HomeMy WebLinkAboutAugust-September 2020The Official City Newsletter for Arden Hills Residents August/September 2020
Three candidates have filed
Affidavits of Candidacy for
two seats on the Arden Hills
City Council. Bobby Goldman,
Brenda Holden and Dave
McClung will vie for two
4-year terms (2021-2024).
Candidate profiles will be
published on the city website
in mid-September and in the
October newsletter. Their
names will be on the November
3 general election ballot.
Candidates File to Run for
Arden Hills City CouncilWith the November general election on the horizon, please remember
the below guidance regarding political campaign signs during the
election season.
• Campaign signs should
not interfere with
regulatory signs and
traffic control devices.
• Signs cannot be placed
in the Clear Vision
Triangle, which extends
30 feet in each direction
from the intersection
corners.
• Those seeking election must get permission from private property
owners prior to the placement of signs.
• Failure to obtain permission may result in removal of the sign.
• Signs are prohibited on property owned by the city, county, federal
government and school districts.
• Signs placed within city right-of-way should not be placed within
five feet of the edge of the roadway pavement or curb.
• The City of Arden Hills is not responsible for damage to signs placed
in the right-of-way.
• Signs placed in Ramsey County or State of Minnesota right-of-way
are subject to Ramsey County and State of Minnesota consent and
regulations.
• Do not attach signs to public utility poles, trees, street signs,
stoplights or fences.
If the city receives a complaint or finds a violation on city property or
the right-of-way, the sign will be removed and stored at Arden Hills City
Hall.
Candidates have 10 days following an election to remove signs, per state
statute.
If you have any questions, please do not hesitate to contact city staff at
651-792-7800.
Political Campaign Sign Rules During Election Season
November 3 General
Election Absentee Voting
The general election will be
held Tuesday, November 3rd.
View your sample ballot at
myballotmn.sos.state.mn.us
If you cannot make it to your
polling place on November 3,
or if you prefer to vote by mail,
you can request an absentee
ballot at mnvotes.sos.state.
mn.us/ABregistration.
Absentee voting began Friday,
September 18.
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
www.cityofardenhills.org
651-792-7800
Office Hours
Monday through Friday
8:00 a.m. to 4:30 p.m.
Sheriff and Fire
911
Water and Sewer Problems
(During non-business hours)
651-767-0640
Mayor
David Grant 651-538-0747
dgrant@cityofardenhills.org
Councilmembers
Brenda Holden 651-636-2987
bholden@cityofardenhills.org
Fran Holmes 612-599-2457
fholmes@cityofardenhills.org
Dave McClung 651-332-0352
dmcclung@cityofardenhills.org
Steve Scott 651-604-0919
sscott@cityofardenhills.org
City Administrator
Dave Perrault 651-792-7824
dperrault@cityofardenhills.org
Communications Coordinator
651-792-7817
Council meetings are held at City
Hall on the second and fourth
Mondays of the month at 7:00 p.m.
Meetings are televised live on Cable
Channel 16. Meetings of the Planning
Commission are televised as well. Visit
cityofardenhills.org for information
about archived meeting playbacks.
Arden Hills Notes is the official
newsletter of the City of Arden Hills, an
equal-opportunity employer.
City News Updates
The city’s annual State of the City Address is pre-recorded this
year and will be available on the city website by mid-September at
cityofardenhills.org. CTV North Suburbs has taped the Mayor’s address,
which includes information about the city’s financial standing, important
development project updates, public works projects, parks and trails
improvements and more. To receive an email message when the State of
the City address has been posted online, sign up for City News Alerts at
cityofardenhills.org/NotifyMe.
State of the City Address Available Online
Census Takers are in our Neighborhoods
The U.S. 2020 Census is underway. More than 84% of Arden Hills’
households have already been counted. Great job! If you haven't
completed the survey, you may get a visit from a Census Bureau
employee. Census takers will wear masks and follow local public health
guidelines when they visit your home. Census takers are hired from
your area, and their goal is to help you and everyone in your home be
counted in the 2020 Census. If someone visits your home this year to
collect information for the 2020 Census, check to make sure they have a
valid ID badge with their photograph, a U.S. Department of Commerce
watermark, and an expiration date. Census workers may also carry
Census Bureau bags and other equipment with the Census Bureau logo.
Night to Unite Canceled for 2020
In the interest of the health and safety of all citizens, the Ramsey County
Sheriff’s Office has canceled participation in the 2020 Night to Unite
event. The event is traditionally celebrated the first Tuesday in August,
was earlier postponed to October and is now canceled. The Sheriff’s
Office hopes to come back to a bigger and better event next year when
Night to Unite will be on Tuesday, August 3, 2021.
Round Lake Cleanup
Round Lake is in need of cleanup due to decades of sediment
contamination by the U.S. Army. A document describing potential
cleanup strategies is nearing completion and is expected to be
submitted to the Minnesota Pollution Control Agency (MPCA) and the
Environmental Protection Agency (EPA) this fall. The next step will be
for the Army to choose its preferred cleanup strategy and to place it on
public notice for a 30-day comment period. This is expected to happen
before the end of the year. The vision of the U.S. Fish and Wildlife
Service (owner of Round Lake) is to have a fully functioning unit of the
National Wildlife Refuge System, by providing quality habitat for focal
species to promote their conservation and management and providing
priority public use opportunities where appropriate and compatible.
