Loading...
HomeMy WebLinkAbout12-21-2020-WSAGENDA ITEMS Lexington Station 3rd Addition Concept Review - Kensington Development Mike Mrosla, Community Development Manager/City Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF ATTACHMENT G.PDF B -2 Zoning Code Update Mike Mrosla, Community Development Manager/City Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF AH Foundation Benches And GreenStep City Signs Mike Mrosla, Community Development Manager/City Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENTS B AND C.PDF Twin Cities North Chamber Business Assistance During COVID -19 Mike Mrosla, Community Develoment Manager/City Planner MEMO.PDF Snelling Avenue And County Road E Feasibility Report Todd Blomstrom, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Hiring Interviews And Council Participation Dave Perrault, City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Accrual Payouts Upon Employee Separation Dave Perrault, City Administrator MEMO.PDF Council Tracker Dave Perrault, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor: David Grant Councilmembers: Brenda Holden Fran Holmes Dave McClung Steve Scott City Council Work Session Agenda December 21, 2020 5:00 p.m. City Hall Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651 -792 -7800 Website : www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. This meeting can be accessed remotely by joining via Zoom T o join the Zoom Meeting via your computer, click this link (or copy and paste it into a new browser): https://us02web.zoom.us/j/81740718221 CALL TO ORDER 1. 1.A. Documents: 1.B. Documents: 1.C. Documents: 1.D. Documents: 1.E. Documents: 1.F. Documents: 1.G. Documents: 1.H. Documents: 2. AGENDA ITEMSLexington Station 3rd Addition Concept Review - Kensington DevelopmentMike Mrosla, Community Development Manager/City Planner MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFATTACHMENT F.PDFATTACHMENT G.PDFB-2 Zoning Code UpdateMike Mrosla, Community Development Manager/City Planner MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFAH Foundation Benches And GreenStep City SignsMike Mrosla, Community Development Manager/City Planner MEMO.PDF ATTACHMENT A.PDF ATTACHMENTS B AND C.PDF Twin Cities North Chamber Business Assistance During COVID -19 Mike Mrosla, Community Develoment Manager/City Planner MEMO.PDF Snelling Avenue And County Road E Feasibility Report Todd Blomstrom, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Hiring Interviews And Council Participation Dave Perrault, City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Accrual Payouts Upon Employee Separation Dave Perrault, City Administrator MEMO.PDF Council Tracker Dave Perrault, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor:David Grant Councilmembers:Brenda Holden Fran HolmesDave McClungSteve Scott City Council Work Session Agenda December 21, 20205:00 p.m. City Hall Address:1245 W Highway 96 Arden Hills MN 55112 Phone:651 -792 -7800 Website : www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.This meeting can be accessed remotely by joining via ZoomTo join the Zoom Meeting via your computer, click this link (or copy and paste it into a new browser): https://us02web.zoom.us/j/81740718221CALL TO ORDER1.1.A.Documents:1.B.Documents:1.C.Documents: 1.D. Documents: 1.E. Documents: 1.F. Documents: 1.G. Documents: 1.H. Documents: 2. City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 1 of 8 AGENDA ITEM – 1A MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Mike Mrosla, Community Development Manager/City Planner Joe Hartmann, Associate Planner SUBJECT: Lexington Station 3rd Addition Concept Plan Review Budgeted Amount: Actual Amount: Funding Source: NA NA NA Concept Plan Proposal The Concept Plan Review process is an opportunity for the City Council to provide comments and questions regarding proposed developments. A concept review is considered advisory and is nonbinding to the City and Applicant (Section 1320.14, Subd. 4 of the Zoning Code). A formal application will be subject to the full review process, including a public hearing with Planning Commission and City Council review. Kensington Development Partners (“Applicant”) has submitted an application for Concept Plan Review of the proposed third phase of Lexington Station. Lexington Station is located at 3787 Lexington Avenue (“Subject Property”). The property is zoned B-3 Service Business District and is guided as Commercial use on the 2040 Land Use Plan. Background In 2013, the City approved a Master Planned Unit Development (PUD) for Roberts Management’s proposed Lexington Station redevelopment project, located at the southwest corner of Lexington Avenue North and Red Fox Road. The total project area is 7.57 acres and is comprised of three parcels. The proposed development would be completed in three (3) phases. Phase I of the redevelopment was completed in 2013-2014 and included the demolition of the former Blue Fox Restaurant and the construction of a 15,340 square foot multi-tenant commercial building with a drive through. Phase II consisted of removing the existing building at 1120 Red Fox Road and constructing a new 16,922 square foot multi-tenant commercial building with a drive through. Phase II was completed in in the fall of 2018. The approved plan for Phase III or the Subject Site consists of a 15,210 square foot multi-tenant commercial building with a drive through and a standalone 17,841 square foot box retail building City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 2 of 8 on 4.24 acres as shown below and in Attachment C. During construction of Phase III, a new access on Lexington Avenue would be constructed. The proposed access would align with the existing Target service and the existing access on Lexington Avenue would be removed. The proposed new access/intersection would include a traffic signal. The proposed traffic signal is included in Ramsey County Lexington Avenue reconstruction project that is anticipated to start in 2022. Concept Plan Proposal The Subject Site is currently owned by Roberts Management and contains an existing building that was constructed in 1980 and is approximately 63,000 square feet. The Applicant is proposing to amend the Master PUD to accommodate a standalone 43,000 square foot grocery store. The proposed grocery store would be new to the Minnesota market. However, at this time the Applicant is unable to disclose the name of the proposed user due to non-disclosure agreement (NDA). Amended Planned Unit Development This proposal would require an amended PUD as the approved site plan would change from two (2) to one (1) building. In addition, the proposed building would increase the overall approved square footage from 65,313 to 75,262 and would also impact the overall parking on the site. City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 3 of 8 Discussion Design Standards – Meets Standards of Zoning Code and PUD At least seventy-five (75) percent of the exterior building materials should be made of brick masonry, tile masonry, natural stone or its synthetic equivalent, decorative concrete plank, transparent glass or any combination thereof. Trim and other accent or decorative features may be metal, wood, split faced block, EIFS, or stucco. Undesirable materials include simulated brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or panels, brightly colored metal roofing or canopies, pre-cast tilt-up walls, and mirrored or reflective glass. The Applicant is proposing to construct the building to match and complement the design of the existing buildings of Phase I and II. The use of similar materials and design features will seek to harmonize the development and maintain the City’s focus on high quality and timeless materials. The transparency requirements for businesses within the B-3 District have been considered in the development and the proposal plan will use opaque windows in the anticipated service areas. The non-primary facades will utilize rock face concrete masonry unit (CMU), utilizing colors consistent with the brick building material on the non-primary façade of the retail building in Phase II and the previously approved material in the PUD. The building would be 19 percent brick masonry, 10 percent glass, and 2 percent stone, for a total of 30 percent. Rock face CMU comprises 54 percent, Phenolic Panels are proposed for 12 percent and metal storefront is proposed for the remaining 4 percent of the total façade area. Examples of Phenolic Panels can be found on newly remodeled Target Stored as shown on the image below and in Attachment D. The Phenolic Panels are a flat panel reinforced with wood fibers with a decorative surface that is resistant to weather and sun. City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 4 of 8 Tree Replacement - Meets Standards of Zoning Code The Applicant has submitted a landscaping plan that shows proposed tree plantings and mitigation. The proposed plan meets the intent ordinance. The Applicant is proposing 134 caliper inches of new trees and 15 caliper inches of replacement trees. Snow Storage - Meets Standards of Zoning Code Adequate area should be designed for snow storage such that clear visibility shall be afforded from the property to any public street. The Applicant is proposing to store snow in the southwest corner of the proposed site. Parking Setbacks – Flexibility Requested The City Code requires off-street parking spaces to be located a minimum of 20 feet from the right- of-way of any public street. Flexibility was granted for the parking spaces on the northern side of Phase I and II which are approximately 9 feet from the Red Fox Road right-of-way (ROW). The Applicant is requesting a similar reduction in parking setback from the ROW be granted due to wide County ROW on Lexington Avenue. The Applicant is proposing a 7.51 feet setback from the ROW. The approved Phase I drive through on the east side of the building adjacent to Lexington Avenue has approximately a three (3) foot setback from the ROW. City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 5 of 8 Parking - Flexibility requested Per City Code 1325.06, there are general categories that determine the number of parking spaces that would need to be provided. Retail Sales uses must provide one (1) parking space for each 150 sq. ft. of gross floor area. The proposed plan would consist of a one-story 43,000 square foot grocery store and would require 287 parking spaces. The Applicant is proposing 207 parking spaces and 437 total for the development. The table on the next page breaks down the parking from the different phases and the approved PUD requirements. Phase I and II Parking Requirements Land Use Total Square Footage of Phase I & II Required Stalls Number of Stalls Provided Parking Deficiency/Surplus Retail - 1 space per 150 SF of gross sales floor space 32,262 sq. ft. 215 230 +15 Proposed Phase III Proposed Parking Land Use Total Square Footage Required Stalls Number of Stalls Provided Parking Deficiency/Surplus Retail - 1 space per 150 SF of gross sales floor space 43,000 sq. ft. 287 207 -80 Approved Master Plan Parking Requirements Land Use Total Square Footage Required Stalls Number of Stalls Provided Parking Deficiency/Surplus Retail - 1 space per 150 SF of gross sales floor space 65,313 sq. ft. 436 413 -23 Proposed Amended Master Plan Parking Requirements Land Use Total Square Footage Required Stalls Number of Stalls Provided Parking Deficiency/Surplus Retail - 1 space per 150 SF of gross sales floor space 75,262 sq. ft. 502 437 -65 It’s worth noting that at this time staff has not seen an interior floor plan and cannot determine the required parking as the proposed project could host a variety of uses (retail, office, and storage). Each use is subject to minimum parking requirements in the Zoning Code and could offset the parking deficiencies. Freestanding Signage - Meets Standards PUD Properties in Sign District 5 are allowed one freestanding sign measuring up to 100 square feet in area and not exceeding 16 feet in height. The Applicant would like to utilize the previously PUD approved monument sign standards. The approved monument signs measure 26 feet in height and have a total sign copy area of 171.9 square feet. City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 6 of 8 Wall Signage – Flexibility requested Properties in Sign District 5 are allowed wall signs up to 80 square feet. The Applicant is requesting flexibly for a 90 and 180 square feet sign above the main entrances to the building (east elevation facing Lexington Ave) and a 90 square feet sign on the north elevation (facing previous Lexington Station phases and Red Fox Road). Proposed New Lexington Avenue Access and Traffic Study A traffic study is currently underway by SRF, the applicant’s traffic consultant. SRF completed the previous work for the Lexington Station Master PUD submittal. The study will review existing operations within the area, evaluated traffic impacts to the roadway network, and recommended improvements to the proposed development site. SRF and the Applicant are aware that the County intends to reconstruct Lexington Avenue between County Road E and I-694 in 2022. The Applicant has stated they intend to complete construction of Phase 3 in 2022, so the timing of the Lexington Avenue improvement could coincide with the final phase of the development. A new access driveway in alignment with the Target service road is proposed to be constructed during the project. The existing driveway on Lexington Avenue that serves Phase I and Phase II is a temporary access point that is scheduled to close. The proposed new access driveway at the southern end of the site is approved as the sole permanent access off of Lexington Avenue. The proposed new access/intersection would include a traffic signal. The proposed traffic signal is included in the Ramsey County Lexington Avenue reconstruction project that is anticipated to start in 2022. However, the proposed tenant is requiring a signal be constructed as part of their project in the event the County delays the Lexington Avenue reconstruction project beyond 2022. The Applicant, City and County have discussed this issue and incorporated provisions in the Lexington Avenue Cooperative Agreement to allow the City to move forward with the signal installation as an independent project. The construction of a signal at this intersection would remove the existing full access into Big O Tires and Arby’s site as a new median would be constructed to the south of the new signal, City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 7 of 8 restricting left turn movements. The proposed access in the Big O Tires and Arby’s site would become a south bound right in and right out. The City is generally not in a position to remove access from the Big O Tires and Arby’s site to benefit the proposed development, and because of that, staff requested the Applicant to consider adding an access from Lexington Station third addition into the Big O/Arby’s site. However, the proposed access into the Big O Tires and Arby’s site becomes moot if the County moves forward with the Lexington Avenue project as they have the authority to revoke the full access into the Big O Tires and Arby’s site. City staff has noted concerns with the design of the proposed site access drive in relation to the overall site layout. The layout provides limited vehicle staking distance at the eastbound approach to the signal. During peak traffic periods, exiting vehicles could potentially stack along the east side of the proposed building while waiting for a green signal phase. The site traffic study currently underway will evaluate the current access design and potential site design modifications. The final site layout may change due to recommendations made by the traffic study. Approvals required The proposed land use application would require the following approvals: • Site Plan Review • An Amended Planned Unit Development (PUD) is required due to modified site plan. In addition, a PUD would be use for performance standard flexibility (at a minimum, wall sign, parking lot setbacks and parking stall requirements). The table below provides the performance standards for the B-3 District and the preliminary analysis for the proposed development: Ordinance Requirements B-3 District Standards Proposed Development Maximum Floor Area Ratio (FAR) 0.8 Approx. 0.23 Maximum Structure Coverage 40% 23% Minimum Landscape Lot Area 25% Unknown Minimum Front Yard Setback 50 ft. 140.5 ft. Minimum Rear Yard Setback 20 ft. 37 ft. Minimum Side Yard Setback 20 ft. (min)/ 40 ft. (total) 68 ft. (min) / 229 ft. (total) Minimum Lot Area 13,000 sq. ft. 183,694 sq. ft. Maximum Building Height 35 ft. 35 ft. Ordinance Flexibility Requested Parking Standards Development Proposal Parking Requirements 1 per 150 sq. ft. 1 per 208 sq. ft. Parking Setback 9 ft. per PUD 7.51 ft. Wall Signage 80 sq. ft. 175 and 90 sq. ft. Budget Impact NA Attachments A. Application City of Arden Hills P:\Planning\Planning Cases\2020\Concepts\Lexington Station 3 Page 8 of 8 B. Location Map C. Approved Master PUD Site Plan D. Concept Elevations E. Concept Site Plans F. Lexington Avenue Reconstruction Plans G. PowerPoint and Project Narrative Attachment A Disclaimer: This map is intended for reference purposes only and is not a legally recorded map or survey. The City of Arden Hills shall not be liable for any damages or claims that arise due to accuracy, availability, use or misuse of the information herein pursuant to MN Statute 466.03 Subd 21. Location Map Red Fox Road Grey Fox RoadDunlap Street NorthLexington Avenue NorthNorthwoods Drive± §¨¦35W §¨¦694 £¤10 Shoreview Subject Parcel Park and Open Space $WWDFKPHQW% (PHASE #2)PROPOSED ONE STORYRETAIL/OFFICE BUILDING16,922 SFFUTUREPROPOSED ONE STORYANCHOR17,841 SF(PHASE #3)PROPOSED ONE STORYRETAIL/OFFICE BUILDING15,210 SFEXIST. BUILDINGOUTLINETRASHTTRASHTRASH1111112011811101212121112121412181566202020128118111111551312413 TOTAL STALLS11EXISTING RETAIL BUILDING15,340 SF173'-8"100'65'234'65'260'BIKE RACKLARGE PLANTERTYP OF 420' BUILDINGSETBACK LINE20' BUILDINGSETBACK LINE20' BUILDINGSETBACK LINE20' BUILDINGSETBACK LINE24'24'24'24'SPEAKERSPEAKERPROPOSEDMONUMENT SIGNPROPOSEDMONUMENT SIGNEXISTINGMONUMENT SIGNPROPOSEDSIGNALCENTERIDENTIFICATIONSIGNFENCE IN THE EVENTOF A DRIVE-THRUA1.1Architectural Consortium, L.L.C. 2016901 North Third Street, Suite 220 612-436-4030Minneapolis, MN 55401 Fax 612-692-9960PRELIMINARYNOT FOR CONSTRUCTIONNORTH0306015SITE SUMMARY:TYPICAL PARKING SPACES SHOWN: TYP STALL = 9' X 18' = 162 SFREQUIRED PARKING PER BUILDINGS: 1 STALL PER 150 SF / RETAILTOTAL BUILDINGS SF / RETAIL: 65,313 SFTOTAL LANDSCAPE COVERAGEGREENSPACE: 65,760 SFTOTAL REQUIRED PARKING: 65,313 / 150 = 435 STALLSTOTAL PARKING PROVIDED: 413 STALLSTotal Parking Lot Area: 157,696 SFTotal Parking Island Green Space Area: 6,767 SFTotal Parking Lot Boundary Green Space: 8,947 SFREQUIRED PARKING LOT GREEN SPACE: 15,797 SFPROVIDED PARKING LOT GREEN SPACE: 15,714 SF Attachment C Phase IPhase IIPhase III ),1,6+(')/225 %2&$123< 72&08 72678' %2/2:&$123< (;(;(;(;(;(;(;(;(;(;(;(;)85785(0(&+$1,&$/81,7(;(;(;(;(;(;522)/,1(%(<21')85785(0(&+$1,&$/81,7%(<21'),1,6+(')/225 %2&$123< 72&08 72678' %2/2:&$123< (;(;(;(;(;(;(;(;(;(;(;(;(;(;(;(;(;(;(;522)/,1(%(<21' )8785(0(&+$1,&$/81,7)8785(0(&+$1,&$/81,7(/(9$7,21)$&$'($5($5(4*/$666)3529,'('*/$666)($6764)764)7  64)7  1257+ 64)7 64)7  64)7 72 $%29(*5$'(%8,/',1*0$7(5,$/$5($6)3(5&(17$*(&$676721( (; 6)%5,&. (; 6)&08  (; 6) &08  (; 6) 3+(12/,&3$1(/ (;(; 6) 6725()5217 6) 0(7$/'2256 6) &$123< 6) 727$/ 6)/(;,1*72167$7,21 3+$6(,,,)8785(*52&(5<6+(///(;,1*72167$7,21$5'(1+,//601(;7(5,25(/(9$7,216&21&(373/$17$* 352'8&7 0$18)$&785(5 02'(/),1,6+ 6,=( &200(176(; 3+(12/,&3$1(/&21&($/(')$67(1(56721(:22'$5&+,7(&785$/3$1(/6 *5(<0(6+'%  [ (; 3+(12/,&3$1(/&21&($/(')$67(1(56721(:22'$5&+,7(&785$/3$1(/6 )281'5<$%  [ (; JD*$/9$1,=(' ,0(7&2 /$7,78'(),1,6+35(:($7+(5('*$/9$/80((; &$17,/(9(5&$123< 0$3(6$5&+,7(&785$/&$123,(6 :+,7(%$.('(1$0(/(; &$17,/(9(5&$123< 0$3(6$5&+,7(&785$/&$123,(6 6+(5:,1:,//,$06(/(&75,&/,0(*5((1 0$3(6&86720&2/25720$7&+(; $/80,1806725()5217 .$:1((5 ),1,6+%/$&.$12',=('(; 3$5$3(7&23,1* ),5(6721( &+$5&2$/(; 63$1'5(/*/$66 7%' 7%'(; 6/23('&23,1* 2/'&$67/( &25'29$0,'1,*+7(; &$123< ),16 0$3(6$5&+,7(&785$/&$123,(6 %/$&.(; 63/,7)$&(&08 7%' 5(' [[ 5811,1*%21'720$7&+3+$6($1''(9(/230(17(; 63/,7)$&(&08 7%' <(//2: [[ 5811,1*%21'720$7&+3+$6($1''(9(/230(17(; &$676721( 7%' <(//2: 5811,1*%21'720$7&+3+$6($1''(9(/230(17(; %5,&. 7%' 5('%/(1' 5811,1*%21'720$7&+3+$6($1''(9(/230(17(;7(5,25(/(9$7,210$7(5,$/6;;  ($67(/(9$7,21  1257+(/(9$7,21*/$663(5&(17$*(6%8,/',1*0$7(5,$/6 Attachment D ),1,6+(')/225 %2&$123< 72&08 %2/2:&$123< %2'2&. (;(;(;(;(;(;(;(;(;522)/,1(%(<21'(;(;(;(;),1,6+(')/225 %2&$123< 72&08 72678' %2/2:&$123< %2'2&. (;(;(;(;(;(;(;(;522)/,1(%(<21'(;(;(;(;)8785(0(&+$1,&$/81,7)8785(0(&+$1,&$/81,7/(;,1*72167$7,21 3+$6(,,,)8785(*52&(5<6+(///(;,1*72167$7,21$5'(1+,//601(;7(5,25(/(9$7,216&21&(373/$1  :(67(/(9$7,21  6287+(/(9$7,21 6'6'6'6'212' - 0"30' - 0"15' - 2"16' - 0"4' - 8"11' - 4"4' - 8"11' - 4"5' - 2"11' - 8"11' - 4"2' - 8"11' - 4"2' - 8"11' - 4"2' - 8"11' - 4"2' - 8"11' - 4"2' - 8"11' - 4"2' - 8"194' - 0"36' - 0"67' - 2 1/8"8' - 0"74' - 3 7/8"11' - 0"3' - 6"11' - 0"3' - 6"11' - 0"3' - 6"11' - 0"3' - 6"11' - 0"3' - 6"258' - 0"28' - 4 1/4"12' - 0"27' - 0"125' - 8 3/8"193' - 0 5/8"0' - 10"6' - 4"2' - 8"8' - 0"8' - 0"8' - 0"12' - 2"352326('*52&(5<6725(64)744' - 0"4' - 0"164' - 0"/(;,1*72167$7,21 3+$6(,,,)8785(*52&(5<6+(///(;,1*72167$7,21$5'(1+,//6016,7(3/$1&21&(373/$1 ),1,6+(')/225 %2&$123< 72&08 72678' %2/2:&$123<    ),1,6+(')/225 %2&$123< 72&08 72678' %2/2:&$123< /(;,1*72167$7,21 3+$6(,,,)8785(*52&(5<6+(///(;,1*72167$7,21$5'(1+,//6010$7(5,$/%2$5'&21&(373/$1  ($67(/(9$7,21  1257+(/(9$7,216721(:22'3+(12/,&3$1(/6)281'5< (; %$6('2))[*5,'%5,&. (; 720$7&+3+$6(,,'(9(/230(1781'(56,'(2)$:1,1*6+(5:,1:,//,$066:(/(&75,&/,0( (; 0$3(6$5&+,7(&785$/&$123<:+,7(%$.('(1$0$/ (; 63/,7)$&(%/2&. (; 720$7&+3+$6(,,'(9(/230(1763$1'5(/*/$66:+,7( (; 63/,7)$&(%/2&. (; 720$7&+3+$6(,,'(9(/230(176721(:22'3+(12/,&3$1(/6*5(<0(6+ (; %$6('2))[*5,'&$676721( (; 720$7&+3+$6(,,'(9(/230(17 West elevation of Lexington Station Phase IIRock face concretemasonry unit (CMU)Proposed Lexington Station Phase IIPhenolic Panel Example – (Remodeled Targets Exteriors) PROPOSED BUILDING43,000 SF2828311897999999275LEXINGTON AVENUEEXISTINGBUILDING1 STORY BRICK BUILDI3833 LEXINGTON AVE1 STORY BRICK BUILDING3845 LEXINGTON AVE45'DUMPSTERENCLOSURECOMPACTOR222'194'212'33.34'24'24'24'CROSS ACCESS PREDICTEDON APPROVAL BYNEIGHBORING TENANTS68.67'140.51'37.09'161.33'24'18'9' 9'18'63'24'24' 12' 26'7.51'EXISTING ACCESSTO BE REMOVEDDescriptionRev. DateLEXINGTON STATIONPHASE 3RED FOX ROADARDEN HILLS, MN 55112Sheet Title:Project #:Drawn By:Checked By:Issue Date:12206100.000TJRMJW10.07.203524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2020 Larson Engineering, Inc. All rights reserved.P:\Projects\Projects - 2020\12206100 - Lexington Station - Phase 3 (Kensington Development)\C. Design\Drawing Files\12206100 C200 - Paving.dwg3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Project Title:KENSINGTONDEVELOPMENTPARTNERS700 COMMERCE DRIVE - SUITE 130OAK BROOK, IL 60523Client:Date: Lic. No.:I hereby certify that this plan,specifications or report was preparedby me or under my direct supervisionand that I am a duly licensedProfessional Engineer under the lawsof the state of Minnesota.PRELIMINARY NOT FOR CONSTRUCTION0NORTH15 30 60Sheet:PAVING PLANC200STANDARD PARKING STALLS = 200ADA PARKING STALLS = 7TOTAL PARKING STALLS = 207PARKING STALL COUNTMinimum Lot AreaMaximum Floor Area RatioMaximum Structure CoverageMinimum Front Yard SetbackMinimum Rear Yard SetbackMinimum Side Yard SetbackB-3 Distict Standards13,000 SF0.840%50 ft20 ft20 ft (min) / 40 ft (total)Development Proposal183,694 SF0.2323%140.5 ft37 ft68 ft (min) / 229 ft (total) $WWDFKPHQW( Attachment F CITY OF ARDEN HILLS 2020 LAND USE AMENDMENT3787 Lexington AvenueArden Hills, MNConcept Plan Review 700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COMAbout Kensington Development PartnersKensington Development Partners acquires, develops and redevelops retail and mixed-use projects throughout the United States. 70+years of collective industry experience has afforded ongoing strategic and valued relationships with national retailers, local municipalities,brokers, lenders and investors, all on a repeat basis. The Principals’ vast experience, creative approach and long history of workingtogether as a team separates Kensington from the rest of the competition because they have the ability to understand and solve thecomplexities that often arise in the development process. Kensington’s full service, in-house development expertise allows us to provideour clients with the skills necessary to make confident and accurate real estate decisions during the site selection, entitlement, andconstruction process to help maximize their performance.The Kensington team is comprised of resourceful and driven veterans that have the relationships and market knowledge to identifycaptivating development and redevelopment opportunities and the expertise to execute on them. To date, Kensington’s founders havedeveloped over 65 projects totaling more than 7 million square feet of property. Each project is regarded as a partnership with our clientsand we promote a working environment in which communicationand service are essential.A commitment to excellence, creativity, leadership, and the cultivating of relationships has been and will remain a hallmark of eachPrincipal as they move forward at Kensington Development Partners.2 700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COMJay Eck, Principal at Kensington Development Partners, has built an enviable reputation as a leader in retail development in the Midwest over the last 30 years. He has persevered throughmultiple economic cycles, remaining at the forefront of retail trends and leading to completion numerous multi-faceted, groundbreaking developments totaling more than 10 millionsquare feet. Eck coordinates development projects from conception through completion, negotiating purchase agreements with land sellers and leases with the tenants. Eck’s vastexperience and creative approach to understanding and solving the complexities that often arise in the development process were a driving force behind his development success over theyears. His creative approachandextensive experience will help thedevelopmentteam understandand solve the complexities thatwill arise from theproject.Chad Jones,Principal at Kensington Development Partners, is a CPA and had previously been the Chief Financial Officer of Bradford Real Estate for over 10 years while working in thefinance and real estate industries for 20 years. Jones procures all joint venture, banking, and investor relationships for Kensington. He has extensive experience with municipal incentiveagreements, lease negotiation, entitlements, property management and contract negotiation. Jones has a Bachelor’s degree in Accounting and a Master’s Degree in Real Estate Law.Jones will runall financialmodels andsecure all requiredfinancingfor the developmentandwill be the main point of contact for any incentiveagreements with the Village.John Schoditsch,Principal at Kensington Development Partners, brings over 20 years of commercial real estate experience to the Company. Prior to his development career he was a FirstVice President at CB Richard Ellis, and in his last year of brokerage was named 2004 Retail Broker of the Year Finalist. After a successful tenure at CB Richard Ellis, Schoditsch became apartner at Bradford Real Estate and partnered with Eck to procure the majority of Bradford Real Estate’s development deals over the last 13 years. Schoditsch has an exceptional reputationwithin the brokerage and retail community and has used his many years of experience to cultivate those strong relationships with brokers, retailers and municipalities to help procure andmaintain a vital development pipeline. He has a vast amount of experience in site selection, deal procurement, contract and lease negotiation, and entitlements.  Over the last 20 years,Schoditsch has worked with the majority of expanding retailers that have entered the Chicagoland area, including, Mariano’s, LA Fitness, Kohl’s, Cooper’s Hawk, Flix Brewhouse, Starbucks,Chase Bank, PNC Bank, Portillo’s, Art Van, Goodyear, Walgreens, CVS, McDonald’s, Raising Cane’s, Aldi, Noodles and Co. and Panera. Schoditsch will use his development and marketingexpertise to secure the properend users for thedevelopment.Experience and QualificationsOf Individual Team Personnel3 700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COMFinancial Equity Partner - IM PropertiesKensington Development Partners and IM Properties have formeda partnership that combines Kensington’s vast experience incommercial real estate development with IM’s substantial cashresources and entrepreneurial spirit. With IM’s portfolio currentlyvalued in excess of One Billion Dollars, the partnership has accessto substantial cash resources from internal funds enabling themto maximize the potential of a wide range of exciting commercialdevelopment opportunities. The partnership between Kensingtonand IM Properties has seen the principals of both companieswork together to deliver over 1,850,000 square feet of ground updevelopment since 2009, an investment of over $550M. Withtheir substantial cash resources, entrepreneurial structure, andstrong relationships, Kensington and IM Properties can maximizetheir potential to develop, acquire, or invest in a wide range ofexcitingcommercial real estate opportunities.4 2. Project TeamKensington Development PartnersOverall Team Leader, Leasing, Zoning & Entitlements, Construction Manager, Marketing, Budgeting & Financing700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COMIM PropertiesFinancial Equity PartnerLegal CounselBecker GurianEngineerWoolpertProduction ArchitectsNorr5 700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM3. Organizational Chart – Ownership StructureOwnerJoint Venture Kensington/ IM Properties (Single Purpose LLC to be formed)50%Kensington Development Partners Inc. (Developer)James EckJohn SchoditschChad Jones50%IM Properties PLC(Equity)Lord Robert Edmiston6 700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COMPrincipals’ Development History65 PROJECTS - OVER 7 MILLION SF7Year Completed Center Name Address City State Intersection SF Description/Anchor2020 * Oakridge Court Algonquin IL NWC Randall Rd & Becky Lynn Lane 20,442 Aldi2020 * Sawmill Station * 6763 Dempster St Morton Grove IL SEC Dempster St & Waukegan Rd 310,000LA Fitness, Flix Brewhouse, Kohl's, Coopers Hawk Winery & Restaurant, Dollar Tree, Ross, Grocery Store, 240 Apartment Units2020 * Market Centre * 6200 S Cass Ave Westmont IL NWC 63rd St & Cass Ave 110,000 LA Fitness Signature Club, Starbucks, Small Shop Retail,Cinema/Retail 2020 Schaumburg Corners Schaumburg IL NEC Golf Rd & Roselle Rd 160,290Bob's Discount Furniture, Office Depot, Petco, H Mart, O'Reilly, Mattress Firm, Jimmy Johns, and Orange Theory2019 Park Avenue Center 1919-1931 Skokie Valley Blvd Highland Park IL SEC Skokie Valley Blvd & Park Ave 70,131 Staples, Trek Bicycle, Illinois Bone & Joint, and Foss Swim School2019 * Aldi - Gurnee * 18824 W Grand Ave Gurnee IL NWQ Grand Ave & N Hutchins Rd 19,800 ALDI2019 * Raising Cane's - Batavia * 1998 McKee St Batavia IL SEC Randall & McKee St 4,000 Raising Cane's Restaurant2018 Aldi - Vernon Hills 1800 Milwaukee Ave Vernon Hills IL NWC Milwaukee Ave & Greggs Parkway 19,800 ALDI2017 The Corners of Brookfield 20111 W Bluemound Rd Brookfield WI Bluemound Rd & Barker Rd 750,000Von Maur, Free People, Anthropologie, Silverspot Cinema, Lululemon, Café Hollander, Sendik's Food Market, Cycle Bar, LL Bean, Goddess & Baker, 244 Apartment Units2016 Harwood Heights 7308 W Lawrence Ave Harwood Heights IL NWC Harlem Ave & Lawrence Ave 90,000 Art Van & Portillo's2016 AT&T - Rolling Meadows 1155 Golf Rd Rolling Meadows IL SWC Golf Rd & Algonquin Rd 4,300 Five Guys, Noodles & Co, Jimmy Johns, T-Mobile, Chipotle, Hand & Stone Massage and Panera Bread2016 Mariano's - Orland Park 9504 142nd St Orland Park IL NEQ LaGrange Rd & 143rd St 84,000 Mariano's Fresh Market2016 Mariano's - Westmont 150 W 63rd St Westmont IL NWQ 63rd St & Cass Ave 84,000 Mariano's Fresh Market2016 Lombard 435 W Roosevelt Rd Lombard L SEC Roosevelt & Finley 90,000 Mariano's Fresh Market2015 Just Tires - Lake Zurich 175 Quentin Rd Lake Zurich IL NWC Rt 22 & Quentin Rd 6,600 Just Tires2014 Fox Run Square 1212 S Naper Blvd Naperville IL NEC 75th St & Naper Blvd 143,469 Mariano's Fresh Market, ACE Hardware, ATI, GNC, Massage Envy2013 AAA 1680 N Milwaukee Ave Vernon Hills IL SWC Milwaukee Ave & Gregg's Pkwy 9,000 AAA2014 Mariano's - Lake Zurich 1350 E Rt 22 Lake Zurich IL NWC Rt 22 & Quentin Rd 90,000 Mariano's Fresh Market, PNC Bank, McDonald’s2013 Mariano's - Harwood Heights 7401 W Lawrence Ave Harwood Heights IL SWC Lawrence Ave & Oketo Ave 82,000 Mariano's Fresh Market2013 Mariano's - Wheaton 625 S Main St Wheaton IL NWC Roosevelt Rd & Naperville Rd 85,000 Mariano's Fresh Market2013 Mariano's - Frankfort 21001 S La Grange Rd Frankfort IL NEC Rt 30 & La Grange Rd 85,000 Mariano's Fresh Market, Physicians Immediate Care, Noodles & Company, Jersey Mike’s2012 HH Gregg - Crystal Lake 4483 Rt 14 Crystal Lake IL SEQ Rt 31 & Rt 14 32,446 hhgregg2012 Mariano's - Palatine 545 N Hicks Rd Palatine IL NEQ Hicks Rd & Baldwin Rd 80,000 Mariano's Fresh Market, PNC Bank2011 Chase - Downers Grove 6241 Main St Downers Grove IL NEC 63rd St & Main St 3,819 Chase2011 HH Gregg - Niles 5701 W Touhy Ave Niles IL SEQ Touhy Ave & Lehigh Ave 36,876 hhgregg, PNC Bank2010 Chase - Park Ridge 500 Busse Hwy Park Ridge IL SWC Busse Hwy & Greenwood Ave 4,121 Chase2009 Franklin Marketplace 10420 Grand Ave Franklin Park IL NWC Grand Ave & Mannheim Rd 19,430 CVS Pharmacy, Chase, Sonic2008 ALDI - Northlake 50 W North Ave Northlake IL NEC North Ave & Hillside Ave 17,000 ALDI2008 Chase - Barrington 136 Northwest Hwy Barrington IL NEC Rt 14 & Prospect Ave 4,604 Chase2008 Gregg's Landing South1640 N Milwaukee Ave Vernon HillsIL SWC Milwaukee Ave & Gregg's Pkwy285,000 Lowe's, Mariano’s Fresh Market, AAA, Staples, MB Bank, Starbucks, Panda Express, Jersey Mike’s2008 Ogden Hill 1200 Ogden Ave Montgomery IL US Hwy 30 & Rt 34 534,000 Menards, JCPenney, Office Depot2008 Somers Market Center 6119 31st St. Somers WI NWC Rt 31 & 38th St 400,000 Walmart Supercenter, Sam’s Club 700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COMPrincipals’ Development History61 PROJECTS - OVER 7 MILLION SF82007 Spring Hill Retail Shops 27 S Western Ave Carpentersville IL SWC Rt 31 & Huntley Rd 15,616 Chase, Jamba Juice, US Cellular, Panda Express, 2nd Wind, SportClips2007 Bradford Commons 2728 W 75th St Naperville IL SEC Rt 59 & 75th St80,000 XSport Fitness, Starbucks, SportClips, La Hacienda2006 Bradford Square 122 W North Ave Northlake IL NWC North Ave & Hillside Ave 14,976 Chase, Potbelly Sandwich Works, Panda Express, Cingular2006 South Holland Retail Shops 390 E 162nd St South Holland IL NWC 162nd St & South Park Ave 20,820 Walgreens, Chase, Cleaners Depot2005 The Marketplace of Glenwood 18701 S Halsted St Glenwood IL SEC 187th St & Halsted St 50,000 ALDI, Chase, Autozone2005 Walgreens 3009 W St Charles Rd Lombard IL SWC St Charles Rd & Elizabeth St 14,000 Walgreens2005 Shoppes of Elmhurst 680 E North Ave Elmhurst IL SWQ North Ave & Route 83 8,000 Starbucks, ATI, Sport Clips, Jimmy John's2004 CVS Pharmacy 200 W Northwest Hwy Palatine IL NWC Rt 14 & Smith Rd 13,013 CVS Pharmacy2004 CVS Pharmacy 1855 W Irving Park Rd Schaumburg IL SEC Irving Park Rd & Wise Rd 13,013 CVS Pharmacy2004 Greenfield Commons 2360 W Indian Trl Aurora IL SEC Indian Trail Rd & Orchard Rd 225,000 Lowe's, Office Depot, Factory Card Outlet, Bank of America, CVS2004 Market Place of Darien 2425 75th St Darien IL SWC 75th St & Lyman Ave 35,600Oakbrook Bank, Back to Bed, SportClips, Cleaners Depot, Vitamin Shoppe, Cingular Wireless, Chicago Home Fitness, WineStyles, Panda Express, Jimmy Johns2004 Market Place 413 N Milwaukee Ave Vernon Hills IL SEQ Townline Rd & Milwaukee Ave 190,000 Redevelopment of Super Kmart to: Bed Bath & Beyond, JoAnn Fabrics, DSW Shoes, Ashley Furniture, Old Navy2004 Walgreens 562 Main St Hamilton OH Main St & Eaton Ave 13,650 Walgreens2004 Walmart Supercenter 2500 W 95th St Evergreen Park IL NWC Western Ave & 95th St 151,980 Walmart Supercenter, Sam’s Club2003 Village Center 5720 Washington Ave Mt. Pleasant WI Village Center Dr & Hwy 20 11,600 Chipotle, Noodles & Co, Starbucks, Kinko’s, AT&T Wireless2003 The Crossings 5500 Washington Ave Mt. Pleasant WI Village Center Dr & Hwy 20 250,000 Kohl’s, Jewel-Osco, Catherine’s, Panera Bread, Cost Cutters, Sally Beauty, Hallmark, Dress Barn, Shoe Carnival2003 Meadows Crossing Shopping Center 1317 Golf Rd Rolling Meadows IL SWC Golf Rd & Algonquin Rd 240,000 Meijer, Chipotle, Washington Mutual, Cookies by Design, Gino’s T-Mobile, Honey Baked Ham, Game Stop2003 The Landing 159 N Weber Rd Bolingbrook IL SWC Weber Rd & Boughton Rd 112,500 PetSmart, Pier One, Sears Appliance, OfficeMax, Borders Books, Outlots2003 Walgreens 57 W Main St Amelia OH Main St & Chapel Rd 14,560 Walgreens2003 Shoppes of Riverwoods 2001 N Milwaukee Ave Riverwoods IL NEQ Milwaukee Ave & Deerfield Pkwy 30,000 Panera Bread, Chase Bank, Jimmy John's2002 Archway East 815 Cog Cir Crystal Lake IL NWC Rt 31 & Rt 14 12,000 Vitamin Shoppe, Chicago Home Fitness, Corner Bakery, Nextel, Portillo’s, TGIF Fridays2002 Walgreens 2751 E Main St St. Charles IL SWC Main St & Lakeside Dr 13,905 Walgreens2000 Strip Center 2558 W Schaumburg Rd Schaumburg IL NEC Schaumburg Rd & Barrington Rd 15,000 Chipotle, Hallmark, PrimeCo, Mattress Giant2000 The Home Depot Center 950 Rt 59 Bartlett IL SWC Rt 59 & Stearns Rd 180,000 Home Depot, First American Bank, KFC/Taco Bell/Pizza Hut, Outlots1999 Sam's Club - Batavia 501 N Randall Rd Batavia IL Route 31 & south of Fabyan 150,000 Sam’s Club, Portillo’s, Bennigans, Chuck E Cheese1999 Market Place 1460 Golf Rd Rolling Meadows IL NWC Algonquin Rd & Golf Rd 391,114 Walmart, Sam's Club, Chili’s, Old Country Buffet, Small Shops1998 The Marketplace South 235 N Milwaukee Ave Vernon Hills IL Rt 60 & Milwaukee Ave 360,000 Sam's Club, Kohl’s, Extended Stay America, Evanston NW Hospital, Carpet Wholesale, US Bank1998 Walgreens 101 Lily Cache Ln Bolingbrook IL SWC Route 53 & Lily Cache 13,905 Walgreens1997 Odyssey West 3440 Odyssey Ct Naperville IL NWC Route 88 & Route 59 700,000 Car Max, Odyssey Fun World1997 Westhill Plaza 2201 S Kensington Dr Appleton WI SWQ Kensington Dr & Calumet St 275,000 Home Depot, PetsMart, Burlington Coat Factory, Small Shops1997 Deer Grove Crossing 609 Dundee Rd Palatine IL SWC Rand Rd & Dundee Rd 180,000 Home Depot, Starbucks, Sprint, Midas, Dunkin Donuts, Small Shops1996 Circuit City - Green Bay 1940 W Mason St Green Bay WI Mason St & US 41 26,000 Circuit City1996 Portage Crossings 6087 Hwy 6 Portage IN SEC Hwy 6 & Willowcreek Rd300,000 Wamart, Jewel-Osco, Hollywood Video, McDonald’s, Taco Bell, Eyeglass Emporium OUTLINE•Site Location•Project Summary•Flexibility Matrix (Forthcoming)•Preliminary Site Plan•Floor Plan•Elevations•Material Board•Survey•Landscape Plan700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM9 SITE LOCATION700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM10 PROJECT SUMMARY700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM11NORR and Larson Engineering are working on behalf of Kensington Development Partners to manage the development of Phase III of Lexington Station.In 2013, the City approved a Master PUD for the Lexington Station redevelopment project at the southwest corner of Lexington Avenue North and Red FoxRoad. The total project area is 7.57 acres in size and is comprised of three separate parcels (3833 and 3771 Lexington Avenue and 1120 Red Fox Road).Phase I of the development was completed in 2013-14 and Phase II was completed in 2017-2018. Phase III, as described in this narrative, will complete thedevelopment and secure Lexington Station as a retail destination in Arden Hills.Modifications to the Master PUDPhase III shall consist of the demolition of the existing multi-tenant building and redevelopment of Lot 3, Block 1, of the Roberts Addition to Arden Hills.Kensington Development Partners is seeking modifications to the Master PUD to accommodate a new proposed design of this approximately 4.24-acre site.The existing approved PUD for Phase III depicts (2) separate one-story buildings, one 17,841 SF Retail Anchor and one 15,210 SF Retail/Office building. Theproposed plan would consist of a one-story grocery anchor with a total of 207 parking spaces. The proposed changes to the parking fields in Phase I and IIwould increase the total parking of the development to 421 spaces while maintaining access and circulation aisles. During