fully enclosed. A trash
enclosure is proposed along the southern edge of the property.
Bicycle Parking – Requirements
There is currently no bicycle parking proposed on the site. 1325.05 Subd. (8) (Q) requires bicycle
parking. For commercial uses, one bicycle parking space is required for every 20 automobile
spaces. As a condition of approval, the Applicant shall provide a bike rack.
3. Sign Code – Chapter 12
The property is located in Sign District 4: County Road E Frontage.
A. Wall Signage – Requirements
This approval does not include signs. A separate sign permit is required for all proposed signage.
Signage shall meet the requirements of Sign District 4.
B. Freestanding Signage – Meets Requirements
There are no proposed freestanding signs at this time.
4. Traffic Study
A traffic study is not required.
Suggested Findings of Fact
Staff offers the following findings of fact for consideration:
1. The property located at 1310 W County Road E is located in the B-2 General Business
District.
2. The applicant has proposed a Final/Master Planned Unit Development in order to add work
bays for automotive repairs and retail space for sales.
3. The applicant has submitted a Master and Final Planned Unit Development.
4. The Master PUD substantially conforms with the requirements of the City Code.
5. Where the plan is not in conformance with the City Code, flexibility has been requested by
the applicant and/or conditions have been placed on an approval that would mitigate the
nonconformity.
6. Flexibility through the PUD process has been requested in the following areas: minimum
caliper inches, building materials.
7. The proposed development plan meets or exceeds the minimum requirements of the City
Code in the following areas: lot size, building coverage, landscape coverage, setbacks,
street trees, perennials and shrubs, planting islands, drainage wetlands and flood plain
tree selection, lighting, screening.
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 9 of 11
8. The Master PUD is in conformance with the Arden Hills 2030 Comprehensive Plan. The
property at 1310 W County Road E is guided for Community Mixed Use. Community
Mixed Use areas are intended to offer a broad range of retail, services, and office space to
meet community needs.
9. The application is not anticipated to create a negative impact on the immediate area or the
community as a whole.
Options and Motion Language
Staff has provided the following options and motion language for this case. The Planning
Commission should consider providing additional findings of fact as part of the motion to support
their recommendation for approval or denial.
1. Recommend Approval with Conditions: Motion to recommend approval of Planning Case 19-
001 for a Site Plan Review and Final PUD at 1310 W County Road E., based on the findings
of fact and submitted plans, subject to the following conditions:
1. The project shall be completed in accordance with the plans submitted as amended by
the conditions of approval. Any significant changes to the plans, as determined by the
City Planner, shall require review and approval by the Planning Commission and City
Council.
2. This approval does not include signs. A separate sign permit is required for all
proposed signage. All signage shall meet the requirements of Sign District 4.
3. Prior to the issuance of a building permit, a landscape financial security of $5,000.00
dollars shall be submitted. Landscape financial security is held for two full growing
seasons.
4. Before construction, grading, or land clearing begins, trees or tree areas that are to be
preserved shall be visibly marked and city-approved tree protection fencing or other
method shall be installed and maintained at the critical root zones of the trees to be
protected. The location of the fencing shall be in conformance with the approved tree
preservation plan and approved by staff in writing.
5. All rooftop or ground mounted mechanical equipment shall be hidden from view with
the same materials used on the building in accordance with City Code requirements.
6. Prior to the issuance of a building permit, the Applicant shall submit a materials board
to be approved in writing by staff.
7. Prior to the issuance of a building permit, the Applicant shall provide a snow removal
and storage plan detailing how snowfalls will be accommodated on site.
8. The Applicant shall be responsible for obtaining a land disturbance permit from the
City’s Engineering Division prior to the commencement of any site activities as well
as any necessary right-of-way permits from the city and Ramsey County.
9. The Applicant shall be responsible for obtaining any other permits necessary from
other agencies, including but not limited to, MPCA, Rice Creek Watershed District,
and Ramsey County prior to the start of any site activities.
10. All disturbed boulevards shall be restored with sod.
11. The Applicant shall be responsible for protecting the proposed on-site storm sewer
infrastructure and components and any existing storm sewer from exposure to any and
all stormwater runoff, sediments and debris during all construction activities.
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 10 of 11
Temporary stormwater facilities shall be installed to protect the quality aspect of the
proposed and existing stormwater facilities prior to and during construction activities.
Maintenance of any and all temporary stormwater facilities shall be the responsibility
of the Applicant.
