HomeMy WebLinkAbout03-22-21-R Mayor: Address:
David Grant 1245 W Highway 96
Arden Hills MN 55112
Councilmembers: ARQEN HILLS Phone:
Brenda Holden 651-792-7800
Fran Holmes Regular City Council
Dave McClung Agenda Website;
Steve Scott March 22, 2021 www.cityofardenhills.org
7:00 p.m.
City Hall
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well-maintained infrastructure, fiscal soundness, and our
long-standing tradition as a desirable City in which to live, work, and play.
This meeting can be accessed remotely by joining via Zoom
To join the Zoom Meeting via your computer, click this link (or copy and paste it
into anew browser): https://us02weob.zoom.us/j/87940862485
This meeting will be streamed live on local Cable Channel 16 and available for playback on our
website.
CALL TO ORDER
1. APPROVAL OF AGENDA
2. PUBLIC INQUIRIES/INFORMATIONAL
This is an opportunity for citizens to bring to the Council's attention any items not
currently on the agenda which are relevant to the City. In addressing the Council, you
must first state your name and address for the record. To allow adequate time for each
person wishing to address the Council, speakers must limit their comments to three
(3) minutes. Written documents may be distributed to the Council prior to the meeting
to allow a more timely presentation. Speakers should not use obscene, profane, or
threatening language, or make personal attacks. Matters of litigation involving the City
shall not be discussed during Public Inquiry by citizens or Council. The Council may
not respond to speaker comments, engage in a debate, or take any action on the
issues raised by citizens, but may direct City staff to research or follow up on an
issue, if desired by Council. If Council directs further review by staff, the results of that
review will be presented at a following regular Council meeting.
3. RESPONSE TO PUBLIC INQUIRIES
4. PUBLIC PRESENTATIONS
4.A. St. Paul Regional Water Services Presentation
St. Paul Regional Water Services
Documents:
MEMO.PDF
ATTACHMENT A.PDF
5. STAFF COMMENTS
5.A. COVID-19 Update
Dave Perrault, City Administrator
Documents:
MEMO.PDF
6. APPROVAL OF MINUTES
6.A. March 8, 2021 Special City Council Executive Session (Closed)
Documents:
03-08-21-SEC.PDF
6.B. March 8, 2021 Regular City Council
Documents:
03-08-21-R.PDF
7. CONSENT CALENDAR
Those items listed under the Consent Calendar are considered to be routine by the
City Council and will be enacted by one motion under a Consent Calendar format.
There will be no separate discussion of these items, unless a Councilmember so
requests, in which event, the item will be removed from the general order of business
and considered separately in its normal sequence on the agenda.
7.A. Motion To Approve Claims And Payroll
Gayle Bauman, Finance Director
Pang Silseth, Accounting Analyst
Documents:
MEMO.PDF
7.B. Motion To Approve City Administrator Three-Year Performance Evaluation
Julie Hanson, City Clerk
Documents:
MEMO.PDF
7.C. Motion To Approve Resolution 2021-015 Recommending The City Of Coon Rapids
Award The 2021 Street Maintenance Program
David Swearingen, Interim Public Works Director
Documents:
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
7.D. Motion To Approve Proposal For Construction Materials Testing Services With
Braun Intertec- 2021 PMP Street& Utility Improvements
David Swearingen, Interim Public Works Director
Documents:
MEMO.PDF
ATTACHMENT A.PDF
8. PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
9. PUBLIC HEARINGS
9.A. Quarterly Special Assessments For Delinquent Utilities
Dave Perrault, City Administrator
Documents:
MEMO.PDF
10. NEW BUSINESS
10.A. Resolution 2021-016 Adopting And Confirming Quarterly Special Assessments For
Delinquent Utilities
Dave Perrault, City Administrator
Documents:
MEMO.PDF
ATTACHMENT A.PDF
10.B. Request For Proposals (RFP) For Preparation Of A Feasibility Report- Arden
Oaks Street Improvements Project
David Swearingen, Interim Public Works Director
Documents:
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
11. UNFINISHED BUSINESS
12. COUNCIL/STAFF COMMENTS
ADJOURN
PUBLIC PRESENTATIONS—4A
,fi` DEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
FROM: Dave Perrault, City Administrator
SUBJECT: St. Paul Regional Water Services Presentation
Budgeted Amount: Actual Amount: Funding Source:
Background/Discussion
Representatives from St. Paul Regional Water Services will provide a presentation at the March
22, 2021 regular Council meeting regarding their McCarrons Treatment Plant Project.
Attachments
Attachment A: Presentation from Saint Paul Regional Water
Page 1 of 1
1
H
4 U a i
a
a
� a
e
r
IN
44
04
N
e
r
f
b
.rr
J If
7 r G
o
�1
� V V�fi
IV
Ln
lI I I
cn
i
4.1 �
O cB
O �
N OLn
cn m Ol •i
O r-I cB
L Ol
W
4— j 4— j Z cn N —
C6 E cD
— x
_ :3
^ _0Ln
4--j M N
c4-Ji� ate--+ - � O
O 4- O Q
O O .— � —
E U N a a--+
L-�
:3 O O O N
4—J >-
U C� N -se +� U � +
U
Q) 0 m
uco < LT
N �
ca �
�O N N
0
O
Q iJ ca Q iJ
Q - Q c +-+
N v v O 4- c
i O N
> > > E i N >
U V) O O m N v 0 N
i i i
coO Q Q c c Q i
k
L
N
Imo,
O
z
� _ f
vk
n M
p m nw x.
... �. y,
w
w m .
mm1°^
w
:w-. _n. �" � ✓P Wow .J'm .
I
ar
4r 5
41
�illl� �1k °c 1 a"r
O O
U
O
M � �'
N Q dJ
X O 4--J >
O0 �O
C6 Q O -0 s
Q +_+ 'XOJdJ
c; _O 3 O
u 1,4
_� (1) O
Q Q O 4-
Q� DC Q Q Q
•V)
Ln co
O :3
07
co
4-1 _0
Q �
a�
CO
V a� �
V
E m E w
•
a
u
U
N
O
co
co
C s
O ;
N
C >
N •�
� Q C
N � Q
Q X
N
• c
O
N � �
a� N
c o
+�
• • a a-0i N Ln
m i i ,��
o �*
4, 0
4' °}'
•�' O Ql Q ° 3 �;
N (V M M ° E � U 4.1
4-1
U U m a m ON
y�
N 4-1
> m
O O
rl (V M
N N N (V k
• O O O O °' N
(V N N (V z O
O
V Ln
N L L a--+ L
•L Q a) a �0 N N O
0) � b° CNN 'JEE
a o00 � - a
U 4J
Imo
V ua o � � � � o � = 0
^ v O m UA > p N L N N > 4A
4J = N f6 f6 U >. L N U
Ef6 4J
fL6 U • • Q a + ate-+
`. - = �<- p mac,., �"•' '�. �.I 't
�.a
:4
'�.•'•' �. .ate,..
•fin ~�� �.4 •`� • •• . ' fit•,•Ya if
y
(Z
STAFF COMMENTS—5A
,fi` DEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
FROM: Dave Perrault, City Administrator
SUBJECT: COVID-19 Update
Budgeted Amount: Actual Amount: Funding Source:
A verbal update will be provided at the City Council meeting.
Page 1 of 1
DRAFT ,
,-AVEN HILLS
Approved: March 22, 2021
CITY OF ARDEN HILLS,MINNESOTA
SPECIAL CITY COUNCIL EXECUTIVE SESSION
(CLOSED) MARCH 8,2021
5:45 P.M. -ARDEN HILLS CITY HALL
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor Grant called to order the Special City
Council Executive Session (Closed) at 5:45 p.m.
Note: On March 20, 2020, the Mayor signed a determination allowing Councilmembers to
participate in City Council meetings via telephone pursuant to State Statute 13D.021
Present via Telephone: Mayor David Grant, Councilmembers Brenda Holden, Fran
Holmes, Dave McClung and Steve Scott
Absent: None
Also present: City Clerk Julie Hanson (until 6:30 pm) and City Administrator Dave
Perrault(after 6:30 pm); via telephone: Lisa Sorensen, Sorensen Consulting
1. AGENDA ITEMS
A. City Administrator Performance Evaluation (Closed per Minn. Stat. 13D.05,
Subd. 3(a))
Lisa Sorensen of Sorensen Consulting conducted the three year performance review of City
Administrator Dave Perrault.
ADJOURN
Mayor Grant adjourned the Special City Council Executive Session (Closed) at 6:55 p.m.
Julie Hanson David Grant
City Clerk Mayor
DRAFT
I
--zSRZEN HILLS
Approved: March 22, 2021
CITY OF ARDEN HILLS,MINNESOTA
REGULAR CITY COUNCIL MEETING
MARCH 8,2021
7:00 P.M. -ARDEN HILLS CITY COUNCIL CHAMBERS
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor David Grant called to order the regular City
Council meeting at 7:00 p.m.
Note: On March 20, 2020 the Mayor signed a determination allowing Councilmembers to
participate in City Council meetings via telephone pursuant to State Statute 13D.021
Present: Mayor David Grant, Councilmembers Brenda Holden, Fran Holmes, Dave
McClung and Steve Scott
Absent: None
Also present: City Administrator Dave Perrault; Interim Public Works Director David
Swearingen; Finance Director Gayle Bauman; City Clerk Julie Hanson; Planning
Consultant Corrin Bemis, Bolton and Menk; and Engineering Consultant Nick Amatuccio,
Bolton & Menk
1. APPROVAL OF AGENDA
Councilmember Holmes requested Item 7F be pulled from the Consent Agenda for discussion as
Item 8A.
MOTION: Councilmember Holden moved and Councilmember Holmes seconded a
motion to approve the meeting agenda as amended. A roll call vote was taken.
The motion carried unanimously (5-0).
2. PUBLIC INQUIRIESANFORMATIONAL
David Brown, 1292 Winridge Drive, explained he lives near Boston Scientific. He noted he sent
a letter to the City regarding his concerns regarding Boston Scientific. He stated he wanted this
project to be a win-win but wanted to better understand how the process works and what the
approval timeline would be. He questioned if the neighbors could have a conversation with
Boston Scientific in order to address their concerns.
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 2
City Administrator Perrault explained staff had received Mr. Brown's letter and was in contact
with Mr. Mills, who sent another letter to the City Council. He reported the next step for Boston
Scientific would be to complete a planning application to the City and noted Boston Scientific
would be coming before the Planning Commission on April 7, 2021. He indicated it would be up
to Boston Scientific to hold a neighborhood meeting to address the neighbor's concerns.
Mr. Brown asked if the Planning Commission meeting would be open to the public.
City Administrator Perrault reported this meeting would be open to the public. Further
discussion ensued regarding the process that would be followed to review and approve the Boston
Scientific request.
Mr. Brown commented he would be interested in Boston Scientific holding a meeting with the
neighbors prior to the April 7, 2021 Planning Commission meeting.
3. RESPONSE TO PUBLIC INQUIRIES
None.
4. PUBLIC PRESENTATIONS
A. NineNorth (Formerly CTV North Suburbs)Update
Dana Healy, NineNorth Executive Director, thanked the Council for their time. She introduced
herself and NineNorth to the City Council noting NineNorth produces community focused digital
media to educate and engage the public. She commented on how the space at NineNorth had been
redesigned to focus on its missions. She described the services provided by NineNorth which
included meeting coverage, web streaming, video production, social media coordination, cable
playback and virtual events. She discussed how NineNorth was growing its social media presence.
She commented further on how the pandemic stretched her cities and how NineNorth worked to
provide access to hardware, software, expertise and content. She stated moving forward she would
work to maximize efforts on behalf of Arden Hills which included quarterly reports and
neighborhood networks, be a guest on Cities Speak, sign up for the e-blast, and to identify other
video opportunities on behalf of the community. She thanked the Council for their time and
encouraged the City Council to review NineNorth's annual report.
Councilmember Scott thanked the NineNorth technical team for working so diligently to move
the City to Zoom meetings in a timely manner in 2020. He also thanked NineNorth for
completing a video special on the Public Works plow crew.
Councilmember Holmes requested further information regarding the audit that was recently
completed for NineNorth.
Ms. Healy discussed the recent audit and explained this occurred every seven years and noted the
audit takes approximately 18 months to complete. She noted Arden Hills would be receiving a
check from the findings before the end of March. She commented further on how PEG fees have
been reduced by 40% over the past five years and how this led to a shift in services provided by
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 3
NineNorth. She described how she was working to create new revenue streams in order to make
NineNorth more self-sufficient.
Mayor Grant asked if there was a timeline in place for the name change.
Ms. Healy described how she was working to get all social media outlets migrated from CTV to
NineNorth. She explained she has petitioned Facebook five times requesting the name change.
5. STAFF COMMENTS
A. COVID-19 Update
City Administrator Perrault provided the Council with an update on how the City was
responding to COVID-19. He encouraged residents to visit the City's website for the most current
and up to date information regarding COVID-19. He reported the Minnesota Department of
Health and CDC also had websites with current guidelines and recommendations. He explained
the City of Arden Hills remains in a peacetime state of emergency and City Hall will remain
closed until further notice. He indicated City staff remains operational and can be reached via
phone or email. He encouraged residents to monitor the rollout of the vaccine on the State of
Minnesota's website. He also noted that the Federal Government was considering another round
of stimulus funding, which would have implications for the City and its residents.
6. APPROVAL OF MINUTES
A. February 8, 2021, Special City Council Executive Session (Closed)
B. February 8, 2021, Regular City Council
C. February 16, 2021, City Council Work Session
D. February 22, 2021, Special City Council Executive Session (Closed)
E. February 22, 2021, Regular City Council
MOTION: Councilmember Holden moved and Councilmember Holmes seconded a
motion to approve the February 8, 2021, Special City Council Executive
Session (Closed) meeting minutes, February 8, 2021 Regular City Council meeting minutes, February 16, 2021, City Council Work Session meeting
minutes; February 22, 2021, Special City Council Executive Session (Closed)
meeting minutes; and February 22, 2021, Regular City Council meeting
minutes as presented. A roll call vote was taken. The motion carried
unanimously(5-0).