construction of Phase III,theplanned new access driveway on Lexington Avenue in alignment with the Target service road will be completed and the existing Lexington Ave driveway wouldbe closed.Building DesignKensington Development Partners proposes the construction of a building to match the cohesive design of the existing buildings of Phase I and IIdevelopments. The use of similar materials and design features will seek to harmonize the development and maintain the City’s focus on high quality andtimeless materials. The transparency requirements have been considered in the development and met with the use of opaque windows in the anticipatedservice areas. The non-primary facades will utilize the previously approved rock face CMU, with color consistent with the brick building material, on the non-primary façade of the retail building in Phase II. FLEXIBILITY MATRIX700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM12B-3 District Standards Development ProposalMinimum Lot Area13,000 SF 183,694 SFMaximum Building Height35 FT 35 FTMaximum Floor Area Ratio0.8 0.23Maximum Structure Coverage40% 23%Minimum Front Yard Setback50 FT 140.5 FTMinimum Rear Yard Setback20 FT 37 FTMinimum Side Yard Setback20 ft (min) / 40 ft (total) 68 FT (min) / 229 FT (total) PRELIMINARY SITE PLAN700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM13GNIDLIUBDESOPORPFS000,348282138197999999725LEXINGTON AVENUEEXISTINGBUILDING'54DUMPSTERENCLOSURECOMPACTOR'222194''212'43.3324''42'42CROSS ACCESS PREDICTEDON APPROVAL BYNEIGHBORING TENANTS68.67''15.041'90.73161.33''42'819' 9''8163''4224' 12' 26''15.7EXISTING ACCESSTO BE REMOVEDDescriptionRev. DateLEXINGTON STATIONPHASE 3RED FOX ROADARDEN HILLS, MN 55112Sheet Title:Project #:Drawn By:Checked By:Issue Date:12206100.000TJRMJW10.07.203524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2020 Larson Engineering, Inc. All rights reserved.P:\Projects\Projects - 2020\12206100 - Lexington Station - Phase 3 (Kensington Development)\C. Design\Drawing Files\12206100 C200 - Paving.dwg3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Project Title:KENSINGTONDEVELOPMENTPARTNERS700 COMMERCE DRIVE - SUITE 130OAK BROOK, IL 60523Client:Date: Lic. No.:I hereby certify that this plan,specifications or report was preparedby me or under my direct supervisionand that I am a duly licensedProfessional Engineer under the lawsof the state of Minnesota.PRELIMINARY NOT FOR CONSTRUCTION0NORTH15 30 60Sheet:PAVING PLANC200STANDARD PARKING STALLS = 200ADA PARKING STALLS = 7TOTAL PARKING STALLS = 207PARKING STALL COUNTMinimum Lot AreaMaximum Floor Area RatioMaximum Structure CoverageMinimum Front Yard SetbackMinimum Rear Yard SetbackMinimum Side Yard SetbackB-3 Distict Standards13,000 SF0.840%50 ft20 ft20 ft (min) / 40 ft (total)Development Proposal183,694 SF0.2323%140.5 ft37 ft68 ft (min) / 229 ft (total) FLOOR PLAN700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM14 ELEVATIONS700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM15 ELEVATIONS700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM16 MATERIAL BOARD700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM17 SURVEY700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM18 LANDSCAPE PLAN700 COMMERCE DRIVE, SUITE 130, OAK BROOK, IL 60523 630.402.6065WWW.KENSINGTONDEV.COM19 Page 1 of 2 AGENDA ITEM – 1B MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Mike Mrosla, Community Development Manager/City Planner SUBJECT: B-2 District Setback and Design Standards Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A For Council Consideration Council may consider providing further direction on revising the B-2 District design standards. Background At the work session meeting on September 17, 2018 the City Council discussed building facade and parking setbacks standards for the B2 district. Staff proposed revising the front yard setback requirement from 20 feet to 50 feet. Staff also recommended removing the requirement that at least 50 percent of the largest building on each site be constructed at the front setback line of 20 feet. Council and staff agreed on removing the City code language below (Attachment A) and revising the front yard building setback to 50 feet (Attachment B). The following language is proposed to removed: • 1325.05 Design Standards, Subd. 8, (F) (B): o Twenty percent (20%) of all other first level building facades that are reasonably visible from the public right of way shall be comprised of window or door openings. Simulated or opaque windows may be used on service areas. • 1325.05, Subd. 8, M. Parking (1) (2): o Placing parking between the street right-of-way and a building shall be discouraged. o No more than 50 percent of the parking on a site may be between buildings or in the side yards. However, the Council did have additional concerns about building façade requirements. At its August 12, 2019 and June 8, 2020 work sessions, the City Council and staff continued discussing the façade transparency requirements on mechanical and storage areas in the B-2 and B-3 Districts. Page 2 of 2 During the discussions, Council asked staff to review spandrel glass and determine if it could be illuminated to appear as an active storefront when viewed from an adjacent public street. Upon review it was determined that spandrel glass should not be illuminated. Unlike typical window glass, which is meant to be transparent, spandrel glass is designed to be opaque in order to help hide features between the floors of a building, including vents, wires, slab ends and mechanical equipment. If the intent is to have the space to look occupied by illumination, spandrel glass should not be used. Following a discussion, Council and staff concurred that the existing ordinance shall not be amended and that the existing language in subsection A and shown below provides the city the authority to wave the transparency requirements when privacy concerns are warranted otherwise all windows shall consist of transparent glass. “Fifty percent (50%) of all first level building façades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. Transparency requirement may be waived by the City where privacy concerns warrant.” Next Steps Based on the direction provided by the City Council, staff will bring this item to the January or February Planning Commission for review. Budget Impact NA Attachments A. 1325.05 Design Standards Subd 8. Redline B. District Provisions Table Redline 1325.05 Design Standards. Subd. 8 Additional Design Standards for New Development, Redevelopment, and Modifications to Existing Sites in the B2 and B3 Districts. (revised 04/27/15) Unless preempted by the standards in this section, all other zoning provisions shall apply: A. Purpose and Intent. The purpose of these additional design standards is to promote a high level of architectural, landscaping, and site design in the business districts of Arden Hills. The City seeks to create a unified, harmonious, and high-quality environment to foster a distinct, positive, and successful image for the City. The criteria by which new development, redevelopment, and site modifications in the Districts shall be judged are as follows: 1. Consistency with provisions of the comprehensive plan and other guiding plans as amended from time to time; provisions of the zoning ordinance and subdivision ordinance; and all other applicable regulations. 2. Use of appropriate materials, lighting, textures, colors, and architectural and landscape forms to create a unified, high-quality design concept for each site that is compatible with adjacent and neighboring structures and functions. 3. Creation of unified site designs, each with a sense of internal order, that provide desirable environments for site users and visitors and the community as a whole and that consider all site elements. 4. Provision of safe and adequate access from public streets to sites giving ample consideration to the location and number of access points, the safety and convenience of merging and turning movements, and traffic management and mitigation. 5. Provision of on-site vehicular, bicycling, and pedestrian circulation by way o f interior drives, parking areas, pathways, and walkways adequate to handle anticipated needs and to safety buffer pedestrians and cyclists from motor vehicles. Ample consideration shall be given to the width of interior drives, internal traffic movement and flow, separation of pedestrian, cycling, automobile; and delivery traffic, and the safe, convenient, and practical arrangement of parking spaces. B. Application. The standards in this Section should apply only to the building or site elements being developed or altered (i.e. a proposal for changes to a building would be required to meet only those standards that pertain to buildings while changes to a parking area would be required to meet the standards for parking areas but not for buildings). The design standards shall be applied proportionately to the degree of change proposed. Upon recommendation from the Planning Commission, the City Council may waive specific design standards based on the scale of the project. The City Council shall make the final determination on the compatibility and consistency with the design standards. C. Architectural Style and Building Character. Evaluation of a project shall be based on the quality of its design and on its relationship to its surroundings. Site characteristics to be evaluated for this purpose include, but are not limited to, building and landscaping materials, colors, textures, shapes, massing, building components, height, roof-line, and setback. Monotony of design, both within projects and between projects and its surrounding, is prohibited. Variation in detail, form, and arrangement shall provide visual interest. (revised 11/25/13) D. Buildings shall be constructed of materials that are enduring, timeless, and well - detailed. Other new materials of equal or better quality to those listed may be approved by the Community Development Department. (revised 11/25/13) 1. At least seventy-five percent (75%) of the exterior building materials shall be of brick masonry, tile masonry, natural stone (or synthetic equivalent), decorative concrete plank, transparent glass or any combination thereof. (revised 11/25/13) 2. Trim and other accent or decorative features may be metal, wood, split faced block, EIFS, or stucco. Metals shall have a matte finish and have visible corner moldings and trim when used on exterior walls. EIFS shall be located at least twelve (12) feet above the ground line. (revised 11/25/13) 3. Undesirable materials shall include simulated brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or panels, brightly colored metal roofing or canopies, pre-cast tilt-up walls, mirrored or reflective glass, and materials that represent corporate colors or logos not in conformance with approved building materials. (revised 11/25/13) E. Building Design. The arrangement, massing, materials and colors shall work to create a high quality development that is responsive to existing buildings, site features, and site design on adjoining sites in the district. (revised 11/25/13) 1. At least fifty percent (50%) of the largest building on each site shall be constructed at the front setback line. 2. Façade treatment shall be carried around all sides. Architectural elements such as, but not limited to, windows, shutters, awnings, doors, masonry exterior veneers, cornice detailing, window casings, and other architectural details should demonstrate consistency on all sides of the structure that are reasonably visible to the general public. Plain flat walls shall not be permitted when viewable from the public right -of-way or public areas. 3. To avoid long unbroken expanses and to increase visual interest from the street, buildings of more than 40 feet in width shall be divided into smaller increments (between 20 and 40 feet) through articulation of the facades to convey the impression of individually-constructed small storefronts or, in the case of housing, housing units. This can be achieved through the combination of the following techniques: a) The use of windows and doors; b) Façade modulation-stepping backward or forward or extending a portion of the façade; c) Vertical divisions into storefronts with separate display windows and entrances; d) Recesses and projections such as porches, dormers and bays that create shadows and add visual interest; e) Variation in the rooflines by using multiple roof and ridge lines perp endicular to one another, offsetting single roof lines, stepped roofs; f) Providing a lighting fixture, trellis, tree, or other landscape feature with each interval. 4. Awnings or overhangs shall be provided at the primary entryway and at all entrances fronting a public street to provide protection for pedestrians. Awnings shall be opaque so as not to create a glowing effect with lights under the awnings. Awnings shall be constructed of durable and protective material, and shall be properly maintained. Plastic or fiberglass awnings shall not be permitted. (revised 11/25/13) 5. Any multi-level building shall distinguish the ground floor level from the upper floors by use of any or a combination of these techniques: an intermediate cornice line, difference in building materials or details, awnings trellis or arcade, special window details, or brick corbels or quoins. A strong base and top for multi-story buildings shall be established; middle layers shall be simpler. Detail shall be an integral part of the architecture rather than a series of applied elements. 6. Standardized corporate or franchise architecture identified with a particular chain shall be discouraged unless it is compatible with surrounding architecture and conforms to these design standards. (revised 11/25/13) 7. Entrances shall have convenient access to the street frontage and to parking serving the use. For those properties along County Road E, access to the street frontage shall be given priority where feasible. F. Window and Door Openings (revised 11/25/13) 1. Commercial Façade Transparency. a) Fifty percent (50%) of all first level building façades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. Transparency requirement may be waived by the City where privacy concerns warrant. (revised 11/30/15) b) Twenty percent (20%) of all other first level building facades that are reasonably visible from the public right of way shall be comprised of window or door openings. Simulated or opaque windows may be used on service areas. (revised 11/30/15) c) If the building is a one story design and the first floor elevation exceeds twelve (12) feet, then only the first twelve (12) feet shall be included in calculating the façade area. (revised 11/30/15) d) The City may consider a proportional reduction in the transparent window and door requirement on the public street façade if additional transparent glass is used on the remaining sides. (revised 11/30/15) 2. Residential Façade Transparency. Twenty percent (20%) of all residential building façades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. Transparency requirement may be waived by the City where privacy concerns warrant. (revised 11/30/15) 3. Configurations. The shape, size, and placement of windows and doors shall emphasize the intended organization and articulation of the façade. Windows and doors shall be recessed at least one inch rather than being flush with the building façade. (revised 11/25/13) 4. Materials. Acceptable materials for window trim include anodized aluminum, steel, wood, and clad wood. Door trim shall be made of steel, wood, or clad wood. (revised 11/25/13) 5. For buildings with a use or function that does not readily allow w indows (e.g. cooler or freezer areas, mechanical rooms, security areas, storage areas) the transparent window standards may be reduced at the discretion of the City Council. However, aesthetic interest must be provided by the use of upper level windows or architectural detailing that provides arches, patterning, recesses, and shadowing. Architectural detailing may include such things as change in materials, change in color and other significant visual relief provided in a manner or at intervals in keeping with the size, mass, and scale of the wall. (revised 11/25/13) G. Building Color. Building colors shall be muted. Recommended colors include browns, grays, tans, beiges, and dark or muted green, blues, and reds. Bright or brilliant colors and sharply contrasting colors may be used for only accent purposes occupying a maximum of five percent (5%) of building façades. (revised 11/25/13) H. Fences. Fences shall blend into the landscape, be compatible with other materials used on site, and be made of a material that minimizes corrosion. Finished and treated wood, brick, stone or wrought iron is encouraged. I. Signs. 1. Business signs shall be architecturally compatible with the style, materials, colors and details of the building. Signs shall be incorporated into the façades of the buildings rather than extending past the roof line and should not project more than twelve (12) inches beyond the plane of the façades. Retail business wall signs shall be located in a position above the front window that is located consistently among stores. (revised 11/25/13) 2. All other provisions in Chapter 12, Sign Code, shall apply. J. Site Furnishings and Seating Areas. 1. Site furnishings shall be provided based on the scale of the project. The site furnishings may be spread out on the site or clustered to provide a more formal area. Placing site furnishings near landscaped areas is encouraged. These areas may be shared by multiple tenants on a property or adjacent properties and may include tables, chairs, benches, plantings, and other outdoor amenities such as a plaza. These areas shall be maintained for year round use. Creativity is highly encouraged. These spaces shall be connected to the sidewalk system. 2. Benches and decorative plantings shall be provided near the primary entrance of all buildings on a site. 3. Restaurants shall include a functional outdoor seating area with tables, chairs, plantings, and access to the restaurant. a) No outdoor seating shall be permitted in any portion of the public sidewalks where normal pedestrian traffic flow is obstructed. b) The outdoor seating area shall not be used for exterior storage when the area is not in use. (revised 11/25/13) c) These areas shall be distinguished with decorative fencing and/or plantings. d) If alcoholic beverages are served, the establishment shall take reasonable steps to insure that alcoholic beverages are consumed only by patrons of the establishment who are of age. All other provisions related to the license to serve alcohol shall apply. K. Screening. 1. Trash and recycling equipment, materials, and containers shall be fully enc losed and integrated into the architecture of the buildings. 2. All mechanical equipment, whether roof-mounted or ground-mounted should be integrated into the architecture of the building. It shall be completely screened from the ground-level view of adjacent properties and public streets. Wood screening shall not be permitted. 3. Truck docks and delivery areas shall face away from the public street and shall be integrated into the architecture of the building. L. Landscaping. A minimum of one tree shall be placed along the right-of-way every forty (40) feet. The tree shall not interfere with the roadway and shall be on private property. (revised 11/25/13) M. Parking. 1. Placing parking between the street right-of-way and a building shall be discouraged. 2. No more than fifty percent (50%) of the parking on a site may be between buildings or in the side yards. 1 3. Sufficient parking shall be provided to accommodate the reasonable hourly peak on a given site. Shared parking is encouraged to reduce land devoted to parking. Hourly variations among different types of land use may be considered when estimated parking demands. 24. Plantings shall be used to soften and shade parking lots and parking structures. Parking adjacent to streets should be screened from view with landscaping, including but not limited to trees, hedges, flowers and other bushes and/or decorative masonry walls. Berms shall be discouraged. (revised 11/25/13) 35. Parking lot islands shall be used to distribute large parking lots into separate areas. Parking lot islands shall be planted with trees or include infiltration basins and plantings. Entry drives shall be defined by trees and shrubs. (revised 11/25/13) 46. A concrete curb shall be provided around the periphery of all parking lots and access roads, except where the City Engineer determines that a curb would impede drainage. 57. Parking structures that are visible from off the site shall display an integration of building materials, form, and colors with the principal building. No signs other than directional signs shall be permitted on parking ramp facades. (revised 11/25/13) 68. Parking structures that are visible from off the site shall display an integration of building materials building form, textures, architectural motif, and building colors with the principal building. No signs other than directional signs shall be permitted on parking ramp facades. N. Traffic Study. A traffic study shall be required for all new developments, redevelopments, and significant modifications to existing sites unless waived by the City Council. O. Lighting. Exterior lighting shall be provided for the safety and convenience of occupants and visitors. 1. A lighting plan shall be submitted that shows location, type of illumination and design. A photometric analysis of site and building shall be submitted for City approval with all new construction or redevelopment projects. 2. Exterior lighting shall be consistent in type, design, scale, and color to create unity in the Districts. High-pressure sodium lighting and other similar types of lighting color may be required by the City to promote a unified lighting color throughout the Districts. Other lighting colors may be considered during the City review process. 3. Exterior lighting for parking lots and buildings shall not be excessive and shal l be directed at their intended purposes. 4. Lighting under a gasoline station canopy shall not be directly visible from the street but shall be recessed into the canopy or otherwise shielded. 5. Light washing of buildings and accent lighting may be permitted through the City review process provided that it does not negatively impact residential areas or traffic safety and is complementary to the district as a whole. P. Pedestrian and Bicycle Circulation. Pedestrian and bicycle improvements shall be installed in accordance with the City of Arden Hills Comprehensive Plan and the local guiding plan and shall be in conformance with the following: 1. Site design shall facilitate pedestrian connections and mobility within and between buildings, sites, and uses by providing clear visual indicators through door placement, signage, striping, raised pathways, and integrating landscaping components. (revised 11/25/13) 2. An internal sidewalk system shall link the primary entrance of each building on site with the public sidewalk or trail network. In the event a building is subdivided into multiple separated tenant spaces, a sidewalk must link the primary entrance of each separated tenant space with the public sidewalk network. (revised 11/25/13) 3. Where there is new building construction or renovation where the renovation value is thirty percent (30%) or more of the pre-renovation value of the structure, a minimum six foot concrete sidewalk adjacent to or in all rights-of-way shall be provided. The location of the sidewalk shall be prescribed by the Public Works Director. The new sidewalks shall connect to sidewalks on adjacent properties if they exist. At the discretion of the City Council, the property owner may, in lieu of constructing the sidewalk, pay the City an amount equal to the cost of constructing the sidewalk to satisfy the obligations of this section. Said payment shall be used by the City to further maintain and construct the pathway system within the City. (revised 11/25/13) Q. Bicycle Parking. (adopted 11/25/13) 1. General Requirements. a) Bicycle parking may be provided using the following approaches: bicycle racks, bicycle lockers, or bicycle parking stations. b) Bicycle racks must support a bicycle frame at two locations and enable the frame and one or both wheels to be secured. The City requires that bicycle racks meet inverted "U", ring-and-post, or comparable design standards. c) Bicycle racks or lockers must be securely anchored to a level, concrete or pavement surface. 2. Location Criteria. Bicycle parking shall be located in a safe, designated area and should be within fifty (50) feet of the primary building entrance. Bicycle racks shall be visible either from within the building or the public right-of-way. 3. Dimension Criteria. a) At least two (2) feet of clearance shall be provided from the centerline of each adjacent bicycle rack. b) An access aisle of at least five (5) feet shall be provided in each bicycle parking facility. c) Bicycle racks shall be at least twenty-four (24) inches from a wall to which they are parallel and thirty (30) inches from a wall which they are perpen dicular. 4. Number of Required Bicycle Parking Spaces. For commercial uses, one bicycle parking space shall be provided for every twenty (20) automobile parking spaces. A minimum of two (2) parking spaces is required. R. Drainage/Water Management Plan. Stormwater management plans shall comply with Rule C: Stormwater Management Plans of the Rice Creek Watershed District Rules. S. Environmental Conservation and Sustainability. The City encourages the use of green materials and environmentally friendly construction and site design such as the use of pervious surfaces, green rooftops, energy efficient materials, LEED standards, and other green building techniques. City of Arden Hills Chapter 13 Zoning Code Section 1320 – District Provisions Adopted: November 13, 2006 Page 3 of 5 *See Sections 1320.07 – 1320.14 for further requirements. ** But in no case less than 1/2 Building Height. *** See Section 1330.03. R-1 R-2 R-3 R-4 NB B-1 B-2 *B-3 *B-4 CC *G-B I-1 I-2 I-FLEX CD POS INST 1. Minimum Lot Area (SF per Dwelling Unit) Single Family 14,000 11,000 11,000 11,000 == == == == == == == == == == ====== Two Family 14,000 8,000 8,000 8,000 == == == == == == == == == == ====== Multiple Family PUD == ==5,450 3,630 == ==2,178 == == == == == == == ====== 2. Minimum Lot Area (SF) Non-Residential Uses 14,000 11,000 11,000 11,000 13,000 13,000 13,000 13,000 ==20,000 5 AC 30,000 24,000 24,000 ====13,000 Mixed Use Project or == Multiple Occupancy Center == == == ====13,000 ==5 AC ==20 AC == == == Single Use Project or Free Standing Building == == == ====13,000 ==2 AC ==10 AC == == == ====== 3. Minimum Lot Size (ft) Width/Depth Non-residential == == == ==100/130 100/130 100/130 100/130 100/130 100/100 100/130 100/130 100/130 100/130 ====100/130 Single Family 95/130 85/120 85/120 85/120 == == == == == == == == == == ====== Two Family 95/130 85/120 85/120 85/120 == == == == == == == == == == ====== 4. Height (ft.)35 35 35 35 35 35 50 35 35 35 35 35 45 45 35 35 35 5. Floor Area Ratio (F.A.R.)0.3 0.3 0.3 0.3 0.7 0.7 0.8 0.8 0.3 0.8 ==0.6 0.8 0.8 0.3 0.3 0.7 6. Lot Covered by Structure 25% 25% 25% 25% 35% 35% 45%40%25%40%==30% 40% 40% 25% 25% 35% 7. Min. Landscape Lot Area 65% 65% 65% 65% 35% 25%20%25% 25%20%35% 35% 25% 25% 65% 65% 25% 8. Minimum Building Setbacks (ft) Front yard 40 40 40 40 20 50 20 50 50 20 50 55 50 50 40 40 50 Rear Yard (Principle)30 30 30 30 20 20 20 20 20 20 20 20 20 20 30 30 20 Rear Yard (Accessory)10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Side Yard Interior - Principal (Min/total both yards on lot)10/25 5/15 5/15 5/15 5/15 20/40 10-20 20/40 20/40 10-20 20/40 ** 20/40 20/40 20/40 10/20 10/20 20/40 Side Yard Interior - Accessory 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Side Yard Corner 40 40 40 40 20 50 20 50 50 20 50 50 50 50 40 40 50 Other Setbacks Lakeshore - High Water Mark*** Abutting Residential Zoning District == == == ==30 100 ==100 100 60 100 100 100 100 100 = = = = 100 20 12 ========== 9. PUD & SUP Maximum Dwelling Unit Density Per Net Acre 3 5.5 8 12 ==== ==== 20 ==== == == 50 City of Arden Hills Chapter 13 Zoning Code Section 1320 – District Provisions Adopted: November 13, 2006 Page 4 of 5 **** Total housing units and building square footage will be determined based on the capacity of the adjacent roadways and interse ctions as determined by the required traffic study and may be reduced. Page 1 of 2 AGENDA ITEM – 1C MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Mike Mrosla, Community Development Manager/City Planner SUBJECT: Arden Hills Foundation Benches and GreenStep City Participation Signs Budgeted Amount: Actual Amount: Funding Source: NA NA Arden Hills Foundation City of Arden Hills Council shall consider The Council shall consider the proposed locations of new park benches funded by the Arden Hills Foundation. In addition, the Council shall consider providing staff direction on acquiring additional GreenStep Cities participation signage. Background At a recent meeting the City Council discussed asking the Arden Hills Foundation for financial contribution to assist in acquiring additional parks benches and GreenStep Cities participation signage. Previously the Arden Hills Foundation provided funding to the City to acquire neighborhood watch signs. Park Benches Discussion Staff has identified four (4) potential locations for new benches (Attachment A) if there is a desire to install additional benches along City trails and within park property. Staff is seeking Council direction on the proposed locations. Park benches cost approximately $700 each. GreenStep Cities Participation Signage Discussion During the same meeting the Council asked if the Foundation could potentially contribute in acquiring additional GreenStep Cities participation signage. Minnesota GreenStep Cities is a voluntary challenge, assistance and recognition program to help cities achieve their sustainability and quality-of-life goals. The City of Arden Hills is currently recognized as a Step Two (2) Page 2 of 2 GreenStep City. Once named a GreenStep City, the municipality has the opportunity to purchase a participation sign(s) to be added at any state highway, County or City road entrance to the city. Signs are not permitted to be located on freeways. Any signs located in MNDOT and County right of way (ROW) require approval from the specific agencies prior to placement. The signs are two (2) feet by two (2) feet and cost $52.00 per sign. Signs can be ordered through the GreenStep Cities. Generally GreenStep City participation signs are attached to the green city identifications signs. When the City of Arden Hills was named a GreenStep City the City purchased one (1) sign. The sign was attached to the existing city identification sign located within the median on Minnesota State Highway 51 (Attachment B) and shown below. Upon review of existing City of Arden Hills identifications signs the City currently has one (1) existing identification sign that can accommodate a GreenStep City sign. The sign is located on Cleveland Avenue adjacent to New Brighton (Attachment C). The City can acquire additional signs and place standalone GreenStep Cities signs. However, it is worth noting that according to the MNDOT Traffic Engineering Manual, the population figures must be on city identification signs and use the population figure of the last official Federal or State census. If a community requests the population figure to be updated, MNDOT will update the population figure at the cost of the community. The 2020 Census count is now complete, and the Census Bureau is currently processing the data. It is anticipated that within the next year the City will have the opportunity to work with MNDOT and update the identification signs. At that time there may be an opportunity to purchase and located additional identification signs at the direction of the City Council. At Council direction staff can identify potential location for signs and bring it back for discussion at a future work session discussion. Council and staff can determine how many GreenStep Cities signs to purchase. Budget Impact Pending direction from the Council staff can coordinate funding contribution from the Arden Hills Foundation for the park benches and GreenStep Cities signs. Attachments: A. Existing and proposed City park benches exhibit B. Existing City identification sign with GreenStep Cities participation signage exhibit C. Existing City identification signs exhibit !( !( !( !( !(!(!(!(!( !( !( !(!(!(!( !(!(!(!(!(!(!(!(!( !( !( !( !( !( !(!( !(!(!(!(!(!( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !(!(!(!( !( !( !( !( !( !(!( !( !( !( !( !(!(!(!(!( !(!(!( !( !( !( !( !(!( !(!(!(!(!( !( !( !( Tony Schmidt Regional Park Crepeau Nature Preserve Hazelnut Park Ingerson Park Freeway Park Tony Schmidt Regional Park Sampson Park Lindey's Park Charles Perry Park Tony Schmidt Regional Park Valentine Park Floral Park Royal Hills Park Cummings Park Arden Manor Park Johanna Marsh Arden Oaks Park Community Gardens Lake Josephine Lake Johanna Valentine Lake Round Lake Karth LakeSun Fish Lake Bench Locations 01,500 Feet Ü Document Path: P:\PR&PW\Parks\Asset Management Inventory\Park-Trail bench locations.mxd!( !( !(!( !( !( Proposed Bench Site #1 Proposed Bench Site #2 Proposed Bench Site #3 Proposed Bench Site #4 Attachment A Existing City identification sign located within Minnesota State Highway 51 ROW and has a GreenSteps Cities participation Sign attached. Attachment B Existing City identification sign located within City ROW Existing City identification sign located within State ROW and with GreenSteps Cities participation sign attached. Existing City identification signs located within interstate freeway ROW Attachment C Page 1 of 2 AGENDA ITEM – 1D MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Mike Mrosla, Community Development Manager/City Planner SUBJECT: Twin Cities North Chamber COVID19 Business Assistance Programs Budgeted Amount: Actual Amount: Funding Source: NA NA NA Council shall consider The Council shall consider recommendations from Twin Cities North Chamber on how cities can assist business that have been impacted by COVID19. Background At its November 23, 2020 Economic Development Authority meeting the Commissioners recommended staff review Twin Cities North Chamber suggestions on how cities can assist businesses impacted by COVID19. According to the Chamber, cities are offering the following assistance to businesses: 1. Liquor license refunds, rebates or deferral of fees until sometime in 2021. 2. Deferment or forgiveness of 2021 business related licenses and fees. The Chamber recommends this especially for hospitality uses that have been directly impacted by the Executive Orders. 3. Temporary signage flexibility. 4. Expanded hours of operation. 5. Zoning flexibility to allow certain uses to operate outdoors adjacent to their location. Discussion The City of Arden Hills has previously approved a similar assistance program as recommended by Twin Cities North Chamber. At its May 26, 2020 meeting the City Council approved a prorated refund of on-sale liquor license fees to businesses affected by Executive Orders. Nine (9) businesses received a refund of their 2020 on-sale liquor license fees. Upon review of other cities the majority have not made a determination on 2021 on-sale liquor licenses fees. However, municipalities are discussing potentially deferring on-sale liquor licenses fees and other Page 2 of 2 miscellaneous fees until spring 2021. The tables below shows information on 2020 License Renewals for businesses, signs and massage establishments and 2020 Liquor Licenses. 2020 License Renewals: Businesses, Signs and Massage Establishments Type of fee # of Businesses Fee Average Fee Non-fee paying licenses (registration) 85 N/A N/A Sign Renewals 93 $ 3,800 $ 40.86 Fee paying licenses 72 $ 9,787 $135.93 Total Number of Business Licenses 157* $13,587 $ 86.54 *Some businesses pay for sign renewal but have a non-fee paying license (registration), and not all fee paying licenses pay sign renewal. **Chart excludes liquor licenses, massage therapists, mobile food units, solicitors, tobacco sales, tree service and waste haulers. 2020 Liquor Licenses In regard to other recommendations, City staff has been monitoring temporary signage within the community and has been flexible with businesses as long as the signage meets the intent of the sign code and doesn’t impact the general safety and welfare of the general public. Staff has not been approached by local businesses requesting to expanded hours of operation. In addition, the City Council approved resolution 2020-024 permitting zoning flexibility for local businesses to utilize outdoor space adjacent to their typical location for expanded dining areas and retails sales. Staff approved four (4) applications for zoning flexibility. Budget Impact Based on the direction provided by the City Council, staff is not anticipating any budget impacts. Attachments: N/A Page 1 of 2 AGENDA ITEM – 1E MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Todd Blomstrom, Public Works Director/City Engineer SUBJECT: Feasibility Report for Snelling Avenue and County Road E Improvements Budgeted Amount: Actual Amount: Funding Source: $2,807,000 $2,816,529 PIR, Utility Funds, State Aid (2021-2025 CIP) (Area 1 and 2) Ramsey County, Assessments Council Should Consider City Council direction is requested regarding recommendations contained within the draft Feasibility Study report for Snelling Avenue North and County Road E. Background/Discussion City staff has completed the draft feasibility study report for the Snelling Avenue North and County Road E improvement project as provided in Attachment B. The report outlines the potential improvements to Snelling Avenue North from County Road E to State Trunk Highway 51. The feasibility study was previously ordered by City Council Resolution 2019-026. The feasibility report describes proposed street and utility improvements organized into two separate areas. Area 1 involves improvements to the 4,300-ft long segment of Snelling Avenue North located south of County Road E as well as street improvements to Cummings Lane and the intersection at Bussard Court. Area 2 involves improvements to the intersection of Snelling Avenue North at County Road E. A significant portion of the report is focused on an analysis of two design alternatives for Snelling Avenue extending to the south of County Road E (Area 1). Alternative 1 consisting of road improvements that include the addition of a pedestrian trail along the west side of the roadway. Alternative 2 consists of roadway improvements that exclude the trail construction, but maintains 8-ft wide paved shoulders along the length of the road. Page 2 of 2 Section 7 of the report provides recommendations for specific street, water main, sanitary sewer, and drainage improvements based on infrastructure needs and available project funding. The recommendations within Section 7 are based on preliminary direction from the City Council during a work session on July 20, 2020 regarding the estimated costs for the potential trail construction and a work session on September 21, 2020 regarding the proposed intersection improvements. Staff is seeking direction from the City Council regarding the following three items. 1. Does the City Council continue to support the recommended roadway and utility improvements along Snelling Avenue North as outlined in the report? 2. Does the City Council continue to support the recommendations to further study the intersection of Snelling Avenue North and County Road E, with a target date for potential improvements in 2023 or 2024? 