HomeMy WebLinkAbout01-19-21 PTRCAPPROVAL OF AGENDA
APPROVAL OF MINUTES
November 17, 2020 Minutes
DRAFT 11 -17 -20 -PTRC MINUTES.PDF
UNFINISHED BUSINESS
Snelling Avenue South Update Memo
SNELLING AVENUE SOUTH TRAIL UPDATE MEMO.PDF
SNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT A.PDF
SNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT B.PDF
SNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT C.PDF
Mounds View High School Trail Update Memo
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE MEMO.PDF
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT A.PDF
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT B.PDF
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT C.PDF
NEW BUSINESS
Park Benches Proposal Memo
PARK BENCHES PROPOSAL MEMO.PDF
PARK BENCHES PROPOSAL ATTACHMENT A.PDF
Ice Rink And Recreation Update Memo
ICE RINK AND RECREATION UPDATE MEMO.PDF
Election Of A Committee Chair Memo
ELECTION OF A COMMITTEE CHAIR MEMO.PDF
REPORTS
NEXT MEETING
Tuesday, February 16, 2021
ADJOURN
A quorum of the City Council may be present at this
meeting.
Chair:
John Van
Valkenburg
Committee
Members:
Jill Anderson
Paul Beggin
Dan Dietz
Terry Finlay
Micah Kiernan
Marie Hinton
Suzanne McGaugh
Tim Nelson
Harold Petersen
Kristine Poelzer
Rich Straumann
Council Liaison:
David
Grant
Parks, Trails, and Recreation
Committee
January 19, 2021
6:30 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting,
strong residential neighborhoods, vital business community, well -maintained
infrastructure, fiscal soundness, and our long -standing tradition as a desirable
City in which to live, work, and play.
This meeting can be accessed remotely by joining via Zoom.
To join the Zoom meeting, click this link (or copy and paste it into a new browser):
https://us02web.zoom.us/j/82933324414?
pwd=SGNiRnhXZzlsc3JFc1N5T0I1bUhWQT09
Agenda
CALL TO ORDER
1.
2.
2.A.
Documents:
3.
3.A.
Documents:
3.B.
Documents:
4.
4.A.
Documents:
4.B.
Documents:
4.C.
Documents:
5.
6.
6.A.
APPROVAL OF AGENDAAPPROVAL OF MINUTESNovember 17, 2020 MinutesDRAFT 11 -17 -20 -PTRC MINUTES.PDFUNFINISHED BUSINESSSnelling Avenue South Update Memo
SNELLING AVENUE SOUTH TRAIL UPDATE MEMO.PDF
SNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT A.PDF
SNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT B.PDF
SNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT C.PDF
Mounds View High School Trail Update Memo
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE MEMO.PDF
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT A.PDF
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT B.PDF
MOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT C.PDF
NEW BUSINESS
Park Benches Proposal Memo
PARK BENCHES PROPOSAL MEMO.PDF
PARK BENCHES PROPOSAL ATTACHMENT A.PDF
Ice Rink And Recreation Update Memo
ICE RINK AND RECREATION UPDATE MEMO.PDF
Election Of A Committee Chair Memo
ELECTION OF A COMMITTEE CHAIR MEMO.PDF
REPORTS
NEXT MEETING
Tuesday, February 16, 2021
ADJOURN
A quorum of the City Council may be present at this
meeting.
Chair:John Van ValkenburgCommittee Members:Jill AndersonPaul BegginDan DietzTerry FinlayMicah KiernanMarie HintonSuzanne McGaughTim NelsonHarold PetersenKristine PoelzerRich StraumannCouncil Liaison:David Grant Parks, Trails, and Recreation Committee January 19, 20216:30 p.m. City Hall Address:1245 W Highway 96 Arden Hills MN 55112 Phone:651 -792 -7800 Website : www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. This meeting can be accessed remotely by joining via Zoom. To join the Zoom meeting, click this link (or copy and paste it into a new browser):https://us02web.zoom.us/j/82933324414?pwd=SGNiRnhXZzlsc3JFc1N5T0I1bUhWQT09AgendaCALL TO ORDER1.2.2.A.Documents:3.3.A.
Documents:
3.B.