7. CONSENT CALENDAR
A. Motion to Approve Consent Agenda Item - Claims and Payroll
B. Motion to Approve Resolution 2021-012 Appointing Emily Rousseau to the
Finance Planning and Analysis Committee (FPAC)
C. Motion to Approve Payment No. 3 to Air Express, Inc. — City Hall HVAC
Replacement Project
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 4
D. Motion to Approve Professional Services Amendment with Bolton & Menk—2021
PMP Street and Utility Improvement Project
E. Motion to Approve Second Amendment to Site Use Lease Agreement with AT&T
(North Water Tower— 1221 Cummings Park Drive)
MOTION: Councilmember Holden moved and Councilmember Holmes seconded a
motion to approve the Consent Calendar as amended removing Item 7F and
to authorize execution of all necessary documents contained therein. A roll
call vote was taken. The motion carried unanimously (5-0).
8. PULLED CONSENT ITEMS
A. Motion to Approve Resolution 2021-014 Regarding Support of Job Creation
Fund Application in Connection with Boston Scientific Corporation
Councilmember Holmes stated the Council has not received a presentation on this item and for
this reason she would like a presentation on this item.
City Administrator Perrault explained Boston Scientific Corporation proposes to construct an
expansion of their manufacturing facility at Building 14, in the northwest corner of the Arden
Hills campus. The purpose of the facility is the development and production of lithium batteries
for use in medical devices. The primary space in the facility is a 'dry room', a space maintained at
less than 1% relative humidity, which is required for handling lithium. Ancillary functions in the
addition include office and conference space. The proposed expansion is expected generate 150
new jobs over the next three years.
City Administrator Perrault reported to assist with the funding of the proposed addition to
Building 14, Boston Scientific is applying to the Minnesota Department of Employment and
Economic Development's Job Creation Fund. The JCF provides financial incentives to new and
expanding businesses that meet certain job creation and capital investment targets. Companies
deemed eligible to participate may receive up to $1 million for creating or retaining high-paying
jobs and for constructing or renovating facilities or making other property improvements. In some
cases, companies may receive awards of up to $2 million.
City Administrator Perrault stated business applicants for the Job Creation Fund must apply
through the city. To be eligible for funding, DEED requires applicants obtain a resolution of
support approved by the City Council.
City Administrator Perrault explained this is one step in assisting the applicant with obtaining
funding for the project. Staff commented further on the Findings of Fact and the approval
timeline.
Planning Consultant Corrin Bemis reported adoption of the resolution of support does not
obligate the City to approve development plans. It also does not obligate the City to provide any
financial incentives now or in the future.
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 5
Councilmember Holmes stated she wanted the specific findings within this Resolution made
known to the public. She also wanted residents to understand that the Boston Scientific project
was not being approved, but rather their request for a DEED grant.
Councilmember Holden expressed concern that Boston Scientific was not in attendance at this
meeting, given the fact this request was being considered. She stated she did not feel comfortable
supporting this request until her questions were answered by Boston Scientific regarding Building
14. She suggested action on this item be tabled to a future meeting, or Special City Council
meeting.
Mayor Grant asked what the timeline was for submission of this item.
City Administrator Perrault discussed the process followed by DEED and understood their
review and approval took four to six weeks to complete. He commented he was uncertain when
the application was due to DEED. He explained he could reach out to Boston Scientific to see
when they needed this item approved or if a delay was possible.
Mayor Grant stated he would like to see Boston Scientific invited to the Council work session
scheduled for March 15, 2021.
Councilmember Holmes explained this would mean the matter would not be approved until
March 22, 2021.
Mayor Grant reported a Special City Council meeting could be held after the work session on
March 15, 2021 to approve the Boston Scientific item.
Councilmember Holmes stated she believed it was important for the City Council to discuss this
request prior to the item going to the Planning Commission on April 7, 2021.
Mayor Grant agreed and explained he would work with the City Administrator to adjust the
March 15, 2021 work session agenda and call for a special meeting following the work session.
MOTION: Councilmember Holmes moved and Councilmember Holden seconded a
motion to table action on the Job Creation Fund Application in Connection
with Boston Scientific Corporation to the March 15, 2021 Special City
Council meeting. A roll call vote was taken. The motion carried (5-0).
9. PUBLIC HEARINGS
None.
10. NEW BUSINESS
A. Resolution 2021-013 Declaring Costs to be Assessed; Ordering the
Preparation of Proposed Assessments and Calling for a Public Hearing on
Proposed Assessments —2021 PMP Street and Utility Improvements Project
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 6
Nick Amatuccio, Bolton & Menk, explained on January 25, 2021, the City Council approved
plans and specifications and ordered advertisement for bids for the 2021 PMP Street and Utility
Improvement Project located in the Hazelnut Park residential neighborhood. Bids were opened on
February 24, 2021 after receiving 11 bids for the project. The five lowest bids were reviewed with
the Council.
Mr. Amatuccio reported the low bid of $2,704,412.10, received from C&L Excavating, Inc.,
(C&L) compares favorably with the construction engineer's estimate which is $3,234,599.50.
Further analysis of the low bid; adding overhead and dividing it into the cost for the
reconstruction and reclamation project areas results in the following street project costs:
• $1,110,790.22 Total Project Cost for the Reconstruction Streets (Glenpaul and east Jerrold)
• $293,723.19 Total Project Cost for the Reclamation Streets (Edgewater and west Jerrold)
Mr. Amatuccio commented each of these total project costs were then analyzed for the assessable
cost which as described in the City's Assessment Policy is half of the street project cost. The
results of this analysis are as follows:
• Reconstruction Assessment Rate of$6,942.44 per unit as compared to the Feasibility Report
estimate of$8,107.00.
• Reclamation Assessment Rate of $2,532.10 per unit as compared to the Feasibility Report
estimate of$2,984.00.
Mr. Amatuccio stated staff recommends setting the interest rate at 2% over the City's bond
interest rate which is approximately 1.15%, resulting in an assessment interest rate of 3.15%. The
project timeline was reviewed with the Council. Staff commented further on the assessment rates
for the project and it was noted the proposed resolution is consistent with this recommended
action.
Councilmember Holden questioned if the City has worked with C&L in the past.
Interim Public Works Director Swearingen explained he received positive feedback when
asking another city about C&L and the quality of their work.
Mayor Grant asked what city provided this feedback.
Interim Public Works Director Swearingen stated this feedback came from the city of
Zimmerman.
Mayor Grant requested staff reach out to other cities in order to receive additional feedback
regarding C&L.
Councilmember Scott indicated he supported the Resolution.
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 7
MOTION: Councilmember Holden moved and Councilmember Holmes seconded a
motion to adopt Resolution #2021-013 — Declaring Costs to be Assessed;
Ordering the Preparation of Proposed Assessments and Calling for a Public
Hearing on Proposed Assessments for the 2021 PMP Street and Utility
Improvements Proiect.A roll call vote was taken. The motion carried (5-0).
11. UNFINISHED BUSINESS
None.
12. COUNCIL COMMENTS
Councilmember Scott congratulated Emily Rosseau on her appointment to FPAC.
Councilmember Scott stated the Scoops for Troops event was held virtually in 2020 and this
organization was struggling to find new leadership and an event has yet to be planned for 2021.
Councilmember McClung explained he received a letter from an Arden Hills resident regarding
affordable housing. He requested the Council discuss this topic at a future worksession meeting.
Councilmember Holmes reported March 19 is the last day applicants apply for the City Planner
position. She recommended the Council pin down participation in the interviews at the March 15
work session.
Councilmember Holmes stated February 14, 1951 was the beginning of Arden Hills. She
explained Arden Hills was celebrating its 70th anniversary and thanked the Communications
Coordinator for putting an article in the recent newsletter and on the City's website.
Councilmember Holmes commented the front desk folks are starting to get calls regarding
COVID and how the City would be managing door to door solicitors, garage sales,picnic shelters,
etc. for this summer. She suggested this topic be placed on the March 15, 2021 work session for
further discussion.
Councilmember Holden thanked the Mayor for putting Boston Scientific on the next
worksession meeting.
Councilmember Holden explained the City would be having a 25% water increase and
encouraged residents to read the recent article in the St. Paul paper to better understand why this
was occurring.
Councilmember Holden asked if the sewer lining was occurring prior to the PMP project.
Interim Public Works Director Swearingen explained the sewer lining work was part of the
PMP project.
ARDEN HILLS CITY COUNCIL—MARCH 8, 2021 8
Councilmember Holden reported the Arden Hills Shoreview Rotary was holding a human
trafficking presentation on April 15, 2021 at 7:00 p.m. She indicated additional information on
this event was posted on the City's website.
Councilmember Holden stated she would like the Council to receive updates from the
committees and Council liaisons.
Mayor Grant explained he attended a meeting with the North Metro Mayors and stated he
learned about the potential stimulus package that the City, State and residents of Arden Hills may
be receiving.
Mayor Grant commented on the committee assignments. He addressed a letter that was sent to
the Council from a PTRC member and stated he understood that residents were advocating for
trails. He stated he encouraged the PTRC to prioritize trail improvements and this would be done
at their next meeting. He commented he had a conversation with the PTRC Chair and noted all
future letters from the PTRC would be sent from the Chair.
Mayor Grant requested the liaison to the Fire Board provide the Council with an update.
Councilmember McClung stated he had nothing to report at this time. He explained it was his
understanding the Fire Chief would be meeting with the State representative in March.
ADJOURN
MOTION: Councilmember Holden moved and Councilmember Holmes seconded a
motion to adiourn. A roll call vote was taken. The motion carried
unanimously(5-0).
Mayor Grant adjourned the Regular City Council Meeting at 8:31 p.m.
Julie Hanson David Grant
City Clerk Mayor
CONSENT ITEM 7A
,-iIZEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Gayle Bauman, Finance Director
Pang Silseth, Accounting Analyst
SUBJECT:
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
A. Approve Claims and Payroll
or
B. Reject Claims and Payroll
Background
Payroll is processed biweekly and accounts payable is processed weekly.
Budget Impact
NA
Attachments
2021 Payroll #6 ... ................................................................... $86,212.06
Total Payroll $86,212.06
Paid Claims--- 2/27/2021 through 03/12/2021
(Check Nos. 49943-49967 and ACH Checks) .................. .................. $456,975.94
Total Accounts Payable $456,975.94
Total Claims $543,188.00
CITY OF ARDEN HILLS
PAYROLL#6
CHECKS DATED: 03/19/21
Biweekly: 02/27/21 - 03/12/21
EMPLOYEE DEDUCTIONS AMT. CITY BENEFIT Payment Method
FIT 1 5,999.561 EFT
SIT 1 2,713.58 EFT
FICA Oasdi 4,101.69 4,101.69 EFT
FICA Medicare 959.29 959.29 EFT
TOTAL TAXES 1 13,774.121 5,060.98
Health Premium 1,368.38 (512.04) A/P Check"
Dental Premium 193.02 48.95 A/P Check"
FSA Health Care Reimb. 0.00 A/P Check"
FSA Dependent Care Reimb. 0.00 A/P Check"
TOTAL FLEXIBLE SPENDING 1 1,561.40 (560.99)
HSA Health Saving, 498.33 0.00
Health Care Savings Plan-Retirement 7,532.55 EFT
Health Care Savings Plan-2% 402.65 EFT
Health Care Savings Pla11-4% 458.34 EFT
TOTAL HEALTH SAVINGS 1 8,891.871 0.00
PERA 4,023.18 4,642.12 EFT
1CMA 2,407.71 409.50 EFT
Central Pension Fund-Union 614.40 A/P Check"
MN State Retirement System 750.00 EFT
TOTAL RETIREMENT 1 7,795.291 5,051.62
IUOE 49 Dues Union 140.00 A/P Check"
LTD/STD Insurance 0.00 A/P Check"
PERA Life Insurance 32.00 A/P Check"
Life/Addl/Dep,Life 77.94 0.00 A/P Check"
Life/Addl non-tax 28.20 A/P Check"
UNUM 1 19.51 A/P Check"
AFLAC 1 22.761 EFT
TOTAL VOLUNTARY 1 320.411 0.00
Total Employee Deductions 32,343.09
Net Payroll 0.00
Direct Deposit 44,317.36 EFT
Gross Payroll Tie-Out 76,660.45
Plus City Paid Benefit 9,551.61
TOTAL PAYROLL COST 1 86,212.06
FICA TIE-OUT
Gross Payroll 76,660.45
Less Total FSA 1,561.40
Less Total H.SA 8,891.87
Less Voluntary Ins 50.96
Net P/R Subject to FICA 66,156.22
FICA Oasdi 6.20% 4,101.69
FICA Medicare 1.45% 959.29
Note:Federal and State Payroll Tax obligations are satisfied by means of utilizing the US Bank Easy Tax
Deposit Service. Transfers are typically made up to two days after the payroll date.
*A/P Checks can be found on the ACCOUNTSPAYABLE Check Approval report.
Checks may be paid this week or the following week.