Benchmarks: A Review of Recent Council Action
July 27, 2020
All items approved by a
unanimous 5-0 vote unless
noted.
• Approved a resolution for
a conditional use permit
and amended planned
unit development for
establishment of a daycare
center at North Heights
Lutheran Church, 1700
Hwy 96 W. (4-1 McClung
opposed).
• Approved an ordinance
amendment to Chapter 13
of the zoning code defining
requirements for call
center parking, loading and
circulation.
• Approved a resolution
accepting a feasibility
report and calling for a public
hearing for the 2021 Pavement
Management Plan for street and
utility improvements.
August 10, 2020
• Approved purchase of
equipment needed to convert
a base 2021 utility truck for
snow plowing operations for
$133,000.
• Awarded a professional services
agreement to Bolton & Menk
for $337,767 for design and
construction engineering
support of the proposed 2021
Pavement Management Plan for
street and utility improvements.
• Awarded a $53,808 construction
contract to Klein Underground
for curb and stormwater catch
basin repair work in multiple
areas of the city.
• Awarded a $125,525
cooperative and maintenance
agreement with Ramsey
County for the city’s shared
costs for pedestrian crosswalk
improvements on Hamline
Avenue.
• Denied a planning case for
a 12” front deck variance
at 1741 Venus Ave (3-2
with Holden, Holmes and
McClung voting to deny).
For a complete listing of recent
City Council action, visit
cityofardenhills.org and click on
View Agendas & Minutes.
Where to Find City Resolutions and Ordinances
City resolutions and ordinances
are written and amended as part
of official City Council business.
Community members who are
looking for proposed resolution
and ordinance language can
check the city’s Agenda Center,
which is accessible from the
city’s website by clicking on the
Agendas & Minutes button on the
homepage cityofardenhills.org
and then clicking on the desired
agenda packet.
Final approved and adopted
resolutions and ordinances are
stored in Laserfiche, the city’s
online repository for archived
documents.
To access these documents, visit
cityofardenhills.org and click
on Archived Documents under
Helpful Links on the website
homepage.
The public can also find City
Council minutes and packets;
commission, committee and board
information; and city newsletters
in Archived Documents.
Do you want to know more about
waste, recycling, energy and
other environmental health issues
in Ramsey County? Sign up to
receive Green Ramsey, a monthly
e-newsletter produced by Ramsey
County’s Environmental Health
Division. Visit RamseyCounty.us
and search “Green Ramsey." Once
you’re on the Green Ramsey web
page, click on the red envelope to
sign up.
Get Recycling Tips and More
The Arden Hills City
Council, at its August
24 Council Meeting,
approved entry
into a three-cities’
agreement that paves
the way for a future
fire station location in
Arden Hills.
The agreement allows
for the purchase of the
land, which includes
a portion of land
near Bethel University’s Anderson
Center, located off of County Road
E and Pine Tree Drive.
The agreement also authorizes
the city to pay the Lake Johanna
Fire Department (LJFD) for its
proportional share of the land
purchase and future road relocation
cost, not to exceed $341,000.
Along with Arden Hills, the cities
of North Oaks and Shoreview make
up the other two cities named in
the agreement. The new station
will primarily serve Arden Hills
and Southern Shoreview. The cities
of North Oaks and Shoreview are
scheduled to approve the agreement
at upcoming council meetings.
The agreement follows on the
heels of a needs assessment and
search for land for a new station.
The assessment concluded that
the current station model was
not sufficient to meet fire service
needs for the next 50 years and
recommended closing Station 4
(3615 Victoria St, Shoreview) and
constructing a new headquarters
with additional training,
administrative and equipment
space.
After considering the needs
assessment, the Lake Johanna Fire
Department Board of Directors (of
which, Arden Hills has one vote and
North Oaks and Shoreview have
one and two votes, respectively)
and the three cities directed the
fire chief to engage Bethel in
discussions regarding the land.
Following discussions with Bethel
University, a tentative agreement
was reached between the fire
department and the University,
and the fire department followed
through with a purchase agreement.
The purchase agreement allows
the fire department a due diligence
period that ended on August 21,
2020, and a closing date of no
later than September 21, 2020.
Following its due diligence, the
fire department intends to move
forward with the purchase of the
land.
The purchase of the land includes
two costs: the first being the cost
of the land at $1.35 million and
the second being the department’s
share of the cost to relocate the
existing access road not
to exceed $325,000.
The fire department
is also contributing
$300,000 of its general
fund money towards the
land acquisition. This
leaves the cost to the
cities at $1.375 million,
assuming the road
relocation cost comes in
at the maximum amount.
Traditionally, the
three cities of Arden
Hills, North Oaks and Shoreview
have funded the fire department’s
operating and capital expenses.