Documents:
4.
4.A.
Documents:
4.B.
Documents:
4.C.
Documents:
5.
6.
6.A.
APPROVAL OF AGENDAAPPROVAL OF MINUTESNovember 17, 2020 MinutesDRAFT 11 -17 -20 -PTRC MINUTES.PDFUNFINISHED BUSINESSSnelling Avenue South Update MemoSNELLING AVENUE SOUTH TRAIL UPDATE MEMO.PDFSNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT A.PDFSNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT B.PDFSNELLING AVE SOUTH TRAIL UPDATE ATTACHMENT C.PDFMounds View High School Trail Update MemoMOUNDS VIEW HIGH SCHOOL TRAIL UPDATE MEMO.PDFMOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT A.PDFMOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT B.PDFMOUNDS VIEW HIGH SCHOOL TRAIL UPDATE ATTACHMENT C.PDFNEW BUSINESSPark Benches Proposal MemoPARK BENCHES PROPOSAL MEMO.PDFPARK BENCHES PROPOSAL ATTACHMENT A.PDFIce Rink And Recreation Update MemoICE RINK AND RECREATION UPDATE MEMO.PDFElection Of A Committee Chair MemoELECTION OF A COMMITTEE CHAIR MEMO.PDFREPORTSNEXT MEETINGTuesday, February 16, 2021ADJOURNA quorum of the City Council may be present at this
meeting.
Chair:John Van ValkenburgCommittee Members:Jill AndersonPaul BegginDan DietzTerry FinlayMicah KiernanMarie HintonSuzanne McGaughTim NelsonHarold PetersenKristine PoelzerRich StraumannCouncil Liaison:David Grant Parks, Trails, and Recreation Committee January 19, 20216:30 p.m. City Hall Address:1245 W Highway 96 Arden Hills MN 55112 Phone:651 -792 -7800 Website : www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. This meeting can be accessed remotely by joining via Zoom. To join the Zoom meeting, click this link (or copy and paste it into a new browser):https://us02web.zoom.us/j/82933324414?pwd=SGNiRnhXZzlsc3JFc1N5T0I1bUhWQT09AgendaCALL TO ORDER1.2.2.A.Documents:3.3.A.Documents:3.B.Documents:4.4.A.Documents:4.B.Documents:4.C.Documents:5.6.6.A.
CITY OF ARDEN HILLS
PARKS, TRAILS AND RECREATION COMMITTEE MEETING
TUESDAY, NOVEMBER 17, 2020, 6:30 PM
ARDEN HILLS CITY HALL
CALL MEETING TO ORDER
Chair Rich Straumann called the November 17, 2020 meeting of the Parks, Trails, and Recreation
Committee to order at 6:30 p.m.
MEMBERS PRESENT: Chair Rich Straumann, Committee Members Jill Anderson, Paul
Beggin, Terry Finlay, Marie Hinton, Tim Nelson, Dan Dietz, and John Van Valkenburg
OTHERS PRESENT: Staff Liaison Joe Vaughan and Public Works Director/City Engineer Todd
Blomstrom
ABSENT: Committee Members Nancy O’Malley, Harold Peterson, Micah Kiernan, Suzanne
McGaugh, and Kristine Poelzer, Council Liaison David Grant
1.APPROVAL OF AGENDA
MOTION: The agenda was unanimously approved by the Committee.
2.APPROVAL OF MINUTES
A.September 15, 2020 PTRC Minutes
MOTION: The minutes were approved by the Committee.
3.UNFINISHED BUSINESS
A. Recreation Program Update
Staff Liaison Vaughan stated that Staff received direction from the City Council to move forward
with a select few recreation programs. Staff developed a shortened version of the winter recreation
guide, attachment A. The five areas approved were outdoor skating and hockey, before and after
school programs, virtual programs, special event and holiday events, and adult programs. The City
Council approved moving forward with outdoor skating lessons, some virtual programs, and some
adult programs. A few families have already registered for the virtual event with Santa.
Staff Liaison Vaughan noted that warming houses will only be open to rink attendants, the public
will use picnic tables outside. Attendants will be required to wear masks when not able to socially
distance, cleaning policies will be put in place and encouraging residents to wear facial coverings
DRAFT
Parks, Trails & Recreation Committee Meeting Minutes November 17, 2020
Page 2
of some kind. There is a COVID plan prepared that will be provided to ice rink instructors and
rink attendants.