Accounts Payable
Checks by Date - Detail by Check Date
User: Pang.Silseth
Printed: 3/15/2021 3:22 PM ----A DEN HiiLLs
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
ACH ACH001 US BANK 02/28/2021
BAUMG22021 WILLIAMS SCOTSMAN RPO-Hazelnut Park-J 582.00
BAUMG22021 MNGFOA Membership 70.00
BEEBT22021 MENARDS BLAINE-Perry Park Supplies 71.13
CHRIM22021 CHETS SHOES-Supplies 11.83
CHRIM22021 RED WING SHOES-Clothing Allowance 87.26
CHRIM22021 CHETS SHOES-Clothing Allowance 76.24
FRIDJ22021 AMZN MKTP US*V39GAOQE3-Supplies 22.98
FRIDJ22021 AMERICAN PUBLIC WORKS-Training Materi 110.10
FRIDJ22021 AMZN MKTP US*C29PS3GE3-Camera#8543] 69.99
FRIDJ22021 THE HOME DEPOT 2808-Table Saw 375.26
FRIDJ22021 CARHARTT-Clothing Allowance 119.97
FRIDJ22021 SHERWIN WILLIAMS-Perry Park Painting Sul 198.30
FRIDJ22021 U OF M CONTLEARNING-Training 145.00
FRIDJ22021 THE HOME DEPOT 2828-Supplies 435.12
FRIDJ22021 AMZN MKTP US*5G7DJ5D43-Phone Cases 41.38
FRIDJ22021 THE UPS STORE#2111-Mailing 40.27
GEBAM22021 THE HOME DEPOT-Perry Park Supplies 71.47
GEBAM22021 RED WING SHOES-Clothing Allowance 8.24
HANSJ22021 2021 RCLLG Membership Renewal 550.00
HANSJ22021 SECRETARY OF STATE-Notary Renewal 120.00
HANSJ22021 THE STAR TRIBUNE Subscription 55.77
MEKAT22021 APPLE.COM/BILL-ICloud Storage 0.99
MIKAT22021 FLEET FARM 3100-Parts 91.00
MEKAT22021 MENARDS BLAINE-Supplies 21.81
MEK AT22021 CARHARTT-Safety Jackets 299.98
MEK AT22021 POLLUTION CONTROL AGENCY-Training 23.00
MIKAT22021 CARHARTT-Safety Jackets 479.97
MROSM22021 SQ*TECH DUMP-Christmas Light Recycling 31.60
MROSM22021 SQ*TECH DUMP-Christmas Light Recycling 101.00
MROSM22021 SQ*TECH DUMP-Christmas Light Recycling 54.00
MROSM22021 SENSIBLE LAND USE COALITI-Training 20.00
MROSM22021 SQ*TECH DUMP-Christmas Light Recycling -29.80
MROSM22021 SQ*TECH DUMP-Christmas Light Recycling 16.80
WARDR22021 INTL CODE COUNCIL-Training Registration 100.00
WARDR22021 INTL CODE COUNCIL-Training Registration 320.00
WARDR22021 INTL CODE COUNCIL-Training Registration 200.00
Total for this ACH Check for Vendor ACH001: 4,992.66
ACH ACH002 AFLAC 02/28/2021
497175 Insurance Premiums-Feb 2021 45.52
Total for this ACH Check for Vendor ACH002: 45.52
ACH ACH003 PITNEY BOWES INC 02/28/2021
1242021 Jan Postage-fee 19.99
1242021 Dec Postage-Newsletter 739.37
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 1
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
Total for this ACH Check for Vendor ACH003: 759.36
ACH ACH005 MINNESOTA REVENUE-SALES&USE 02/28/2021
012021 January Sales/Use Tax -0.60
012021 January Sales/Use Tax 11,451.60
Total for this ACH Check for Vendor ACH005: 11,451.00
Total for 2/28/2021: 17,248.54
ACH 0192 GRAINGER INC 03/05/2021
9813828457 Supplies 77.04
9819340192 Supplies 12.79
9819340200 Charger and Supplies 304.61
9819340218 Supplies 84.18
Total for this ACH Check for Vendor 0192: 478.62
ACH 0327 STAPLES INC 03/05/2021
3469452788 Supplies 38.37
3469452789 Supplies 15.58
3469452790 Supplies 9.78
3469452790 Supplies 51.18
3469452791 Supplies 5.29
Total for this ACH Check for Vendor 0327: 120.20
ACH 0382 ICMA RETIREMENT TRUST- 106944 03/05/2021
PR 21-05 PR Batch 00101.03.2021 ICMA Employee Perce PR Batch 00101.03.2021 ICM 354.90
PR 21-05 PR Batch 00101.03.2021 ICMA Employer Perce PR Batch 00101.03.2021 ICM 409.50
Total for this ACH Check for Vendor 0382: 764.40
ACH 0387 ICMA RETIREMENT TRUST 9302482 03/05/2021
PR 21-05 PR Batch 00101.03.2021 ICMA Employee Perce PR Batch 00101.03.2021 ICM 241.90
PR 21-05 PR Batch 00101.03.2021 ICMA Employee Dedu PR Batch 00101.03.2021 ICM 1,811.54
Total for this ACH Check for Vendor 0387: 2,053.44
ACH 0761 ELECTRIC PUMP INC 03/05/2021
0070344-IN Repair LS#11 567.15
Total for this ACH Check for Vendor 0761: 567.15
ACH 0940 ZEE MEDICAL SERVICES INC 03/05/2021
54053266 First Aid Supplies 369.70
Total for this ACH Check for Vendor 0940: 369.70
ACH 10343 TIM BEEBE 03/05/2021
3012021 Mileage Reimbursement 2/16-2/18 92.58
3012021 Expense Reimbursement 80.18
Total for this ACH Check for Vendor 10343: 172.76
ACH 10365 JENNIFER SHULL 03/05/2021
3012021 Mileage Reimbursement 2/4-2/26 7.48
3012021 Expense Reimbursement 4.15
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 2
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
Total for this ACH Check for Vendor 10365: 11.63
ACH 1115 WSB&ASSOCIATES INC 03/05/2021
R-0 1 745 1-000-1 ESRI Cloud-EA Migration-January 1,622.00
R-017496-000-1 2021 DataLink-Janaury 3,600.00
Total for this ACH Check for Vendor 1115: 5,222.00
ACH 1363 WATER CONSERVATION SERVICES IN( 03/05/2021
11109 Leak Locate-February 8 304.50
Total for this ACH Check for Vendor 1363: 304.50
ACH 4889 COMM[JNITYFOOTWORKS 03/05/2021
03032021 March Foot Care 224.00
Total for this ACH Check for Vendor 4889: 224.00
ACH 5180 THE TESSMAN COMPANY LLC 03/05/2021
S328366-IN Supplies-Ice Melt 467.50
Total for this ACH Check for Vendor 5180: 467.50
ACH 5665 METERING&TECHNOLOGY SOLUTIC 03/05/2021
18869 Meters-Brausen Auto 1,317.82
Total for this ACH Check for Vendor 5665: 1,317.82
ACH 6077 CIVICPLUS 03/05/2021
209002 Annual Fee 3/2021-2/2020-Website 7,122.44
Total for this ACH Check for Vendor 6077: 7,122.44
ACH 6987 CITIES DIGITAL INC 03/05/2021
51013 Document Scanning 742.00
Total for this ACH Check for Vendor 6987: 742.00
ACH 7025 ON SITE COMPANIES-OSSTC INC 03/05/2021
1082197 Restrooms 2/20-3/19 344.00
Total for this ACH Check for Vendor 7025: 344.00
ACH TOII TOKLE INSPECTIONS INC 03/05/2021
3012021 February Inspections 2,537.60
Total for this ACH Check for Vendor TOIL 2,537.60
49943 0131 BEISSWENGERS DO IT BEST 03/05/2021
410341 Supplies 2.19
Total for Check Number 49943: 2.19
49944 1018 BETHEL UNIVERSITY 03/05/2021
GE 20 1 9-003 89 Escrow Refund:GE 20 1 9-003 89,3900 Bethel D_ -242.92
GE 2019-00389 Escrow Refund:GE 2019-00389,3900 Bethel D 2,864.90
Total for Check Number 49944: 2,621.98
49945 CPF 1 CENTRAL PENSION FUND 03/05/2021
184503.0221 February Pension 1,228.80
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 3
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
Total for Check Number 49945: 1,228.80
49946 0176 FRATTALLONES HARDWARE INC 03/05/2021
091511/A Supplies 14.98
091600/A Supplies 6.36
Total for Check Number 49946: 21.34
49947 0454 LEAGUE OF MN HUMAN RIGHTS COX 03/05/2021
2129 2021 Dues 100.00
Total for Check Number 49947: 100.00
49948 10362 MARCO TECHNOLOGIES LLC 03/05/2021
INV8473650 Copier Usage 2/25-3/24 77.18
INV8473650 Copier Usage 2/25-3/24 13.62
Total for Check Number 49948: 90.80
49949 0600 NCPERS GROUP LIFE INS 03/05/2021
315800032021 March Insurance 64.00
Total for Check Number 49949: 64.00
49950 0282 REPUBLIC SERVICES 9899 03/05/2021
0899-003682342 February Recycling 8,109.61
0899-003686665 PW Waste-February 162.36
Total for Check Number 49950: 8,271.97
Total for 3/5/2021: 35,220.84
ACH 0192 GRAINGER INC 03/12/2021
9822024064 Supplies 37.96
9822024072 Air Gun 29.72
9822024080 Supplies 63.19
9824427620 Supplies 50.46
Total for this ACH Check for Vendor 0192: 181.33
ACH 0220 MINNESOTA DEPARTMENT OF LABOF 03/12/2021
ALR0119144X Annual Elevator Inspection 100.00
Total for this ACH Check for Vendor 0220: 100.00
ACH 0243 METROPOLITAN COUNCIL-WASTE W7 03/12/2021
1121113 April Wastewater 70,596.57
Total for this ACH Check for Vendor 0243: 70,596.57
ACH 0285 XCEL ENERGY 03/12/2021
721879122 1/17/21-2/16/21 1,020.91
721879122 1/17/21-2/16/21 1,488.48
721879122 1/17/21-2/16/21 228.51
721879122 1/17/21-2/16/21 56.27
721879122 1/17/21-2/16/21 -1,418.30
721879122 1/17/21-2/16/21 1,935.36
721879122 1/17/21-2/16/21 2,682.20
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 4
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
Total for this ACH Check for Vendor 0285: 5,993.43
ACH 0319 CITY OFROSEVILLE 03/12/2021
0229913 IT Support-March 6,803.72
0229956 Netmotion License 37.99
Total for this ACH Check for Vendor 0319: 6,841.71
ACH 0320 HEALTH PARTNERS INC 03/12/2021
103486359 April Dental 826.57
Total for this ACH Check for Vendor 0320: 826.57
ACH 0327 STAPLES INC 03/12/2021
3469908781 Supplies 28.06
3469908782 Supplies 43.87
3469908783 Supplies 10.99
Total for this ACH Check for Vendor 0327: 82.92
ACH 0922 NORTH SUBURBANACCESS CORPOR, 03/12/2021
2021-001 Production Services-January 1,020.25
Total for this ACH Check for Vendor 0922: 1,020.25
ACH 10343 TIM BEEBE 03/12/2021
3082021 Clothing Allowance 173.06
Total for this ACH Check for Vendor 10343: 173.06
ACH 10363 MINUTE MAKER SECRETARIAL 03/12/2021
M1231 February Meeting Minutes 421.00
Total for this ACH Check for Vendor 10363: 421.00
ACH 1125 BOLTON&MENK INC 03/12/2021
0265350 Lift StationlO Rehab 8,505.00
Total for this ACH Check for Vendor 1125: 8,505.00
ACH 1223 ADAM'S PEST CONTROL-MAIN 03/12/2021
3260928 March Pest Control 71.59
Total for this ACH Check for Vendor 1223: 71.59
ACH 1330 MN CLN SERVICES INC 03/12/2021
0321NN0I February Janitorial Service 2,005.58
Total for this ACH Check for Vendor 1330: 2,005.58
ACH 4445 PIONEER RIM AND WHEEL CO 03/12/2021
OICC4454 Supplies 170.54
Total for this ACH Check for Vendor 4445: 170.54
ACH 5518 KORTERRAINC 03/12/2021
20803 Annual Service Fee 1/30-21-1/29/22 1,600.00
Total for this ACH Check for Vendor 5518: 1,600.00
ACH 5665 METERING&TECHNOLOGY SOLUTI( 03/12/2021
18936 Meters-Brausen 1,038.00
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 5
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
Total for this ACH Check for Vendor 5665: 1,038.00
ACH 7501 KELLY&LEMMONS PA 03/12/2021
55316 February Prosecution 3,160.22
Total for this ACH Check for Vendor 7501: 3,160.22
ACH JOHC JOHNSON CONTROLS INC 03/12/2021
1-101473434876 Service to Au Handling Unit 402.20
1-101484790197 Service-Sensor and Security System 602.00
1-101555452047 Service to Door Alarm 341.00
Total for this ACH Check for Vendor JOHC: 1,345.20
49951 10453 AIR EXPRESS INC 03/12/2021
HVAC Pay 3 HVAC Project Pmt 3 141,800.00
HVAC Pay 3 HVAC Project Pmt 3 -7,090.00
Total for Check Number 49951: 134,710.00
49952 7804 BARTON SAND&GRAVEL CO 03/12/2021
210228 Select Granular Sand 1,230.57
Total for Check Number 49952: 1,230.57
49953 0131 BEISSWENGERS DO IT BEST 03/12/2021
411495 Painting Supplies 47.03
Total for Check Number 49953: 47.03
49954 1033 COMCAST 03/12/2021
101030.0321 Service 3/3-4/2 108.35
98681.0321 Service 3/5-4/4 109.71
Total for Check Number 49954: 218.06
49955 10218 FIR GREEN INC 03/12/2021
141911 RRA-February 2,110.75
Total for Check Number 49955: 2,110.75
49956 0447 I.U.O.E LOCAL 49 BENEFIT FUND-INSI 03/12/2021
BP3.0421 April Insurance 10,600.00
N134.0421 April Insurance 1,527.00
Total for Check Number 49956: 12,127.00
49957 0390 INT'L UNION OPERATING ENGINEERS 03/12/2021
1200.0321 March Dues 280.00
Total for Check Number 49957: 280.00
49958 10448 MARCO TECHNOLOGIES LLC 03/12/2021
437391816 Contract 2/25-3/25 35.36
437391816 Contract 2/25-3/25 200.35
Total for Check Number 49958: 235.71
49959 0257 MINNESOTA DEPT OF HEALTH 03/12/2021
2022021 Ql 2021 Water Connection 6,422.00
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 6
Check No Vendor No Vendor Name Check Date Check Amount
Invoice No Description Reference
Total for Check Number 49959: 6,422.00
49960 10286 MINNESOTA OCCUPATIONAL HEALTF 03/12/2021
362107 Drug Screen 102.00
Total for Check Number 49960: 102.00
49961 10271 MN PEIP 03/12/2021
1066861 April Health Insurance 8,483.62
Total for Check Number 49961: 8,483.62
49962 1208 PREMIUM WATERS INC 03/12/2021
610207-02-21 February Water 15.99
Total for Check Number 49962: 15.99
49963 3100 PROVIDENT LIFE AND ACCIDENT INS 03/12/2021
E0471136.0221 February Insurance 39.02
Total for Check Number 49963: 39.02
49964 10373 QUADIENT FINANCE USA INC 03/12/2021
6418.0221 Postage 1,000.00
Total for Check Number 49964: 1,000.00
49965 0811 RAMSEY COUNTY 03/12/2021
EMCOM-009100 Fleet Support-February 24.96
EMCOM-009137 CAD-February 544.99
EMCOM-009153 Dispatch-February 3,978.60
FLEET-000620 Service&Parts-January 6,390.00
FLEET-000620 Service&Parts-January 3,651.46
FLEET-000621 Fuel-February 2,517.31
SHRFL-001957 Law Enforcement-March 115,686.34
Total for Check Number 49965: 132,793.66
49966 10459 JENNIFER SPALDING 03/12/2021
UB#12261 Refund Reissue UB Refund 132.48
Total for Check Number 49966: 132.48
49967 10354 ST.PAUL PIONEER PRESS 03/12/2021
221572589 Ad for Bid-Hamline/Shorewood 109.35
221572589 Ad for Bid-2021 PMP 207.00
221572589 Ad for Bid-Hamline/Shorewood 109.35
Total for Check Number 49967: 425.70
Total for 3/12/2021: 404,506.56
Report Total(64 checks): 456,975.94
AP Checks by Date-Detail by Check Date(3/15/2021 3:22 PM) Page 7
CONSENT ITEM—7B
,- iRZEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Julie Hanson, City Clerk
SUBJECT: City Administrator Three Year Performance Evaluation
Budgeted Amount: Actual Amount: Funding Source:
Council Should Consider
Motions to approve, table, or deny the following:
• Step increase (from Grade 22/Step 8 to Grade 22/Step 9) for City Administrator Dave
Perrault effective January 1, 2021.