3. Should staff proceed with a second round of public engagement and schedule the feasibility report to be officially received by the Council in April and an Improvement hearing in May 2021 to make a final determination regarding the project improvements? Budget Impact Proposed project funding sources are a combination of the City’s Permanent Improvement Revolving (PIR) fund, utility funds, Ramsey County, Municipal State Aid, and special assessments for street improvements as summarized in the following table. Area 1: Snelling Avenue North from CR E to Highway 51, including Bussard Ct. intersection Area 2: Roundabout Intersection Improvements at Snelling Ave and County Road E Alternative 1: Reconstruction with addition of pedestrian trail Alternative 2: Full depth reclamation with no trail construction Attachments Attachment A: Presentation Slides Attachment B: Feasibility Report Summary of Project Funding Sources AREA 1 – Snelling Ave N AREA 2 Roundabout Cummings Lane Alternative 1 Alternative 2 Funding Funding Source Funding Amount Funding Amount Amount Amount PIR Fund $1,716,530 $660,780 $0 $32,565 Special Assessments $122,150 $122,150 $18,860 $32,565 Municipal State Aid Funds $0 $0 $330,530 $0 Ramsey County $0 $0 $1,048,179 $0 Sanitary Sewer Improvements $58,420 $60,480 $125,740 $0 Water Main Improvements $440,260 $161,970 $158,230 $0 Storm Drainage Improvements $947,590 $44,200 $0 $20,280 TOTAL $3,284,950 $1,049,580 $1,681,539 $85,410 Feasibility Study Snelling Avenue North and County Road E City Council Work Session December 21, 2020 Slide 1 Previous City Council Review Work Session to discuss feasibility report process:August 12, 2019 Council ordered preparation of feasibility report:August 26, 2019 Work Session to discuss trail and roadway improvements:October 21, 2019 Contamination identified, issued RFP for consultant Nov & Dec Awarded environmental investigation work to consultant:January 13, 2020 Work session to discuss environmental study and trail costs:July 20, 2020 Work Session to discuss intersection improvements:September 21, 2020 Slide 2 Project Area Area 1: Snelling Avenue North •County Road E to Hwy 51 Alternative 1 –Trail Alternative 2 –No Trail •Cummings Lane Area 2: Snelling Ave / CR E Intersection Area 2 Area 1 Slide 3 Design Alternative No. 1 Corridor Challenges Steep slopes at multiple locations Vertical elevation difference up to 25 feet Wetlands, power poles, trees, landscape features Soil contamination at two locations Schematic Design Layout Narrow road width to 28 feet, with curb and gutter Place trail adjacent to back of curb, similar to 2018 trail project Requires storm sewer system and storm water management per RCWD Compounding costs associated with storm sewer and soil disturbance Slide 4 Design Alternative No. 1 Slide 5 Design Alternative No. 2 Schematic Design Layout Full depth reclamation and replacement of pavement Maintain two 12-ft travel lanes and two 8-ft paved shoulders Shoulder pavement markings Minimal disturbance to underlying soil material Slide 6 Design Alternative No. 2 Slide 7 Cummings Lane Pavement Replacement Pavement is highly distressed Deteriorated beyond simple resurfacing Full depth reclamation and repaving Minimal volume, remains rural section Storm inlet repair at east end Slide 8 Water Main Improvements Snelling Avenue No significant history of water breaks Main is located 4 to 8 feet west of pavement edge Single water source to Bussard Ct Replace 600 feet, 8-in diameter WM –Alternative 2 Replace all water main –Alternative 1 County Road E Intersection Replace 12-in dia WM thru intersection Connection to 2018 Water Main project Slide 9 Sanitary Sewer Improvements Snelling Avenue Replace sewer crossing at Skiles Lane Combination of cast iron and VCP pipe Cast iron is highly deteriorated County Road E Intersection Line or replace deteriorated segments Slide 10 Drainage Improvements Snelling Avenue Rural section drainage Subgrade repairs at Bussard Ct intersection County Road E Intersection Line and replace deteriorated segments Slide 11 Intersection Improvements Work Session on September 21, 2020 Intersection Control Evaluation Report Traffic volume assumptions Traffic growth, post COVID Concerns with traffic stacking Direction was to conduct additional traffic study for the intersection in 2021 and 2022 with Ramey County Slide 12 Project Costs Table 4 -Summary of Project Costs AREA 1 AREA 2 Cummings Lane Alternative 1 Alternative 2 Roundabout FDR Improvement Estimated Cost Estimated Cost Estimated Cost Estimated Cost Street Improvements $1,838,680 $782,930 $917,700 $65,130 Sanitary Sewer Improvements $58,420 $60,480 $125,740 $0 Water Main Improvements $440,260 $161,970 $158,230 $0 Storm Drainage Improvements $947,590 $44,200 $479,860 $20,280 TOTAL $3,284,950 $1,049,580 $1,681,530 $85,410 Area 1: Snelling Avenue North from County Road E to Highway 51, including Bussard Ct Area 2: Roundabout Intersection Improvements at Snelling Ave North and County Road E Alternative 1: Reconstruction with addition of pedestrian trail Alternative 2: Full depth reclamation with no trail construction Slide 13 Project Funding Table 5 -Summary of Project Funding Sources AREA 1 AREA 2 Cummings Lane Alternative 1 Alternative 2 Roundabout Improvement Funding Amount Funding Amount Funding Amount Funding Amount PIR Fund $1,716,530 $660,780 $0 $32,565 Special Assessments $122,150 $122,150 $18,860 $32,565 Municipal State Aid Funds $0 $0 $330,530 $0 Ramsey County $0 $0 $1,048,179 $0 Sanitary Sewer Improvements $58,420 $60,480 $125,740 $0 Water Main Improvements $440,260 $161,970 $158,230 $0 Storm Drainage Improvements $947,590 $44,200 $0 $20,280 TOTAL $3,284,950 $1,049,580 $1,681,539 $85,410 Area 1: Snelling Avenue North from County Road E to Highway 51, including Bussard Ct Area 2: Roundabout Intersection Improvements at Snelling Ave North and County Road E Alternative 1: Reconstruction with addition of pedestrian trail Alternative 2: Full depth reclamation with no trail construction Slide 14 Estimated Assessments Slide 15 Street Improvements: Area 1 - Snelling Avenue, County Road E to Highway 51 Estimated Street Costs: ......................................................... $782,930 50% Estimated Street Costs: ................................................. $391,465 Total Street Length Frontage: .............................................. 8,220 feet 50% Cost per Foot: ................................................................... $47.62 R1 Zoned Minimum Frontage Width: ...................................... 95 feet Assessment Rate: ...................................................................... $4,524 Street Improvements: Cummings Lane Estimated Street Costs: ........................................................... $65,130 50% Estimated Street Costs: ................................................... $32,565 Number of Lots: ................................................................................. 8 50% Cost per Foot: ................................................................... $4,071 Public Engagement Comments Received from Public Open House Meeting in October 2019 Roadway pavement is highly deteriorated and needs to be improved Concerns regarding speeding traffic and desire for lower speed limit Concerns or objections to the proposed roundabout intersection Concerns for pedestrian safety along the corridor Comment cards included in Appendix J Slide 16 Project Recommendations Snelling Avenue: County Road E to Highway 51 Proceed with improvements in 2022 Full depth reclamation and replacement of pavement (Alternative 2) Maintain 40-ft width, two 8-ft wide paved shoulders Full depth reclamation of Cummings Lane Isolated replacement of water main and sanitary sewer Reconstruct east 100 feet of Bussard Court Snelling Avenue and County Road E Intersection Conduct additional traffic study of intersection with Ramsey County Report findings and recommendations back to Council Anticipate potential intersection improvements on a separate schedule 2023 -2025 Slide 17 City Council Direction 1.Does Council continue to support the recommended roadway and utility improvements as outlined in the report? Construction in 2022? Estimated funding and assessment rates? 2.Does Council continue to support the recommendations to further study the intersection at Snelling / County Road E with a target date for potential improvements between 2023 and 2025? 3.Should staff proceed with a second round of public engagement, with recommended acceptance of feasibility report in April 2021? Slide 18 FEASIBILITY REPORT SNELLING AVENUE NORTH AND COUNTY ROAD E STREET AND UTILITY IMPROVEMENTS City Project No. PW-20-0100 December 16, 2020 DRAFT Prepared by: City of Arden Hills Public Works Department 1245 West Highway 96 Arden Hills, MN 55112 CERTIFICATION SNELLING AVENUE NORTH AND COUNTY ROAD E STREET AND UTILITY IMPROVEMENTS City Project No. PW-20-0100 I hereby certify that this plan, specification, or report was prepared by me or under by direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota DRAFT ___________________________________________________ Todd A. Blomstrom Date: _________, 2020 License No. 26437 TABLE OF CONTENTS Feasibility Report Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 TITLE SHEET CERTIFICATION TABLE OF CONTENTS 1. Introduction ...................................................................................................................... 1 1.1 Authorization 1.2 Project Scope 1.3 Available Data 1.4 Previous Studies 2. Existing Conditions .......................................................................................................... 4 2.1 Land Use 2.2 Streets 2.3 Intersection Conditions 2.4 Sanitary Sewer 2.5 Water Main 2.6 Drainage 2.7 Environmental Conditions 2.8 Private Utilities 3. Proposed Improvements ............................................................................................... 11 3.1 Street Improvements, Area 1 3.2 Street Improvements, Area 2 3.3 Street Improvements, Cummings Ln and Bussard Ct 3.4 Utility Improvements, Area 1 3.5 Utility Improvements, Area 2 3.6 Easements 3.7 Permits/Approvals 3.8 Construction Access and Staging 4. Public Involvement ........................................................................................................ 17 5. Estimated Cost and Funding ........................................................................................ 18 5.1 Opinion of Cost 5.2 Project Funding 5.3 Preliminary Assessment Roll 6. Project Schedule ............................................................................................................. 22 7. Conclusions and Recommendations ............................................................................. 23 8. Feasibility, Necessity and Cost Effectiveness .............................................................. 24 Appendix A: Study Area Map Appendix B: Intersection Control Evaluation Report Appendix C: Geotechnical Report Appendix D: Sanitary, Water and Drainage Improvements Maps Appendix E: Wetland Delineation Documents TABLE OF CONTENTS Feasibility Report Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 Appendix F: Environmental Investigation Documents Appendix G: Area 1, Alternative 1 Schematic Layout Appendix H: Area 1, Alternative 2 Schematic Layout Appendix I: Area 2 Roundabout Schematic Layout Appendix J: Public Involvement Information Appendix K: Itemized Opinion of Probable Costs Appendix L: Preliminary Assessment Maps and Preliminary Assessment Roll Feasibility Report Page 1 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 1. INTRODUCTION 1.1 Authorization On August 26, 2019, the Arden Hills City Council adopted Resolution 2019-026 ordering the preparation of an engineering feasibility study for the Old Snelling Avenue and County Road E Improvement Project. The resolution directs staff to study the need, cost- effectiveness and feasibility of potential infrastructure improvements within the proposed project area. During the project investigation, soil contamination was identified within the project corridor, which resulted in an expanded scope of work and extended time line for the feasibility study as further described in Section 2. 1.2 Project Scope This report investigates the feasibility of street and utility improvements identified within the City of Arden Hills Capital Improvement Program titled Old Snelling Avenue PMP with Intersection Improvements at County Road E and local streets directly adjacent to the Snelling Avenue corridor. The project was identified as a result of deteriorating street pavement conditions, traffic delays at the intersection of Snelling Avenue North and County Road E, and potential deterioration of water main, sanitary sewer and drainage infrastructure. The project is separated into two distinct parts as described below. Area 1 – Snelling Avenue North  Snelling Avenue North (MSAS 111) from County Road E to State Trunk Highway 51  Bussard Court from Snelling Avenue North to 100 feet west of Snelling Avenue North  Cummings Lane from Snelling Avenue North to east termini Area 2 – Intersection of Snelling Avenue North and County Road E  Snelling Avenue North (CSAH 76) from County Road E to Arden Oaks Drive  Snelling Avenue North from County Road E to 375 feet south of intersection  Lake Johanna Blvd (CSAH 149) from Snelling Avenue N to Ridgewood Road  County Road E (CSAH 15) from Snelling Avenue N to Pascal Avenue A map depicting the location of potential street and utility improvements is provided in Appendix A. This report includes specific recommendations regarding the recommended scope of improvements, estimated project costs, funding sources, estimated assessments and a project delivery schedule. Improvements considered within this report include street reconstruction, intersection improvements, pedestrian trail construction, water main replacement, sanitary sewer repairs and drainage improvements. Feasibility Report Page 2 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 1.3 Available Data  City of Arden Hills 2040 Comprehensive Plan  City of Arden Hills Engineering Record Plans  Intersection Control Evaluation, 2018  Factual Geotechnical Exploration and Engineering Review, dated November 7, 2019  Geotechnical Memorandum, dated October 7, 2020  Pavement Condition Ratings within the project area  Sanitary and Storm Sewer CCTV Televising Inspections Data by the City  Storm Sewer CCTV Televising Inspections provided by Ramsey County  Water Main break and leak history database  GIS database for infrastructure conditions  Field observations of project area  City of Arden Hills Assessment Policy  Arden Hills Engineering Design Standards 1.4 Previous Studies Over the past ten years, the City of Arden Hills completed three studies focused on potential improvements to Old Snelling Avenue within the proposed project area. A brief summary of these three documents is provided below. Preliminary Scoping Document, Old Snelling Avenue Improvements (2010) The City completed a preliminary scoping document for proposed improvements to Old Snelling Avenue North from County Road E to TH 51 in December 2010. This study reviewed five project alternatives as described below.  Alternative 1: Urban Reconstruction (with parking on both sides): Full road reconstruction with one 12 foot driving lane in each direction, eight foot paved shoulders for parking, and concrete curb and gutter.  Alternative 2: Urban Reconstruction (with no parking): Full road reconstruction with one 12 foot driving lane in each direction, a two foot curb reaction distance, and concrete curb and gutter.  Alternative 3: Rural Reconstruction: Full road reconstruction with one 12 foot driving lane in each direction and 6 foot paved shoulders (no additional curb and gutter).  Alternative 4: Rural Reconditioning (bituminous reclaim): This alternative consists of reclaiming the existing 24 foot wide bituminous roadway and reclaiming the 8 foot wide shoulders. The new street and shoulder widths would be replaced to match the existing section (no significant subgrade correction).  Alternative 5: Bituminous Reclaim (Non-State Aid standard): This alternative consists of removing Old Snelling Avenue from the State Aid system and performing an improvement to the roadway segment that does not meet State Aid standards, such as removing the existing paved shoulders. Feasibility Report Page 3 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT The Preliminary Scoping Document did not provide a specific recommendation regarding the preferred alternative. Snelling Avenue North was originally constructed by MnDOT and turned back to the City in approximately 1995. The document includes the following statement: “It should be noted that City staff was not able to receive Minnesota Department of Transportation (Mn/DOT) records for the original construction or maintenance on Old Snelling Avenue. Since the soil borings were obtained within the roadway shoulder areas, City staff believes there possibly might be a concrete base underlying the existing asphalt surface.” 2012 Feasibility Report, Old Snelling Avenue Improvements The City prepared a Feasibility Report in March 2012 for proposed improvements along Snelling Avenue North from County Road E to Trunk Highway 51. This report focused on Alternative 4 from the Preliminary Scoping Document, which includes reclaiming and repaving Old Snelling Avenue to maintain the existing width and lane configuration and no additional curb and gutter. The report describes potential construction of a pedestrian trail extension along Snelling Avenue North as identified in the City’s Parks, Trails, and Open Space Plan. Preliminary cost estimates from a 2008 trail study are sited in the report, with a recommendation to construct an 8-foot wide trail along the west side of Old Snelling Road from County Road E to TH 51. However, it appears that trail construction costs were not included in the project cost estimates within the 2012 Feasibility Report. The 2012 Feasibility Report was completed prior to the current proposal to construct intersection improvements at the intersection of County Road E and Snelling Avenue North and does not include costs for intersection improvements. In addition, recent utility inspections have identified the need to repair or replace deteriorated storm sewer and sanitary sewer within the project area, which are not included in the 2012 Report. Intersection Control Evaluation, County Road E at Old Snelling Avenue (2018) The City and County jointly participated in the preparation of an Intersection Control Evaluation (ICE) study in October 2018 for the intersection of County Road E and Snelling Avenue North. A copy is provided in Appendix B. This report includes an evaluation of traffic control, intersection lane geometry, and operations using projected traffic volumes. The County Road E corridor is projected to see an increase in traffic over the coming years. Two alternatives for intersection modifications were evaluated, including the construction of a traffic signal and the construction of a single-lane roundabout. Both the traffic signal and roundabout alternatives are believed to accommodate future growth in the area, but the study concluded that the roundabout is believed to provide a safer alternative than the current all- way stop control. The intersection volumes did not meet traffic signal warrants. Feasibility Report Page 4 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 2. EXISTING CONDITIONS 2.1 Land Use Properties located within Area 1 (Snelling Avenue North from County Road E to Highway 51) are within the R-1 Single Family Residential District based on the City’s Zoning Map. Two types of properties border the proposed improvements consisting of single family residential properties and two tax-exempt properties located at 3588 Ridgewood Road (City) and 1357 Cummings Lane (State Trust). Properties within Area 2 (Snelling Avenue N and County Road E Intersection) are located in the R-1 Single Family Residential District, with one parcel in the northeast quadrant of the intersection that is zoned within the NB-Neighborhood Business District, generally referred to as the Lindey’s Steakhouse property. The second parcel at 1525 Lake Johanna Boulevard is a R-1 single family residential home with frontage and driveway access within the proposed construction limits of the potential intersection improvements as described below. 2.2 Streets Street improvements considered within the study are organized into two potential improvement areas as described below. AREA 1 – Snelling Avenue North Snelling Avenue North from County Road E to Trunk Highway 51 is an undivided roadway that is approximately 4,300 feet long (0.81 mile) and lies within a 200 foot right-of-way. The northerly 430 feet immediately south of County Road E is an urban section roadway with curb and gutter, two through lanes, one northbound left turn lane and shoulders having an approximate total street width of 44-feet. The remaining corridor is a rural road section having 12 foot driving lanes in each direction and 8 foot paved shoulders, for a total width of 40 feet. Snelling Avenue North was previously a state highway, which was turned back t o the City in the mid-1990s. Soil borings conducted in 2019 indicate fill material varying in depth from 1.5 feet to 11.5 feet and generally classified as clayey sand. Underlying the fill is glacial till consisting of clayey sand and sandy lean clay. The top bituminous pavement thickness ranges from 3-inches to 11-inches thick, with 6-inches to 24-inches of aggregate base above a second lower layer of bituminous pavement along the southern portion of the corridor. A copy of the geotechnical report and soil boring logs are provided in Appendix C. Pavement conditions are highly deteriorated with a current Pavement Condition Rating of 15 out of 100. A majority of the pavement is aging and exhibiting characteristics of distress, such as potholes, rutting, and severe cracking throughout much of the corridor. The demand for frequent pavement patching has become excessive and it is no longer cost effective to maintain the existing pavement though preservation or resurfacing improvements. Feasibility Report Page 5 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT A 140- foot long segment of Snelling Avenue North located approximately 400 feet north of Highway 51 was reconstructed in 2018 during replacement of the bridge that conveys drainage from Lake Josephine to Lake Johanna. Snelling Avenue North serves as a collector roadway and is currently designated as a Municipal State Aid street (MSAS 111). Average daily traffic data indicates a volume of 1600 vehicles per day in 2017, the most recent data available from MnDOT. The roadway is posted at 40 miles per hour in both the northbound and southbound directions. Cummings Lane is a rural section residential street extending approximately 575 feet east from Snelling Avenue North and lies within a 60 foot wide right-of-way. The existing bituminous pavement rating is below 20, with significant block cracking and segments having complete pavement failure. Pavement thickness was found to be only 2 to 3 inches in various locations. Routine patching and pavement resurfacing are no longer cost effective due to the extent of pavement deterioration. The storm sewer catch basin located at the east end of the street collects surface drainage and discharges into the right -of-way for Trunk Highway 51. This catch basin structure and corrugated metal outlet pipe are deteriorated based on inspections conducted in 2020. Bussard Court is an urban section residential street serving 15 residential properties to the west of Snelling Avenue North. This street is approaching the end of service life and should be considered for reconstruction within the next five years. However, the first 100-feet directly west of Snelling Avenue is highly deteriorated due to unstable subgrade conditions. The Public Works department has made several attempts to complete small repairs, but the pavement continues to fail and has become difficult to maintain in the winter and spring. Subgrade corrections are needed to stabilize the pavement. Area 2 – Intersection of Snelling Avenue North and County Road E The intersection of Snelling Avenue North and County Road E is currently controlled by an all-way stop condition. The east leg of the intersection consists of one eastbound and westbound travel lane with a continuous left turn lane and an average daily traffic (ADT) volume of 10,000 vehicles per day (2017). The north leg of the intersection consists of one northbound and southbound travel lane with a dedicated southbound left turn lane and an average daily traffic volume of 6,600 vehicles per day (2019). The west leg of the intersection consists of one eastbound and westbound travel lane with an eastbound left turn lane and an average daily traffic volume of 5,100 vehicles per day (2019). The south leg is described above. The intersection is contained within a large swath of right of way stemming from the previous 1950’s intersection configuration as a state highway. The intersection has been in its current configuration since 1974. Minor improvements were completed along the north and east legs of the intersection in 2018 during construction of an adjacent pedestrian trail. Pavement conditions at the intersection are showing signs of distress, with generally lower pavement condition ratings for the south leg of the intersection as described above. Intersection functionality and crash history are described below. Feasibility Report Page 6 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 2.3 Intersection Conditions In April 2018, the City Council entered into a cooperative agreement with Ramsey County to conduct a traffic study and Intersection Control Evaluation (ICE) for the intersection of Snelling Avenue North and County Road E. The ICE study was completed in November 2018. A copy of the report is provided in Appendix B. The purpose of the ICE report was to evaluate the existing (2018) and future (2038) traffic control layout for the intersection of County Road E and Snelling Avenue North and recommend potential improvements. The report identifies two key points related to the existing intersection function. 1. The County Road E corridor is projected to see an increase in traffic over the coming years with the Bethel University Expansion. 2. MnDOT’s Crash Mapping Analysis Tool (MnCMAT) database indicates there have been 9 crashes at the intersection between January 2013 and December 2015. Existing crash patterns show that the intersection experiences an extremely high rate of 0.68 crashes per million entering vehicles compared to the average rate of 0.34 for all-way stop intersections. The crash rate is higher than the critical rate of 0.65 and the severity rate of 0.76 is higher than the Statewide average severity rate of 0.5. The intersection was simulated with a traffic model for both the AM and PM peak traffic hours using existing (2018) traffic volume data as described in the ICE report. The traffic operations analysis showed that the intersection currently operates at an acceptable Level of Service (LOS) “A” during the AM peak hour and LOS “B” during the PM peak hour. The report concluded “The analysis results indicate there are not major queuing issues currently at the intersection. However, based on field observation during the peak hours, the intersection seems to perform far poorer tha[n] what the analysis is indicating.” The study then continued with further analysis of the intersection, substituting traffic volume data from the 2013 Bethel University Expansion Traffic Stud y in lieu of existing 2018 traffic volume data. This alternative analysis assumed traffic volumes of approximately 30 percent more than measured volumes and identified that the intersection is forecasted to fail during the PM peak hour under current conditions. The study further predicted that the intersection would continue to operate poorly during the PM peak hour under projected increases in traffic volume in the year 2038. The installation of traffic signals are guided by a series of standards, or warrants, that define the minimum conditions under which installing a traffic signal could be justified. The ICE report reviewed existing traffic characteristics and determined that traffic signal warrants are not currently met for the intersection of Snelling Avenue North and County Road E. Installation of a signal would not be justified at this time. The traffic study further reviewed the intersection to determine if warrants are met for installation of a single lane roundabout. Although no formal traffic warrants for roundabouts currently exist, the MnDOT Intersection Control Evaluation Manual states that if a traffic signal or an all-way stop warrant is met, a roundabout should also be considered as a traffic control device. All-way stop warrants are currently met for this intersection, therefore the Feasibility Report Page 7 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT ICE report concluded that installation of a roundabout is considered to be justified and recommended at the intersection of Snelling Avenue North and County Road E. The Arden Hills City Council reviewed and discussed the above information during a work session on September 21, 2020. Traffic conditions at this intersection have recently changed as a result of the COVID-19 pandemic and construction along the I-35W North MnPass Project. The City Council directed staff to conduct further study of the intersection as described in Section 3 of this report. 2.4 Sanitary Sewer The existing sanitary sewer within the study area consists of vitrified clay pipe (VCP), polyvinyl chloride pipe (PVC), and segments with cured in place liner as summarized on the following Table 1. Sanitary sewers were inspected by the City Public Works Department in 2019 using video televising equipment and conditions were documented as shown in the right column on the table. Condition grades are based on a scale of 1 (good) to 5 (significant defects). Pipe sections with condition grades between 3 and 5 should generally be considered for potential rehabilitation or replacement as described in Section 3. A map showing the location of the references sewer segments is provided in Appendix D. Table 1: Summary of Existing Sanitary Sewer Conditions Segment Project Area Pipe Material Pipe Diameter Year Installed CIPP Lining Overall Condition of Main Pipe MH 3-031 to 3-030 2 PVC 8-inch 1983 No 3 MH 3-030 to 3-032 2 VCP 8-inch 1960 No 3 MH 3-033 to 3-032 2 VCP 8-inch 1960 No 3 MH 3-033 to 3-034 2 VCP 8-inch 1960 No 5 MH 3-035 to 3-034 2 VCP 8-inch 1960 No 3 MH 3-038 to 3-037 2 VCP 8-inch 1960 No 5 MH 3-037 to 3-036 2 VCP 8-inch 1960 No 5 MN 3-036 to 3-034 2 VCP 8-inch 1960 No 5 MN 3-043 to 3-042 2 PVC 8-inch 1983 No 2 MH 3-042 to 3-033 2 PVC 8-inch 1983 No 2 MN 8-160 to 8-159 1 VCP 10-Inch 1960 Yes 2 MH 8-159 to 8-158 1 VCP 10-Inch 1960 Yes 2 MH 8-161 to 8-158 1 VCP 8-inch 1960 Yes 2 MH 8-158 to 8-157 1 VCP/CIP 10-inch 1960 No 4 MH 8-016 to 8-015 1 VCP 8-inch 1965 Yes 2 Feasibility Report Page 8 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 2.5 Water Main The existing water distribution mains within the study area consists of cast iron pipe (CIP) and ductile iron pipe (DIP) as summarized on the following Table 2. A review of the City’s water main break historical records did not identify past water main pipe break or leak repairs. The water main extending between Lemetti Lane and Bussard Court is considered to have an elevated risk for pipe breaks due to the configuration of the water system as further described in Section 3. Water main was replaced and increased to a 12-inch diameter pipe along Snelling Avenue to the north of County Road E in 2018, but the project did not extend the new, larger diameter water main to the 12-inch diameter main along County Road E. A 150-ft segment of 6-inch diameter water main was not replaced. Replacement of this 150-ft segment is an important improvement to eventually provide higher water supply conveyance capacity to the northern portion of the city. 2.6 Drainage Snelling Avenue North between Highway 51 and Arden Place is a rural section roadway with minimal storm sewer. The majority of runoff is directed to ditches along the roadway, which ultimately drain to ponds and wetlands within the Johanna subwatershed area. Table 2: Summary of Existing Water Main Street From To Project Area Pipe Material Pipe Diameter Year Installed County Rd E 260' East of Snelling Ridgewood 2 12-inch DIP 1968 Snelling County Road E 150' North of CR E 2 6-inch DIP 1982 Snelling Arden Place 470' N of Arden Pl 1 6-inch CIP 1969 Snelling Arden PL Crossing Arden PL Crossing 1 8-inch CIP 1969 Snelling Skiles Ln Lametti Ln 1 8-inch CIP 1969 Snelling Glenarden Crossing Glenarden Crossing 1 8-inch CIP 1969 Snelling Lametti Ln Bussard Ct 1 8-inch CIP 1969 Snelling Cummings Crossing Cummings Crossing 1 8-inch CIP 1969 Snelling Bussard Ct Bridge Crossing 1 8-inch CIP 1969 Snelling Bridge Crossing Bridge Crossing 1 8-inch DIP 2018 Snelling Bridge Crossing South Termini 1 8-inch CIP 1969 Feasibility Report Page 9 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT The segment of Snelling Avenue located north of Arden Place drains to a storm sewer system within the intersection at County Road E. From this intersection, runoff is conveyed north through 18-inch and 21-inch diameter storm sewer pipes that discharges into a wetland located in the southwest quadrant of Snelling Avenue North and the railroad crossing (Public Waters #194W), within the Valentine subwatershed area. Ramsey County has conducted a CCTV inspection of this 18-inch and 21-inch storm sewer and documented that a majority of pipe segments are in poor to failing condition with cracks, voids and multiple joint failures. The existing storm sewer system is shown in Appendix D. The two project areas are not identified within the Flood Hazard Areas Map contained within the City’s Surface Water Plan, with the exception of the Lake Josephine outlet channel crossing at the new Snelling Avenue bridge structure near the south end of the project corridor. A wetland delineation review was conducted with Rice Creek Watershed District during preparation of this feasibility report. A copy of the wetland boundary determination and Wetland Conservation Act decision for the project corridor is provided in Appendix E. Minor additional wetland delineation work may be required during the design process based on the extent of storm sewer replacement north of the Snelling Avenue and County Road E intersection for Public Waters #194W noted above. 2.7 Environmental Conditions During the geotechnical investigation process for this feasibility study, the geotechnical firm reported “Apparent Hydrocarbon Odors” at 11 of the 15 soil boring locations. In response to this information, the City hired a consultant to conduct an environmental investigation to assist with identification of potential contaminants within the project area. The scope of work for the environmental investigation included a Phase I Environmental Site Assessment (ESA) and a field investigation to evaluate the current subsurface soil, groundwater and soil vapor conditions along the project corridor. The investigation identified elevated contamination levels at two locations along the corridor designated as environmental borings EB-3 and EB-8. Polycyclic aromatic hydrocarbons (PAH) and diesel range organics (DRO) impacted soil above the MPCA reuse criteria was identified at these two locations. Benzo(a)pyrene was detected in soil samples at EB-3 and EB-8 above the Tier II Industrial and Tier 1 Residential soil reference values criteria. DRO also exceeded the MPCA criteria for unregulated full, which will require disposal of excavated regulated fill at an MPCA-permitted landfill during construction. Following completion of the field investigation, the City authorized the environmental consultant to prepare a Response Action Plan, a Construction Contingency Plan and a MPCA Brownfields enrollment application for the project. A copy of the Phase I ESA, Field Investigation Report and Response Action Plan are provided in Appendix F. Feasibility Report Page 10 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 2.8 Private Utilities Private utility companies having infrastructure within the study area will be notified early during the project design phase and requested to coordinate any necessary repairs or replacements at their cost. Private utility infrastructure located in the study area includes Comcast (Cable), CenturyLink (Telephone), and Xcel Energy (Electric/Gas). The natural gas above-ground infrastructure in the southwest quadrant of Snelling Avenue and County Road E will require significant coordination as part of the design process for future intersection improvements. Feasibility Report Page 11 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 3. PROPOSED IMPROVEMENTS 3.1 Street Improvements: Area 1 – Snelling Avenue North Two alternatives for roadway improvements along Snelling Avenue North from County Road E to Highway 51 were investigated as part of this study. Alternative 1 - Full Reconstruction Plus Trail: This alternative includes the full depth reconstruction of the roadway and the addition of an 8 to 10 foot wide multiuse pedestrian/bicycle trail extending from County Road E to Highway 51. The potential trail was considered based on the City’s 2040 comprehensive plan which identifies a proposed regional bicycle transportation network trail extending along Snelling Avenue North from Hamline Avenue at Highway 51 to Lake Valentine Road. A schematic layout of the proposed roadway and trail improvements for Alternative 1 is provided in Appendix G. The proposed road section and trail alignment were identified due to several challenges along the corridor. While the road is located in a wide right of way, there are sections of steep grades along several sections, with side slopes adjacent to the road in excess of 1:3 and grade differentials of 25 feet or more at certain locations, in addition to delineated wetland boundaries along the corridor. Alternative 1 proposes to narrow the roadway from 40 feet to a width of 28 to 34 feet within the center section, install curb and storm sewer, and set the trail alignment directly adjacent to the west curb line in an attempt to minimize substantial tree removal, minimize large volumes of cut and fill grading, and avoid impacts to delineated wetlands. A similar trail alignment was used along Snelling Avenue to the north of County Road E. The advantages of Alternate 1 include completion of a segment of regional trail and providing a dedicated facility for pedestrian and bicycles along the road corridor currently posted at 40 mph. Pedestrians currently walk along the 8 -foot wide paved shoulder. The disadvantages of Alternate 1 include a substantial increase in project costs, increased scope and construction timeline for installation of curb and storm sewer, increased risk of encountering areas of soil contamination during storm sewer installation, use of limited city funds compared to higher priority trail segments to the north of County Road E, and creation of a paved trail segment that terminates at Highway 51 with no safety improvements to cross the highway at Hamline Avenue. Alternative 2 - FDR Pavement Replacement (no trail): This alternative consists of reclaiming the existing pavement by milling the bituminous pavement material and blending it with the upper portion of the underlying aggregate base, commonly referred to as full depth reclamation (FDR). Approximately 4-inches of reclaimed material would then be removed to maintain the existing vertical profile of the road, and a new 4-inch thick bituminous pavement section would be placed to the existing 40-feet road width, including two 12-foot Feasibility Report Page 12 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT travel lines and two 8-foot wide paved shoulders. Fog line pavement markings would be installed to delineate the pavement shoulders. A schematic layout of the proposed roadway and trail improvements for Alternative 2 is provided in Appendix H. The advantages of Alternate 2 include a shorter construction timeline, lower project costs, focus of limited capital funds for trail segments north of County Road E, and reduced risk of encountering contaminated soil conditions. The disadvantages of Alternative 2 would include maintaining the current condition where bicyclists and pedestrians continue to use the 8-ft wide paved shoulders without the benefit of a dedicated multiuse trail facility south of County Road E. Council Consideration: The City Council reviewed the two roadway alternatives described above during a work session on July 20, 2020. The Council discussed the cost differential between the two alternatives in relation to the City’s limited availability of capital improvement funds. The Council also discussed the higher priority currently placed on recreational trail segments along Snelling Avenue North from County Road E2 to Lake Valentine Road and the connection to Mounds View High School, which is reflected in the City’s current efforts to obtain federal regional solicitation funding for trail improvements. While not ideal, the roadway south of County Road E does have 8-foot wide shoulders to provide some accommodation for pedestrians and bicyclist. Based on these factors, the consensus of the City Council was a general preference for Alternative 2. 