HomeMy WebLinkAboutApril-May 2020The Official City Newsletter for Arden Hills Residents April/May 2020
All of us can help keep our
community
safe during the
COVID-19
outbreak by
remaining
vigilant and
informed. Visit
cityofardenhills.org/coronavirus to
sign up for news announcements
and alerts and to view information
and resources from city, county,
state and federal organizations.
These web pages are updated
continuously, as new information is
available. City Hall remains closed
to the public, but services are
continuing.
Payments, correspondence, permit
applications, and more can be
submitted online or left outside
City Hall in marked bins. The US
Mail bin is used by the mail carrier.
Use the locked drop box for utility
bill payments (checked daily by
staff). There is a larger bin to drop
off plan sets for permits.
To maintain its commitment
to robust public participation,
all City Council and Planning
Commission meetings in April
will allow council and commission
members, staff and the public to
participate virtually in response to
Find Coronavirus Updates at Cityofardenhills.org/Coronavirus
the COVID-19 pandemic. In the
interest of protecting the health
and safety of the community, the
city has devised multiple ways for
the public to participate remotely
in the city meetings before and
during the live meeting.
Call 651-792-7800 for more
information or visit the city
website at cityofardenhills.org.
Sheriff’s Office forms
COVID-19 “Help Team”
The Ramsey County Sheriff’s
Office has formed a COVID-19
"Help Team" that assists those in
the community who are most at
risk and vulnerable during this
time. Help team functions include
the pick-up and delivery of
prescription medication, pre-paid
food and groceries; and referrals
to organizations providing social
services, financial assistance,
medical assistance, mental health
and more.
For help, call or text 651-448-3874
or send an email to HelpTeam@
co.ramsey.mn.us during week
days from 8:00 a.m. to 8:00 p.m.
and weekends from 10:00 a.m. to
4:00 p.m. Always call 9-1-1 for
emergencies.
TCAAP/Rice Creek Commons
Redevelopment Update
The judge appointed to oversee
a lawsuit that was brought forth
by Ramsey County against the
City of Arden Hills last spring has
ordered the litigation to proceed.
As the litigation over the Twin
Cities Army Ammunition
Plant (TCAAP) redevelopment
proceeds, the City of Arden Hills
wants to address current news
stories and public comments
regarding the project.
Affordable housing
The City understands the demand
for housing options to meet needs
across a variety of income levels,
which is specifically why the City
worked with the County in 2016
and 2017 to ensure affordable
housing was included in the
TCAAP development. In fact,
approximately 43 percent of the
City’s housing stock is affordable
per the Metropolitan Council
housing standards.
It is important for community
members to understand that
the City of Arden Hills has no
authority to regulate housing
affordability, nor does it work to
restrict affordable housing in the
City. The City’s role is to create
the zoning for the City, and the
zoning on TCAAP does not limit
TCAAP Continued on Page 4
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
www.cityofardenhills.org
651-792-7800
Office Hours
Monday through Friday
8:00 a.m. to 4:30 p.m.
Sheriff and Fire
911
Water and Sewer Problems
(During non-business hours)
651-767-0640
Mayor
David Grant 651-538-0747
dgrant@cityofardenhills.org
Councilmembers
Brenda Holden 651-636-2987
bholden@cityofardenhills.org
Fran Holmes 612-599-2457
fholmes@cityofardenhills.org
Dave McClung 651-332-0352
dmcclung@cityofardenhills.org
Steve Scott 651-604-0919
sscott@cityofardenhills.org
City Administrator
Dave Perrault 651-792-7824
dperrault@cityofardenhills.org
Communications Coordinator
Dawn Skelly 651-792-7817
dskelly@cityofardenhills.org
Council meetings are held at City
Hall on the second and fourth
Mondays of the month at 7:00 p.m.
Meetings are televised live on Cable
Channel 16. Meetings of the Planning
Commission are televised as well. Visit
cityofardenhills.org for information
about archived meeting playbacks.
Arden Hills Notes is the official
newsletter of the City of Arden Hills, an
equal-opportunity employer.
City News Updates
Ramsey County Yard Waste and Food Scrap Collection sites are open,
including the site at 3530 Hudson Road in Arden Hills. Please stay six
feet from others when using the site. Site hours are Monday, Wednesday,
Friday, 11:00 a.m. to 7:00 p.m.; Tuesday and Thursday, Closed;
Saturday, 9:00 a.m. to 5:00 p.m.; and Sunday 11:00 a.m. to 5:00 p.m.
Compost bin pickup has been suspended due to the COVID-19 outbreak,
with the exception of the May 2nd pick-up date.