Committee Member Beggin wondered if they would be having residents sign in when they come
to use the rink.
Staff Liaison Vaughan responded that rink attendants will keep track of the number of
participants at the rink, he will look into getting names, addresses and phone numbers.
B. Building 189 Update
Chair Straumann referred back to these comments that Committee Member Beggin made at the
September 15, 2020 meeting. Mr. Beggin said it has been a long process with the first meeting
being in 1993. They are trying to provide new and unique recreational opportunities on the
property. They are discussing 12K of cross-country skiing within the Arden Hills section and
another 10-12K in the north section, and expand near Irondale to about 10K. Mountain biking has
also been looked at on those trails. Rice Creek was rerouted to its original state and canoes and
kayaks can be used on the Creek. A landing has been discussed at the beginning and end. Building
189 has been talked about being made into a trail head center with a variety of amenities/activities.
Chair Straumann said he sent an email to Ramsey County and was told the Metropolitan Council
should have the master plan on their agenda in January. He asked if Staff could find out who
would be making the presentation.
Committee Member Nelson reported that Battle Creek received about half of their funding
request, and they are waiting to hear what the money will be used for.
Chair Straumann asked about the bonding bill.
Public Works Director/City Engineer Blomstrom commented the city had submitted projects for
the State bonding bill, two were trail extensions. The trail projects didn’t make the cut for the State
bonding bill.
Public Works Director/City Engineer Blomstrom said there will be easements from the cul-de-
sac at the end of Gateway Boulevard to the edge of the tower property which will help in the
process of trail corridor extended. Ultimately a trail easement across the tower property would be
needed.
Chair Straumann said he has a commitment from State Farm to add a bench at Crepeau Nature
Preserve.
Further discussion ensued regarding other trails, possible funding and types of trail surfaces.
Benches and funding were also reviewed. A map and spreadsheet will be sent to committee
members.
Parks, Trails & Recreation Committee Meeting Minutes November 17, 2020
Page 3
4. NEW BUSINESS
A. Winter Ice Rink
Discussed as part of item 3A.
B. Chair Nomination and Committee Resignations
Discussed after Item 4C.
Chair Straumann announced that Committee member Nancy O’Malley resigned at the end of her
term.
Chair Straumann stated that he is stepping down from chair position, but will remain on the
committee.
Staff Liaison Vaughan said that according to the ordinance for the creation of the PTRC, the
Mayor, with the City Council’s approval, should appoint one member to serve as Chair.
C. Friends of the Parks and Trails St Paul & Ramsey County Donation
Staff Liaison Vaughan reported staff received a donation from the Friends of the Parks and Trails
of St. Paul & Ramsey County to purchase a tree and plant it at Valentine Park. The tree may be the
native species of our choice and probably won’t be planted until spring.
5. REPORTS
None
6. NEXT MEETING
The next PTRC Committee meeting is scheduled for Tuesday, January 19, 2021.
ADJOURNMENT
The meeting adjourned at 7:47 p.m.
Agenda Item 3-A
MEMORANDUM
DATE: January 19, 2021
TO: Parks, Trails and Recreation Committee
FROM: Joe Vaughan, Recreation Programmer
SUBJECT: Snelling Avenue South Trail Update Memo
Background
The City of Arden Hills is conducting a feasibility study for proposed street and utility
improvements along Snelling Avenue North from County Road E to Trunk Highway 51. This
study includes an investigation of design alternatives for the roadway and the potential addition
of a pedestrian trail along Snelling Avenue North. Attached is a copy of a portion of Section 3,
attachment A, of the study describing the potential trail segment south of County Road E. See
attachments B and C for trail maps and drawings.
City Council will make their final decision regarding this trail in May.
Feasibility Report Page 11
Snelling Avenue North and County Road E - Street and Utility Improvements
City Project Number PW 20-0100
3.PROPOSED IMPROVEMENTS
3.1 Street Improvements: Area 1 – Snelling Avenue North
This study included an investigation of design alternatives for the roadway and potential
addition of a pedestrian trail along Snelling Avenue North. While multiple roadway and trail
layout alternatives were initially considered as part of the study, viable design options are
governed by specific design requirements, which include the following standards.