3.2 Street Improvements: Area 2 – Intersection of Snelling Ave and County Road E Section 2.3 provides a summary of the Intersection Control Evaluation (ICE) study previously conducted for the intersection of Snelling Avenue North and County Road E. The ICE report provides a review of alternatives considered for the intersection and recommended construction of a single lane roundabout. A copy of the ICE report is provided in Appendix B. Two schematic layouts were prepared for the proposed roundabout intersection improvements as provided in Appendix I. While both layouts are similar, there is variation in the intersection alignment to illustrate the ability to minimize potential right of way acquisition and the need to relocate overhead power and natural gas utilities near the intersection. For the purposes of this feasibility report, both layouts are assumed to have the same estimated costs as provided in Section 5. Council Consideration: The City Council reviewed the ICE report and the proposed single lane roundabout intersection improvements during a work session on September 21, 2020. The Council discussed the significant changes in traffic volumes at the intersection of Snelling Avenue and County Road E due to the COVID-19 pandemic. The Council also discussed the potential changes to traffic volume from Bethel University, which is one of the primary trip generators for this intersection, and concerns expressed during the public open house meeting in October 2019 regarding the proposed roundabout. The consensus of the City Council was to separate the potential intersection improvements into an independent Feasibility Report Page 13 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT project from the Area 1 roadway improvements south of County Road E. The Council further directed staff to work with Ramsey County to conduct additional traffic study of the intersection after traffic patterns return to more stable condition in 2021 or 2022. 3.3 Street Improvements: Cummings Lane and Bussard Court As mentioned in Section 2, Cummings Lane and the east 100-feet of Bussard Court are highly deteriorated and can no longer be cost-effectively maintained. Proposed improvements for Cummings Lane consist of reclaiming the existing pavement, shaping the generated aggregate material to raise the center crown to improve pavement drainage and repaving the roadway with 4-inches of bituminous pavement. The installation of curb and gutter is not proposed along Cummings Lane. Improvements also include replacement of the storm sewer structure at the low point of the road and the culvert extending into the drainage ditch along Trunk Highway 51. Proposed street improvements for the 100-foot section of Bussard Court include removal of the pavement, reconstruction of the upper two feet of subgrade with granular and aggregate base, replacement of damaged curb and placement of 4-inches of new bituminous pavement. 3.4 Utility Improvements: Area 1 – Snelling Ave N south of County Road E Sanitary Sewer Sanitary sewer along Snelling Avenue is located approximately 30 feet or more to the east and west of the roadway pavement. The segment between Arden Place and Skiles Lane was previously improved with a CIPP liner. Based on the recent condition evaluation summarized in Section 2, the recommended sanitary sewer improvements are limited to replacement of the 8-inch diameter crossing at Skiles Lane east as shown in Appendix D. This segment of sewer was originally constructed with a combination of VCP and CIP pipe materials, which is believed to have been done as an alternative to installing a steel casing pipe within the former State highway. The CIP section of pipe is in a highly deteriorated condition. Water Main Under the Alternative 1 scenario (trail), water main along Snelling Avenue North would be replaced with new ductile iron or PVC pipe due to the significant excavation and disturbance required for construction of the trail and associated storm sewer system. Under the Alternative 2 scenario (no trail), a majority of existing water main south of County Road E is proposed to remain in-place. These segments of water main do not have a history of water main breaks based on City records. Removal and replacement of water main between Lemetti Lane and Bussard Court is recommended to improve reliability of the water supply feed from Cummings Lane, particularly for Bussard Court, which is supplied from only one direction. A water main break between Bussard and Cummings Lane would disrupt water service to 19 or more homes. The locations of water main improvements are indicated in Appendix D. Feasibility Report Page 14 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT Drainage Snelling Avenue south of Arden Place is predominately a rural section roadway with little storm sewer within the project area. Culverts are located under the adjacent streets and driveways connecting to Snelling Avenue. The addition of a pedestrian trail as described in Alternate 1 would require the installation of a significant amount of curb and storm sewer to allow the trail to be located directly adjacent to the road surface and minimize the amount of fill embankment within wetlands and steep slope areas. Rice Creek Watershed District (RCWD) requirements as outlined in Rule C apply to public linear roadway projects. The proposed roadway improvements under Alternate 1, including a new pedestrian trail, would likely create more than 10,000 square feet of non-exempt, new impervious surface and would require the addition of Best Management Practices (BMPs) such as bio-filtration, stormwater detention for discharge rate management, and inline sediment/grit chambers. Section 5 includes a general cost estimate for these BMP items. Proposed roadway improvements for Alternative 2 (no addition of pedestrian trail) would not create 10,000 square feet or more of new impervious surface. Rule C requirements do not currently apply to mill, reclamation and overlay pavement projects. Section 5 does not include the additional costs for permanent BMPs for Alternative 2. Temporary erosion and sediment control devices will be utilized during construction in accordance with applicable NPDES permit and RCWD Rule D requirements. 3.5 Utility Improvements: Area 2 – Intersection of Snelling Ave and County Road E Sanitary Sewer Based on the recent condition evaluation described in Section 2, the recommended sanitary sewer improvements include installation of 250 feet of cured-in-place-pipe (CIPP) sewer lining between MH 3-035 and 3-034 as well as between MH 3-033 and 3-034 as shown in Appendix D. Sanitary sewer pipe between MH 3-034 and 3-038 is proposed to be removed and replaced due to the highly deteriorated condition of the pipe. Water Main Recommended water main improvements within Area 2 include replacement of 620 feet of 12-inch diameter water main within the intersection and replacement of an additional 150 feet of 6-inch diameter water main extending north with 12-inch water main to complete the water main capacity improvements along Snelling Avenue North from County Road E to County Road E2. Drainage Construction of a roundabout intersection improvement will require replacement of existing storm sewer to reconfigure storm sewer inlets and conveyance pipes based on the geometric design of the roundabout. Recommended improvements also include rehabilitation of approximately 600 feet of existing storm sewer by installation of cured-in-place-pipe (CIPP) lining as shown in Appendix D. The CIPP installation is recommended as a cost effective Feasibility Report Page 15 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT method of repairing the pipe segments located outside of the intersection by avoiding excavation required to remove and replace the pipes. Storm water drainage design will need to meet Rice Creek Watershed District (RCWD) requirements as outlined in Rule C. This section of the watershed regulations requires a permit for Public Linear Projects creating 10,000 square feet or more of impervious surface. The project design will evaluate specific Best Management Practices (BMPs) such as bio - filtration and inline sediment/grit chambers placed before discharging into the downstream storm sewer system. Section 5 includes a general cost estimate for these BMP items. Temporary erosion and sediment control devices will be utilized during construction in accordance with applicable NPDES permit and RCWD Rule D requirements. Private Utilities Construction of a single lane roundabout as shown in Appendix I is anticipated to require relocation of overhead power lines along the west side of Snelling Avenue and may require modification to the natural gas manifold assembly located in the southwest quadrant of the intersection. Early and frequent coordination with Xcel Energy will be necessary during the design process. 3.6 Easements Street improvements south of County Road E as proposed within this report are anticipated to occur within the existing road right-of-way. Public utility improvements are planned to occur within the right-of-way or currently dedicated drainage and utility easements. The need for permanent easement acquisition south of County Road E is not expected to construct the project as proposed. Construction of the proposed single lane roundabout at the intersection of County Road E and Snelling Avenue North may require temporary and permanent easement acquisition in the southwest quadrant of the intersection from the residential property at 3586 Ridgewood Road and potentially the northeast quadrant at 3610 Snelling Avenue North. The intersection design described in Section 3.4 will involve encroachments into the excess right-of-way green space commonly referred to as Lindey’s Park in the southeast corner of the intersection. A portion of this green space will also be needed for construction of a stormwater BMP to fulfill the regulatory requirements of the Rice Creek Watershed District. 3.7 Permits/Approvals The anticipated permits required for the proposed project are as follows:  Minnesota Department of Health . . . . . . . . . . . . . . . Extension of Water Main  Ramsey County . . . . . . . . . . . . . . . . . . . . . . . . . . . . Right-of-Way Permit  Rice Creek Watershed District . . . . . . . . . . . . . . . . . Rule C Erosion Control, Linear Rule D  Minnesota Pollution Control Agency . . . . . . . . . . . . Erosion and Stormwater Permit  Minnesota Dept of Transportation. . . . . . . . . . . . . . . Right-of-Way and Drainage Permit Feasibility Report Page 16 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 3.8 Construction Access and Staging A traffic control and construction staging plan would be developed during preparation of construction plans to coordinate property access and traffic safety within the project area. The contractor will be responsible for providing access to all properties at the end of each work day, with the exception of concrete curing times during curb installation. Additional information regarding staging and property access would be provided to residents prior to and during the construction phase of the project. Feasibility Report Page 17 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 4. PUBLIC INVOLVEMENT A public open house meeting was conducted on October 17, 2019 at Arden Hills City Hall to present information on the proposed improvements to Snelling Avenue North, potential pedestrian trail improvements, and potential intersection improvements at County Road E. An invitation letter was mailed to 240 properties near the project corridor for the open house meeting. The meeting was attended by approximately 50 to 60 people. The open house included stations where residents could review schematic drawings of the proposed road improvements, pedestrian trail option and layout of the potential roundabout intersection improvements. Residents asked questions of staff and provide comments regarding the project. The most common comments included the following items.  Roadway pavement is highly deteriorated and needs to be improved.  Concerns regarding speeding traffic and a desire to lower the speed limit  Concerns or objections to the proposed roundabout  Concerns for pedestrian safety along the corridor  Concerns with traffic stacking west of the traffic signal at County Road E and Highway 51 interchange. City staff distributed comment cards during the meeting to allow residents to provide additional written comments regarding the project. The City received 13 comment cards and one letter, which are provided in Appendix J. A subsequent letter was mailed to residents on November 4, 2019 notifying residents of the planned change in delivery schedule from 2021 to 2022 due to Ramsey County changing the construction schedule for Lexington Avenue from 2020 to 2021. A copy of this letter is included in Appendix J. Based on direction from the City Council regarding the results of this feasibility study, additional information would be shared with residents through mailed letters, emails, social media and informational updates on the City’s website. Feasibility Report Page 18 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 5. ESTIMATED COST AND FUNDING 5.1 Opinion of Cost A summary of the total project cost estimate for the project is provided in Table 4 below. The estimates includes 37% in overhead costs as outlined in the City’s Assessment Policy. Overhead costs account for engineering, legal, financing, contingency and administrative costs associated with the project. A detailed estimate is provided in Appendix K. Area 1: Snelling Avenue North from County Road E to Highway 51, including Bussard Ct Area 2: Roundabout Intersection Improvements at Snelling Ave North and County Road E Alternative 1: Reconstruction with addition of pedestrian trail Alternative 2: Full depth reclamation with no trail construction The opinion of total project costs is based on recent construction projects of similar character and assumes the construction of proposed improvements will begin in 2022. Actual costs will be determined through competitive bids following final design for the project. Table 4 - Summary of Project Costs AREA 1 AREA 2 Cummings Lane Alternative 1 Alternative 2 Roundabout FDR Improvement Estimated Cost Estimated Cost Estimated Cost Estimated Cost Street Improvements $1,838,680 $782,930 $917,700 $65,130 Sanitary Sewer Improvements $58,420 $60,480 $125,740 $0 Water Main Improvements $440,260 $161,970 $158,230 $0 Storm Drainage Improvements $947,590 $44,200 $479,860 $20,280 TOTAL $3,284,950 $1,049,580 $1,681,530 $85,410 Feasibility Report Page 19 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 5.2 Project Funding Proposed project funding sources are a combination of the City’s Permanent Improvement Revolving (PIR) fund, utility funds, Ramsey County, Municipal State Aid, and special assessments for street improvements as summarized in Table 5 below. Area 1: Snelling Avenue North from County Road E to Highway 51 , including Bussard Ct. Area 2: Roundabout Intersection Improvements at Snelling Ave and County Road E Alternative 1: Reconstruction with addition of pedestrian trail Alternative 2: Full depth reclamation with no trail construction Table 5 - Summary of Project Funding Sources AREA 1 AREA 2 Cummings Lane Alternative 1 Alternative 2 Roundabout Funding Source Funding Amount Funding Amount Funding Amount Funding Amount PIR Fund $1,716,530 $660,780 $0 $32,565 Special Assessments $122,150 $122,150 $18,860 $32,565 Municipal State Aid Funds $0 $0 $330,530 $0 Ramsey County $0 $0 $1,048,179 $0 Sanitary Sewer Improvements $58,420 $60,480 $125,740 $0 Water Main Improvements $440,260 $161,970 $158,230 $0 Storm Drainage Improvements $947,590 $44,200 $0 $20,280 TOTAL $3,284,950 $1,049,580 $1,681,539 $85,410 Feasibility Report Page 20 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 5.3 Preliminary Assessment Roll Assessments for street improvement costs are proposed to be levied to benefiting properties as outlined in Minnesota Statute 429 and the City of Arden Hills Assessment Policy. A preliminary assessment map and detailed preliminary assessment roll is provided in Appendix L. Special assessments to benefiting properties along residential streets typically fund 50 percent of the surface improvements, including contingencies and overhead pursuant to Part 1 of the City’s Assessment Policy. The policy states that corner lots shall be assessed on the street that is used for the mailing address. This provision is interpreted to limit assessments for street improvements to the street segment abutting the mailing address frontage of the property. This is an important provision given that only 24 properties are addressed on Snelling Avenue North between County Road E and Highway 51. All other properties have mailing addresses from adjacent side. Given the non-standard lot configuration and limited number of eligible properties along the Snelling Avenue corridor based on mailing addresses, assessments for Area 1 street improvements on Snelling Avenue were calculated by dividing 50 percent of street costs (under Alternate 2, no trail) by the total length of roadway improvement frontage to determine a cost per foot. This unit cost per foot was then multiplied by the minimum lot frontage for R1 zoned properties at 95 feet to arrive at a residential equivalent unit (REU) assessment rate. Part 1 of the City’s Assessment Policy further states that the assessable cost of an improvement shall be defined as those costs that, in the opinion of the City Council, are attributable to the need for service in the area served by the improvement. The potential trail construction described in Alternate 1 and the proposed roundabout intersection construction within Area 2 are considered regional improvements that serve numerous properties outside of the project area and regional traffic traveling through the project corridor. Therefore, the costs for these improvements are not included in the estimated REU rate. The preliminary assessment rates for the parcels adjacent to the Area 2 intersection improvements are calculated based on Area 1 standard street improvements as described above. Estimated assessment rates are provided below. Street Improvements: Area 1 - Snelling Avenue, County Road E to Highway 51 Estimated Street Costs: ......................................................... $782,930 50% Estimated Street Costs: ................................................. $391,465 Total Street Length Frontage: .............................................. 8,220 feet 50% Cost per Foot: ................................................................... $47.62 R1 Zoned Minimum Frontage Width: ...................................... 95 feet Assessment Rate: ...................................................................... $4,524 Feasibility Report Page 21 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT The Assessment Policy states that the assessment rate shall be computed on a per-lot unit basis, with a lot unit being defined as a platted single-family residential lot or equivalent, which, according to current Arden Hills Municipal Code cannot be further subdivided for R- 1 and R-2 residential use. Two assessable lots within the project have an area that is large enough to subdivide into multiple R-1 or R-2 single family lots with a minimum lot area of 14,000 square-feet. 3263 Snelling Avenue North is listed as 3.38 acres on the Ramsey County property records. Given the size, dimensions and terrain, this lot is assigned three (3) REUs on the draft assessment roll. 3265 Snelling Avenue North is listed as 2.52 acres on the Ramsey County property records. Given the size, dimensions and terrain, this lot is assigned two (2) REUs on the draft assessment roll. The Assessment Policy also states that the commercial equivalent assessment rate shall be based on 70 percent of the total street reconstruction costs. The assessment rate for the Neighborhood Business district property at 3610 Snelling Avenue North (Lindey’s Steakhouse) would be 70/50 times the cost per foot calculated above, applied to the 215-ft property frontage along Snelling Avenue North, or $14,335. Assessment rates for proposed street improvements along Cummings Lane were calculated based on the standard application of the Assessment Policy by calculating 50 percent of the street improvements divided by the number of lots with mailing addresses on Cummings Lane. Street Improvements: Cummings Lane Estimated Street Costs: ........................................................... $65,130 50% Estimated Street Costs: ................................................... $32,565 Number of Lots: ................................................................................. 8 50% Cost per Foot: ................................................................... $4,071 As stated above, a preliminary assessment map and detailed preliminary assessment roll is provided in Appendix L. Feasibility Report Page 22 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 6. PROJECT SCHEDULE The following project schedule is proposed for improvements to Snelling Avenue North from County Road E to Trunk Highway 51. City Council reviews Draft Feasibility Report ...................................... December 21, 2020 and Provides Direction Regarding Assessments City Staff Sends Mailing and Provides Recorded ..................................... February 1, 2021 Presentation for 2nd Round of Public Engagement City Council Accepts Feasibility Report ....................................................... April 12, 2021 and Orders Public Improvement Hearing City Council Conducts Public Improvement Hearing .................................... May 24, 2021 And Orders Plans and Specifications City Council Approves Plans and Specifications .......................................... January 2022 And Authorizes Ad for Bid City Opens Bids and Computes Assessments .............................................. February 2022 City Council Accepts Bids and Orders ........................................................ February 2022 the Assessment Hearing City Council Conducts Assessment Hearing ................................................... March 2022 And Awards the Construction Contract Begin Construction ............................................................................................. May 2022 Complete Construction .............................................................................. November 2022 City Certifies Assessments to County ....................................................... November 2022 Record Plan Completion ..................................................................................... May 2023 Warranty Inspection .................................................................................. September 2025 (2 years Following Substantial Completion) Feasibility Report Page 23 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 7. CONCLUSIONS AND RECOMMENDATIONS Based on the findings of this report, the following street and utility improvements are recommended for City Council consideration. Street Improvements - Area 1 Recommended street and utility improvements for Snelling Avenue North from County Road E to Highway 51 consists of pavement improvements as previously described as Alternative 2 within this report. The construction of a new pedestrian trail is not recommended at this time due to the additional cost in relation to limited available capital funding and the Councils priority to focus on trail construction north of County Road E to connect the City’s trail system to Mounds View High School and eventually to the regional trail system at County Road 96. Recommended improvements are summarized as follows.  Full depth pavement reclamation and repaving the roadway to the existing section width from County Road E to Highway 51.  Reconstruction of Bussard Court from Snelling Avenue N to 100 feet west of Snelling Avenue N to address failing pavement and subgrade deficiencies.  Full depth pavement reclamation and repaving of Cummings Lane from Snelling Avenue to east termini.  Replacement of water main between Lemetti Lane and Bussard Court to improve reliability of the water supply feed south of Cummings Lane.  Replacement of the 8-inch diameter sanitary sewer crossing at Skiles Lane due to deteriorated pipe conditions. Intersection and Utility Improvements – Area 2 Intersection improvements at Snelling Avenue North and County Road E are not recommended to proceed to construction until completion of further investigation of projected traffic volume growth for Bethel University and the surrounding roadway system. Ramsey County Public Works representatives have indicated a willingness to conduct additional study of the intersection and reschedule the intersection improvements within their Transportation Improvement Program to the year 2023. During the interim planning period, City and County staff should work collaboratively to address the following issues.  Sanitary sewer repairs within the northeast quadrant of the intersection as described in Section 3.  Pipe lining and repairs to storm sewer located to the north and east of the intersection as described in Section 3.  Coordination of future intersection construction schedule with the proposed improvements along Lexington Avenue between County Road E and I-694. The total estimated cost for the proposed improvements to Snelling Avenue North as recommended above is $1,134,990.00. Proposed funding for the project can be provided through a combination of special assessments and City funds as outlined in Section 5 of this report. Feasibility Report Page 24 Snelling Avenue North and County Road E - Street and Utility Improvements City Project Number PW 20-0100 DRAFT 8. FEASIBILITY, NECESSITY AND COST EFFECTIVENESS The improvements recommended in this study are necessary to continue safe and reliable street and utility services. The reconstruction of streets provides the City with a cost-effective means of continuing the City’s street improvement efforts and ensuring an adequate means of transportation for residents. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within the City. Proposed water main improvements will provide for an orderly replacement of water distribution system assets and reduce the risk of potential water service disruptions for properties located along Lemetti Lane and Bussard Court. The recommended improvements constitute a project large enough to ensure a competitive bidding environment, economy of scale, and are deemed to be cost-effective. Based on the information contained within this report, the proposed improvements as described can be considered necessary, cost-effective, and feasible from an engineering standpoint. APPENDIX A Project Area Map APPENDIX B Intersection Control Evaluation Report INTERSECTION CONTROL EVALUATION COUNTY ROAD E AT OLD SNELLING AVENUE Arden Hills, MN October 8, 2018 Prepared for: City of Arden Hills WSB PROJECT NO. 011498-000 S.A.P. NO. 187-111-002 S.A.P. NO. 062-615-039 S.A.P. NO. 062-676-004 S.A.P. NO. 062-749-002 INTERSECTION CONTROL EVALUATION COUNTY ROAD E AT OLD SNELLING AVENUE WSB PROJECT NO. 011498-000 S.A.P. NO. 187-111-002 S.A.P. NO. 062-615-039 S.A.P. NO. 062-676-004 S.A.P. NO. 062-749-002 CITY OF ARDEN HILLS Funding Category: ............................................................................................................. TBD Estimated Letting Date:...................................................................................................... TBD Work Identification: .................................................................. Intersection Control Evaluation I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. 40945 DATE: 10/08/2018 Sean Delmore, P.E., PTOE License No. REVIEWED: DATE: ___________ County Engineer – Ramsey County REVIEWED: DATE: ___________ City Engineer – City of Arden Hills APPROVED: DATE: ___________ MnDOT Metro District State Aid Engineer COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 1 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Table of Contents Introduction ..................................................................................................................... 2 Description of Location .................................................................................................... 2 Existing Conditions .......................................................................................................... 4 Future Conditions ............................................................................................................ 5 Traffic Control Analysis ................................................................................................... 8 Evaluation Considerations ............................................................................................. 16 Alternatives Analysis ..................................................................................................... 17 Conclusion .................................................................................................................... 17 List of Figures Figure 1 – Project Location ............................................................................................. 3 Figure 2 – Existing Geometry .......................................................................................... 6 Figure 3 – Proposed Geometry ....................................................................................... 7 Figure 4 – Level of Service Guidelines .......................................................................... 12 Figure 5 – Proposed Roundabout Geometry ................................................................. 18 Figure 6 – Truck Turning Paths ..................................................................................... 19 Figure 7 – Fast Path Analysis ....................................................................................... 20 Figure 8 – Horizontal Sight Distance ............................................................................. 21 List of Tables Table 1 – Existing Crash Rate Calculation ...................................................................... 5 Table 2 – Existing and Projected Crash Rates by Traffic Control Type ......................... 11 Table 3 – 2018 Existing Condition Operations Summary (SimTraffic) .......................... 13 Table 4 – 2018 (Study volumes) No Build Operations Summary (SimTraffic) ............... 14 Table 5 – 2018 (Study volumes) Build Operations Summary (RODEL) ........................ 14 Table 6 – 2038 No Build Operations Summary (SimTraffic) .......................................... 15 Table 7 – 2038 Build Operations Summary (RODEL) ................................................... 15 Appendices APPENDIX A – Existing Turn Movement Counts APPENDIX B – Crash Diagram APPENDIX C – Traffic Signal Warrant Analysis APPENDIX D – All-Way Stop Warrant Analysis APPENDIX E – SYNCHRO/RODEL Operations Results COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 2 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Introduction The purpose of this report is to evaluate the traffic control and intersection lane geometry necessary for the intersection of County Road E and Old Snelling Avenue in the City of Arden Hills in Ramsey County, Minnesota. This report will document the existing conditions, operations and safety. It will also analyze existing and proposed intersection geometry using projected traffic volumes. Description of Location County Road E is an undivided two-lane arterial roadway at the intersection with Old Snelling Avenue. County Road E begins on the west along the Ramsey County border at NE Stinson Parkway, is interrupted by Tony Schmidt Regional Park, and forms again at the study intersection. County Road E then runs east and turns into Soo Street near I- 694. County Road E resumes east of Centerville Road and becomes TH 244 (Wildwood Road) at the Washington County border. County Road E connects the Cities of New Brighton, Arden Hills, and Shoreview, and to the east Vadnais Heights and Gem Lake in Ramsey County. Josephine Road (CSAH 149), which forms the west leg of the study intersection, is an arterial that runs around the north and west sides of Lake Johanna, and eventually becomes Fairview Avenue at County Road D. Old Snelling Avenue is an undivided two-lane collector roadway at the intersection with County Road E. Old Snelling Avenue begins in the south at Snelling Avenue (TH 51) and terminates to the north at County State-Aid Highway (CSAH) 96. This roadway provides access primarily to residential streets and multiple schools in the City of Arden Hills. Old Snelling Avenue is designated as CSAH 76 to the north of County Road E. The project location within the context of the surrounding area is represented in Figure 1. Figure 1 Existing Intersection Location and Surrounding Network County Road E and Old Snelling Avenue Intersection Control Evaluation Arden Hills, Ramsey County, Minnesota LEGEND Existing Intersection Location COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 4 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Existing Conditions The intersection of County Road E and Old Snelling Avenue is currently controlled by an all-way stop application. A summary of the characteristics of County Road E and Old Snelling Avenue at the intersection of study follows: County Road E at the intersection of study: ▪ East-west Alignment ▪ West approach o 30 mph speed limit o 1 exclusive left-turn lane o 1 shared thru/right-turn lane o Existing ADT of 5,100 vehicles per day (vpd) ▪ East approach o 35 mph speed limit o 1 exclusive left-turn lane o 1 thru lane o 1 exclusive right-turn lane o Existing ADT of 10,500 vpd Old Snelling Avenue at the intersection of study: ▪ North-south Alignment ▪ North approach o 45 mph speed limit o 1 exclusive left-turn lane o 1 shared thru/right-turn lane o Existing ADT of 6,700 vpd ▪ South approach o 40 mph speed limit o 1 exclusive left-turn lane o 1 shared thru/right-turn lane o Existing ADT of 1,700 vpd The existing intersection geometry is depicted in Figure 2. Traffic turning movement counts at the intersection of County Road E and Old Snelling Avenue were collected on February 7, 2018. The results of these traffic counts are provided in Appendix A. Existing Average Daily Traffic (ADT) volumes are from Minnesota Department of Transportation (MnDOT) traffic volume map years 2013, 2014, and 2016, and are included in Figure 2. A summary of the 3-year (January 2013- December 2015) crash history at the intersection of County Road E and Old Snelling Avenue is provided in Table 1. MnDOT’s Crash Mapping Analysis Tool (MnCMAT) database indicates there have been 9 crashes at the intersection between January 2013 and December 2015. Existing crash patterns show that the intersection experiences an extremely high rate of 0.68 crashes per million COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 5 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS entering vehicles compared to the average rate of 0.34 for all-way stop intersections. The crash rate is higher than the critical rate of 0.65 , and the severity rate of 0.76 is higher than the Statewide average severity rate of 0.5. A Crash Diagram can be found in Appendix B. Table 1 – Existing Crash Rate Calculation Future Conditions The County Road E corridor is projected to see an increase in traffic over the coming years with the Bethel University expansion. Two alternatives for intersection modifications include the construction of a traffic signal and the construction of a single-lane roundabout at the intersection of County Road E and Old Snelling Avenue . The traffic signal- controlled intersection would likely maintain similar geometry as the existing condition, but the single-lane roundabout would require modified geometry which i s shown in Figure 3. Both the traffic signal and roundabout alternatives are believed to accommodate future growth in the area, but the roundabout is believed to provide a safer alternative than the traffic signal alternative and current all-way stop control. Calculated Average**Critical***Calculated Average** County Road E and Old Snelling (2013-2015)9 12,000 0.68 0.34 0.65 0.76 0.50 Crash Rate*Number of Crashes Daily Entering VehiclesLocation ***Critical crash rates are expressed in crashes per million entering vehicles with 0.95 confidence level. Severity Rate **Average for all-way stop intersections using MnDOT 2015 green sheets. *Intersection crash rates are expressed in crashes per million entering vehicles. County Road E and Old Snelling (2013-2015) Figure 2 Existing Intersection Geometry Existing AM/PM Turning Movements LEGEND 2 4 8 Lane Geometry 50 (75) AM (PM) Turning Movements 248 Turning Movement s 2 4 8 15 (32)(7) 14i r w (311) 103 ,(19) 8 x (11) 23(12) 23(60) 28 v39 (26)73 (81)242 (245)k 187 (148) 239 (345) f Lake Johanna Blvd County Rd E 2018 Existing RAMSEY COUNTY 149 RAMSEY COUNTY 15 RAMSEY COUNTY 76 County Road E and Old Snelling Avenue Intersection Control Evaluation Arden Hills, Ramsey County, Minnesota Figure 3 Roundabout Alternative Forecasted 2018 & 2038 AM/PM Turning Movements LEGEND 2 4 8 Lane Geometry 50 (75) AM (PM) Turning Movements 248 Turning Movement Lake Johanna Blvd County Rd E 2018 Study v (10) 15(15) 25(20) 15(125) 125 ,(10) 10 (25) 25 15 (15) x 2 4 8 215 (215) i r w s 360 (360) f 35 (30)95 (130)430 (380)k 2038 v (11) 17(17) 28(22) 17(398) 138 ,(28) 11 (99) 28 17 (50) x 2 4 8 238 (260) i r w s 398 (403) f 39 (33)105 (144)475 (420)k RAMSEY COUNTY 149 RAMSEY COUNTY 15 RAMSEY COUNTY 76 County Road E and Old Snelling Avenue Intersection Control Evaluation Arden Hills, Ramsey County, Minnesota COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 8 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Traffic Control Analysis The following subsections detail the analysis used for determining the appropriate traffic control for this intersection. Twelve hours of turning movements (6:00 AM-6:00 PM) were counted on February 7, 2018 and used to perform a traffic signal warrant analysis and all-way stop warrant analysis. Traffic Signal Warrant Analysis Part 4 of the Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD) contains information pertaining to highway traffic signals, including a series of traffic -signal warrants that define the minimum conditions under which installing a traffic signal could be justified. These traffic signal warrants have been developed as national guidelines to promote continuity of traffic control devices and to ensure that traffic signals are installed at intersections that benefit from their operations. The following are the nine MnMUTCD traffic signal warrants: Warrant 1-Eight-Hour Vehicle Volume Warrant 2-Four-Hour Vehicle Volume Warrant 3-Peak Hour Vehicle Volume Warrant 4-Pedestrian Volume Warrant 5-School Crossing Warrant 6-Coordinated Signal System Warrant 7-Crash Experience Warrant 8-Roadway Network Warrant 9-Intersection Near a Grade Crossing Table 4C-1 70% volumes were also used for warrant analysis. The MnMUTCD allows for use of these values when the conditions are as follows: “May be used when the major-street speed exceeds 40 mph or in an isolated community with a population of less than 10,000.” – MnMUTCD Table 4C-1, Warrant 1, Eight-Hour Vehicular Volume. According to the MnMUTCD, inclusion of right-turn volumes for warrant analysis is dependent on engineering judgment, site factors and turning movement volumes. By applying engineering judgment, right-turn movements on only the westbound approach of the intersection were removed from the analysis due to the presence of a right-turn lane. The following is the result of the traffic signal warrant analysis. See Appendix C for additional information. ▪ Warrant 1 – Eight-Hour Vehicle Volume: NOT MET ▪ Warrant 2 – Four-Hour Vehicle Volume: NOT MET COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 9 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS ▪ Warrant 3 – Peak-hour Vehicle Volume: NOT MET ▪ Warrant 4 – Pedestrian Volume: NOT MET ▪ Warrant 5 – School Crossing: N/A ▪ Warrant 6 – Coordinated Signal System: N/A ▪ Warrant 7 – Crash Experience1: NOT MET ▪ Warrant 8 – Roadway Network: NOT MET ▪ Warrant 9 – Intersection Near a Grade Crossing: N/A No Traffic Signal Warrants are met with existing traffic volumes, lane geometry, and speed limits. All-Way Stop Warrant Analysis Part 2B of the MnMUTCD contains information pertaining to the all-way stop control with criteria relating to vehicular volumes and crash history that define the minimum conditions under which installing an all-way stop could be justified. The following are the discussions regarding whether the intersection geometry and/or traffic volumes meet the guidance in the MnMUTCD. Text in italics denotes guidance from the MnMUTCD, and regular text denotes discussion on whether conditions meet the guidance. Using the provided count data, all-way stop warrants were analyzed. • A multi-way stop application can be used as an interim measure while arrangements can be made to install a traffic signal – A traffic signal is not warranted at this intersection. • Five or more reported crashes in a 12-month period that are susceptible to correction by a multi-way stop installation - Only two correctable crashes occurred within a 12-month period within the past 5 years at this intersection. • Minimum volumes – 3 of the required 8 hours were met, See Appendix D for volume analysis. • Where no single criterion is satisfied, but where the preceding criteria are all satisfied to 80% of the minimum values. – 7 of the required 8 hours were met, See Appendix D for the 80% minimum value analysis. (the eighth hour was three vehicles short of being met) • The need to control left-turn conflicts – Southbound left-turn conflicts need to be controlled due to high turning movements volumes. • The need to control vehicle/pedestrian conflicts near locations that generate high pedestrian volumes – The intersection does not currently experience a high level of pedestrian and bicycle traffic that would require installation of a multi-way stop to provide adequate operations, however trail improvements are planned as part of this project. 