All items need a simple majority for action unless otherwise noted.
Background
State Statute allows the City Council to meet in a closed session to conduct the City
Administrator's performance evaluation but formal approval of the results at an open City
Council meeting is required.
Discussion
The City Council met in a closed session on March 8, 2021, with Lisa Sorensen of Sorensen
Consulting for the purpose of conducting the three-year performance evaluation of City
Administrator Dave Perrault.
The evaluation concluded with the determination that City Administrator Perrault is meeting
expectations satisfactorily. As a result, it is recommended that the City Council direct the City's
payroll staff to provide a one-step increase per the terms of City Administrator Perrault's
contract.
Budget Impact
N/A
Attachments
N/A
Page 1 of 1
CONSENT ITEM—7C
,fi` DEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: David Swearingen, Interim Public Works Director
SUBJECT: 2021 Street Maintenance Program
Budgeted Amount: Actual Amount: Funding Source:
$250,000 $ 89,039.10 Street Maintenance Fund
Council Should Consider
Motions to approve, table, or deny the following:
• Resolution 2021-015, recommending that the City of Coon Rapids Award a Contract
for the 2021 Street Maintenance Program.
All items need a simple majority for action unless otherwise noted.
Background/Discussion
In 2005, a Joint Powers Agreement(JPA)for Traffic Markings, Street Sweeping, Crack Sealing,
Screening, and Seal Coating was executed by the cities of Coon Rapids, Andover, Brooklyn
Center, Columbia Heights, and Fridley. Since 2005, six additional cities have joined the joint
powers agreement(Ham Lake, East Bethel, Anoka, Mahtomedi, Circle Pines and Mounds
View). On December 11, 2017, the City Council authorized an amendment to the JPA to include
the City of Arden Hills.
The City of Coon Rapids solicited bids in February 2021 for sealcoating,pavement markings,
crack sealing and fog sealing on behalf of the member cities. Bids were opened on March 12,
2021 and summarized in the bid tabulation provided in Attachment A. The program costs for
Arden Hills is summarized on Attachment B based on estimated quantities provided to the City
Page 1 of 2
of Coon Rapids in January 2021. A map depicting the locations of proposed work in Arden Hills
for 2021 is provided in Attachment C.
Staff has reviewed the bid prices and recommends that the City proceed with the work. Under
the terms of the Joint Powers Agreement, the City is required to provide a letter of concurrence
to Coon Rapids if the City intends to participate in the program this year. A resolution
recommending award of the contract is provided as Attachment D.
Budget Impact
The 2021 Operating Budget includes funding in the amount of$250,000 for the proposed work
under the 2021 Street Maintenance Program and other annual costs related to resurfacing streets
(such as, our internally led paving project). Attachment B includes the estimated contract cost in
the amount of$77,239.10,plus estimated expenses for engineering and administration ($4,000)
and contingency for quantity variations ($7,800) resulting in a total estimated project cost of
$89,039.10
Attachments
Attachment A: Bid Tabulation
Attachment B: Arden Hills Program Costs
Attachment C: Seal Coat Map
Attachment D: Resolution 2021-015
Page 2 of 2
................
..............
..............
....................
m Millill
ATTACHMENT 6
2020 STREET MAINTENANCE PROGRAM
CITY OF ARDEN HILLS
BID SUMMARY
DESCRIPTION BID UNIT QUANTIT UNITS TOTAL COST
PRICE
AGG - F&I FA- 1 1/8" (1) $1.18 44,630 SY $52,663.53
OIL - F&I CRS-2P (POLYMER MOD) (1) $0.28 12,496 GAL $ 3,499.00
CRACK SEAL - F&I STREET R&S (2) $0.44 11,100 LF $ 4,884.00
CRACK SEAL - F&I STREET B&G (2) $0.39 17,701 LF $ 6,903.39
CRACK SEAL - F&I TRAIL B&G (2) $0.39 3,000 LF $ 1,170.00
F&I STREET FOG SEAL CUL-DE-SAC (3) $4.77 1,143 GAL $ 5,451.58
F&I TRAIL FOG SEAL (3)1 $3.12 855 GAL $ 2,667.60
Additional Items
Engineering &Admin (5%) $ 4,000.00
Contingency for Quantities (10%) $ 7,800.00
TOTAL ESTIMATED PROJECT COSTS $ 89,039.10
(1) Pearson Bros Inc.
(2) Northwest Asphalt & Maintenance
(3) Allied Blacktop Company
3
Attachment C
,,00 lil
3
Sun Fish
,rrz„
a Lake
a Q
�O
— o
= KAR!`uKE
6
�I
4
R
I
I Round �l g
Lake Nry� �� ��
R,'1 �? amet[xo
Xil(s
Pnnk 3
�EN Cror
� Pnnkg
N
wE � AVE
Fog and Crack Seal Path
x Fimn1 scw
as Pnnk
Fog Seal Cul-de-sac
Seal Coat
I
Crack Seal
ays3 E a
1111111111 5 > �
d� Regim,nlPmk Prznk y2
y
Valentine 'I
Lake
i I
Zmm Sdnnidr
Regio„nl Przrk
W
F
pJE
P
Charles LMP� 9y
Prrr,�Pnrk _
Onks
q$9¢
i %egmr,rz(Prznk NPB� i„dr,�eoux�v xoaoE
N
PN
ryNA
P III
;III H
NEB
i � OSJP E
= SJP
a
—� Lake
nr Johanna Pr��rr
Pmk
Hn:rL,rir u
Pnnk �
Pnrk
0
w ✓Nnrsl,rz Ew�R
�I Lake
�NaEE Josephine
o --------
N
2021 Seal Coat
EN HILLS
0 1,000
I Feet
Attachment D
'!Tt
-ARDEE.N MLLS
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2021-015
A RESOLUTION RECOMMENDING THE CITY OF COON RAPIDS AWARD THE
2021 STREET MAINTENANCE PROGRAM
WHEREAS, the City of Arden Hills participates in a joint powers agreement with the
North Metro Regional Street Maintenance Consortium for street maintenance services; and
WHEREAS, the City of Coon Rapids solicited bids for the 2021 Street Maintenance
Program based on work quantities requested by members of said joint powers agreement; and
WHEREAS, the City of Coon Rapids opened bids for the 2021 Street Maintenance
Program on March 12, 2021 and provided a bid tabulation to members of said joint powers
agreement for consideration prior to awarding contracts.
THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS,
MINNESOTA:
1. The Mayor and City Council recommend that the City of Coon Rapids award the
2021 Street Maintenance Program contracts to the low responsible bidders as outlined
in the joint powers agreement and summary of bids.
2. The awarded contract includes quantities for seal coating, crack sealing and fog
sealing as previously submitted by the City of Arden Hills.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 22ND
DAY OF MARCH,2021.
David Grant,Mayor
ATTEST:
Julie Hanson, City Clerk
CONSENT ITEM—7D
,fi` DEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: David Swearingen, Interim Public Works Director
SUBJECT: 2021 PMP - Materials Testing
Budgeted Amount: Actual Amount: Funding Source:
$40,000 $ 34,888.00 2021 PMP Overhead Costs
(Included in project overhead costs)
Council Should Consider
Motions to approve, table, or deny the following:
• Proposal for Construction Materials Testing Services with Braun Intertec for the 2021
PMP Street&Utility Improvements
All items need a simple majority for action unless otherwise noted
Back2round/Discussion
As part of the 2021 PMP Street&Utility Project, materials testing is required to ensure the
quality of work meets the specifications outlined with this project. The project includes elements
such as pavement subgrade preparation, select granular embankment placement, aggregate base
placement, new concrete curb and gutter, sidewalk, driveways, full-depth reclamation and new
bituminous pavement. Improvements to the sanitary, storm, and water main utilities will also be
part of this project. Testing firms use information on what elements and at what quantity are
involved with a project to determine a Schedule of Materials Control which then tells you the
frequency of testing needed.
Page 1 of 2
Staff solicited proposals from Braun Intertec and American Engineering Testing as shown in the
following table:
FIRM TOTAL
Braun Intertec $34,888.00
American Engineering $40,154.50
Testing
Staff has reviewed the proposals and recommends approving materials testing services with
Braun Intertec(Attachment A).
Budget Impact
Funding for the materials testing is included in the overhead identified in the project budget for
$40,000.
Attachments
Attachment A: Braun Intertec Testing Proposal
Page 2 of 2
Braun Int Attachment A
B RAU N 11001 Hamps ire AvenueFax:
NTERTE C Minneapolis,MN 55438 Web: braunintertec.com
The Science You Build On.
March 11, 2021 Proposal QTB134946
Mr. David Swearingen
City of Arden Hills
1425 Paul Kirkwold Drive
Arden Hills, MN 55112
Re: Proposal for Construction Materials Testing Services
Arden Hills 2021 PMP Street & Utility Improvements
City Project No. PW-21-0100
Arden Hills, Minnesota
Dear Mr. Swearingen:
Braun Intertec Corporation is pleased to submit this proposal to provide construction materials testing
services for the Arden Hills 2021 PMP Street & Utility Improvements Project in Arden Hills, Minnesota.
Since our inception in 1957, we have grown into one of the largest employee owned engineering firms in
the nation. With more than 1,000 employee owners, retaining our firm gives you access to a diverse
range of services and professionals you can consult with if the unforeseen occurs. The size of our
company also allows us to respond quickly when schedule constraints occur.
Our White Bear Lake office is located within 15 miles of the site, minimizing travel times and trip
expenses.This proximity also provides the opportunity to quickly mobilize to the site when unforeseen
needs arise.
Our Understanding of Project
This project will include pavement subgrade preparation, select granular embankment placement,
aggregate base placement, new concrete curb and gutter, sidewalk, and driveways along with a new
bituminous pavement in the Hazelnut Park Neighborhood in Arden Hills, Minnesota. Improvements to
the sanitary, storm, and water main utilities will also be part of this project. This project will also include
full depth reclamation, as well as reinstallation of block and wood timber retaining walls.
Available Project Information
This proposal was prepared using the following documents and information.
■ Project plans and specifications prepared by Bolton & Menk, Inc. dated January 19, 2021.
■ Discussions with Nick Amatuccio of Bolton and Menk, Inc. about materials testing rates for
project.
City of Arden Hills
Proposal QTB134946
March 11, 2021
Page 2
Scope of Services
Services are performed under the direction of a licensed professional engineer. Testing services will be
performed on an on-call, as-needed basis as requested and scheduled by you or your on-site project
representative. After reviewing available information to determine compliance with project plans and/or
specifications and other design or construction documents, our scope of services for the project will be
limited to the tasks defined below.
Soil Related Services
■ Measure the in-place dry density, moisture content and relative compaction of fill placed for
pavement support and of utility backfill for compliance with the project documents. This task
includes performing laboratory Proctor tests to provide maximum dry densities from which
the relative compaction of fill can be determined, as well as the use of a nuclear density
gauge to measure in-place dry densities and moisture contents.
■ Sample and test CL-5 aggregate base, select granular borrow, full depth reclamation and
stabilizing aggregate materials for compliance with the project documents.This task includes
laboratory gradation testing of materials.
■ Perform MnDOT dynamic cone penetrometer(DCP) tests on CL-5 aggregate base material.
Concrete Related Services
■ Sample and test fresh concrete associated with pavement and/or curb-and-gutter for
compliance with the project documents, and cast test cylinders for laboratory compressive
strength testing. We assume that we will be able to appropriately dispose of excess concrete
(and associated wash water) on site at no additional cost to us.
■ Measure and report the compressive strength of the concrete test cylinders for compliance
with the project documents. A set of three cylinders will be tested at 28 days for each set
cast. If field cure cylinders are requested, each additional cylinder will be charged at the unit
price listed in our cost estimate.
Bituminous Related Services
■ Sample and test bituminous pavement materials for compliance with the project documents.
This task includes Rice specific gravity, Gyratory density, fine aggregate angularity, percent
crushed, asphalt content and extracted aggregate gradation tests of the bituminous.
■ Obtain cores and measure the thickness and density of the compacted bituminous pavement
by the core method for compliance with the project documents. We assume the bituminous
contractor will cut the cores and the full-time inspection staff will mark the core locations
and provide the cores to Braun Intertec.
Consulting, Project Communication and Reporting Services
■ Project management, including scheduling of our field personnel.
BRAUN
INTERTEC
City of Arden Hills
Proposal QTB134946
March 11, 2021
Page 3
■ Review test reports, and communicating with you and the parties you may designate such as
the project contractor(s), and other project team members, as needed.
■ Transmit test results to the project team on a weekly basis.
Basis of Scope of Work
The costs associated with the proposed scope of services were estimated using the following
assumptions. If the construction schedule is modified or the contractor completes the various phases of
the project at different frequencies or durations than shown in this proposal, we may need to adjust the
overall cost accordingly. The scope of work and number of trips required to perform these services are as
shown in the attached table. Notable assumptions in developing our estimate include:
■ We assume compaction testing will be performed using the nuclear density method on
subgrade preparation, select granular embankment and utility trench backfill; a minimum of
three tests will be conducted each trip with twelve trips assumed for utility trench backfill; a
minimum of five tests will be conducted each trip with six trips assumed for subgrade
preparation; a minimum of five tests will be conducted each trip with six trips assumed for
select granular embankment.
■ We assume compaction testing on aggregate base material will be performed using the
Dynamic Cone Penetration (DCP) method; a minimum of six tests will be conducted each trip
with four trips assumed.