Yard Waste Sites Open; Compost Bin Sales Suspended
City Cancels May Cleanup Day Event
The city’s regularly scheduled May Cleanup Day event has been
canceled. Other options are being explored. To learn about locations
for disposing or recycling items, call Ramsey County’s Recycling &
Disposal Hotline at 651-633-3279 (EASY) Answered 24/7.
Fire Department Seeks Additional Location
The Lake Johanna Fire Department is in talks with Bethel University
to acquire a piece of land adjacent to the Anderson Center on Pine Tree
Drive for a future fire station. If an agreement is reached between the
fire department and the university, the fire department will need to go
through the city’s normal public engagement process, which includes a
neighborhood meeting and public hearings at the Planning Commission
and City Council. Visit cityofardenhills.org/developmentprojects for
more information on the project need assessment and background.
Application Submitted For Vacant Fire Station
O’Meara Construction has submitted an application to remove the
existing vacant fire station at 3246 New Brighton Road and then
subdivide the property into four owner-occupied, single-family
residential lots. The proposed development is currently in the staff
review process and has not been reviewed by the Planning Commission
or City Council. Sign up for (Notify Me) news alert email notifications
for future meeting agendas at cityofardenhills.org/NotifyMe. If you
would like additional information, please call 651-792-7800 or email
planning@cityofardenhills.org.
Summit Development to Begin Site Grading in June
Summit Development plans to build a 120-unit senior housing
community west of Old Highway 10 on vacant land south of Parkshore
Drive. Site grading is scheduled to begin in June 2020.
Summer Hours Begin May 26
Summer staffing hours at City Hall begin Tuesday, May 26 and end
Friday, September 4, pending Council approval. City Hall will be open
from 7:30 a.m. to 5:00 p.m. Monday through Thursday and from 7:30
a.m. to 11:30 a.m. on Friday.
Benchmarks: A Review of Recent City Council Action
All items approved by a unanimous
5-0 vote, unless otherwise noted.
February 24, 2020
• Approved a resolution
requesting a funding advance
of $1.3 million from Municipal
State Aid Funds related to 2018
Old Snelling Trail and Water
Main Projects.
• Approved a planned unit
development amendment and
site plan review for a 700 sq.
ft. addition and loading dock
to Building 10 on the Boston
Scientific Campus.
• Denied a variance request
for a new larger deck at 3159
Shoreline Rd and approved a
resolution establishing findings
of fact regarding denial of the
case. Applicant was requesting
an additional 5.5 foot
encroachment into established
shoreline setbacks on Lake
Josephine.
• Approved an amendment for
Brausen’s Family Automotive
& Repair on County Rd E.
The Applicant requested to
modify the previously approved
building architecture and
materials.
March 9, 2020
• Approved an extension of
preliminary and final plats
and developer’s agreement
for Summit Development
for a 120-unit senior housing
and assisted care facility on
Parkshore Drive and Old
Highway 8.
• Approved a contract with MN
Dept. of Corrections Institution
Community Work Crew
(ICWC) to provide labor for
various city projects.
• Approved Public Works
Department purchases of
two new trucks and a Bobcat
for $191,416 (5-0 vote).
Amendment to postpone
purchase of a 3rd truck
approved 3-2 (Holmes and
McClung opposed).
March 23, 2020
• Approved promotion of Senior
Engineering Tech David
Swearingen to Assistant City
Engineer, Engineer in Training.
• Approved appointing Marcie
Jefferys and Kurtis Weber
(alternate) to the Planning
Commission for terms ending
December 31, 2022.
• Approved a resolution
supporting Arden Manor Park
improvements via Community
Development Block Grant in
the amount of $189,700.
• Approved a resolution
authorizing the City of Coon
Rapids to award the 2020 Street
Maintenance contract under an
existing North Metro Regional
Joint Powers Agreement.
• Approved a $90,000
Stormwater Management Grant
Agreement from the Rice Creek
Watershed District to address
the Karth Lake Runoff Control
Project.
• Approved a resolution certifying
quarterly delinquent utilities to
Ramsey County.
March 23, 2020
• Mayor Grant declared a Local
Emergency effective 2:00 p.m.
on March 23, invoking the
city’s disaster plan in response
to the COVID-19 pandemic. At
its regular March 23 Council
meeting later that evening,
the full Council voted 5-0
to approve a resolution that
extends the declaration of
the local emergency until the
emergency has ended or further
action is taken by the City
Council.
March 26, 2020
• At an emergency Council
meeting, the Council approved
a resolution that set the Arden
Hills Water Main (Lexington
Avenue) project and Mounds
View High School Trail
Segments project as their
number one and two priorities,
respectively, for State bonding
consideration.