1 MnDOT 2015 TEM states: Current MnDOT policy is that, in general, warrant 7 is not applicable to an intersection that is already signalized. COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 10 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS • Locations where a road user, after stopping, cannot see conflicting traffic and is not able to negotiate the intersection unless conflicting cross traffic is also required to stop – Sightlines are currently visible. • An intersection of two residential neighborhood collector (through) streets of similar design and operating characteristics where multi-way stop control would improve operational characteristics of the intersection – County Road E and Old Snelling Avenue are of similar design, and have similar functional classification, and traffic currently operates with a multi-way stop. Two warrants were met at the intersection of County Road E and Old Snelling Avenue which does meet the guidance for an all-way stop according to the MnMUTCD. Although no traffic warrants for roundabouts currently exist, the MnDOT Intersection Control Evaluation Manual states that if a traffic signal or an all-way stop warrant is met, a roundabout should also be considered as a warranted traffic control device. There are all-way stop warrants that are currently met for this intersection, therefore a roundabout is considered to be justified. COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 11 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Crash Evaluation Crash reductions for each type of intersection control were estimated based on the proposed layout and the crash reduction factors from the Federal Highway Administration (FHWA) Crash Reduction Factors and the Minnesota Department of Transportation (MnDOT) Roundabout Crash Reduction Factors. Table 2 shows the projected crash rate and yearly crashes for each traffic control type using the existing traffic volumes. Fewer crashes mean a reduced cost to the local economy in terms of lost productivity related to property damage, injuries, and congestion on local roadways. Table 2 – Existing and Projected Crash Rates by Traffic Control Type Traffic Forecasts Base year 2018 volumes were used from the Bethel University Traffic Study (SRF, 2013) and forecasted out to year 2038. Based on the City of Arden Hills - 2030 Comprehensive Plan, traffic volumes in the area are projected to rise by 0.5% annually. For future analysis, the 0.5% annual increase in traffic movement volumes will be used in all simulations to determine level of service. Intersection Capacity Evaluation Intersection operations are evaluated in terms of average seconds of delay per vehicle, each approach and turning movement for the intersection. The average number of seconds of delay is broken into six ranges assigned letter grades A through F defining each level of service (LOS) as shown in Figure 4. The ranges for unsignalized intersections are narrower than the ranges for signalized intersections. This is because many factors including the intangible factors of driver discomfort and frustration are considered. A one-minute delay at a red light is perceived as being more tolerable than one minute waiting for a gap in t raffic at a stop sign, especially when there are vehicles queued behind. It is generally recognized that LOS D is the lowest acceptable LOS for All-Way Stop (existing)0.68 3.00 All-Way Stop (Metro district average rate)0.34 1.51 Traffic Signal (Metro district average rate)0.52 2.29 Urban Single Lane Roundabout 0.60 0.27 1.18 * Crash reduction factors taken from MnDOT's HSIP Program guidance Crash Reduction Factor* ** Crash rate for proposed improvements = (1 - CRF) x (existing CR) Traffic Control Crash Rate** Projected Crashes Per Year COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 12 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS urban intersections. Intersection capacity is also defined in terms of queue lengths of stopped vehicles. A 100-foot queue is approximately equal to four cars. Figure 4 – Level of Service Guidelines Synchro / SimTraffic, and RODEL software was used to simulate existing and future traffic operations at the intersection of County Road E and Old Snelling Avenue. Synchro is a macroscopic software application used for optimizing traffic signal timing and performing capacity analysis of roadway networks consisting of stop, yield, and signalized traffic control conditions. The underlying equations are based on Highw ay Capacity Manual procedures. SimTraffic is a microscopic software application that performs simulation and animation of vehicular traffic based on Synchro inputs. SimTraffic follows individual cars and uses a wide variety of variables (including some random variables) to simulate real-world driver behavior. Traffic operations at the intersection of County Road E and Old Snelling Avenue were simulated using existing (2018) and 2038 traffic volumes for the existing traffic control and lane geometry (no build condition) and for each proposed traffic control and lane geometry (build conditions). 80 55 35 20 10 LOS A LOS B LOS C LOS D LOS E LOS F Not CongestedCongested50 35 25 10 LOS A LOS B LOS C LOS D LOS E LOS F Not CongestedCongested15 Signalized Intersection Un-signalized IntersectionControl Delay per Vehicle (sec.)Control Delay per Vehicle (sec.)SOURCE: Level of Service thresholds from the Highway Capacity Manual. K:\Traffic\Level of Service (LOS)\LOS Delay Graphic.ppt COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 13 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS RODEL is a software program that predicts the traffic performance of roundabouts. The capacity estimates are based on research completed at the British Transport and Road Research Laboratory (TRRL) and use empirical equations originally published in 1980. RODEL calculates the capacity of each roundabout entry as a function of the circulating flow past that entry and six other geometric parameters. An important f eature of RODEL is the capability to vary the evaluation confidence level, which provides a factor of safety that takes into account the variability of traffic predictions and flow characteristics. RODEL, however, is not able to model the interaction of traffic in a system of intersections. Existing Operations Analysis The intersection of County Road E and Old Snelling Avenue is currently all-way stop controlled. This configuration was simulated in Synchro/SimTraffic for both the AM and PM peak hours using existing (2018) traffic volumes. The results of the existing condition traffic operations analysis are summarized in Table 3. Detailed modeling results are provided in Appendix E. Table 3 – 2018 Existing Condition Operations Summary (SimTraffic) The traffic operations analysis shows that the intersection currently operates at an acceptable LOS A during the AM peak hour and LOS B during the PM peak hour. The analysis results indicate there are no major queuing issues currently at the intersection. However, based on field observation during peak hours, the intersection seems to perform far poorer that what the analysis is indicating. In order to perform a sensitivity analysis, data from the Bethel University Expansion Traffic Study will also be used for the 2018 and 2038 scenarios. 2018 No Build (Bethel Study volumes) Traffic Operations Analysis The 2018 no build analysis was modeled using Synchro/SimTraffic software with the Bethel Study’s projected 2018 traffic volumes. This scenario assumes existing lane geometry, access, and traffic control. The results of the 2018 no build condition traffic operations analysis are summarized in Table 4. Further modeling results are provided in Appendix E. Left Through Right Left Through Right NB 5 (A)9 (A)4 (A)6 (A)11 (B)4 (A) WB 6 (A)11 (B)6 (A)8 (A)12 (B)8 (A) SB 8 (A)11 (B)5 (A)10 (B)12 (B)5 (A) EB 6 (A)8 (A)4 (A)11 (B)15 (C)12 (B) * Delay measured in seconds per vehicle Intersection ControlLocation Approach Intersection Delay* (LOS) Intersection Delay* (LOS) 8 (A) PM Peak Movement Delay* (LOS) 11 (B)All-Way StopAM Peak Movement Delay* (LOS) Old Snelling Ave & County Rd E COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 14 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Table 4 – 2018 (Bethel Study volumes) No Build Operations Summary (SimTraffic) With the 2018 projected volumes, the intersection is expected to operate with an overall B during the AM peak hour and an overall E during the PM peak hour. The intersection was forecasted to fail during the PM peak hour under the no build condition. 2018 Roundabout Traffic Operations Analysis The 2018 Roundabout analysis was modeled using RODEL software with projected 2018 traffic volumes as described in the “Traffic Forecasts” section. This scenario assumes roundabout alternative lane geometry, access, and traffic control. The results of the 2018 roundabout condition traffic operations analysis are summarized in Table 5. Further modeling results are provided in Appendix E. Table 5 – 2018 (Study volumes) Roundabout Operations Summary (RODEL) With the 2018 volumes and the proposed geometry, the intersection will operate with an overall LOS A during the AM and PM peak hours. The roundabout alternative would be designed to accommodate the Bethel University expansion and future growth in the area. 2038 No Build Traffic Operations Analysis The 2038 no build analysis was modeled using Synchro/SimTraffic software with projected 2038 traffic volumes as described in the “Traffic Forecasts” section. This scenario assumes existing lane geometry, access, and traffic control. The results of the 2038 no build condition traffic operations analysis are summarized in Table 6. Further modeling results are provided in Appendix E. Left Through Right Left Through Right NB 5 (A)11 (B)6 (A)8 (A)15 (C)9 (A) WB 9 (A)15 (C)9 (A)12 (B)21 (C)12 (B) SB 16 (C)14 (B)8 (A)74 (F)40 (E)33 (D) EB 9 (A)11 (B)6 (A)43 (E)56 (F)51 (F) Intersection ControlLocation Approach Intersection Delay* (LOS) Intersection Delay* (LOS) 12 (B) PM Peak Movement Delay* (LOS) 41 (E)All-Way StopAM Peak Movement Delay* (LOS) Old Snelling Ave & County Rd E * Delay measured in seconds per vehicle ControlLocation Approach Approach Delay* (LOS) Intersection Delay* (LOS) Approach Delay* (LOS) Intersection Delay* (LOS) NB 5 (A)5 (A) WB 7 (A)8 (A) SB 8 (A)8 (A) EB 5 (A)10 (B) Intersection PM Peak HourAM Peak Hour RoundaboutCR E & Old Snelling 7 (A)8 (A) COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 15 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Table 6 – 2038 No Build Operations Summary (SimTraffic) With the 2038 projected volumes, the intersection is expected to operate with an overall C during the AM peak hour and an overall F during the PM peak hour. The intersection will continue to operate extremely poor during the PM peak hour, with southbound and eastbound queues expected to reach over 1,000 feet under the no build condition. 2038 Roundabout Traffic Operations Analysis The 2038 Roundabout analysis was modeled using RODEL software with projected 2038 traffic volumes as described in the “Traffic Forecasts” section. This scenario assumes the roundabout alternative lane geometry, access, and traffic control. The results of the 2038 build condition traffic operations analysis are summarized in Table 7. Further modeling results are provided in Appendix E. Table 7 – 2038 Roundabout Operations Summary (RODEL) With the 2038 projected volumes and the roundabout alternative geometry, the intersection is expected to continue operating with an overall LOS A during the AM and PM peak hours. Left Through Right Left Through Right NB 6 (A)12 (B)6 (A)8 (A)16 (C)9 (A) WB 9 (A)17 (C)10 (B)12 (B)28 (D)13 (B) SB 32 (D)18 (C)12 (B)158 (F)109 (F)98 (F) EB 10 (B)11 (B)7 (A)175 (F)187 (F)182 (F) * Delay measured in seconds per vehicle Intersection ControlLocation Approach Intersection Delay* (LOS) Intersection Delay* (LOS) 19 (C) PM Peak Movement Delay* (LOS) 104 (F)All-Way StopAM Peak Movement Delay* (LOS) Old Snelling Ave & County Rd E ControlLocation Approach Approach Delay* (LOS) Intersection Delay* (LOS) Approach Delay* (LOS) Intersection Delay* (LOS) NB 5 (A)6 (A) WB 8 (A)10 (B) SB 10 (B)10 (B) EB 5 (A)13 (B) Intersection PM Peak HourAM Peak Hour RoundaboutCR E & Old Snelling 8 (A)11 (B) COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 16 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Evaluation Considerations Right of Way Impacts Maintaining the existing geometry and traffic control (all-way stop control application) would require no additional right of way. The build alternative would require the acquisition of right of way. Project Costs • All-Way Stop Control (existing geometry and traffic control) – would require no construction or maintenance costs. • Roundabout – Total cost for the construction of a roundabout and surrounding improvements is estimated to be ~$1,200,000. Political Consideration / Public Input This project is in the pre-design stage and the purpose of this Intersection Control Evaluation is to provide data and analysis to decision makers regarding the performance, safety, operations and other characteristics of the existing traffic control, traffic signal control and a single-lane roundabout. The traffic signal control alternative does not meet warrants necessary for installation of a traffic signal. The existing all-way stop condition is expected to operate poorly with expected traffic growth. The roundabout is expected to provide a safer and more efficiently operating intersection than the other alternatives. Design Data The roundabout alternative would be designed to be an urban, single-lane roundabout. The geometric layout of the roundabout alternative is provided in Figure 5. The design vehicle used for this intersection is a WB-62. The truck turning paths are shown in Figure 6. The circulatory roadway width for the roundabout alternative would be 20’ (face-to-face of curb). A 14’ truck apron would encompass the center island to provide space for larger trucks to navigate the roundabout. A fast path was also completed for this intersection and is summarized in Figure 7. The preliminary design of the roundabout alternative meets the speed requirements in NCHRP 672: Roundabouts an Informational Guide, 2nd Edition. A horizontal sight distance analysis was completed for this intersection, and the results are shown in Figure 8. COUNTY ROAD E & OLD SNELLING AVENUE ICE PAGE 17 WSB PROJECT NO. 011498-000 CITY OF ARDEN HILLS Alternatives Analysis Based on field evaluation and observation, the existing geometry and traffic control at the study intersection has poor operation during the afternoon and particularly the p.m. peak hour. Traffic simulation modeling indicates that expected traffic growth at this intersection will result in increasingly poorer operations. The inte rsection has experienced above average crash and severity rates, and the intersection volumes do not meet traffic signal warrants. Due to these issues, a single-lane roundabout is an appropriate method for providing a safer intersection with improved operation. Conclusion A roundabout at the intersection of County Road E and Old Snelling Avenue is justified. The intersection currently has an all-way stop control application and currently has significant delays and queuing issues during the PM peak hour. Traffic volumes are expected to increase over the next 20 years and a roundabout will accommodate the higher volumes and provide a safer alternative compare d to the existing traffic control. Figure 5: Proposed Roundabout Geometry 14'20'150'Ol d Sn elli n g Av e 14'20' 57'R 43'R200'R 57'R 100'R 516'R 500'R 100'R 500'R 120'R 100'R 766'R 100'R 750'R 250'R 250'R 57'R 100'R 100'R 2000'R 350'R 1984'R 77'R 100'R 466'R 450'R 100'R 200'R Lake Johanna Blvd 516'R Date: Printed:WSB Filename:K:\011498-000\Cad\Exhibits\ICE\F5 - Proposed Roundabout Geometry.dgn10/8/2018 ICE Report|Arden Hills, MN County Road E at Old Snelling Avenue N 0 25 ft 50 ft Right Turns Left Turns (EB/WB)Left Turns (NB/SB) Steering Angle Lock to Lock Time Articulating Angle WB-62 Trailer Track Tractor Track Trailer Width Tractor Width 19.504.00 feet 8.50 8.50: 8.00 8.00 : : : 0.00 2.50 41.00 15.00 48.00 : : :6.0 28.4 70.0 Figure 6: Truck Turning PathsOl d S n elli n g Av e County Road E County Road E Ol d S n elli n g Av e County Road E Ol d S n elli n g Av e Lake Johanna Blvd Lake Johanna Blvd Lake Johanna Blvd Date: Printed:WSB Filename:K:\011498-000\Cad\Exhibits\ICE\F6 - Truck Turning Paths.dgn10/8/2018 ICE Report|Arden Hills, MN County Road E at Old Snelling Avenue WB-62AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved. WB-62AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved. WB-62 AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved. WB-62 AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved.WB-62AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved. WB-62AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved. WB-62AASHTO 2011 (US) (c) 2018 Transoft Solutions, Inc. All rights reserved. NNN R5R2 R5 R3 Figure 7: Fast Path Analysis R1 R5 R5 R1 R2 R3 R1 R2 R3 R1 R2 R3 R4 R4 R4R4 Old S nellin g Ave County Road E County Road E Ol d Sne lli ng Ave Lake Johanna Blvd Lake Johanna Blvd FAST PATH ANALYSIS (CR E & OLD SNELLING AVE) Approach Curve Radius Speed Differential Relative Speed Crosswalk Distance to Southbound R1 150 23.8 8.2 R2 105 19.1 3.6 R3 27 11.4 60 R4 60 15.6 0.0 R5 110 21.1 5.6 Northbound R1 152 23.9 8.4 R2 65 16.0 0.5 R3 25 9.4 54 R4 60 15.6 0.0 R5 108 21.0 5.4 Westbound R1 163 24.6 9.0 R2 80 17.3 1.7 R3 24 8.4 54 R4 60 15.6 0.0 R5 107 20.9 5.3 Eastbound R1 150 23.8 8.2 R2 90 18.1 2.5 R3 27 11.4 66 R4 60 15.6 0.0 R5 140 23.2 7.6 Notes 1. R3 is calculated using R2 or R4 speed + acceleration to crosswalk. 2. Relative Speed Differential is from minimum speed (typically R4) within roundabout. according to NCHRP Report 672: Roundabouts an Informal Guide: Second Edition 3. Relative Speed Difference should be in the range of no more than 10 - 15 mph, Date: Printed:WSB Filename:K:\011498-000\Cad\Exhibits\ICE\F7 - Fast Path Analysis.dgn10/8/2018 County Road E at Old Snelling Ave ICE Report|Arden Hills, MN N N LEGEND CLEAR ZONE OBSTRUCTION Figure 8: Horizontal Sight DistanceOl d S n elli n g Av e County Road E Date: Printed:WSB Filename:K:\011498-000\Cad\Exhibits\ICE\F8 - Horizontal Sight Distance Analysis.dgn10/8/2018 County Road E at Old Snelling Ave ICE Report|Arden Hills, MN N APPENDIX A Existing Turning Movement Counts File Name : Co Rd E & Old Snelling Ave Site Code : Start Date : 2/7/2018 Page No : 1 Co Rd E & Old Snelling Ave 6am-6pm Arden Hills, MN 20's Groups Printed- Cars + Old Snelling Ave From North Co Rd E From East Old Snelling Ave From South Lake Johanna Blvd From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 06:00 AM 1 0 8 0 9 15 10 1 0 26 1 1 1 0 3 0 3 0 0 3 41 06:15 AM 1 0 11 0 12 17 12 1 0 30 2 0 0 0 2 0 10 0 0 10 54 06:30 AM 4 2 23 0 29 26 14 1 0 41 5 0 0 0 5 1 8 4 0 13 88 06:45 AM 6 2 29 0 37 44 23 0 0 67 3 1 3 0 7 0 12 5 0 17 128 Total 12 4 71 0 87 102 59 3 0 164 11 2 4 0 17 1 33 9 0 43 311 07:00 AM 6 7 66 0 79 68 26 1 0 95 3 6 2 1 12 1 16 12 0 29 215 07:15 AM 6 20 68 0 94 48 29 7 0 84 6 8 5 0 19 1 14 9 0 24 221 07:30 AM 9 17 65 0 91 47 28 3 0 78 7 5 2 0 14 2 21 2 0 25 208 07:45 AM 16 8 59 0 83 77 61 4 0 142 9 6 7 0 22 3 22 13 0 38 285 Total 37 52 258 0 347 240 144 15 0 399 25 25 16 1 67 7 73 36 0 116 929 08:00 AM 4 20 64 1 89 67 56 5 0 128 1 7 3 0 11 0 31 7 0 38 266 08:15 AM 10 28 54 0 92 48 42 3 0 93 6 5 2 0 13 3 29 6 0 38 236 08:30 AM 7 15 43 0 65 54 42 7 0 103 6 0 3 0 9 0 29 5 0 34 211 08:45 AM 7 12 51 0 70 85 34 3 0 122 3 2 3 2 10 3 26 5 1 35 237 Total 28 75 212 1 316 254 174 18 0 446 16 14 11 2 43 6 115 23 1 145 950 09:00 AM 6 1 49 0 56 47 25 3 0 75 6 3 3 0 12 1 1 3 0 5 148 09:15 AM 5 14 39 0 58 35 28 3 0 66 3 5 0 0 8 1 20 7 0 28 160 09:30 AM 8 6 36 0 50 28 13 2 0 43 4 2 0 0 6 0 18 2 0 20 119 09:45 AM 4 12 19 0 35 33 15 2 0 50 6 4 0 0 10 2 21 3 0 26 121 Total 23 33 143 0 199 143 81 10 0 234 19 14 3 0 36 4 60 15 0 79 548 10:00 AM 1 6 30 0 37 21 10 6 0 37 3 0 1 0 4 1 18 1 0 20 98 10:15 AM 3 7 38 0 48 28 21 3 0 52 3 0 0 0 3 0 9 3 0 12 115 10:30 AM 3 5 35 0 43 34 16 1 1 52 1 2 0 2 5 2 12 4 0 18 118 10:45 AM 4 8 32 0 44 44 13 6 0 63 0 4 0 0 4 2 17 5 0 24 135 Total 11 26 135 0 172 127 60 16 1 204 7 6 1 2 16 5 56 13 0 74 466 11:00 AM 8 8 24 0 40 42 21 6 0 69 3 4 2 0 9 0 26 3 0 29 147 11:15 AM 3 4 26 0 33 43 13 1 0 57 4 2 1 0 7 1 22 6 0 29 126 11:30 AM 1 7 18 2 28 39 19 8 0 66 7 1 1 0 9 1 23 2 2 28 131 11:45 AM 5 5 27 0 37 40 31 4 0 75 2 3 0 1 6 1 31 10 1 43 161 Total 17 24 95 2 138 164 84 19 0 267 16 10 4 1 31 3 102 21 3 129 565 12:00 PM 4 13 19 0 36 53 17 7 0 77 5 5 0 0 10 2 22 7 0 31 154 12:15 PM 2 11 39 1 53 57 23 4 0 84 3 4 0 0 7 0 23 4 0 27 171 12:30 PM 4 15 43 0 62 58 34 2 0 94 2 5 1 0 8 7 22 5 0 34 198 12:45 PM 4 8 32 0 44 45 21 5 0 71 2 1 1 0 4 2 29 5 0 36 155 Total 14 47 133 1 195 213 95 18 0 326 12 15 2 0 29 11 96 21 0 128 678 01:00 PM 3 4 41 0 48 45 30 3 0 78 7 2 0 0 9 1 26 5 0 32 167 01:15 PM 4 15 43 0 62 47 22 7 0 76 4 1 1 0 6 3 30 6 0 39 183 01:30 PM 3 14 45 0 62 42 32 6 0 80 3 2 0 1 6 1 17 5 1 24 172 01:45 PM 10 9 44 0 63 40 18 4 0 62 5 3 0 0 8 3 28 7 0 38 171 Total 20 42 173 0 235 174 102 20 0 296 19 8 1 1 29 8 101 23 1 133 693 02:00 PM 2 8 32 0 42 51 31 4 0 86 3 1 3 0 7 4 33 7 0 44 179 02:15 PM 5 10 65 0 80 46 19 9 0 74 5 4 1 0 10 2 31 5 1 39 203 02:30 PM 6 11 43 0 60 59 31 3 0 93 4 2 0 0 6 2 24 6 0 32 191 02:45 PM 4 18 50 0 72 39 21 3 0 63 3 1 1 0 5 6 35 6 0 47 187 Total 17 47 190 0 254 195 102 19 0 316 15 8 5 0 28 14 123 24 1 162 760 03:00 PM 3 14 50 0 67 44 35 12 0 91 4 2 0 0 6 3 32 6 0 41 205 03:15 PM 6 13 41 0 60 40 27 5 0 72 1 7 0 0 8 2 28 3 0 33 173 03:30 PM 5 19 46 0 70 50 18 8 0 76 7 1 0 0 8 1 34 13 0 48 202 03:45 PM 8 19 44 0 71 73 24 10 0 107 2 6 0 0 8 4 38 11 0 53 239 Total 22 65 181 0 268 207 104 35 0 346 14 16 0 0 30 10 132 33 0 175 819 WSB & Associates 701 Xenia Ave S Minneapolis, MN File Name : Co Rd E & Old Snelling Ave Site Code : Start Date : 2/7/2018 Page No : 2 Co Rd E & Old Snelling Ave 6am-6pm Arden Hills, MN 20's Groups Printed- Cars + Old Snelling Ave From North Co Rd E From East Old Snelling Ave From South Lake Johanna Blvd From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 04:00 PM 5 20 54 0 79 58 21 5 0 84 4 2 2 0 8 7 51 19 0 77 248 04:15 PM 13 23 68 0 104 71 47 12 1 131 3 2 2 0 7 7 70 15 2 94 336 04:30 PM 8 28 65 0 101 83 37 5 0 125 5 0 2 0 7 3 87 10 3 103 336 04:45 PM 1 18 52 0 71 98 40 8 0 146 1 2 2 0 5 5 86 17 0 108 330 Total 27 89 239 0 355 310 145 30 1 486 13 6 8 0 27 22 294 61 5 382 1250 05:00 PM 4 12 60 0 76 93 24 7 0 124 3 7 1 0 11 4 68 18 0 90 301 05:15 PM 11 21 54 0 86 98 42 11 0 151 4 1 0 0 5 4 72 13 0 89 331 05:30 PM 9 23 58 0 90 80 21 12 0 113 4 1 0 0 5 7 51 9 0 67 275 05:45 PM 8 17 34 1 60 82 23 7 0 112 4 3 0 0 7 7 57 10 1 75 254 Total 32 73 206 1 312 353 110 37 0 500 15 12 1 0 28 22 248 50 1 321 1161 Grand Total 260 577 2036 5 2878 2482 1260 240 2 3984 182 136 56 7 381 113 1433 329 12 1887 9130 Apprch %9 20 70.7 0.2 62.3 31.6 6 0.1 47.8 35.7 14.7 1.8 6 75.9 17.4 0.6 Total %2.8 6.3 22.3 0.1 31.5 27.2 13.8 2.6 0 43.6 2 1.5 0.6 0.1 4.2 1.2 15.7 3.6 0.1 20.7 WSB & Associates 701 Xenia Ave S Minneapolis, MN File Name : Co Rd E & Old Snelling Ave Site Code : Start Date : 2/7/2018 Page No : 3 Co Rd E & Old Snelling Ave 6am-6pm Arden Hills, MN 20's Old Snelling Ave From North Co Rd E From East Old Snelling Ave From South Lake Johanna Blvd From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 06:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 16 8 59 0 83 77 61 4 0 142 9 6 7 0 22 3 22 13 0 38 285 08:00 AM 4 20 64 1 89 67 56 5 0 128 1 7 3 0 11 0 31 7 0 38 266 08:15 AM 10 28 54 0 92 48 42 3 0 93 6 5 2 0 13 3 29 6 0 38 236 08:30 AM 7 15 43 0 65 54 42 7 0 103 6 0 3 0 9 0 29 5 0 34 211 Total Volume 37 71 220 1 329 246 201 19 0 466 22 18 15 0 55 6 111 31 0 148 998 % App. Total PHF .578 .634 .859 .250 .894 .799 .824 .679 .000 .820 .611 .643 .536 .000 .625 .500 .895 .596 .000 .974 .875 Old Snelling Ave Lake Johanna Blvd Co Rd E Old Snelling Ave Right 37 Thru 71 Left 220 Peds 1 InOut Total 295 329 624 Right246 Thru201 Left19 Peds0 OutTotalIn353 466 819 Left 15 Thru 18 Right 22 Peds 0 Out TotalIn 96 55 151 Left31 Thru111 Right6 Peds0 TotalOutIn253 148 401 Peak Hour Begins at 07:45 AM Cars + Peak Hour Data North WSB & Associates 701 Xenia Ave S Minneapolis, MN File Name : Co Rd E & Old Snelling Ave Site Code : Start Date : 2/7/2018 Page No : 4 Co Rd E & Old Snelling Ave 6am-6pm Arden Hills, MN 20's Old Snelling Ave From North Co Rd E From East Old Snelling Ave From South Lake Johanna Blvd From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 13 23 68 0 104 71 47 12 1 131 3 2 2 0 7 7 70 15 2 94 336 04:30 PM 8 28 65 0 101 83 37 5 0 125 5 0 2 0 7 3 87 10 3 103 336 04:45 PM 1 18 52 0 71 98 40 8 0 146 1 2 2 0 5 5 86 17 0 108 330 05:00 PM 4 12 60 0 76 93 24 7 0 124 3 7 1 0 11 4 68 18 0 90 301 Total Volume 26 81 245 0 352 345 148 32 1 526 12 11 7 0 30 19 311 60 5 395 1303 % App. Total PHF .500 .723 .901 .000 .846 .880 .787 .667 .250 .901 .600 .393 .875 .000 .682 .679 .894 .833 .417 .914 .969 Old Snelling Ave Lake Johanna Blvd Co Rd E Old Snelling Ave Right 26 Thru 81 Left 245 Peds 0 InOut Total 416 352 768 Right345 Thru148 Left32 Peds1 OutTotalIn568 526 1094 Left 7 Thru 11 Right 12 Peds 0 Out TotalIn 132 30 162 Left60 Thru311 Right19 Peds5 TotalOutIn181 395 576 Peak Hour Begins at 04:15 PM Cars + Peak Hour Data North WSB & Associates 701 Xenia Ave S Minneapolis, MN APPENDIX B Crash Diagram Light Classification by Type L = Daylight DN = Dawn Fatal DU = Dusk Personal Injury DL = Dark Lighted Prop. Damage DO = Dark, Lights Off Total 0 1 D = Dark, Unlighted Weather C = Clear CL = Cloudy R = Rain S = Snow SL = Sleet F = Fog Surface D = Dry I = Icy W = Wet S=Snow Unknown 1 2/22/2013 (1) L-S-S 1/24/2014 (4) DU--I2/20/2014 (5) L-S-SL5/22/2015 (7) L-C-DSnow 2 Unknown 0 Mist 0 Sleet 0 Unknown 0 12:00 AM - 6:00 AM 1 4:00 PM - 7:00 PM 3 Rain 1 Snow 3 Fall (Sep - Nov)1 7:00 PM - 12:00 AM 0 Fog 0 Icy 1 Summer (Jun - Aug)2 6:00 AM - 10:00 AM 0 Cloudy 1 Wet 1 Spring (Mar - May)2 10:00 AM - 4:00 PM 5 Weather Pavement Time of Year Time of Day Clear 4 Dry 4 Winter (Dec - Feb)4 1 2 2 2 1 1 2 2 1 1 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 Side Swipe Rear End Right Angle Right Turn Ran Off Road Ped/Bicycle Other Out of Control Left Turn Right Angle Collision Types Rear End Head-On 7/28/2015 (8) L-C-DSide Swipe Bicycle Fatality Injury 12/23/2013 (3) L-CL-S 10/2/2014 (6) L-R-W Parked Vehicle Fixed Object 8/20/2015 (9) L-C-D Backing Vehicle Non-moving Vehicle Pedestrian Crash Diagram County Rd E & Old Snelling Ave, Arden Hills, MN January 2013 - December 2015 Symbols Moving Vehicle County Rd E Old Snelling AveNotes: 5/1/2013 (2) L-C-D: Two cars travelling in unknown directions had an unknown type of collision. No personal injuries were reported. 12/23/2013 (3) L-CL-S: A vehicle travelling east struck a pedestrian travelling south. The pedestrian failed to yield the right of way and resulted in an unknown type of collision. No personal injuries were reported. County Rd E Old Snelling AveC APPENDIX C Traffic Signal Warrant Analysis County Rd E at Old Snelling Avenue Ramsey Mallori Speed Approach Description Lanes POPULATION < 10,000?No 35 Major App 1 County Rd E (WB)2 0.70 FACTOR USED?No 30 Major App 3 County Rd E (EB)2 EXISTING SIGNAL ?No 45 Minor App 2 Old Snelling (SB)2 0.80 FACTOR USED?No 40 Minor App 4 Old Snelling (NB)2 Notes: 600/900 200/100 200/100 480/720 160/80 160/80 MAJOR APP 1 MAJOR APP. 3 TOTAL 1+3 MINOR APP. 2 MINOR APP. 4 MAJOR 1A/1B MINOR 2 1A/1B MINOR 4 1A/1B MET SAME 1A/1B MAJOR 1C A/B MINOR 2 1C A/B MINOR 4 1C A/B MET SAME 1C (A/B) 12:00 AM -1:00 AM 0 0 0 0 0 //////// 1:00 AM -2:00 AM 0 0 0 0 0 //////// 2:00 AM -3:00 AM 0 0 0 0 0 //////// 3:00 AM -4:00 AM 0 0 0 0 0 //////// 4:00 AM -5:00 AM 0 0 0 0 0 //////// 5:00 AM -6:00 AM 0 0 0 0 0 //////// 6:00 AM -7:00 AM 87 62 149 17 43 //////// 7:00 AM -8:00 AM 347 159 506 66 116 ///X /X///X / 8:00 AM -9:00 AM 315 192 507 41 144 ///X /X///X / 9:00 AM -10:00 AM 199 91 290 36 79 //////// 10:00 AM -11:00 AM 172 76 248 14 74 //////// 11:00 AM -12:00 PM 136 103 239 30 126 ///X ////X / 12:00 PM -1:00 PM 194 113 307 29 128 ///X ////X / 1:00 PM -2:00 PM 235 122 357 28 132 ///X ////X / 2:00 PM -3:00 PM 254 121 375 28 161 ///X ///X/X / 3:00 PM -4:00 PM 268 139 407 30 175 ///X ///X/X / 4:00 PM -5:00 PM 355 175 530 27 377 //X/X /X//X/X X/ 5:00 PM -6:00 PM 311 147 458 28 320 //X/X ///X/X / 6:00 PM -7:00 PM 0 0 0 0 0 //////// 7:00 PM -8:00 PM 0 0 0 0 0 //////// 8:00 PM -9:00 PM 0 0 0 0 0 //////// 9:00 PM -10:00 PM 0 0 0 0 0 //////// 10:00 PM -11:00 PM 0 0 0 0 0 //////// 11:00 PM -12:00 AM 0 0 0 0 0 //////// Met (Hr)Required (Hr) 0 8 0 8 1 8 0 8 SIGNAL WARRANTS ANALYSIS Year: Condition: Warrant 1A 7/9/2018 THRESHOLDS 1A/1B/1C: Warrant Satisfied? Not Satisfied LOCATION: COUNTY: REF. POINT: DATE: OPERATOR: HOUR WARRANT 1 - EIGHT HOUR VOLUME Not Satisfied Not Satisfied Warrant 1B Warrant 1C (Cond A) Warrant 1C (Cond B) County Rd E at Old Snelling Avenue Page 2 Ramsey Mallori Speed Approach Description Lanes 35 Major App1:County Rd E (WB)2 0.70 FACTOR USED?No 30 Major App3:County Rd E (EB)2 POPULATION < 10,000?No 45 Minor App2:Old Snelling (SB)2 40 Minor App4:Old Snelling (NB)2 Notes: Met (Hr)Required (Hr) 0 4 Met (Hr)Required (Hr) 0 1 7/9/2018 LOCATION: COUNTY: REF. POINT: Not Satisfied Not Satisfied Warrant 2 Warrant 3 WARRANT 3 - PEAK HOUR VOLUME Warrant Satisfied? Warrant Satisfied? WARRANT 2 - FOUR HOUR VOLUME OPERATOR: DATE: 0 100 200 300 400 500 600 700 800 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800Minor Street Volume Approach (vph)Major Street Combined Volume (vph) Figure 1: Four-Hour Warrant Analysis Minor 2 Warrant Threshold Minor 4 Warrant Threshold Hourly Count - Minor 2 Hourly Count - Minor 4 0 100 200 300 400 500 600 700 800 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800Minor Street Volume Approach (vph)Major Street Combined Volume (vph) Figure 2: Peak Hour Warrant Analysis Minor 2 Warrant Threshold Minor 4 Warrant Threshold Hourly Count - Minor 2 Hourly Count - Minor 4 County Rd E at Old Snelling Avenue Page 3 Ramsey Mallori Speed Approach Description 35 Major App1:County Rd E (WB) 0.70 FACTOR USED?No 30 Major App3:County Rd E (EB) POPULATION < 10,000?No 45 Minor App2:Old Snelling (SB) 40 Minor App4:Old Snelling (NB) MAJOR APP 1 MAJOR APP. 3 TOTAL 1+3 PEDS X-ING MAJOR Met (Hr)Required (Hr) 12:00 AM -1:00 AM 0 0 0 0 0 4 1:00 AM -2:00 AM 0 0 0 0 0 1 2:00 AM -3:00 AM 0 0 0 0 3:00 AM -4:00 AM 0 0 0 0 4:00 AM -5:00 AM 0 0 0 0 5:00 AM -6:00 AM 0 0 0 0 6:00 AM -7:00 AM 87 62 149 0 7:00 AM -8:00 AM 347 159 506 0 8:00 AM -9:00 AM 315 192 507 1 9:00 AM -10:00 AM 199 91 290 0 10:00 AM -11:00 AM 172 76 248 1 11:00 AM -12:00 PM 136 103 239 3 12:00 PM -1:00 PM 194 113 307 0 1:00 PM -2:00 PM 235 122 357 1 2:00 PM -3:00 PM 254 121 375 1 3:00 PM -4:00 PM 268 139 407 0 4:00 PM -5:00 PM 355 175 530 6 5:00 PM -6:00 PM 311 147 458 1 6:00 PM -7:00 PM 0 0 0 0 7:00 PM -8:00 PM 0 0 0 0 8:00 PM -9:00 PM 0 0 0 0 9:00 PM -10:00 PM 0 0 0 0 10:00 PM -11:00 PM 0 0 0 0 11:00 PM -12:00 AM 0 0 0 0 No If Yes, will proposed signal inhibit the progression of traffic on the major approach? N/A Warrant 4 Satisfied?Not Satisfied LOCATION: COUNTY: REF. POINT: Warrant 4 (Peak Pedestrian Vol.) OPERATOR: WARRANT 4 - PEDESTRIAN VOLUME HOUR DATE:7/9/2018 Warrant 4 (4-Hour Pedestrian Vol.) Is crossing within 300' of other signal or stop sign controlling the major approach? 0 100 200 300 400 500 600 700 800 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800Minor Street Volume Approach (vph)Major Street Combined Volume (vph) Figure 3: Pedestrian Warrant Analysis Pedestrians Crossing Major Road Pedestrian Four-Hour Warrant Threshold Pedestrian Peak-Hour Warrant Threshold County Rd E at Old Snelling Avenue Page 4 Ramsey Mallori Is the principal reason for the signal to accommodate the movement of schoolchildren across the major road?No Are there at least 20 schoolchildren crossing the major road in the highest crossing hour?N/A If both above questions are answered yes, calculate the available gaps below: Are needed gaps greater than available gaps?N/A Is crossing within 300' of other signal or stop sign controlling the major approach?N/A If Yes, will proposed signal inhibit the progression of traffic on the major approach?N/A Warrant 5 met?No Part A Is the street a one-way street or a street that has traffic predominately in one direction?No Do adjacent traffic control signals provide adequate platooning?N/A Part B Is the street a two-way street?Yes Do adjacent traffic control signals provide adequate platooning?Yes Will proposed signal provide for progressive operation of traffic?N/A Will proposed signal spacing be less than 1000 feet?N/A Provide proof of platooning issues: Warrant 6 met?No WARRANT 6 - COORDINATED SIGNAL SYSTEM N/A LOCATION: COUNTY: REF. POINT: DATE:7/9/2018 OPERATOR: WARRANT 5 - SCHOOL CROSSING County Rd E at Old Snelling Avenue Page 4 Ramsey Mallori 480/720 160/80 160/80 MAJOR APP 1 MAJOR APP. 3 TOTAL 1+3 MINOR APP. 2 MINOR APP. 4 MAJOR 7 A/B MINOR 2 7 A/B MINOR 4 7 A/B MET SAME 7 (A/B) 12:00 AM -1:00 AM 0 0 0 0 0 //// 1:00 AM -2:00 AM 0 0 0 0 0 //// 2:00 AM -3:00 AM 0 0 0 0 0 //// 3:00 AM -4:00 AM 0 0 0 0 0 //// 4:00 AM -5:00 AM 0 0 0 0 0 //// 5:00 AM -6:00 AM 0 0 0 0 0 //// 6:00 AM -7:00 AM 87 62 149 17 43 //// 7:00 AM -8:00 AM 347 159 506 66 116 X///X / 8:00 AM -9:00 AM 315 192 507 41 144 X///X / 9:00 AM -10:00 AM 199 91 290 36 79 //// 10:00 AM -11:00 AM 172 76 248 14 74 //// 11:00 AM -12:00 PM 136 103 239 30 126 ///X / 12:00 PM -1:00 PM 194 113 307 29 128 ///X / 1:00 PM -2:00 PM 235 122 357 28 132 ///X / 2:00 PM -3:00 PM 254 121 375 28 161 //X/X / 3:00 PM -4:00 PM 268 139 407 30 175 //X/X / 4:00 PM -5:00 PM 355 175 530 27 377 X//X/X X/ 5:00 PM -6:00 PM 311 147 458 28 320 //X/X / 6:00 PM -7:00 PM 0 0 0 0 0 //// 7:00 PM -8:00 PM 0 0 0 0 0 //// 8:00 PM -9:00 PM 0 0 0 0 0 //// 9:00 PM -10:00 PM 0 0 0 0 0 //// 10:00 PM -11:00 PM 0 0 0 0 0 //// 11:00 PM -12:00 AM 0 0 0 0 0 //// Met (Hr)Required (Hr) 1 8 0 8 Has there been an adequare trial of alternatives that has failed to reduce the crash frequency?No Crash History (within a 12-month period) Number of Crashes: Right Angle:2 TOTAL:2 Left Turn:Required:5 Pedestrian: Warrant 7 met?No THRESHOLDS 1A/1B/1C: HOUR Warrant 7 (Cond A) Warrant 7 (Cond B) REF. POINT: DATE:7/9/2018 OPERATOR: WARRANT 7 - CRASH EXPERIENCE LOCATION: COUNTY: County Rd E at Old Snelling Avenue Page 5 Ramsey Mallori Major Approach Road Minor Approach Road Part of street or highway system that serves as the principal roadway network for through traffic flow No No Rural or suburban highway outside, entering, or traversing a city No No Appears as a major route on an official plan No No Yes Does the intersection have 5-Year projected traffic volumes that meet Warrants 1, 2, or 3?No No Warrant 8 met?No No Is the center of the railroad track less than 140 feet from the stop line or yield line?N/A Clear storage distance (closest to)N/A Approach crossing grade N/A Rail traffic per day 0 Percent of high-occupancy buses on minor-street approach 0% Percent of tractor-trailer trucks on minor-street approach 0% Met (Hr)Required (Hr) 0 1 Warrant 9 met?No Warrant 9 Does the intersection have a total existing or immediately projected entering volume of at least 1,000 vehicles per WARRANT 8 - ROADWAY NETWORK Does the intersection have a total existing or immediately projected entering volume of at least 1,000 vehicles per LOCATION: COUNTY: REF. POINT: DATE:7/9/2018 OPERATOR: WARRANT 9 - INTERSECTION NEAR GRADE CROSSING Is the principal reason for installation of a signal the proximity of the intersection to a grade crossing controlled by a stop or yield control? 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800Minor Street Adjusted Volume (vph)Major Street Combined Volume (vph) Figure 4: Grade Crossing Warrant Analysis Adjusted Approach Volume Grade Crossing Warrant Threshold County Rd E at Old Snelling Avenue Page 6 Ramsey Mallori Warrant 1 Not Met Notes: Condition A Not Met Condition B Not Met Condition C Not Met Warrant 2 Not Met Warrant 3 Not Met Warrant 4 Not Met Warrant 5 Not Met Warrant 6 Not Met Warrant 7 Not Met Warrant 8 Not Met Warrant 9 Not Met WARRANT SUMMARY LOCATION: COUNTY: REF. POINT: DATE:7/9/2018 OPERATOR: APPENDIX D All-Way Stop Warrant Analysis LOCATION:County Rd E at Old Snelling Avenue COUNTY:Ramsey REF. POINT:Speed Approach Description Lanes DATE:7/9/2018 35 Major App1:County Rd E (WB)2 30 Major App3:County Rd E (EB)2 OPERATOR:Mallori 45 Minor App2:Old Snelling (SB)2 40 Minor App4:Old Snelling (NB)2 0.70 FACTOR USED?Yes VOLUME THRESHOLDS:240/160 / / 1:00:00 AM / / 2:00:00 AM / / 3:00:00 AM / / 4:00:00 AM / / 5:00:00 AM / / 6:00:00 AM 87 62 17 43 / / 7:00:00 AM 347 159 66 116 X/ X/X 8:00:00 AM 315 192 41 144 X/ X/X 9:00:00 AM 199 91 36 79 / X/ 10:00:00 AM 172 76 14 74 / X/ 11:00:00 AM 136 103 30 126 / / 12:00:00 PM 194 113 29 128 X/ X/ 1:00:00 PM 235 122 28 132 X/ X/X 2:00:00 PM 254 121 28 161 X/ X/X 3:00:00 PM 268 139 30 175 X/X X/X 4:00:00 PM 355 175 27 377 X/X X/X 5:00:00 PM 311 147 28 320 X/X X/X 6:00:00 PM / / 7:00:00 PM / / 8:00:00 PM / / 9:00:00 PM / / 10:00:00 PM / / 11:00:00 PM / / Met (Hr)Required (Hr) All Way Stop 100% Volume Warrant:3 8 All Way Stop 80% Volume Warrant:7 8 Minor road peak hour delay (seconds)15 Volume warrant met?No 357 375 407 507 239 307 80% VOLUME WARRANT MET 458 ALL WAY STOP WARRANT 530 300 290 248 149 506 182 185 115 88 157 160 189 205 404 348 156 MINOR APP. 2 MINOR APP. 4 Year:2018 All-Way Stop VOLUME WARRANT 200 HOUR MAJOR APP. 1 MAJOR APP. 3 Existing Condition: 60 MAJOR TOTAL Σ (APP. 1 & APP. 3) MINOR TOTAL Σ (APP. 2 & APP. 4) 100% VOLUME WARRANT MET LOCATION:County Rd E at Old Snelling Avenue Page 2 COUNTY:Ramsey REF. POINT: DATE:7/9/2018 OPERATOR:Mallori Is a traffic control signal justified?No Amount of correctible crashes:2 Right-Turn Left-Turn Right-Angle 2 Other Is there a need to control left-turn conflicts?Yes Is there a need to control vehicle/pedestrian conflicts near a high pedestrian generator?No Are there sight issues (inability to see conflicting traffic) at the intersection?No Yes Notes/explanations: Other warrants met? Is the intersection between two residential neighborhood collector (through) streets of similar design and operating characteristics where multi-way stop control would improve traffic operational characteristics of the intersection? OTHER WARRANTS Yes (,Left-Turn Conflicts,Operational APPENDIX E SYNCHRO/RODEL Operations Results Table E1. 2018 Existing AM MOEs Table E2. 2018 Existing PM MOEs Table E3. 2018 Study No Build AM MOEs Table E4. 2018 Study No Build PM MOEs Table E5. 