■ We assume sixteen sets of concrete tests will be required to complete the project.
■ We assume the rebar observations before concrete placements will be completed by the
project representative's construction oversight manager.
■ We assume your full-time on-site construction observer will observe the test rolling for this
project.
■ We assume bituminous paving will be completed in six days for this project.
■ We assume the project engineer of record will review and approve contractor's quality
control submittals and test results.
■ You, or others you may designate, will provide us with current and approved plans and
specifications for the project. Modification to these plans must also be sent to us so we can
review their incorporation into the work.
■ We will require a minimum of 24 hours' notice for scheduling inspections for a specific time.
Shorter than 24 hours' notice may impact our ability to perform the requested services, and
the associated impacts will be the responsibility of others.
BRAUN
INTERTEC
City of Arden Hills
Proposal QTB134946
March 11, 2021
Page 4
If the work is completed at different rates than described above,this proposal should be revised. If the
pace of construction is different than described above, this proposal should be revised.
Cost and Invoicing
We will furnish the services described herein for an estimated fee of$34,888. Our estimated costs are
based on industry averages for construction production. Depending on the contractor's performance,
our costs may be significantly reduced or slightly higher than estimated. A tabulation showing our
estimated hourly and/or unit rates associated with our proposed scope of services is also attached. The
actual cost of our services will be based on the actual units or hours expended to meet the requirements
of the project documents.
This cost estimate was developed with the understanding that the scope of services defined herein will
be required and requested during our normal work hours of 6:00 a.m.to 4:00 p.m., Monday through
Friday. Services that we are asked to provide to meet the project requirements or the contractor's
construction schedule outside our normal business hours will be invoiced using an overtime rate factor.
The factor for services provided outside our normal work hours or on Saturday will be 1.25 times the
listed hourly rate for the service provided. The factor for services provided on Sunday or legal holidays
will be 1.5 times the listed hourly rate for the service provided. We have not included premiums for
overtime in our cost estimate; however, we recommend that allowances and contingencies be made for
overtime charges based on conversations with the contractor. You will be billed only for services
provided on a time and materials basis.
Because our services are directly controlled by the schedule and performance of others,the actual cost
may vary from our estimate. It is difficult to project all of the services and the quantity of services that
may be required for any project. If services are required that are not discussed above, we will provide
them at the rates shown in the attached table or, if not shown, at our current Schedule of Charges. We
will invoice you on a monthly basis.
General Remarks
We will be happy to meet with you to discuss our proposed scope of services further and clarify the
various scope components.
We appreciate the opportunity to present this proposal to you. After reviewing this proposal, please sign
and return one copy to our office as notification of acceptance and authorization to proceed. If
anything in this proposal is not consistent with your requirements, please let us know immediately.
Braun Intertec will not release any written reports until we have received a signed agreement. Also,
ordering services from Braun Intertec constitutes acceptance of the terms of this proposal including the
attached General Conditions.
The proposed fee is based on the scope of services described and the assumption that our services will
be authorized within 30 days and that others will not delay us beyond our proposed schedule.
BRAUN
INTERTEC
City of Arden Hills
Proposal QTB134946
March 11, 2021
Page 5
We include the Braun Intertec General Conditions, which provide additional terms and are a part of our
agreement.
To have questions answered or schedule a time to meet and discuss our approach to this project further,
please contact Colin Keane at 612.704.2674 (ckeane@braunintertec.com) or Andrew Valerius at
952.995.2242 (avalerius@braunintertec.com).
Sincerely,
BRAUN INT RTEC CORPORATION
o in M. Keane
Staff Engineer
Andrew M. Valerius
Account Leader, Senior Project Manager
Charles M. Cadenhead,Jr., PE
Vice President, Principal Engineer
Attachments:
Cost Estimate Table
General Conditions—CMT(1/1/18)
c: Mr. Nick Amatuccio; Bolton & Menk, Inc.
The proposal is accepted. We will reimburse you in accordance with this agreement, and you are
authorized to proceed:
Authorizer's Firm
Authorizer's Signature
Authorizer's Name (please print or type)
Authorizer's Title
Date
BRAUN
INTERTEC
BRAU N Project Proposal
I N T E RT E C QT B 134946
The science You Build On. City of Arden Hills 2021 PMP St. & Utility Impts. PW-21-0100
Client: Work Site Address: Service Description:
City of Arden Hills Prior Ave N,Jerrold Ave, Edgewater Ave,Glenpaul Construction Materials Testing
David Swearingen Ave
1425 Paul Kirkwold Dr Arden Hills, MN
Arden Hills,MN 55112
(651)633-5676
Description Quantity Units Unit Price Extension
Phase 1 Construction Materials Testing
Activity 1.1 Soil Testing $17,460.00
Compaction Testing-Nuclear 60.00 Hour 82.00 $4,920.00
Work Activity Detail Qty Units Hrs/Unit Extension
Select Granular Borrow/Embankment 6.00 Trips 2.50 15.00
Subgrade Preparation 6.00 Trips 2.50 15.00
Sanitary Sewer Backfill 2.00 Trips 2.50 5.00
Watermain Backfill 7.00 Trips 2.50 17.50
Storm Sewer Backfill 3.00 Trips 2.50 7.50
1308 Nuclear moisture-density meter charge,per hour 60.00 Each 24.00 $1,440.00
1861 CMT Trip Charge 41.00 Each 19.00 $779.00
217 Compaction Testing-DCP's 18.00 Hour 82.00 $1,476.00
Work Activity Detail Qty Units Hrs/Unit Extension
CL-5 Aggregate Base 6.00 Trips 3.00 18.00
1530AG Asphalt Content of Aggregate Base,per sample 2.00 Each 150.00 $300.00
209 Sample pick-up 16.50 Hour 82.00 $1,353.00
Work Activity Detail Qty Units Hrs/Unit Extension
Select Granular Borrow/Embankment 4.00 Trips 1.50 6.00
CL-5 Aggregate Base 4.00 Trips 1.50 6.00
Full Depth Reclamation 2.00 Trips 1.50 3.00
Stabilizing Aggregate 1.00 Trips 1.50 1.50
1162 Sieve Analysis with 200 wash,per sample 42.00 Each 136.00 $5,712.00
Work Activity Detail Qty Units Hrs/Unit Extension
Select Granular Embankment 22.00 Each 1.00 22.00
CL-5 Aggregate Base 16.00 Each 1.00 16.00
Full Depth Reclamation 3.00 Each 1.00 3.00
Stabilizing Aggregate 1.00 Each 1.00 1.00
Moisture Density Relationship(Proctor) 8.00 Each 185.00 $1,480.00
Activity 1.2 Concrete Testing $5,880.00
Concrete Testing 40.00 Hour 82.00 $3,280.00
Work Activity Detail Qty Units Hrs/Unit Extension
Curb&Gutter 7.00 Trips 2.50 17.50
Sidewalk, Ped Ramps&Driveways 8.00 Trips 2.50 20.00
Sign Posts 1.00 Trips 2.50 2.50
CMT Trip Charge 24.00 Each 19.00 $456.00
Compressive strength of concrete cylinders,per specimen 48.00 Each 31.00 $1,488.00
Work Activity Detail Qty Units Hrs/Unit Extension
Curb&Gutter 7.00 Sets 3.00 21.00
Sign Posts 1.00 Sets 3.00 3.00
Sidewalk, Ped Ramps&Driveways 8.00 Sets 3.00 24.00
03/11/2021 08:35 AM Page 1 of 2
BRAU N Project Proposal
I N T E RT E C QT B 134946
The science You Build On. City of Arden Hills 2021 PMP St. & Utility Impts. PW-21-0100
278 Concrete Cylinder Pick up 8.00 Hour 82.00 $656.00
Work Activity Detail Qty Units Hrs/Unit Extension
Cylinder Pickup 8.00 Trips 1.00 8.00
Activity 1.3 Pavement Testing $7,158.00
2689 MnDOT Bituminous Verification,per sample 6.00 Each 679.00 $4,074.00
209 Sample pick-up 12.00 Hour 82.00 $984.00
Work Activity Detail Qty Units Hrs/Unit Extension
Mixture Sampling 6.00 Trips 1.00 6.00
Mark and Observe Cores 6.00 Trips 1.00 6.00
1861 CMT Trip Charge 12.00 Each 19.00 $228.00
1542 Thickness and Density of Bituminous Core 36.00 Each 52.00 $1,872.00
Activity 1.4 Project Management $4,390.00
226 Project Manager 20.00 Hour 160.00 $3,200.00
228 Senior Project Manager 2.00 Hour 185.00 $370.00
238 Project Assistant 10.00 Hour 82.00 $820.00
Phase 1 Total: $34,888.00
Proposal Total: $34,888.00
03/11/2021 08:35 AM Page 2 of 2
BRAUN
General Conditions INTERTEC
Construction Material Testing and Special Inspections
Section 1:Agreement further that site conditions may vary over distance costs and agree to pay for those services at the
1.1 Our agreement with you consists of these or change overtime. rates listed in our cost estimate.
General Conditions and the accompanying written
proposal or authorization("Agreement').This 2.4 Our duties do not include supervising or 3.6 You agree to include us as an indemnified
Agreement is the entire agreement between you directing your representatives or contractors or party in your contracts,if any,for work by others
and us.It supersedes prior agreements.It may be commenting on,overseeing,or providing the on the project,protecting us to the same degree
modified only in a writing signed by us,making means and methods of their services unless as you are protected.You agree to list us as an
specific reference to the provision modified. expressly set forth in this Agreement.We will not Additional Insured under your liability insurance
be responsible for the failure of your contractors, policies and to require subrogation be waived
1.2 The words"you,""we,""us,"and"our" and the providing of Services will not relieve against us and that we will be added as an
include officers,employees,and subcontractors. others of their responsibilities to you or to others. Additional Insured on all policies of insurance,
including any policies required of your contractors
1.3 In the event you use a purchase order or 2.5 We will provide a health and safety program or subcontractors,covering any construction or
other documentation to authorize our scope of for our employees,but we will not be responsible development activities to be performed on the
work("Services"),any conflicting or additional for contractor,owner,project,or site health or project site.
terms are not part of this Agreement.Directing us safety.
to start work prior to execution of this Agreement Section 4:Reports and Records
constitutes your acceptance.If,however,mutually 2.6 You will provide,at no cost to us, 4.1 Unless you request otherwise,we will
acceptable terms cannot be established,we have appropriate site safety measures as to work areas provide our report(s)in an electronic format.
the right to terminate this Agreement without to be observed or inspected by us.Our employees
liability to you or others,and you will compensate are authorized by you to refuse to work under 4.2 Our reports,notes,calculations,and other
us for fees earned and expenses incurred up to the conditions that may be unsafe. documents and our computer software and data
time of termination. are instruments of our service to you,and they
2.7 Unless a fixed fee is indicated,our price is an remain our property.We hereby grant you a
Section 2:Our Responsibilities estimate of our project costs and expenses based license to use the reports and related information
2.1 We will provide Services specifically on information available to us and our experience we provide only for the related project and for the
described in this Agreement.You agree that we and knowledge.Such estimates are an exercise of purposes disclosed to us.You may not transfer our
are not responsible for services that are not our professional judgment and are not guaranteed reports to others or use them for a purpose for
expressly included in this Agreement.Unless or warranted.Actual costs may vary.You should which they were not prepared without our written
otherwise agreed in writing,our findings,opinions, allow a contingency in addition to estimated costs. approval.You agree to indemnify,defend,and
and recommendations will be provided to you in hold us harmless from claims,damages,losses,
writing.You agree not to rely on oral findings, Section 3:Your Responsibilities and expenses,including attorney fees,arising out
opinions,or recommendations without our 3.1 You will provide us with prior environmental, of such a transfer or use.
written approval. geotechnical and other reports,specifications,
plans,and information to which you have access 4.3 If you do not pay for Services in full as
2.2 In performing our professional services,we about the site.You agree to provide us with all agreed,we may retain work not yet delivered to
will use that degree of care and skill ordinarily plans,changes in plans,and new information as to you and you agree to return to us all of our work
exercised under similar circumstances by site conditions until we have completed Services. that is in your possession or under your control.
reputable members of our profession practicing in
the same locality.If you direct us to deviate from 3.2 You will provide access to the site.In the 4.4 Electronic data,reports,photographs,
our recommended procedures,you agree to hold performance of Services some site damage is samples,and other materials provided by you or
us harmless from claims,damages,and expenses normal even when due care is exercised.We will others may be discarded or returned to you,at our
arising out of your direction.If during the one year use reasonable care to minimize damage to the discretion,unless within 15 days of the report date
period following completion of Services it is site.We have not included the cost of restoration you give us written direction to store or transfer
determined that the above standards have not of damage in the estimated charges. the materials at your expense.
been met and you have promptly notified us in
writing of such failure,we will perform,at our Section 5:Compensation
cost,such corrective services as may be necessary, 3.3 If we notify you that radiographic or gamma P
ray equipment or other nuclear testing or 5.1 You will pay for Services as stated in this
within the original scope in this Agreement,to Agreement.If such payment references our
remedy such deficiency.Remedies set forth in this measuring device will be used,you will be g P Y
responsible for the cooperation of your employees Schedule of Charges,the invoicing will be based
section constitute your sole and exclusive recourse on the most current schedule.An estimated
with respect to the performance or quality of and your contractors in observing all radiation upon
Services. safety standards. amount is not a firm figure.You agree to pay all
sales taxes and other taxes based on your
3.4 You will notify us of any knowledge or payment of our compensation.Our performance is
2.3 We will reference our field observations and subject to credit approval and payment of any
sampling to available reference points,but we will suspicion of the presence of hazardous or
p g not survey,set,or check the accuracy of those dangerous materials present on any work site.If specified retainer.
points unless we accept that duty in writing. we observe or suspect the presence of
Locations of field observations or sampling contaminants not anticipated in this Agreement, 5.2 You will notify us of billing disputes within 15
described in our report or shown on our sketches we may terminate Services without liability to you days.You will pay undisputed portions of invoices
are based on information provided by others or or to others,and you will compensate us for fees upon receipt.You agree to pay interest on unpaid
estimates made by our personnel.You agree that earned and expenses incurred up to the time of balances beginning 30 days after invoice dates at
such dimensions,depths,or elevations are termination. the rate of 1.5%per month,or at the maximum
approximations unless specifically stated rate allowed by law.
