HomeMy WebLinkAbout07-19-21-WSAGENDA ITEMS
Review Draft Feasibility Report –Arden Oaks Improvement Project
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Speed Limits Discussion
MEMO.PDF
ATTACHMENT A.PDF
CIP Budget
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Water Meters Discussion
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
CD Staffing
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Council Tracker
MEMO.PDF
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:
David Grant
Councilmembers:
Brenda Holden
Fran Holmes
Dave McClung
Steve Scott
City Council Work Session
Agenda
July 19, 2021
5:00 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our
long -standing tradition as a desirable City in which to live, work, and play.
CALL TO ORDER
1.
1.A.
Documents:
1.B.
Documents:
1.C.
Documents:
1.D.
Documents:
1.E.
Documents:
1.F.
Documents:
2.
AGENDA ITEMSReview Draft Feasibility Report –Arden Oaks Improvement ProjectMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFSpeed Limits DiscussionMEMO.PDFATTACHMENT A.PDFCIP BudgetMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFWater Meters Discussion
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
CD Staffing
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Council Tracker
MEMO.PDF
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenFran HolmesDave McClungSteve Scott City Council Work SessionAgendaJuly 19, 20215:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.CALL TO ORDER1.1.A.Documents:1.B.Documents:1.C.Documents:1.D.Documents:
1.E.
Documents:
1.F.
Documents:
2.
Page 1 of 3
AGENDA ITEM – 1A
MEMORANDUM
DATE: July 19, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: David Swearingen, Interim Public Works Director
SUBJECT: Draft Feasibility Report for Arden Oaks Street Improvements
Budgeted Amount: Actual Amount: Funding Source:
$827,000 $583,000 PIR, Surface Water, Sanitary,
(Estimated) Water, Special Assessments
Council Should Consider
Review the draft feasibility report for the Arden Oaks Street Improvements project and
provide any feedback.
Request a proposal from TKDA to continue the Arden Oaks Street Improvements project
into engineering design and construction administration.
Background/Discussion
On April 26, 2021 Council approved Resolution 2021-023 Ordering of the Feasibility Report for
the Arden Oaks Street Improvements project and the Professional Services Agreement with
TKDA.
TKDA has prepared a draft feasibility study (Attachment A) for the Arden Oaks Street
Improvements project for consideration by the City Council to be accepted on July 26, 2021.
Staff is requesting an opportunity with Council to review the content of the draft feasibility study
and allow for any feedback.
The improvements consist of pavement rehabilitation, concrete curb and gutter repair, casting
replacement and adjustment, and appurtenant work on the following areas:
Arden Oaks Drive between (between Snelling Avenue North and County Road E West)
Arden Oaks Court (from Arden Oaks Drive to the end of the Cul-de-sac)
Page 2 of 3
TKDA has done excellent work through the feasibility process. They understand the project site
well and have connected with the neighborhood through collecting information from the
questionnaires distributed to the residents and speaking with them while on site. On past projects
staff has sent Request for Proposals (RFP) to consultants to prepare plans and specs and
construction administration. Staff is requesting Council consider asking TKDA for a proposal,
this will eliminate any errors from transfer of information to another consultant and the
neighborhood has already become familiar with TKDA.
Budget Impact
Page 3 of 3
Attachments
Attachment A – Draft Feasibility Report
Attachment B – PowerPoint Slides
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 1
Feasibility Report
Arden Oaks Neighborhood Improvements
City of Arden Hills, Minnesota
City Project No. PW-21-0109
TKDA Project No. 18196.000
DRAFT – July 8, 2021
DRAFT REPORT
7-8-2021 Attachment A
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 2
Arden Oaks Neighborhood Improvements
Feasibility Report
City of Arden Hills, Minnesota
City Project No. PW-21-0109
TKDA No. 18196.000
July 8, 2021
I hereby certify that this report was prepared by me or under my direct supervision, and
I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
Larry Poppler
Professional Engineer
Date: July 8, 2021 Lic. No.: 41005
TKDA
444 Cedar Street - Suite 1500
Saint Paul, MN 55101
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 3
Summary
Arden Oaks Neighborhood Improvements:
Pavement rehabilitation, concrete curb and gutter repair, casting replacement and adjustment, and
appurtenant work on the following areas:
x Arden Oaks Drive between (between Snelling Avenue North and County Road E West)
x Arden Oaks Court (from Arden Oaks Drive to the end of the Cul-de-sac)
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 4
Table of Contents
Certification Page .................................................................................................................................. 2
Summary ............................................................................................................................................... 3
Table of Contents .................................................................................................................................. 4
Introduction .......................................................................................................................................... 5
Background .......................................................................................................................................... 5
Arden Oaks Neighborhood Existing Conditions .............................................................................. 6
Arden Oaks Neighborhood Proposed Improvements ..................................................................... 8
Resident Input ....................................................................................................................................10
Project Funding .................................................................................................................................10
Estimated Costs ....................................................................................................................... 10
Assessment Policy ................................................................................................................... 11
Assessment Calculation and Estimation .................................................................................. 12
Funding Sources ...................................................................................................................... 12
Preliminary Project Schedule ...........................................................................................................13
Conclusion and Recommendation ..................................................................................................13
List of Tables
Table 1 Coring Log ................................................................................................................................ 8
Table 2 Project Cost ............................................................................................................................11
Table 3 Assessment Calculation .........................................................................................................12
Table 4 Project Funding ......................................................................................................................12
Table 5 Project Schedule ....................................................................................................................13
List of Exhibits
Forensic Pavement Report ........................................................................................................ Exhibit 1
Resident Input ............................................................................................................................ Exhibit 2
Typical Cross Sections .............................................................................................................. Exhibit 3
Engineer's Estimate ................................................................................................................... Exhibit 4
Preliminary Assessment Rolls ................................................................................................... Exhibit 5
Assessment Map ....................................................................................................................... Exhibit 6
Geotechnical Report .................................................................................................................. Exhibit 7
15% Street Improvement Plans ................................................................................................. Exhibit 8
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 5
Feasibility Report
Arden Oaks Neighborhood Improvements
Prepared for City of Arden Hills, Minnesota
Introduction:
On April 26, 2021, the Arden Hills Council adopted Resolution 2021-23 which ordered the
preparation of a Feasibility Report for improvements to the project areas listed below:
Arden Oaks Neighborhood:
Bituminous paving, storm water improvements, concrete curb and gutter repair, and appurtenant
work on the following areas:
x Arden Oaks Drive (Snelling Avenue North and County Road E West)
x Arden Oaks Court (from Arden Oaks Drive to the end of the Cul-de-sac)
Located within Section 27-SW, Township 30N, Range 23W, as described on 2 plats: Arden Oaks
and Shady Oaks Addition.
This report evaluates the feasibility of two options for Arden Oaks neighborhood street
improvements in the described project areas. All existing infrastructure elements were evaluated,
improvements recommended, cost estimates of the proposed improvements prepared and funding
strategies developed in this report. Option one will be comprised of a full depth street reclamation
and option two will be comprised of a 2” bituminous mill and overlay.
Background:
The City of Arden Hills currently utilizes pavement rating data, pavement forensic data, soil boring
information, and the Capital Improvement Plan (CIP) to prioritize the infrastructure improvement
needs within the city. As reported in the Arden Hills pavement forensic report and the CIP both
Arden Oaks Drive and Arden Oaks Court are recommended for pavement rehabilitation.
The Arden Oaks neighborhood is a single family residential neighborhood and is proposed for
rehabilitation from Snelling Avenue South to County Road E West. Improvements would include
pavement rehabilitation, curb repair, and storm water infrastructure improvements as needed. The
forensic pavement report showing the Arden Oaks Neighborhood rehabilitation plan can be found
on Exhibit 1 in the appendix.
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 6
Arden Oaks Existing Conditions:
Streets and Lane Configurations:
The majority of properties located within
the Arden Oaks residential neighborhood
were platted in the mid to late 1980s.
According to the City’s CIP and city
records, the last major maintenance task
was a mill and overlay in 1996. Since then
it appears the street section has been
treated with chip seals, crack seals, hot
patching and partial overlays several
times in the years since. The most recent
maintenance appears to be a street
overlay in select areas coating the outside
edges of the roadway with a 1” to 1.5” lift
of bituminous. According to the CIP, the
Arden Oaks neighborhood is schedule for
major maintenance (mill and overlay or
reclamation) in 2022.
Many factors have accounted for roadway deterioration including the following:
x Time and weather (freeze/thaw cycle)
x Underlying soil conditions
x Traffic volumes
x Roadway pavement section
x Heavy vehicle loading
x Surface and subsurface water drainage
The City completes pavement ratings for
local streets and have noted that the
ratings for the streets in this
neighborhood were in the low 30s out of
a 100-scale rating. During the field
inspection of the neighborhood, many
roadway deficiencies were noted
including large frost cracks (through both
curb and street sections), fatigue cracks,
pot holes, and minor drainage issues. It
was also noted that many of defects had
been patched or filled recently.
Additionally it has been observed at
certain times of the year ground water and
water discharged from sump pumps
seeping from behind the curb and into the street section. Although the geotechnical report did not
explicitly note high ground water in the area there are signs of it from field observations.
The geotechnical report completed by WSB found that the pavement section in the Arden Oaks
neighborhood ranged from 5 to 6-1/2 inches in depth. Additionally, suitable aggregate base material
was found over the entire area or the Arden Oaks neighborhood ranging in depth from 5 to 13
inches. Underlain soils were typically sandy lean clay with gravel. The geotechnical report is located
Figure 1. Recent Bituminous Overlay on Arden Oaks
Drive
Figure 2. Bituminous Patching, May 2019 Arden Oaks
Drive
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 7
in the appendix in Exhibit 7; additionally the typical cross sections for the Arden Oaks neighborhood
can be found under Exhibit 3.
Curb and Gutter: The current condition of the curb and gutter
along Arden Oaks is mostly acceptable with exception to the
few areas with settling, large cracks, and drainage issues. In
general, the curb on Arden Oaks Drive appears to be
functional in a drainage perspective and aesthetically in
good condition. A large majority of the curb that was in
functional condition had vegetation growing in the expansion
joints. The vegetation seemed to be trapping sediment and
other debris causing water to spill out of the gutter onto the
roadway.
On the south end of Arden Oaks Drive there appears to be
an existing concrete apron that has been overlaid with
bituminous blocking water from traveling from west to east.
The buildup of material from various maintenance
operations has caused localized drainage issues.
Utilities: The existing sanitary sewer in the neighborhood is 8” PVC sewer pipe with concrete
manholes and adjustment rings, the existing watermain in the neighborhood is 6” DIP and the storm
sewer is various sizes of 12” to 18” reinforced concrete pipe. All utilities in the neighborhood were
constructed with the original roadway around 1983. From field inspection, most castings in the
neighborhood appear to be acceptable in both function and aesthetic. It was noted that some
structures looked to be covered in debris and beginning to collect sediment in the gutters around
them.
Additionally some of the curb and gutter around the
catch basins has begun to crack and sag causing
drainage issues and sedimentation. The drainage
issues could potentially lead to pavement damage
by allowing water into the pavement section. It was
noted that some of the catch basin rings are
beginning to deteriorate and break off into the
structures. Some sedimentation was noted in the
structures.
Watermain within the neighborhood consists of 6” ductile iron pipe which was installed in 1983.
The watermain functions well and is not proposed for improvement. Maintenance does not note
deficiencies in the watermain systems in this neighborhood. Valve casting adjustments would be
needed with street improvements.
Sanitary sewer pipe includes 8” PVC pipe which was also installed in 1983. The pipe and
structures are in good condition and do not require improvement. The rings and casting
adjustments would be completed with street improvements.
Figure 3. Deteriorated Curb Arden
Oaks Drive
Figure 4. Failing Rings in Catch Basin Arden
Oaks Drive.
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 8
Drainage and Detention Ponds: Two stormwater detention ponds have been identified in the
project area. The first is located northeast of 1399 Arden Oaks Drive, and the second is located
west of 1469 Arden Oaks Drive. These two ponds have collected some sediment and have partially
lost their full ability to treat storm water before discharging to natural bodies of water. At this time,
it does not appear that a full cleanout would be
necessary, but the ponds may benefit from cleanup
around the inlets and outlets. Further investigation and
survey may be required to investigate and evaluate the
benefits and cost of the maintenance; these costs were
not factored into the cost estimates in this report.
The cul-de-sac east of Snelling Avenue appears to
have consistent ground water along the south curb line.
Upon the field inspection, several drain tile and sump
pump discharges were noted in the cul-de-sac area
extending down the street towards Snelling Avenue.
Several residents explained the drainage issues they
had in this area as well. It was noted that water comes
from the back yards in between the houses to the street on the south side of Arden Oaks Drive.
Arden Oaks Neighborhood Proposed Improvements:
Streets: Considering the existing condition, deterioration factors, and geotechnical investigation, a
full depth pavement reclamation is proposed for the streets within the project area. With pavement
ratings below 45 out of 100, mill and overlay provides only limited benefit as the underlying base
pavement materials have deteriorated to a point that cracking would reflect to the new bituminous
overlay almost immediately.
If mill and overlay is selected, a portion of the project may still need full depth reclamation according
to the forensic report and the geotechnical report including Arden Oaks drive from Snelling Ave
North 400 feet east to the cul-de-sac. For the rest of the area, a mill and overlay can be shorter-
term street improvement (10-year improvement). However, reclamation of the street section can
provide more structural aggregate base and disrupt the existing frost heaving that has breached
the existing aggregate base and bituminous surface (15-year improvement plus future mill and
overlay opportunity). Reclamation is traditionally considered a longer-term maintenance task in
which future mill and overlays can be done to extend underlying pavement and base longevity. A
mill and overlay will likely begin to show cracking within one to two years following the conclusion
of the project. Table 1 presents the coring information gathered from the geotechnical report coring
log (Exhibit 7) and forensic pavement report (Exhibit 1).
Table 1: Coring Logs
Core Bituminous (in) Aggregate Base (in) Total (in) Subgrade Soil Type Mill & Overlay Depth (in) Reclaim Depth (in)
A 5 12 17 Sandy lean clay *NR 12
B 5.5 8 13.5 Sandy lean clay *NR 12
C 6 6 12 Sandy lean clay 2 12
D 5 8 13 Fill: Sandy lean clay 2** 12
E 6 5 11 Sandy lean clay 2 12
F 6.5 7 13.5 Sandy lean clay 2 12
G 5.5 5 10.5 Fill: Sandy lean clay 2 12
H 6 13 19 Fill: Sandy lean clay 2 12
*NR – Not recommended by report
** Potential area subject to raveling after milling
Figure 5. Ground Water Emerging from
May 2019 Arden Oaks Drive
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 9
Due to the fact that some areas of the project are not recommended for a mill and overlay and
some areas of the street may require bituminous removal and replacement after milling and prior
to overlaying, it is recommended the entire project area be reclaimed and full depth pavement
replacement be performed. This will provide the neighborhood with a uniform street section and
longer lasting results.
To make room for the new bituminous
section, the reclaimed material will be
graded and compacted to a depth of 5”
below finish grade after reclamation and
excess material removed. A leveling
layer of 1” of class 5 will be added under
a 4” bituminous pavement section
placed over the new roadway base in
two lifts across the width to provide a
smooth new surface. A proposed typical
section for Arden Oaks Drive and Arden
Oaks Court is shown in Exhibit 3.
Curb and Gutter: Existing curb and gutter will remain in place except for curb that is damaged,
settled, or not draining properly. The existing curb will be inspected and marked for removal prior
to construction. It is typical to see between 20% to 30% curb replacement for residential roadways
of this age due to settlement or cracking. From examination of the curb in the field, it was found
that approximately 30% +/- 5% of the curb would need to be replaced due to large cracks or settling
causing drainage issues. For the purposes of this report and estimates, 30% was used for
calculation of project costs and scope.
One portion of curb, approximately 300 feet in
length around the Arden Oaks Drive cul-de-sac
extending down the south curb line approximately
100 feet, was noted during field inspection as being
in poor condition. It is recommended the curb in
that stretch be replaced in its entirety. In addition
to the curb being replaced, it is recommended that
drain tile be installed around the radius of the cul-
de-sac to the catch basin located on the south side
curb of the Snelling Avenue Arden Oaks
intersection. A valley gutter is also recommended
at the Arden Oaks Drive County Road E
intersection to better facilitate drainage through the
intersection.
In addition to curb and gutter replacement, driveways impacted by replaced curb and gutter will be
patched to the same, or better than, previous conditions. Turf disturbed as a part of the curb
replacement process will be restored with 6” topsoil and residential grade seed.
Utilities: It is recommended that all the manhole and catch basin rings be replaced as a part of the
pavement rehabilitation project. It is typical to reset all manhole and catch basin grades to match
the new grades of the roadway to improve drivability and drainage. In addition to the adjustment
rings, outdated and damaged manhole and catch basin casting assemblies will be replaced with
their modern castings. Storm sewer manholes and catch basins and sanitary manholes will be
recast with new concrete rings. Sanitary sewer manholes will be recast with concrete rings and
infiltration prevention products to limit inflow and infiltration into the sanitary system.
Figure 6. 2020 Street Reclamation Project from White
Bear Township Street Project
Figure 7. Curb and Gutter from 2020 Mendota
Heights Street Project
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 10
Resident Input:
On May 7, 2021, an informational letter including a questionnaire was sent to the 40 property
owners adjacent to the Arden Oaks project to inform them of upcoming street improvements and
give basic project information. The questionnaires asked about several questions including
drainage and erosion issues, pet fences and other private utilities, traffic and pedestrian issues,
and other resident concerns.
Twenty-eight (28) of the Arden Oaks neighborhood questionnaires were returned, for a 70.0%
return rate.
The letters, questionnaires, and responses are shown in Exhibit 2. Primary concerns from the
questionnaire were localized drainage issues, truck turnarounds, through traffic during congested
times, and pedestrian safety while crossing Snelling Ave and County Road E.
Several residents requested cross walks to be installed across the Ramsey County collector roads
(Snelling Avenue and County Road E) in efforts to make crossing safer and easier. Any crosswalks
proposed must follow the Ramsey County procedures and evaluation for consideration. Funding
for these improvements would also be a County expenditure. This report recommends the
assessment of pedestrian improvements, in coordination with Ramsey County, at the intersections
of Arden Oaks Drive and Snelling Avenue and Arden Oaks Drive and County Road E. There are
currently no pedestrian ramps on either side of the street and no sidewalks on Arden Oaks Drive.
Americans with Disabilities Act (ADA) would require the installation of pedestrian ramps on both
sides of the intersections. Additionally, pedestrian safety and ease of crossing would benefit from
a flashing beacon sign.
An additional issue noted by residents in the questionnaire was semi-truck traffic turning around
within the neighborhood, specifically the cul-de-sac off Snelling Avenue. The neighborhood streets
are not designed for, or expected to have, any amount of truck traffic. The cul-de-sac could be
reduced in size to discourage this activity; however, this would lengthen residential driveways and
bring them closer to one another. Another solution may be to add a center island in the cul-de-sac
containing a rain garden to discourage turnaround tr affic. This issue could be reviewed as a part of
the final considerations and design process.
A power point presentation will be prepared with audio to be placed on the City’s website. This
power point will provide information from the feasibility study and offer contact information for
questions. This power point will help prepare the public for the upcoming public hearing. A link to
the website will be sent with the notice for the public hearing.
Project Funding:
Estimated costs: The following costs were prepared for both full depth reclamation (option 1) and
a mill and overlay (option 2). Engineer’s Estimates (Exhibit 4) were prepared for both options and
are subject to change depending on the final design of the project, required easements and/or right
of way, soil conditions, bids received, and actual work performed. Both cost estimates include
indirect cost for City administration, design engineering, construction engineering, legal support,
fiscal support, interest during construction, assessment roll preparation and contingencies
encountered during design and construction. Table 2 compares the estimated project construction
and indirect costs for both options.
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 11
Table 2: Project Cost
Option 1 – Full Depth Reclamation Estimated Costs
Street Improvements $ 413,197.50
Indirect Costs for Street Improvements (27%)* $ 111,563.33
Total Costs for Street Improvements $ 524,760.83
Storm Sewer Improvements $ 33,150.00
Indirect Costs for Storm Sewer Improvements (27%)* $ 8,950.50
Total Costs for Storm Sewer Improvements $ 42,100.50
Sanitary Sewer Improvements $ 9,750.00
Indirect Costs for Sanitary Sewer Improvements (27%)* $ 2,632.50
Total Cost for Sanitary Sewer Improvements $ 12,382.50
Water Improvements $ 2,450.00
Indirect Costs for Water Improvements (27%)* $ 661.50
Total Cost for Water Improvements $ 3,111.50
Total Improvement Cost $ 458,547.50
Total Indirect Costs for City (27%)* $ 123,807.83
Total Project Cost $ 582,355.33
Total project cost (rounded) – Option 1 $ 583,000.00
Option 2 – Mill and Overlay Estimated Costs
Street Improvements $ 278,695.00
Indirect Costs for Street Improvements (27%)* $ 75,247.65
Total Costs for Street Improvements $ 353,942.65
Storm Sewer Improvements $ 20,400.00
Indirect Costs for Storm Sewer Improvements (27%)* $ 5,508.00
Total Costs for Storm Sewer Improvements $ 25,908.00
Sanitary Sewer Improvements $ 9,750.00
Indirect Costs for Sanitary Sewer Improvements (27%)* $ 2,632.50
Total Cost for Sanitary Sewer Improvements $ 12,382.50
Water Improvements $ 2,450.00
Indirect Costs for Water Improvements (27%)* $ 661.50
Total Cost for Water Improvements $ 3,111.50
Total Improvement Cost $ 311,295.00
Total Indirect Costs for City (27%)* $ 84,049.65
Total Project Cost $ 395,344.65
Total project cost (rounded) – Option 2 $ 396,000.00
Assessment Policy:
Per the City’s Assessment Policy, benefiting properties shall be assessed 5 0% of the street
improvement costs. The remaining 50% shall be paid through the Street Capital Improvement
Fund. The term of the assessment is proposed to be 10 years for a reclamation and 5 years for a
mill and overlay. The interest rate for the term has not yet been set and will be provided as the
process moves forward. The interest rate was assumed to be 3.15% for the purpose of this report.
