Loading...
HomeMy WebLinkAbout2019-009,A�EN HILLS City of Arden Hills Ordinance 2019-009 — Appendix A 2020 Fee Schedule I. Administrative Dogs/Cats — Licenses Two years (Pro -rated for second $30.00 year g $13.00) Dogs/Cats — Duplicate Tags Each $6.50 Dogs/Cats — Boarding $22.00 per day Dogs/Cats — Impoundment Fee $50.00 Dogs/Cats — Surrender Fee Each $25.00 Dogs — Residential Kennel Annual $21.00 License Dogs — Dangerous Dog Fee Annual $500.00 Dogs — Potentially Dangerous Annual $250.00 Dog Fee Copying — General City Material $0.25 8 % x 11; $0.50 large. Per Page. Add postage if mailing copies Assessment Search $53.00 per half hour Private Activity Revenue Bonds Non-refundable application fee $500.00 Annual Administrative Fee 1/8 of 1% (0.125%) of outstanding principal balance of the bonds for the life of the bonds Reimbursement of all City costs Building Construction (All permits are non-refundable after 90 days) Building Permits — Permit Fee Fees shall be based according to the 2019 State Statute 326B.153 and are determined by the City's Building Official Commercial Building Permits — 65% of Building Permit Fee. Plan Review Fee Payment equaling half of this fee is due at time of permit submittal (non-refundable) Residential New $2,000 Construction/Additions — Escrow Temporary Certificate of Escrow To be determined by Building Occupancy (CO) Official Building Permits — Re -inspection $63.25 per State Statute 326B.153 Building Permits — Manufactured $100.00 + State Surcharge fee as Home Location, outlined in State Statute 326B.148 Building Permits — Demolition Permit Fee $100.00 + State Surcharge fee as outlined in Statute 326B.148 Escrow $2,000 Page 1 of 10 Building Permits — Special Investigations 100% of Permit Fee State Surcharge — based on valuation Fee based on 2019 State Statute 326B.148 State Surcharge — Fixed Fees Fee based on State Statute 326B.148 Plumbing Permits — Minimum Fee $60.00 Plumbing Permits — Residential 1.25% of Project Value Plumbing Permits — Commercial 1.25% of Project Value + $50.00 Electrical Permits — Minimum Fee $45.00 + State Surcharge Electrical Permits — Maximum Single Family Dwelling Fee $190.00 Electrical Permits — General See Exhibit "A" attached to fee schedule Mechanical Permits — Minimum Fee $60.00 Mechanical Permits — Residential 2% of Project Value Mechanical Permits — Commercial 1.25% of Project Value + $50.00 Fire Protection Permits — Permit Fee Fees shall be based according to the 2019 State Statute 326B.153 and are determined by the City's Building Official Fire Protection Permits — Plan Review Fee 65% of Permit Fee Fire Protection Permits — Re- inspection $63.25 per State Statute 326B.153 III. Liquor Licensing On -sale 1,999 square feet (SF) or less $3,465.00 On -sale 2,000 (SF) — 2,999 (SF) $4,620.00 On -sale 3,000 (SF) — 3,999 (SF) $5,775.00 On -sale 4,000 (SF) or more $6,930.00 On -sale, Sunday $200.00 (340A.504 Subd. 3(b) limits $200 fee for Sunday sales) Off -sale $210.00 Club Fee $315.00 On -sale, Malt Beverage $126.00 Off -sale, Malt Beverage $42.00 On -sale, Wine $ 2,000.00 (340A.408 Subd. 2(c) limits fee to $2000 or half of on -sale license fee, whichever is less) Strong Beer No Charge (as part of On -Sale Wine License) Investigation Fee $158.00 Minor Consumption Violation with Server Training First Violation $105.00 Second Violation $525.00 Third Violation $1,050.00 Fourth Violation $1,575.00 Page 2 of 10 Minor Consumption Violation without Server Training IV. Maps and Ordinances First Violation Second Violation Third Violation Fourth Violation $525.00 $1,050.00 $1,575.00 $2,100.00 and may be subject to license revocation Zoning Ordinance Municipal Code Comprehensive Plan $0.25 per side Color Maps (8.5 x 11) $2.00 Color Maps (I I x 17) $4.00 Street Maps $2.00 