Minnesota Rules 8820.9920: Minimum Design Standards; Rural and Suburban
undivided; New or Reconstruction Projects
Minnesota Rules 8820.9926: Minimum Design Standards; Rural and Suburban
undivided; Reconditioning Projects
Minnesota Rules 8820.9936: Minimum Design Standards; Urban; New or
Reconstruction Projects
Minnesota Rules 8820.9995: Minimum Off-Road and Shared Use Path Standards
Americans with Disabilities Act (ADA) Design Standards
It is important to note that some segments of the roadway corridor within Area 1 have
extensive vertical relief with steep slopes extending east and west from the edge of pavement.
Road improvements beyond full depth reclamation work is considered “reconstruction” by
MnDOT and triggers MN Rules 8820.9920 design requirements. Maximum in-slope grades
may be difficult to achieve and would require substantial clearing of trees and placement of
fill to widen the roadway platform in some areas, particularly along the roadway between
Skiles Lane and Lametti Lane. While there is sufficient right of way available along the
corridor, separation of the trail alignment from the edge of the roadway pavement would also
require substantial tree clearing and fill placement within areas having steep side slopes in
order to comply with ADA requirements for maximum trail grades.
Due to the standards and challenges mentioned above, two primary alternatives were
investigated as part of this study.
Alternative 1 - Full Reconstruction Plus Trail: This alternative includes the full
reconstruction of the roadway and the addition of an 8 to 10 foot wide multiuse
pedestrian/bicycle trail extending from County Road E to Highway 51. The potential trail
was considered based on the City’s 2040 comprehensive plan which identifies a proposed
regional bicycle transportation network trail extending along Snelling Avenue North from
Hamline Avenue at Highway 51 to Lake Valentine Road.
A schematic layout of the proposed roadway and trail improvements for Alternative 1 is
provided in Appendix G. The proposed road section and trail alignment were identified due
to several terrain challenges along the corridor as noted above. While the road is located in
a wide right of way, there are sections of steep grades along several sections, with side slopes
adjacent to the road in excess of 1:3 and grade differentials of 25 feet or more at certain
locations, in addition to delineated wetland boundaries along the corridor.
Attachment A
Feasibility Report Page 12
Snelling Avenue North and County Road E - Street and Utility Improvements
City Project Number PW 20-0100
Alternative 1 proposes to narrow the roadway from 40 feet to a width of 28 to 34 feet within
the center section, install curb and storm sewer, and placement of the trail alignment directly
adjacent to the west curb line in an attempt to minimize substantial tree removal, minimize
large volumes of cut and fill grading, and avoid impacts to delineated wetlands. A similar
trail alignment was used along Snelling Avenue to the north of County Road E.
The advantages of Alternate 1 include completion of a segment of regional trail and
providing a dedicated facility for pedestrian and bicycles along the road corridor currently
posted at 40 mph. Pedestrians currently walk along the 8-foot wide paved shoulder. The
disadvantages of Alternate 1 include a substantial increase in project costs, increased scope
and construction timeline for installation of curb and storm sewer, increased risk of
encountering areas of soil contamination during storm sewer installation, and use of limited
city funds compared to higher priority trail segments to the north of County Road E.
Alternative 2 - FDR Pavement Replacement (no trail): This alternative consists of
reclaiming the existing surface pavement by milling the bituminous pavement material and
blending it with the upper portion of the underlying aggregate base, commonly referred to as
full depth reclamation (FDR). Approximately 4-inches of reclaimed material would then be
removed to maintain the existing vertical profile of the road, and a new 4-inch thick
bituminous pavement section would be placed to the existing 40-feet road width, including
two 12-foot travel lines and two 8-foot wide paved shoulders. Edge line pavement markings
would be installed to delineate the pavement shoulders.