The area proposed to be assessed is every lot, piece, and parcel within the City limits benefiting
from the Arden Oaks Neighborhood improvements, with driveways abutting the roadway, within the
following described areas located within Section 27-SW, Township 30N, Range 23W, as described
on 2 plats: Arden Oaks and Shady Oaks Addition. Per paragraph I in the Definitions Section of the
assessment policy (page 8), we do not recommend placing an assessment on the park within the
Arden Oaks neighborhood. The intended use of the park appears to be for the local residents of
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 12
the neighborhood and is not intended for regional use. The improvement cost is assessed on a unit
basis to the benefiting properties as per the Assessment Policy adopted by the Arden Hills task
force in 2004, and as amended. Due to the lower density of homes within the neighborhood and
the parks centralized location, the assessments for the improvements are above average compared
to other recent assessments for similar work in the city. See Exhibit 5 for the preliminary
assessment roll and Exhibit 6 for the preliminary assessment map.
Assessment Calculation and Estimation:
The assessable amount is divided by the number of units within the project area; each lot shall
count for 1 unit. The preliminary assessment calculation is derived from taking the overall
assessable project costs, multiplying by 50%, and then dividing by the number of units within the
project area. The units are shown in the Arden Oaks Neighborhood preliminary assessment roll
and include a total number of 40 units. Below is the calculation for the assessments for both project
options. Table 3 displays the assessment calculation and estimation:
Table 3: Assessment Calculation
Option 1 – Full Depth Reclamation
Total Project Cost $ 583,000
Assessable Amount $ 524,800
Assessment (50% of Assessable Amount) $ 262,400
Single Family Dwelling Units 40 Units
Unit Assessment (Assessable amount/ 40 Units) $ 6,560 /Unit
Option 2 – Mill and Overlay
Total Project Cost $ 396,000
Assessable Amount $ 354,000
Assessment (50% of Assessable Amount) $ 177,000
Single Family Dwelling Units 40 Units
Unit Assessment (Assessable amount/ 40 Units) $ 4,425 /Unit
Funding Sources: Funding sources for this project are proposed to come from municipal levy,
assessments, and utility funds. Table 4 summarizes the funding sources for the two project
options:
Table 4: Project Funding
Funding Breakdown Option 1 – Full Depth Reclamation Amount
Permanent Improvement Revolving Fund (PIR) $263,007
Special Assessments $262,400
Utility Fund – Storm Sewer Fund $ 42,100
Utility Fund – Sanitary Sewer Fund $ 12,382
Utility Fund – Water Fund $ 3,111
TOTAL $583,000
Funding Breakdown Option 2 – Mill and Overlay Amount
Permanent Improvement Revolving Fund (PIR) $177,599
Special Assessments $177,000
Utility Fund – Storm Sewer Fund $ 25,908
Utility Fund – Sanitary Sewer Fund $ 12,382
Utility Fund – Water Fund $ 3,111
TOTAL $396,000
DRAFT REPORT
7-8-2021
Feasibility Report TKDA Project No. 18196.000
City of Arden Hills Page 13
With a total estimated bond issue of $525,407 for full depth reclamation (option 1), the assessed
amount of $262,400 would be equivalent to 50% of the total bond issue. For the mill and overlay
(option 2), the bond issue would be $354,599 and assessments of $177,000 would also be
equivalent to 50% of the total bond issue.
Minnesota Statutes Chapter 429 Special Assessment Bond Issue requires that a minimum of 20%
of the total bond issue amount be recovered through special assessments.
Preliminary Project Schedule:
Table 5 outlines a project schedule to substantially complete the assessable project in 2022:
Table 5: Preliminary Project Schedule
Activity Date
Authorize Preparation of Feasibility Report April 26, 2021
City Council Work Session July, 19, 2021
Accept Feasibility Report July 26, 2021
Public Hearing / Order Improvements August 23, 2021
Accept Plans and Specifications and Authorize Bidding January, 2022
Bid Opening February, 2022
Accept Bids and Authorize Assessment Hearing March, 2022
Assessment Hearing / Adopt Assessment Roll / Award Contract April, 2022
Commencement of Construction May, 2022
Substantial Completion of Construction September, 2022
Certify Assessments to County November, 2022
Warranty Inspection June, 2024
Conclusion and Recommendation:
It is recommended that a full depth reclamation project for the Arden Oaks neighborhood be
completed. Full Depth Reclamation will produce a uniform stable long lasting roadway for the
residents of Arden Oaks as well as reduce short-term maintenance. The total estimated cost of
the recommended improvements is $583,000. A portion of this project is proposed to be
assessed to the benefiting property owners and the remainder through other funding sources. In
accordance with the City’s Assessment policy, the preliminary assessment for the recommended
improvement is calculated at $6,559 per unit. As the project is designed and competitively bid,
the calculated assessment amount will be updated leading up to the adoption of the assessment
roll. A 15% Street Improvement Plan is located in exhibit 8.
The improvements are necessary to allow for safe and reliable street and utility services within
the Arden Oaks neighborhood. The project will be competitively bid to allow for a cost effective
improvement. The feasibility study has provided an overall analysis of the feasible improvements
for consideration within this neighborhood. Therefore, the proposed improvements within the
Arden Oaks neighborhood as outlined in this report are necessary, cost effective, and feasible
from an engineering standpoint.
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
Exhibit 1
)RUHQVLF3DYHPHQW5HSRUW
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum
To: Todd A. Blomstrom, PE
From: Andrea Blanchette, PE
Tom Wood
Sheue Torng Lee
Date: May 6, 2020
Re: Arden Oaks Area Forensic Report
City of Arden Hills
WSB Project No. 016063-000
WSB is pleased to submit this pavement forensics report detailing the results of the pavement
coring which was completed on May 4, 2020 in the City of Arden Hills. The various characteristics
of the pavement cores were summarized to provide information to the City to assist in
determining the appropriate pavement maintenance or rehabilitation method.
A total of 8 pavement cores were obtained within the Arden Oaks neighborhood. The locations of
the pavement cores are summarized in Figure 1. A summary of the pavement depths and
conditions for the streets are shown in Table 1. Pictures of the cores obtained can be found in
the Appendix.
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE May 6, 2020 Page 2 Figure 1. Pavement core locations within the Arden Oaks area.Core 1 Core 2 Core 3 Core 4 Core 5 Core 6 Core 7 Core 8 Core 9 DRAFT REPORT7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 3
Table 1. Pavement core location and information.
Core ID
Bituminous
Depth
(inches)
Aggregate
Depth ᵠ
(inches)
Recommended
Maintenance
Activity
Notes
1 6.25 9
Full depth
reclamation
(FDR)
Core was in good condition.
The top lift was 2.5 inches. All
layers were bonded together
well. Subgrade material was
found to be clay.
2 6.25 3
Core was in fair condition and
there was debonding between
pavement lifts. The top lift
was 2 inches. Subgrade
material was found to be
sand.
3 6 8
Mill and Overlay
Core was in fair condition and
it was starting to show signs
of deterioration, losing fines
and binder. The top lift was 2
inches. Subgrade material
was found to be sand.
4 6.5 8
Core was in poor condition
exhibiting raveling between
pavement lifts. The top lift
was 2 inches. Subgrade
material was found to be clay.
5 6 11
Core was in good condition.
The top lift was 2 inches. All
layers were bonded together
well. Subgrade material was
found to be clay.
6 6 8
Core was in fair condition and
it was starting to show signs
of deterioration, losing fines
and binder. The top lift was 2
inches. Subgrade material
was found to be clay.
7 5.75 7
Core was in good condition.
The top lift was 1.5 inches.
Subgrade material was found
to be clay.
8 N/A N/A
Core was not obtained due to
the uniformity of the roads
observed.
9 7 10
There was delamination
between pavement lifts. The
top lift was 2 inches.
Subgrade material was found
to be sand.
ᵠ Aggregate material was observed to be limestone at all core locations.
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 4
Summary and Recommendations
The cores obtained within the Arden Oaks area had bituminous depths ranging from 5.75 inches
to 7 inches, with at least 3 inches of underlying aggregate base. Three of the cores were in good
condition, while the others exhibit distresses such as delamination or deterioration. The cores
had a top lift of 1.5 inches, 2 inches, or 2.5 inches. The surface of the streets (excluding the
segment where Core 9 was obtained) was observed to be in poor condition covered in extensive
amount of cracking and patching.
Based on the findings from pavement coring, it would be feasible to perform a partial depth mill
and overlay on Arden Oaks Drive (excluding the segment where Core 1 and Core 2 were taken).
It would be recommended to extend the milling depth beyond the depth of the top lift of the
existing bituminous pavement to ensure proper bonding between the new overlay and the
underlying existing asphalt. Core 4 showed raveling between pavement lifts, thus, we would
recommend the City to account for spots that may need additional patching.
It is important to note that a partial depth mill and overlay will not eliminate all the crack patterns
within the pavement. Cracks will reflect through the new overlay within a few years. That said, in
order to extend the service life of this preservation method, we would recommend the City to
conduct routine crack sealing. Crack sealing is a cost-effective method to prevent infiltration of
water and incompressible material into the cracks.
Along the segment where Core 1 and Core were taken, it would be recommended to perform a
full depth reclamation (FDR). It is our understanding that there were base issues along this
segment where water is seeping out through the bituminous pavement. An FDR would be able to
help address the base issues. This rehabilitation method would also remove all the existing
distresses, and re-blend the bituminous and a portion of the aggregate as a base to re-pave over,
essentially creating a new roadway section.
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 5
Appendix
Arden Oaks Area
Coring Pictures
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 6
Core 1
Core 2
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 7
Core 3
Core 4
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 8
Core 5
Core 6
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 9
Core 7
Core 8
DRAFT REPORT
7-8-2021
Todd Blomstrom, PE
May 6, 2020
Page 10
Core 9
DRAFT REPORT
7-8-2021
Exhibit 2
5HVLGHQW,QSXW
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
June 25, 2021
RE: Arden Oaks Street Improvements – Property Owners Questionnaire
City Project Number PW-21-0109
Dear Resident of Arden Oaks:
The City of Arden Hills has initiated the process of roadway rehabilitation and utility
improvements for the summer of 2022 which includes your neighborhood. Over the next couple
months, the City will be collecting data and studying your neighborhood street. A feasibility
report will be prepared that includes information about the recommended improvements and
associated costs. The Arden Hills City Council ordered the preparation of a feasibility report for
the Arden Oaks Neighborhood Improvements at the April 26th, 2021, city council meeting.
Things to know and consider as the project moves forward:
x Surveyors will be working on your street very soon to collect topographic data for the
street improvement project. The surveyors take ground shot data to locate key features
within the project area. They may take shots into your yard and driveway to locate
certain features and ground slopes.
x Residents pay a portion of the overall project cost in the form of a special assessment.
You will not be billed for the special assessment until 2022.
x Estimated special assessments for your neighborhood will not be determined until after
information has been gathered from the questionnaires and a feasibility report is
completed.
x An informational virtual presentation detailing the project will be available for viewing
on the cities website in the coming weeks after all information has been collected and
considered.
x Components of a project vary and are based on questionnaire responses. Special
assessments typically include the cost of the new roadway. Other utility upgrades such as
water main, sanitary sewer, and storm sewer are funded through utility funds and are not
assessed.
x Construction typically starts in spring/early summer and ends in late fall of the same year.
Another important step is to collect feedback from you regarding your street. The information
you share with us is essential in determining certain aspects of the project that may be
constructed.
The following information explains the questionnaire that is enclosed. A map showing the
boundaries of the area to be reconstructed is also enclosed. After reading this letter completely,
please complete the questionnaire and return by June 10th, 2021, in the self-addressed stamped
envelope.
Drainage and Erosion Issues
The City would like to know about any local drainage problems that you may have.
DRAFT REPORT
7-8-2021
Does storm water run-off stand in the street or in front of your house? Do you have a sump pump
that directs water towards the street? Is your lawn wet from ground water coming through the
ground? As part of the storm sewer design process, we would like to know if these or similar
situations are occurring in your yard or around your neighborhood. If so, please describe it in the
drainage and erosion section of the questionnaire. We will review them for possible corrective
action if applicable to the project.
Private Underground Utilities
Some residents install private underground utilities near the street in the City owned right-of-
way. Typically the right-of-way is 15' to 20' behind the roadway. These utilities are usually lawn
irrigation or electric pet fences. Utility and roadway improvements can damage these utilities and
other property in the right of way.
The contractor is responsible for protecting marked irrigation systems. If marked irrigation is
damaged it will be replaced by the contractor to its original or improved condition. However, if
the contractor knows the location of these private utilities, they can attempt to avoid damaging
them. Please mark your irrigation system before construction begins to avoid damage. Due to the
difficulty of locating and protecting electric pet fences, it is problematic to require the contractor
to protect and repair them during construction. If possible during construction, please accurately
mark the pet fences to avoid damage. The contractor will not be required to fix the wires marked
or unmarked, but damage may be avoidable if the fence is properly marked.
If you have any private underground utilities, please tell us in the private underground utilities
section of the questionnaire.
Traffic/Pedestrian Issues
The City of Arden Hills typically reviews traffic or pedestrian issues on local streets. We would
like to know if you feel that your roadway has any traffic or pedestrian issues. If you feel that the
streets in Arden Oaks neighborhood are overcrowded or are subject to speeding vehicles, please
make a comment on the traffic/pedestrian issues section of the questionnaire.
Questions
During the next few weeks you may see engineering staff or land surveyors gathering
information near or around your house. Feel free to ask them any questions about the street
project. If you have questions after reading this letter or talking to staff, please call me or the
engineering staff at 651-788-0269 (mobile) or 651-792-7847 (office).
Sincerely,
David Swearingen
Public Works Director
DSwearingen@cityofardenhills.com
Enclosed: Property Owners Questionnaire
Reconstruction Map
Self-Addressed Stamped Envelope
DRAFT REPORT
7-8-2021
Project No. PW-21-0109 Arden Oaks Neighborhood Improvements 1
PROPERTY OWNERS QUESTIONAIRE
ARDEN OAKS NEIGHBORHOOD STREET
IMPROVEMENTS, CITY OF ARDEN HILLS
Please do NOT answer these questions before you have read the attached letter. Please complete and
return this survey by June 10th, 2021, using the self-addressed stamped-envelope.
Address __________________________________________________________________________
Drainage and Erosion Issues:
1. Do you have any of the following? (check all that apply)
Basement drain tile Sump pump None
2. Does water stand in your front yard after heavy rain? Yes No
If yes,
A. How long is it there? ______________________________________________________
B. How far away is it from your house? __________________________________________
C. Where is it in relation to the house (direction and feet)? _________________________
D. Is the standing water creating damage to the property or is it just a nuisance?
________________________________________________________________________
E. Please sketch in the space below: your house, garage, driveway, and where drainage
problem is occurring:
3. Please list specific surface water drainage or erosion problems in your neighborhood:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
NOTE: Most private drainage problems (which are usually attributed to grades at or near the
foundation) will likely NOT be solved by this street project. However, with this information
we may be able to take a look at the whole picture and possibly address some occurrences.
Private Underground Utilities
4. Do you have an underground lawn irrigation system in the City right-of-way? (Typically the
right-of-way is 15' to 20' behind the roadway.)
Yes No
5. Do you have an underground electric pet containment system in the City's right-of-way?
Yes No
DRAFT REPORT
7-8-2021
Project No. PW-21-0109 Arden Oaks Neighborhood Improvements 2
6. Do you have any private wiring, private pipes, etc in the City's right-of-way?
Yes No
Traffic/Pedestrian Issues
7. Do you feel your neighborhood or roadway has any pedestrian or traffic issues (e.g. crossing
adjacent to busy roadways, parking, excessive speed, traffic volumes, etc.)?
Yes No
If yes, where?
___________________________________________________________________________
___________________________________________________________________________
Other Issues
8. Additional Comments/Questions:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Thank you for your cooperation. Please return this questionnaire in the enclosed self-addressed,
stamped-envelope.
Please complete all questions and return to the City of Arden Hills by June 10th, 2021.
DRAFT REPORT
7-8-2021
Project No. PW-21-0109 Arden Oaks Neighborhood Improvements 2
6. Do you have any private wiring, private pipes, etc in the City's right-of-way?
Yes No
Traffic/Pedestrian Issues
7. Do you feel your neighborhood or roadway has any pedestrian or traffic issues (e.g. crossing
adjacent to busy roadways, parking, excessive speed, traffic volumes, etc.)?
Yes No
If yes, where?
___________________________________________________________________________
___________________________________________________________________________
Other Issues
8. Additional Comments/Questions:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Thank you for your cooperation. Please return this questionnaire in the enclosed self-addressed,
stamped-envelope.
Please complete all questions and return to the City of Arden Hills by June 10th, 2021.