2018 Study Build MOEs L T R Total L T R L T R Delay LOS Delay LOS Ave Queue Max Queue Storage Ave Queue Max Queue Storage Ave Queue Max Queue Storage NB 14 23 23 60 5 9 4 A A A 6 A NB 7 26 230 21 40 WB 15 187 239 441 6 11 6 A B A 8 A WB 8 27 1000 37 79 34 77 200 SB 242 73 39 354 8 11 5 A B A 8 A SB 48 86 200 37 67 EB 28 103 8 139 6 8 4 A A A 7 A EB 14 38 70 30 60 LOS by MovementAppr LOS by Intersection (Sec/Veh) LOS by Approach (Sec/Veh)Appr Right-Turn Average & Maximum Traffic Queueing (feet) Left-Turn Intersection ControlLocation ThroughForecast Volumes Total Delay by Movement 8 A All-Way Stop1: Old Snelling Ave & County Rd E L T R Total L T R L T R Delay LOS Delay LOS Ave Queue Max Queue Storage Ave Queue Max Queue Storage Ave Queue Max Queue Storage NB 7 11 12 30 6 11 4 A B A 7 A NB 4 25 230 14 32 WB 32 148 345 525 8 12 8 A B A 9 A WB 15 39 1000 33 68 52 110 200 SB 245 81 26 352 10 12 5 B B A 10 B SB 57 126 200 39 77 EB 60 311 19 390 11 15 12 B C B 14 B EB 34 94 70 77 199 Intersection Appr ControlLocation Appr Average & Maximum Traffic Queueing (feet) Left-Turn Through Right-Turn LOS by Approach (Sec/Veh) Forecast Volumes Total Delay by Movement LOS by Movement LOS by Intersection (Sec/Veh)All-Way Stop1: Old Snelling Ave & County Rd E 11 B L T R Total L T R L T R Delay LOS Delay LOS Ave Queue Max Queue Storage Ave Queue Max Queue Storage Ave Queue Max Queue Storage NB 15 25 15 55 5 11 6 A B A 8 A NB 8 22 230 21 53 WB 15 215 360 590 9 15 9 A C A 11 B WB 8 27 1000 49 111 56 139 200 SB 430 95 35 560 16 14 8 C B A 15 C SB 96 200 200 44 124 EB 25 125 10 160 9 11 6 A B A 10 B EB 13 55 70 35 91 12 B All-Way Stop1: Old Snelling Ave & County Rd E LOS by Intersection (Sec/Veh) LOS by Approach (Sec/Veh)Appr Right-Turn Average & Maximum Traffic Queueing (feet) Left-Turn Intersection ControlLocation ThroughForecast Volumes Total Delay by Movement LOS by MovementAppr L T R Total L T R L T R Delay LOS Delay LOS Ave Queue Max Queue Storage Ave Queue Max Queue Storage Ave Queue Max Queue Storage NB 10 15 20 45 8 15 9 A C A 11 B NB 6 22 230 21 56 WB 45 235 365 645 12 21 12 B C B 15 C WB 21 62 1000 64 154 68 147 200 SB 380 130 30 540 74 40 33 F E D 64 F SB 168 224 200 237 606 EB 90 360 25 475 43 56 51 E F F 53 F EB 77 95 70 229 460 LOS by Approach (Sec/Veh) Forecast Volumes Total Delay by Movement LOS by Movement LOS by Intersection (Sec/Veh)All-Way Stop1: Old Snelling Ave & County Rd E 41 E Intersection Appr ControlLocation Appr Average & Maximum Traffic Queueing (feet) Left-Turn Through Right-Turn L T R Total Delay LOS Delay LOS Delay LOS Feet NB 15 25 15 55 5 A 5 A 100 WB 15 215 360 590 7 A 7 A 125 SB 430 95 35 560 8 A 8 A 25 EB 25 125 10 160 5 A 5 A 0 NB 10 15 20 45 5 A 5 A 25 WB 45 235 365 645 8 A 8 A 150 SB 380 130 30 540 8 A 8 A 125 EB 90 360 25 475 10 B 10 B 125 7 A LOS By Part of Approach Entry Intersection Appr Roundabout50% 95% Queues Confidence Level PM Peak 8 A LOS by Intersection (Sec/Veh) LOS by Approach (Sec/Veh)ControlPeak Hour RoundaboutAM Peak50% Volumes Table E6. 2038 No Build AM MOEs Table E7. 2038 No Build PM MOEs Table E8. 2038 Build MOEs L T R Total L T R L T R Delay LOS Delay LOS Ave Queue Max Queue Storage Ave Queue Max Queue Storage Ave Queue Max Queue Storage NB 17 28 17 62 6 12 6 A B A 9 A NB 7 22 230 24 53 WB 17 238 398 653 9 17 10 A C B 13 B WB 9 24 1000 57 137 63 153 200 SB 475 105 39 619 32 18 12 D C B 28 D SB 149 223 200 102 374 EB 28 138 11 177 10 11 7 B B A 11 B EB 15 57 70 38 94 LOS by MovementAppr LOS by Intersection (Sec/Veh) LOS by Approach (Sec/Veh)Appr Right-Turn Average & Maximum Traffic Queueing (feet) Left-Turn Intersection ControlLocation ThroughForecast Volumes Total Delay by Movement 19 C All-Way Stop1: Old Snelling Ave & County Rd E L T R Total L T R L T R Delay LOS Delay LOS Ave Queue Max Queue Storage Ave Queue Max Queue Storage Ave Queue Max Queue Storage NB 11 17 22 50 8 16 9 A C A 11 B NB 7 26 230 23 50 WB 50 260 403 713 12 28 13 B D B 18 C WB 22 59 1000 84 216 80 190 200 SB 420 144 33 597 158 109 98 F F F 143 F SB 207 225 200 628 1206 EB 99 398 28 525 175 187 182 F F F 184 F EB 86 95 70 742 1343 Intersection Appr ControlLocation Appr Average & Maximum Traffic Queueing (feet) Left-Turn Through Right-Turn LOS by Approach (Sec/Veh) Forecast Volumes Total Delay by Movement LOS by Movement LOS by Intersection (Sec/Veh)All-Way Stop1: Old Snelling Ave & County Rd E 104 F L T R Total Delay LOS Delay LOS Delay LOS Feet NB 17 28 17 62 5 A 5 A 150 WB 17 238 398 653 8 A 8 A 150 SB 475 105 39 619 10 B 10 B 25 EB 28 138 11 177 5 A 5 A 0 NB 11 17 22 50 6 A 6 A 25 WB 50 260 403 713 10 B 10 B 175 SB 420 144 33 597 10 B 10 B 150 EB 99 398 28 525 13 B 13 B 175Roundabout50% 95% Queues Confidence Level PM Peak 11 B LOS by Intersection (Sec/Veh) LOS by Approach (Sec/Veh)ControlPeak Hour RoundaboutAM Peak50% Volumes 8 A LOS By Part of Approach Entry Intersection Appr APPENDIX C Geotechnical Report Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is 100% employee-owned | sehinc.com | 651.490.2000 | 800.325.2055 | 888.908.8166 fax MEMORANDUM TO: Todd Blomstrom, PE (Lic. MN, TX) FROM: Hector Flores, PE (Lic. MN, MI, IN, ND) DATE: October 7, 2020 RE: Old Snelling Avenue Geotechnical Recommendations SEH No. 152489 14.00 The purpose of this memorandum is to document the results of the subsurface investigation and provide geotechnical recommendations for the Old Snelling Avenue reconstruction project in Arden Hills, Minnesota. The following paragraphs discuss the project background, subsurface investigation, existing pavement conditions, existing subsurface conditions, groundwater conditions, and geotechnical recommendations for design and construction of the project. PROJECT BACKGROUND The project is located along Old Snelling Avenue between Snelling Avenue N (TH 51) and County Road E (CSAH 15/149) in Arden Hills, Minnesota. The project consists of reconstructing the existing street. It is assumed that the roadway will consist of Hot Mixed Asphalt (HMA). In addition to the roadway, the project may include construction of a storm sewer system as well as watermain and sanitary sewer work. GEOTECHNICAL INVESTIGATION Subsurface Investigation The subsurface investigation for this project was performed by Northern Technologies, LLC (NTI) of Inver Grove Heights, Minnesota. The drilling program for the subsurface investigation and laboratory testing program were developed by SEH geotechnical staff. The geotechnical data report (GDR) No. 19.MSP09107.000 prepared by NTI dated November 7, 2019 for the subsurface investigation is attached to this memorandum. The subsurface investigation consisted of fifteen (15) SPT soil borings using a hollow stem auger and standard penetration test (SPT) sampling every 2.5 feet along the existing streets and at Freeway Park located in the southeast quadrant of the Old Snelling Avenue and County Road E (CSAH 15) intersection. The borings terminate at a depth of 14.5 feet. Laboratory tests consist of moisture content tests, Atterberg Limits tests, and mechanical sieve tests, and R-Value tests. PAVEMENT CONDITIONS Existing pavement measured during the subsurface investigation was identified as bituminous over aggregate base in borings B-1 through B-13. Borings B-1 through B-7 and B-11 encountered bituminous pavement under the aggregate base. Table 1 summarizes the pavement thicknesses measured at each boring. The total pavement section (including aggregate base) thickness varies between 17 to 29 inches and the average thickness is 24 inches. Old Snelling Avenue Geotechnical Recommendations October 7, 2020 Page 2 Table 1 – Pavement Thickness SUBSURFACE CONDITIONS Fill was encountered below existing grade in all borings with the exception of Boring B-10. The fill varied in depth from 1.5 feet to 11.5 feet below the surface. The fill was typically classified as clayey sand (SC). Sometimes the fill is described as having trace organics, trace gravel, and/or pieces of bituminous pavement. Underlying the fill is glacial till typically classified as clayey sand (SC) and sandy lean clay (CL). The fines content varied between 41% to 62% for the samples tested in glacial till. Borings B-1, through B-3 and B-5 terminate in glacial outwash typically classified as poorly graded sand (SP). The top of the sand is between 7 to 11.5 feet below the surface. Boring B-8 encountered a layer of peat between the fill and the glacial till at a depth of 7 to 9 feet. The peat is described as rather stiff with trace gravel and a moisture content of 235%. Apparent hydrocarbon odor was detected and documented at some samples in a majority of the borings during drilling. The apparent odor was documented in the boring logs. The odor was encountered in the samples from the fill, glacial till, and glacial outwash. This memorandum only addresses the geotechnical recommendations for the project. It is recommended to consult with qualified personnel to provide recommendations with respect to contaminated soil or groundwater. GROUNDWATER CONDITIONS Groundwater was observed at borings B-1 and B-12 during drilling operations at a depth of 14 feet below the surface. The groundwater elevation at B-1 is 878 feet and 900 feet at B-12. It was assumed that the groundwater at B-12 is perched and that the groundwater elevation across the site will be at the Lake Johanna surface water elevation. Groundwater depths recorded during drilling can be unreliable because of the short time period of the observation. In silty, clayey, or organic soils, longer duration observations within the borehole are typically necessary to obtain a more accurate measurement of the water table. Perched water and fluctuation of the groundwater elevation should be expected during periods of precipitation and snow melt above clay Boring Top Pavement Thickness (in.) Aggregate Base Thickness (in.) Bottom Pavement Thickness (in.) Total Pavement Thickness (in.) B-1 3 9 7 19 B-2 3 8 10 21 B-3 7 11 6 24 B-4 3 17 8 28 B-5 3 11 8 22 B-6 5 13 9 27 B-7 4 11 11 26 B-8 4.5 24 0 28.5 B-9 5 24 0 29 B-10 4.5 20 0 24.5 B-11 3 10 9 22 B-12 4.5 20 0 24.5 B-13 11 6 0 17 Old Snelling Avenue Geotechnical Recommendations October 7, 2020 Page 3 soils. It is recommended to control potential surface water runoff that may occur due to precipitation or snow melt as this may impact construction and compaction of embankment soils. ROADWAY RECOMMENDATIONS Pavement Section Pavement design was performed for Old Snelling Avenue N. From Table 1, the average pavement section thickness is 24 inches with bituminous pavement under the aggregate base from borings B-1 through B-7. For Pavement design purposes, it was assumed that the proposed pavement section for Old Snelling Avenue would be comprised of bituminous pavement over aggregate base on existing fill rather than the existing bituminous pavement or aggregate base. It is understood that a full depth reclamation (FDR) of the existing pavement and base will be performed. The FDR will use the recycled material as a base for new bituminous pavement. It is recommended that the recycled material used as a base during the FDR be in accordance with Class 5 base for recycled materials (MnDOT 3138.2.E(2)). ESALs were estimated using traffic data from MnDOT. The traffic data and ESAL estimates are attached to this memorandum. R-value results from the geotechnical investigation were used as part of the pavement design. The R-value results are attached to this memorandum. The average R-value used in the pavement design was 36 with a standard deviation of 22. Pavement design was performed using MnPAVE-Flexible. The pavement design results are attached to this memorandum. Table 2 summarizes the recommended pavement sections. Table 2 – Recommended Pavement Section WATERMAIN RECOMMENDATIONS Watermain Pipe Backfill Watermain segments are proposed to be installed at a nominal depth of 7 to 8 feet below finished grade using and open cut trench. The trench is recommended to extend a minimum of 12 inches below the bottom of the pipe. Backfill around the pipe is recommended to conform to Select Granular Borrow (MnDOT 3149.2B.2). Place backfill in lifts of not more than 6 inches thick from the bottom of the trench to a minimum of 12 inches from the top of the pipe and compact to a minimum 95% of the Standard Proctor maximum dry density. Project specifications are recommended to include material testing provisions such as gradation and Standard Proctor tests for all sources of backfill. Trench Backfill Excavated trench material free of organics, deleterious debris, and contamination may be suitable for reuse as trench backfill. However, these materials may be wet and not suitable for immediate backfilling. The material may require spreading, disking, and/or other methods to dry it out in order to meet moisture requirements for acceptable compaction. Adequate space and time will be required at the project site to segregate unsuitable material from the soil and conduct material drying activities. If wet excavated material cannot be prepared for reuse as trench backfill, replacement backfill will be required. The replacement backfill is recommended to meet the criteria of Granular Borrow (MnDOT 3149.2B.1). Place trench backfill in loose lifts of 8 inches or less from 12 inches from the top of the pipe to the bottom of the aggregate base. Compact the trench backfill to a minimum 95% of the Standard Proctor maximum dry Roadway Aggregate Base (in.) Bituminous Pavement (in.) Old Snelling Avenue 8 4 Old Snelling Avenue Geotechnical Recommendations October 7, 2020 Page 4 density. Project specifications are recommended to include material testing provisions such as gradation and Standard Proctor tests for all sources of trench backfill. Soil Correction Soil correction is recommended for watermain in the vicinity of Boring B-8. Peat is recorded in the logs between depths of 7 to 9 feet. A very loose layer of clayey sand (SC) underlies the peat. It is recommended to excavate and remove all organic soils including peat as well as the very loose soil layer below the watermain to a minimum depth of 11 feet below the ground surface and backfill with Select Granular Borrow (MnDOT 3149.2B.2) prior to installation of the watermain. Compact the backfill to a minimum 95% of the Standard Proctor maximum dry density. A Type VI geotextile (MnDOT 3733) is recommended to be installed in conjunction with soil correction to a depth below the bottom of the peat in lieu of the soil correction to a depth of 11 feet below the ground surface. STORM SEWER RECOMMENDATIONS Storm sewer pipe and structures are recommended to be bedded on a minimum of 6 inches of Select Granular Borrow (MnDOT 3149.2B.2). Structures installed deeper than 5 feet from finished grade are recommended to be bedded on a minimum of 12 inches of Granular Borrow (MnDOT 3149.2B.2). Backfill for proposed storm sewer pipe is recommended to conform to Select Granular Borrow (MnDOT 3149.2B.2). Place backfill in lifts of not more than 6 inches thick from the bottom of the trench to a minimum of 6 inches from the top of the pipe. Compact the trench backfill to a minimum 95% of the Standard Proctor maximum dry density. Project specifications are recommended to include material testing provisions such as gradation and Standard Proctor tests for all sources of backfill. See Watermain Recommendations section for trench backfill recommendations. SANITARY SEWER RECOMMENDATIONS It was assumed that sanitary sewer pipe and structures are to be installed at a depth of 10 to 12 feet below finished grade using and open cut trench. The trench is recommended to extend a minimum of 12 inches below the bottom of the pipe. Backfill around the pipe is recommended to conform to Select Granular Borrow (MnDOT 3149.2B.2). Place backfill in lifts of not more than 6 inches thick from the bottom of the trench to a minimum of 12 inches from the top of the pipe and compact to a minimum 95% of the Standard Proctor maximum dry density. Project specifications are recommended to include material testing provisions such as gradation and Standard Proctor tests for all sources of backfill. See Watermain Recommendations section for trench backfill recommendations. GENERAL CONSTRUCTION CONSIDERATIONS Depending on weather and season, dewatering may be required for subgrade and utility excavations along the project. Project specifications are recommended to require a written Dewatering Plan to be submitted by the contractor prior to commencing any excavation work. Excavations are recommended to be in accordance with OSHA 29CFR Parts 1926.650 through 1926.652. Old Snelling Avenue Geotechnical Recommendations October 7, 2020 Page 5 Apparent hydrocarbon odor was detected and documented at some samples in a majority of the borings during drilling. The apparent odor was documented in the boring logs. The odor was encountered in the samples from the fill, glacial till, and glacial outwash. This memorandum only addresses the geotechnical recommendations for the project. It is recommended to consult with qualified personnel to provide recommendations with respect to contaminated soil or groundwater. HDF Attached: Geotechnical Data Report Traffic Data ESAL Spreadsheet Pavement design results cc: Justin Bergerson (SEH) s:\ae\a\arden\152489\5-final-dsgn\50-final-dsgn\45-geo\recommendations\old snelling ave geo recommendations - update.docx FACTUAL GEOTECHNICAL EXPLORATION AND ENGINEERING REVIEW Old Snelling Avenue Roadway Improvements Arden Hills Minnesota NTI Project No. 19.MSP09107.000 Prepared For: City of Arden Hills 1245 West Highway 96 Arden Hills, Minnesota 55112 November 7, 2019 City of Arden Hills Attention: Mr. Todd Blomstrom 1245 West Highway 96 Arden hills, Minnesota 55112 Subject: Factual Geotechnical Exploration and Engineering Review Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 Dear Mr. Blomstrom, In accordance with your request and subsequent authorization, Northern Technologies, LLC (NTI) conducted a Geotechnical Exploration for the above referenced project. Our services included the advancement of exploration borings and preparation of a factual engineering report. Our work was performed in general accordance with our proposal dated September 12, 2019. Soil samples obtained at the site will be held for 60 days at which time they will be discarded. Please advise us in writing if you wish to have us retain them for a longer period. You will be assessed an additional fee if soil samples are retained beyond 60 days. We appreciate the opportunity to have been of service on this project. If there are any questions regarding the soils explored or our review and recommendations, please contact us at your convenience at (651) 389-4191. Northern Technologies, LLC Richard S. Jett, E.I.T. Staff Engineer Debra A. Schroeder, P.E. Senior Engineer RSJ/das I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a Duly Licensed Professional Engineer under the Laws of the State of Minnesota. Debra A. Schroeder Date: 11/07/2019 Reg. No. 52743 Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 Contents 1.0 INTRODUCTION .................................................................................................................................... 1 1.1 Site / Project Description ....................................................................................................................... 1 1.2 Scope of Services .................................................................................................................................... 1 2.0 EXPLORATION PROGRAM RESULTS ...................................................................................................... 1 2.1 Exploration Scope .................................................................................................................................. 1 2.2 Subsurface Conditions ........................................................................................................................... 2 2.3 Groundwater Conditions ........................................................................................................................ 2 2.4 Laboratory Test Program ....................................................................................................................... 3 3.0 CLOSURE .............................................................................................................................................. 3 Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 Page 1 of 3 1.0 INTRODUCTION 1.1 Site / Project Description It is our understanding the project will consist of improvements to the existing Old Snelling Avenue between County Road E and Snelling Avenue North in Arden Hills, Minnesota. 1.2 Scope of Services The purpose of this factual report is to present a summary of our geotechnical exploration and provide the soil conditions encountered at the project area. Our “scope of services” was limited to the following: 1.Explore the project subsurface by means of seventeen (17) Standard Penetration Test (SPT) borings extending to depths of approximately 14.5 feet below existing grade. 2.Conduct laboratory testing as requested by a representative of Short Elliott Hendrickson Inc. (SEH). 3.Provide a factual geotechnical report with the results of our field and laboratory tests results. 2.0 EXPLORATION PROGRAM RESULTS 2.1 Exploration Scope The field exploration was performed during a period of October 3 through 11, 2019 with the borings advanced to depths of approximately 14.5 feet below the existing ground surface. Two (2) borings (SB- 16 and SB-17) were not completed at the requested of the client’s representative Short Elliot Hendrickson Inc. (SEH) due to utility obstructions at the original boring locations. A representative of SEH marked and surveyed the boring locations prior to mobilization. The borings were performed by a two-person crew utilizing a CME 750 All Terrain Vehicle-mounted drill rig. Samples were collected in general accordance with ASTM D 1586 “Standard Test Method for Standard Penetration Testing (SPT) and Split-Barrel Sampling of Soils.” The boreholes were backfilled with auger cuttings, or were abandoned using high solids bentonite or neat cement grout as per appropriate local and state statutes. Minor settlement of the boreholes will occur. Owner is responsible for final closure of the boreholes. Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 Page 2 of 3 2.2 Subsurface Conditions The soil profile generally consisted of bituminous pavement (generally ranging in thickness from 3.0 to 11.0 inches) overlaying apparent aggregate base (generally ranging in thickness from 8.0 to 24.0 inches). As an exception to this, Borings SB-14 and SB-15 encountered topsoil at the surface (approximately 5.0 inches in thickness). In Borings SB-1 through SB-7 and Boring SB-11, an additional bituminous pavement layer was encountered directly below the apparent aggregate base layer ranging in thickness from 6.0 to 11.0 inches. Apparent undocumented fill soils were encountered ranging in depths from approximately 1.5 to 11.5 feet below the existing grade. Generally, the undocumented fill soils consisted of clayey sand (SC), silty sand (SM), and sandy lean clay to lean clay with sand (CL). As an exception, apparent undocumented fill soils were not encountered at the Boring SB-10 location. The glacial deposits were generally encountered extending to the termination depths of the borings and consisted of clayey sand (SC), silty sand (SM), poorly graded sand (SP), and sandy lean clay (CL). A paludal deposit generally consisted of peat (Pt) soil was encountered at the Boring SB-8 location between depths of approximately 7.0 and 9.0 feet below existing grade. Apparent hydrocarbon odors (detected by human perception only) were observed throughout the project area. Please refer to the boring logs within the appendices for a detailed description and depths of stratum at each boring. Additional comment on the evaluation of recovered soil samples is presented within the report attachments. 2.3 Groundwater Conditions The drill crew observed the borings for groundwater (if any) during and at the completion of drilling activities. Measurable groundwater was observed in two (2) of the fifteen (15) SPT borings (SB-1 and SB-12) at a depth of approximately 14.0 feet below existing grade (approximate elevations of 877.76 and 900.23 feet). Possible perched groundwater conditions were observed at Boring SB-6 at a depth of approximately 11.5 feet (approximately elevation 901.01 feet) The site soils were conducive to movement of groundwater both laterally and vertically over time. The moisture content of such soils can vary annually and per recent precipitation. Such soils and other regional dependent conditions may produce groundwater entry of project excavations. Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 Page 3 of 3 2.4 Laboratory Test Program The soil classifications are based upon our interpretation of the standard penetration test (SPT) resistance determined while sampling soils, laboratory test results, and experience with similar soils from other sites near the project. The results of such tests are summarized on the boring logs. 3.0 CLOSURE The scope of services for this project does not include either specifically or by implication any environmental or biological assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This factual report has been prepared for the exclusive use of the City of Arden Hills and their agents for specific application to the proposed Old Snelling Avenue Roadway Improvements project in Arden Hills, Minnesota. Northern Technologies, LLC has endeavored to comply with generally accepted geotechnical engineering practice common to the local area. Northern Technologies, LLC makes no other warranty, expressed or implied. Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 APPENDIX A GEOTECHNICAL EVALUATION OF RECOVERED SOIL SAMPLES FIELD EXPLORATION PROCEDURES GENERAL NOTES WATER LEVEL SYMBOL DESCRIPTIVE TERMINOLOGY RELATIVE PROPORTIONS PARTICLE SIZES CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 GEOTECHNICAL EVALUATION OF RECOVERED SOIL SAMPLES We visually examined recovered soil samples to estimate distribution of grain sizes, plasticity, consistency, moisture condition, color, presence of lenses and seams, and apparent geologic origin. We then classified the soils according using the Unified Soil Classification System (ASTM D2488). A chart describing this classification system and general notes explaining soil sampling procedures are presented within appendices attachments. The stratification depth lines between soil types on the logs are estimated based on the available data. In-situ, the transition between type(s) may be distinct or gradual in either the horizontal or vertical directions. The soil conditions have been established at our specific boring locations only. Variations in the soil stratigraphy may occur between and around the borings, with the nature and extent of such change not readily evident until exposed by excavation. These variations must be properly assessed when utilizing information presented on the boring logs. We request that you, your design team or contractors contact NTI immediately if local conditions differ from those assumed by this report, as we would need to review how such changes impact our recommendations. Such contact would also allow us to revise our recommendations as necessary to account for the changed site conditions. FIELD EXPLORATION PROCEDURES Soil Sampling – Standard Penetration Boring: Soil sampling was performed according to the procedures described by ASTM D-1586. Using this procedure, a 2 inch O.D. split barrel sampler is driven into the soil by a 140 pound weight falling 30 inches. After an initial set of six inches, the number of blows required to drive the sampler an additional 12 inches is recorded (known as the penetration resistance (i.e. “N-value”) of the soil at the point of sampling. The N-value is an index of the relative density of cohesionless soils and an approximation of the consistency of cohesive soils. Soil Sampling – Power Auger Boring: The boring(s) was/were advanced with a 6 inch nominal diameter continuous flight auger. As a result, samples recovered from the boring are disturbed, and our determination of the depth, extend of various stratum and layers, and relative density or consistency of the soils is approximate. Soil Classification: Soil samples were visually and manually classified in general conformance with ASTM D-2488 as they were removed from the sampler(s). Representative fractions of soil samples were then sealed within respective containers and returned to the laboratory for further examination and verification of the field classification. In addition, select samples were submitted for laboratory tests. Individual sample information, identification of sampling methods, method of advancement of the samples and other pertinent information concerning the soil samples are presented on boring logs and related report attachments. Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 GENERAL NOTES DRILLING and SAMPLING SYMBOLS LABORATORY TEST SYMBOLS SYMBOL DEFINITION SYMBOL DEFINITION C.S.Continuous Sampling W Moisture content-percent of dry weight P.D.2-3/8” Pipe Drill D Dry Density-pounds per cubic foot C.O.Cleanout Tube LL, PL Liquid and plastic limits determined in accordance with ASTM D 423 and D 424 3 HSA 3 ¼” I.D. Hollow Stem Auger QU Unconfined compressive strength-pounds per square foot in accordance with ASTM D 2166-66 4 FA 4” Diameter Flight Auger 6 FA 6” Diameter Flight Auger 2 ½ C 2 ½” Casing 4 C 4” Casing D.M.Drilling Mud Pq Penetrometer reading-tons/square foot J.W.Jet Water S Torvane reading-tons/square foot H.A.Hand Auger G Specific Gravity – ASTM D 854-58 NXC Size NX Casing SL Shrinkage limit – ASTM 427-61 BXC Size BX Casing Ph Hydrogen ion content-meter method AXC Size AX casing O Organic content-combustion method SS 2” O.D. Split Spoon Sample M.A.Grain size analysis 2T 2” Thin Wall Tube Sample C* One dimensional consolidation SH 3” Thin Wall Tube Sample QC Triaxial Compression * See attached data Sheet and/or graph WATER LEVEL SYMBOL Water levels shown on the boring logs were determined at the time and under the conditions indicated. In sand, the indicated levels can be considered relatively reliable for most site conditions. In clay soils, it is not possible to determine the ground water level within the normal scope of a test boring investigation, except where lenses or layers of more pervious water bearing soil are present; and then a long period of time may be necessary to reach equilibrium. Therefore, the position of the water level symbol for cohesive or mixed soils may not indicate the true level of the ground water table. The available water level information is given at the bottom of the log sheet. DESCRIPTIVE TERMINOLOGY RELATIVE DENSITY CONSISTENCY TERM N60 Value (corrected) TERM N60 Value (corrected) Very Loose 0 – 4 Soft 0-4 Loose 5 – 8 Medium 5-8 Medium Dense 9 – 16 Rather Stiff 9 – 15 Dense 16 – 30 Stiff 16 – 30 Very Dense Over 30 Very Stiff Over 30 RELATIVE PROPORTIONS PARTICLE SIZES TERMS RANGE MATERIAL DESCRIPTION U.S. SIEVE SIZE Trace 0 – 5% Boulders Over 3” A little 5 – 15% Gravel Coarse 3” to ¾” Some 15 – 30% Medium ¾” to #4 Sand Coarse #4 to #10 Medium #10 to #40 Fine #40 to #200 Silt and Clay Determined by Hydrometer Test Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 CLASSIFICATION of SOILS for ENGINEERING PURPOSES ASTM Designation D-2487 and D2488 (Unified Soil Classification System) Major Divisions Group Symbol Typical Name Classification Criteria Course Grained Soils More than 50% retained on No. 200 sieve * Gravels 50% or more of coarse fraction retained on No. 4 sieve.Clean Gravels GW Well –graded gravels and gravel-sand mixtures, little or no fines. Classification on basis of percentage of fines. Less than 5% passing No. 200 Sieve: GW, GP, SW, SP More than 12% passing No. 200 Sieve: GM, GC, SM, SC From 5% to 12% passing No. 200 Sieve: Borderline Classification requiring use of duel symbols. Cu = D60 / D10 greater than 4. Cz = (D30)2 / (D10 x D60) between 1 & 3. GP Poorly graded gravels and gravel-sand mixtures, little or no fines. Not meeting both criteria for GW materials. Gravels with Fines GM Silty gravels, gravel-sand- silt mixtures. Atterberg limits below “A” line, or P.I. less than 4. Atterberg limits plotting in hatched area are borderline classifications requiring use of dual symbols. GC Clayey gravels, gravel-sand- clay mixtures. Atterberg limits above “A” line with P.I. greater than 7. Sands More than 50% of coarse fraction passes No 4 sieve.Clean SandsSW Well-graded sands and gravelly sands, little or no fines. Cu = D60 / D10 greater than 6. Cz = (D30)2 / (D10 x D60) between 1 & 3. SP Poorly-graded sands and gravelly sands, little or no fines. Not meeting both criteria for SW materials. Sands with Fines SM Silty sands, sand-silt mixtures. Atterberg limits below “A” line, or P.I. less than 4. Atterberg limits plotting in hatched area are borderline classifications requiring use of dual symbols. SC Clayey sands, sand-clay mixtures. Atterberg limits above “A” line with P.I. > 7. Fine Grained Soils More than 50% passes No. 200 sieve * Silts and Clays Liquid Limit of 50% or less ML Inorganic silts, very fine sands, rock flour, silty or clayey fine sands. CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. OL Organic silts and organic silty clays of low plasticity. Silts and Clays Liquid Limit greater than 50%. MH Inorganic silts, micaceous or diatomaceous fine sands or silts, elastic silts. CH Inorganic clays of high plasticity, fat clays. OH Organic clays of medium to high plasticity. Highly Organic Soils Pt Peat, muck and other highly organic soils. Plasticity Index Chart0102030405060010 20 30 40 50 60 70 80 90 100Liquid LimitPlasticity LimitChart for classification of fine grained soils and the fin fraction of coarse grained soils.Atterberg Limits plotting in hatched area are borderline classifications requiring use of dual symbols.OH & MH SoilsCH SoilsCL SoilsOL & ML Soils"A" LineCL-ML Soils Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 APPENDIX B GROUNDWATER ISSUES Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 GROUNDWATER ISSUES The following presents additional comment and soil specific issues related to measurement of groundwater conditions at your project site. Note that our groundwater measurements, or lack thereof, will vary depending on the time allowed for equilibrium to occur in the borings. Extended observation time was not available during the scope of the field exploration program and, therefore, groundwater measurements as noted on the borings logs may or may not accurately reflect actual conditions at your site. Seasonal and yearly fluctuations of the ground water level, if any, occur. Perched groundwater may be present within sand and silt lenses bedded within cohesive soil formations. Groundwater typically exists at depth within cohesive and cohesionless soils. We anticipate that a system of sump pits and pumps located outside of the foundation areas would be suitable for control if perched groundwater were to be encountered. If excavations are advanced into a static groundwater table within an underlying granular soil layer a well point system would likely be a more suitable method of control. NTI cautions that such seepage may be heavy and will vary based on seasonal and annual precipitation, and ground related impacts in the vicinity of the project. Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project No. 19.MSP09107.000 APPENDIX C BORING LOCATION DIAGRAM SOIL BORING LOGS LABORATORY TEST RESULTS Boring Location Diagram Old Snelling Avenue Roadway Improvements Arden Hills, Minnesota NTI Project #: 19.MSP09107.000 NOTE: Boring locations are approximate. SB-2 SB-12 Completed Soil Borings: AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 3-4-5 (9) 4-4-4 (8) 4-5-9 (14) 5-6-8 (14) 5-5-5 (10) 4-5-5 (10) 0.3 1.0 1.6 7.0 14.5 891.5 890.8 890.2 884.8 877.3 2.8 2.0 17 15 2 39 56 56 50 67 67 BITUMINOUS PAVEMENT (3.0 inches) APPARENT AGGREGATE BASE (9.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. BITUMINOUS PAVEMENT (7.0 inches) CLAYEY SAND, (SC) light brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 2. POORLY GRADED SAND, (SP) light brown, fine to coarse grained, moist to saturated, medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor (by human perception only) in Sample No. 5. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 14.00 ft / Elev 877.76 ft GROUND ELEVATION 891.76 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 190820.866 Easting: 557685.349 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-1 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-5-7 (12) 2-3-4 (7) 2-4-4 (8) 6-7-8 (15) 5-5-5 (10) 5-9-6 (15) 0.3 0.9 1.8 4.0 6.5 9.0 11.5 13.0 14.5 903.1 902.4 901.6 899.3 896.8 894.3 891.8 890.3 888.8 4.3 2.0 3.0 12 14 21 14 11 67 56 44 56 56 61 35 41 BITUMINOUS PAVEMENT (3.0 inches) APPARENT AGGREGATE BASE (8.0 inches) BITUMINOUS PAVEMENT (10.0 inches) CLAYEY SAND, (SC) dark gray to brown, fine to coarse grained, moist, trace gravel, trace organics (Undocumented Fill) CLAYEY SAND, (SC) dark brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. CLAYEY SAND, (SC) light brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 5. CLAYEY SAND, (SC) reddish brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) POORLY GRADED SAND, (SP) light brown, fine to coarse grained, moist, medium dense, little gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 903.32 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 191221.576 Easting: 557680.229 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-2 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-5-5 (10) 5-8-8 (16) 5-11-13 (24) 4-8-9 (17) 4-7-8 (15) 5-6-7 (13) 0.6 1.5 2.0 9.0 11.5 14.5 914.0 913.1 912.6 905.6 903.1 900.1 13 13 13 39 56 39 56 56 72 36 BITUMINOUS PAVEMENT (7.0 inches) APPARENT AGGREGATE BASE (11.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. BITUMINOUS PAVEMENT (6.0 inches) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, trace gravel, occasional slag pieces (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 2. NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. POORLY GRADED SAND, (SP) light brown, fine to medium grained, moist, dense, trace gravel (Glacial Till) POORLY GRADED SAND, (SP) light brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 914.559 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 191613.151 Easting: 557676.552 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-3 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-5-6 (11) 4-3-3 (6) 2-3-4 (7) 3-3-4 (7) 2-6-4 (10) 4-5-5 (10) 0.3 1.7 2.3 6.5 14.5 911.0 909.6 909.0 904.8 896.8 2.0 1.5 2.0 12 15 17 16 16 18 61 56 61 56 56 56 49 BITUMINOUS PAVEMENT (3.0 inches) APPARENT AGGREGATE BASE (17.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. BITUMINOUS PAVEMENT (8.0 inches) CLAYEY SAND, (SC) brown to light brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 3. CLAYEY SAND, (SC) light brown, fine to coarse grained, moist, loose to medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 5. NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 6. NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 7. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 911.282 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 192057.746 Easting: 557614.507 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-4 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com 12 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 3-3-3 (6) 5-5-6 (11) 4-5-7 (12) 6-8-8 (16) 5-6-6 (12) 6-7-7 (14) 0.3 1.2 1.8 6.5 11.5 14.5 907.4 906.5 905.8 901.2 896.2 893.2 212.8 16 18 14 15 33 56 61 67 61 50 56 48 BITUMINOUS PAVEMENT (3.0 inches) APPARENT AGGREGATE BASE (11.0 inches) BITUMINOUS PAVEMENT (8.0 inches) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, trace gravel, occasional root pieces (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 2. NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 3. CLAYEY SAND, (SC) brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. POORLY GRADED SAND, (SP) light brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Outwash) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 907.661 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 192421.354 Easting: 557495.347 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-5 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-3-4 (7) 2-4-5 (9) 4-5-5 (10) 6-7-8 (15) 1-2-2 (4) 3-5-7 (12) 0.4 1.5 2.3 6.5 9.0 11.5 13.0 14.5 912.2 911.1 910.3 906.1 903.6 901.1 899.6 898.1 2.3 14 17 13 16 26 15 67 67 50 56 61 67 39 54 BITUMINOUS PAVEMENT (5.0 inches) APPARENT AGGREGATE BASE (13.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. BITUMINOUS PAVEMENT (9.0 inches) CLAYEY SAND, (SC) dark brown to brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 2. SILTY SAND, (SM) dark brown, fine to medium grained, moist, medium dense, trace gravel (Glacial Till) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 5. SANDY LEAN CLAY, (CL) light brown, wet, soft, trace gravel (Glacial Till) NOTE: Possible perched water at 11.5 feet CLAYEY SAND, (SC) light brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 7. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 912.597 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 192795.817 Easting: 557367.613 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-6 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-4-5 (9) 2-3-4 (7) 2-3-3 (6) 2-2-4 (6) 2-3-4 (7) 5-6-7 (13) 0.3 1.3 2.2 4.0 6.5 9.0 14.5 927.3 926.4 925.5 923.7 921.2 918.7 913.2 1.8 1.5 2.0 16 11 20 22 16 16 56 50 39 50 61 89 50 BITUMINOUS PAVEMENT (4.0 inches) APPARENT AGGREGATE BASE (11.