12. Prior to the issuance of a building permit, the Engineering Division shall review and
approve the utility plan in writing.
13. The Applicant shall provide a minimum stacking of four (4) vehicles for the car wash.
14. Bollards or a similar material shall be placed between the carwash queue and the
convenience store parking lot and gas pumps to clearly delineate the carwash queuing
area.
15. After three (3) months of car wash operation, the Applicant and staff shall review traffic
operations. The Applicant shall implement any improvements recommended by the
City Engineer at that time.
16. Bike racks shall be provided.
17. If the need is identified by the City, the proof of parking spaces shall be installed.
18. All light poles shall be a maximum of 25 feet in height, including base, and shall be
shoebox style, downward directed, with high-pressure sodium or LED lamps and
flush lens. Other than wash or architectural lighting, attached security lighting shall
be shoebox style, downward directed with flush lens. In addition, any entry lighting
under canopies shall be recessed and use a flush lens. Shields shall also be added as
directed by the City.
19. No neon banding shall be permitted on the fuel canopy.
20. No exterior storage shall be permitted onsite.
21. Overnight vehicle storage is prohibited. All overnight vehicle storage shall be stored
indoors.
2. Recommend Approval without Conditions: Motion to recommend approval of Planning Case
19-001 for a Site Plan Review and Final PUD at 1310 W County Road E., based on the findings
of fact and submitted plans in the June 5, 2019, Report to the Planning Commission.
3. Recommend Denial: Motion to recommend denial of 19-001 for a Site Plan Review and Final
PUD at 1310 W County Road E. based on the following findings of fact: the Planning
Commission should identify findings to deny should specifically reference the reasons for
denial and why those reasons cannot be mitigated.
4. Table: Motion to table 19-001 for a Site Plan Review and Final PUD at 1310 W County Road
E. for the following reasons: the Planning Commission should identify a specific reason and/or
information request should be included with a motion to table.
Notice and Public Comments
Notice was published in the Arden Hills-Shoreview Bulletin on May 22, 2019. Notice was prepared
by the City and mailed to property owners within 500 feet of the subject property. Staff has not
received any letters, e-mails, or telephone calls from property owners or residents in regards to this
planning case.
_____________________________________________________________________________________________
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-001 Brausen – Final PUD\Memos Reports
Page 11 of 11
Deadline for Agency Actions
The City of Arden Hills received the completed application for this request on May 7, 2019.
Pursuant to Minnesota State Statute, the City must act on this request by July 6, 2019 (60 days),
unless the City provides the petitioner with written reasons for an additional 60 day review period.
The City may, with the consent of the applicant, extend the review period beyond the initial 120
days.
Attachments
A. Application
B. Location Map
C. 11x17 Plan Sets
HakansonAnderson
PROJECT
LOCATION
BRAUSEN'S AUTOMOTIVE SITE IMPROVEMENTS
CONSTRUCTION PLANS FOR CLEARING AND GRUBBING, SITE GRADING, SANITARY SEWER, WATERMAIN, STORM SEWER,
CONCRETE CURB AND GUTTER, BITUMINOUS PAVEMENT, RESTORATION AND MISCELLANEOUS CONSTRUCTION
FOR TED BRAUSEN
IN THE CITY OF ARDEN HILLS
GOVERNING SPECIFICATIONS
SHEET INDEX
XX X
X
X
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-006 - Zoning Code Amendment – ZA
Page 1 of 3
MEMORANDUM
DATE: June 5, 2019 PC Agenda Item 4.A
TO: Planning Commission Chair and Commissioners
FROM: Mike Mrosla, Community Development Manager/City Planner
SUBJECT: Planning Case #19-006 – Public Hearing Required
Applicant: City of Arden Hills
Request: City Code Amendment – Chapter 13 – Zoning Ordinance Definitions
Requested Action
Consider approval of Planning Case 19-006 for proposed amendments to Chapter 13 – Zoning
Code floor area definition of the City Code, as presented in the June 5, 2019 Report to the Planning
Commission.
Background
The City has initiated proposed amendments to Chapter 13 – Zoning Code to revise the existing
“Floor Area” definition of the City Code. The amendment would address the following:
1. The existing language below is not consistent with Minnesota State Building Code
requirements.
Floor area. The sum of the gross horizontal area of all floors of a building as measured
in square feet from the exterior sides of the exterior walls, or from the centerline of party
walls separating attached buildings, but not including covered porches that meet the
requirements in Section 1325.03 Subd 2.D; decks; any space where the average floor-to-
ceiling height is less than six feet; attached or detached garages; and other detached
accessory structures.