For a complete listing of recent City
Council action, please review the
meeting minutes on the city website
at cityofardenhills.org and click on
View Agendas & Minutes.
TCAAP continued from page 1
or restrict the development of
affordable housing.
Once the zoning is established it is
up to the developers to design and
build projects, some of which may
or may not be affordable, but that
decision is not made by the City. It
is also up to the developer to decide
how the affordable housing will
be paid for. Like in the rest of the
City, there is nothing prohibiting
affordable housing on TCAAP.
Outside of TCAAP, the City
already has a significant amount of
affordable housing; approximately
forty-three percent of the City’s
housing stock is affordable per
the Metropolitan Council housing
standards.
Tax and other incentives
In some circumstances, a developer
requests that a city contribute to
the cost of affordable housing
through tax and other incentives.
However, from the beginning of
the TCAAP development, the City
of Arden Hills has made it clear
that it will strive to not increase
the tax burden of the current
residents of Arden Hills with
the costs of developing TCAAP.
With its financial constraints and
expectations to provide other
services such as police, fire, snow
plowing, roads, road maintenance,
parks and recreation and a myriad
of other services, the city does not
have additional funds available for
tax incentives to the developers
unless it were to risk a significant
additional tax burden on current
residents.
TCAAP will not be a "cash cow"
The TCAAP development will not
be a “cash cow” for Arden Hills; the
increased taxes the City will receive
from the TCAAP development
will be used to provide the needed
services for that area.
Ford site comparison
A comparison commonly made to
TCAAP is the former Ford site in
St. Paul, where TCAAP is planned
for 1,460 units and the Ford site
is estimated between 2,400 and
4,000 units. A city the size of St.
Paul, at 308,000 residents, has
more tax capacity and resources
to finance a development like the
Ford site with greater density and
affordable housing demands than
Arden Hills, at 9,900 residents.
The Ford site generates property
tax revenues for St. Paul and has
for years, even though it is not
yet built out. These revenues can
offset the costs of development.
Property taxes will not be collected
on the TCAAP site until the site is
developed. Therefore, TCAAP has
nothing coming in to help support
development of affordable housing
or higher density. The Ford site will
require less investment by St. Paul
in terms of infrastructure which is
already in place, such as sewer and
water and a well-functioning public
transit system. The TCAAP site
does not currently have sewer and
water on the site or public transit
options. The Metropolitan Council,
which oversees public transit,
does not have any plans to greatly
increase public transit to TCAAP,
either.
City wants sustainable project
The City of Arden Hills is
committed to ensuring TCAAP is
a viable and sustainable project,
but significantly changing a well-
thought-out plan at the last minute
risks the long-term success of the
project. That is a risk the Arden
Hills residents should not have to
take.
If you are ready to get started
on a home improvement
project this spring, be aware
most projects require permits
from the city before work
begins. These projects must be
inspected when completed to
make sure that the minimum
standards are met.
Projects that require a permit
include: accessory buildings
or sheds, decks, gas or wood
fireplaces, fences, replacement
water heaters, furnaces, air
conditioners, windows and
egress windows, siding,
roofing, driveways, insulation,
in-ground swimming pools;
and any interior remodels that
involve demolishing, opening
up walls, or moving or building
walls.
Visit cityofardenhills.org and
click on the Get A Permit button
to learn more about how to
obtain a permit or call City Hall
staff at 651-792-7800. City Hall
is closed to the public, but staff
are available by phone or email.
Please maintain social
distancing of 6 feet apart from
others and pick up your dogs’
messes when using city trails,
parks and sidewalks. Pets must
be leashed at all times. Pets
are required to be licensed
by the city. This helps track
them if they are running loose
or lost. For information, visit
cityofardenhills.org and search
for pet licenses. Thank you for
keeping our parks and trails
enjoyable for all.
Home Improvement
Projects Require a Permit
Parks, Trails & Pet Rules
The Lake Johanna Fire Department
(LJFD) serves some 42,000
residents in the communities of
Arden Hills, Shoreview and North
Oaks from three fire stations that
cover a total of 32 square miles.
Currently the department operates
three stations: Station 2- 4676
Hodgson Road, North Oaks;
Station 3- 5545 Lexington Ave. N.
Shoreview; and Station 4- 3615
Victoria Street, Shoreview. Fire
Station 1, located on New Brighton
Road in Southern Arden Hills, was
closed in 2017 and not replaced.
The department responds to all
fire, EMS and Rescue calls and
anticipates responding to over
4,000 calls in 2020.