As-Builts (I I x 17) Based on number of copies and staff time Parks & Recreation Youth Athletic Association Field Rental Adult Club / Intramural Field Rental Ball Field Rental, Unlighted Ball Field Rental, Lighted Ball Field Tournament Fee (Adult), Full Maintenance Ball Field Tournament Fee (Adult), Minimum Maintenance Warming House Rental/Ice Rink Rental Picnic Shelters - Resident Picnic Shelters — Non -Resident Picnic Pavilions — Resident Picnic Pavilions — Non -Resident Picnic Pavilions — Resident Non -Profit Picnic Pavilions — Other Non -Profit Additional Picnic Tables Community Garden Plot — One Plot Community Garden Plot — Second Plot Per two hour time block Per two hour time block Per two hour time block. Tournament fees are extra. Per two hour time block. Tournament fees are extra. Includes all day maintenance staff on site Includes prep for fields and midday drag of fields Only allowed during non-public use hours unless authorized by City staff Available for reservation Available for reservation Includes up to five picnic tables Includes up to five picnic tables Includes up to five picnic tables Includes up to five picnic tables For every two extra tables Annual Annual $32.00 per time block + applicable tax $52.00 per time block + applicable tax $105.00 per time block + applicable tax $ 130.00 per time block + applicable tax $525.00 per day + $200.00 damage deposit + applicable tax $315.00 per day + $200.00 damage deposit + applicable tax $50.00 per hour + $200.00 damage deposit + key deposit + applicable tax No Charge $30.00 $125.00 per time slot + $200.00 damage deposit + applicable tax*fee waived for Night to Unite and other public events open to all Arden Hills residents $200.00 per time slot + $200.00 damage deposit + applicable tax $75.00 per day + $200.00 $100.00 per day + $200.00 $20.00 + applicable tax* *fee waived for Night to Unite and other public events open to all Arden Hills residents $50.00 + applicable tax $25.00 + applicable tax Page 3 of 10 Room Rental — City Hall, Community Room (Normal business hours: 8:00 am — 4:30 pm) (Non -business hours: weekends and holidays) Room Rental — City Hall, Small Conference Room (Normal business hours: 8:00 am — 4:30 pm) (Non -business hours: weekends and holidays) Room Rental — Equipment Rental — DVD, VCR, T.V. Per Day (Scheduling a room after regular hours is contingent upon the presence of a city employee; In the event staff is not available, the City reserves the right to deny application). Per Day (Scheduling a room after regular hours is contingent upon the presence of a city employee; In the event staff is not available, the City reserves the right to deny application). Regular business hours usage: Army National Guard: No charge City Government: No charge Resident, Non- profit: $90.00 Resident, For - profit: $120.00 Non -Resident, Non-profit: $130.00 Non -Resident, For -profit: $155.00 (includes Regular business hours usage: $25.00 Army National Guard: No charge City Government: No charge Resident, Non- profit: $50.00 Resident, For - profit: $60.00 Non -Resident, Non-profit: $70.00 Non -Resident, For -profit: $80.00 (includes Non -business hours usage: Resident: $200 Non -Resident: $225 (includes applicable tax) Non -business hours usage: Resident: $200 Non -Resident: $225 (includes applicable tax) $200.00 $20.00 + applicable tax VI. Planning and Zoning (Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow include planning and engineering staff time, City attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20% of its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The escrow may be reduced or increased by the City Planner on a project by project basis.) Page 4 of 10 Description: Escrow Fees: Initial Application Fees: Preliminary Plat