DRAFT REPORT
7-8-2021
Draintile Sump Pump None Standing Water Duration Location Property Damage Other Issues Sketch Included Irrigation Pet Fence Wiring/Pipes1370 Arden Oaks DriveY Y N N N N N Catch basin is collapsing N Y Y N N1401- The house and yard are filled with everything - "you name it" including cars, used building materials, etc. Inhabitable and just gets worse and worse. The cars in the backyard have been there since the owner bought the property.1376 Arden Oaks DriveYYNN N N N N N YN NAt the corner of Arden Oaks Dr and County Road E would like to see a crosswalk marking.We have comcast cable that has wire running underground in the right of way and a mail box.1377 Arden Oaks DriveYYNN N N NI believe the catch basin need rebuilding most are over 35 years old in our neighborhood roads are in bad shape for sure.NNNNExcessive speed everyday between CO. Rd. E and north to the tee. It is a complete black out when the moon is not out. VERY DARKGoodwill looks awful - I wont support them. 1401 Co Rd E - Condemn this dumping ground. Trim trees on our "parkway". Shoreview keeps 96 looking great, as you can see everyday. Co. Rd. E is a big disappointment - trees LOOK BAD. When they do road repair we would like to retain our current type of curbing. Thank you1388 Arden Oaks DriveYYNN N N NNN Y N Y (Irrigation)NN1392 Arden Oaks DriveN Y N Y Unsure Unsure Nuisance N Y Y N NNAre we always going to be able to drive in and out of our garage? How much will it cost? I am 92 and have to save for the improvement. 1397 Arden Oaks DriveYYNN N N N N N NN NCrossing County Road E to trail at Arden Oaks Dr entrance. Crossing Old Snelling to trail at Arden Oaks Dr entrance.N1399 Arden Oaks DriveYYNNNNNNNNNNNN1415 Arden Oaks DriveYYNNNNNNNYNNNN1416 Arden Oaks CourtYYNN N N N N N YN YA openings to the neighborhood it is unsafe to cross at Arden Oaks Drive across County Road E to access the bike path and at Old Snelling at the other end of Arden Oaks Drive. Both sides are very dangerous for pedestrians to cross the street to reach the sidealk this creates a dangerous situation for people to access the park when crossing with young children and strollers from the sidewalk/bikepath on the main roads.N1428 Arden Oaks CourtYYNN N N N N N YN NNN1429 Arden Oaks CourtYYNN N N N N N YN Y NI have irrigation system water heads about 10' from Road.1434 Arden Oaks DriveYYNNNNNNNYNNNN1437 Arden Oaks CourtYYNNNNNNNYNNNN1438 Arden Oaks CourtYYNNNNNNNNNNNN1443 Arden Oaks CourtY Y N Y 1-2 Days 30' East Nuisance N N Y N N NStanding water in front of our driveway after rain in the street.1450 Arden Oaks DriveNYNNNNNNNNNNNN1452 Arden Oaks DriveNYNN N N N N N YN NCrossing from 1499 Arden Oaks Drive across Snelling Ave North to trail needs a crosswalk, could use one to cross county Road E out of Arden Oaks Drive as wellSee notes on attached map. Otherwise needs general resurfacing1453 Arden Oaks DriveY N N N N N N N N Y N N N Broken curbing in front of our house1462 Arden Oaks DriveYYNYThe ice and slush is there until evaporatesNDamage to the street; no mail delivery due to drainageTwo houses behind our house drain into our yard (1444 and 1438 Arden Oaks Court). We have drain lines that flow into the street.YYNYWe get lots of traffic just turning around in the culdesacWe want to talk to someone about the drainage issues. Please call Colleen Paulus 651-894-44951469 Arden Oaks DriveNYNN N N NThe sewer in front of our house takes all the water coming down the hill. In the winter we often have a "lake" in front of our driveway. In summer this can happen during heavy rain. When water freezes in the winter its very slippery.NNNN NUnsure of the scope of work - is just repaving the street and raising manholes (they need it)… or will include curb and gutter? Rasing the grates (they need it)?1473 Arden Oaks DriveNNYNNNNNNNYNNN1476 Arden Oaks DriveYYNY 1-2 WeeksNext to house to street backyard to front yard, South/east side to front north sideCreating damage (basement and Driveway), front yard landscaping had to be removed due to water damageConstant standing water on lawn curb and street. After rain water comes our of ground for several days to a week. Ice on street all winter from standing water YYNNTraffic uses culdesac as turn around. So dark on street I have had my car broken into several times. Because the street is a cut through between old snelling and county road E cars speed through during rush hour.Due to the nature of the street being easy in/out at least once a year there are car and home break-ins. It would be nice to have street lights or other safety features. There are currently no street lights.1483 Arden Oaks DriveYYNN N N NCuldesac across street - Major problem with water off (cant read word) elevations.NYNNConstant "speeders" going through neighborhood! Cut-through when Linden's sop sign becomes conjestedMail box relocation security! There have been recent mail thefts!1486 Arden Oaks DriveYYNN N N Nwater comes down between 1466 and 1462 and turns culdesac in front of these houses into ice rink in the winter. Water from 1486 and 1476 runs down into street, turns into ice in winter in the streetNYNY NProperty has heated driveway with colored concrete top and colored concrete steps going down to the street. Property has cable junction box and telephone junction box in the citys right of way1499 Arden Oaks DriveYYNN N N N N N YYYCrossing over Snelling Ave North Oaks Dr as a pedestrian is dangerous. I would like to see a combination of slower speed limit and a pedestrian crosswalk. (metered/signed) put in a place making it easier and safer for families to access the sidewalk and trails off Snelling.NNo address (1) Y Y N N N N N N Y Y N N N NNo address (2) Y Y N N N N N N N N N N Excessive Speed NNo address (3) Y Y N N N N N N N N N N N NPrivate Underground UtilitiesDrainage & Erosion IssuesQuestionaire Tabulation - Arden Oaks Street ImprovementsTraffic Issues Other IssuesAddress DRAFT REPORT7-8-2021
3$*(,17(17,21$//</()7%/$1.DRAFT REPORT7-8-2021
Exhibit 3
7\SLFDO6HFWLRQV
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
ROW VARIES 30'-35'ROW VARIES 30'-35'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO BACK OF CURB 36' +/-0.5'ROW VARIES 60'-70'ROW VARIES 30'-35'ROW VARIES 30'-35'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO BACK OF CURB 36' +/-0.5'ROW VARIES 60'-70'EXISITING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDEXISTING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDB418 CURB AND GUTTER - SPOT REPLACEMENTAPPROVED GRANULAR BACKFILL6" TOPSOIL WITH SEEDEXISITING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDEXISTING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDB418 CURB AND GUTTER - SPOT REPLACEMENTAPPROVED GRANULAR BACKFILL6" TOPSOIL WITH SEED120.33'0.5'10.5' MAX2.0' MIN0.5'0.5' MINB418 CURB AND GUTTER - SPOT REPLACEMENTAPPROVED GRANULARBACKFILL6" TOPSOILWITH SEED4" PERFORATED PVC DRAIN TILEFREE DRAINING AGGREGATEGEOTEXTILE FABRIC TYPE 1GEOTEXTILE FABRIC TYPE 5K:\a-f\ArdenHills\18196000\04_Production\01_CAD\01_Xrefs\C001 TYPICAL SECTIONS.dwg Jul 07, 2021 - 2:05pm444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDDRAWING NO.PROJ. NO.FILENAME:PLOT DATE:NAME:SIGNATURE:LIC. NO.:DATE:C001TYPICAL SECTIONSLPPSPBMOBLARRY POPPLER 410056/23/2021--- --- --- ------ --- --- ------ --- --- ------ --- --- ------ --- --- ---I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.ARDEN OAKS STREETIMPROVEMENTS18196.0006" CONCRETE DRIVEWAY PAVEMENT6" AGGREGATE BASE CLASS 5SUBGRADE3" TYPE 9.5 WEARING COURSEMIXTURE (2,B) (SPWEA230B) (2 LIFTS)6" AGGREGATE BASE CLASS 5SUBGRADEPROPOSED CONCRETE DRIVEWAYPROPOSED BITUMINOUS DRIVEWAY2.0" MILL BITUMINOUS SURFACE2.0" OVERLAY TYPE 9.5 WEARING COURSE MIXTURE (2,B) (SPWEA230B)TACK COAT AS DIRECTED BY THE ENGINEEREXISTING BITUMINOUS DEPTH VARIES 3" TO 4.5"EXISTING BASE MATERIAL DEPTH VARIES 5" TO 13"MILL & OVERLAY - OPTION 22.0" TYPE 9.5 WEARING COURSE MIXTURE (2,B) (SPWEA230B)TACK COAT AS DIRECTED BY THE ENGINEER2.0" TYPE 9.5 WEARING COURSE MIXTURE (2,B) (SPWEA230B)+/- 12" FULL DEPTH RECLAMATION5" COMMON EXCAVATION1" OF CLASS 5 AGGREGATE BASEDEPTH OF BASE VARIES 7" TO 15"FULL DEPTH RECLAMATION - OPTION 1SUBGRADESUBGRADESALVAGED PAVERS6" CLASS 5 AGGREGATE BASESUBGRADE1" SAND LEVELING COURSESWEEP CRACKS WITH SELECT GRANULAR BORROWPAVER DRIVEWAYFULL DEPTH RECLAMATION - OPTION 1MILL & OVERLAY - OPTION 2DRAINTILEDRAFT REPORT7-8-2021
3$*(,17(17,21$//</()7%/$1.DRAFT REPORT7-8-2021
Exhibit 4
(QJLQHHU¶V(VWLPDWH
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
ESTIMATED Q ESTIMATED $ ESTIMATED TOTAL $ ESTIMATED Q ESTIMATED $ ESTIMATED TOTAL $1 2021.501 MOBILIZATION LUMP SUM 1 22,000.00$ 22,000.00$ 1 15,000.00$ 15,000.00$ 2 2104.503 SAWING BIT PAVEMENT (FULL DEPTH) LIN FT 360 2.00$ 720.00$ 360 2.00$ 720.00$ 3 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 170 4.00$ 680.00$ 170 4.00$ 680.00$ 4 2104.503 REMOVE CURB AND GUTTER LIN FT 1900 5.00$ 9,500.00$ 1900 5.00$ 9,500.00$ 5 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 80 15.00$ 1,200.00$ 80 15.00$ 1,200.00$ 6 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 60 10.00$ 600.00$ 60 10.00$ 600.00$ 7 2104.604 SALVAGE AND REINSTALL BRICK PAVERS SQ YD 20 50.00$ 1,000.00$ 20 50.00$ 1,000.00$ 8 2105.504 GEOTEXTILE FABRIC TYPE 1 SQ YD 420 2.00$ 840.00$ 0 2.00$ -$ 9 2105.504 GEOTEXTILE FABRIC TYPE 5 SQ YD 790 2.00$ 1,580.00$ 530 2.00$ 1,060.00$ 10 2105.507 COMMON EXCAVATION CU YD 1460 25.00$ 36,500.00$ 190 25.00$ 4,750.00$ 11 2105.507 SUBGRADE EXCAVATION CU YD 550 30.00$ 16,500.00$ 440 30.00$ 13,200.00$ 12 2105.601 DEWATERING LUMP SUM 1 2,500.00$ 2,500.00$ 0 2,500.00$ -$ 13 2105.607 SELECT GRANULAR BORROW CU YD 530 25.00$ 13,250.00$ 350 25.00$ 8,750.00$ 14 2105.609 CRUSHED ROCK (3" MINUS) TON 120 40.00$ 4,800.00$ 80 40.00$ 3,200.00$ 15 2111.519 TEST ROLLING ROAD STA 29 150.00$ 4,350.00$ 1.5 150.00$ 225.00$ 16 2112.519 SUBGRADE PREPARATION ROAD STA 29 350.00$ 10,150.00$ 1.5 350.00$ 525.00$ 17 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 25 200.00$ 5,000.00$ 15 200.00$ 3,000.00$ 18 2130.523 WATER M GALLON 100 50.00$ 5,000.00$ 60 50.00$ 3,000.00$ 19 2211.509 AGGREGATE BASE (CV) CLASS 5 TON 770 20.00$ 15,400.00$ 160 20.00$ 3,200.00$ 20 2215.504 FULL DEPTH RECLAMATION SQ YD 10445 2.50$ 26,112.50$ 1340 2.50$ 3,350.00$ 21 2232.504 MILL BITUMINOUS SURFACE (2.0") SQ YD 0 6.00$ -$ 9105 4.00$ 36,420.00$ 22 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) TON 1180 70.00$ 82,600.00$ 1180 70.00$ 82,600.00$ 23 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) TON 1180 60.00$ 70,800.00$ 160 60.00$ 9,600.00$ 24 2502.503 4" PERF TP PIPE DRAIN LIN FT 750 15.00$ 11,250.00$ 0 15.00$ -$ 25 2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 1 1,500.00$ 1,500.00$ 0 1,500.00$ -$ 26 2504.602 ADJUST VALVE BOX EACH 5 300.00$ 1,500.00$ 5 300.00$ 1,500.00$ 27 2504.602 REPLACE VALVE BOX EACH 1 950.00$ 950.00$ 1 950.00$ 950.00$ 28 2506.502 ADJUST FRAME AND RING CASTING EACH 27 750.00$ 20,250.00$ 27 750.00$ 20,250.00$ 29 2531.503 CONCRETE CURB & GUTTER DESIGN D418 LIN FT 1900 28.00$ 53,200.00$ 1900 28.00$ 53,200.00$ 30 2531.603 CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 70 75.00$ 5,250.00$ 70 75.00$ 5,250.00$ 31 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SQ YD 60 75.00$ 4,500.00$ 60 75.00$ 4,500.00$ 32 2563.601 TRAFFIC CONTROL LUMP SUM 1 12,000.00$ 12,000.00$ 1 12,000.00$ 12,000.00$ 33 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM 1 5,000.00$ 5,000.00$ 0 5,000.00$ -$ 34 2573.502 STORM DRAIN INLET PROTECTION EACH 30 150.00$ 4,500.00$ 30 150.00$ 4,500.00$ 35 2573.503 SEDIMENT CONTROL LOG TYPE COMPOST LIN FT 350 3.00$ 1,050.00$ 350 3.00$ 1,050.00$ 36 2574.507 COMMON TOPSOIL BORROW CU YD 50 50.00$ 2,500.00$ 50 50.00$ 2,500.00$ 37 2574.508 FERTILIZER TYPE 3 POUND 15 1.00$ 15.00$ 15 1.00$ 15.00$ 38 2575.504 CATEGORY 20 - STRAW SQ YD 650 2.00$ 1,300.00$ 650 2.00$ 1,300.00$ 39 2575.505 SEEDING ACRE 0.14 15,000.00$ 2,100.00$ 0.14 15,000.00$ 2,100.00$ 40 2575.508 SEED MIXTURE 25-151 POUND 50 12.00$ 600.00$ 50 12.00$ 600.00$ 458,547.50$ 311,295.00$ ESTIMATED QUANITITES - ARDEN OAKS NEIGHBORHOOD STREET IMPROVEMENTSITEM NUMBERFULL DEPTH RECLAMATIONSPEC NUMBERDESCRIPTIONOPTION 1 - FULL DEPTH RECLAMATIONOPTION 2 - MILL & OVERLAYMILL & OVERLAYUNITSDRAFT REPORT7-8-2021
PAGE ,17(17,21$//<LEFT BLANK DRAFT REPORT7-8-2021
Exhibit 5
3UHOLPLQDU\$VVHVVPHQW5ROOV
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
Description:Arden Oaks Street ImprovementsAssessment Unit Rate (50%):$8,636.73Interest Rate:3.15%Term:10Initial Year:2022Total Units:40NUMBER PARCEL ADDRESS PARCEL NUMBER LEGAL DESCRIPTION PROPERTY OWNER JOINT OWNER OWNER ADDRESS CITY AND ZIPASSESSIBLE UNITSSTREET ASSESSMENTTOTAL ASSESSMENTAMOUNTNOTES11486 ARDEN OAKS DR 273023330008Lot 2 Block 3 of ARDEN OAKSBarbara Muller1486 Arden Oaks Dr Arden Hills MN 55112-6955 1 8,636.73$ 8,636.73$ 21499 ARDEN OAKS DR 273023330002 Lot 1 Block 1 of ARDEN OAKSMatthew R Jergenson Sarah E Jergenson 1499 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 3 1483 ARDEN OAKS DR 273023330003 Lot 2 Block 1 of ARDEN OAKSThomas C HouseElizabeth R House 1483 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 41496 ARDEN OAKS DR 273023330007Lot 1 Block 3 of ARDEN OAKS Jeffrey T Traiforos Jessica M Traiforos 1496 Arden Oakes Dr Arden Hills MN 55112-6955 1 8,636.73$ 8,636.73$ 5 1476 ARDEN OAKS DR 273023330009Lot 3 Block 3 of ARDEN OAKSAlex SchiermanAnnie Schierman1476 Arden Oaks Dr Arden Hills MN 55112-6955 1 8,636.73$ 8,636.73$ 6 1469 ARDEN OAKS DR 273023330005Lot 2 Block 2 of ARDEN OAKSMark E Nagel Colleen C Nagel 1469 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 71473 ARDEN OAKS DR 273023330039 Lot 12 Block 3 of SHADY OAKS ADDITIONAaron J Nielsen Kirsten M Nielsen 1473 Arden Oaks Dr New Brighton MN 55112-6956 1 8,636.73$ 8,636.73$ 8 1452 ARDEN OAKS DR 273023330013 Lot 7 Block 3 of ARDEN OAKSAmy L Valentine 1452 Arden Oaks Dr Arden Hills MN 55112-69551 8,636.73$ 8,636.73$ 9 1460 ARDEN OAKS DR273023330012 Lot 6 Block 3 of ARDEN OAKS Timothy Wagenknecht Alison R Wagenknecht 1460 Arden Oaks Dr Arden Hills MN 55112-69551 8,636.73$ 8,636.73$ 10 1462 ARDEN OAKS DR273023330011 Lot 5 Block 3 of ARDEN OAKS Terry L PaulusColleen J Paulus 1462 Arden Oaks DrArden Hills MN 55112-69551 8,636.73$ 8,636.73$ 111466 ARDEN OAKS DR273023330010 Lot 4 Block 3 of ARDEN OAKS Anne T Alwell Tullio J Alessi 1466 Arden Oaks Dr Arden Hills MN 55112-6955 1 8,636.73$ 8,636.73$ 12 1442 ARDEN OAKS DR 273023340016 Lot 9 Block 3 of ARDEN OAKSNancy Stevens Evertz Trustee 1442 Arden Oaks DrSaint Paul MN 55112-6955 1 8,636.73$ 8,636.73$ 131434 ARDEN OAKS DR 273023340017Lot 10 Block 3 of ARDEN OAKS Michael Bohan Maureen Obrien Bohan 1434 Arden Oaks Dr New Brighton MN 55112-6955 1 8,636.73$ 8,636.73$ 14 1424 ARDEN OAKS DR273023340018 Lot 11 Block 3 of ARDEN OAKSGrant J Wishart Christine A Wishart 1424 Arden Oaks Dr New Brighton MN 55112-6955 1 8,636.73$ 8,636.73$ 151414 ARDEN OAKS DR273023340019Lot 12 Block 3 of ARDEN OAKS Todd K LundeenCindy L Lundeen 1414 Arden Oaks Dr Arden Hills MN 55112-6955 1 8,636.73$ 8,636.73$ 161415 ARDEN OAKS DR 273023340005Lot 8 Block 2 of ARDEN OAKSDennis A Foster TrusteePatricia L Foster Trustee 1415 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 171425 ARDEN OAKS DR273023340004Lot 7 Block 2 of ARDEN OAKS Claude R BragstadRuth C Bragstad 1425 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 181435 ARDEN OAKS DR273023340003Lot 6 Block 2 of ARDEN OAKS Frank R DolinarKathleen J Dolinar 1435 Arden Oaks Dr St Paul MN 55112-6956 1 8,636.73$ 8,636.73$ 19 1445 ARDEN OAKS DR 273023340002Lot 5 Block 2 of ARDEN OAKSKevin P Keenan Nancy M Keenan 1445 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 201453 ARDEN OAKS DR273023340001Lot 4 Block 2 of ARDEN OAKS Paul D SmythDorothy Smyth1453 Arden Oaks Dr Arden Hills MN 55112-69561 8,636.73$ 8,636.73$ 211450 ARDEN OAKS DR 273023340015 Lot 8 Block 3 of ARDEN OAKS Mark W Mccloskey Dawnelle J Mccloskey1450 Arden Oaks Dr Arden Hills MN 55112-6955 1 8,636.73$ 8,636.73$ 221463 ARDEN OAKS DR 273023330006 Lot 3 Block 2 of ARDEN OAKSDavid W Dvorak Donna B Dvorak 1463 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 23 1413 ARDEN OAKS DR 273023340028- City Of Arden Hills 1245 Highway 96 W Arden Hills MN 55112-540008,636.73$ -$ ARDEN OAKS Park24 1388 ARDEN OAKS DR 273023340013 Lot 16 Block 2 of ARDEN OAKS Matthew J Goggin Grace J Goggin 1388 Arden Oaks Dr Arden Hills MN 55112-6957 1 8,636.73$ 8,636.73$ 251390 ARDEN OAKS DR273023340012 Lot 15 Block 2 of ARDEN OAKSTravis A Johnson Melanie Johnson1390 Arden Oaks Dr Saint Paul MN 55112-6957 1 8,636.73$ 8,636.73$ 261392 ARDEN OAKS DR 273023340011 Lot 14 Block 2 of ARDEN OAKS Janet M Kuhl 1392 Arden Oaks Dr Arden Hills MN 55112-69571 8,636.73$ 8,636.73$ 271395 ARDEN OAKS DR 273023340010Lot 13 Block 2 of ARDEN OAKS Joshua A Bodie Samantha J Brown 1395 Arden Oaks Dr Arden Hills MN 55112-6964 1 8,636.73$ 8,636.73$ 281397 ARDEN OAKS DR 273023340009Lot 12 Block 2 of ARDEN OAKSSteven J Johnson Susan J Iverson1397 Arden Oaks Dr St Paul MN 55112-6964 1 8,636.73$ 8,636.73$ 29 1399 ARDEN OAKS DR 273023340008 Lot 11 Block 2 of ARDEN OAKSCarl J Nelson1399 Arden Oaks DrArden Hills MN 55112-69641 8,636.73$ 8,636.73$ 301401 ARDEN OAKS DR273023340007Lot 10 Block 2 of ARDEN OAKS Courtney J Carlson Jenna A Carlson 1401 Arden Oaks DrArden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ SUBJ TO ESMTS; LOT 10 BLK 231 1407 ARDEN OAKS DR273023340006Lot 9 Block 2 of ARDEN OAKSAlexandra WelleZachary J Muehlenbein 1407 Arden Oaks Dr Arden Hills MN 55112-6956 1 8,636.73$ 8,636.73$ 32 1401 COUNTY ROAD E W 273023340055 Lot 1 Block 1 of SHADY OAKS ADDITION Korhan Yesil 1401 County Road E W Saint Paul MN 55112-365208,636.73$ -$ DRIVEWAY ON COUNRT ROAD E 33 1415 COUNTY ROAD E W 273023340059Lot 3 Block 2 of SHADY OAKS ADDITIONJoshua Golden 1415 County Road E W Arden Hills MN 55112-365208,636.73$ -$ DRIVEWAY ON COUNRT ROAD E 34 1376 ARDEN OAKS DR273023340052 Lot 19 Block 1 of SHADY OAKS ADDITIONDavid R Swenson TrusteeCheryl L Swenson Trustee 1376 Arden Oaks Dr Arden Hills MN 55112-6957 1 8,636.73$ 8,636.73$ EX W 25 FT OF S 210 FT AND EX N 30 FT LOT 3 BLK 2351377 ARDEN OAKS DR 273023340060Lot 20 Block 3 of ARDEN OAKSDavid L BeamishNancy J Beamish 1377 Arden Oaks Dr Arden Hills MN 55112-6958 1 8,636.73$ 8,636.73$ N 30 FT LOT 3 BLK 2 SHADY OAKS ADDITION AND IN SD ARDEN OAKS LOT 20 BLK 3361416 ARDEN OAKS CT273023340026Lot 19 Block 3 of ARDEN OAKSMatthew R Nelson Cara Nelson1416 Arden Oaks CT Arden Hills MN 55112-6961 1 8,636.73$ 8,636.73$ 37 1428 ARDEN OAKS CT273023340025 Lot 18 Block 3 of ARDEN OAKS Nicholas Brokke Erin Brokke 1428 Arden Oaks CT Arden Hills MN 55112-69611 8,636.73$ 8,636.73$ 381438 ARDEN OAKS CT 273023340049Lot 17 Block 3 of ARDEN OAKSDavid M Kemp Hoda S Kemp 1438 Arden Oaks CT Arden Hills MN 55112-69611 8,636.73$ 8,636.73$ 391444 ARDEN OAKS CT 273023340023Lot 16 Block 3 of ARDEN OAKSCollin Pittier Rachel Jones-Pittier 1444 Arden Oaks CT Arden Hills MN 55112-69611 8,636.73$ 8,636.73$ 401443 ARDEN OAKS CT273023340022 Lot 15 Block 3 of ARDEN OAKSDavid W Angell Mary K Angell 1443 Arden Oaks CT St Paul MN 55112-69611 8,636.73$ 8,636.73$ 41 1437 ARDEN OAKS CT 273023340021Lot 14 Block 3 of ARDEN OAKS Geraldine L Kremer 1437 Arden Oaks CT St Paul MN 55112-69611 8,636.73$ 8,636.73$ 42 1370 ARDEN OAKS DR 273023340054 Lot 1 Block 1 of SHADY OAKS ADDITION Donald F Palme 2158 64th St Saint Paul MN 55110-10331 8,636.73$ 8,636.73$ N 100 FT OF LOTS 1,2 & LOT 3 & THE S 15 FT OF THE N 115 FT OF LOTS 1 & 2 & THE W 10 FT OF LOT 3 BLK 143 1429 ARDEN OAKS CT273023340020 Lot 13 Block 3 of ARDEN OAKSTodd Michael Hertog 1429 Arden Oaks CT Arden Hills MN 55112-69611 8,636.73$ 8,636.73$ 40 345,469.13$ TotalsArden Oaks Preliminary Assessment RollDRAFT REPORT7-8-2021
PAGE ,17(17,21$//<LEFT BLANK DRAFT REPORT7-8-2021
Exhibit 6
$VVHVVPHQW0DSV
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
14991483147314691463145314451435142514151407140113991397139513921390138813761377141614281438144414431437142914131414142414341442145014521460146214661476148614963638362836103609362336313632362014351427142314151401137013871377367236821367365736413635152535901434142614201412140414001392137036283611362536373645365536633673368135803574356839003900COUNTY ROAD E WESTSOO LINE RAILROAD COMPANYBETHEL UNIVERSITYSNELLING
A
V
E
N
U
E
N
O
R
T
H
SNELLIN
G
A
V
E
N
U
E
N
O
R
T
HPASCAL AVENUE NORTHARDEN OAKS DRIVEARDEN OAKS COURTARDEN OAKS DRIVEARDEN OAKS DRIVELAKE JOHANNA BOULEVARDTH 51 (SNELLING AVENUE)HAMLINE AVENUE NRIDGEWOOD COURTK:\a-f\ArdenHills\18196000\04_Production\01_CAD\01_Xrefs\V-BASE.dwg May 05, 2021 - 6:24pm444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDDRAWING NO.PROJ. NO.BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCHON THIS DRAWING ADJUST SCALES ACCORDINGLY.ALL CONTRACTORS AND SUBCONTRACTORSSHALL VERIFY ALL DIMENSIONS BYMEASUREMENT AT THE BUILDING AND/OR SITEFILENAME:PLOT DATE:ARDEN OAKS STREETIMPROVEMENTSASSESSMENT MAPPW-21-01091 OF 1SCALE IN FEET0 50 100 200ASSESSABLE UNITPROJECT AREADRAFT REPORT7-8-2021
3$*(,17(17,21$//</()7%/$1.DRAFT REPORT7-8-2021
Exhibit 7
*HRWHFKQLFDO5HSRUW
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
GEOTECHNICAL REPORT
ARDEN OAKS STREET IMPROVEMENTS
ARDEN HILLS MN
September 19, 2019
Prepared for:
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
WSB PROJECT NO. 014297-000
DRAFT REPORT
7-8-2021
GEOTECHNICAL REPORT
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000
ARDEN OAKS STREET IMPROVEMENTS
ARDEN HILLS, MINNESOTA
FOR
CITY OF ARDEN HILLS, MINNESOTA
September 19, 2019
DRAFT REPORT
7-8-2021
CERTIFICATION
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000
I hereby certify that this plan, specification, or report was prepared by me or
under my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the State of Minnesota.