Fire department officials are
currently negotiating with Bethel
University to purchase land on
Pine Tree Drive in Arden Hills, in
order to build a new fire station to
better serve southern Arden Hills
and Shoreview. This future station
would replace the current Station
140 on Victoria
Street.
The department
is a combination
department with
five full-time
and 78 paid on-
call firefighters
assigned to three
stations. They are
cross-trained as
firefighters and
Emergency Medical
Technicians. The
Department is part of the North
Suburban HAZMAT team with
neighboring fire departments and
also operates the North Suburban
Technical Rescue Team with
Roseville Fire Department.
The department currently has a
minimum of six firefighters on duty
24/7 and staffs two fire stations.
When additional manpower or
equipment is needed off duty
personnel are called back for
assistance.
2019 statistics
In 2019, the Lake Johanna Fire
Department responded to 3,820
calls for service in the three contract
cities. 1,138 of these calls were
for service in Arden Hills, which
accounted for 29.8 percent of all
department calls and reflects an
increase of 99 calls over last year’s
Arden Hills' totals.
The full annual report can
be viewed at ljfd.org or at
cityofardenhills.org under the
Government tab on the Emergency,
Fire & Police web page.
Lake Johanna Fire Department Publishes 2019 Annual Report
The Arden Hills community
recycled a total of 1.6 million
pounds (803 tons) of material
in 2019! The most recycled
materials were mixed paper at
35% and cardboard at 19%.
Through Simple Recycling
(ended February, 2020), residents
recycled 11,550 pounds of
textiles.
2019 Waste and Recycling End-of-Year Report; Congratulations Arden Hills!
The Arden Hills Yard Waste and
Food Scraps Collection Site had
8,301 visits, up 15% from 2018!
To get started collecting food
scraps, pick up a starter kit at the
Arden Hills Yard Waste Collection
site at 3530 Hudson Avenue.
If you notice that your business
or multi-family building isn’t
recycling to the best of its ability,
tell the property manager to check
out BizRecycling.com, which
provides free recycling resources,
grants and consultations to
businesses and multi-family
buildings.
The community should be
proud of its efforts! Visit
RamseyRecycles.com or call
651-633-3279, for more
information on what can be
recycled in Arden Hills.
The City of Arden Hills has
identified a number of street
improvement projects for 2020 and
beyond, including the following:
2020 Street Maintenance Project
Each year, the city performs street
and trail preservation activities in
different parts of the city as part of
a long-term program. Pavement
preservation work for the 2020
construction season will include
seal coating, crack sealing and
fog sealing within segments of
city streets and trails. For project
information, visit cityofardenhills.
org/roadconstruction and the 2020
Street Maintenance Project for a
project map, details and updates.
Snelling Avenue North and
County Road E Improvements
The city is in the early stages of
planning and design for proposed
improvements to Snelling Avenue
North scheduled for construction in
2022. Project planning includes the
following components.
1. Reconstruction of Snelling
Avenue North extending
from Highway 51 through the
intersection with County Road
E.
2. Consideration of a single lane
roundabout at the intersection
of County Road E and Snelling
Avenue North in partnership
with Ramsey County.
3. Replacement of water main,
sanitary sewer and storm sewer
based on a condition assessment
currently underway.
A neighborhood meeting was
conducted last fall to share project
information and get feedback. An
environmental site assessment
is currently being conducted
along the project corridor. Soil
and groundwater samples will
be collected at 14 locations in
April 2020 to identify if potential
contaminants exist under the
roadway where water, sanitary
sewer and storm sewer utility
replacement may be necessary.
The environmental assessment is
scheduled to be completed in June.
Additional project design, cost
estimating, and public informational
efforts will resume in July.
Hazelnut Park Area Street
Improvements (2021)
The city is collecting data and
project planning for proposed street
and utility improvements within the
Hazelnut Park area anticipated for
the 2021 construction season. The
project includes the following street
segments.
• Glenpaul Avenue from New
Brighton Road to Cleveland
Avenue
• Edgewater Avenue from New
Brighton Road to the west end
of the cul-de-sac
• Jerrold Avenue from New
Brighton Road to the west end
of the cul-de-sac
• Prior Avenue from County Road
D to Jerrold Avenue
• Lake Valentine Road from
Snelling Avenue North to
Mounds View High School
(tentative)
City staff is determining the extent
of water main, sanitary sewer
and storm sewer replacement that
should be included in the project. A
letter describing the project scope,
process and schedule will be mailed
to property owners within the
project area in May.
2020 Street, Parking Lot and
Drainage Improvements
The design process is underway
for three smaller projects that were
packaged together for delivery as
listed below.