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. BITUMINOUS PAVEMENT (11.0 inches) SANDY LEAN CLAY, (CL) gray, moist, trace gravel (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 2. SILTY SAND, (SM) light gray, fine to medium grained, moist, trace gravel, trace organics (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 3. CLAYEY SAND, (SC) light gray, fine to coarse grained, moist, trace gravel (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. CLAYEY SAND, (SC) gray to light brown, fine to coarse grained, moist, loose to medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 927.652 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 193198.221 Easting: 557231.811 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-7 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-3-4 (7) 3-4-4 (8) 4-4-5 (9) 1-1-2 (3) 2-2-3 (5) 4-5-6 (11) 0.4 2.4 4.0 7.0 9.0 13.0 14.5 935.9 933.9 932.3 929.3 927.3 923.3 921.8 0.3 0.5 2.0 13 16 235 24 20 18 61 50 67 56 67 72 48 BITUMINOUS PAVEMENT (4.5 Inches) APPARENT AGGREGATE BASE (24.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. CLAYEY SAND, (SC) gray to brown, fine to coarse grained, moist, trace gravel, trace organics (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 2. CLAYEY SAND, (SC) gray, fine to coarse grained, moist, trace gravel (Undocumented Fill) PEAT, (Pt) dark brown, moist, rather stiff, trace gravel (Paludal Deposit) CLAYEY SAND, (SC) gray, fine to coarse grained, moist, very loose to loose, trace gravel (Glacial Till) CLAYEY SAND, (SC) dark brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 936.276 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 193559.947 Easting: 557106.498 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-8 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-5-5 (10) 2-3-4 (7) 6-8-9 (17) 5-8-9 (17) 4-6-6 (12) 4-6-7 (13) 0.4 2.4 4.0 14.5 938.1 936.1 934.5 924.0 3.5 2.8 3.0 6 13 15 14 14 15 67 83 83 94 89 100 48 BITUMINOUS PAVEMENT (5.0 inches) APPARENT AGGREGATE BASE (24.0 inches) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 1. CLAYEY SAND, (SC) brown to dark brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, loose to dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/3/19 COMPLETED 10/3/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 938.514 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 193885.387 Easting: 556995.16 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-9 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com 16 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-4-4 (8) 3-4-5 (9) 3-5-7 (12) 3-5-7 (12) 3-5-7 (12) 3-5-6 (11) 0.4 2.0 4.0 14.5 932.4 930.7 928.7 918.2 24 2.8 2.5 2.5 2.8 21 15 14 15 15 15 4061 89 67 83 78 67 39 BITUMINOUS PAVEMENT (4.5 inches) APPARENT AGGREGATE BASE (20.0 inches) LEAN CLAY WITH SAND, (CL) reddish brown, moist, medium, trace gravel (Glacial Till) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/4/19 COMPLETED 10/4/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 932.734 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 194253.214 Easting: 556862.81 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-10 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-3-4 (7) 3-3-3 (6) 2-2-2 (4) 2-2-3 (5) 6-7-8 (15) 3-6-7 (13) 0.3 1.1 1.8 4.0 9.0 13.0 14.5 916.4 915.6 914.8 912.6 907.6 903.6 902.1 2.5 2.0 0.0 2.0 2.5 3.0 15 18 22 17 16 15 0 78 89 56 94 67 62 BITUMINOUS PAVEMENT (3.0 inches) APPARENT AGGREGATE BASE (10.0 inches) BITUMINOUS PAVEMENT (9.0 inches) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) NOTE: No recovery in Sample No. 2. Auger cuttings sampled. SANDY LEAN CLAY, (CL) gray, fine to medium grained, moist, medium to soft, trace gravel (Glacial Till) CLAYEY SAND, (SC) brown to gray, fine to coarse grained, moist, loose to medium dense, trace gravel (Glacial Till) CLAYEY SAND, (SC) dark brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/4/19 COMPLETED 10/4/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 916.647 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 194728.33 Easting: 556701.573 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-11 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com 14 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-2-2 (4) 2-2-3 (5) 2-3-4 (7) 3-4-4 (8) 5-3-3 (6) 3-4-4 (8) 0.4 2.0 6.5 11.5 14.5 913.9 912.2 907.7 902.7 899.7 19 1.0 33 22 17 15 17 33 61 22 22 67 22 67 BITUMINOUS PAVEMENT (4.5 inches) APPARENT AGGREGATE BASE (20.0 inches) CLAYEY SAND, (SC) black, fine to coarse grained, moist, trace gravel, occasional organics (Undocumented Fill) LEAN CLAY WITH SAND, (CL) black, moist, trace gravel, occasional organics (Undocumented Fill) NOTE: Apparent hydrocarbon odor detected (by human perception only) in Sample No. 4. CLAYEY SAND, (SC) gray, fine to coarse grained, moist, loose, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/4/19 COMPLETED 10/4/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 14.00 ft / Elev 900.23 ft GROUND ELEVATION 914.234 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 194550.929 Easting: 556509.907 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-12 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-5-5 (10) 4-4-5 (9) 3-4-6 (10) 4-5-6 (11) 4-6-5 (11) 5-6-6 (12) 0.9 1.4 2.0 5.0 14.5 932.5 932.0 931.4 928.4 918.9 1.3 2.3 2.8 1.8 2 10 19 16 16 16 17 83 100 100 89 100 100 BITUMINOUS PAVEMENT (11.0 inches) APPARENT AGGREGATE BASE (6.0 inches) SILTY SAND, (SM) dark brown, fine to coarse grained, moist, trace gravel, occasional bituminous pieces (Undocumented Fill) CLAYEY SAND, (SC) brown to gray, fine to coarse grained, moist, trace gravel, occasional bituminous pieces (Undocumented Fill) CLAYEY SAND, (SC) light brown to light gray, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/11/19 COMPLETED 10/11/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater observed GROUND ELEVATION 933.413 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 194543.628 Easting: 557032.789 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-13 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 1-1-2 (3) 2-2-3 (5) 3-4-5 (9) 3-6-8 (14) 3-6-8 (14) 3-6-9 (15) 0.4 4.0 14.5 931.5 928.0 917.5 1.0 1.8 2.5 21 18 16 17 15 18 89 67 89 83 83 22 48 TOPSOIL (5.0 inches) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, trace gravel (Undocumented Fill) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, loose to medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/4/19 COMPLETED 10/4/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 931.958 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)Northing: 194435.63 Easting: 556903.889 MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-14 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-3-6 (9) 3-4-6 (10) 6-7-8 (15) 4-6-8 (14) 4-5-7 (12) 4-6-6 (12) 0.4 1.5 6.5 14.5 935.3 934.2 929.2 921.2 2.5 3.0 3.3 3.3 16 16 14 14 14 14 44 83 83 94 94 89 43 TOPSOIL (5.0 inches) CLAYEY SAND, (SC) dark brown, fine to coarse grained, moist, trace gravel, trace organics (Undocumented Fill) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) CLAYEY SAND, (SC) brown, fine to coarse grained, moist, medium dense, trace gravel (Glacial Till) DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Drew Faherty CHECKED BY Deb Schroeder DATE STARTED 10/4/19 COMPLETED 10/4/19 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevations provided by SEH, Inc. HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No Groundwater Observed GROUND ELEVATION 935.736 feet ATTERBERG LIMITS PLASTICLIMITGRAPHICLOGDEPTH(ft)0.0 2.5 5.0 7.5 10.0 12.5 SAMPLE TYPENUMBERBLOWCOUNTS(N VALUE)PLASTICITYINDEXPOCKET PEN.(tsf)MOISTURECONTENT (%)LIQUIDLIMITRECOVERY %(RQD)FINESDRY UNIT WT.(pcf)MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-15 PROJECT LOCATION Arden Hills, Minnesota CLIENT City of Arden Hills PROJECT NUMBER 19.MSP09107.000 PROJECT NAME Old Snelling Avenue Roadway Improvements NTI LOG - NORTHING & EASTING - NTI-2017-09-14.GDT - 11/6/19 12:52 - R:\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Avenue East Inver Grove Heights, MN 55076 P: 651-389-4191 www.NTIgeo.com TEST SPECIMEN 1 2 3 4 R-VALUE (240 psi) MOISTURE CONTENT (%)8.7 7.9 7.0 DENSITY (pcf)125.8 129.2 129.3 EXPANSION PRESSURE (psi)0.180 0.180 0.000 EXUDATION PRESSURE (psi)102 355 725 R-VALUE 58 72 75 67 SOIL TYPE: Silty Sand with Gravel LOCATION: Old Snelling Ave Roadway Improvements (19.MSPO9107.000) SB-6 at 1-5' DATE SAMPLED: DATE RECEIVED: 10/18/2019 DATE TESTED: 10/23/2019 GRAVEL:SAND:SILT AND CLAY: LIQUID LIMIT:PLASTICITY INDEX: R-VALUE KUMAR & ASSOCIATES19-1-384 These test results apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written approval of Kumar & Associates, Inc. R-value performed in accordance with ASTM D2844. Atterberg limits performed in accordance with ASTM D4318. Sieve analyses performed in accordave with ASTM D422, D1140 90HVEEM STABILOMETER TEST RESULTS 0 10 20 30 40 50 60 70 80 90 100 0 100 200 300 400 500 600 700 800R-ValueEXUDATION PRESSURE (psi) TEST SPECIMEN 1 2 3 4 R-VALUE (240 psi) MOISTURE CONTENT (%)8.6 7.8 7.0 DENSITY (pcf)130.7 132.2 135.4 EXPANSION PRESSURE (psi)0.210 0.030 0.060 EXUDATION PRESSURE (psi)176 309 444 R-VALUE 18 30 57 23 SOIL TYPE: Silty Sand with Gravel LOCATION: Old Snelling Ave Roadway Improvements (19.MSP09107.000) SB-2 at 1-5' DATE SAMPLED: DATE RECEIVED: 10/18/2019 DATE TESTED: 10/23/2019 GRAVEL:SAND:SILT AND CLAY: LIQUID LIMIT:PLASTICITY INDEX: R-VALUE KUMAR & ASSOCIATES19-1-384 These test results apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written approval of Kumar & Associates, Inc. R-value performed in accordance with ASTM D2844. Atterberg limits performed in accordance with ASTM D4318. Sieve analyses performed in accordave with ASTM D422, D1140 89HVEEM STABILOMETER TEST RESULTS 0 10 20 30 40 50 60 70 80 90 100 0 100 200 300 400 500 600 700 800R-ValueEXUDATION PRESSURE (psi) TEST SPECIMEN 1 2 3 4 R-VALUE (240 psi) MOISTURE CONTENT (%)9.1 8.2 7.4 DENSITY (pcf)129.6 133.7 136.8 EXPANSION PRESSURE (psi)0.180 0.060 0.150 EXUDATION PRESSURE (psi)211 356 554 R-VALUE 17 24 44 18 SOIL TYPE: Silty Sand with Gravel LOCATION: Old Snelling Ave Roadway Improvements (19.MSPO9107.000) SB-10 at 1-5' DATE SAMPLED: DATE RECEIVED: 10/18/2019 DATE TESTED: 10/23/2019 GRAVEL:SAND:SILT AND CLAY: LIQUID LIMIT:PLASTICITY INDEX: R-VALUE KUMAR & ASSOCIATES19-1-384 These test results apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written approval of Kumar & Associates, Inc. R-value performed in accordance with ASTM D2844. Atterberg limits performed in accordance with ASTM D4318. Sieve analyses performed in accordave with ASTM D422, D1140 88HVEEM STABILOMETER TEST RESULTS 0 10 20 30 40 50 60 70 80 90 100 0 100 200 300 400 500 600 700 800R-ValueEXUDATION PRESSURE (psi) 0 10 20 30 40 50 60 0 20 40 60 80 100 P L A S T I C I T Y I N D E X CL CH MHCL-ML Sample Data LIQUID LIMIT ML Cc: ATTERBERG LIMITS' RESULTS Classification Northern Technologies, LLC Debra Schroeder (11/6/19) Submitted by, ASTM D4318 12 16 14 DEPTH 9.0 1.5 9.0 PLSAMPLE #BOREHOLE PI Fines 33 40 33 SB-5 SB-10 SB-12 21 24 19 LL Report To: Attention: Old Snelling Avenue Roadway Improvements City of Arden Hills Project: Project Number: Location: 19.MSP09107.000 Arden Hills, Minnesota ATTERBERG LIMITS - GEO - NTI-2017-09-14.GDT - 11/6/19 08:59 - \\NTI-AZ-FS01\ARCHIVES\RAMSEY\1-PROJECTS\2019 PROJECTS\OLD SNELLING AVENUE ROADWAY IMPROVEMENTS_GEO_19.MSP_09107.000\ENGINEERING REPORTS\GINT\OLD SNELLING.GPJInver Grove Heights 6160 Carmen Ave E Inver Grove Heights, Minnesota 55076 P: 651.389.4191 F: 651.389.4190 www.NTIgeo.com Instructions: All yellow boxes require an input value. Dropdown choices are provided for Base Year (C18), Number of Lanes (C19), and AADT Range (C20). You must click on cells C18, C19, and C20 to access the dropdown choices. General Information Date Forecast Performed by Name of County or City Project Number Project Description Route Number Base Year (i.e. opening to traffic)2020 Number of Lanes (total both directions)2 = typical 2 lane AADT Range Urban: >1500 Historical AADT (enter a minimum of two years)Year AADT Enter oldest traffic data here 2017 1,600 Enter second oldest traffic data here 2040 1,980 Enter third oldest traffic data here Enter fourth oldest traffic data here Base Year AADT 2020 1,650 20-Year AADT 2040 1,980 35-Year AADT 2055 2,230 Growth Rate Vehicle Class %Flexible Rigid 2AX-6TIRE SU 1.52%0.25 0.24 3AX+SU 0.46%0.58 0.85 3AX TST 0.09%0.39 0.37 4AX TST 0.12%0.51 0.53 5AX+TST 0.89%1.13 1.89 TR TR, BUSES 0.47%0.57 0.74 TWIN TRAILERS 0.02%2.40 2.33 Total 3.57%NA NA 20-Year Flexible Forecast =161,000 20-Year Rigid Forecast =228,000 35-Year Flexible Forecast =295,000 35-Year Rigid Forecast =418,000 State Aid ESAL Traffic Forecast Calculator - 04/07/2014 For State Aid questions and information, please contact Joel Ulring (MnDOT State Aid) at 651-366-3831. 11/11/2019 HDF Ramsey County ARDEN - 152489 Vehicle Type ESAL Factors 1.00% Old Snelling Avenue N This ESAL calculator is for use with default Heavy Commerical Traffic values; click "User Defined Traffic Values" sheet below if you wish to enter your own Heavy Commercial Traffic values. MnPAVE Design Summary MnPAVE 6.405 Simulation Input File: Old Snelling Ave FDR.mpv Confidence Level for Preliminary Life Estimate = 70% Confidence and Reliability may not agree. Thickness and modulus are reduced when Confidence > 50%. Monte Carlo Reliability randomly selects values for each layer. Use Reliability for final design. Preliminary Life Estimate 20-Year Reliability (2,500 cycles) Fatigue FatigueRutting Rutting >50 years >50 years 100%100% Project Information District County City Metro Ramsey Arden Hills Project Number Route Reference Post 152489 Old Snelling Ave from to Letting Date Construction Type 12/20/19 Designer Soils Engineer Climate Information Seasons Location 5 45˚ 0’ Latitude, 93˚ 4’ Longitude Structural Information (Design Level: Intermediate) Layer Type Subtype Height (in.) 1 Hot-Mix Asphalt (Pb = 5.0%)PG58-34 (2360F 1/2")4.00 2 Aggregate Base FDR 8.00 3 Engineered Soil R-Value = 36 (SC) Traffic Information (Speed = 40 mph) Load Type First Year ESAL Growth Rate Axle Repetitions ESAL 7,403 1.0% (compound)163,000 Notes Proposed pavement section for Old Snelling Ave assuming section over existing soils. The Minnesota Department of Transportation makes no guarantee or warranty, either express or implied, with respect to the reuse of the data provided herewith, regardless of its format or means of its transmission. The user accepts the data "as is", and assumes all risks associated with its use. By accepting this data, the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user shall include with the data a copy of this disclaimer. The Minnesota Department of Transportation assumes no responsibility, actual or consequential, for damage that results from any user’s reliance on this data. Printed Thursday, September 17, 2020 at 10:58:33 APPENDIX D Sanitary Sewer, Water Main and Storm Sewer Maps FreewayParkLindey's Park Arden OaksPark L AKE JOHANNA BLVDSNELLING AVE NA R D E N O A K S C T COUNT Y ROAD EPASCAL AVE NGLENAR DENRDRIDGEWOOD CTOAK AVEGLENARDEN CTSKILES LNARDEN OAKS DRFOREST LNRIDGEWOOD RDARDEN PLSIEMS CT8-143 8-142 8-147A 8-147 8-145 8-144 8-1358-136 8-123 8-124 8-129 8-128 3-055 3-056 3-052 8-146 3-013 4-011 4-010 3-0013-009 3-010 3-011 3-012 4-009 4-007 9-017 3-016 3-018 3-022 3-0233-024 3-032 3-033 3-034 3-035 3-036 3-037 3-038 3-019 3-020 4-008 4-001 4-002 4-003 4-004 4-005 4-012 4-013 4-014 4-015 4-016 4-018 8-160A 4-020 8-159 8-158 8-162 8-163 8-164 8-138 8-139 8-150 4-019 3-0443-043 3-042 3-031 3-029 3-021 3-045 9-018 9-019 9-020 9-021 9-022 8-161 8-137 8-157 8-132 8-116 8-117 8-118 8-119 8-120 8-121 8-122 8-131 8-130 8-148 4-017 8-160 8-0558-056 3-024A 3-014 3-030 3-017 Old Snelling Sanitary Sew er Replacement 0 400Feet Ü Document Path: P:\PR&PW\Numbered Projects\PW-20-0100 Old Snelling and County Road E Improvements\02 design\Prelim. Design\Sanitary Replacement.mxdSanitary Pipe !(Sanitary ManholesSanitary ImprovementsReplacementCIPP Lindey's Park LAKE JOHANNA BLVD COUNT Y ROAD ESNELLING AVE NPASCAL AVE NARDEN OAKS DR RIDGEWOOD RD 0 200Feet Ü Document Path: P:\PR&PW\Numbered Projects\PW-20-0100 Old Snelling and County Road E Improvements\02 design\Prelim. Design\Storm Improvements.mxdStorm Sewer ReplacementStorm Sewer Rehabilitation ")Catch Basin & IDsStorm Sewer Pipe Old Snelling Storm Sewer Improvements FreewayParkLindey's Park COUNT Y ROAD ELAKEJOHANNABLVD SNELLINGAVENCANNON AVEOAK AVELAMETTICIRC U M MIN G S L N HAMLINE AVE NRIDGEWOODCTGLENARDEN CTS N E L LINGAVENTOCORDEBUSSARD CT L A M E T T I L N SKILES LN CORDETOSBSNELLINGAVENFOREST LNRIDGEWOODRDARDEN PLSIEMSCTGLENARDEN RD1036 1040 1171 1267 1268 12701274 1281 1298 1302 1303 1306 1310 1312 Old Snelling Watermain Improvements 0 400Feet Ü Document Path: P:\PR&PW\Numbered Projects\PW-20-0100 Old Snelling and County Road E Improvements\02 design\Prelim. Design\Watermain Improvements.mxdWatermain Replacement !>Gate ValvesWatermain Pipe !þ Hydrants APPENDIX E Wetland Delineation Document BWSR NOD Form - October 2019 1 Minnesota Wetland Conservation Act Notice of Decision Local Government Unit: Rice Creek Watershed District County: Ramsey Applicant Name: City of Arden Hills Applicant Representative: Todd Blomstrom Project Name: Old Snelling and CR E Improvements LGU Project No. (if any): 19-201R Date Application Received by LGU: 10/10/2019 Date of LGU Decision: 8/20/2020 Date this Notice was Sent: 8/20/2020 WCA Decision Type - check all that apply Wetland Boundary/Type Sequencing Replacement Plan Bank Plan (not credit purchase) No-Loss (8420.0415) Exemption (8420.0420) Part: ☐ A ☐ B ☐ C ☐ D ☐ E ☐ F ☐ G ☐ H Subpart: ☐ 2 ☐ 3 ☐ 4 ☐ 5 ☐ 6☐ 7 ☐ 8 ☐ 9 Replacement Plan Impacts (replacement plan decisions only) Total WCA Wetland Impact Area: Wetland Replacement Type: ☐ Project Specific Credits: ☐ Bank Credits: Bank Account Number(s): Technical Evaluation Panel Findings and Recommendations (attach if any) Approve Approve w/Conditions Deny No TEP Recommendation A joint application for wetland boundary/type was provided by SEH Inc. on 10/10/2019. Site visits were attended on 10/24/2019 and 10/31/2019 by representatives from BWSR and RCWD. The TEP noted that a another wetland boundary/type application for the same survey area was previously approved on 2/13/2019 (RCWD #18-163R) and, with the exception of Wetland 8, the wetlands boundaries delineated under the 18-163R application remained valid and accurate. The TEP found that due to recent work within Wetland 8 under RCWD After-the-Fact Permit 18-089, wetland characteristics may be masked, and recommended that boundary adjustments should reflect the recent grading. An updated wetland boundary map was provided by SEH Inc. on 8/19/2020. The Statute 15.99 decision timeframe was extended three times and waived by the applicant on 6/3/2020. LGU Decision Approved with Conditions (specify below)1 Approved1 Denied List Conditions: The applicant needs to submit a survey of the wetland boundary as well as gps points of the wetland delineation in a form acceptable to the RCWD. Decision-Maker for this Application: ☒ Staff ☐ Governing Board/Council ☐ Other: Decision is valid for: ☒ 5 years (default) ☐ Other (specify): 1 Wetland Replacement Plan approval is not valid until BWSR confirms the withdrawal of any required wetland bank credits. For project- specific replacement a financial assurance per MN Rule 8420.0522, Subp. 9 and evidence that all required forms have been recorded on the title of th e property on which the replacement wetland is located must be provided to the LGU for the approval to be valid. LGU Findings – Attach document(s) and/or insert narrative providing the basis for the LGU decision1. ☒ Attachment(s) (specify): Figure 7 by SEH Inc. dated and RCWD received 8/19/2020. ☒ Summary: The LGU finds the wetland boundaries illustrated in the attached figure titled: Figure 7 Wetland Delineation BWSR NOD Form - October 2019 2 Results by SEH Inc. dated and RCWD received 8/19/2020 accurate and supported by the submitted wetland delineation for the LGU administration of the WCA. This decision is not intended to define boundaries of MN DNR jurisdiction or regulate activities under the jurisdiction of the MN DNR, except to the extent that MN DNR finds the decision consistent with their requirements. The LGU decision is valid for five years. However, the decision will cease to be valid before then, if the Technical Evaluation Panel determines that the wetland boundary or type has changed due to natural or artificial changes to the hydrology, vegetation, or soils of the area. The LGU finds that the wetland typing may need to be reviewed in conjunction with any future project. Advisory Note: A Wetland Replacement Plan application must include a statement from the MnDNR, or the applicant's licensed professional, based on MnDNR database review, as to the potential presence of an endangered or threatened species or potential impact to a rare natural community (Minn. Rules 8420.0330, subp. 3.A(5); 8420.0525). Applicants should initiate this review early. 1 Findings must consider any TEP recommendations. Attached Project Documents ☒ Site Location Map ☐ Project Plan(s)/Descriptions/Reports (specify): Appeals of LGU Decisions If you wish to appeal this decision, you must provide a written request within 30 calendar days of the date you received the notice. All appeals must be submitted to the Board of Water and Soil Resources Executive Director along with a check payable to BWSR for $500 unless the LGU has adopted a local appeal process as identified below. The check must be sent by mail and the written request to appeal can be submitted by mail or e-mail. The appeal should include a copy of this notice, name and contact information of appellant(s) and their representatives (if applicable), a statement clarifying the intent to appeal and supporting information as to why the decision is in error. Send to: Appeals & Regulatory Compliance Coordinator Minnesota Board of Water & Soils Resources 520 Lafayette Road North St. Paul, MN 55155 travis.germundson@state.mn.us Does the LGU have a local appeal process applicable to this decision? ☒ Yes1 ☐ No 1If yes, all appeals must first be considered via the local appeals process. Local Appeals Submittal Requirements (LGU must describe how to appeal, submittal requirements, fees, etc. as applicable) See RCWD Board of Managers Resolution 2019-13 regarding delegated decisions and appeal, available at www.ricecreek.org on the Board Agendas, Minutes & Resolutions page. Notice Distribution (include name) Required on all notices: SWCD TEP Member: Michael Schumann BWSR TEP Member: Ben Meyer LGU TEP Member (if different than LGU contact): DNR Representative: Melissa Collins & John Gleason Watershed District or Watershed Mgmt. Org.: Applicant (notice only): Todd Blomstrom (City of Arden Hills) Agent/Consultant (notice only): Rebecca Bedhun (SHE Inc) Optional or As Applicable: BWSR NOD Form - October 2019 3 Corps of Engineers: Maria DeLaundreau BWSR Wetland Mitigation Coordinator (required for bank plan applications only): Members of the Public (notice only): Other: Signature: Date: This notice and accompanying application materials may be sent electronically or by mail. The LGU may opt to send a summary of the application to members of the public upon request per 8420.0255, Subp. 3. 08/20/20 SEH : Wetland 1 KH: Wetland E SEH : Wetland 2 KH: Wetland F SEH : Wetland 5 KH: Wetland D SEH : no name KH: Wetland C SEH : Wetland 8 KH: no name SEH : Wetland 9 KH: Wetland B SEH : Wetland 10 KH: Wetland A Figure 7 3535 VADNAIS CENTER DR. ST. PAUL, MN 55110 PHONE: (651) 490-2000 FAX: (888) 908-8166 TF: (800) 325-2055 www.sehinc.comPath: S:\AE\A\Arden\152489\3-env-stdy-regs\30-env-doc\90-wetlands\GIS\2020 Updates\Figure 7 - Delin Results.mxdWetland Delineation Results Old Snelling and CR E Improvements Arden Hills, Minnesota Project: ARDEN 152489 Print Date: 8/11/2020 Map by: rbeduhn Projection: UTM NAD 83 Zone 15N Source: SEH, Google This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided. Legend 2020 Wetland Delineation Update ± 0 500250 Feet APPENDIX F Environmental Documents County E Rd Glenhill R non r Project Corridor 0 1,000 Feet¯Figure 1 - Project Corridor Location Field Investigation Old Snelling Ave & CR E Improvements Arden Hills, MN 1 inch = 1,000 feet !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( County E Rd Cu Cannon A EB-1 * EB-3 EB-4 EB-5 EB-6 EB-7 EB-8 * EB-10 EB-11 EB-9 EB-2 EB-13EB-12 * EB-14 SV-2 SV-9 !(Environmental Boring !(Soil Vapor Boring Project Corridor 0 525 Feet¯Figure 2 - Environmental Boring Locations Field Investigation Old Snelling Ave & CR E Improvements Arden Hills, MN 1 inch = 525 feet * = Groundwater sample collected !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( County E Rd Cu Cannon A EB-1 * EB-2 EB-3 EB-4 EB-5 EB-6 EB-7 EB-8 * EB-9 EB-10 EB-11 EB-12 * EB-13 EB-14 SV-2 SV-9 !(Environmental Boring !(Soil Vapor Boring Project Corridor 0 525 Feet¯Figure 3 - Analytical Exceedances Field Investigation Old Snelling Ave & CR E Improvements Arden Hills, MN 1 inch = 525 feet * = Groundwater sample collected 1,3-Butadiene 50 9.3 90 1,3-Butadiene 38 9.3 90 Naphthalene 10 28 4.5 Benzo[a]pyrene 2 3 1.4 Benzo[a]pyrene (BaP) Equivalent 2 23 1.4 DRO 100* NE NE Naphthalene NA 10 28 4.5 Benzo[a]pyrene 2 3 1.4 Benzo[a]pyrene (BaP) Equivalent 2 23 1.4 DRO 100* NE NE Table 1 - Soil Analytical ResultsOld Snelling Avenue and County Road E ImprovementsArden Hills, MNWSB Project Number: 015447-000Sample ID (Depth Interval) EB-1 (6-8) EB-1 (10-12) EB-2 (2-4) EB-2 (8-10) EB-3 (4-6) EB-3 (8-10) EB-4 (4-6) EB-4 (8-10) EB-5 (4-6) EB-5 (8-10) EB-6 (4-6) EB-6 (8-10) EB-7 (4-6) EB-7 (8-10)Sample Date 4/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020Volatile Organic Compounds (VOCs)Naphthalene 91-20-30.633<0.5100.585<0.314 NA NA NA NA NA NA NA NA NA NA 10 28 4.5All Other VOCs NAND ND ND ND ND ND ND ND ND ND ND ND ND NDNE NE NEPolycyclic Aromatic Hydrocarbons (PAHs)Acenaphthene 83-32-9<0.0565 <0.130 <0.112 <0.0560 <0.05000.310<0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 1,200 5,260 81Acenaphthylene 208-96-8<0.0565 <0.1300.212<0.0560 <0.05001.28<0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEAnthracene 120-12-7<0.0565 <0.1300.184<0.0560 <0.05001.83<0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 7,880 45,400 1,300Benzo[a]anthracene 56-55-3<0.0565 <0.1300.416<0.0560 <0.05005.75<0.0569 <0.01150.116<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEBenzo[b]fluoranthene 205-99-2<0.0565 <0.1300.930<0.05600.0571 6.66<0.0569 <0.01150.194<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEBenzo[k]fluoranthene 207-08-9<0.0565 <0.1300.264<0.0560 <0.05003.26<0.0569 <0.01150.0772<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEBenzo[a]pyrene 50-32-8<0.0565 <0.1300.611<0.0560 <0.05006.08<0.0569 <0.01150.149<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 2 3 1.4Benzo[g,h,i]perylene 191-24-2<0.0565 <0.1300.523<0.0560 <0.05003.92<0.0569 <0.01150.111<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEChrysene 218-01-9<0.0565 <0.1300.425<0.0560 <0.05005.50<0.0569 <0.01150.118<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEDibenz(a,h)anthracene 53-70-3<0.0565 <0.1300.133<0.0560 <0.05000.888<0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NEFluoranthene 206-44-00.0837<0.1300.813<0.05600.102 15.2<0.0569 <0.01150.165 0.0845<0.01130.0122<0.0111 <0.0574 1,080 6,800 670Fluorene 86-73-7<0.0565 <0.1300.127<0.0560 <0.05000.888<0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 850 6,800 110Indeno[1,2,3-cd]pyrene 193-39-5<0.0565 <0.1300.575<0.0560 <0.05004.70<0.0569 <0.01150.132<0.0562 <0.0113 <0.0115 <0.0111 <0.0574 NE NE NE2-Methylnaphthalene 91-57-6<0.0565 <0.130 <0.112 <0.0560 <0.0500 <0.0981 <0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 100 369 NENaphthalene 91-20-3<0.05650.230 0.294<0.0560 <0.0500 <0.0981 <0.0569 <0.0115 <0.0567 <0.0562 <0.0113 <0.0115 <0.0111 <0.0574 10 28 4.5Phenanthrene 85-01-80.103<0.1300.769<0.0560 <0.05006.32<0.0569 <0.01150.0579<0.0562 <0.01130.0275<0.0111 <0.0574 NE NE NEPyrene 129-00-00.0583<0.1300.686<0.05600.0829 12.4<0.0569 <0.01150.140 0.0738<0.0113 <0.0115 <0.0111 <0.0574 890 5,800 440Benzo[a]pyrene (BaP) Equivalent 50-32-80.000 0.0000.9080.0000.006 8.6690.000 0.0000.2020.000 0.000 0.000 0.000 0.0002 23 1.4All Other Analyzed PAHs NAND ND ND ND ND ND ND ND ND ND ND ND ND NDNE NE NERCRA 8 MetalsArsenic 7440-38-2NA NA NA NA NA <3.07 NA NA NA NA NA NA NA NA 9 20 5.8Barium 7440-39-3NA NA NA NA NA25.0NA NA NA NA NA NA NA NA 1,100 18,000 1,680Chromium 7440-47-3NA NA NA NA NA14.6NA NA NA NA NA NA NA NA44,000/87 A100,000/650 A1,000,000,000/36 ALead 7439-92-18.52<4.885.18 6.54<4.64 <4.325.20<9.35 <8.534.75 8.09<9.805.37<9.23 300 700 2,700Mercury 7439-97-6NA NA NA NA NA <0.0198 NA NA NA NA NA NA NA NA 0.5 1.5 3.3All Other RCRA Metals NANA NA NA NA NA NA NA NA NA NA NA NA NA NA NE NE NEPolychlorinated Biphenyls (PCBs)PCBs, Total 1336-36-3NA NA NA NA NA <0.501 NA NA NA NA NA NA NA NA 1.2 8 NEDiesel Range Organics (DRO)DRO STL0014367.0<8.0579.8<6.368.52 102<5.80 <5.698.32 7.53<6.85 <6.12 <6.50 <5.80100* NE NEGasoline Range Organics (GRO)GRO STL01887<11.8 <17.2 <11.8 <10.9 <10.6 <10.5 <11.8 <12.1 <10.6 <11.7 <10.4 <11.4 <11.3 <11.2100* NE NENotes:All results reported in milligrams per kilogram (mg/kg)BOLD = Concentration is greater than or equal to laboratory reporting limitND = Analyte not detected above laboratory reporting limitsNA - Not Analyzed NE = Not Established< = Analyte not detected greater than or equal to laboratory reporting limit shownSRV = Soil Reference ValueSLV = Soil Leaching Value*= MPCA criteria for unregulated fillA = Vaules are for Chromium III / Chromium VIBlue = Value is greater than or equal to Tier I Residentail SRVGreen = Value is greater than or equal to Tier II Industrial SRVPink = Value is greater than or equal to Screening SLVTier I Residential SRV (mg/kg) Tier II Industrial SRV (mg/kg)Screening SLV(mg/kg)WSBCAS #Page 1 of 2 Table 1 - Soil Analytical ResultsOld Snelling Avenue and County Road E ImprovementsArden Hills, MNWSB Project Number: 015447-000Sample ID (Depth Interval) EB-8 (2-4) EB-8 (8-10) EB-9 (4-6) EB-9 (8-10) EB-10 (4-6) EB-10 (8-10) EB-11 (4-6) EB-11 (8-10) EB-12 (4-6) EB-12 (8-10) EB-13 (4-6) EB-13 (8-10) EB-14 (4-6) EB-14 (8-10)Sample Date 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/16/2020 04/17/2020 04/17/2020 04/17/2020 04/17/2020 04/17/2020 04/17/2020 04/17/2020 04/17/2020Volatile Organic Compounds (VOCs)Naphthalene 91-20-36.87 2.14NA NA NA NA NA NA NA NA NA NA NA NA 10 28 4.5All Other VOCs NAND ND ND ND ND ND ND ND ND ND ND ND ND NDNE NE NEPolycyclic Aromatic Hydrocarbons (PAHs)Acenaphthene 83-32-96.65 16.1<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 1,200 5,260 81Acenaphthylene 208-96-84.71 9.00<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEAnthracene 120-12-721.0 51.0<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 7,880 45,400 1,300Benzo[a]anthracene 56-55-321.6 50.7<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEBenzo[b]fluoranthene 205-99-226.0 60.5<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEBenzo[k]fluoranthene 207-08-910.8 21.4<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEBenzo[a]pyrene 50-32-820.4 45.3<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 2 3 1.4Benzo[g,h,i]perylene 191-24-211.5 23.6<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEChrysene 218-01-920.9 46.2<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEDibenz(a,h)anthracene 53-70-33.24 6.84<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEFluoranthene 206-44-077.2 185 0.0968<0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 1,080 6,800 670Fluorene 86-73-722.6 60.8<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 850 6,800 110Indeno[1,2,3-cd]pyrene 193-39-514.5 30.5<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NE2-Methylnaphthalene 91-57-60.431 1.43<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 100 369 NENaphthalene 91-20-30.867 2.60<0.0578 <0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 10 28 4.5Phenanthrene 85-01-891.3 237 0.133<0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 NE NE NEPyrene 129-00-058.1 135 0.0705<0.0553 <0.0563 <0.112 <0.0115 <0.0115 <0.137 <0.0580 <0.0568 <0.0555 <0.0112 <0.0556 890 5,800 440Benzo[a]pyrene (BaP) Equivalent 50-32-829.713 65.9020.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.0002 23 1.4All Other Analyzed PAHs NAND ND ND ND ND ND ND ND ND ND ND ND ND NDNE NE NERCRA 8 MetalsArsenic 7440-38-2<10.84.94NA NA NA NA NA NA NA NA <3.91 NA NA NA 9 20 5.8Barium 7440-39-353.2 57.5NA NA NA NA NA NA NA NA90.7NA NA NA 1,100 18,000 1,680Chromium 7440-47-314.4 19.6NA NA NA NA NA NA NA NA15.5NA NA NA44,000/87 A100,000/650 A1,000,000,000/36 ALead 7439-92-16.30 6.29 5.02 4.91 5.64<9.524.63 5.12 7.92<4.85 <8.995.26 5.54 4.84300 700 2,700Mercury 7439-97-6<0.0223 <0.0225 NA NA NA NA NA NA NA NA0.0297NA NA NA 0.5 1.5 3.3All Other RCRA Metals NANA NA NA NA NA NA NA NA NA NA NA NA NA NA NE NE NEPolychlorinated Biphenyls (PCBs)PCBS, Total 1336-36-3<0.0567 <0.0575 NA NA NA NA NA NA NA NA <0.0562 NA NA NA 1.2 8 NEDiesel Range Organics (DRO)DRO STL001431160 366<5.92 <6.02 <5.07 <5.86 <6.23 <6.217.93<6.3914.0 8.21<6.76 <6.48100* NE NEGasoline Range Organics (GRO)GRO STL01887<11.6 <12.1 <10.3 <11.0 <11.9 <10.5 <12.1 <11.6 <12.3 <12.2 <10.8 <10.8 <12.1 <11.1100* NE NENotes:All results reported in milligrams per kilogram (mg/kg)BOLD = Concentration is greater than or equal to laboratory reporting limitND = Analyte not detected above laboratory reporting limitsNA - Not Analyzed NE = Not Established< = Analyte not detected greater than or equal to laboratory reporting limit shownSRV = Soil Reference ValueSLV = Soil Leaching Value*= MPCA criteria for unregulated fillA = Vaules are for Chromium III / Chromium VIBlue = Value is greater than or equal to Tier I Residentail SRVGreen = Value is greater than or equal to Tier II Industrial SRVPink = Value is greater than or equal to Screening SLVWSBTier I Residential SRV (mg/kg) Tier II Industrial SRV (mg/kg)Screening SLV(mg/kg)CAS #Page 2 of 2 Table 2 - Groundwater Analytical ResultsOld Snelling Avenue and County Road E ImprovementsArden Hills, MNWSB Project Number: 015447-000Sample ID GW-1 GW-8 GW-12Water Level (ft. below grade) 9.21 7.24 5.10Sample Date 04/16/2020 04/16/2020 04/17/2020Volatile Organic Compounds (VOCs)All Analyzed VOCs NAND ND NDNA NARCRA 8 MetalsLead 7439-92-1300 1100 1580NE NEAll Other RCRA Metals NAND ND ND NE NEDiesel Range Organics (DRO)Diesel Range Organics (DRO) STL00143<125244 *<1251,000 ** 200Gasoline Range Organics (GRO)Gasoline Range Organics (GRO) STL01887<100 <100 <5001,000 ** 200Notes:All values reported in micrograms per liter (µg/L)BOLD = Concentration is greater than or equal to laboratory reporting limit< = Analyte not detected greater than or equal to laboratory reporting limit shownND = Analyte not detected above laboratory reporting limitsNA = Not ApplicableNE = Not Established* = Laboratory Control Sample (LCS) or Laboratory Control Sample Duplicate (LCSD) is outside acceptance limits.** = MPCA criteria for remedial investigationBlue = Value exceeds established MDH guidance valueDischarge Limits shown are the most stringent values indicated in the Minnesota Pollution Control Agency (MPCA) National Pollutant Dishcharge Elimination Sysytem (NPDES)/State Disposal System document wq-wwprm9-25 dated 2/2/2017CAS #Health Based Risk Guidance Value (µg/L)WSBLimits for Contaminated Groundwater Discharges (µg/L)Page 1 of 1 Table 3 - Soil Vapor Analytical ResultsOld Snelling Avenue and County Road E ImprovementsArden Hills, MNWSB Project Number: 015447-000Sample ID SV-2 (4FT) SV-9 (4FT)Sample Date 4/16/2020 4/16/2020Benzene 71-43-233 181501,5001,3-Butadiene106-99-050 389.3902-Butanone (Methyl Ethyl Ketone (MEK))78-93-316 18170,000600,000Cyclohexane110-82-710 7.3210,000700,000Ethanol64-17-5< 94120NENEEthylbenzene 100-41-422< 8.71401,300n-Heptane142-82-533< 8.214,00047,000n-Hexane110-54-357 2624,00083,000Propylene115-07-1560 230100,000370,000Tetrachloroethene (PCE)127-18-415 201101,100Toluene (Methylbenzene)108-88-3300 37140,000470,000m&p-Xylene 179601-23-151< 223,300 b12,000 bo-Xylene 95-47-617< 8.73,300 b12,000 bAll Other Analyzed VOCsNEND NDvariousvariousNotes:All results reported in micrograms per cubic meter (µg/m3)BOLD = Concentration is greater than or equal to laboratory reporting limitND = Analyte not detected greater than or equal to laboratory reporting limitsNE = Not Established< = Analyte not detected greater than or equal to laboratory reporting limit shownISV = Intrusion Screening Valueb = Based on total xylenes CAS #1330-20-7Value is greater than or equal to 33X Residential ISVValue is greater than or equal to 33X Commercial / Industrial ISVWSBCAS #Residential 33X ISV 3) Volatile Organic Compounds (VOCs)Commercial / Industrial 33X ISV 3) Page 1 of 1 Phase I Environmental Site Assessment Old Snelling Avenue & County Road E Improvements WSB Project No. R-015447-000 Figures FIGURES M-333 County E Rd Glenhill n Av r Project Corridor 0 1,000 Feet¯Figure 1 - Project Corridor Location Phase I ESA Old Snelling Ave & CR E Improvements Arden Hills, MN 1 inch = 1,000 feet County E Rd Cu a nnon Av Project Corridor 0 500 Feet¯Figure 2 - Project Corridor Details Phase I ESA Old Snelling Ave & CR E Improvements Arden Hills, MN 1 inch = 500 feet County E Rd Cu a nnon Av Project Corridor 0 500 Feet¯Figure 3 - REC Map Phase I ESA Old Snelling Ave & CR E Improvements Arden Hills, MN 1 inch = 500 feet Phase I Environmental Site Assessment Old Snelling Avenue & County Road E Improvements WSB Project No. 015447-000 Appendices APPENDIX A Photographic Documentation Old Snelling Avenue and County Road E Improvements Arden Hills, Minnesota Photo 1: South end of the Project Corridor, including Bridge 62J17, facing southeast. Photo 2: Typical view of the Project Corridor, facing north. Old Snelling Avenue and County Road E Improvements Arden Hills, Minnesota Photo 3: Typical overhead powerlines and pole-mounted transformer along the western side of the Project Corridor, facing northwest. Photo 4: North end of the Project Corridor, facing south. Adjacent high-pressure gas main pictured on Old Snelling Avenue and County Road E Improvements Arden Hills, Minnesota Photo 5: Leak Site LS0012785 located approximately 250 feet east of the Project Corridor, facing southeast. Photo 6: Approximate location of adjacent Site Assessment Site SA0008406, facing northeast. Old Snelling Avenue and County Road E Improvements Arden Hills, Minnesota Photo 7: Approximate location of adjacent Site Assessment Site SA0008404, facing east. Photo 8: Project Corridor, facing east. APPENDIX G Area 1, Alternative 1 Schematic Drawings Snelling Avenue North – With Trail 00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109WETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWET00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109℄14.00'LANE10.00'TRAILSLOPE VARIES2.0%2.0%B618 CONCRETE CURB & GUTTER4" MIN3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS1'12.00'LANE2.0%4.0%4:18.00'SHOULDER1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIALSLOPEVARIES34.00'2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:55 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NSNELLING AVE/STH 51BITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE 00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118WET00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118℄14.00'LANE10.00'TRAILSLOPE VARIES2.0%2.0%B618 CONCRETE CURB & GUTTER4" MIN3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS1'12.00'LANE2.0%4.0%4:18.00'SHOULDER1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIALSLOPEVARIES34.00'2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:56 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASNELLING AVE NBUSSARD CT LAMETTI LN CUMMINGS L NLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE 00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127WETWETWETWETWETWETWETWETWET00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127℄14.00'LANE14.00'LANE28.00'FACE-FACE10.00'TRAILSLOPE VARIES2.0%2.0%2.0%SLOPE VARIESB618 CONCRETE CURB & GUTTERB618 CONCRETE CURB & GUTTER2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL1'4" MIN4" MIN3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS1'10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:58 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASNELLING AVE NGLENARDEN RDSKILES LNLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE 00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135WETWETWETWETWETWETWETWETWETWETWETWETWETWET00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135℄12.00'LANE12.00'LANE36.00'6.00'SHOULDER8.00'TRAILSLOPE VARIES2.0%2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS4.0%4:16.