,-AEN HILLS
Special City Council
Work Session Agenda
September 9, 2019
7:00 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651-792-7800
Website:
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well-maintained infrastructure, fiscal soundness, and our
long-standing tradition as a desirable City in which to live, work, and play.
CALL TO ORDER
1. AGENDA ITEMS
1.A. Hamline Avenue Crosswalks And Retaining Walls
Todd Blomstrom, Interim Public Works Director/City Engineer
Documents:
MEMO.PDF
ATTACHMENT A.PDF
1.B. Perry Park - Dog Park Improvements
Todd Blomstrom, Interim Public Works Director/City Engineer
Documents:
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
1.C. Shorewood Drive Drainage Improvements
Todd Blomstrom, Interim Public Works Director/City Engineer
Documents:
MEMO.PDF
ATTACHMENT A.PDF
2. COUNCIL/STAFF COMMENTS
ADJOURN
AGENDA ITEM — IA
'It
-731�EN HILLS
MEMORANDUM
DATE: September 9, 2019
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Todd Blomstrom, Interim Public Works Director/City Engineer
SUBJECT: Hamlin Avenue Crosswalks
Budgeted Amount: Actual Amount: Funding Source:
$ 55,120.00 $ 55,120.00 Street Maintenance Operating Budget
For Council Consideration
City Council direction regarding delivery of potential pedestrian improvements along Hamlin
Avenue.
Backl4round
Two pedestrian crosswalks are located along Hamlin Avenue south of Highway 96, at the
intersection of Wyncrest Court and a midblock crosswalk between Indian Oaks Circle and Eide
Circle. Due to concerns of pedestrian safety at these locations, staff had HR Green complete an
analysis and provide preliminary recommendations for crossing improvements, which were
presented to the City Council at the January 22, 2019 work session.
The City Council entered into a professional services agreement with HR Green in February
2019 for design and preparation of construction plans for the proposed pedestrian crossing
improvements. HR Green has completed this design work. The project plans were revised
during the design process based on technical reviews with Ramsey County.
The final project plans are generally consistent with the recommendations provided to the City
Council in January 2019, with the exception of the proposed installation of Rectangular Rapid
Flashing Beacons (RRFB). The midblock crossing between Indian Oaks Circle and Eide Circle
does not meet the County's criteria for minimum pedestrian vol une to warrant the installation of
RRFBs. The final plans have removed the RRFBs from the project scope.
Page 1 of 1
Staff is seeking direction from the City Council regarding the following items associated with
this project.
1. The scope of proposed pedestrian crossing improvements, including the removal of the
Rectangular Rapid Flashing Beacons.
2. The project cost estimate and funding source for project delivery, including direction to
seek a cooperative agreement with Ramsey County.
3. The project delivery schedule and opportunities to merge this project with other small
projects to improve the efficiency of the delivery process.
Budget Impact
The estimated construction cost for the project is provided in Attachment 1. The following table
provides the estimated total project cost. Project funding is proposed from the street
maintenance operating budget for the City's share of funding, and Ramsey County cost
participation in an amount to be determined, anticipated to be 50 percent, through preparation of
a cooperative agreement.
Project Construction Costs $ 80,284.00
Project Design Costs $ 21,954.00
Construction Contract Administration $ 8,000.00
TOTAL $110,238.00
Attachment
Attachment A - Opinion of Probable Project Cost (construction)
Page 2 of 2
OPINION OF PROBABLE PROJECT COST Attachment A
Hamline Avenue Crosswalk Project
August 8, 2019
Prepared by HR Green
ITEM
NUMBER
ITEM DESCRIPTION
UNITS
UNIT COST
TOTAL
ESTIMATED
QUANTITY
ESTIMATED
TOTAL COST
2021.501
MOBILIZATION
LUMP SUM
$ 20,000.00
1
$
20,000.00
2102.518
PAVEMENT MARKING REMOVAL
SQ FT
$ 3.00
208
$
624.00
2104.502
REMOVE SIGN TYPE C
EACH
$ 75.00
6
$
450.00
2104.503
SAWING BITUMINOUS PAVEMENT FULL DEPTH
LIN FT
$ 7.00
190
$
1,330.00
2104.503
REMOVE CURB AND GUTTER
LIN FT
$ 13.00
87
$
1,131.00
2104.504
REMOVE CONCRETE WALK
SQ YD
$ 12.00
14
$
168.00
2104.504
REMOVE BITUMINOUS PAVEMENT
SQ YD
$ 15.00
95
$
1,425.00
2104.618
REMOVE AND REPLACE BITUMINOUS PAVEMENT
LIN FT
$ 75.00
87
$
6,525.00
2301.602
DRILL AND GROUT REINFORCEMENT BAR EPDXY COATED
EACH
$ 35.00
17
$
595.00
2521.618
CONCRETE WALK
SQ FT
$ 17.00
803
$
13,651.00
2531.603
CONCRETE CURB AND GUTTER
LIN FT
$ 45.00
229
$
10,305.00
2531.618
ITRUNCATED DOMES
SQ FT
$ 50.00 1
103
$
5,150.00
2563.601
TRAFFIC CONTROL
LUMP SUM
$ 5,000.00
1
$
5,000.00
2563.601
ALTERNATE PEDESTRIAN ROUTE
LUMP SUM
$ 6,000.00
1
$
6,000.00
2564.502
OBJECT MARKER TYPE X4-2
EACH
$ 90.00
4
$
360.00
2564.618
SIGN TYPE C
SQ FT
$ 40.00
103
$
4,120.00
2573.502
STORM DRAIN INLET PROTECTION
EACH
$ 175.00
6
$
1,050.00
2575.602
SITE RESTORATION
EACH
$ 600.00
4
$
2,400.00
TOTAL CONSTRUCTION COST
$
80,284.00
Page 1 of 1 H RG reen
AGENDA ITEM —1B
,-ARZEN HILLS
MEMORANDUM
DATE: September 9, 2019
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Sara Knoll, Parks and Recreation Coordinator
Todd Blomstrom, Interim Public Works Director/City Engineer
SUBJECT: Perry Park Dog Park Improvements
Budgeted Amount: Actual Amount
TBD
For Council Consideration
Funding Source:
TBD
The Public Works Department is seeking direction form the City Council regarding
improvements made to the Perry Park Dog Park.