Administrative Fee $500 Escrow $2,500 Final Plat Administrative Fee $500 Escrow $1,500 Lot Split/Minor Subdivision (R-1 and R-2 only) Administrative Fee $350 Escrow $1,500 Rezoning or TCAAP Regulating Plan Map Amendment Administrative Fee $500 Escrow $1,500 Comprehensive Plan Amendment Administrative Fee $500 Escrow $2,500 Variance or Permitted Adjustment Administrative Fee $350 Escrow $1,000 Conditional Use or Interim Use Permit/CUP or IUP Amendment Administrative Fee $400 Escrow $1,500 Planned Unit Development Master Plan or Special Development Plan Master Plan Administrative Fee $500 Escrow $2,500 Final Planned Unit Development or Final Special Development Plan Administrative Fee $350 Escrow $1,500 Planned Unit Development Amendment or Special Development Plan Amendment Administrative Fee $400 Escrow $1,500 Concept Review Administrative Fee $150 Escrow $1,000 Vacation of Easement Administrative Fee $150 Escrow $1,000 Site Plan Review Administrative Fee $400 Escrow $1,500 City Code Amendment Administrative Fee $350 Escrow $1,500 Zoning Code or TRC Amendment Administrative Fee $400 Escrow $1,500 Zoning Letter Administrative Fee $75 Land Use Requests — Not Already Specified Administrative Fee $150 Escrow $1,000 Zoning Permit Decks under 30", Driveways, Fences, Sheds and Temporary Structures $65 Commercial Parking Lot Resurfacing $100 Recreational Vehicle Parking Permit 7 Day Permit, renewable once per 12 months $25 Home Occupation I Permit No charge Home Occupation II Permit Administrative Fee $150 Escrow $500 Commercial Outdoor Display and Sales Area Permit $100 Appeal of Administrative Administrative Fee $150 Page 5 of 10 Zoning, Sign, or Subdivision Decisions TCCAP Development Related Professional Services Charge VII. Public Work; Right -of -Way Permit Right -of Way Permit — Small Cell Wireless Facilities Grading & Erosion Control Fees Escrow Any portion of the TCAAP development can prepay an amount on behalf of future parcels to be developed and that the prepayment amount will be netted out and the fee schedule will be undated annually. Permit Fee Escrow Permit for up to 15 locations; rent and maintenance per each location Permit Fee Escrow VIII. Utility Hookup Charges Water Permits — Service Per inspection Installation/Revairs/Alteration Water Permits — Interior Plumbing, New Home Water Permanent Disconnect Curb Box and Service Lead, 1" Service Connection on Unsurfaced Street Restoration of Typical Road Mix Street Restoration of Higher -Type Street Larger than 1" Service Connection Water Permits — Plan Check Fee Water Permits — Re -inspection Hydrant Meter Rental Water Meter/Spacer Charges — Customer Requested Water Meter Accuracy Test Water Meter/Spacer Charges — 5/8" x 3/4" Meter Model 25 Fee includes removal of meter, bench test at maintenance facility, and returning meter to residence; Fee will not be applied if the meter is found to be inaccurate to a degree exceeding three percent (3%) from the result of the bench test Standard Meter $1,000 $2,743 per acre $150 To be determined by the Engineer $150 ROW permit fee, rent $150 per year, maintenance $25 per year $150 To be determined by the Engineer $40.00 $40.00 $215.00 $165.00 $105.00 Set by Engineer Set by Engineer Set by Engineer $40.00 $2,000 deposit, monthly rental of $30.00, water permit fee of $170.00, State surcharge of $1.00 plus applicable standard water usage rate charge for Based on Meter Size Contact Public Works for Quote $ $470.00 Page 6 of 10 Water Meter/Spacer Charges — 3/4" x 7 %" Meter Model 35 Water Meter/Spacer Charges — 1" Meter Water Meter/Spacer Charges — Greater than 1" Water Connection Fee — Connection fee for previously un-served or expanded lots Water Availability Fee — New or Additional Units Sewer Connection Fee — Connection