A schematic layout of the proposed roadway and trail improvements for Alternative 2 is
provided in Appendix H. The advantages of Alternate 2 include a shorter construction
timeline, lower project costs, focus of limited capital funds for trail segments north of County
Road E, and reduced risk of encountering contaminated soil conditions. The disadvantages
of Alternative 2 would include maintaining the current condition where bicyclists and
pedestrians continue to use the 8-ft wide paved shoulders without the benefit of a dedicated
multiuse trail facility south of County Road E.
Council Consideration: The City Council reviewed the two roadway alternatives described
above during two work sessions on July 20, 2020 and December 21, 2020. The Council
discussed the cost differential between the two alternatives in relation to the City’s limited
availability of capital improvement funds. The Council also discussed the higher priority
currently placed on recreational trail segments along Snelling Avenue North from County
Road E2 to Lake Valentine Road and the connection to Mounds View High School. While
not ideal, the roadway south of County Road E does have 8-foot wide shoulders to provide
some accommodation for pedestrians and bicyclist.
Feasibility Report Page 13
Snelling Avenue North and County Road E - Street and Utility Improvements
City Project Number PW 20-0100
Based on these work session discussions, the City Council requested staff to consider
additional measures that could be incorporated into the design for Alternative 2 to provide
additional safety measures for pedestrians using the west shoulder area. The following six
strategies should be further developed during the design process.
A. Lane and Shoulder Configuration: In an effort to provide additional pedestrian space
along the west side of the roadway, while maintaining the existing 40-ft total road width,
the following road section is recommended for consideration during the design under
Alternate No. 2: 8-ft wide paved east shoulder, 11-ft wide northbound lane, 11-ft wide
southbound lane, and 10-ft wide paved west shoulder. A reduction of the east shoulder
to 6-ft wide and additional widening of the west shoulder could be considered during the
design process, but good engineering judgement should be used when considering a
reduction of the east shoulder width between Skiles Lane and Lametti Lane due to the
vertical relief and steeper side slopes along the roadway.
B. Pavement Markings: Due to pedestrian use of the paved shoulder areas and the steep
terrain along portions of the roadway, the proposed design for Alternate 2 includes the
placement of White Edge Line Pavement Markings along the length of the roadway
pursuant to section 3B.6 of the Minnesota Manual on Uniform Traffic Control Devices,
including the option for “wide” solid edge line markings. Edge line markings would
assist in minimizing unnecessary driving on paved shoulders.
C. No Parking Designation: Parking restrictions along the west side of Snelling Avenue
North should be considered to minimize the occurrence of parked vehicles that would
require bicyclists and pedestrians to shift out of the shoulder and into the travel lane. The
cost of No Parking sign installation is included in the project cost estimate.
D. Shoulder Rumble Strips: Due to steeper in-slope grades along portions of the corridor
and the need to minimize vehicle lane departures, the project design should include
consideration of rectangular corrugated or sinusoidal shoulder rumble strips in
accordance with MnDOT Technical Memorandum No. 17-08-T-02. Special attention
should be given to the lateral placement and width of shoulder rumble strips during final
design to minimize noise concerns. The cost of rumble strip installation is included in
the project cost estimate for Alternative 2.
E. Speed Limit Considerations: A traffic engineering study should be conducted along the
corridor during the project design process to determine if a lower speed limit may be
justified due to design constraints and limited sight distances for driveways and street
intersections. It is possible that the results of the study could recommend a reduction in
the current posted speed limit of 40 miles per hour.
F. Speed Display Signs: The placement of speed display signs along the portion of Snelling
Avenue/Old Highway 10 north of I-694 have shown some effectiveness with improving
compliance with posted speed limits. While the installation of speed display signs should
be limited to locations meeting specific criteria, this section of Snelling Avenue North is
Feasibility Report Page 14
Snelling Avenue North and County Road E - Street and Utility Improvements
City Project Number PW 20-0100
a longer, uninterrupted roadway that tends to generate higher vehicle speeds compared
to most other local roadways within the community. The design process should closely
consider the installation of these signs. The cost of two permanently mounted speed
display signs is included in the cost estimate for Alternative 2.
3.2 Street Improvements: Area 2 – Intersection of Snelling Ave and County Road E
Section 2.3 provides a summary of the Intersection Control Evaluation (ICE) study
previously conducted for the intersection of Snelling Avenue North and County Road E. The
ICE report provides a review of alternatives considered for the intersection and
recommended construction of a single lane roundabout. A copy of the ICE report is provided
in Appendix B.