otherwise in the report.You accept the inherent 3.5 The time our field personnel spend on the
risk that samples or observations may not be job site depends upon the scheduling of the work 5.3 If you direct us to invoice a third party,we
representative of things not sampled or seen and we are observing or testing.You agree that any may do so,but you agree to be responsible for our
changes in scheduling may result in additional compensation unless the third party is
GC-CMT Page 1 of 2
creditworthy(in our sole opinion)and provides business opportunity,loss of profit or revenue, 6.7 No officer or employee acting within the
written acceptance of all terms of this Agreement. loss of product or output or business scope of employment shall have individual liability
interruption. for his or her acts or omissions,and you agree not
5.4 Your obligation to pay for Services under this to make a claim against individual officers or
Agreement is not contingent on your ability to 6.3 You and we agree that any action in relation employees.
obtain financing,governmental or regulatory to an alleged breach of our standard of care or this
agency approval,permits,final adjudication of any Agreement shall be commenced within one year Section 7:General Indemnification
lawsuit,your successful completion of any project, of the date of the breach or of the date of 7.1 We will indemnify and hold you harmless
receipt of payment from a third party,or any substantial completion of Services,whichever is from and against demands,damages,and
other event.No retainage will be withheld. earlier,without regard to the date the breach is expenses of others to the comparative extent they
discovered.Any action not brought within that are caused by our negligent acts or omissions or
5.5 If you do not pay us in accordance with this one year time period shall be barred,without those negligent acts or omissions of persons for
Agreement,you agree to reimburse all costs and regard to any other limitations period set forth by whom we are legally responsible.You will
expenses for collection of the moneys invoiced, law or statute.We will not be liable unless you indemnify and hold us harmless from and against
including but not limited to attorney fees and staff have notified us within 30 days of the date of such demands,damages,and expenses of others to the
time. breach and unless you have given us an comparative extent they are caused by your
opportunity to investigate and to recommend negligent acts or omissions or those negligent acts
5.6 You agree to compensate us in accordance ways of mitigating damages.You agree not to or omissions of persons for whom you are legally
with our Schedule of Charges if we are asked or make a claim against us unless you have provided responsible.
required to respond to legal process arising out of us at least 30 days prior to the institution of any
a proceeding related to the project and as to legal proceeding against us with a written 7.2 To the extent it maybe necessary to
certificate executed by an appropriately licensed indemnifyeither of us under Section 7.1,you and
which we are not a party. professional specifying and certif in each and
p certifying we expressly waive,in favor of the other only,any
every act or omission that you contend constitutes immunity or exemption from liability that exists
5.7 If we are delayed by factors beyond our a violation of the standard of care governing our under any worker compensation law.
control,or if project conditions or the scope or professional services.Should you fail to meet the
amount of work changes,or if changed labor conditions above,you agree to fully release us
conditions result in increased costs,decreased Section 8:Miscellaneous Provisions
from any liability for such allegation.efficiency,or delays,or if the standards or 8.1 We will provide a certificate of insurance to
methods change,we will give you timely notice, you upon request.Any claim as an Additional
6.4 For you to obtain the benefit of a fee which Insured shall be limited to losses caused b
the schedule will be extended for each day ofrisks, y our
delay,and we will be compensated for costss includes a reasonable allowance for you and f Y negligence.
expenses incurred in accordance with our agree that our aggregate liability for all claims
Schedule of Charges. will not exceed the fee paid for Services or 8.2 You and we,for ourselves and our insurers,
$50,000,whichever is greater.If you are waive all claims and rights of subrogation for
unwilling to accept this allocation of risk,we will losses arising out of causes of loss covered b our
5.8 If you fail to pay us in accordance with this g y
increase our aggregate liability to$100,000
Agreement,we may consider the default a total provided that,within 10 days of the date of this respective insurance policies.
breach of this Agreement and,at our option, Agreement,you provide payment in an amount
terminate our duties without liability to you or to that will increase our fees by 10%but not less 8.3 Neither of us will assignor transfer any
others,and you will compensate us for fees interest,any claim,any cause of action,or any
than$500,to compensate us for the greater risk
earned and expenses incurred up to the time of undertaken.This increased fee is not the purchase right against the other.Neither of us will assign or
termination. of insurance. otherwise transfer or encumber any proceeds or
expected proceeds or compensation from the
5.9 Inconsideration of our providing insurance projector project claims to any third person,
6.5 You agree to indemnify us from all liability whether direct) or as collateral or otherwise.
to cover claims made by you,you hereby waive to others in excess of the risk allocation stated y
any right to offset fees otherwise due us. herein and to insure this obligation.In addition,
all indemnities and limitations of liability set 8.4 This Agreement maybe terminated early
Section 6:Disputes,Damage,and Risk Allocation forth in this Agreement apply however the same only in writing.You will compensate us for fees
6.1 Each of us will exercise good faith efforts to may arise,whether in contract,tort statute, earned for performance completed and expenses
resolve disputes without litigation.Such efforts equity or other theory of law,including,but not incurred up to the time of termination.
will include,but not be limited to,a meeting(s) limited to,the breach of any legal duty or the
attended by each party's representative(s) fault,negligence,or strict liability of either party. 8.5 If any provision of this Agreement is held
empowered to resolve the dispute.Before either invalid or unenforceable,then such provision will
of us commences an action against the other, 6.6 This Agreement shall be governed, be modified to reflect the parties'intention.All
disputes(except collections)will be submitted to construed,and enforced in accordance with the remaining provisions of this Agreement shall
mediation. laws of the state in which our servicing office is remain in full force and effect.
located,without regard to its conflict of laws rules.
6.2 Notwithstanding anything to the contrary in The laws of the state of our servicing office will 8.6 No waiver of any right or privilege of either
this Agreement,neither party hereto shall be govern all disputes,and all claims shall be heard in party will occur upon such party's failure to insist
responsible or held liable to the other for the state or federal courts for that state.Each of on performance of any term,condition,or
punitive,indirect,incidental,or consequential us waives trial by jury. instruction,or failure to exercise any right or
damages,or liability for loss of use,loss of privilege or its waiver of any breach.
GC-CMT Revised 1/1/2018 Page 2 of 2
PUBLIC HEARING— 9A
,fi` DEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Gayle Bauman, Finance Director
Mary Tomnitz, Accounting Clerk
SUBJECT: Public Hearing Regarding Quarterly Special Assessments for Delinquent Utilities
Budgeted Amount: Actual Amount: Funding Source:
Council Should Consider
Motion to approve,table or deny the following:
• Hold a Public Hearing regarding delinquent utilities.
All items need a simple majority for action unless otherwise noted.
Background
Water customers whose accounts are 90 days past due were informed that the City intends to
certify delinquent charges to Ramsey County to be collected with property taxes. These
customers have the right to a hearing in front of the City Council to discuss this matter prior to
certification.
Pagel of 1
NEW BUSINESS— 10A
,fi` DEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Gayle Bauman. Finance Director
Mary Tomnitz, Accounting Clerk
SUBJECT: Adopting and Confirming Quarterly Special Assessments for Delinquent Utilities
Budgeted Amount: Actual Amount: Funding Source:
Council Should Consider
Motion to approve,table or deny the following:
• Resolution 2021-016 certifying delinquent utilities to Ramsey County
All items need a simple majority for action unless otherwise noted.
Background
Delinquent utility amounts are certified to Ramsey County quarterly. A list of utility accounts
with a delinquent balance was compiled and notices dated February 12, 2021 were mailed. These
customers were informed of their delinquent status and were asked to make payment of the
delinquent balance by March 12, 2021. Utility accounts with an unpaid delinquent balance would
be certified to Ramsey County to be added to property taxes payable in 2022. The certification
amount is equal to the unpaid delinquent balance plus an eight percent penalty.
The list of remaining delinquent utility accounts is attached. The City will request that Ramsey
County levy the delinquent balances against the respective properties.
Attachments
Attachment A: Resolution No. 2021-016 and Delinquent Utility Accounts List
Pagel of 1
'It Attachment A
�-A ZEEN�HILLS
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2021-016
RESOLUTION ADOPTING AND CONFIRMING QUARTERLY SPECIAL
ASSESSMENTS FOR DELINQUENT UTILITIES
WHEREAS, the amount to be specially assessed for DELINQUENT UTILITIES has
been duly calculated in accordance with the provisions of the Municipal Code and Minnesota
Statues; and
WHEREAS, notices have been duly mailed as required by law; and
WHEREAS, said proposed assessments have at all times since their filing been open
for public inspection, and an opportunity has been given to all interested parties to present
objections if any, to the proposed assessments; and
WHEREAS, there were no oral or written objections received.
1. The amounts so calculated and set forth in said notices are hereby levied against the
respective parcels of land described therein, and
2. The proposed assessments are hereby adopted and confirmed as special
assessments for each of said parcels of land and the assessments together with an
additional penalty of eight percent (8%) of the original unpaid amount, inclusive of
any previous delinquency penalty, shall be a lien concurrent with general taxes
upon such parcel.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Arden
Hills, Minnesota, that the City Administrator be authorized and directed to transmit to the
County Auditor a certified duplicate of the assessment roll to be extended upon the property
tax lists of the County, and the County Auditor shall collect said special assessments with
taxes levied in 2021,payable in 2022:
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS
22nd DAY OF MARCH,2021.
ATTEST: DAVID GRANT,MAYOR
JULIE HANSON, CITY CLERK
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting
cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage.
PID# Cust No Service Address Water Sewer Storm Total Fee 8% Assessment
Arrears Certification Total
343023440085 000091-000 1174 Edgewater Avenue 60.41 66.39 15.61 142.41 11.39 153.80
223023240216 000223-000 4361 Arden View Court 86.85 103.94 20.24 211.03 16.88 227.91
223023340036 000231-000 4101 Hamline Avenue N 92.94 109.27 15.61 217.82 17.43 235.25
223023240275 000290-000 4442 Arden View Court 98.67 125.86 20.24 244.77 19.58 264.35
223023240336 000367-000 4335 Arden View Court 88.25 108.43 20.24 216.92 17.35 234.27
223023240326 000375-000 4370 Arden View Court 81.15 97.51 20.24 198.90 15.91 214.81
223023210040 000398-000 1354 Arden View Drive 61.76 68.33 20.24 150.33 12.03 162.36
223023210030 000408-000 1375 Arden View Drive 125.95 134.11 20.24 280.30 22.42 302.72
223023210057 000454-000 1393 Arden View Drive 66.95 76.67 20.24 163.86 13.11 176.97
223023120013 000569-000 1307 Karth Lake Circle 148.59 180.53 15.61 344.73 27.58 372.31
223023320013 000743-000 4283 Norma Avenue 716.12 492.59 15.61 1,224.32 97.95 1,322.27
283023330013 001255-000 2027 Thom Drive 93.87 109.27 15.61 218.75 17.50 236.25
213023140007 001276-000 4375 Old Highway 10 9.99 109.27 15.61 134.87 10.79 145.66
163023340015 001285-000 4627 Highway10 154.54 176.62 15.61 346.77 27.74 374.51
283023410038 001344-000 3757 McCracken Lane 238.74 149.90 15.61 404.25 32.34 436.59
213023430017 001534-000 1791 Janet Court 113.20 124.56 15.61 253.37 20.27 273.64
333023110036 001551-000 1611 Lake Johanna Boulevard 180.69 146.20 15.61 342.50 27.40 369.90
283023120052 001575-000 1761 Lake Valentine Road 148.38 117.04 15.61 281.03 22.48 303.51
213023410051 001584-000 1681 Brueberry Lane 56.58 61.03 20.24 137.85 11.03 148.88
343023330018 001639-000 1516 Edgewater Avenue 85.62 121.55 15.61 222.78 17.82 240.60
343023240003 001775-000 3466 Glenarden Road 99.99 109.27 15.61 224.87 17.99 242.86
343023410055 001808-000 1171 Carlton Drive 199.68 207.73 15.61 423.02 33.84 456.86
333023340020 001884-000 3223 Lake Johanna Boulevard 79.37 88.22 15.61 183.20 14.66 197.86
333023340066 001897-000 1921 Glenpaul Avenue 135.67 129.67 15.61 280.95 22.48 303.43
343023210016 001920-000 1437 Arden Place 110.26 109.27 15.61 235.14 18.81 253.95
333023420038 001969-000 3290 Lake Johanna Boulevard 125.27 115.14 15.61 256.02 20.48 276.50
333023330080 002041-000 1985 County Road D W 1.15 69.31 7.35 77.81 6.22 84.03
333023240032 002096-000 1876 Grant Road 327.47 190.50 15.61 533.58 42.69 576.27
333023240094 002105-000 1873 Stowe Avenue 94.34 122.33 15.61 232.28 18.58 250.86
333023240027 002204-000 1840 Grant Road 171.95 134.45 15.61 322.01 25.76 347.77
343023310015 002293-000 3354 Snelling Avenue N 61.08 68.00 15.61 144.69 11.58 156.27
333023240057 002306-000 1854 Noble Road 35.69 46.06 11.45 93.20 7.46 100.66
333023320044 002633-000 3304 Katie Lane 100.19 109.27 15.61 225.07 18.01 243.08
333023240073 002692-000 1891 Lake Lane 50.97 69.09 15.61 135.67 10.85 146.52
343023110001 002738-000 1160 County Road E W Suite 100 1,463.94 552.47 218.88 2,235.29 178.82 2,414.11
223023240194 002844-000 4383 Arden View Court 69.79 80.29 20.24 170.32 13.63 183.95
333023330057 003236-000 2015 Glenpaul Avenue 159.56 109.27 15.61 284.44 22.76 307.20
283023330012 003256-000 2023 Thom Drive 137.18 135.55 15.61 288.34 23.07 311.41
223023240240 003444-000 4412 Arden View Court 149.94 160.25 20.24 330.43 26.43 356.86
223023240283 003898-000 4463 Arden View Court 88.95 106.97 20.24 216.16 17.29 233.45
223023210007 003937-000 1343 Arden View Drive 113.38 133.91 20.24 267.53 21.40 288.93
343023420014 004546-000 12531ngerson Road 90.33 192.54 15.61 298.48 23.88 322.36
223023330015 004713-000 4149 Norma Avenue 120.49 135.05 15.61 271.15 21.69 292.84
333023320008 005251-000 2000 Stowe Avenue 137.23 134.42 15.61 287.26 22.98 310.24
223023210117 005368-000 1450 Arden View Drive 72.60 83.52 20.24 176.36 14.11 190.47
223023130025 006256-000 1301 Nursery Hill Court 558.12 109.27 15.61 683.00 54.64 737.64
213023410028 006494-000 1675 Brueberry Lane 110.82 109.27 20.24 240.33 19.23 259.56
223023220045 006806-000 4519 Royal Hills Drive 43.95 56.71 15.61 116.27 9.30 125.57
223023240248 007082-000 4416 Arden View Court 102.41 109.79 20.24 232.44 18.60 251.04
283023330011 007090-000 1971 Thom Drive 70.56 80.79 15.61 166.96 13.36 180.32
333023310030 007153-000 1827 Beckman Avenue 147.59 147.34 15.61 310.54 24.84 335.38
223023230016 007235-000 1528 McClung Drive 110.85 129.51 15.61 255.97 20.48 276.45
333023240019 008210-000 1873 Grant Road 71.34 83.33 15.61 170.28 13.62 183.90
223023320026 008331-000 1469 Colleen Avenue 189.87 218.85 15.61 424.33 33.95 458.28
333023340067 009129-000 1927 Glenpaul Avenue 106.71 116.18 15.61 238.50 19.08 257.58
343023220010 009593-000 3493 Siems Court 158.14 167.17 15.61 340.92 27.27 368.19
343023310039 009776-000 1468 Lametti Lane 161.07 124.53 15.61 301.21 24.10 325.31
223023240322 009989-000 4478 Arden View Court 89.98 107.56 20.24 217.78 17.42 235.20
223023210020 011462-000 1364 Arden View Drive 78.50 109.27 20.24 208.01 16.64 224.65
223023240239 011640-000 4413 Arden View Court 107.26 109.27 20.24 236.77 18.94 255.71
343023110001 011648-000 1160 County Road E W,Suite 200 493.37 444.80 - 938.17 75.05 1,013.22
343023210002 011863-000 1392 County Road E W 42.72 109.27 15.61 167.60 13.41 181.01
223023220020 011930-000 4528 Keithson Drive 148.94 195.15 15.61 359.70 28.78 388.48
343023130009 012369-000 1309 Cannon Avenue 115.19 129.89 15.61 260.69 20.86 281.55
333023240108 012524-000 1850 Indian Place 70.12 96.38 15.61 182.11 14.57 196.68
9,883.23 8,825.95 1,273.23 19,982.41 1,598.61 21,581.02
NEW BUSINESS— IOB
,- iRZEN HILLS
MEMORANDUM
DATE: March 22, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: David Swearingen, Interim Public Works Director
SUBJECT: Feasibility Report for Arden Oaks Street Improvements
Budgeted Amount: Actual Amount: Funding Source:
$827,000 $542,340 PIR, Surface Water, Sanitary,
(anticipated) Water, Special Assessments
Council Should Consider
Motions to approve, table, or deny the following:
• Authorizing Request for Proposals for the preparation of a feasibility report of the Arden
Oaks Street Improvements project.