1. Installation of two new
pedestrian crosswalks with
raised medians along Hamline
Avenue, located near Wyncrest
Court and Indian Oaks Circle.
2. Installation of drainage
improvements along the north
portion of Shorewood Drive to
resolve local flooding issues.
3. Replacement of deteriorated
parking lot pavement at the City
Hall site.
The project consultant has
completed design work for the
pedestrian crosswalks and field
survey work for the parking lot
and drainage improvements.
Construction plans are being
prepared for review by the
City Council at an upcoming
work session. Project bidding
is anticipated to occur in June.
Additional information regarding
the construction schedule will be
available after receiving bids.
City Identifies Street Improvement Projects for 2020 and Beyond
In 2019, the Ramsey County Sheriff’s Office responded to 35,420 calls
for service in the seven contract cities of Arden Hills, Falcon Heights,
Little Canada, North Oaks, Shoreview, Vadnais Heights and White Bear
Township, which is an increase of 10 percent in calls from 2018.
There were 5,253 calls in Arden Hills in 2019, which is 1.48 percent less
than the number of calls in 2018. See calls by classification in the pie chart
below.
Arden Hills 2019 Traffic Violations
In 2019, the Ramsey County Sheriff’s Office conducted 423 traffic stops in
Arden Hills, which resulted in 368 citations (219 were for speeding) and
55 verbal warnings.
The 2019 statistics are located at cityofardenhills.org. Visit the
Government tab and then the Emergency, Fire and Police web page and
click on the Related Documents box.
Mounds View High School Traffic
and Pedestrian Improvements
In May 2019, the City Council
approved a planning case for
building and site improvements
at Mounds View High School.
City Council approval included
conditions that the School District
perform a traffic and pedestrian
study and implement safety
measures to address the significant
increase in pedestrian crossings of
Lake Valentine Road by students
using the parking lot north of the
school building.
The traffic and pedestrian study
has resulted in 12 recommended
improvements along Lake Valentine
Road adjacent to the school.
The list of recommended site
improvements will be presented
to the City Council at the April
27 Regular City Council meeting
in the form of an amendment to
the Planned Unit Development
Agreement for Mounds View High
School.
I-35W North MnPASS
Construction
The I-35W North MnPass Project
will continue this spring with
a focus on center lanes and the
median portion of the corridor,
in addition to continued work on
bridge structures. Northbound
traffic lanes will be shifted to
prepare for full construction work
to begin in April. The final traffic
configuration plan for 2020 is being
reviewed by MnDOT and will be
shared with the City Council when
approved by MnDOT.
Ramsey County Sheriff’s Office Releases 2019 Stats
Patrol Calls by Classification – Arden Hills 2019
Calls for service are initiated by citizens via 9-1-1 or deputy initiation
while on patrol.
Quality of Life Calls involve situations and acts of physical disorder,
damage to property or disruption of community life.
Other/Miscellaneous Calls are those requests that don’t meet the other four
descriptions, such as assisting medical calls, fire agencies and alarm calls.
Street Projects (Continued)
Inside
Arden Hills, MN . 55112-5734
COVID-19 Update
TCAAP/Rice Creek Commons Update
Sheriff and Fire Department Reports
Street Improvement Projects
Made in Arden Hills Features Powder Technology Inc.
Powder Technology Inc.,
located at 1300 Grey Fox Road,
manufacturers ISO test dust grades
and other test contaminants used for
testing automotive, aerospace and
military mechanical components,
as well as air and liquid filtration
testing.
The company has been in business
since 1980 and has three parts of its
business operations: ISO test dust
and test dust contaminants, particle
size analysis and toll processing.
Three things to know
1. Powder Technology produces
the contaminants used to
test products such as air,
fuel or water filtration
systems. Different grades
of dust are needed to test
different products, such as
filters, windshield wipers or
upholstery, for example.
2. Powder Technology has an
in-house laboratory to measure
particle sizes for material
being processed as well as
samples sent in by a customer.
Depending on the material
being tested there are a few
different ways to test, and PTI
personnel can help with which
is the best to meet the customer
need.
3. Toll processing can test the
feasibility of new products,
improve applications and
increase manufacturing
efficiency. Onsite equipment is
used to process non-hazardous
dry industrial powders. The
company can custom process
materials, including reducing
the particle size of materials
or narrowing the particle
size distribution, packaging,
labeling and distribution.
Powder Technology Inc. helps
companies achieve particle size
range goals in a collaborative
and confidential environment.
Powder Technology Inc. has a
stable and growing employee
pool, a comprehensive benefits
package and space for expansion.
For more information, visit
powdertechnologyinc.com.