Two schematic layouts were prepared for the proposed roundabout intersection
improvements as provided in Appendix I. While both layouts are similar, there is variation
in the intersection alignment to illustrate the ability to minimize potential right of way
acquisition and the need to relocate overhead power and natural gas utilities near the
intersection. For the purposes of this feasibility report, both layouts are assumed to have the
same estimated costs as provided in Section 5.
Council Consideration: The City Council reviewed the ICE report and the proposed single
lane roundabout intersection improvements during a work session on September 21, 2020.
The Council discussed the significant changes in traffic volumes at the intersection of
Snelling Avenue and County Road E due to the COVID-19 pandemic. The Council also
discussed the potential changes to traffic volume from Bethel University, which is one of the
primary trip generators for this intersection, and concerns expressed during the public open
house meeting in October 2019 regarding the proposed roundabout. The consensus of the
City Council was to separate the potential intersection improvements into an independent
project from the Area 1 roadway improvements south of County Road E. The Council further
directed staff to work with Ramsey County to conduct additional traffic study of the
intersection after traffic patterns return to more stable condition in 2021 or 2022.
If the City proceeds with Alternative 2 for Snelling Avenue North (no trail), this study
recommends that an 8-ft wide paved pedestrian trail is eventually constructed along the west
side of Snelling Avenue between County Road E and Arden Place to provide separation of
vehicle and pedestrian traffic where the shoulder width narrows within the approach to the
County Road E intersection.
3.3 Street Improvements: Cummings Lane and Bussard Court
As mentioned in Section 2, Cummings Lane and the east 100-feet of Bussard Court are highly
deteriorated and can no longer be cost-effectively maintained. Proposed improvements for
Cummings Lane consist of reclaiming the existing pavement, shaping the generated
aggregate material to raise the center crown to improve pavement drainage and repaving the
roadway with 4-inches of bituminous pavement. The installation of curb and gutter is not
proposed along Cummings Lane. Improvements also include replacement of the storm sewer
00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109WETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWET00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109℄14.00'LANE10.00'TRAILSLOPE VARIES2.0%2.0%B618 CONCRETE CURB & GUTTER4" MIN3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS1'12.00'LANE2.0%4.0%4:18.00'SHOULDER1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIALSLOPEVARIES34.00'2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:55 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NSNELLING AVE/STH 51BITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETEAttachment B
00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118WET00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118℄14.00'LANE10.00'TRAILSLOPE VARIES2.0%2.0%B618 CONCRETE CURB & GUTTER4" MIN3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS1'12.00'LANE2.0%4.0%4:18.00'SHOULDER1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIALSLOPEVARIES34.00'2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:56 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASNELLING AVE NBUSSARD CT
LAMETTI LN
CUMMINGS
L
NLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE
00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127WETWETWETWETWETWETWETWETWET00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127℄14.00'LANE14.00'LANE28.00'FACE-FACE10.00'TRAILSLOPE VARIES2.0%2.0%2.0%SLOPE VARIESB618 CONCRETE CURB & GUTTERB618 CONCRETE CURB & GUTTER2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL1'4" MIN4" MIN3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS1'10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:58 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASNELLING AVE NGLENARDEN RDSKILES LNLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE