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIALSLOPEVARIESSLOPEVARIESSLOPEVARIES10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:59 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASKILES LNSKILES LNARDEN PLFOREST LNARDEN PLSNELLING AVE NLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE 00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145WETWETWET00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145℄12.00'LANE14.00'LANE34.00'FACE-FACE8.00'PARKING2.0%2.0%2.0%SLOPE VARIESB618 CONCRETE CURB & GUTTERB618 CONCRETE CURB & GUTTER2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)12" GRANULAR MATERIAL1'1'4" MIN4" MINTYPICAL SECTION - OPTION #1NTS8.00'TRAILSLOPE VARIES2.0%3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)5.00'TRAIL5.0%10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 2:00 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASNELLING AVE NRIDGEWOOD RDCTH E CTH E / L A K E J O H A N N A B L V DFREEWAYPARKLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE APPENDIX H Area 1, Alternative 2 Schematic Drawings Snelling Avenue North – No Trail 00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109WETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWET00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:04 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NSNELLING AVE/STH 51 00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118WET00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:04 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NBUSSARD CT LAMETTI LN CUMMINGS L N 00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127WETWETWETWETWETWETWETWETWET00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:04 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NGLENARDEN RDSKILES LN 00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135WETWETWETWETWETWETWETWETWETWETWETWETWETWET00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:05 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSKILES LNSKILES LNARDEN PLFOREST LNARDEN PLSNELLING AVE N 00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145WETWETWET00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145℄12.00'LANE14.00'LANE34.00'FACE-FACE8.00'PARKINGSLOPE VARIES2.0%2.0%2.0%SLOPE VARIESB618 CONCRETE CURB & GUTTERB618 CONCRETE CURB & GUTTER2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)1'1'4" MIN4" MINTYPICAL SECTION - OPTION #3NTS10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:05 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015 FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NRIDGEWOOD RDCTH E CTH E / L A K E J O H A N N A B L V DFREEWAYPARK APPENDIX I Area 2, Roundabout Intersection Schematic Drawings ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651) 490-2000 DRAWING NO. 1 SNELLING AVE. / COUNTY RD. E OPTION 1 ROUNDABOUT 0 feetscale 50 50 100 25 COUNTY RD. E SNELLI NG AVE.OLD HWY 10 ST. PAUL, MN 55110 3535 VADNAIS CENTER DR. PHONE: (651) 490-2000 DRAWING NO. 2 SNELLING AVE. / COUNTY RD. E OPTION 2 ROUNDABOUT 0 feetscale 50 50 100 25 COUNTY RD. E SNELLI NG AVE.OLD HWY 10 APPENDIX J Public Information and Open House Documents Public Informational Meeting - Open House Old Snelling Avenue and County Road E Improvements Dear Property Owner: The Arden Hills City Council has authorized the preparation of a feasibility study as a first step in considering proposed improvements to Old Snelling Avenue. A project location map is provided on the back of this page. The following potential improvements are being considered at this time:  Reconstruction of Old Snelling Avenue from County Road E to Highway 51;  Construction of a single lane roundabout at the intersection of County Road E and Old Snelling Avenue in partnership with Ramsey County;  Construction of a pedestrian trail along Old Snelling Avenue from County Road E to Highway 51;  Replacement of watermain, sanitary sewer, and storm sewer based on a condition assessment currently underway. City staff will be hosting a public informational meeting to provide information on the project and to solicit your input on the proposed improvements. This meeting will be an open house format. You may attend the meeting anytime between 4:30 PM and 7:00 PM at your convenience to discuss the project with City staff. Informational Meeting – Open House Thursday, October 17, 2019 4:30 PM to 7:00 PM Arden Hills City Hall Council Chambers 1245 West Highway 96 Arden Hills, MN 55112 It is important to note that this project may result in an assessment to properties with driveway access directly onto Old Snelling Avenue / Old Highway 10. An additional public informational meeting will be conducted at a future date if the City Council determines that the project should proceed to the design phase. If you have any questions or cannot attend the open house meeting, please feel free to contact me at tblomstrom@cityofardenhills.org or 651-792-7846. Sincerely, Todd Blomstrom, PE Interim Public Works Director/City Engineer Approximate Project Boundary Preliminary Prelim. Concept Only S oldSnellingAvenueandCountyRoadElmprovements Comments: Return to: Todd Blomstrom, City of Arden li!l? 65t-792-7846 (tblomstrom@city;i;de;hilis.org 1, lZ+S West Highway 96, Arden Hills' MN 55LL2 City of Arden Hills ▪1245 West Highway 96 ▪ Arden Hills Minnesota 55112 Phone 651.792.7800 ▪ Fax 651.634.5137 ▪ www.cityofardenhills.org Project Update OLD SNELLING AVENUE AND COUNTY ROAD E IMPROVEMENTS RESCHEUDLED TO 2022 CONSTRUCTION SEASON November 4, 2019 The City of Arden Hills and Ramsey County are in the early stages of planning for roadway improvements along Old Snelling Avenue and County Road E. The City’s Capital Improvement Plan identifies improvements to Old Snelling Avenue from County Road E to Highway 51 to address deteriorated pavement conditions. The City’s capital plan and County’s transportation improvement program also identify reconstruction of the intersection at County Road E and Old Snelling Avenue to improve safety and traffic operations. An open house informational meeting for the project was held on October 17, 2019 to provide an opportunity for residents to review initial concept drawings and provide input for the project. The open house meeting was well attended by approximately 50 people providing many valuable questions and comments. This project update is being sent to residents near the project area to provide information regarding the anticipated project schedule. The project was initially planned for construction in the 2020 or 2021 time frame. However, Ramsey County will be reconstructing Lexington Avenue between County Road E and I-694 in 2021. Major improvements to Old Snelling Avenue and County Road E during the same time line as construction along Lexington Avenue would be difficult for local traffic, particularly given current road work underway along I-35W. The Old Snelling Avenue project has been rescheduled for the 2022 construction season. This schedule will allow additional time for planning the project and additional opportunity for public input during the design process. The City and County will work together to align the proposed improvements at the intersection of Old Snelling Avenue and County Road E on this same construction schedule. All residents are encouraged to visit the project website to stay updated on the project. The project page is located at www.cityofardenhills.org/constructionprojects. If you have additional questions, please contact the City Public Works Department at 651-792-7800. APPENDIX K Project Cost Estimates Opinion of Probable Costs Area 1, Alternative 1 Area 1, Alternative 2 Area 2, Roundabout Intersection OPINION OF PROBABLE COST - ALTERNATIVE NO. 1 Feasibility Study Snelling Avenue North - County Road E to Highway 51 Arden HIlls, Minnesota Project Number PW-21-0100 Item No.Item Unit Unit Price Est. Quantity Total Price 1 MOBILIZATION LS -1 115,000.00$ 2 TRAFFIC CONTROL LS -1 25,000.00$ SUBTOTAL - GENERAL AND REMOVALS 140,000.00$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)51,800.00$ TOTAL - GENERAL AND REMOVALS 191,800.00$ 3 CLEARING ACRE $5,150.00 2.0 10,300.00$ 4 SAWING BITUMINOUS PAVEMENT LIN FT $4.00 700 2,800.00$ 5 REMOVE BITUMINOUS PAVEMENT SQ YD $3.00 27,300 81,900.00$ 6 REMOVE CONCRETE CURB & GUTTER LIN FT $3.50 848 2,968.00$ 7 COMMON EXCAVATION CU YD $20.00 10,300 206,000.00$ 8 SELECT GRANULAR BORROW CU YD $22.00 5,500 121,000.00$ 9 AGGREGATE BASE, CLASS 5 TON $18.00 4,170 75,060.00$ 10 BITUMINOUS MATERIAL FOR TACK COAT GAL $3.25 885 2,876.25$ 11 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON $85.00 656 55,760.00$ 12 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)TON $70.00 2,150 150,500.00$ 13 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (2,B)TON $70.00 1,880 131,600.00$ 14 6-INCH CONCRETE WALK - PEDESTRIAN RAMP SQ FT $14.00 2,050 28,700.00$ 15 TRUNCATED DOME SQ FT $59.00 160 9,440.00$ 16 CONCRETE CURB & GUTTER, DESIGN B618 LIN FT $15.00 5,360 80,400.00$ 17 STRIPING & SIGNAGE LS -1 100,000.00$ 18 STABILIZED CONSTRUCTION ENTRANCE EACH $2,200.00 2 4,400.00$ 19 EROSION CONTROL AND RESTORATION LS -1 200,000.00$ SUBTOTAL - STREET IMPROVEMENTS 1,263,704$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)467,571$ TOTAL - STREET IMPROVEMENTS 1,731,275$ 20 REMOVE WATER MAIN LIN FT 7.00$ 3025.00 21,175.00$ 21 REMOVE WATER SERVICE PIPE LIN FT 5.00$ 75.00 375.00$ 22 REMOVE HYDRANT AND GATE VALVE ASSEMBLY EACH 480.00$ 6.00 2,880.00$ 23 REMOVE GATE VALVE & BOX EACH 175.00$ 16.00 2,800.00$ 24 REMOVE CURB STOP & BOX EACH 105.00$ 4.00 420.00$ 25 2-INCH RIGID INSULATION SQ YD 34.50$ 40.00 1,380.00$ 26 SPECIAL SOIL HANDLING FOR CONTAMINATION LS -$ 1.00 12,000.00$ 27 INSTALL HYDRANT, GATE VALVE AND 6-INCH DIP CL 52 ASSEMBLY EACH 5,900.00$ 7.00 41,300.00$ 28 1" CORPORATION STOP EACH 195.00$ 4.00 780.00$ 29 6" GATE VALVE & BOX EACH 2,150.00$ 3.00 6,450.00$ 30 8" GATE VALVE & BOX EACH 2,389.00$ 13.00 31,057.00$ 31 1" CURB STOP AND BOX EACH 400.00$ 4.00 1,600.00$ 32 CONNECT TO EXISTING WATERMAIN EACH 910.00$ 8.00 7,280.00$ 33 1" TYPE K COPPER PIPE LIN FT 40.00$ 75.00 3,000.00$ 34 DUCTILE IRON FITTINGS - EXPOXY COATED LBS 7.25$ 2170.00 15,732.50$ 35 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 50.00$ 2500.00 125,000.00$ 36 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 57.00$ 525.00 29,925.00$ SUBTOTAL - WATER SYSTEM 303,155$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)112,167$ TOTAL - WATER SYSTEM 415,322$ Snelling Avenue North CR E to Hwy 51 MOBILIZATION AND REMOVAL STREET IMPROVEMENTS WATER SYSTEM Page 1 of 2 OPINION OF PROBABLE COST - ALTERNATIVE NO. 1 Feasibility Study Snelling Avenue North - County Road E to Highway 51 Arden HIlls, Minnesota Project Number PW-21-0100 Item No.Item Unit Unit Price Est. Quantity Total Price Snelling Avenue North CR E to Hwy 51 37 REMOVE SEWER PIPE (SANITARY)LIN FT 10.00 130.00 1,300.00 38 SALVAGE CASTING EACH 105.00 2.00 210.00 39 EXPOSE & REPAIR SANITARY SEWER SERVICE CONNECTION (< 13' DEPTH)EACH 3,500.00 2.00 7,000.00 40 TEMPORARY CONVEYANCE OF WASTEWATER LS 6,000.00 1.00 6,000.00 41 10" PVC PIPE SEWER (SANITARY SDR 26)LF 145.00 130.00 18,850.00 42 RECONSTRUCT OUTSIDE DROP LIN FT 866.00 5.00 4,330.00 43 ADJUST FRAME AND RING CASTING EACH 1,075.00 2.00 2,150.00 SUBTOTAL - SANITARY SEWER 39,840$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)14,741$ TOTAL - SANITARY SEWER 54,581$ 44 REMOVE PIPE STORM SEWER LIN FT 13.00$ 850.00 11,050.00$ 45 4-INCH PE CORRUGATED PERFORATED PIPE DRAIN WITH SOCK LIN FT 17.50$ 5390.00 94,325.00$ 46 CONNECT 4-INCH PVC OR PERF PE TO STORM SEWER EACH 183.00$ 25.00 4,575.00$ 47 15-INCH STORM SEWER PIPE LIN FT 48.00$ 830.00 39,840.00$ 48 18-INCH STORM SEWER PIPE LIN FT 50.75$ 1700.00 86,275.00$ 49 21-INCH STORM SEWER PIPE LIN FT 56.00$ 1375.00 77,000.00$ 50 24-INCH STORM SEWER PIPE LIN FT 62.00$ 490.00 30,380.00$ 51 48-INCH STORM SEWER PIPE LIN FT 80.00$ 180.00 14,400.00$ 52 18" RC PIPE APRON EACH 1,350.00$ 6.00 8,100.00$ 53 24" RC PIPE APRON EACH 1,450.00$ 16.00 23,200.00$ 54 48" RC PIPE APRON EACH 2,200.00$ 4.00 8,800.00$ 55 CONNECT TO EXISTING STORM SEWER EACH 750.00$ 1.00 750.00$ 56 CONST DRAINAGE STRUCTURE DES 48-4020 EACH 2,050.00$ 20.00 41,000.00$ 57 CONST DRAINAGE STRUCTURE DES 60-4020 EACH 3,200.00$ 5.00 16,000.00$ 58 CASTING ASSEMBLY EACH 815.00$ 25.00 20,375.00$ 59 BMP FOR QUALITY & RATE CONTROL - NORTH SEGMENT LS 75,000.00$ 1.00 75,000.00$ 60 BMP FOR QUALITY & RATE CONTROL - CENTRAL SEGMENT LS 50,000.00$ 1.00 50,000.00$ 61 BMP FOR QUALITY & RATE CONTROL - SOUTH SEGMENT LS 50,000.00$ 1.00 50,000.00$ SUBTOTAL - STORM SEWER 651,070.00$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)240,896$ TOTAL - STORM SEWER 891,965.90$ STORM SEWER SANITARY SEWER Page 2 of 2 OPINION OF PROBABLE COST - ALTERNATIVE NO. 2 Feasibility Study Snelling Avenue North - County Road E to Highway 51 Arden HIlls, Minnesota Project Number PW-21-0100 Item No.Item Unit Unit Price Est. Quantity Total Price Est. Quantity Total Price Est. Quantity Total Price 2021.501 MOBILIZATION LS 40,000.00 0.86 34,400.00 0.06 2,064.00 0.08 165.12 2563.601 TRAFFIC CONTROL LS 28,000.00 0.85 23,800.00 0.06 1,680.00 0.08 2,240.00 SUBTOTAL - MOBILIZATION AND TRAFFIC 58,200$ 3,744$ 2,405$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)21,534$ 1,385$ 890$ TOTAL - MOBILIZATION AND TRAFFIC 79,734$ 5,129$ 3,295$ 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 5.00 250.00 1,250.00 130.00 650.00 0.00 0.00 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 3.25 0.00 0.00 400.00 1,300.00 0.00 0.00 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT 4.00 700.00 2,800.00 30.00 120.00 0.00 0.00 2105.501 COMMON EXCAVATION (EV)(P)CU YD 20.00 2,300.00 46,000.00 300.00 6,000.00 200.00 4,000.00 2105.522 SELECT GRANULAR BORROW (CV)CU YD 28.00 100.00 2,800.00 270.00 7,560.00 10.00 280.00 2105.602 POTHOLE EXISTING UTILITIES EACH 535.00 5.00 2,675.00 1.00 535.00 0.00 0.00 2123.501 COMMON LABORERS HOUR 83.00 15.00 1,245.00 4.00 332.00 0.00 0.00 2123.507 3.0 CU YD SHOVEL HOUR 182.00 15.00 2,730.00 4.00 728.00 0.00 0.00 2123.61 STREET SWEEPER (WITH PICKUP BROOM)HOUR 155.00 40.00 6,200.00 6.00 930.00 0.00 0.00 2130.501 WATER FOR DUST CONTROL M GALS 34.00 100.00 3,400.00 10.00 340.00 10.00 340.00 2211.501 AGGREGATE BASE, CLASS 5 TON 20.00 500 10,000.00 180 3,600.00 300 6,000.00 2331.604 AGGREGATE BASE, CLASS 7, FULL DEPTH RECYCLED PRODUCTION SQ YD 2.55 18,250.00 46,537.50 0.00 0.00 1,800.00 4,590.00 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALS 3.25 925.00 3,006.25 25.00 81.25 85.00 276.25 2360.501 TYPE SPWEB240C WEARING COURSE MIXTURE TON 70.00 4,350.00 304,500.00 95.00 6,650.00 400.00 28,000.00 2531.501 CONCRETE CURB AND GUTTER, DESIGN B618 - HAND FORM LIN FT 30.00 250.00 7,500.00 130.00 3,900.00 0.00 0.00 2582.502 4" SOLID LINE - PAINT LIN FT 1.75 8,200.00 14,350.00 0.00 0.00 0.00 0.00 2582.502 4" DOUBLE YELLOW - PAINT LIN FT 2.25 4,100.00 9,225.00 0.00 0.00 0.00 0.00 2582.502 24" STOP LINE - PAINT LIN FT 14.00 50.00 700.00 0.00 0.00 0.00 0.00 SUBTOTAL - STREET IMPROVEMENTS 464,919$ 32,726$ 43,486$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)172,020$ 12,109$ 16,090$ TOTAL - STREET IMPROVEMENTS 636,939$ 44,835$ 59,576$ Snelling Avenue North CR E to Hwy 51 MOBILIZATION AND REMOVAL STREET IMPROVEMENTS Bussard Ct Pavement Reconstruction Cummings Lane FDR Page 1 of 3 OPINION OF PROBABLE COST - ALTERNATIVE NO. 2 Feasibility Study Snelling Avenue North - County Road E to Highway 51 Arden HIlls, Minnesota Project Number PW-21-0100 Item No.Item Unit Unit Price Est. Quantity Total Price Est. Quantity Total Price Est. Quantity Total Price Snelling Avenue North CR E to Hwy 51 Bussard Ct Pavement Reconstruction Cummings Lane FDR 2104.501 REMOVE PIPE STORM SEWER LIN FT 15.00 200.00 3,000.00 0.00 0.00 30.00 450.00 2104.523 SALVAGE CASTING EACH 185.00 0.00 0.00 2.00 370.00 1.00 185.00 2531.501 CONCRETE CURB AND GUTTER, HAND FORM LIN FT 65.00 0.00 0.00 0.00 0.00 50.00 3,250.00 2503.541 18-INCH STORM SEWER PIPE LIN FT 52.00 55.00 2,860.00 0.00 0.00 58.00 3,016.00 2503.541 24-INCH STORM SEWER PIPE LIN FT 75.00 55.00 4,125.00 0.00 0.00 0.00 0.00 2503.541 48-INCH STORM SEWER PIPE LIN FT 95.00 90.00 8,550.00 0.00 0.00 0.00 0.00 2503.541 18-INCH FES EACH 2.00 525.00 1,050.00 0.00 0.00 1.00 2.00 2503.541 24-INCH FES EACH 2.00 750.00 1,500.00 0.00 0.00 0.00 0.00 2503.541 48-INCH FES EACH 2.00 1,100.00 2,200.00 0.00 0.00 0.00 0.00 2503.541 CONST DRAINAGE STRUCTURE DES 48-4020 EACH 2050.00 0.00 0.00 0.00 0.00 2.00 4,100.00 2506.516 CASTING ASSEMBLY R-1733 EACH 1,225.00 0.00 0.00 0.00 0.00 2.00 2,450.00 2506.522 ADJUST FRAME AND RING CASTING EACH 2,150.00 0.00 0.00 2.00 4,300.00 0.00 0.00 SUBTOTAL - STORM SEWER 23,285$ 4,670$ 13,453$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)8,615$ 1,728$ 4,978$ TOTAL - STORM SEWER 31,900$ 6,398$ 18,431$ 1 REMOVE SEWER PIPE (SANITARY)LIN FT 10.00 130.00 1,300.00 0.00 0.00 0.00 0.00 2 SALVAGE CASTING EACH 105.00 2.00 210.00 0.00 0.00 0.00 0.00 3 EXPOSE & REPAIR SANITARY SEWER SERVICE CONNECTION (< 13' DEPTH)EACH 3,500.00 2.00 7,000.00 0.00 0.00 0.00 0.00 4 TEMPORARY CONVEYANCE OF WASTEWATER LS 6,000.00 1.00 6,000.00 0.00 0.00 0.00 0.00 5 10" PVC PIPE SEWER (SANITARY SDR 26)LF 145.00 130.00 18,850.00 0.00 0.00 0.00 0.00 6 RECONSTRUCT OUTSIDE DROP LIN FT 866.00 5.00 4,330.00 0.00 0.00 0.00 0.00 7 ADJUST FRAME AND RING CASTING EACH 1,075.00 2.00 2,150.00 0.00 0.00 0.00 0.00 SUBTOTAL - SANITARY SEWER 39,840$ -$ -$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)14,741$ -$ -$ TOTAL - SANITARY SEWER 54,581$ -$ -$ SANITARY SEWER STORM SEWER Page 2 of 3 OPINION OF PROBABLE COST - ALTERNATIVE NO. 2 Feasibility Study Snelling Avenue North - County Road E to Highway 51 Arden HIlls, Minnesota Project Number PW-21-0100 Item No.Item Unit Unit Price Est. Quantity Total Price Est. Quantity Total Price Est. Quantity Total Price Snelling Avenue North CR E to Hwy 51 Bussard Ct Pavement Reconstruction Cummings Lane FDR 1 REMOVE WATER MAIN LIN FT 7.00 750.00 5,250.00 0.00 0.00 0.00 0.00 2 REMOVE HYDRANT AND GATE VALVE ASSEMBLY EACH 480.00 2.00 960.00 0.00 0.00 0.00 0.00 3 REMOVE GATE VALVE & BOX EACH 175.00 6.00 1,050.00 0.00 0.00 0.00 0.00 4 SPECIAL SOIL HANDLING FOR CONTAMINATION LS 6,500.00 1.00 6,500.00 0.00 0.00 0.00 0.00 5 2-INCH RIGID INSULATION SQ YD 34.50 20.00 690.00 0.00 0.00 0.00 0.00 6 INSTALL HYDRANT, GATE VALVE AND 6-INCH DIP CL 52 ASSEMBLY EACH 5,900.00 2.00 11,800.00 0.00 0.00 0.00 0.00 7 6" GATE VALVE & BOX EACH 2,150.00 3.00 6,450.00 0.00 0.00 0.00 0.00 8 8" GATE VALVE & BOX EACH 2,389.00 6.00 14,334.00 0.00 0.00 0.00 0.00 9 ADJUST GATE VALVE BOX EACH 258.00 6.00 1,548.00 0.00 0.00 0.00 0.00 10 CONNECT TO EXISTING WATERMAIN EACH 910.00 3.00 2,730.00 0.00 0.00 0.00 0.00 11 DUCTILE IRON FITTINGS - EXPOXY COATED LBS 7.25 1,600.00 11,600.00 0.00 0.00 0.00 0.00 12 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 50.00 50.00 2,500.00 0.00 0.00 0.00 0.00 13 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 57.00 700.00 39,900.00 0.00 0.00 0.00 0.00 SUBTOTAL - WATER SYSTEM 105,312$ -$ -$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)38,965$ -$ -$ TOTAL - WATER SYSTEM 144,277$ -$ -$ 2573.53 INLET PROTECTION - TYPE A EACH 128.00 0.00 0.00 2.00 256.00 2.00 256.00 2123.604 TILL BOULEVARD SUBGRADE SQ YD 2.75 50.00 137.50 135.00 371.25 0.00 0.00 2574.525 TOPSOIL BORROW (LV)CU YD 28.40 20.00 568.00 30.00 852.00 0.00 0.00 2575.505 SODDING, TYPE LAWN SQ YD 3.90 75.00 292.50 135.00 526.50 0.00 0.00 2575.525 EROSION CONTROL BLANKET, CATEGORY 3 SQ YD 4.50 1,700.00 7,650.00 0.00 0.00 0.00 0.00 2575.601 EROSION CONTROL LS 1.00 1.00 10,000.00 1.00 3,500.00 1.00 1,200.00 2575.605 HYDROSEEDING ACRE 6,180.00 1.50 9,270.00 0.00 0.00 0.25 1,545.00 SUBTOTAL - RESTORATION 27,918$ 5,506$ 3,001$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)10,330$ 2,037$ 1,110$ TOTAL - RESTORATION 38,248$ 7,543$ 4,111$ RESTORATION WATER SYSTEM Page 3 of 3 APPENDIX B - OPINION OF PROBABLE COST OPINION OF PROBABLE COST - Single Lane Roundabout Feasibility Study Snelling Avenue North at County Road E Arden HIlls, Minnesota Project Number PW-21-0100 Item No. Item Unit Unit Price Est. Quantity Total Price 1 MOBILIZATION LS - 1 75,000.00$ 2 TRAFFIC CONTROL LS - 1 50,000.00$ SUBTOTAL - MOBILIZATION AND TRAFFIC 125,000.00$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)46,250.00$ TOTAL - MOBILIZATION AND TRAFFIC 171,250.00$ 3 CLEARING EACH $315.00 5 1,575.00$ 4 GRUBBING EACH $135.00 5 675.00$ 5 SAWING BITUMINOUS PAVEMENT LIN FT $3.00 120 360.00$ 6 REMOVE BITUMINOUS PAVEMENT SQ YD $3.00 4,330 12,990.00$ 7 REMOVE BITUMINOUS TRAIL SQ YD $5.00 200 1,000.00$ 8 REMOVE CONCRETE CURB & GUTTER LIN FT $3.50 1,650 5,775.00$ 9 REMOVE CONCRETE SIDEWALK SQ FT $1.75 95 166.25$ 10 COMMON EXCAVATION CU YD $16.00 3,100 49,600.00$ 11 SELECT GRANULAR BORROW CU YD $22.00 1,700 37,400.00$ 12 AGGREGATE BASE, CLASS 5 TON $18.00 1,275 22,950.00$ 13 BITUMINOUS MATERIAL FOR TACK COAT GAL $3.25 217 705.25$ 14 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON $85.00 175 14,875.00$ 15 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)TON $75.00 600 45,000.00$ 16 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (2,B)TON $75.00 600 45,000.00$ 17 6-INCH CONCRETE WALK - PEDESTRIAN RAMP SQ FT $14.00 200 2,800.00$ 18 8-INCH CONCRETE PAVEMENT SQ FT $20.00 2,750 55,000.00$ 19 TRUNCATED DOME SQ FT $59.00 170 10,030.00$ 20 CONCRETE CURB & GUTTER, DESIGN B618 LIN FT $18.00 2,850 51,300.00$ 21 CONCRETE CURB & GUTTER, DESIGN SURMOUNTABLE LIN FT $20.00 460 9,200.00$ 22 STRIPING & SIGNAGE LS - 1 50,000.00$ 23 STABILIZED CONSTRUCTION ENTRANCE EACH $2,200.00 1 2,200.00$ 24 ROW & EASEMENTS LS - 1 125,000.00$ 25 EROSION CONTROL AND RESTORATION LS - 1 60,000.00$ SUBTOTAL - STREET IMPROVEMENTS 603,602$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)223,333$ TOTAL - STREET IMPROVEMENTS 826,934$ 26 REMOVE WATER MAIN LIN FT 6.30$ 775.00 4,882.50$ 27 REMOVE WATER SERVICE PIPE LIN FT 5.00$ 20.00 100.00$ 28 REMOVE HYDRANT AND GATE VALVE ASSEMBLY EACH 480.00$ 1.00 480.00$ 29 REMOVE GATE VALVE & BOX EACH 175.00$ 3.00 525.00$ 30 REMOVE CURB STOP & BOX EACH 105.00$ 1.00 105.00$ 31 2-INCH RIGID INSULATION SQ YD 34.50$ 20.00 690.00$ 32 TEMPORARY WATER SERVICE LS -$ 1.00 5,000.00$ 33 INSTALL HYDRANT, GATE VALVE AND 6-INCH DIP CL 52 ASSEMBLY EACH 5,900.00$ 1.00 5,900.00$ 34 1" CORPORATION STOP EACH 195.00$ 1.00 195.00$ 35 12" GATE VALVE & BOX EACH 4,000.00$ 4.00 16,000.00$ 36 1" CURB STOP AND BOX EACH 400.00$ 1.00 400.00$ 37 ADJUST GATE VALVE BOX EACH 258.00$ 4.00 1,032.00$ 38 CONNECT TO EXISTING WATERMAIN EACH 1,000.00$ 3.00 3,000.00$ 39 1" TYPE K COPPER PIPE LIN FT 40.00$ 80.00 3,200.00$ 40 DUCTILE IRON FITTINGS - EXPOXY COATED LBS 7.25$ 1050.00 7,612.50$ 41 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 45.00$ 15.00 675.00$ 42 12" WATERMAIN DUCTILE IRON CL 52 LIN FT 70.00$ 760.00 53,200.00$ 102,997$ PRELIM. ESTIMATING CONTINGENCY 38,109$ WATER TOTAL OPC ESTIMATE 141,106$ MOBILIZATION AND TRAFFIC STREET IMPROVEMENTS WATER SYSTEM Snelling Avenue at County Road E Intersection Improvements WATER SUBTOTAL Page 1 of 2 APPENDIX B - OPINION OF PROBABLE COST OPINION OF PROBABLE COST - Single Lane Roundabout Feasibility Study Snelling Avenue North at County Road E Arden HIlls, Minnesota Project Number PW-21-0100 Item No. Item Unit Unit Price Est. Quantity Total Price Snelling Avenue at County Road E Intersection Improvements 43 REMOVE SEWER PIPE (SANITARY)LIN FT 10.00$ 280 2,800.00$ 44 REMOVE SANITARY SERVICE PIPE LIN FT 10.00$ 35 350.00$ 45 REMOVE MANHOLE EACH 700.00$ 3 2,100.00$ 46 TEMPORARY CONVEYANCE OF WASTEWATER LS -$ 1 8,500.00$ 47 DEWATERING - SANITARY SEWER LS -$ 1 7,500.00$ 48 CONNECT TO EXISTING SANITARY SEWER EACH 1,900.00$ 1 1,900.00$ 49 CONNECT TO EXISTING MANHOLE (SAN)EACH 1,595.00$ 1 1,595.00$ 50 8" x 4" PVC WYE, SCHEDULE 40 EACH 200.00$ 1 200.00$ 51 8" PVC PIPE SEWER (SANITARY SDR 35)LIN FT 65.00$ 280 18,200.00$ 52 LINING SEWER PIPE 8" DIA LIN FT 50.00$ 250 12,500.00$ 53 4" PVC SANITARY SERVICE PIPE (SCH 40)LIN FT 45.00$ 15 675.00$ 54 6" PVC SANITARY SERVICE PIPE (SCH 40)LIN FT 48.00$ 20 960.00$ 55 CASTING ASSEMBLY R-1733 (SELF SEAL LID)EACH 1,155.00$ 4 4,620.00$ 56 CONSTRUCT SANITARY SEWER MANHOLE EACH 4,100.00$ 4 16,400.00$ 57 CONSTRUCT SANITARY SEWER MH (EXTRA DEPTH)LIN FT 290.00$ 12 3,480.00$ SUBTOTAL - SANITARY SEWER 81,780$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)30,259$ TOTAL - SANITARY SEWER 112,039$ 58 REMOVE PIPE STORM SEWER LIN FT 13.00$ 600.00 7,800.00$ 59 REMOVE DRAINAGE STRUCTURE EACH 575.00$ 6.00 3,450.00$ 60 4-INCH PE CORRUGATED PERFORATED PIPE DRAIN WITH SOCK LIN FT 18.00$ 700.00 12,600.00$ 61 CONNECT 4-INCH PVC OR PERF PE TO STORM SEWER EACH 183.00$ 4.00 732.00$ 62 15-INCH STORM SEWER PIPE LIN FT 50.00$ 500.00 25,000.00$ 63 18-INCH STORM SEWER PIPE LIN FT 55.00$ 275.00 15,125.00$ 64 21-INCH STORM SEWER PIPE LIN FT 59.00$ 120.00 7,080.00$ 65 15" RC PIPE APRON EACH 1,350.00$ 1.00 1,350.00$ 66 21" RC PIPE APRON EACH 1,400.00$ 1.00 1,400.00$ 67 STORM SEWER PIPE LINING LIN FT 75.00$ 665.00 49,875.00$ 68 CONNECT TO EXISTING STORM SEWER EACH 750.00$ 2.00 1,500.00$ 69 CONST DRAINAGE STRUCTURE DES 48-4020 EACH 2,050.00$ 8.00 16,400.00$ 70 CONST DRAINAGE STRUCTURE DES 60-4020 EACH 3,200.00$ 3.00 9,600.00$ 71 CASTING ASSEMBLY EACH 1,100.00$ 11.00 12,100.00$ 72 BMP FOR QUALITY & RATE CONTROL - INTERSECTION LS 150,000.00$ 1.00 150,000.00$ SUBTOTAL - STORM SEWER 314,012.00$ ENG. DESIGN, ADMIN, CONTINGENCY (37%)116,184$ TOTAL - STORM SEWER 430,196.44$ SANITARY SEWER STORM SEWER Page 2 of 2 APPENDIX L Preliminary Assessment Roll FreewayParkLindey's Park JohannaMarsh Lake JohannaSIEMS CTHAMLINEGLENARDEN RDA R D E N PL OA K AVE FOREST LNRIDGEWOOD RDSKILES LNL A M E T T I L N ASBURY AVE NBUSSARD CT CANNONDEN CTRIDGEWOOD CTC U M MIN G S LNPASCAL AVE NEDGEWATER AVE TILLER LNSNELLING AVE NARDEN PLSKILES LNLAMETTI CIRL A K E J O H A N N A BLVDSIEMS CTARDEN PL GLENAARDEN OAKS DRSNELLING AVE NAVE INGERSON RD AVE NCO U N T Y R O A D E W CONNELLY AVESNELLING AVE NRD EN RDG L E NAR13933653 133513571370141214313484152015781616160015941590 3168 3207 3208 32223235 3400 3411 3459 3588 3200 3263 3265 1355 3400 3420 145414351487 131413083377 3445 3213 3261 1580 3610 1505 3180 3535 3 3 9 4 1313 3369 3438 3270 1483 13263385 1468 1450 3395 3254 1401 14003517 3427 1400 3581 13203354 13143544 3413 3371 1471 3430 3421 13061370 130013861600 14011445 3455 3270 3550 3530 1433 13771353140113671431 3505 1 4 5 8 3586 3550 3434 1500 3466 1466 12943201 1399 12983331 3631 1482 3551 3628 14341535 3426 3447 13663272 3447 3484 1454 14151516 3576 35103529 1539 3454 15233500 15563568 1525 341912963508 13273436 3522 3520 1492130313193461 1535 3270.5 13781489 3582 3530 1295137313781394 1315140015531451 14071385132313851450142114853590 15043570 3623 3436 3609 3442 142914153327 1541 14753531 3564 3401 1377343032383319 3511 15411478 331114193541 3448 1404 13253 5 1 5 140813873 5 2 1 144815503437 3452 15351468 3632 3233129231703635 14173444 321015563470 3260 1484 13703435154914001423 34611611 3493 13763549131515873580 1384139213691550154814143489 3583 3440 1545 141714273475 13773568 15161429 3530 15571385140014203311 139114261613 142015741301142615641556139213771423140413993574 1 4 6 5 3558 3465 1 4 5 5 14123471 14113538 350515751563143515201406131714341405146214553312 3538 143014283511 14633544 3188138314431528131514421462143414803415 144115401569145136253641 154015363459 130913053461 14711297158415323320 1 4 7 9 3517 32401 4 7 1 3521 3505 14273620 3464 143735523 6111 6 0 5 3450 1 6 0 9 34581618 13141324 13081302 3220 1302323213221479 3271 Prepared by:City of Roseville Engineering Department Data Sources and Contacts:* Ramsey County GIS Base Map (2/27/12)* City of Roseville Engineering DepartmentFor further information regarding the contents of this map contact:City of Roseville, Engineering Department,2660 Civic Center Drive, Roseville MN DISCLAIMER:This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records,information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is tobe used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to preparethis map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purposerequiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepanciesare found please contact 651-792-7044. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21 (2000),and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees todefend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties whicharise out of the user's access or use of data provided. 0 100 200 300 400 Feet March 15, 2012 mapdoc: OldSnellingAssessments.mxd map: OldSnellingAssessments.pdf Old Snelling Avenue Rehabilitation Assessments Parcels to Assess Rehabilitation Segment City Project:Snelling Avenue North and County Road E - Street and Utility Improvements Project No.:PW-20-0100 Date:November 5, 2020 PID OWNER NAME 1 OWNER NAME 2 OWNER STREET ADDRESS CITY/STATE ZIP CODE SINGLE-FAMILY REU PEOPOSED TOTAL ASSESSMENT 343023340023 3233 SNELLING AVE N U Kurt Scholz Lorraine E Tompkins 3233 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023340022 3235 SNELLING AVE N U Kurt Scholz Lorraine E Tompkins 3233 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023320009 3261 SNELLING AVE N Spencer A Johnson Jan D Johnson 3261 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023310013 3263 SNELLING AVE N Roland E Engel, Joan P Engel Rolf R Engel, Barbara M Engel 3263 Snelling Ave N Arden Hills, MN 55112 3 $13,572 343023310001 3265 SNELLING AVE N Rolf R Engel Rev Liv Tr Barbara M Engel Rev Liv Tr 3265 Snelling Ave N Arden Hills, MN 55112 2 $9,048 343023310047 3271 SNELLING AVE N Roland Edward Engel, Martin Rudolf Engel Heidi Louise Burris 3265 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023310028 3260 SNELLING AVE N Mark H Muska Karin E Muska 3260 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023310026 3270 SNELLING AVE N Kurt A Wick Ying Tan 3270 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023310025 3270 1/2 SNELLING AVE N Seth C Kinzer -3270 1/2 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023310016 3272 SNELLING AVE N David J Clausen Barbara A Clausen 3272 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023310015 3354 SNELLING AVE N Ellen J Campbell -3354 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023230039 3369 SNELLING AVE N Jonathan Frank -3369 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023240037 3371 SNELLING AVE N Dennis M Ott Sharon C Ott 3371 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023240036 3377 SNELLING AVE N Robert H Carlson Jr Gregg S Larson 3377 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023240038 3385 SNELLING AVE N Mark A Heggestad Jill M Heggestad 3385 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023240030 3395 SNELLING AVE N Peter Dufault -3395 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023230040 3401 SNELLING AVE N Sara J Schultz Mohn -3401 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023230031 3413 SNELLING AVE N Paul B Dykstra Tr -3413 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023230030 3421 SNELLING AVE N James N Aman Paula M Aman 3421 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023230029 3427 SNELLING AVE N R David Resch Laurie J Resch 3427 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023220039 3515 SNELLING AVE N Christy L Timm Hughes Christopher P Hughes 3515 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023220038 3521 SNELLING AVE N Luzmila G Amundson Michael E Amundson 3521 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023220037 3529 SNELLING AVE N David L Webster Trustee Dianne S Wolf Trustee 3529 Snelling Ave N Arden Hills, MN 55112 1 $4,524 343023220032 3583 SNELLING AVE N Jonathan P Taylor Karla M Taylor 3583 Snelling Ave N Arden Hills, MN 55112 1 $4,524 TOTAL AREA 1 $122,148 273023330019 1525 LAKE JOHANNA BLVD Patricia A Rushman -1525 Lake Johanna Blvd Arden Hills, MN 55112 1 $4,524 273023330014 3610 SNELLING AVE N Lindey S Inc -3610 Snelling Ave N Arden Hills, MN 55112 COMM $14,335 TOTAL AREA 2 $18,859 343023310017 1399 CUMMINGS LN Emily Peterson Christopher Peterson 1399 Cummings Ln Arden Hills, MN 55112 1 $4,071 343023310018 1385 CUMMINGS LN Bhjn Llc Acr Homes Inc Mississippi 2437 Rice St and 2055 Rice St Roseville MN 55113 1 $4,071 343023310020 1377 CUMMINGS LN David A Obrien Kristine J Obrien PO Box 120385 New Brighton MN 55112 1 $4,071 343023310019 1357 CUMMINGS LN State Of Mn Trust Exempt Ramsey Co Tax Forf Land PO Box 64097 St Paul MN 55164 1 - TBD $4,071 343023310045 1355 CUMMINGS LN Christopher J Nason Vicki Lynn Nason 1355 Cummings Ln Arden Hills, MN 55112 1 $4,071 343023310024 1366 CUMMINGS LN Howard F Wallace Trustee Ruby M Wallace Trustee 17423 Lever St NE Andover MN 55304 1 $4,071 343023310023 1378 CUMMINGS LN Kao Thao James P Thao 1378 Cummings Lane Arden Hills, MN 55112 1 $4,071 343023310022 1400 CUMMINGS LN Rebecca Mitchell Scott Johnson 1400 Cummings Ln Arden Hills, MN 55112 1 $4,071 TOTAL CUMMINGS LN $32,568 PROPERTY ADDRESS Draft Assessment Roll Page 1 of 1 Page 1 of 2 AGENDA ITEM – 1F MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Council Participation and Hiring Process Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A For Council Consideration The Council may provide further direction on the Council’s role in the interview process during the recruitment process of a new employee. Background The Personnel Committee requested the City Council discuss the role of the Council during the recruitment process for new employees, specifically whether or not the Council should sit in on interviews. The City is a Plan A city, which means Council retains ultimate authority when it comes to the hiring process, although some parts are delegated to staff. The current process is staff will lay out a proposed hiring process when requesting authorization to begin the recruitment process, an example of the recent search for a Communications Coordinator is attached (see Attachment A). Typically, the Council is only involved in the interview process for Department Head level and above positions; however, the Council could pass a policy that would outline when and how Council will be involved in the interview process or Council could amend proposed authorizations to post on a case-by-case basis. The most recently approved hiring and termination policy is attached (see Attachment B); should Council want to formally amend that policy and add language regarding Council attending hiring interviews, Council should provide direction on: • What is its role in the interview? o Official scorer or just to listen Page 2 of 2 • What positions will Council be involved in interviewing? o Department Head and above, supervisory, as needed, all positions • Which member(s) of the Council will attend? o A member of the Personnel Committee, the respective liaison to that function, the Mayor Budget Impact N/A Attachment Attachment A: Example Authorization to Post for Communications Communicator Attachment B: Hiring and Termination Policy Amended 2018 DATE: August 24, 2020 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Approve Communications Coordinator Updated Job Description and Authorize Staff to Post for the Vacant Position Budgeted Amount: Estimated Amount: Funding Source: N/A N/A N/A Council Should Consider Council should consider approving the updated Communications Coordinator Job Description and authorize staff to begin the recruitment process for the vacant position. Background The current Communications Coordinator submitted their resignation with a final day of September 4, 2020. The Personnel Committee has reviewed the position and suggested the attached changes to the job description (see Attachment A). This authorization will approve the updated job description and allow staff to being the recruitment process to fill the Communications Coordinator role. Anticipated process: -Council approves authorization to begin the recruitment process -Staff posts for the position and reviews candidates -Staff reviews applications, interviews candidates, and selects finalists -Staff will add their recommendation to the consent calendar at a future meeting This position will not be brought forward to the Personnel Committee or City Council for future consideration except for final approval at a City Council meeting. Budget Impact This will not adversely affect the 2020 budget as no additional positions are being added. Attachments Attachment A: Updated Communications Coordinator Job Description CONSENT ITEM – 6F MEMORANDUM CITY OF ARDEN HILLS HIRING AND TERMINATION AUTHORITY This document will establish a process for the hiring and termination of employees and the City Administrator, Personnel Committee, and City Council’s respective roles in that process. The City of Arden Hills is organized as a “Statutory A” City, meaning all personnel decisions must be ultimately approved by the City Council. To ensure efficiency in operations and timely decision making, the City Council hereby authorizes the City Administrator to undertake the selection process and make hiring, decisions for seasonal employment positions that have been budgeted for in the current budget year, and to implement employee evaluation, discipline and/or termination decisions. All other personnel decisions must be first brought forward to the Personnel Committee and the full City Council for direction and formal approvals, unless otherwise directed by the City Council. It is expected the City Administrator will keep the Personnel Committee informed on relevant personnel issues, and will defer decisions per the Personnel Committee’s, or City Council’s, request or direction. Purpose By instituting this procedure, it will help ensure City operations continue with fewer disruptions, and aid in making sure positions are filled in a timely manner. Furthermore, it outlines the roles of the City Administrator, Personnel Committee, and City Council in the hiring, employee evaluation and termination process. Page 1 of 2 AGENDA ITEM – 1G MEMORANDUM DATE: December 21, 2020 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Accrual Payouts Upon Employee Separation Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A For Council Consideration The Council may consider giving staff further direction on refining the City’s policy surrounding accrual payments when an employee separates from the City. Background The City’s current policy surrounding the payout of accrued Paid Time Off (PTO), Flex Time, and Comp Time is that any accrued time shall be converted to cash and paid directly into an employee’s Health Care Savings Plan (HCSP); these payouts are capped at their respective maximums in the Personnel Policy at 240 hours for PTO, 40 hours for Comp Time, and 80 hours for Flex Time. The HCSP is very limited in scope and can only be used for reimbursement of medical expenses following the separation from public service. As a result, an employee leaving the City can only use their respective payouts from accrued balances for medical related expenses. This does not give the employee much flexibility in-terms of access to those dollars, and restricts access to funds if needed for other purposes. It is believed this policy was originally implemented as a tool to save the City from paying employer taxes on high leave balances. While this reason is understandable, the Council may want to consider amending its policy and allow for either a direct payment to employees of accrued balances and/or giving employees the option of a payout upon separation into a deferred compensation account (457). While this would result in employer taxes when an employee separates, the effect is not significant to the budget; for example, an employee earning $30 per hour with 100 hours of PTO accrued would be paid $3,000 (less normal taxes), and the City would be responsible for approximately $229.50 in employer taxes (note the City would be paying the $3,000 to the employee regardless, the Page 2 of 2 $229.50 is the additional employer expense). While it varies from city to city, the trend for cities is to offer some form of payout to the employee and not deposit funds into an HCSP account. A few logistics still need to be worked out as any changes to the current model need to be approved by HCSP, but if Council is supportive staff will work on getting language to Council for approval at their first meeting in January. The language, if feasible, would give employees options, for example, choosing between a payment to a deferred compensation account or a cash payout. Note, any contradicting language in the Union’s contract would supersede an update to the Personnel Policy for Union employees, but changes to the contract could be considered in 2021 as it is a negotiation year for the contract. Budget Impact Although the City would incur additional expenses, the amount incurred would not significantly impact the budget. Attachment N/A Page 1 of 1 AGENDA ITEM – 1H MEMORANDUM DATE: TO: FROM: December 21, 2020 Honorable Mayor and City Councilmembers Dave Perrault, City Administrator SUBJECT: Council Tracker Update Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider The Council should provide further direction on items presented on the Council Request Tracker. Background City Council will receive a verbal update on items the Council has previously directed staff to research and/or bring forward. Discussion N/A Budget Impact N/A Attachments N/A