Darin E. Hyatt, PE
Date: September 19, 2019 Lic. No. 41316
DRAFT REPORT
7-8-2021
540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM September 19, 2019
Mr. Todd Blomstrom, PE
Interim Public Works Director/City Engineer
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Re: Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No.: 014297-000
Dear Mr. Blomstrom:
We have conducted a geotechnical subsurface exploration program for the above referenced
project. This report contains our soil boring logs, an evaluation of the conditions encountered in
the borings and our recommendations for subgrade preparation, underground utility installation,
and other geotechnical related design and construction considerations.
If you have any questions concerning this report or our recommendations, or for construction
material testing for this project, please call us at (952) 737-4660.
Sincerely,
WSB
Darin Hyatt, PE Mark Osborn, PE
Senior Geotechnical Engineer Geotechnical Project Engineer
Attachment
Geotechnical Report
DEH/tw
DRAFT REPORT
7-8-2021
TABLE OF CONTENTS
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 1
TITLE SHEET
CERTIFICATION SHEET
LETTER OF TRANSMITTAL
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................................................... 1
Project Location ......................................................................................................................... 1
Project Description .................................................................................................................... 1
Purpose and Project Scope of Services .................................................................................... 1
2. PROCEDURES ..................................................................................................................................... 2
2.1 Boring Layout and Soil Sampling Procedures ........................................................................... 2
2.2 Groundwater Measurements and Borehole Abandonment ....................................................... 2
2.3 Boring Log Procedures and Qualifications ................................................................................ 2
3. EXPLORATION RESULTS .................................................................................................................. 3
3.1 Site and Geology ....................................................................................................................... 3
3.2 Subsurface Soil and Groundwater Conditions .......................................................................... 3
3.3 Strength Characteristics ............................................................................................................ 3
3.4 Groundwater Conditions ............................................................................................................ 3
4. ENGINEERING ANALYSIS AND RECOMMENDATIONS .................................................................. 5
4.1 Discussion ................................................................................................................................. 5
4.2 Watermain Utilities ..................................................................................................................... 5
4.3 Backfill and Fill Selection and Compaction ............................................................................... 5
4.4 Dewatering................................................................................................................................. 5
4.5 Pavement Areas ........................................................................................................................ 5
4.6 Optional Frost Free Pavement Design ...................................................................................... 7
4.7 Construction Considerations ..................................................................................................... 7
4.8 Construction Safety ................................................................................................................... 7
4.9 Cold Weather Construction ....................................................................................................... 7
4.10 Field Observation and Testing................................................................................................... 7
4.11 Plan Review and Remarks ........................................................................................................ 8
5. STANDARD OF CARE ......................................................................................................................... 9
Appendix A
Soil Boring Exhibit
Logs of Test Borings
Symbols and Terminology on Test Boring Log
Notice to Report Users Boring Log Information
Unified Soil Classification System (USCS)
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 1
1. INTRODUCTION
Project Location
The proposed roadway improvements will be in the Arden Oaks Neighborhood in Arden Hills, Minnesota.
Specific roadway areas include Arden Oaks Drive, Arden Oaks Court and Arden Oaks Drive.
Borings were completed through the existing pavement sections. The approximate boring locations can
be found on the Soil Boring Exhibit in Appendix A.
Project Description
It is proposed to reconstruct the existing surface along these alignments and complete curb and gutter
repairs/installation and place a new watermain. After backfilling the utilities, new roadways will be
constructed. The new roadways will be two lane bituminous roads, reconstructed to about the same
horizontal and vertical alignments as the existing ones.
Underground utilities will consist of watermain. This utility is expected to be placed within 8 feet of final
grades.
WSB has developed recommendations for this project in consideration of the proposed layout, loadings,
and configurations as understood at this time. WSB must be made aware of the revised or additional
information in order to evaluate the recommendations for continued applicability.
Purpose and Project Scope of Services
Our proposal was authorized by Sue Polka, Interim City Engineer with the City of Arden Hills. In order to
assist the design team in preparing plans and specifications, we have developed recommendations for
pavement and utility subgrade preparation and pavement thicknesses. As such, we have completed a
subsurface exploration program and prepared a geotechnical report for the referenced site. This stated
purpose was a significant factor in determining the scope and level of service provided. Should the
purpose of the report change the report immediately ceases to be valid and use of it without WSB’s prior
review and written authorization shall be at the user’s sole risk.
Our authorized scope of work has been limited to:
1. Mobilization / Demobilization of a Truck Mounted Drill Rig.
2. Clearing underground utilities utilizing the Gopher State One Call.
3. Drilling 8 standard penetration test borings to a depth of about 10 feet each.
4. Sealing the borings per Minnesota Department of Health procedures.
5. Perform soil classification and analysis.
6. Review of readily available project information and geologic data.
7. Providing this geotechnical report containing:
a. Summary of our findings.
b. Discussion of subsurface soil and groundwater conditions and how they may affect the
proposed pavements and utilities.
c. Estimated R-value of the soils.
d. A discussion of soils for use as structural fill and site fill.
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 2
2. PROCEDURES
2.1 Boring Layout and Soil Sampling Procedures
WSB recommended the boring depths and selected the desired locations. Our field crew staked the
boring locations using existing site features as guides. The approximate boring locations are shown on
the Soil Boring Exhibit in Appendix A which is an aerial photo.
We drilled the borings on June 19, 2019, with a truck-mounted CME-55 drill rig operated by a two-person
crew. The drill crew advanced the borings using continuous hollow stem augers. Drilling methods, crew
chief, depths, sampling interval, casing usage, groundwater observations, test data, and other drilling
information are indicated on the boring logs.
Generally, the drill crew sampled at 2 ½ foot intervals to the borings termination depths.
The materials encountered were described on field logs and representative samples were containerized,
and transported to our laboratory for further examination and testing.
The samples were visually examined to estimate the distribution of grain sizes, plasticity, consistency,
moisture condition, color, presence of lenses and seams, and apparent geologic origin. We classified the
soils according to type using the Unified Soil Classification System (USCS). A chart describing the
Unified Soil Classification System is included in Appendix A.
2.2 Groundwater Measurements and Borehole Abandonment
The drill crew observed the borings for free groundwater while drilling and after completion. These
observations and measurements are noted on the boring logs. The crew then backfilled the borings with
soil cuttings to comply with Minnesota Department of Health regulations.
2.3 Boring Log Procedures and Qualifications
The subsurface conditions encountered by the test borings are illustrated on the Logs of Test Borings in
Appendix A. Similar soils were grouped into the strata shown on the boring logs, and the appropriate
estimated USCS classification symbols were also added. The depths and thickness of the subsurface
strata indicated on the boring logs were estimated from the drilling results.
The transition between materials (horizontal and vertical) is approximate and is usually far more gradual
than shown. Information on actual subsurface conditions exists only at the specific locations indicated
and is relevant only to the time exploration was performed. Subsurface conditions and groundwater
levels at other locations may differ from conditions found at the indicated locations. The nature and
extent of these conditions would not become evident until exposed by construction excavation. These
stratification lines were used for our analytical purposes and, due to the aforementioned limitations,
should not be used as a basis of design or construction cost estimates.
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 3
3. EXPLORATION RESULTS
3.1 Site and Geology
The borings were performed on existing roadway alignments within the Arden Oaks neighborhood.
The Ramsey County Geologic Atlas indicated the surficial geology in the area of our borings are glacial
deposits. These deposits consist primarily of till consisting of silty and clayey sands to clay.
3.2 Subsurface Soil and Groundwater Conditions
The boring profile generally consisted of a pavement section overlying fill and/or naturally deposited
glacial till.
Pavement Section
The bituminous thickness ranged from about 5 to 6 ½ inches and averaged over 5 ½ inches. The
underlying aggregate base ranged from about 5 to 13 inches and averaged about 7 ¾ inches.
Fill
Borings PB-E, PB-G and PB-H encountered fill beneath the aggregate base. The fill consisted mainly of
sandy lean clay that was dark brown to brown and gray in color and moist.
Naturally Deposited Soils
Below the pavement section or fill, our borings encountered and terminated in glacially deposited soils.
The glacial till consisted of sandy lean clay that contained gravel, was brown and moist. Glacial outwash
consisting of sand was encountered beneath the till at a depth of about 10 feet in Boring PB-E. The fine-
to coarse-grained sand contained gravel, was brown and considered moist.
3.3 Strength Characteristics
The penetration resistance N-values of the materials encountered were recorded during drilling and are
indicated as blows per foot (BPF). Those values provide an indication of soil strength characteristics and
are located on the boring log sheets. Also, visual-manual classification techniques and apparent moisture
contents were also utilized to make an engineering judgment of the consistency of the materials.
Table 1 presents a summary of the penetration resistances in the soils for the standard penetration test
borings completed and remarks regarding the material strengths of the soils.
Table 1: Penetration Resistances
Soil Type Classification Penetration
Resistances Remarks
Fill CL 5 to 7 BPF Variable compaction
Till CL 4 to 20 BPF Very soft to hard
Outwash SP 23 BPF Medium dense
The preceding is a generalized description of soil conditions at this site. Variations from the generalized
profile exist and should be assessed from the boring logs, the normal geologic character of the deposits,
and the soils uncovered during site excavation.
3.4 Groundwater Conditions
WSB took groundwater level readings in the exploratory borings, reviewed the data obtained, and
discussed its interpretation of the data in the text of the report.
Groundwater was not observed during or shortly after drilling and sampling. It should be noted that our
borings were not left open long enough to allow for groundwater stabilization. In clay soils, it may take a
long time (longer than what was available with our time on site) for water to enter a bore hole and rise to
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 4
its hydrostatic level. Based on our observations and the apparent moisture content in the penetration test
samples it is our opinion that a static groundwater level is below the depth explored by our borings.
Note that groundwater levels may fluctuate due to seasonal variations (e.g. precipitation, snowmelt and
rainfall) and/or other factors not evident at the time of measurement.
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 5
4. ENGINEERING ANALYSIS AND RECOMMENDATIONS
4.1 Discussion
Based on our borings it is our opinion that the proposed watermain and pavement can generally be
supported on the soils encountered in the borings. However, soft sandy lean clay soils should be
anticipated during construction and a partial removal and replacement maybe necessary.
Also, the soils within the pavement subgrade consist mainly of lean clay soils, which are frost susceptible.
Consideration should be given to partially subcutting these soils and replacing with a non-frost
susceptible granular fill to reduce the potential frost heave below the pavement section.
4.2 Watermain Utilities
Invert elevations are anticipated to be within 8 feet of existing grades and we anticipate the subgrade
soils for the utilities will consist chiefly of sandy lean clay. If the clayey soils are soft or become soft it may
be necessary to perform a partial subcut and replacement. Where soft unstable soils are encountered at
invert grade, subexcavation of these materials to a depth of 1 to 2 feet and replacement with a coarse
sand or gravel is recommended. Underground utilities are expected to be installed by backhoes
completing the excavations and placing pipe and backfills. Soil compactors should be used to compact
the fill in thin even lifts to the specified densities.
4.3 Backfill and Fill Selection and Compaction
It is our opinion the onsite non-organic soils may be reused as backfill and fill provided they are moisture
conditioned and can be compacted to their specified densities. Any wet soils excavated would need to be
dried before reuse as an engineered fill. Backfills with cobbles larger than six inches (6”) should not
come in contact with utilities. We recommend that soils be moisture conditioned to meet compaction
specifications as determined from their standard Proctor tests (ASTM D-698). The fill should be spread in
thin lifts (8 to 10 inches depending on compaction equipment) to allow for full depth compaction. Table 2
indicates the recommended compaction levels.
Table 2: Recommended Level of Compaction for Backfill and Fill
Area Percent of Standard Proctor
Maximum Dry Density
Pavement: Within 3 feet of top of subgrade
Within 3 foot perimeter of structures such
as manholes
100
Pavement: Greater than 3 feet below top of subgrade 95
Utility Trench (unless within 3 feet of pavement
subgrade)
95
Landscaping (non-structural) 90
4.4 Dewatering
Based on the results of our soil borings and the proposed construction, dewatering is not anticipated.
4.5 Pavement Areas
After removing the existing pavement sections and backfilling the utilities, the final subgrade should have
proper stability within three vertical feet of grading grade (grade which contacts the bottom of the
aggregate base). This will generally be achieved in fill areas with proper compaction of embankment
materials and in cut areas through proper subgrade preparation. The stability of the pavement subgrade
should be evaluated using the test roll procedure (MnDOT 2111), except a fully loaded tandem axle dump
truck or a full water truck should be utilized for the proof roll. If unstable soils are found under the test roll,
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 6
these soils should be improved by means of scarification, moisture conditioning, and re-compaction, or by
subcutting and replacement. If the on-site soils cannot be moisture conditioned and compacted as
recommended, we recommend removing these unsuitable materials and replacing them with Select
Grading Material (MnDOT 2105.1.A.6). We also recommend a proof-roll be performed again on the
aggregate base just prior to placement of the bituminous pavement.
Table 3 below presents the approximate pavement section thickness and subgrade soils that were
encountered within the borings.
Table 3: Roadway Soil Boring Profiles
Boring No.
Bituminous
Thickness
(inches)
Aggregate
Base
Thickness
(inches)
Subgrade Soils
(Upper 4 feet)
PB-A 5 12 Sandy lean clay
PB-B 5 ½ 8 Sandy lean clay
PB-C 6 6 Sandy lean clay
PB-D 5 8 Sandy lean clay
PB-E 6 5 Fill: Sandy lean clay
PB-F 6 ½ 7 Sandy lean clay
PB-G 5 ½ 5 Fill: Sandy lean clay
PB-H 6 13 Fill: Sandy lean clay
Once the site has been prepared as recommended, we anticipate the subgrade will consist predominately
of sandy lean clay. The MnDOT Flexible Pavement Design Guidance Memo from January 2017,
indicates soils such as those anticipated have an estimated R-value of 12.
Being traffic counts were not provided to us, we have assumed that the volume and distribution of
vehicles using these roadways will have 20-year flexible Equivalent Single Axle Loads (ESAL’s) less than
75,000.
Based on MnDOT’s FlexPave excel design utilizing granular equivalent charts, we recommend the
pavement sections indicated below in Table 4.
Table 4: Recommended Flexible Pavement Section
Section Thickness (inches) Granular Equivalent
Bituminous Course, MnDOT 2360 2 4.5
Bituminous Course, MnDOT 2360 2 4.5
Aggregate Base, MnDOT 3138 (Class 5, 5Q, or
6) 8 8
Subgrade Preparation, MnDOT 2111 Yes -
TOTAL 12 17.0
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 7
Within several years after initial paving, some thermal shrinkage cracks will develop. We recommend
routine maintenance be performed to improve pavement performance and increase pavement life.
Pavement should be sealed with a liquid bitumen sealer to retard water intrusion into the base course and
subgrade. Localized patch failures may also develop where trucks or buses turn on the pavement. When
these occur, they should be cut out and patch repaired.
4.6 Optional Frost Free Pavement Design
Optionally, the use of a non-frost susceptible sand cushion will help reduce the effects of frost heave. In
our opinion, placement of 18 inches of select granular fill below the Class 5 Aggregate Base should
generally provide for a non-frost susceptible subgrade. It should be noted that any sand cushion placed
below the pavement section will provide positive benefits for reduced potential frost heave. The owner
and/or design team should evaluate the costs and benefit of this option to determine if it should be
incorporated into the pavement design.
Drainage of the sand cushion is recommended. Drainage of the sand cushion may be accomplished by
daylighting to adjacent ditches or the use of drain tile. Drain tile wrapped in a sock should be placed at
the base of the sand cushion and tied into catch basins. We recommend the sand cushion contain a
select granular sand with less than 12% passing the #200 sieve. Alternately, a 3 inch minus rock fill could
be placed instead of a select granular sand and drain tile.
For transitioning the thickness of the sand subbase along the profile of the roadway, we recommend the
thickness have a longitudinal taper of no steeper than 10H:1V. A taper of 4H:1V can be used
perpendicular to the centerline for cross street/driveway connections. The placement of the sand
subbase should extend slightly beyond the outer edge of the curbs to maintain subgrade uniformity for
frost movement.
4.7 Construction Considerations
Good surface drainage should be maintained throughout the work. Under no circumstances should fill be
placed into standing water.
Soil corrections at this site for pavement subgrades may not be continuous in all areas. We recommend
tapering the fills back to native soils at a ten to one (10:1) slope.
4.8 Construction Safety
All excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P “Excavations
and Trenches”. This document states that excavation safety is the responsibility of the contractor.
Reference to this OSHA requirement should be included in the job specifications.
The responsibility to provide safe working conditions on this site, for earthwork, building construction, or
any associated operations is solely that of the contractor. This responsibility is not borne in any manner
by WSB.
4.9 Cold Weather Construction
It is our understanding that construction is unlikely to occur during the winter months. However, if the
construction does continue into the winter months we recommend the following guidelines.
Only unfrozen fill should be used. Placement of fill must not be permitted on frozen soil.