00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135WETWETWETWETWETWETWETWETWETWETWETWETWETWET00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135℄12.00'LANE12.00'LANE36.00'6.00'SHOULDER8.00'TRAILSLOPE VARIES2.0%2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIAL3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)TYPICAL SECTION - OPTION #1NTS4.0%4:16.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE CLASS 5 (MNDOT 3138)12" GRANULAR MATERIALSLOPEVARIESSLOPEVARIESSLOPEVARIES10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 1:59 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASKILES LNSKILES LNARDEN PLFOREST LNARDEN PLSNELLING AVE NLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE
00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145WETWETWET00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145℄12.00'LANE14.00'LANE34.00'FACE-FACE8.00'PARKING2.0%2.0%2.0%SLOPE VARIESB618 CONCRETE CURB & GUTTERB618 CONCRETE CURB & GUTTER2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)12" GRANULAR MATERIAL1'1'4" MIN4" MINTYPICAL SECTION - OPTION #1NTS8.00'TRAILSLOPE VARIES2.0%3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C6" AGGREGATE BASE CLASS 5 (MNDOT 3138)5.00'TRAIL5.0%10/7/2020Save: 10/7/2020 1:53 PM jbergerson Plot: 10/7/2020 2:00 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-1.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 1SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTASNELLING AVE NRIDGEWOOD RDCTH E
CTH
E
/
L
A
K
E
J
O
H
A
N
N
A
B
L
V
DFREEWAYPARKLEGENDWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE SIDEWALKCONCRETE DRIVEWAYBITUMINOUS TRAILBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERHEAVY DUTY CONCRETE
00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109WETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWETWET00+10000+10100+10200+10300+10400+10500+10600+10700+10800+109℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:04 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NSNELLING AVE/STH 51Attachment C
00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118WET00+10900+11000+11100+11200+11300+11400+11500+11600+11700+118℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:04 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NBUSSARD CT
LAMETTI LN
CUMMINGS
L
N
00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127WETWETWETWETWETWETWETWETWET00+11800+11900+12000+12100+12200+12300+12400+12500+12600+127℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:04 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NGLENARDEN RDSKILES LN
00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135WETWETWETWETWETWETWETWETWETWETWETWETWETWET00+12600+12700+12800+12900+13000+13100+13200+13300+13400+135℄12.00'LANE12.00'LANE40.00'8.00'SHOULDER2.0%2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)TYPICAL SECTION - OPTION #3NTS4.0%4:18.00'SHOULDER4.0%4:12.0%1.50'1.50'3" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)SLOPEVARIESSLOPEVARIES10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:05 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSKILES LNSKILES LNARDEN PLFOREST LNARDEN PLSNELLING AVE N
00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145WETWETWET00+13600+13700+13800+13900+14000+14100+14200+14300+14400+145℄12.00'LANE14.00'LANE34.00'FACE-FACE8.00'PARKINGSLOPE VARIES2.0%2.0%2.0%SLOPE VARIESB618 CONCRETE CURB & GUTTERB618 CONCRETE CURB & GUTTER2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 - SPWEA330C2" PLANT-MIXED BITUMINOUS WEARING COURSEMNDOT SPEC 2360 -SPWEB340C8" AGGREGATE BASE(GENERATED FROM FULL-DEPTH PAVEMENT RECLAMATION)1'1'4" MIN4" MINTYPICAL SECTION - OPTION #3NTS10/6/2020Save: 10/6/2020 4:02 PM jmeemken Plot: 10/6/2020 4:05 PM S:\AE\A\Arden\152489\5-final-dsgn\51-drawings\10-Civil\cad\dwg\sheet\Snelling Ave N - Alt-2.dwg0feetscale30603015
FILE NO.DATE:PHONE: 651.490.20003535 VADNAIS CENTER DRIVEST. PAUL, MN 55110-5196www.sehinc.com152489OPTION 3SNELLING AVE N IMPROVEMENTSARDEN HILLS, MINNESOTALEGENDBITUMINOUS PAVEMENTCONCRETE CURB & GUTTERCONCRETE DRIVEWAYBITUMINOUS DRIVEWAYBITUMINOUS SHOULDERWETLAND BOUNDARYWETPARCEL BOUNDARYRIGHT OF WAYSNELLING AVE NRIDGEWOOD RDCTH E
CTH
E
/
L
A
K
E
J
O
H
A
N
N
A
B
L
V
DFREEWAYPARK
Agenda Item 3-B
MEMORANDUM
DATE: January 19, 2021
TO: Parks, Trails and Recreation Committee
FROM: Joe Vaughan, Recreation Programmer
SUBJECT: Mounds View High School Trail Update Memo
Background
The City Council has recently expressed their desire to focus on completing the Mounds View
High School Trail. This trail project would be an extension of the preexisting trail on the west
side of Snelling Avenue North. The trail would extend from County E2 to Lake Valentine Road,
continuing on to the east parking lot for Mounds View High School. See all of the Attachments
for trail maps.