Background
The City of Arden Hills converted the Perry Park baseball field #4 into a dog park in 2016. The
dog park continues to see an increase in use each season. Staff held the annual Bark & Rec Day
in July and received feedback from residents about improvements. There are no trees in the dog
park to provide shade currently, and it was the number one improvement suggested by residents.
Staff has noted additional deficiencies with the dog park area. The aggregate material within the
former infield area remains within the site, which is a source of dust and dirt for dog use. The
site also has drainage challenges, which was one factor in the site being discontinued as a
baseball field. Low areas and a lack of grade across the field area creates areas of wet turf and
standing water. In addition, the tall backstop fencing and players benches remain along the
southwest boundary of the dog park area.
The following three options were identified to improve the site conditions within the dog park
area. A preliminary estimate of the associated costs for each option are provided in the budget
section of this memo.
Page 1 of 2
Option 1: Aggregate removal, topsoil placement, seeding the existing infield and plant ten
(10) trees.
Option 2: Aggregate removal, topsoil placement and seeding within the existing infield and
plant ten (10) trees. Remove existing fencing around the backstop, dugout areas and players
benches. Fill in low spots with top soil and seed.
Option 3: Aggregate removal and grading within the site to correct drainage issues.
Hydroseeding for turf restoration and plant ten (10) trees. Remove existing fencing around
the backstop, dugout areas and players benches.
Staff is prepared to provide a brief summary of the three options and discuss a preferred option
based on available funding at the upcoming work session on September 9, 2019.
Budget Impact
A preliminary, planning level, cost estimate of the three options is provided in the following
table. Additional details regarding anticipated project costs are provided in Attachment 2. Cost
estimates can be refined based on the preferred option as directed by the City Council.
Option Preliminary Cost Estimate
Option 1
$ 11,020.00
Option 2
$ 16,630.00
Option 3
$ 33,825.00
Attachment
Attachment A — Site Photographs
Attachment B — Preliminary Planning Level Cost Estimate
Attachment
Attachment B
Preliminary Planning Level Estimate
Perry Dog Park Improvements
OPTION 1: INFIELD RESTORATION ONLY
ITEM
NUMBER
ITEM DESCRIPTION
UNITS j
UNIT COST
TOTAL
ESTIMATED
QUANTITY
ESTIMATED
TOTAL COST
1
DISPOSAL OF INFIELD MATERIAL, SUBCUT 6 -INCHES
CU YD
$
8.00
125
$ 1,000.00
$ 1,620.00
2
TOPSOIL BACKFILL MATERIAL
CU YD $ 12.00
135
3
TURF ESTABLISHMENT, SEEDING
SQYD
$
1.75
800
$ 1,400.00
4
TREE PLANTING, 2 -INCH B&B
EACH
$
350.00
10
$ 3,500.00
5
REPAIR IRRIGATION SYSTEM, INFIELD AREA ONLY
LUMP SUM
$
3,500.00
1
$ 3,500.00
3,500.00
TOTAL
REPAIR IRRIGATION SYSTEM, INFIELD AREA ONLY
LUMP SUM
$
3,500.00
$ 11,020.00
OPTION 2: INFIELD RESTORATION AND FENCE REPLACEMENT
ITEM
NUMBER
ITEM DESCRIPTION
UNITS
UNIT COST
TOTAL
ESTIMATED
QUANTITY
ESTIMATED
TOTAL COST
1
DISPOSAL OF INFIELD MATERIAL, SUBCUT 6 -INCHES
CU YD
$
8.00
125
$
1,000.00
2
TOPSOIL BACKFILL MATERIAL
CU YD
$
12.00
140
$
1,680.00
3
TURF ESTABLISHMENT, SEEDING
SQYD
$
1.75
800
$
1,400.00
4
TREE PLANTING, 2 -INCH B&B
EACH
$
350.00
10
$
3,500.00
5
REPAIR IRRIGATION SYSTEM, INFIELD AREA ONLY
LUMP SUM
$
3,500.00
1
$
3,500.00
6