4.10 Field Observation and Testing
The soil conditions illustrated on the Logs of Test Borings in Appendix A are indicative of the conditions
only at the boring locations. For this reason, we recommend that all excavations at this site be observed
by a geotechnical engineer or technician prior to fill or backfill placement or construction of any foundation
elements to determine if the soils are capable of supporting the fill backfill and/or foundation loads. These
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 8
observations are necessary to judge if all unsuitable materials have been removed from within the
planned construction area and an appropriate degree of lateral oversize has been provided.
WSB also recommends a representative number of field density tests be taken in all engineered fill and
backfill placed to aid in judging its suitability. Fill placement and compaction should be monitored and
tested to determine that the resulting fill and backfill conforms to specified density, strength or
compressibility requirements. Prior to use, any proposed fill and backfill material should be submitted to
the WSB laboratory for testing to verify compliance with recommendations and project specifications.
Dynamic Cone Penetrometer (DCP) tests can be completed in the aggregate base in lieu of density
testing. We recommend following MnDOT Specification 2211.3.D.2.c.
WSB would be pleased to provide the necessary field observation, monitoring and testing services during
construction.
4.11 Plan Review and Remarks
The observations, recommendations and conclusions described in this report are based primarily on
information provided to WSB, obtained from our subsurface exploration, our experience, several
necessary assumptions and the scope of service developed for this project and are for the sole use of our
client. We recommend that WSB be retained to perform a review of final design drawing and
specifications to evaluate that the geotechnical engineering report has not been misinterpreted. Should
there be any changes in the design or location of the structures related to this project or if there are any
uncertainties in the report we should be notified. We would be pleased to review any project changes
and modify the recommendations in this report (if necessary) or provide any clarification in writing.
The entire report should be kept together; for example, boring logs should not be removed and placed in
the specifications separately.
The boring logs and related information included in this report are indicators of the subsurface conditions
only at the specific locations indicated on the Soil Boring Exhibit and times noted on the Logs of Test
Boring sheets in Appendix A. The subsurface conditions, including groundwater levels, at other
locations on the site may differ significantly from conditions that existed at the time of sampling and at the
boring locations.
The test borings were put down by WSB solely to obtain indications of subsurface conditions as part of a
geotechnical exploration program. No services were performed to evaluate subsurface environmental
conditions.
WSB has not performed any observations, investigations, studies or testing that is not specifically listed in
the scope of service. WSB shall not be liable for failing to discover any condition whose discovery
required the performance of services not authorized by the Agreement.
DRAFT REPORT
7-8-2021
Geotechnical Report
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000 Page 9
5. STANDARD OF CARE
The recommendations and opinions contained in this report are based on our professional judgment. The
soil testing and geotechnical engineering services performed for this project have been performed with
the level of skill and diligence ordinarily exercised by reputable members of the same profession under
similar circumstances, at the same time and in the same or a similar locale. No warranty, either express
or implied, is made.
DRAFT REPORT
7-8-2021
Geotechnical Report Appendix A
Arden Oaks Street Improvements
Arden Hills, Minnesota
WSB Project No. 014297-000
APPENDIX A
Soil Boring Exhibit
Log of Test Borings
Symbols and Terminology on Test Boring Log
Notice to Report Users Boring Log Information
Unified Soil Classification Sheet (USCS)
DRAFT REPORT
7-8-2021
!(
!(
!(
!(
!(!(
!(
!(
PB-A
PB-B
PB-C PB-D
PB-E
PB-F
PB-G
PB-H
ARDEN OAKS DR
COUNTY ROAD ESNELLING
AVE
NPASCAL AVE NARDEN OAKS CT
SNELLING AVE N!(Soil Boring Location
0175
Feet¯
Soil Boring Exhibit
Geotechnical Report | Arden Oaks
Street and Utility Improvements
Arden Hills, MN
WSB Project: 014297-000 Document Path: K:\014297-000\GIS\Maps\SoilBoringExhibit\ArdenOaksSoilBoring.mxd Date Saved: 9/3/2019 8:02:06 AM1 inch = 175 feet
DRAFT REPORT
7-8-2021
!
#
$%"$&'%( )* * *
&,+!* & ! +-$) .*!/3(4/1/
5(2(0
0!7(5
*05(6
5
&.8
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
!
#
9
9
$%"$&'%(: )* * *
&,+!* & ! +-$) .*!/3(4/1/
152(0
!$"*'&*)' <
*05(6
5
&.8
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
#9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
!
9
:
9$%"$&'%(9 )* * *
&,+!* & ! +-$) .*!/3(4/1/
155(
*05(6
5
&.8
:
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
#9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
!
#
#
$%"$&'%(: )* * *
&,+!* & ! +-$) .*!/3(4/1/
152(0
*05(6
5
&.8
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
#9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*),
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
'8412
!
!
9
9$%"$&'%( )* * *
&,+!* & ! +-$) .*!/0(>3(4/
1
&,+!* & ! +-$) .*!/(00123(4/
1/155(
&,-$) .*!/56(0/3(4/1/
0801
*05(6
5
&.8
#
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
#9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)*
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
!
9
9$%"$&'%(# )* * *
&,+!* & ! +-$) .*!/3(4/1/
(7155(
*05(6
5
&.8
9
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
#9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
!
!
#
$%"$&'%( )* * *
&,+!* & ! +-$) .*!/6(7/1
&,+!* & ! +-$) .*!/3(4/1/
5(
*05(6
5
&.8
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
#9
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
!
!
9
9$%"$&'%( )* * *
&,+!* & ! +-$) .*!/6(70
3(4/1
&,+!* & ! +-$) .*!/3(4/1/
5(
*05(6
5
&.8
:
9
$"* $&
,*
.*$&
,*
- *)
,*
- *)
*!*. $'&
- *)!*.*!"* %)*"*&
"!*,
,*, *
99
"*',
);9
*&,;9
!6607;
,*)<8(2
&1;
(4 25;
&
)'=* & "*;
" (0'>1.(81!
)'=* !' $'&; (01/"&')$&&%"*)
*' !$*&-?;
#
"!*" @&+*
*'!'$
')$$&% ,*
A5B
9
#
:
-!@1& !"# %"&$ '($$$&)&&&'$'$)*+%*,+-.,* )$$'&'" *)$ !
DRAFT REPORT
7-8-2021
6\PERO 'HVFULSWLRQ 6\PERO 'HVFULSWLRQ
+6$ /'+ROORZ6WHP$XJHU 0& 0RLVWXUHFRQWHQW$670'
)$ )OLJKW$XJHU '' 'U\'HQVLW\SFI
+$ +DQG$XJHU // /LTXLG/LPLW$670'
5& 6L]H$%RU1URWDU\FDVLQJ 3/ 3ODVWLF/LPLW$670'
&6 &RQWLQXRXVVSOLWEDUUHOVDPSOLQJ
'0 'ULOOLQJ0XG ,QVHUWVLQODVWFROXPQ
-: -HWWLQJ:DWHU
6% 2'VSOLWEDUUHOVDPSOLQJ 4X 8QFRQILQHGFRPSUHVVLYHVWUHQJWKSVI$670'
B/ RU2'VSOLWEDUUHOOLQHUVDPSOHU 3T 3HQHWURPHWHU5HDGLQJWVI$670'
B7 RUWKLQZDOOHGWXEHVDPSOH 7V 7RUYDQH5HDGLQJWV
: :DVKVDPSOH * 6SHFLILF*UDYLW\$670'
% %DJVDPSOH 6/ 6KULQNDJHOLPLWV$670'
3 7HVW3LWVDPSOH 2& 2UJDQLF&RQWHQFW$670'
B4 %414RU34ZLUHOLQHV\VWHP 63 6ZHOO3UHVVXUHWVI$670'
B; $;%;RU1;GRXEOHWXEHEDUUHO 36 3HUFHQWVZHOOXQGHUSUHVVXUH$670'
1 6WDQGDUGSHQHWUDWLRQWHVWEORZSHUIRRW )6 )UHHVZHOO$670'
&5 &RUHUHFRYHU\SHUFHQW 66 6KULQNVZHOO$670'
:/ :DWHUOHYHO S+
QD QRPHDVXUHPHQWUHFRUGHG 6& 6XOIDWHFRQWHQWSDUWVPLOOLRQRUPJO
&& &KORULGHFRQWHQWSDUWVPLOOLRQRUPJO
& 2QHGLPHQVLRQDOFRQVROLGDWLRQ$670'
4F 7ULD[LDOFRPSUHVVLRQ$670'DQG'
'6 'LUHFW6KHDU$670'
. &RHIILFLHQWRISHUPHDELOLW\FPVHF$670'
3 3LQKROH7HVW$670'
'+ 'RXEOHK\GURPHWHU$670'
0$ 3DUWLFOHVL]HDQDO\VLV$670'
5 /DERUDWRU\HOHFWUHLFDOUHVLVWLYLW\RKPFP$670*
96 )LHOGYDQHVKHDU$670'
54' 5RFNTXDOLW\GHVLJQDWLRQSHUFHQW
,5 ,QILOWUDWLRQ7HVW$670'
7\SH 6L]H5DQJH 7HUP 9LVXDO2EVHUYDWLRQ
%RXOGHUV ! /HQVHV 6PDOOSRFNHWVRIGLIIHUHQWVRLOV
&REEOHV /DPLQDWLRQ WKLFNVWUDWXP
&RDUVHJUDYHO /D\HU WKLFNVWUDWXP
)LQHJUDYHO VLHYH 6WUDWLILHG $OWHULQJOHQVHVRIYDU\LQJPDWHULDOVRUFRORUV
&RDUVHVDQG VLHYHVLHYH 9DUYHG $OWHULQJODPLQDWLRQVRIFOD\VLOWILQHVDQGRUFRORUV
0HGLXPVDQG VLHYHVLHYH 'U\ 3RZGHU\QRQRWLFHDEOHZDWHU
)LQHVDQG VLHYHVLHYH 0RLVW 'DPSEHORZVDWXUDWLRQ
6LOW SDVVLQJVLHYHDQG!PP :HW 0&DERYHSODVWLFOLPLW
&OD\ SDVVLQJVLHYHDQGPP :DWHUEHDULQJ 3HUYLRXVVRLOEHORZZDWHUWDEOH
6DWXUDWHG &RKHVLYHVRLOZLWK0&DERYHOLTXLWOLPLW
*UDYHO 'HVFULSWLRQ *UDYHO 19DOXH 5HODWLYH'HQVLW\
$OLWWOHJUDYHO 9HU\ORRVH
:LWKJUDYHO /RRVH
*UDYHOO\ 0HGLXPGHQVH
'HQVH
! 9HU\GHQVH
3DUWLFOH6L]HV 6RLO/D\HULQJDQG0RLVWXUH
6<0%2/6
6<0%2/6$1'7(50,12/2*<217(67%25,1*/2*
'ULOOLQJDQG6DPSOLQJ /DERUDWRU\7HVWLQJ
7(50,12/2*<
*UDYHO&RQWHQW 6WDQGDUG3HQWUDWLRQ5HVLVWDQFH1YDOXH
&RDUVH*UDLQHG6RLOV )LQH*UDLQHG6RLOV &RKHVLRQOHVV6RLOV &RKHVLYH6RLOV
'HVFULSWLRQ
7UDFHRIJUDYHO
DOLWWOHJUDYHO
ZLWKJUDYHO
*UDYHOO\
9HU\KDUG
19DOXH
!
&RQVLVWHQF\
9HU\VRIW
6RIW
)LUP
+DUG
DRAFT REPORT
7-8-2021
127,&(725(325786(56%25,1*/2*,1)250$7,21
6XEVXUIDFH3URILOHV
7KHVXEVXUIDFHVWUDWLILFDWLRQOLQHVRQWKHJUDSKLFUHSUHVHQWDWLRQRIWKHWHVWERULQJVVKRZDQ
DSSUR[LPDWHERXQGDU\EHWZHHQVRLOW\SHVRUURFN7KHWUDQVLWLRQEHWZHHQPDWHULDOVLVDSSUR[LPDWH
DQGLVXVXDOO\IDUPRUHJUDGXDOWKDQVKRZQ(VWLPDWLQJH[FDYDWLRQGHSWKVVRLOYROXPHVDQGRWKHU
FRPSXWDWLRQVUHO\LQJRQWKHVXEVXUIDFHVWUDWDPD\QRWEHSRVVLEOHWRDQ\GHJUHHRIDFFXUDF\
:DWHU/HYHO
:6% $VVRFLDWHV,QFWRRNJURXQGZDWHUOHYHOUHDGLQJVLQWKHH[SORUDWRU\ERULQJVUHYLHZHGWKHGDWD
REWDLQHGDQGGLVFXVVHGLWVLQWHUSUHWDWLRQRIWKHGDWDLQWKHWH[WRIWKLVUHSRUW7KHJURXQGZDWHUOHYHO
PD\IOXFWXDWHGXHWRVHDVRQDOYDULDWLRQVFDXVHGE\SUHFLSLWDWLRQVQRZPHOWUDLQIDOOVFRQVWUXFWLRQRU
UHPHGLDWLRQDFWLYLWLHVDQGRURWKHUIDFWRUVQRWHYLGHQWDWWKHWLPHRIPHDVXUHPHQW
7KHDFWXDOGHWHUPLQDWLRQRIWKHVXEVXUIDFHZDWHUOHYHOLVDQLQWHUSUHWLYHSURFHVV6XEVXUIDFHZDWHU
OHYHOPD\QRWEHDFFXUDWHO\GHSLFWHGE\WKHOHYHOVLQGLFDWHGRQWKHERULQJORJV1RUPDOO\D
VXEVXUIDFHH[SORUDWLRQREWDLQVJHQHUDOLQIRUPDWLRQUHJDUGLQJVXEVXUIDFHIHDWXUHVIRUGHVLJQSXUSRVHV
$QDFFXUDWHGHWHUPLQDWLRQRIVXEVXUIDFHZDWHUOHYHOVLVQRWSRVVLEOHZLWKDW\SLFDOVFRSHRIZRUN
7KHXVHRIWKHVXEVXUIDFHZDWHUOHYHOLQIRUPDWLRQSURYLGHGIRUHVWLPDWLQJSXUSRVHVRURWKHUVLWH
UHYLHZFDQSUHVHQWDPRGHUDWHWRKLJKULVNRIHUURU
7KHIROORZLQJLQIRUPDWLRQLVREWDLQHGLQWKHILHOGDQGQRWHGXQGHU:DWHU/HYHO0HDVXUHPHQWVDWWKH
ERWWRPRIWKHORJ
6DPSOH'HSWK 7KHORZHVWGHSWKRIVRLOVDPSOLQJDWWKHWLPHDZDWHUOHYHO
PHDVXUHPHQWLVWDNHQ
&DVLQJ'HSWK 7KHGHSWKWRWKHERWWRPRIWKHFDVLQJRUKROORZVWHPDXJHU
DWWKHWLPHRIZDWHUOHYHOPHDVXUHPHQW
&DYHLQ'HSWK 7KHGHSWKDWZKLFKDPHDVXULQJWDSHVWRSVLQWKHERUHKROH
:DWHU/HYHO 7KHSRLQWLQWKHERUHKROHDWZKLFKIUHHVWDQGLQJZDWHULV
HQFRXQWHUHGE\DPHDVXUHGHYLFHIURPWKHVXUIDFH
2EVWUXFWLRQ'HSWKV
2EVWUXFWLRQVDQGRUREVWUXFWLRQGHSWKVPD\EHQRWHGRQWKHERULQJORJV2EVWUXFWLRQLQGLFDWHVWKH
VDPSOLQJHTXLSPHQWHQFRXQWHUHGUHVLVWDQFHWRSHQHWUDWLRQ,WPXVWEHUHDOL]HGWKDWFRQWLQXDWLRQRI
GULOOLQJWKHXVHRIRWKHUGULOOLQJHTXLSPHQWRUIXUWKHUH[SORUDWLRQPD\SURYLGHLQIRUPDWLRQRWKHUWKDQ
WKDWGHSLFWHGRQWKHORJV7KHFRUUHODWLRQRIREVWUXFWLRQGHSWKVRQWKHORJZLWKFRQVWUXFWLRQIHDWXUHV
VXFKDVURFNH[FDYDWLRQIRXQGDWLRQGHSWKVRUEXULHGGHEULVFDQQRWQRUPDOO\EHGHWHUPLQHGZLWKDQ\
GHJUHHRIDFFXUDF\)RUH[DPSOHSHQHWUDWLRQRIZHDWKHUHGURFNE\VRLOVDPSOLQJHTXLSPHQWPD\QRW
FRUUHODWHZLWKUHPRYDOE\FHUWDLQW\SHVRIFRQVWUXFWLRQHTXLSPHQW8VLQJWKLVLQIRUPDWLRQIRU
HVWLPDWLQJSXUSRVHVRIWHQUHVXOWVLQDKLJKGHJUHHRIPLVLQWHUSUHWDWLRQ
$FFXUDWHO\LGHQWLI\LQJWKHREVWUXFWLRQRUHVWLPDWLQJGHSWKVZKHUHKDUGURFNLVSUHVHQWRYHUWKHVLWH
UHTXLUHVDVFRSHRIVHUYLFHEH\RQGWKHQRUPDOJHRWHFKQLFDOH[SORUDWLRQSURJUDP7KHULVNRIXVLQJWKH
LQIRUPDWLRQQRWHGRQWKHERULQJORJVIRUHVWLPDWLQJSXUSRVHVPXVWEHXQGHUVWRRG
DRAFT REPORT
7-8-2021
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
Exhibit 8
3ODQV
DRAFT REPORT
7-8-2021
3$*(,17(17,21$//</()7%/$1.