All items need a simple majority for action unless otherwise noted.
Background
The 2021-2025 Capital Improvement Program (CIP) identifies proposed street and utility
improvements within the Arden Oaks area for 2022. The value shown in the above budgeted
amount included Eide Circle, Indian Circle and Indian Place. Those streets were rehabilitated in
2020 as part of the Public Works In-house paving project so they have been removed. The
proposed area now consists of Arden Oaks Drive and Arden Oaks Court which includes
approximately 40 single family homes and is generally referred to as the Arden Oaks
Neighborhood. A map depicting the project area is provided in Attachment A.
The City Council work session on March 15, 2021 included discussion of the anticipated scope of
work, schedule and an initial estimate of costs for potential improvements within the project area.
Based on this discussion, the feasibility study will include an evaluation of potential improvements to
streets and storm sewers. The study will review alternatives for street and drainage designs to
determine the extent that the cost of street improvements, and the associated special assessments, can
be reduced based on existing soil conditions and drainage needs within the residential neighborhood.
Page 1 of 4
Preliminary Scope of Work
Existing infrastructure conditions within the proposed project area are as follows:
• Streets
o Current pavement condition rating is 31 out of a possible score of 100. The surface
of the streets is in poor condition covered in an extensive amount of cracking. These
streets have seen an increase in needs for pothole filling and patching, therefore
increasing the cost to maintain.
o Core samples from the Pavement Forensic Report resulted in varied conditions from
good to poor but ultimately a majority of the cores were showing signs of
deterioration.
• Sanitary
o Sewer was installed in 1982 as part of the residential development. 8-inch PVC
material was used, and through televising reports, it is in good condition.
o Manhole castings and concrete rings are deteriorating and need repair.
• Water
o Water main was installed in 1982 as part of the residential development. 6-inch
ductile iron pipe was used and this area shows no history of main breaks.
• Storm Drainage
o Storm catch basin structures are deteriorating and need repair.
o Storm sewer pipe needs to be televised to report condition.
o Curb and gutter are generally in good condition but spot replacement is needed in
some areas.
o The southern curb line along Arden Oaks Drive off Snelling Ave to the cul-de-sac
has a noticeable sag, indicating poor subsurface drainage or in need of soil
correction.
Additional research regarding the age and condition of existing infrastructure will be evaluated
during preparation of the feasibility report. Based on the previous information stated, staff
anticipates the project will include the following elements:
■ Arden Oaks Drive (From Snelling east 400 feet including cul-de-sac): Full-depth
reconstruction of streets with installation of curb, gutter and storm sewer, producing a street
width of 32 feet. Existing ductile iron water main and PVC sanitary sewer to remain in-place.
■ Arden Oaks Drive (Remainder): Full-depth reclamation of existing pavement, and placement
of new 4-inch bituminous pavement mat, spot repair of damaged curb sections, repair or
replace storm structures. Existing ductile iron water main and PVC sanitary sewer to remain in-
place.
■ Arden Oaks Circle: Full-depth reclamation of existing pavement, and placement of new 4-inch
bituminous pavement mat, spot repair of damaged curb sections, repair or replace storm
structures. Existing ductile iron water main and PVC sanitary sewer to remain in-place.
Preliminary Project Budget
The cost estimate was derived from the above anticipated project elements listed. The initial cost
estimate is summarized in the following table and will be revised as part of the feasibility report.
Page 2 of 4
This estimate includes the anticipated costs for engineering design, surveying, and construction
administration as a 20% contingency. The cost for the feasibility report itself is estimated to be
between $20,000 and $30,000.
Category Estimated Cost CIP Budget
Streets $452,978 $700 000
Storm Drainage $72,802 $60 000
Sanitary Sewer $14,400 $42 000
Water Utility $2,160 $25 000
TOTAL $542,340 $827 000
* Initial estimate subject to revisions during the feasibility study
The City's Special Assessment Policy will be used to prepare a preliminary assessment roll as part
of the feasibility report. The policy states that the City will assess fifty percent of the total cost for
street reconstruction and fifty percent of the cost of bituminous overlay for a typical residential
street section on a unit basis. The feasibility report will include a review of special assessment
rates applied to past projects in the City of Arden Hills. Staff will review anticipated special
assessments with the City Council prior to completing the feasibility report.
Preliminary Project Schedule
This project is proposed to be designed separately from the Snelling Ave Improvements but would
go out to bid during the same 2022 season to strategically bring in competitive bids. The following
is a preliminary project delivery schedule for the Arden Oaks Street Improvements project. A
refined project schedule will be provided within the feasibility report.
Authorize RFP for Feasibility Report March 22, 2021
Issue RFP for Feasibility Report March 23, 2021
Approve Professional Services and Resolution April 26, 2021
Ordering a Feasibility Study
Informational Meeting/Online Open House 91 May 20, 2021
Accept Feasibility Report, Call for Hearing June 14, 2021
Improvement Hearing, Order Plans & Specs June 28, 2021
Issue RFP for Engineering Design June 29, 2021
Approve Engineering Design Agreement July 26, 2021
Informational Meeting/Online Open House 92 October 14, 2021
Approve Plans, Advertisement for Bids December 27, 2021
Call for Assessment Hearing January 10, 2022
Assessment Hearing February 14, 2022
Accept Bids and Award Construction Contract February 14, 2022
Start Construction April 20, 2022
Construction Final Completion November 2, 2022
Page 3 of 4
Financial Impact
The preliminary project cost estimate as provided above is approximately $250,000 less than the
current project budget provided in the 2021-2025 Capital Improvement Plan. The CIP identifies
project funding sources consisting of the PIR fund, other (assessments), sanitary sewer utility,
water utility, and surface water utility. The feasibility study will provide updated project cost
estimates and an alternatives analysis to consider options for minimizing project costs. The full
CIP can be found on the City's website, information relating specifically to this project can be
found in Attachment B. These numbers are based on what Council approved in 2020, and do not
show updated numbers based on the 2020 audit as those numbers are forthcoming. It is worth
noting the feasibility report does not commit the City to expending the funds in 2022, but will
provide a better idea of the project cost and scope for planning purposes. The feasibility report can
also be "shelved" for later use should the Council decide not to move forward with the project in
2022.
Attachments
Attachment A—Arden Oaks Street Improvement Map
Attachment B—CIP Information for Arden Oaks Project
Attachment C - PowerPoint
Page 4 of 4
D111 menf Pefh:P\M&PW N—b—d Prol-,M 21-9199Artlen Oaks I,p—.,,.,W()1 fb—bd,ty\2924PMP Area—d
[Attachment A LL
z�
do SMVO
rt �t N34�Jb'
LU
0 E
Q N-9AV
Q 7VOSVd
L
co
O E
Z
W �
0 �
� L
cn
0
Q
0Lp SNELLING
x ,
W
Attachment B
City of Arden Hills, Minnesota
Capital Improvement Plan
2021 thm 2025
PROJECTS BY DEPARTMENT
Department Project# Priority 2021 2022 2023 2024 2025 Total
Economic Development
Gateway Signs 22-EDA-001 nla 246,130 40,000 286,130
Economic Development Total 246,130 40,000 286,130
Equipment
Replace International Plow Truck(Unit 120) 20-EgpV-001 nla 243,960 243,960
Replace 2012 F-350 Truck(Unit 203) 20-EgpV-005 3 48,000 48,000
Replace 2010 F-350 Truck(Unit 210) 20-EgpV-009 3 46,000 46,000
Replace 1997 Toro Groundsmaster(Unit 409) 21-Eqp-001 3 60,000 60,000
Trade in Program Toro Z Mowers(458&459) 21-Eqp-003 3 30,000 30,000
Portable Message Board 21-Eqp-004 4 16,000 16,000
Add Portable Light Tower 21-Eqp-005 4 10,000 10,000
Replace 2005 Felling Trailer(Unit 414) 22-Eqp-006 4 10,000 10,000
Replace 2001 Toro Workman(Unit 411) 22-Eqp-007 3 25,000 25,000
Building Inspector Vehicle(Unit 504) 22-EgpV-002 nla 36,000 36,000
Replace F-450 Truck(Unit 211) 23-EgpV-002 3 80,000 80,000
Replace 1996 Wacker 880 Roller(Unit 106) 24-Eqp-002 3 10,000 10,000
Replace Sterling Acterra Truck(Unit 431) 24-EgpV-001 3 160,000 160,000
Replace 2012 Int'I Plow Wing Truck(115) 24-EgpV-002 n/a 100,000 150,000 250,000
Replace 2018 Toro Large Area Mower(Unit 457) 25-Eqp-001 3 80,000 80,000
Equipment Total 453,960 71,000 80,000 270,000 230,000 1,104,960
Government Buildings
City Hall Maintenance 21-Bldg-005 2 50,000 50,000 50,000 50,000 50,000 250,000
City Hall parking lot 22-Bldg-006 3 260,000 260,000
City Hall roof 25-Bldg-002 3 150,000 150,000
Government Buildings Total 50,000 310,000 50,000 50,000 200,000 660,000
Parks Department
Playground Structure Replacement 20-Park-003 3 110,000 126,000 236,000
Hard Court Reconstruction 22-Park-001 3 426,000 80,000 506,000
Hazelnut Park Warming House 22-Park-002 4 90,000 90,000
Perry&Cummings Park Roof Maintenance 23-Park-004 3 55,000 55,000
Parks Department Total 626,000 55,000 206,000 887,000
Public Safety i
LJFD General Equipment 21-Pu6-001 nla 17,190 14,500 15,000 15,000 15,000 76,690
LJFD Rescue/Chief/Utility Vehicle Replacement 21-Pu6-002 nla 1,280 20,500 57,750 79,530
LJFD Station Capital 21-Pu6-004 nla 1,190 15,620 10,000 10,000 10,000 46,810
LJFD Engine/Ladder Replacement 22-Pu6-001 nla 187,500 400,000 587,500
Lake Johanna Fire Dept Fire Station 25-Pu6-005 nla 80,600 195,000 275,600
Public Safety Total 100,260 238,120 25,000 82,750 620,000 1,066,130
Produced Using the Plan-It Capital Planning Software 115
Department Project# Priority 2021 2022 2023 2024 2025 Total
Sanitary Sewer Department
Lift Station Rehabilitation 21-Sew-001 2 216,000 90,000 210,000 516,000
Sewer Lining/Rehabilitation 21-Sew-002 2 220,000 175,000 330,000 725,000
Sanitary Sewer Department Total 436,000 90,000 385,000 330,000 1,241,000
Street Department
Hemline Avenue crosswalks 20-Str-005 2 102,000 102,000
2021 PMP-Hazelnut Neighborhood 21-Str-005 2 3,682,000 3,682,000
Arden Oaks Neighborhood Streets 22-Str-001 2 827,000 827,000
Old Snelling Ave PMP,CR E-Hwy 51 22-Str-003 2 1,120,000 1,120,000
Lexington Ave,CR E to 694 22-Str-006 2 1,010,000 1,010,000
Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 23-Str-001 2 1,885,000 1,885,000
Karth Lake East Neighborhood Streets and Stowe Ave 24-Str-001 2 1,385,000 1,385,000
Tiller/Dunlap/Benton Way Resurface/Replace 25-Str-001 2 1,125,000 1,125,000
Old Snelling Ave/CR E Intersection Improvements 25-Str-002 3 1,687,000 1,687,000
Street Department Total 3,784,000 2,957,000 1,885,000 1,385,000 2,812,000 12,823,000
Surface Water Management Dept
Shorewood Drive Drainage Improvements 20-Storm-003 3 52,000 52,000
Karth Lake Runoff Control 21-Storm-001 2 180,000 180,000
Karth Lake retaining wall 23-Stor7n-001 2 65,000 65,000
Storm Pond and Outfall Maintenance 23-Storm-002 2 225,000 225,000
Surface Water Management Dept Total 232,000 290,000 522,000
Water Department
Water Tower Maintenance 22-W-001 2 75,000 60,000 135,000
Booster Station Improvements 25-W-002 2 90,000 90,000
Water Department Total 75,000 60,000 90,000 225,000
GRAND TOTAL 5,056,220 4,613,250 2,770,000 1,887,750 4,488,000 18,815,220
Produced Using the Plan-It Capital Planning Software 116
Capital Improvement Plan 2021 Mru 2025 Department Street Department
City of Arden Hills, Minnesota Contact Public Works Director
Project# 22-Str-001 Type Improvement
Useful Life 30
Project Name Arden Oaks Neighborhood Streets
g Category Streets:Reconstruction
TCAAP No Priority 2 Very Important
Description Total Project Cost: $827,000
Arden Oaks Dr/Arden Oaks Ct
Proposed improvements include spot repair to existing curb,repairs to storm sewer catch basins,hydrant repairs,and sanitary sewer manhole and
casting repairs. Pavement is proposed to be milled or full depth reclamation with new bituminous pavement.