For the future station construction,
the City of Arden Hills will need
to add money to its public safety
capital budget. The first installment
of this additional money ($50,000)
was proposed by staff in the
preliminary 2021 budget.
The full draft agreement and
agreement highlights can be found
at cityofardenhills.org/firestation.
Council Enters Into Three Cities Agreement for Future Fire Station Location
Emergency Grant Program
The City of Arden Hills
developed a Small Business
Emergency Assistance Grant
Program that provided up to
$150,000 in CARES Act Funds
for local businesses adversely
impacted by COVID-19.
Applications will be accepted
until Friday, September
25. Visit the city website at
cityofardenhills.org for details.
COVID-19 City, County
and State Updates
The City of Arden Hills will
not be offering in-person fall
recreation programs due to
COVID-19, but has a list of
virtual activities posted on the
city website at cityofardenhills.
org under Recreation Programs.
City parks, trails, playgrounds,
athletic fields, nature areas and
sport courts remain open and
available for use. City staff is
exploring options for resuming
winter recreation programs in
January 2021.
Ramsey County
Ramsey County has launched
Job Connect, an online job
board. Visit ramseycounty.us/
jobconnect.
A new home meal delivery
program is available to
qualifying residents free of
charge. Visit ramseycounty.us/
homemealdelivery.
Ramsey County has opened
redesigned Service Centers to
provide more convenient and
accessible access to programs
for residents. Nearby locations
include the Roseville and
Shoreview libraries.
State
Minnesota Housing is now
accepting applications for
housing assistance payments
to help prevent eviction and
homelessness and to maintain
housing stability for eligible
renters and homeowners. Visit
mnhousing.gov to learn more.
Gateway Interstate - Scannell Properties has submitted a land use
application to develop the vacant land at the end of Round Lake Road and
Gateway Boulevard. The company plans to construct a 250,000-square-
foot office and warehouse facility.
Two road improvement projects recently were completed in the city. The
2020 Street Maintenance Project included seal coat, crack seal and fog
seal applications on several city streets and trails. The 2020 Overlay
Project, which was conducted by the city’s Public Works Department,
resurfaced Dawn Circle East and West, Indian Oaks Circle, Eide Circle
and the southern segment of Norma Avenue.
Gateway Interstate-Scannell Properties Plans Expansion
Final Plat for Ecko Estates (Former Fire Station 1) Submitted
Barry O’Meara has submitted an application for final plat at 3246 New
Brighton Road. The applicant is proposing to final plat the recently
approved preliminary plat of four owner-occupied, single-family
residential lots called Ecko Estates at the decommissioned fire station 1.
For more information about these projects and other development updates,
visit cityofardenhills.org/developmentprojects.
City Completes Two Road Improvement Projects
City Solicits Project Bids
The city is soliciting bids for repairing sanitary sewer segments near Arden
View Court and Colleen Avenue. Additionally, the city is seeking bids for
an HVAC repair project at City Hall.
2021 Pavement Management Program Neighborhood Meeting
A project improvement hearing has been scheduled for September
14 for property owners located within the city’s 2021 Pavement
Management Program. More information about the project can be found at
cityofardenhills.org/roadconstruction.
Development Updates
Road Construction and Public Works Updates
Inside
Arden Hills, MN . 55112-5734
Candidates File for City Council
Where to Find Ordinances and Resolutions
Agreement for Future Fire Station Location
COVID-19, Development and Road Updates
Made in Arden Hills Features Delkor Systems Inc.
Delkor Systems, located at 4300
Round Lake Blvd W., is a robotic
packaging equipment company that
provides machines and packaging
solutions to Fortune 500 companies
in the food and beverage industry.
The company has been in business
since 1973 and in Arden Hills since
2013.
Three Things to Know
1. In 2014, the company started
to offer retail-ready packaging,
in which the shipping case
became the display tray, just by
tearing off the top hood. This
changed the retail packaging
landscape, as stores could easily
receive and set up eye-pleasing
displays. Many of the package
designs are made from a single
sheet of corrugated cardboard,
which saves paper and the
environment.
2. Delkor Systems is focused
on sustainability. In the
past, product
packaging was
not unique,
and often not
sustainable
either. Brown
boxes, like
moving boxes,
were used
throughout the
industry. Companies such as
Costco, Aldi, Pepsi, Frito-lay
and others have all moved to
more sustainable packaging,
such as retail ready packaging
and tri-sealed cartons. With the
tri-seal carton design, excess
package flaps are removed,
which eliminates the need to
move products to a separate
tray on the shelf and reduces
the amount of packaging
materials.
3. In Arden Hills, employees of
Delkor Systems design and
manufacture sophisticated
robotic packaging machines
and parts in its 165,000-square-
foot manufacturing plant. The
company has doubled in size
since 2014 as global food and
employee shortages continue to
force the industry to adapt and
automate. Recently, Delkor’s
Vice President of Human
Resources and After-Market
Services was named as the
first female to lead the North
American PMMI packaging
trade association.
Delkor Systems employs more than
250 people. For more information,
visit delkorsystems.com.