DRAFT REPORT
7-8-2021
ROW VARIES 30'-35'ROW VARIES 30'-35'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO BACK OF CURB 36' +/-0.5'ROW VARIES 60'-70'ROW VARIES 30'-35'ROW VARIES 30'-35'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO CENTERLINE 18' +/-0.5'BACK OF CURB TO BACK OF CURB 36' +/-0.5'ROW VARIES 60'-70'EXISITING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDEXISTING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDB418 CURB AND GUTTER - SPOT REPLACEMENTAPPROVED GRANULAR BACKFILL6" TOPSOIL WITH SEEDEXISITING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDEXISTING SLOPE VARIES 1.2% TO 4.0%, 2% PROPOSEDB418 CURB AND GUTTER - SPOT REPLACEMENTAPPROVED GRANULAR BACKFILL6" TOPSOIL WITH SEED120.33'0.5'10.5' MAX2.0' MIN0.5'0.5' MINB418 CURB AND GUTTER - SPOT REPLACEMENTAPPROVED GRANULARBACKFILL6" TOPSOILWITH SEED4" PERFORATED PVC DRAIN TILEFREE DRAINING AGGREGATEGEOTEXTILE FABRIC TYPE 1GEOTEXTILE FABRIC TYPE 5K:\a-f\ArdenHills\18196000\04_Production\01_CAD\01_Xrefs\C001 TYPICAL SECTIONS.dwg Jul 07, 2021 - 2:05pm444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDDRAWING NO.PROJ. NO.FILENAME:PLOT DATE:NAME:SIGNATURE:LIC. NO.:DATE:C001TYPICAL SECTIONSLPPSPBMOBLARRY POPPLER 410056/23/2021--- --- --- ------ --- --- ------ --- --- ------ --- --- ------ --- --- ---I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.ARDEN OAKS STREETIMPROVEMENTS18196.0006" CONCRETE DRIVEWAY PAVEMENT6" AGGREGATE BASE CLASS 5SUBGRADE3" TYPE 9.5 WEARING COURSEMIXTURE (2,B) (SPWEA230B) (2 LIFTS)6" AGGREGATE BASE CLASS 5SUBGRADEPROPOSED CONCRETE DRIVEWAYPROPOSED BITUMINOUS DRIVEWAY2.0" MILL BITUMINOUS SURFACE2.0" OVERLAY TYPE 9.5 WEARING COURSE MIXTURE (2,B) (SPWEA230B)TACK COAT AS DIRECTED BY THE ENGINEEREXISTING BITUMINOUS DEPTH VARIES 3" TO 4.5"EXISTING BASE MATERIAL DEPTH VARIES 5" TO 13"MILL & OVERLAY - OPTION 22.0" TYPE 9.5 WEARING COURSE MIXTURE (2,B) (SPWEA230B)TACK COAT AS DIRECTED BY THE ENGINEER2.0" TYPE 9.5 WEARING COURSE MIXTURE (2,B) (SPWEA230B)+/- 12" FULL DEPTH RECLAMATION5" COMMON EXCAVATION1" OF CLASS 5 AGGREGATE BASEDEPTH OF BASE VARIES 7" TO 15"FULL DEPTH RECLAMATION - OPTION 1SUBGRADESUBGRADESALVAGED PAVERS6" CLASS 5 AGGREGATE BASESUBGRADE1" SAND LEVELING COURSESWEEP CRACKS WITH SELECT GRANULAR BORROWPAVER DRIVEWAYFULL DEPTH RECLAMATION - OPTION 1MILL & OVERLAY - OPTION 2DRAINTILEDRAFT REPORT7-8-2021
>>WAT
WATWATWATWATWAT>>>>>>>>>>>>WAT1499148314731469145145214601462146614761486149636723682>>>>
>>>>>>>>>>>>>>>0+001+002+003+004+005+006+007+008+00PI: 4+47.81PC: 5+62.81PC: 0+82.9
9
PC: 2+06.07
PT: 1+70.49
PT: 2+82.60>>WAT
>>WAT
>>WAT >>>>WAT>>>>WATWAT >>>>WAT>>>>WATWAT
WATWATWATWATWATWATWATWATWAT146314531445143514251434144214501452WWWATT
AWATATWWWAWATATWWAWATATTWWWATWATT>WWAWATAT>>WW
WWWAA
AAWAWATT
ATATWWWAWTTATAT>T>>WWAWWATAWT>WWWAWATT
WWAATWWWWWAWWWAATAATTTTWWWWWATWAAATATTTTTTATT WWWWWAWWAATAATTTWWWWWWWAATWAWAATTTTT>>>WWWWAWWWAATAATTTWWWAWWWATAWAAATTTWWTTT WW>>WAWATAAAT WAA>>TATWAW>>WWA ATTTWW>W WWWAWWWWAATAAATTTTWWWAWAATATTTTTTWATWAAT>WA>WWWAWW
7+008+009+0010+0011+00PT: 8+76.91
9009059109159209259309359409459509559009059109159209259309359409459509550+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+502.21%4.84%2.10%5.28%0+41.00906.690PVI STA: 1+16.23PVI ELEV: 905.11LENGTH: 150.00LOW PT. STA: 0+83.86LOW PT ELEV: 906.24PVI STA: 7+57.94PVI ELEV: 917.15LENGTH: 275.00LOW PT. STA: 7+06.69LOW PT ELEV: 919.23PVI STA: 4+66.16PVI ELEV: 923.60LENGTH: 179.10HIGH PT. STA: 5+02.88HIGH PT ELEV: 922.20PVI STA: 11+00.44PVI ELEV: 933.72LENGTH: 355.672.21%4.84%2.10%5.28%0+41.00906.690PVI STA: 1+16.23PVI ELEV: 905.11LENGTH: 150.00LOW PT. STA: 0+83.86LOW PT ELEV: 906.24PVI STA: 7+57.94PVI ELEV: 917.15LENGTH: 275.00LOW PT. STA: 7+06.69LOW PT ELEV: 919.23PVI STA: 4+66.16PVI ELEV: 923.60LENGTH: 179.10HIGH PT. STA: 5+02.88HIGH PT ELEV: 922.20PVI STA: 11+00.44PVI ELEV: 933.72LENGTH: 355.67906.5906.52906.4906.30907.8907.31909.7909.54912.0912.18914.8914.82917.7917.46920.2919.99921.6921.62922.0922.20921.6921.74920.7920.64919.8919.65919.3919.24919.4919.47920.5920.35922.1921.87924.1924.02926.2926.39928.3928.51930.4930.33932.1931.87FILENAME:PLOT DATE:NAME:SIGNATURE:LIC. NO.:DATE:C002STREET IMPROVEMENTSLPPSPBMOBLARRY POPPLER 410056/23/2021--- --- --- ------ --- --- ------ --- --- ------ --- --- ------ --- --- ---I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.ARDEN OAKS STREETIMPROVEMENTS18196.000MATC
HLI
N
E -
ST
A. 7+50
MATC
HLI
N
E -
S
T
A. 7+50MATCHLINE - STA. 11+50ARDEN OAKS DRIVEARDEN OAKS DRIVEARDEN OAKS DRIVESCALE IN FEET02040 80SCALE IN FEET02040 80
SNELLING A
V
E
N
U
ELEGENDPOTENTIAL PAVER DRIVEWAY IMPACTPOTENTIAL BITUMINOUS DRIVEWAY IMPACTPOTENTIAL CONCRETE DRIVEWAY IMPACTSTREET REHABILITATION AREA100% CURB REPLACEMENTLEGENDPOTENTIAL PAVER DRIVEWAY IMPACTPOTENTIAL BITUMINOUS DRIVEWAY IMPACTPOTENTIAL CONCRETE DRIVEWAY IMPACTSTREET REHABILITATION AREA100% CURB REPLACEMENTCURB REPLACEMENTCURB REPLACEMENTDRAINTILEDRAINTILEDRAINTILEK:\a-f\ArdenHills\18196000\04_Production\01_CAD\02_Sheets\C001 STREET IMPROVEMENTS.dwg Jun 25, 2021 - 1:20pm444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDDRAWING NO.PROJ. NO.DRAFT REPORT7-8-2021
>>>>WAT>>>>WATWAT>>>>WAT >>>>>>WATWATWATWATWATWATWATWAT1415140714011399139713951392PARK1414142412+0013+0014+0015+0016+007+00PC: 12+94.74
P
C
:
1
4
+
7
2
.
2
9 PC: 16+67.74P
T
:
1
4
+
7
1
.
0
8 PT: 16+66.6892092593093594094595095592092593093594094595095513+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+5022+630.71%0.76%0.70%1.47%0.17%935.1935.13935.5935.49935.8935.85936.2936.23936.6936.61937.0936.99937.4937.37937.8937.75938.1938.13938.5938.52938.9938.90939.3939.28939.7939.66940.0940.01940.4940.36940.7940.70941.1941.06941.8941.79942.3942.32>>>>>>WATWAT>>>>WAT WAT13951392 13901388137613771416142814381444144314371429PARK16+0017+0018+0019+0020+0021+0022+0022+62.76PC: 16+67.74PC: 19+38.61PT: 16+66.68PT: 18+36.29PT: 20+48.380+001+00K:\a-f\ArdenHills\18196000\04_Production\01_CAD\02_Sheets\C001 STREET IMPROVEMENTS.dwg Jun 25, 2021 - 1:20pm444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDDRAWING NO.PROJ. NO.FILENAME:PLOT DATE:NAME:SIGNATURE:LIC. NO.:DATE:C003STREET IMPROVEMENTSLPPSPBMOBLARRY POPPLER 410056/23/2021--- --- --- ------ --- --- ------ --- --- ------ --- --- ------ --- --- ---I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.ARDEN OAKS STREETIMPROVEMENTS18196.000MATCHLINE - STA. 16+50MATCHLINE - STA. 11+50MATCHLINE - STA. 16+50ARDEN OAKS COURTARDEN OAKS COURTARDEN OAKS DRIVEARDEN OAKS DRIVEARDEN OAKS DRIVEARDE
N
O
A
K
S
D
RI
V
ESCALE IN FEET02040 80SCALE IN FEET02040 80LEGENDPOTENTIAL PAVER DRIVEWAY IMPACTPOTENTIAL BITUMINOUS DRIVEWAY IMPACTPOTENTIAL CONCRETE DRIVEWAY IMPACTSTREET REHABILITATION AREA100% CURB REPLACEMENTLEGENDPOTENTIAL PAVER DRIVEWAY IMPACTPOTENTIAL BITUMINOUS DRIVEWAY IMPACTPOTENTIAL CONCRETE DRIVEWAY IMPACTSTREET REHABILITATION AREA100% CURB REPLACEMENTDRAFT REPORT7-8-2021
9309359409459509559309359409459509550+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+330.68%0.65%1.18%1.89%0+00.00939.7335+57.84940.414PVI STA: 2+79.29PVI ELEV: 940.99LENGTH: 168.16LOW PT. STA: 2+81.28LOW PT ELEV: 941.27PVI STA: 1+22.77PVI ELEV: 942.05LENGTH: 101.73HIGH PT. STA: 1+46.75HIGH PT ELEV: 941.79PVI STA: 4+27.96PVI ELEV: 941.95LENGTH: 120.32HIGH PT. STA: 4+10.34HIGH PT ELEV: 941.700.68%0.65%1.18%1.89%0+00.00939.7335+57.84940.414PVI STA: 2+79.29PVI ELEV: 940.99LENGTH: 168.16LOW PT. STA: 2+81.28LOW PT ELEV: 941.27PVI STA: 1+22.77PVI ELEV: 942.05LENGTH: 101.73HIGH PT. STA: 1+46.75HIGH PT ELEV: 941.79PVI STA: 4+27.96PVI ELEV: 941.95LENGTH: 120.32HIGH PT. STA: 4+10.34HIGH PT ELEV: 941.70K:\a-f\ArdenHills\18196000\04_Production\01_CAD\02_Sheets\C001 STREET IMPROVEMENTS.dwg Jun 25, 2021 - 1:20pm444 Cedar Street, Suite 1500Saint Paul, MN 55101651.292.4400tkda.comDESCRIPTION OF REVISIONSNO. DATE BYDESIGNEDDRAWNCHECKEDDRAWING NO.PROJ. NO.FILENAME:PLOT DATE:NAME:SIGNATURE:LIC. NO.:DATE:C004STREET IMPROVEMENTSLPPSPBMOBLARRY POPPLER 410056/23/2021--- --- --- ------ --- --- ------ --- --- ------ --- --- ------ --- --- ---I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.ARDEN OAKS STREETIMPROVEMENTS18196.000SCALE IN FEET02040 80LEGENDPOTENTIAL PAVER DRIVEWAY IMPACTPOTENTIAL BITUMINOUS DRIVEWAY IMPACTPOTENTIAL CONCRETE DRIVEWAY IMPACTSTREET REHABILITATION AREA100% CURB REPLACEMENTARDEN OAKS DRIVEARDEN OAKS COURTARDEN OAKS DRIVEARDEN OAKS DRIVECOUNTY ROAD EVALLEY GUTTERDRAFT REPORT7-8-2021
Arden Oaks Street ImprovementsJuly, 2021 $WWDFKPHQW%
Introductions•Larry Poppler, TKDA Project Manager–larry.poppler@tkda.com–952-292-1098•David Swearingen, Interim Public Works Director–dswearingen@cityofardenhills.org–651-792-7847
Presentation Agenda•Existing Conditions•Proposed Improvements•Public Input•Project Funding•Assessments•Project Schedule•Recommendations•Next Steps
Existing Conditions•Pavement rating in the low 30s out of 100 •Originally constructed in the mid to late 1980s•Mill and overlay occurred in 1996•Street improvement length 0.52 Miles•Concrete curb and gutter in good condition•Existing pavement depth 5-6 1/2 inches•Gravel Base 5-13 inches•Sandy Lean Clay beneath roadway
Proposed Improvements•Street surface bituminous rehabilitation –2 Options•Option 1 - Pavement Reclamation•Option 2 - Mill and Overlay•Watermain valve adjustments •Sanitary sewer manhole ring replacement•Storm sewer manhole ring replacement•Curb and gutter replacement as necessary
Option 1 - Pavement ReclamationReclamationRemoval of Excess Material
Option 1 –Pavement ReclamationCurb RepairShaping and Compacting Road Base
Option 1 - Pavement ReclamationFinal GradingPaving
Option 2 - Mill and OverlayMilled SurfacePaving
Typical Sections
Construction Details
Construction Details
Public Input•Questionnaire sent to 42 properties•70% Questionnaire Return Rate!•Identified Topics of Interest–Localized Drainage Issues–Pedestrian Safety –Crossings for Snelling Avenue and County Road E–Truck Access and cut through traffic
Estimated CostsOption 1 –Full Depth Reclamation Estimated CostsStreet Improvements $ 413,197.50Indirect Costs for Street Improvements (27%)* $ 111,563.33Total Costs for Street Improvements $ 524,760.83Storm Sewer Improvements $ 33,150.00Indirect Costs for Storm Sewer Improvements (27%)* $ 8,950.50Total Costs for Storm Sewer Improvements $ 42,100.50Sanitary Sewer Improvements $ 9,750.00Indirect Costs for Sanitary Sewer Improvements (27%)* $ 2,632.50Total Cost for Sanitary Sewer Improvements $ 12,382.50Water Improvements $ 2,450.00Indirect Costs for Water Improvements (27%)* $ 661.50Total Cost for Water Improvements $ 3,111.50Total Improvement Cost $ 458,547.50Total Indirect Costs for City (27%)* $ 123,807.83Total Project Cost $ 582,355.33Total project cost (rounded) –Option 1 $ 583,000.00Option 2 –Mill and Overlay Estimated CostsStreet Improvements$ 278,695.00Indirect Costs for Street Improvements (27%)*$ 75,247.65Total Costs for Street Improvements$ 353,942.65Storm Sewer Improvements$ 20,400.00Indirect Costs for Storm Sewer Improvements (27%)*$ 5,508.00Total Costs for Storm Sewer Improvements$ 25,908.00Sanitary Sewer Improvements$ 9,750.00Indirect Costs for Sanitary Sewer Improvements (27%)*$ 2,632.50Total Cost for Sanitary Sewer Improvements$ 12,382.50Water Improvements$ 2,450.00Indirect Costs for Water Improvements (27%)*$ 661.50Total Cost for Water Improvements$ 3,111.50Total Improvement Cost$ 311,295.00Total Indirect Costs for City (27%)*$ 84,049.65Total Project Cost$ 395,344.65Total project cost (rounded) –Option 2$ 396,000.00
Assessment Policy•Residential zoned R-1 property assessed on a Unit basis (properties with Arden Oaks Drive/Court street address)•Assessment rate of 50% of street costs including all overhead costs. •Utility work not assessed
Assessment SummaryAssessment Term 10 years for Reclamation 5 years for Mill and OverlayInterest Rate –Undetermined (2020 Rate 3.15%) Option 1 –Full Depth ReclamationTotal Project Cost$ 583,000 Assessable Amount$ 524,800 Assessment (50% of Assessable Amount)$ 262,400 Single Family Dwelling Units40 UnitsUnit Assessment (Assessable amount/ 40 Units)$ 6,560 /UnitOption 2 –Mill and OverlayTotal Project Cost$ 396,000 Assessable Amount$ 354,000 Assessment (50% of Assessable Amount)$ 177,000 Single Family Dwelling Units40 UnitsUnit Assessment (Assessable amount/ 40 Units)$ 4,425 /Unit
Assessment Area
Amortization Schedules Option 1 –Full Depth ReclamationPrincipal: $6,560.00Interest Rate: 3.15%Payment Interval: AnnuallyNumber of Payments: 10Schedule of PaymentsPlease allow for slight rounding differences.*Payment 1 includes 21 months of interest.Pmt # Date Principal Interest Payment Balance2022 $ 6,560.00 1 2023 $ 656.00 $ 361.62* $ 1,017.62 $ 5,904.00 2 2024 $ 656.00 $ 185.98 $ 841.98 $ 5,248.00 3 2025 $ 656.00 $ 165.31 $ 821.31 $ 4,592.00 4 2026 $ 656.00 $ 144.65 $ 800.65 $ 3,936.00 5 2027 $ 656.00 $ 123.98 $ 779.98 $ 3,280.00 6 2028 $ 656.00 $ 103.32 $ 759.32 $ 2,624.00 7 2029 $ 656.00 $ 82.66 $ 738.66 $ 1,968.00 8 2030 $ 656.00 $ 61.99 $ 717.99 $ 1,312.00 9 2031 $ 656.00 $ 41.33 $ 697.33 $ 656.00 10 2032 $ 656.00 $ 20.66 $ 676.66 $ -Grand Total$ 6,560.00 $ 1,291.50 $ 7,851.50 $ -Option 2 –Mill and OverlayPrincipal: $4,425.00Interest Rate: 3.15%Payment Interval: AnnuallyNumber of Payments: 5Schedule of PaymentsPlease allow for slight rounding differences. *Payment 1 includes 21 months of interest.Pmt # Date Principal Interest Payment Balance2022 $ 4,425.00 12023 $ 885.00 $ 243.93* $ 1,128.93 $ 3,540.00 22024 $ 885.00 $ 111.51 $ 996.51 $ 2,655.00 32025 $ 885.00 $ 83.63 $ 968.63 $ 1,770.00 42026 $ 885.00 $ 55.76 $ 940.76 $ 885.00 52027 $ 885.00 $ 27.88 $ 912.88 $ -Grand Total$ 4,425.00 $ 522.70 $ 4,947.70 $ -
Project FundingFunding Breakdown Option 1 –Full Depth Reclamation AmountPermanent Improvement Revolving Fund (PIR)$263,007Special Assessments$262,400Utility Fund –Storm Sewer Fund $ 42,100Utility Fund –Sanitary Sewer Fund $ 12,382Utility Fund –Water Fund $ 3,111TOTAL$583,000Funding Breakdown Option 2 –Mill and Overlay AmountPermanent Improvement Revolving Fund (PIR)$177,599Special Assessments$177,000Utility Fund –Storm Sewer Fund $ 25,908Utility Fund –Sanitary Sewer Fund $ 12,382Utility Fund –Water Fund $ 3,111TOTAL$396,000
Project Process•Questionnaires Æcomplete•Feasibility Report Ædraft complete•PowerPoint Presentation •Concerns and Questions•Public Hearing / Order Project•Prepare Plans•Approval of Plans / Authorize Bidding•Assessment Hearing•Award of Construction Contract•Construction•Certification of Assessment
Communications•City Website•https://www.cityofardenhills.org/216/Road-Construction-Projects•Letters•Questionnaires•Project Newsletters•Special Notices•Mass E-mail•Individual Meetings or Communication
ScheduleActivityDateAuthorize Preparation of Feasibility ReportApril 26, 2021City Council Work SessionJuly, 19, 2021Accept Feasibility ReportJuly 26, 2021Public Hearing / Order ImprovementsAugust 23, 2021Accept Plansand Specifications and Authorize Bidding January, 2022Bid OpeningFebruary, 2022Accept Bids and Authorize Assessment Hearing March, 2022Assessment Hearing / Adopt Assessment Roll / Award ContractApril, 2022Commencement of Construction May, 2022Substantial Completion of ConstructionSeptember, 2022Certify Assessments to CountyNovember, 2022Warranty Inspection June, 2023
Recommendation / Next Steps•Option 1 –Full Reclamation Recommended•Public Hearing –August 23, 2021•Ordering the Project –August 23, 2021•Preparation of Plans –Fall 2021•Bidding –Winter 2022•Construction –Spring of 2022
Contact Information•Larry Poppler, TKDA Project Manager–larry.poppler@tkda.com–952-292-1098•David Swearingen, Interim Public Works Director–dswearingen@cityofardenhills.org–651-792-7847
Thank You!
Page 1 of 2
AGENDA ITEM – 1B
MEMORANDUM
DATE: July 19, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: John Morast, HR Green - Transportation
David Swearingen, Interim Public Works Director
SUBJECT: City Council Speed Limits Discussions
Budgeted Amount: Actual Amount: Funding Source:
$ $
Council Should Consider
Council should consider presentation information and options and discuss if further actions are
desired.
Background
Legislative changes to the Mn Statutes governing speed limits on local streets were presented
and discussed during the May 13 Council meeting. Minnesota Statute 169.14 Speed Limits,
Zones; Radar regulates highway and roadway speeds in Minnesota and sets statutory speed limits
on a variety of roadways in Minnesota. Subdivision 2 sets maximum speed limits on a variety of
roadways within a Municipality, if adopted by the road authority. The Statute identified the
Commissioner of Transportation as the road authority. When local authorities suspect that an
existing speed limit was not appropriate (either too low or too high) on their local roads, they
can request the commissioner to authorize an engineering and traffic investigation and to erect
appropriate speed limit signs. The results of the investigation could provide speed limit changes
either up or down and would be signed accordingly.
In August 2019, the Minnesota Legislature changed the Statutes governing speed limits on city
streets. The changes allow cities to establish speed on roads under the City’s jurisdiction, other
than the statutory limits, without conducting an engineering and traffic investigation. Any speed
limit change must be implemented in a consistent and understandable manner. “The city must
Page 2 of 2
erect appropriate signs to display the speed limit. A city that uses the authority under this
subdivision must develop procedures to set speed limits based on the city's safety, engineering,
and traffic analysis. At a minimum, the safety, engineering, and traffic analysis must consider
national urban speed limit guidance and studies, local traffic crashes, and methods to effectively
communicate the change to the public.”
Discussion
With these State law changes, City Councils are now considered the “road authority” for
municipal roadways. With previous speed limit discussions, Council desired additional
information regarding speed limits and options. A review of the surrounding cities found that
most have at least reviewed the new authority, many have had discussions at various levels and,
to date, only St. Anthony Village has acted to reduce speed limits on City streets to 25 mph.
The presentation is intended to recap information from previous discussions and provide options
for Council to move forward with any further discussions and/or action the Council would like to
take.
Budget Impact
Budget impacts are dependent on what options and actions the Council takes.