fee for previously un-served or expanded lots Sewer Availability Fee — New or Additional Units Sewer Permits — Service Installation/Alternations/Repairs Sewer Permits — Plan Review Fee Sewer Permits — Reinspections Sewer Access Charge Sanitary Sewer Utility Prohibited Sump Pump Connection The units are based on the Metropolitan Council's formula for calculating new sewer availability charge (SAC) units The units are based on the Metropolitan Council's formula for calculating new sewer availability charge (SAC) units Per inspection Set by Met Council Annually IX. Miscellaneous/Retail Activities Boutique/Garage Sale Tent Permit Sidewalk Sales Business Licensing — Amusement Facilities Business Licensing — Wholesale Bulk Fuel Storage Business Licensing — Hotel/Motel Business Licensing — Courtesy Bench, Non -advertising Business Licensing — Courtesy Bench, Advertising Business Licensing — Mechanical/Electronic Devices Application/notification of City Hall required Includes arcade, dance hall, movie theater, pool/billiard tables, bowling alleys, indoor tennis, skating facility, outdoor tennis, driving ranges, etc. Liability insurance required Includes musical devices, amusement rides, bowling alleys, etc. Contact Public Works for Quote $580.00 Contact Public Works for Quote $840.00 per acre or portion thereof $ 1,375 per unit $840.00 per acre or portion thereof $ 825.00 per unit $40.00 Set by Inspector $40.00 per hour $2,485.00 $100.00 per month No charge $55.00+ State St $53.00 $105.00 $210.00 $6.50 per room $26.00 $79.00 $15.00 per location + $15.00 per machine (MN Statute 449.15 sets maximum permit fee at $15 per location and $15 per machine) Page 7 of 10 Business Licensing — Retail Sales Includes antique shops, $53.00 beauty/barber shops, boat dealers, Christmas tree sales, dry cleaning, laundry, bakery, candy, meats, wholesale foods, caterers, motor vehicle sales, optometrist, mortuary, video sales/rentals, over-the-counter tobacco sales, vending machines (excluding tobacco), & other retail goods not listed Business Licensing — $21.00 per 1,000 square feet, or Restaurants, Cafes, Coffee fraction thereof Houses, etc. Business Licensing — $315.00 Restaurants, Drive-Thru Business Licensing — Service $105.00 Stations Business Licensing — Grocery $21.00 per 1,000 square feet, or fraction thereof Business Licensing — Mobile $30.00 temporary (7 days or less) Food Units/Food Trucks or $100 annual (8 days or more) Charitable Gambling Permit — Includes investigation fee $158.00 Per Minnesota State Statute, Chapter 349 Local Gambling Tax 3% of organizations' gross receipts from all lawful gambling, less prizes paid out Lawful Gambling Fund 10% of net profits Tobacco Sales License Includes investigation fee $300.00 Fireworks Sales As part of existing business $100.00 (MN Statute 624.20 sets maximum permit fee at $100.00) Fireworks Sales Exclusive Business $350.00 (MN Statute 624.20 sets maximum permit fee at $350.00) Massage Therapist Annual Fee, Includes $53.00 investigation fee Massage Therapist Establishment Annual Fee, Includes $158.00 investigation fee Recreational Outdoor Archery $200 first year Range $50 annual renewal Solicitors, Peddlers, Transient Please reference Section 340 of $158.00 background Permit — For -Profit Organizations the Municipal Code for more investigation + $105.00 per information month permit fee Solicitors, Peddlers, Transient Please reference Section 340 of No charge Permit — Non -Profit the Municipal Code for more Organizations information Tree Contractor License $50.00 X. Signs Initial Fee Per Sign $100.00 Page 8 of 10 Permanent Signs, Annual Renewal Per Sign, 100 square feet or less (maximum allowable size) $25.00 Temporary Signs $50.00 Signs, Impoundment First Offense $50.00 Signs, Impoundment