SNELLINGAVENCOUNTY ROAD E2ROLLING HILLS RDLAKEVIEWCTDELLVIEW AVEVALEN
TI
N
E
C
T
GLENVIEWCTCRYSTAL AVEVALENTINE AVEF A IR V I E W AV E N GRAMSIE RDVENUS AVEGLENVIEW AVELAKEVALENTINERD0500FeetÜMVHS Trail ImprovementsAttachment A
SNELLING AVE NL A K E V I E W C T
C O U N T Y R O A D E 2
LAKEVALENTINE RD
GLENVIEW AVEG
L
E
N
V
I
E
W
C
T
0 200Feet
Ü
Concrete Curb & Gutter
Existing
Proposed
Concrete Pedestrian Ramp
Bituminous Trail
Attachment B
VALE
N
TI
N
E
C
R
E
S
T
R
D VALENTINEAVEFAIRVIEWAVENLAKE VALENTINE RD0200FeetÜConcrete Curb & GutterExistingProposedConcrete Pedestrian RampBituminous TrailAttachment C
Agenda Item 4-A
MEMORANDUM
DATE: January 19, 2021
TO: Parks, Trails and Recreation Committee
FROM: Joe Vaughan, Recreation Programmer
SUBJECT: Park Benches Proposal Memo
Background
The City council recently discussed asking the Arden Hills Foundation for financial contribution
to assist in acquiring additional park benches. City staff identified four potential locations for
new benches, Attachment A, and presented them to the City Council. The following locations are
shown on the map.
1. Cummings Park north of athletic fields
2. Public trail northeast of Colleen Avenue
3. Perry Park near the dog park and playgrounds
4. Hazelnut Park along trail system
The City Council supported adding the park benches.
!(
!(
!(
!(
!(!(!(!(!(
!(
!(
!(
!(!(!(
!(!(!(!(!(
!(!(!(!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(!(!(!(
!(!(!(
!(
!(
!(
!(
!(!(
!(!(
!(!(!(
!(
!(
!(
Tony SchmidtRegional Park
Crepeau NaturePreserve
HazelnutPark
IngersonPark
FreewayPark
Tony SchmidtRegional Park
SampsonPark
Lindey's Park
CharlesPerry Park
Tony SchmidtRegional Park
ValentinePark
FloralPark
Royal HillsPark CummingsPark
Arden ManorPark
JohannaMarsh
Arden OaksPark
CommunityGardens
Lake Josephine
Lake Johanna
ValentineLake
RoundLake Karth LakeSun FishLake
Bench Locations 0 1,500Feet
Ü Document Path: P:\PR&PW\Parks\Asset Management Inventory\Park-Trail bench locations.mxd!(
!(
!(!(
!(
!(
Attachment A
Agenda Item 4-B
MEMORANDUM
DATE: January 19, 2021
TO: Parks, Trails and Recreation Committee
FROM: Joe Vaughan, Recreation Programmer
SUBJECT: Ice Rink and Recreation Update Memo
Background
The City ice rinks officially opened to the public on January 2, 2021. The warming houses
remain closed to the public due to COVID-19. City staff has received positive feedback from
many residents and the community as a whole. The ice rinks have been very busy since they
opened. While a rink attendant is on site, the rinks are averaging around 20-30 skaters per hour.
The City is not conducting ice rink reservations or warming house rentals this winter season.
The City offered two Holiday events, Letters from Santa and a Virtual Santa event, during
December 2020. Both programs were received well by residents. This was the first year the City
has conducted a Virtual Santa event. There were around 10 kids who participated in the event.
The City has also begun running the monthly Foot Care Clinic for adults at City Hall and skating
lessons at Cummings Park.
Agenda Item 4-C
MEMORANDUM
DATE: January 19, 2021
TO: Parks, Trails and Recreation Committee
FROM: Joe Vaughan, Recreation Programmer
SUBJECT: Election of a Committee Chair Memo
Background
In December of 2020, Rich Straumann stepped down as chair of the Parks, Trails and Recreation
Committee. At the City Council meeting on January 11, 2021, the City Council approved the
appointment of John Van Valkenburg as the new chair of the Parks, Trails and Recreation
Committee. The newly appointed chair’s term expires December 31, 2021.