Attachments
Attachment A - Speed Limit Options and Discussion Presentation
ARDEN HILLS SPEED LIMIT
DISCUSSIONS –CONTINUED
July 19, 2021 –Council Presentation
Presented by: John Morast, PE –HR Green Regional Director
7/15/2021 1
Project Title
Location
Speed Limit Discussions –Agenda
Recap
Neighboring Communities
LRRB Update
City Street Map
Speed Limit Decision Options
Recommendations
Next Steps
7/19/2021 2
Project Title
Location
Speed Limit Discussions –Process Recap
7/19/2021 3
New Local Road Speed Limit Process
Minn. Statute 169.14 Subd. 5h –Speed limits on City Streets
Cities now can lower speed limits ONLY on City streets
Implement in a consistent and understandable manner
Install appropriate signage
Must develop procedures to set limits based on city’s safety,
engineering and traffic analysis
As a minimum, analysis must consider:
national urban speed limit guidance & studies
effective communications on the change
local crashes
Education and Enforcement
Project Title
Location
Speed Limit Discussions -Recap
August 2019 –Legislature Gives Cities Speed Limit Control
Do Nothing/No Changes
Reduce City Speed Limits to 25 MPH
Wait until LRRB Releases Study Results for Action
Wait For Surrounding Cities To Act and Monitor
Perform Safety, Engineering, and Traffic Analysis
Develop Procedures to Reduce Speed Limits
7/19/2021 4
Project Title
Location
Speed Limit Discussions –Neighbors
7/19/2021 5
Several –Looked into, do nothing, waiting
Falcon Heights –Looking to change, no action yet
Mpls/St Paul –City-wide reductions -20 MPH
St. Anthony Village –City-wide reduction -25 MPH
Project Title
Location
Speed Limit Discussions –LRRB Update
Currently two studies underway
Guidelines for Determining Speed Limits on Municipal Roadways
Project Started March 2021
Quick reference guide for setting speeds
Answering some speed limit changes questions
Impact of Speed Limit Changes on Urban Streets
Project Started July 2020
Evaluating impacts on driver behavior
Developing guidance on when speed limit changes will achieve desired effect
No New Study Updates
7/19/2021 6
Project Title
Location
Speed Limit Discussions –
City Street Map
MnDOT MSA Street Map
Only Municipal Streets
Quick Review of Eligible Streets For
City Speed Changes
Further evaluation needed
City CANNOT Change
State Routes
County Roads
7/19/2021 7
North
Central
South
Project Title
Location
Speed Limit Discussions –City Street Map
Northern Section
Eligible Streets For City Speed
Changes
7/19/2021 8
Project Title
Location
Speed Limit Discussions –City Street List
Northern Section
Preliminarily Eligible City Streets
For City Made Speed Changes
7/19/2021 9
Gateway Ct Indian Oaks Ct
Wedgewood Cir Dawn Cir W
Brueberry Ln Dawn Cir E
Keithson Dr James Ave
Royal Hills Dr Arden View Ct
Arden View Dr Karth Lake Cir
Arden Vista Ct Nursery Hill Lane
McClung Dr Nursery Hill Ct
Colleen Ct Dellwood St
Briarknoll Cir Amble Rd
Briarknoll Dr Wyncrest Ct
Colleen Cir Wyncrest Lane
Colleen Ave Wyncrest Dr
Norma Ave Pleasant Cir
Indian Oaks Cir Pleasant Dr
Indian Oaks Trail Amble Cir
Cummings Park Dr
Arden Hills - North Map
Project Title
Location
Speed Limit Discussions –City Street Map
Central Section
Eligible Streets For City Speed
Changes
7/19/2021 10
Project Title
Location
Speed Limit Discussions –City Street List
Central Section
Preliminarily Eligible City Streets
For City Made Speed Changes
7/19/2021 11
Janet Cir Chatham Ave
Valentine Crest Rd McCracken Ln
Valentine Ave Chatham Ct
Valentine Ct Norma Ave
N. Fairview Ave NormaCir
Crystal Ave W. Floral Dr
Dellview Ave Eide Cir
Glenview Ave James Cir
Gramsie Rd Gale Cir
Venus Ave Northwoods Dr
Rolling Hills Rd Red Fox Rd
Glenview Ct Royal Ln
Brighton Way Lakeview Ct
Arden Hills - Central Map
Project Title
Location
Speed Limit Discussions –City Street Map
Southern Section
Eligible Streets For City Speed
Changes
7/19/2021 12
Project Title
Location
Speed Limit Discussions –City Street List
Southern Section
Preliminarily Eligible City Streets
For City Made Speed Changes
7/19/2021 13
Thom Court Siems Ct Arden Oaks Ct
Thom Drive Ridgewood Ct Cannon Ave
Hudson Ave Arden PL Tiller Ln
Grant Rd Skiles Ln Dellwood Ave
Noble Rd Lametti Ln N Dunlap St
Lake Ln Lametti Cir Hamline Ave N
Katie Ln Bussard Ct Ingerson Ct
Katie Court Cummings Ln Connely Ave
Sandeen Rd Ashbury Ave Waldon Pl
Jerrold Ave Glenhill Rd Hunters Ct
W Edgewater Ave Ridgewood Rd Benton Way
Prior Ave N Forest Ln Fernwood Ct
Shorewood Dr Glenarden Ct Fernwood St
County Road D Glenarden Rd Shoreline Ln
Oak Ave Arden Oaks Pl Edgewater Ave
Arden Hills- South Map
Project Title
Location
Speed Limit Discussions –Options
Options/Next Steps
1.Do Nothing
2.Reduce City Speed Limits to 25 MPH
3.Reduce Speed Limits to 20 MPH
7/19/2021 14
Project Title
Location
Speed Limit Discussions –Options
Do Nothing
No Action needed
Remain 30 MPH as Default Speed
Driver Education & Enforcement Efforts
7/19/2021 15
Project Title
Location
Speed Limit Discussions –Options
Reduce City Speed Limits to 25 MPH
City has authority to set speed limits (Council adopted)
Develop procedures for changes
City Code, signage, locations, etc.
Install appropriate signage
Showing speed limit; beginning and end location of limit locations
Generally city-wide
Entrance or “gate-way” signs
Education and Enforcement
7/19/2021 16
Project Title
Location
Speed Limit Discussions –Options
Reduce City Speed Limits to 20 MPH
Develop procedures to set limits
Based on City’s safety, engineering and traffic analysis
As a minimum, analysis must consider:
national urban speed limit guidance & studies
effective communications on the change
local crashes
Install appropriate signage
Implemented in a consistent and understandable manner
Education and Enforcement
7/19/2021 17
QUESTIONS
DISCUSSIONS
DIRECTION
7/19/2021 18
Project Title
Location
BLANK SLIDE
Project Title
Location
Speed Limit Discussions –
Process
Develop Process
Review/change Code, if necessary
State Statutes
Procedure to chose
Why this and not that
Study
Traffic analysis
Clear concise
Understandable
Process7/19/2021 20
Page 1 of 3
AGENDA ITEM – 1C
MEMORANDUM
DATE:
July 19, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Gayle Bauman, Finance Director
SUBJECT: 2022 – 2026 Capital Improvement Plan (CIP)
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A Various
Council Should Consider
Provide feedback to staff on Preliminary 2022 – 2026 CIP Plan.
Background
Annually, the City prepares a five (5) year Capital Improvement Plan for budgeting and forecasting.
The focus of the CIP is on the maintenance and protection of the City’s existing assets,
redevelopment, and investment in new initiatives. The CIP is part of the budget process, but it is
not a budget, it is a plan, and one that changes often. The CIP does not commit the council to the
proposed projects, nor implement the assumptions made during the preparation; however, this is
the basis for the 2022 Budget as we continue with its preparation.
The city has a finite amount of resources, so prioritizing and then being able to finance projects is
crucial for ensuring the city’s long-term sustainability and being responsible stewards of the city’s
investments. Staff has been working on completing a comprehensive study of the City’s current
and future needs for infrastructure projects to better estimate project costs and ensure more accurate
forecasting of available fund balances.
Discussion
A preliminary plan has been prepared and is attached which includes a summary of projects,
detailed project sheets, sources of funds, and estimated fund balances (since the operating budgets
have not yet been completed, these fund balances are estimated operating costs). Information is
included on street and park projects going out ten (10) years even though our CIP is only for five
years. Please note that project timelines are subject to change and that the current timeline is City
Staff’s best estimate.
The 2021-2025 CIP was an $18.8 Million plan, while the proposed 2022-2026 CIP is listed for
$15.3 Million in expenditures. This is an 18.7% decrease from the previous year’s program or
$3,526,490. The biggest change is found in street projects.
Page 2 of 3
PIR Fund
x The city has about $60 million of streets and trails (based on 29.42 miles of city streets).
Estimating the useful life of these assets at 40 years would require an investment of about
$1.5 million annually. The current funding sources of the tax levy, Municipal State Aid and
special assessments account for about $1.1 million on average per year. This gap in the CIP
fluctuates from year-to-year, but will need to be addressed over time.
x A property tax levy of $250,000 is being proposed for 2022, which is unchanged from 2021.
x The city has been able to self-finance the special assessment portion thus far. However, with
the cost of these projects increasing, we may need to eventually look at bonding for the
special assessment portion of street projects. Current projections do not include any
prepayments of special assessments.
x There is a definite need to stay on top of street improvement projects to ensure streets reach
their useful lives and don’t require costly premature full reconstructions. Several areas of the
city are reaching those crucial ages that significant outlay is needed to ensure the long-term
vitality of the streets.
x Some of the future projects were moved out even further to try and get the City on a schedule
of completing a major street reconstruction project every other year.
x The Snelling Ave. road project (County Road E to Highway 51) is scheduled to proceed in
2022 but the intersection was separated out as its own project and isn’t scheduled until 2023.
x The two trail projects (Mounds View High School and Snelling Avenue N) for which grant
funding is being looked into, are not currently included in the CIP.
x The 3 types of street improvement projects being considered based on condition are:
o Resurfacing is the milling of the top 1.5 to 2 inch surface layer of street pavement and
overlaying the street with a new bituminous surface layer.
o Full Depth Reclamation involves spot repair of existing curb, milling or reclaiming the
full depth of existing bituminous pavement, blending milled material with underlying
aggregate material and installing a new bituminous pavement section.
o Reconstruction involves removal and replacement of larger quantities of existing curb,
installing underlying subgrade correction materials, new aggregate base and a new
bituminous pavement section.
Public Safety Capital Equipment Fund
x The fund is currently being used to account for capital expenditures made by the Lake
Johanna Fire Department.
x A transfer from the General Fund was completed in 2020 to cover the city’s cost of the land
for the new fire station.
x The assumption being used for this CIP is that debt service on the new fire station will begin
in 2025 at $195,000 per year and continuing for 15 years. This could be decreased to
$155,000 if we were to bond for 20 years. Property tax levy increases are proposed for the
years 2021-2025 with a final total levy increase of $225,000.
x Major vehicle purchases are projected to occur in 2022, 2025, 2027 and 2029. LJFD may
need to reevaluate their need and look at spreading these costs out over a longer period of
time to level off the funds needed from contract cities.
Equipment & Building Replacement Fund
x The current plan includes completion of the city hall parking lot project in 2022.
Page 3 of 3
x The long-term asset management plan for equipment has not yet been completed so purchases
are only scheduled out for 5 years.
Utility Funds
x Public Works staff continues to evaluate the condition of City utilities throughout the
community. The majority of street projects currently include a minimum amount for isolated
utility repairs. Staff will complete a comprehensive review of the utility systems to identify
locations where broader water, sanitary sewer and drainage replacement is needed. This will
increase the forecasted capital expenses for the utility funds.
x Rate increase assumptions are as follows:
Water – 2022-2024 (4.5%); 2025-2026 (0%); 2027-2028 (2%); 2029-2031 (0%)
Sewer – 2022-2025 (3.5%); 2026 (0%); 2027-2031 (2%)
Storm – 2022 (3%); 2023-2031 (0%)
Council Direction
Staff is seeking direction from the City Council regarding the following items:
2022 projects
As we review the 2022 projects, does the Council have any questions, comments or concerns
about including them during budget preparation?
2022 property tax levy
The levies for the EDA ($100,000), Equipment/Building Replacement ($50,000) and PIR
($250,000) are currently proposed to remain at the same amount as was levied in 2021 in this plan.
The plan reflects a $50,000 increase in the levy for the Public Safety Capital Fund, going from
$120,000 to $170,000. It is assumed that levy increases will be needed each year from 2022-2025
to ensure the City has sufficient cash on hand to make its debt service payments once the new fire
station is built. Should staff continue forward with this assumption?
2021 General Fund transfer
There is $548,000 available to transfer from the General Fund to capital funds in 2021. This total
represents the amount at 12/31/2020 that was in excess of the 50% fund balance reserve goal
stated in the City’s financial policies. There are needs in the PIR and Public Safety Capital
Funds. Does the Council have a preference on where the funds should go?
Budget Impact
The Council should review the estimated fund balances and funding sources with special attention
given to the Public Safety Capital and Utility Funds.
Attachments
Attachment A: PowerPoint Overview of Capital Improvement Plan
Attachment B: Capital Improvement Plan
Summary of Capital Improvement Plan ExpendituresThe above table shows the City of Arden Hill’s estimated costs for capital projects and equipment for the next five years broken down by department.Department 2022 2023 2024 2025 2026 TotalEconomic Development 0 270,000 0 40,000 0310,000Government Buildings 304,650 50,000 50,000 200,000 50,000654,650Parks Department 765,700 55,000 0 336,000 720,0001,876,700Public Safety Department 230,130 27,000 82,750 622,500 363,0001,325,380Sewer Department 90,000 385,000 0 330,000 0805,000Street Department 3,087,000 1,687,000 1,885,000 0 1,385,0008,044,000Surface Water Department 65,000 145,000 305,000 90,000 250,000855,000Water Department 75,000 0 60,000 90,000 300,000525,000Equipment 78,000 80,000 280,000 230,000 225,000893,000Total 4,695,480 2,699,000 2,662,750 1,938,500 3,293,000 15,288,730Expenditures by Year Attachment A
Changes from Prior Year CIPThe above table shows the differences between the 2021-2025 CIP and the 2022-2026 CIP by department.2Department2021-2025 CIP2022-2026 CIP DifferenceEconomic Development 286,130 310,000 23,870Government Buildings 660,000 654,650(5,350)Parks Department 887,000 1,876,700 989,700Public Safety Department 1,066,130 1,325,380 259,250Sewer Department 1,241,000 805,000(436,000)Street Department 12,823,000 8,044,000(4,779,000)Surface Water Department 522,000 855,000 333,000Technology 0 0 0Water Department 225,000 525,000 300,000Equipment 1,104,960 893,000(211,960)Total 18,815,220 15,288,730(3,526,490)Changes by Department
Projects in 2022Project Fund Source AmountCity Hall Maintenance Equip/Bldg Replacement $50,000Ongoing maintenance & repair placeholder.City Hall Maintenance Equip/Bldg Replacement $254,650Completion of City Hall parking lot.Hard Court Reconstruction Capital Improvement $426,000Floral Park tennis and basketball courts.Hazelnut Park Warming House Capital Improvement $90,000Replace warming house.Arden Manor Park Improvement Capital Improvement $249,700$189,700 is grant funded; $60,000 is City portion.LJFD Capital Items Public Safety Capital $230,130City share of Lake Johanna Fire Department capital budget.3
2022 PMP Cap Impr/Utilities $827,000Arden Oaks neighborhood street & utility improvements.Old Snelling Ave PMP Cap Impr/Utilities $1,250,000County Road E to Highway 51 improvements.Lexington Avenue Cap Impr/Water $1,010,000City share of design work on Ramsey County project.Lift Station Rehab Sewer $90,000Rehabilitation needed on station 14.Storm Sewer Structure Rehab Surface Water Mgmt $65,000Maintenance required by City’s MS4 permit.Water Tower Maintenance Water $75,000South tower maintenance.Projects in 2022Project Fund Source Amount4
Replace 2005 Felling Trailer (#414) Equip/Bldg Replacement $12,000Replace 2001 Toro Workman (#411) Equip/Bldg Replacement $30,000Replace 2013 Bldg Inspector vehicle (#504)Equip/Bldg Replacement $36,000Equipment in 2022Project Fund Source Amount5
Estimated Ending Fund Balance by YearNo additional bonding is included in the projections shown above.6Fund 2022 2023 2024 2025 2026Capital Improvement Fund 3,216,334 3,595,044 2,537,184 3,184,324 2,407,834Economic Development Fund 658,803 402,803 414,133 382,713 388,473Equipment Building Replacement Fund 4,052 224,052 244,052 164,052 239,052Public Safety Capital Fund 90,293 298,293 500,543 188,043 135,043Sanitary Sewer Fund 123,074(72,816)249,544 284,384 560,804Surface Water Fund 161,682 354,882 327,822 545,042 566,082Water Fund 1,006,412 1,093,832 1,253,262 1,342,212 1,134,062Net Fund Surplus (Deficit) by Year
2022-2026
Proposed
CAPITAL IMPROVEMENT PLAN
EQUIPMENT REPLACEMENT PLAN
CITY OF ARDEN HILLS
Council Work Session July 19, 2021
$WWDFKPHQW%
TABLE OF CONTENTS
Section
Page
Department Summary 1
Capital Improvement Plan by Department 2
Capital Improvement Project Detail Sheets 4
Equipment Replacement Program by Department 34
Equipment Project Detail Sheets 35
Projects by Funding Source 44
Sources and Uses of Funds 47
Capital Improvement Plan
City of Arden Hills, Minnesota
DEPARTMENT SUMMARY
2022 2026thru
Total20222023202420252026Department
Economic Development 310,000270,000 40,000
Equipment 893,00078,000 80,000 280,000 230,000 225,000
Government Buildings 654,650304,650 50,000 50,000 200,000 50,000
Parks Department 1,876,700765,700 55,000 336,000 720,000
Public Safety 1,325,380230,130 27,000 82,750 622,500 363,000
Sanitary Sewer Department 805,00090,000 385,000 330,000
Street Department 8,044,0003,087,000 1,687,000 1,885,000 1,385,000
Surface Water Management Dept 855,00065,000 145,000 305,000 90,000 250,000
Water Department 525,00075,000 60,000 90,000 300,000
4,695,480 2,699,000 2,662,750 1,938,500 3,293,000 15,288,730TOTAL
Produced Using the Plan-It Capital Planning Software 1
Capital Improvement Plan
City of Arden Hills, Minnesota
PROJECTS BY DEPARTMENT
2022 2026thru
Total20222023202420252026DepartmentProject #Priority
Economic Development
23-EDA-001 310,000270,000 40,000Gateway Signs n/a
310,000270,000 40,000Economic Development Total
Government Buildings
22-Bldg-005 250,00050,000 50,000 50,000 50,000 50,000City Hall Maintenance 2
22-Bldg-006 254,650254,650City Hall parking lot 3
25-Bldg-002 150,000150,000City Hall roof 3
654,650304,650 50,000 50,000 200,000 50,000Government Buildings Total
Parks Department
22-Park-001 506,000426,000 80,000Hard Court Reconstruction 3
22-Park-002 90,00090,000Hazelnut Park Warming House 4
22-Park-003 249,700249,700Arden Manor Park Improvements 3
23-Park-004 55,00055,000Perry & Cummings Park Roof Maintenance 3
25-Park-003 256,000256,000Playground Structure Replacement 3
26-Park-004 120,000120,000Park Shelter Roof Replacements 4
26-Park-005 600,000600,000MN-51 Trail Connection n/a
1,876,700765,700 55,000 336,000 720,000Parks Department Total
Public Safety
22-Pub-001 587,500187,500 400,000LJFD Engine/Ladder Replacement n/a
22-Pub-002 223,25020,500 2,000 57,750 143,000LJFD Rescue/Chief/Utility Vehicle Replacement n/a
22-Pub-003 77,05017,050 15,000 15,000 15,000 15,000LJFD General Equipment n/a
22-Pub-004 47,5805,080 10,000 10,000 12,500 10,000LJFD Station Capital n/a
25-Pub-005 390,000195,000 195,000Lake Johanna Fire Dept Fire Station n/a
1,325,380230,130 27,000 82,750 622,500 363,000Public Safety Total
Sanitary Sewer Department
22-Sew-001 300,00090,000 210,000Lift Station Rehabilitation 2
22-Sew-002 505,000175,000 330,000Sewer Lining/Rehabilitation 2
805,00090,000 385,000 330,000Sanitary Sewer Department Total
Street Department
22-Str-001 827,000827,000Arden Oaks Neighborhood Streets 2
22-Str-003 1,250,0001,250,000Old Snelling Ave PMP, CR E - Hwy 51 2
22-Str-006 1,010,0001,010,000Lexington Ave, CR E to 694 2
23-Str-002 1,687,0001,687,000Old Snelling Ave/CR E Intersection Improvements 3
24-Str-001 1,885,0001,885,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2
26-Str-001 1,385,0001,385,000Karth Lake East Neighborhood Streets and Stowe Ave 2
8,044,0003,087,000 1,687,000 1,885,000 1,385,000Street Department Total
Produced Using the Plan-It Capital Planning Software 2
Total20222023202420252026DepartmentProject #Priority
Surface Water Management Dept
22-Storm-001 405,00065,000 80,000 80,000 90,000 90,000Storm Sewer Structure Rehabilitation 2
23-Storm-001 65,00065,000Karth Lake retaining wall 2
24-Storm-001 385,000225,000 160,000Storm Pond and Outfall Maintenance 2
855,00065,000 145,000 305,000 90,000 250,000Surface Water Management Dept Total
Water Department
22-W-001 135,00075,000 60,000Water Tower Maintenance 2
25-W-002 90,00090,000Booster Station Improvements 2
26-W-003 300,000300,000Trunk Water Main Improvements 2
525,00075,000 60,000 90,000 300,000Water Department Total
GRAND TOTAL 14,395,7304,617,480 2,619,000 2,382,750 1,708,500 3,068,000
Produced Using the Plan-It Capital Planning Software 3
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Community Devl Dir
2022 2026thru Department Economic Development
Description
Install gateway signs at major entry points to the City. Potential locations for signs include: (1) Highway 96 at Round Lake Road, (2) Highway 96
at Lexington Avenue, (3) County Road E at Highway 51, (4) County Road E at Lexington Avenue, (5) Lexington Avenue at County Road F, and
(6) Lexington Avenue at County Road D. Potential sign locations are not listed in order of priority and are subject to change.