The definition for Floor Area was amended in 2007 to include an average height limit of less than
six feet. The intent of adding a height limit was to clarify what is a non-habitable basement.
However, in 2015 the Minnesota Building Code updated the section of the code regarding ceiling
heights and habitable space. The updated code states various ceiling height requirements
depending on what is constructed in the basement. For example, the minimum height for finished
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-006 - Zoning Code Amendment – ZA
Page 2 of 3
ceilings in basements of new buildings containing laundry rooms, bathrooms, hallways shall be
seven (7) feet and basements in existing buildings have a minimum finished ceiling height of six
(6) feet four (4) inches. However, new building basements not containing any habitable spaces as
identified above shall have a minimum finished ceiling height of six (6) feet (8) eight inches or six
(6) feet four (4) inches when beams, ducts or other mechanical item project.
After speaking with city staff and the city attorney, it was determined to remove the height
requirement and reference the Minnesota Building Code instead. This way, if minimum ceiling
height is modified again in the future, staff doesn’t need to revise the zoning code. The definition
was also reworded for clarification and consistency with the building code and other
municipalities. The definition for floor area is utilized when calculating floor area ratio (FAR).
The floor area ratio (FAR) is one of the primary tools used to limit the bulk of a principle building
on a property. The other tools include minimum landscaping requirements, impervious coverage
limits, setback requirements, and building height limits.
The proposed amendments have been provided in Attachment A. The City Attorney has reviewed
and approved of the proposed changes.
Options and Motion Language
Staff has provided the following options and motion language for this case.
1. Recommend Approval: Motion to recommend approval of Planning Case 19-006 for
proposed amendments to Chapter 13 – Zoning Code, floor area definition of the City Code,
as presented in the June 5, 2019 Report to the Planning Commission.
2. Recommend Approval with Amendments: Motion to recommend approval of Planning
Case 19-006 for proposed amendments to Chapter 13 – Zoning Code, floor area definition
of the City Code, as presented in the June 5, 2019 Report to the Planning Commission with
amendments: a specific reason should be included with amendments.
3. Recommend Denial: Motion to recommend denial of Planning Case 19-006 for proposed
amendments to Chapter 13 – Zoning Code, floor area definition of the City Code: findings
to deny should specifically reference the reasons for denial.
4. Table: Motion to table Planning 19-006 for proposed amendments to Chapter 13 – Zoning
Code, floor area definition of the City Code: a specific reason and/or information request
should be included with a motion to table.
City of Arden Hills
Planning Commission Meeting for June 5, 2019
P:\Planning\Planning Cases\2019\19-006 - Zoning Code Amendment – ZA
Page 3 of 3
Public Notice and Comments
Notice on this planning case was published in the Arden Hills/Shoreview Bulletin on May 22, 2019.
The City has not received any public comments regarding this case.
Attachments
A. Chapter 13 – Zoning Code, Floor Area Definition Red-line Amendments (Section 1305.04)
B. 2015 Minnesota IRC – Section R305 - Ceiling Height
Existing definition:
Floor area. The sum of the gross horizontal area of all floors of a building as measured in square
feet from the exterior sides of the exterior walls, or from the centerline of party walls separating
attached buildings, but not including covered porches t hat meet the requirements in Section
1325.03 Subd 2.D; decks; any space where the average floor-to-ceiling height is less than six feet;
attached or detached garages; and other detached accessory structures.
Relined definition:
Floor area. Means Tthe sum of the gross horizontal area of all floors of a building as measured
in square feet from the exterior sides faces of the exterior walls, or from the centerline of party
walls separating attached two buildings, but not including covered porches that meet the
requirements in Section 1325.03 Subd 2.D; decks; any space where the average floor-to-ceiling
height is less than six feet; attached or detached garages; and other detached accessory
structures. excluding decks, garages, covered porches conforming with Section 1325.03 Subd 2.D;
attics, crawl spaces and basements that do not meet the minimum ceiling height per Minnesota
State Building Code requirements.
Final definition:
Floor area. Means the sum of the horizontal area of all floors of a building measured from the
exterior faces of the exterior walls, or from the centerline of walls separating two buildings ,
excluding decks, garages, covered porches conforming with Section 1325.03 Subd 2.D; attics,
crawl spaces, and basements that do not meet the minimum ceiling height per Minnesota State
Building Code requirements.