BUCKET TRUCK RENTAL
LUMPSUM
$
800.00
1
$
800.00
7
ROLLOFF DUMPSTER
LUMP SUM
$
550.00
1
$
550.00
8
NEW CHAIN LINK FENCE
LIN FT
$
35.00
120
$
4,200.00
8
TOTAL
LUMP SUM
$
800.00
1
$
16,630.00
OPTION 3: INFIELD RESTORATION, FENCE REPLACEMENT AND SITE GRADING TO IMPROVE DRAINAGE
ITEM
NUMBER
ITEM DESCRIPTION
UNITS
UNIT COST
TOTAL
ESTIMATED
QUANTITY
ESTIMATED
TOTAL COST
1
GRADING PLAN PREPARATION (Survey w/staff design)
LUMP SUM
$
4,000.00
1
$
4,000.00
2
DISPOSAL OF INFIELD MATERIAL, SUBCUT 6 -INCHES
CU YD
$
8.00
125
$
1,000.00
3
TOPSOIL BACKFILL MATERIAL
CU YD
$
12.00
140
$
1,680.00
4
SITE GRADING
LUMP SUM
$
7,500.00
1
$
7,500.00
5
HYDROSEEDING
ACRE
$
6,300.00
0.65
$
4,095.00
6
TREE PLANTING, 2 -INCH B&B
EACH
$
350.00
10
$
3,500.00
7
REPAIR IRRIGATION SYSTEM
LUMP SUM
$
6,500.00
1
$
6,500.00
8
BUCKET TRUCK RENTAL
LUMP SUM
$
800.00
1
$
800.00
9
ROLLOFF DUMPSTER
LUMP SUM
$
550.00
1
$
550.00
10
NEW CHAIN LINK FENCE
I LIN FT
$
35.00
120
$
4,200.00
TOTAL
$
33,825.00
AGENDA ITEM — 1C
'It
-731�EN HILLS
MEMORANDUM
DATE: September 9, 2019
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Todd Blomstrom, Interim Public Works Director/City Engineer
SUBJECT: Shorewood Drive Drainage Improvements
Budgeted Amount: Actual Amount: Funding Source:
$ N/A $ N/A TBD
For Council Consideration
City Council direction regarding potential drainage improvements along Shorewood Drive.
Background
The Public Works Department has received multiple requests over the past two years to repair
drainage deficiencies along the northern portion of Shorewood Drive. This section of roadway
was resurfaced within the past three years, including the replacement of bituminous curb along
the full length of the roadway. However, no stormwater drainage improvements were included
in the resurfacing project, resulting in approximately 1,230 feet of roadway draining to a single
storm sewer inlet located in the center of the street at 3203 Shorewood Drive.
During rainfall events, debris is washed down the street and blocks the storm sewer inlet. Larger
storm events produce runoff which exceeds the capacity of the inlet, resulting in pooled water in
the street and overland flow being conveyed over the southerly portion of the driveway at 3203
Shorewood Drive.
Staff has identified three potential options to address this drainage issue as listed below.
1. Installation of additional storm sewer catch basin inlets to the west of the existing inlet.
Page 1 of 1
2. Installation of an elevated driveway apron at 3203 Shorewood Drive and an overflow
spillway adjacent to the driveway.
3. Installation of a trench drain along the driveway for 3203 Shorewood Drive.
Staff is prepared to provide a brief summary of this drainage issue and the proposed process for
determining a potential solution at the upcoming work session on September 9, 2019. Staff is
seeking direction from the City Council if this project should be pursued for the 2020
construction season.
Budget Impact
A project budget has not been established for this item.
Attachment A - Location Map — Shoreview Drive Drainage
Page 2 of 2
Attachment A
Aull
1
900 - �-w
Lake Johanna
0
Beckman! �e
N
Q
00
149 Drainage Location -
f low point on
Shorewood Dr.
930 1934' two �o
�Ce
a
47 0
1
930
r
SO (71
-
--
z z Z
a�
a2i Shorewoo.
m �
&. Catch Basin
A Inlet Outlet
Manholes
Storm Pipe
Contour - 10 FT
-APENHILLS Building Footprints
El Municipal Boundary
City Mask
Little L_.._
1 in=376 ft
N
A
FIGURE 1
SHOREWOOD DRIVE DRAINAGE
LOCATION