Second Offense $75.00 Signs, Impoundment Third Offense $150.00 XI. V Miscellaneous Fees/Permits Rubbish Hauler Annual $158.00 Recycling Hauler Annual $158.00 Contractor License Annual $75.00 Miscellaneous Permit Fee For all other permits not listed $40.00 Staff Research $53.00 per half hour Penalties for Late Payment Failure to pay any penalty imposed shall be grounds for the suspension or termination of any license issued by the City 10% of license fee or $32.00, whichever is greater Tobacco Sales, Illegal First Offense $150.00 Tobacco Sales, Illegal Second Offense within 24 months $600.00 Tobacco Sales, Illegal Third Offense within 24 months $1,050.00 and 7 business day suspension or 30 day suspension of license + admin fine of $250 Tobacco Sales, Illegal Fourth Offense within 24 months Revocation of the license for a one year period Candidate Filing Fee $2.00 Insufficient Funds/Returned Check Fee $35.00 Rental Registration/Renewal Fee $45.00 per rental unit Rental Renewal Late Fee For renewals received after January 31 $90.00 per rental unit Residential Contractor License Check $5.00 Business Subsidy Application Fee Required to reimburse City for full cost of review $2,100.00 + $10,500.00 escrow Construction Activity Waiver Per Waiver Application $263.00 XIL False Alarm Fees Pr False Alarm First two alarms No charge + letter False Alarm Three through ten alarms $100.00 per alarm False Alarm Over ten alarms $300.00 per alarm XIII. Investigation Fees Tobacco, Liquor, Charitable Gambling, & Solicitor's Permits $158.00 XIV. Utility Use Charges AM -gh" Water Per Quarter: Meter Charge 3/4" Meter Size or Smaller $41.52 Meter Charge 1" Meter Size $103.80 Meter Charge 1.5" Meter Size $207.60 Meter Charge 2" Meter Size $332.15 Page 9 of 10 Meter Charge 3" Meter Size $622.79 Meter Charge 4" Meter Size $1,037.99 Meter Charge 6" Meter Size $2,075.98 Meter Charge 8" Meter Size $3,321.56 Meter Charge 10" Meter Size $4,774.75 Meter Charge 12" Meter Size $8,926.70 Consumption: 1-10,000 gals. gallons $3.31 per 1,000 gallons (pro- rated) Consumption: 10,001-35,000 gals. gallons $4.25 per 1,000 gallons (pro - rated) Consumption: Over 35,000 gals. gallons $7.53 per 1,000 gallons (pro- rated) Water Test Fee set by MN State Health Dept $2.43 Sanitary Sewer Per Quarter: Base Charge — All Users per unit (except mobile homes) $56.71 Usage per gals. —Single Family/Multiple Family gallons $5.84 (per 1,000 gallons) $5.84 (per 1,000 gallons) Sanitary Sewer — Commercial Apartment/Condominium gallons Sanitary Sewer - Mobile Home per unit $156.01 A Winter Averaging minimum will be set using a standard usage of 100 gallons per day based on a 30 day month: 100 gallons x 30 days x 3 months = 9,000 gallons per quarter. For April to December quarterly sewer billings, residential usage will be based on the lesser of actual consumption or 9,000 gallons for those customers that were assigned the minumum amount. Customers that have a Winter Average amount greater than 9,000 gallons will be billed on the lesser of actual consumption or their Winter Average consumption. Customers not connected to City water will be billed on 9,000 gallons each quarter. Surface Water Per Quarter: Residential - Single Family per lot $15.61 Residential — Multiple Family per dwelling $20.24 Apartment / Condominium per acre $ 127.45 Industrial / Commercial per acre $198.98 Undeveloped per acre N/A Standby Per Quarter: Standby 1" Service Line or smaller $9.67 Violation of Water or Sewer Use Restrictions: Non -essential usage charge $300 per day XV. Recycling Fee MW Per Residential Parcel with Annual $53.00 curbside recycling Per Residential Parcel without Annual $3.50 curbside recycling XVI. Park Development Park Development Fee Per residential unit $6,500.00 Page 10 of 10