Justification
Existing street pavement conditions are declining with ratings below 35. Proposed improvements are necessary to continue safe and reliable street
and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within
the City.
Expenditures 2021 2022 2023 2024 2025 Total
Construction/Maintenance 827,000 827,000
Total 827,000 827,000
Funding Sources 2021 2022 2023 2024 2025 Total
Capital Improvement Funds 350,000 350,000
(PIR)
Other 350,000 350,000
Sanitary Sewer Utility Fund 42,000 42,000
Surface Water Mgmt Utility 60,000 60,000
Funds
Water Utility Funds 25,000 25,000
Total 827,000 827,000
Budget Impact/Other
Produced Using the Plan-It Capital Planning Software
149
M S o $ O 'n g o 0 �n
i p i i i i i i i i i i i i i i i O
Iq
Cl) N
N
� N
M S O S O l'7 O In
NNIL
N u) O N
A S S S O In S O O O M
i i i i i i i i O c N
N OI N co A m O U7 O
O R N (o N �N... M So M N
oob pp pp pp poo
!Mn i S p N on i o i i i i O o i i i i i i i i i p Sp o O_ m
N N P S M O m cpOD R Of U7 O)
O m N O N �N...
N A N P pp co m O O U7 c9
N m N M W �P... �N... M N to
co S Q S O N S S i i i i i i i i i i i i S i O O {M{�
O O O c m O O O O c �p
N h 7 S O M P M U7 (D A
O co N W N M N �- `. fM0 N m
N
M S S S O In $ O O In
m i p p po (D N . i i i i i i i i i i i i . . i 00 O N
N W N N V 100 O
N M Le V7 Go
M000 S o Oo IS i p i i i i o i i O fM0 m
04 A P h Q N M V �0... W 11 W
N M In O O l?
N N
pp p n oo p pp p p
!9 oOo o O p Op O ai i o 00 pOpp S Op i i o c lM9 r7
N m P h b �O A M N m �O S O N M p
O �P...�Q... �M...m�Q... O N lA7 N
N a N N
M S S O S O In 0 0 O O M
pO Of h O f0 M i i i i . p p i i i i O V) pO/
N O M N po V N'tC W N we
O m `, N a ClC S
N U7 U) .... _ _ a
pp pp pp __ o pop 0 0 0 p0e 0
O O S O Q O O V7 R . . . . . . . S S . . . . . . . O M N N N N N N N
m O O t0 f� O A RR O O O O M a
N N $ rv'. aoo ee�� p N V �i au h (D (o cS suoIIIIW
O `.a fo co
N A a N O �... M cc m
pl NW ` U)
0 0 0 0 0 0 Loo u) M m
O O O O O O O O O O O O O
44 4 4 4 4 o 0 0 0 0 0 0 0 0
m m m m m m m L L L L L L L L L
O N N m � I P N N N M 7 h m I
N N N N N N N N N N N N N N N N
R Z m u m
o W Dm
oa w 7 m m W W
c IL mm o g p n o 3
ui m H O c o 2 C7 c tll
> > NJ w 4) mis
c cL G c m 3 $ 15 m @ >.o m li 7
m Z 2 t �O m 'o Etinw o � v .o
E Q w O o a o x $ S m c V o W W a� W m
atW7 u c v c m v w L 2 a o c 5 E m Y m3 p c a
W W W p� W 0 m t a (D Z •o• 3 u r v m
U m m m m Q w 2 S 3 S a 'm i w m c
y wm E E � o � �� � E � �c m cxz ¢ o. mm oU c u. w
w S u > c .° a u r a a s > c E € m m w f a w
co m w c m 7 CC� U m � ¢ a m _ c Z x c rn 11 m
C c m f� m w C >, U c ^6 y c a c a c m m p E t W C C
m o m m W 0 o 11 c m m Nm 'D W m ' W p pp m g m o Cm 9 = w O -c C
m R' D Z f H F F W IL i x 2 D. a x a 2 c.4
O J U Y H U U F C1 W
� o SS oogo 0
N 7 A O O i i i i i i i i i i p M N
O aD" N O'0 7 tC CD co N
G S O c of a s DD N W o
N N W `....0 N
� N c9 N r
N O S S S S O O
G p p i i i i i to N O SOD N
O) 4 P c f� O N'tC IU W 4
O A A a C .-CD q
N pN N M .N...
co �O l'9 S
. . . . . . . . . .N OSO�.. NNNS O
PIL 'tS;C W
f (y (0 ONO Qp0G A N A v
p1 'O C N co AN l
m
r
N N pp N
A m (Op S 8 . . . . . . . . S m S 8 two (Z COD
h h M O pO O Or O) O N N N
ts
N O Cl) M of (NO N A
N a M C ....c0 M ■ r
N N N p N
m S m i i i i i S i S S S O O A
W (M N O tq N O n N
N R O V O `^W P N VJ
N N N p N
■ m
N O O to
OI O p a O O O a cy 0 C O cp
N W m A O M p `2 a a em
N N N N N
f m O m at pz
S S S S O O m
N I.- N O W , Q
CI
N co n A W n
N O M
CrN N N
p p pp pp a CDc(00 00 S S i i S i i i i i i N O p M 10
N W0 O'O V O'^ �. �.N P OJ U) ' NI
CIN LPN...�P... O con
N cV'N N
Cr N pp N
O�1 S M l07 S S S �O S S co
A M (M V) O O O 7 cD O N O A
N h P O O M ��...gym... ��...m OJ CDV)
CI
N M G m `MO O N mry
N v N N N pp N
A O O m S S S i i i i i i i i i co
C c0�O O O O A
to O O O
A ;--t m A co N N
O A O O V �N...N—
cm `�-'m a co CD NC,
ON
N h O m
" N N cV
Q N O <ee0 pNp ppQ pNp eOe N
SUOIIIIVY
93
N N N N N N N N
P N
O S O O O O O O O O O O
3 3 0 0 0 0 0 0 0 0 0 0
m m s s s s s s s s s s
P N N Pj 7 h h m f� aD
N N N N N N N N N N N N
m
m U
WU 'C
mm L
�.a
c z m �`
W LL m
LL IL w O ppm n O �j
` C O mg w d m aLL c m
Eo cc Y v n _= m E D 3 E v
ui w H O 0 3 •x m o o ( >
2 0 � NJ LL £ mx mp1 •� T-
iom a " w
c C.G c i t in w a4 S m ? v _ E E 7
2 Q LL O w Oq c ° m U o o T c 1 t 9 a e c
o c a m 'm Q Ww m
•S.CW7 c L W W •O a 5 0 Y 3 c v y p w m
wID
Q .w c
y w m Z ZV ` C LL w m1i c KW
ma Wa CmC
C C Rw' IL c0 O m m c E W m c c W O
c
w a c m o c E t > c 5
•� @ N (y pm 9 m C m _y E W Y a .�4 w 'O
m 0' 0 F F W JUS N O U Y H O D U J 13 0 0 F o W
O Ov0 O $ &go O O
W W i i i i i i i O m O cMOj � ILO
O Sao W Op mCO ado o
N L O) O
N r
O O O O O g 0 O O
Cm
M W i i i i i i i i a O L N OND
O W O co 0n a b L 0
O ar � 9 m C co N A
N N
O S O O o O g 0 O O
i i i i i i i i i p i i i 7 0 N m
00
N W ar O ... C coL N r
N
O N (VD
O O N S O O O
m A i i i i p i i cy O M cc V
L C Oi O) aN'7 ' L W
c M W P W) C co ao
N co O p p N r
N R O O i i i i S i i i S S S c C O
10 m � N O O co O c O) m
G
0CR
N O O) m
O S Do
$ O g 0 O O
N N O i i i p i i i i a p
N O' O' O 7 -
OI Mt M �N... C � S
N M O M O N c0c
O S O O S g 0 O O
Ol C i i i p i i i i f� O r N
pj I.. com . v
N O O W N M
O S O O O S S OO S CD O O
M vi vi h ao 7 I� U) M
� `CN O n
N O O O)
O Ov O O 0 0 g 0 O O
IOW m O i p p i i i i i tp O ccq C PO/ I
N O) N'N lh M W O1 rry
G O O m�0... S C O) O S
N v W W N
O N O O S S O O S O O O
to cNp_ A O O i i i i i i i i p i i cy O 0 cq cco ICOO
O) M cM N N'f� O' Oi 7 N W Ol
Cco P.. O ON
{V N (3) .. N .M...
0 0 pp p0p
N N N N N
SUOIIIIW
P N
p o p o p o p o p
s s s s s s s s s s s s
a N N cy 7 N h N m N n ND PN ty ty
N N N N N N N
.�- c z m r_A Ly W
_W m
LL
LL IL W O p n O
qg a ID
c
y W H O O m 0 c W
2 p 7 H LL -E m 2 W N '� o m a c 00
c $o c i W tnwa4c � vE ` v �
E c LL
o a LL O W m o 0: W m
W u L c m v W 5 o
C> O W c W C c O a m m c L cf ''Cco E m E 7 3 W W > qW @ m cc z u c- O c a_ e u
U Q m W ; Z a C W O.Z U i W N W c LL W
W as W
c m m o ''' 8 a W Z Y c rn m Y y p rn° N m
LL 'O f p m c c E W W W a c .W W WO O
W C C m L E L L L C C
O N pm v C m E W y Ctp Ctp Y W
m 0' O o o W N E O U Y o U U J Y Y U) 0 H C> W
m MC) m o$o O m
V M M A i i i i i i i i i f� O r 1q O
O N ry O"
O A S O A i.Oj O V co O
N N O N `�-a M m S
N Cl) 1(f N N
00 O n O$In Lo m
O GmD W i i i i i i i i i i i i i m a^D O S M V
O M M A O m S 10 N N -
A ' `N � O A q
N aL N'O O) `�-m N N r N V N N
Ov O OO S O$O O
153 h N i i i i i p i i O m Op c fN0
04 m m m m m O S N O O L.
N C
A S OD m ... `N O O A
N m N'W m `.P...M N OI S
N N
O (D po po O$O O
M So
N S O W
c, coO Cl) ` O A
N pJ Cr W N `....M N m r
pp N V pp pp pp ,Qo N
N53 l'7 i i i i i i i S i i S i e0. 0 0 c, l7
m N It p M
N A M N ` S v O O O In N u
c, A , A � �M... �N... A coN M N N a p p o o `p`Npl� roi
4 N N_ So i i o O i i i p ^ 00 oo N
N M N
N N m v O pp I, f0 A q
vt
N .N... N
S O S S S S S O O
V N N A i i p i i i ' c O V
N m m oo V .pN... m O
c mm m '� 3
N m m a N
N N M N
o O pp o$o O N
A M i i S i i i i i i O h o fM0 P V
M m f0 W O of ty$ q
N m M
1 N n
Nm m f0 �N...O �.-N co
N N M pp o pp N
MO 7 O , S 00 i i i i , S ^ 00 M O
04 M Awl
-
N A h h bi vi f�
A (oy �.`�
N A In M �.- �.- coN N M N
O O $ $O O
WO O OMD O i i i i i i i i i i i i Op M N IM()
m p N OD O' aD'P O O A ■ N
NN R m m .N...O ....W P.-
Cr N [9 .�... N
0 0 0Ll 0
0 0
suoppyy w w w
O O O O O O O O p 0 0 0 0
4 0 0 0
� vyi � vyiG? G?I? vyi333
M N N O N h N N N N N N N N N N N N
3 Z m Alm
o c J m a
W LL m
LLo
IL W o pm n 0
c c 0 M _ a m a LL c m
E W c n m E LD t m
= m fA � 0 3 x o O c > W
2 0 M LL £ m x W m o m a
O c m o@ >. 8 m LL E c 00
m E Z IL L O0 .2f LL' £ a' .m.. �m .� m O m c 'O u
E Q v j Z o V c a W c ¢� LL $ ID rLL' W m
Q W m c e w £ o x t 3 w m m c E m
C C a w 'm c m 9 w .m.. a m m
U G w e Q w m > � w m °�a @ W c m —°o c
cc W m 3 x Z Q € W o.a z u c mm o K W C LL W
C wern o .+ a W ` z Y c ` rn m W 3 $ W p 6 C m
LL 'O f O m m c E W ?� F N m m W m m
A m c
m $.o o w p pm y o Ctp m V L m - W p m m. La o L c
m w 0 F F w N d O U Y H O D U 3 H ?i m 0 O H F C> W
cn
U w
U
c�
Q
ct
ct
a�
auj
�
N 3AW
O Q 7VZ)SVd
Ul
Q
ct
V
_,.-- OL-D SN jjLLIN
cn
W
W
d :9
I a
r
,r
A � �1
r.
�r
w �
V1
4
O r;r W
�LJ
nct
�LJ
dV
O
Lri Lr;
17, 17,
�2
cN cN C14 cN cN e.N en
S.0
co 0-) 0-) cfj cfj C6
41,j Cj iNj �14
72
Lr)
y�
lio r,
p
Q
4,M
h f) ir-
ji. I
Llf n
Ll
'11r1 -7-
f,7. I
rM