There are three existing gateway signs in the following locations: (1) County Road E2 at I-35W, (2) County Road D at Cleveland Avenue, and (3)
Lake Johanna Boulevard at the Roseville border.
The City has discussed completing the gateway sign at Highway 96 and Lexington Avenue as being a priority.
Staff has budgeted for the completion of an additional gateway sign in 2025 at a location to be determined.
Project #23-EDA-001
Priority n/a
Justification
Advance the economic development goals in the 2030 Comprehensive Plan. Implement the Guiding Plan for the B2 District. Work to better
identify the entrance points to the City for businesses and visitors. Foster civic pride and community identity.
Budget Impact/Other
Annual maintenance costs for sign cleaning and care of landscaping is estimated by the Public Works Department at $500 per sign annually.
Useful Life
Project Name Gateway Signs Category Economic Devl Improvement
Type Improvement
TCAAP No
Total Project Cost:$310,000
Total20222023202420252026Expenditures
310,000270,000 40,000Construction/Maintenance
270,000 40,000 310,000Total
Total20222023202420252026Funding Sources
310,000270,000 40,000EDA General Fund
270,000 40,000 310,000Total
Produced Using the Plan-It Capital Planning Software
4
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Finance Director
2022 2026thru Department Government Buildings
Description
City Hall will require ongoing maintenance and replacement of items to maintain operational duties (carpet, painting, HVAC, etc.).
Project #22-Bldg-005
Priority 2 Very Important
Justification
Items will be due for replacement, and will save the City future repair costs by replacing them in the near-term.
Budget Impact/Other
Useful Life 10
Project Name City Hall Maintenance Category Building Repair & Maint
Type Maintenance
TCAAP No
Total Project Cost:$250,000
Total20222023202420252026Expenditures
250,00050,000 50,000 50,000 50,000 50,000Equip/Vehicles/Furnishings
50,000 50,000 50,000 50,000 50,000 250,000Total
Total20222023202420252026Funding Sources
250,00050,000 50,000 50,000 50,000 50,000Equipment/Building
Replacement Fund
50,000 50,000 50,000 50,000 50,000 250,000Total
Produced Using the Plan-It Capital Planning Software
5
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Building Official
2022 2026thru Department Government Buildings
Description
Reconstruct City Hall parking lot including sidewalk repairs. Replace five parking lot lights.
Project #22-Bldg-006
Priority 3 Important
Justification
The parking lot is in need of repairs including subgrade corrections and replacement of damaged curbing.
Budget Impact/Other
Useful Life 20
Project Name City Hall parking lot Category Building Repair & Maint
Type Improvement
TCAAP No
Total Project Cost:$300,000
Total20222023202420252026Expenditures
254,650254,650Construction/Maintenance
254,650 254,650Total
Total20222023202420252026Funding Sources
254,650254,650Equipment/Building
Replacement Fund
254,650 254,650Total
Produced Using the Plan-It Capital Planning Software
6
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Building Official
2022 2026thru Department Government Buildings
Description
Replace 9000 sq ft roof at City Hall.
Project #25-Bldg-002
Priority 3 Important
Justification
Placeholder for future project.
Budget Impact/Other
Useful Life 20-25
Project Name City Hall roof Category Building Repair & Maint
Type Improvement
TCAAP No
Total Project Cost:$150,000
Total20222023202420252026Expenditures
150,000150,000Construction/Maintenance
150,000 150,000Total
Total20222023202420252026Funding Sources
150,000150,000Equipment/Building
Replacement Fund
150,000 150,000Total
Produced Using the Plan-It Capital Planning Software
7
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Parks Department
Description
Floral Park Tennis and Basketball Courts - Reconstruct 2022
$426,000
Freeway Park Basketball Court - Reconstruct 2025
$80,000
Arden Oaks Basketball Court - Reconstruct 2028
$80,000
Project #22-Park-001
Priority 3 Important
Justification
Proposed improvements are intended to maintain existing court surfaces. In general, a court surface life is approximately 25 years before cracks
and pavement deformation require full reconstruction. Routine crack filling to prolong court surfaces is being performed.
Budget Impact/Other
Useful Life 20-25
Project Name Hard Court Reconstruction Category Park Capital Improvements
Type Improvement
TCAAP No
Total Project Cost:$586,000
Total20222023202420252026Expenditures
506,000426,000 80,000Construction/Maintenance
426,000 80,000 506,000Total
Total20222023202420252026Funding Sources
506,000426,000 80,000Capital Improvement Funds
(PIR)
426,000 80,000 506,000Total
Produced Using the Plan-It Capital Planning Software
8
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Parks Department
Description
Replacement of warming house in Hazelnut Park.
The estimated cost of the warming house assumes construction of a wood frame structure on a concrete foundation - $90,000.
Additional access improvements may be required based on ADA standards.
Project #22-Park-002
Priority 4 Less Important
Justification
Warming house was lost to a fire in 2018. City cost for renting a portable warming house for the past seasons is as follows:
2018-2019 $5,736
2019-2020 $4,069
2020-2021 $4,430
Budget Impact/Other
Useful Life
Project Name Hazelnut Park Warming House Category Park Maintenance
Type Improvement
TCAAP No
Total Project Cost:$90,000
Total20222023202420252026Expenditures
90,00090,000Construction/Maintenance
90,000 90,000Total
Total20222023202420252026Funding Sources
90,00090,000Capital Improvement Funds
(PIR)
90,000 90,000Total
Produced Using the Plan-It Capital Planning Software
9
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Park & Recreation Mgr
2022 2026thru Department Parks Department
Description
Arden Manor Park last replaced in 1999.
City has received grant funding to increase the scope of this project to include the play structure, fiber bedding, concrete work and drainage issues.
Project #22-Park-003
Priority 3 Important
Justification
In order to maintain playground structures that meet current safety guidelines, require a minimum amount of maintenance, and have replacement
parts available, the City is attempting to maintain a replacement schedule for playground facilities based on available funds.
Budget Impact/Other
Useful Life
Project Name Arden Manor Park Improvements Category Park Capital Equipment
Type Improvement
TCAAP No
Total Project Cost:$249,700
Total20222023202420252026Expenditures
249,700249,700Construction/Maintenance
249,700 249,700Total
Total20222023202420252026Funding Sources
60,00060,000Capital Improvement Funds
(PIR)
189,700189,700Grants
249,700 249,700Total
Produced Using the Plan-It Capital Planning Software
10
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Parks Department
Description
Repair or replace roof shingles at these two parks.
Project #23-Park-004
Priority 3 Important
Justification
Roofing materials are aging and deteriorating towards the end of the expected service life.
Budget Impact/Other
Useful Life
Project Name Perry & Cummings Park Roof Maintenance Category Park Capital Improvements
Type Improvement
TCAAP No
Total Project Cost:$55,000
Total20222023202420252026Expenditures
55,00055,000Construction/Maintenance
55,000 55,000Total
Total20222023202420252026Funding Sources
55,00055,000Capital Improvement Funds
(PIR)
55,000 55,000Total
Produced Using the Plan-It Capital Planning Software
11
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Park & Recreation Mgr
2022 2026thru Department Parks Department
Description
Play Structures are replaced on a 20 year replacement schedule.
2025
Arden Oaks Park last replaced in 1999 - $126,000
Freeway Park last replaced in 1998 - $130,000
2027
Ingerson Park last replaced in 2000 - $130,000
2028
Floral Park last replaced in 2001 - $138,000
Sampson Park last replaced 2001- $138,000
2030
Royal Hills Park last replaced 2002 - $144,000
Project #25-Park-003
Priority 3 Important
Justification
In order to maintain playground structures that meet current safety guidelines, require a minimum amount of maintenance, and have replacement
parts available, the City is attempting to maintain a replacement schedule for playground facilities based on available funds.
Budget Impact/Other
Useful Life
Project Name Playground Structure Replacement Category Park Capital Equipment
Type Improvement
TCAAP No
Total Project Cost:$806,000
Total20222023202420252026Expenditures
256,000256,000Construction/Maintenance
256,000 256,000Total
Total20222023202420252026Funding Sources
256,000256,000Capital Improvement Funds
(PIR)
256,000 256,000Total
Produced Using the Plan-It Capital Planning Software
12
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Parks Department
Description
Replace steel roofs on 6 park shelters:
Cummings, Floral, Hazelnut, Royal, Ingerson, Arden Manor
Project #26-Park-004
Priority 4 Less Important
Justification
Shelter roofs are deteriorating and reaching the end of service life.
Budget Impact/Other
Useful Life
Project Name Park Shelter Roof Replacements Category Park Capital Improvements
Type Improvement
TCAAP No
Total Project Cost:$120,000
Total20222023202420252026Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total20222023202420252026Funding Sources
120,000120,000Capital Improvement Funds
(PIR)
120,000 120,000Total
Produced Using the Plan-It Capital Planning Software
13
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Parks Department
Description
Proposed new trail construction. Involves 1,700-feet of 8-feet wide bituminous trail along the west side of MN-51 from the Roseville border to
Snelling Avenue North.
Project #26-Park-005
Priority n/a
Justification
This trail segment is identified as a proposed pathway on the City's master trail system map. It is also identified in the Metropolitan Council
Regional Bicycle Transportation Network (RBTN) and is eligible for funding. MnDOT is scheduled to resurface MN-51 in 2026 within the
proximity of this proposed trail segment.
Budget Impact/Other
Useful Life 20
Project Name MN-51 Trail Connection Category Park Capital Improvements
Type Improvement
TCAAP No
Total Project Cost:$600,000
Total20222023202420252026Expenditures
600,000600,000Construction/Maintenance
600,000 600,000Total
Total20222023202420252026Funding Sources
400,000400,000Capital Improvement Funds
(PIR)
200,000200,000Grants
600,000 600,000Total
Produced Using the Plan-It Capital Planning Software
14
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2022 2026thru Department Public Safety
Description
Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows the fire department has
budgeted for the replacement of a fire engine in future years.
2022
Engine Replacement
Total Cost: $750,000
Arden Hills Cost: $187,500
2025
Ladder Replacement
Total Cost: $1,600,000
Arden Hills Cost: $400,000
Project #22-Pub-001
Priority n/a
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Budget Impact/Other
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a
result of this project would be reflected in the fire services contract in reduced maintenance costs.
Useful Life
Project Name LJFD Engine/Ladder Replacement Category Public Safety
Type Equipment
TCAAP No
Total Project Cost:$1,020,000
Total20222023202420252026Expenditures
587,500187,500 400,000Equip/Vehicles/Furnishings
187,500 400,000 587,500Total
Total20222023202420252026Funding Sources
587,500187,500 400,000Public Safety Capital Fund
187,500 400,000 587,500Total
Produced Using the Plan-It Capital Planning Software
15
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2022 2026thru Department Public Safety
Description
Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows the fire department has
budgeted for the replacement of Rescue/Chief/Utility vehicles in future years.
2022
Vehicle Replacement
Total Cost: $82,000
Arden Hills Cost: $20,500
2023
Tire Replacement
Total Cost: $8,000
Arden Hills Cost: $2,000
2024
Vehicle Replacement
Total Cost: $231,000
Arden Hills Cost: $57,750
2026
Vehicle Replacement
Total Cost: $572,000
Arden Hills Cost: $143,000
Project #22-Pub-002
Priority n/a
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Budget Impact/Other
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a
result of this project would be reflected in the fire services contract in reduced maintenance costs.
Useful Life
Project Name LJFD Rescue/Chief/Utility Vehicle Replacement Category Public Safety
Type Equipment
TCAAP No
Total Project Cost:$331,300
Total20222023202420252026Expenditures
223,25020,500 2,000 57,750 143,000Equip/Vehicles/Furnishings
20,500 2,000 57,750 143,000 223,250Total
Total20222023202420252026Funding Sources
223,25020,500 2,000 57,750 143,000Public Safety Capital Fund
20,500 2,000 57,750 143,000 223,250Total
Produced Using the Plan-It Capital Planning Software
16
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2022 2026thru Department Public Safety
Description
Lake Johanna Fire Department provides a detailed capital budget which includes the costs to each City.
2022 - Network access devices, medical supplies/bags, rescue tools, air bags
Total Cost: $68,200
Arden Hills Cost: $17,050
2023 - Fire hose tester, thermal imaging camera, rehab equipment, gas monitors
Total Cost: $23,000
Arden Hills Cost: $5,750
2024 - Radios, SCBA bottles
Total Cost: $9,600
Arden Hills Cost: $2,400
2025 - Mobile tablets
Total Cost: $45,000
Arden Hills Cost: $11,250
There is a placeholder each year of up to $15,000 based on historical analysis.
Project #22-Pub-003
Priority n/a
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Budget Impact/Other
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a
result of this project would be reflected in the fire services contract in reduced maintenance costs.
Useful Life
Project Name LJFD General Equipment Category Public Safety
Type Equipment
TCAAP No
Total Project Cost:$243,345
Total20222023202420252026Expenditures
77,05017,050 15,000 15,000 15,000 15,000Equip/Vehicles/Furnishings
17,050 15,000 15,000 15,000 15,000 77,050Total
Total20222023202420252026Funding Sources
77,05017,050 15,000 15,000 15,000 15,000Public Safety Capital Fund
17,050 15,000 15,000 15,000 15,000 77,050Total
Produced Using the Plan-It Capital Planning Software
17
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2022 2026thru Department Public Safety
Description
Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows.
2022
Interior painting, exterior concrete repairs, landscaping, stove, grills
Total Cost: $20,300
Arden Hills Cost: $5,075
2023
Ice machine
Total Cost: $3,000
Arden Hills Cost: $750
2024
Convert office to bedrooms
Total Cost: $30,000
Arden Hills Cost: $7,500
2025
Stucco redashing
Total Cost: $50,000
Arden Hills Cost: $12,500
There is a placeholder each year of up to $10,000 based on historical analysis.
Project #22-Pub-004
Priority n/a
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Budget Impact/Other
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a
result of this project would be reflected in the fire services contract in reduced maintenance costs.
Useful Life
Project Name LJFD Station Capital Category Public Safety
Type Equipment
TCAAP No
Total Project Cost:$87,580
Total20222023202420252026Expenditures
47,5805,080 10,000 10,000 12,500 10,000Equip/Vehicles/Furnishings
5,080 10,000 10,000 12,500 10,000 47,580Total
Total20222023202420252026Funding Sources
47,5805,080 10,000 10,000 12,500 10,000Public Safety Capital Fund
5,080 10,000 10,000 12,500 10,000 47,580Total
Produced Using the Plan-It Capital Planning Software
18
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2022 2026thru Department Public Safety
Description
Construction of a new fire station.
Project #25-Pub-005
Priority n/a
Justification
Maintaining the fire station is critical to public safety.
Budget Impact/Other
Useful Life
Project Name Lake Johanna Fire Dept Fire Station Category Public Safety
Type Improvement
TCAAP
Total Project Cost:$1,170,000
Total20222023202420252026Expenditures
390,000195,000 195,000Construction/Maintenance
195,000 195,000 390,000Total
Total20222023202420252026Funding Sources
390,000195,000 195,000Public Safety Capital Fund
195,000 195,000 390,000Total
Produced Using the Plan-It Capital Planning Software
19
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Sanitary Sewer Department
Description
Rehabilitation of lift stations to standardize and replace aging equipment, including pumps and electrical panels.
Lift Station 14 - Pumps and panel (2022) $90,000
Lift Station 5 - Forcemain (2023) $210,000
Lift Station 8 - Pumps, base and electronics (2027) $90,000
Lift Station 2 - Pumps, base and electronics (2028) $75,000
Lift Station 5 - Pumps, base and electronics (2029) $77,000
Lift Station 7 - Pumps, base and electroncis (2030) $80,000
Project #22-Sew-001
Priority 2 Very Important
Justification
The City has maintained a program to refurbish and update sanitary sewer lift stations on a 10-year cycle for reliability, technology and risk
management. The proposed improvements continue this program for the 14 sanitary lift stations within the City's wastewater collection system.
Budget Impact/Other
Reduced maintenance costs.
Useful Life 20
Project Name Lift Station Rehabilitation Category Sanitary Sewer Maintenance
Type Maintenance
TCAAP No
Total Project Cost:$670,000
Total20222023202420252026Expenditures
300,00090,000 210,000Construction/Maintenance
90,000 210,000 300,000Total
Total20222023202420252026Funding Sources
300,00090,000 210,000Sanitary Sewer Utility Fund
90,000 210,000 300,000Total
Produced Using the Plan-It Capital Planning Software
20
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Sanitary Sewer Department
Description
Sewer Lining and Rehabilitation of the sanitary sewer system on a 2-year cycle.
Phase 1 (2021): Lift Station 4 area, Lift Station 5 area, Oak Avenue and Lake Valentine Road
Phase 2 (2023): Arden View Drive Neighborhood
Phase 3 (2025): Venus Avenue Neighborhood
Project #22-Sew-002
Priority 2 Very Important
Justification
As part of our sanitary sewer program, lines found with holes and cracks allowing for infiltration should be lined or repaired as needed. As the
sewer infrastructure is aging, staff will continue to perform sewer inspections and identify locations needing sewer lining and other sewer
improvements.
Budget Impact/Other
This project will help the overall I&I reduction program.
Useful Life 30
Project Name Sewer Lining/Rehabilitation Category Sanitary Sewer Maintenance
Type Maintenance
TCAAP No
Total Project Cost:$1,425,000
Total20222023202420252026Expenditures
505,000175,000 330,000Construction/Maintenance
175,000 330,000 505,000Total
Total20222023202420252026Funding Sources
505,000175,000 330,000Sanitary Sewer Utility Fund
175,000 330,000 505,000Total
Produced Using the Plan-It Capital Planning Software
21
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Street Department
Description
Arden Oaks Dr / Arden Oaks Ct
Proposed improvements include spot repair to existing curb, repairs to storm sewer catch basins, hydrant repairs, and sanitary sewer manhole and
casting repairs. Pavement is proposed to be milled or full depth reclamation with new bituminous pavement.
Project #22-Str-001
Priority 2 Very Important
Justification
Existing street pavement conditions are declining with ratings below 35. Proposed improvements are necessary to continue safe and reliable street
and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within
the City.
Budget Impact/Other
Useful Life 30
Project Name Arden Oaks Neighborhood Streets Category Streets: Reconstruction
Type Improvement
TCAAP No
Total Project Cost:$827,000
Total20222023202420252026Expenditures
827,000827,000Construction/Maintenance
827,000 827,000Total
Total20222023202420252026Funding Sources
350,000350,000Capital Improvement Funds
(PIR)
350,000350,000Other
42,00042,000Sanitary Sewer Utility Fund
60,00060,000Surface Water Mgmt Utility
Funds
25,00025,000Water Utility Funds
827,000 827,000Total
Produced Using the Plan-It Capital Planning Software
22
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Street Department
Description
Reconstruction of Old Snelling Avenue from County Road E to Highway 51 (Snelling Ave).
Reclamation of roadway pavement and placement of new pavement, and limited spot repairs to water and sanitary sewer.
Project #22-Str-003
Priority 2 Very Important
Justification
This segment of roadway is highly deteriorated and requires significant maintenance each year by the Public Works Department. Proposed
improvements are necessary to continue safe and reliable street and utility services.
Budget Impact/Other
Useful Life 20-25
Project Name Old Snelling Ave PMP, CR E - Hwy 51 Category Streets: Reconstruction
Type Improvement
TCAAP No
Total Project Cost:$1,250,000
Total20222023202420252026Expenditures
1,250,0001,250,000Construction/Maintenance
1,250,000 1,250,000Total
Total20222023202420252026Funding Sources
805,000805,000Capital Improvement Funds
(PIR)
155,000155,000Other
62,00062,000Sanitary Sewer Utility Fund
65,00065,000Surface Water Mgmt Utility
Funds
163,000163,000Water Utility Funds
1,250,000 1,250,000Total
Produced Using the Plan-It Capital Planning Software
23
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Street Department
Description
Ramsey County has plans to reconstruct Lexington Ave from County Road E to 694. This project includes a new traffic signal at the
Target/Lexington Station entrance and replacement of 12-inch diameter city water main along Lexington from Grey Fox to Red Fox Road.
Lexington Station property is responsible for Arden Hills' portion of the new traffic signal per PUD agreement 13-003.
Project #22-Str-006
Priority 2 Very Important
Justification
Improvements to Lexington Ave will improve access, circulation and safety for the traveling public.
Budget Impact/Other
Useful Life
Project Name Lexington Ave, CR E to 694 Category Streets:Misc
Type Improvement
TCAAP No
Total Project Cost:$1,010,000
Total20222023202420252026Expenditures
1,010,0001,010,000Construction/Maintenance
1,010,000 1,010,000Total
Total20222023202420252026Funding Sources
400,000400,000Capital Improvement Funds
(PIR)
423,000423,000Grants
187,000187,000Other
1,010,000 1,010,000Total
Produced Using the Plan-It Capital Planning Software
24
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Street Department
Description
The City and County have identified improvements for the intersection of County Road E and Old Snelling Road, including the potential
construction of a roundabout. The Ramsey County TIP currently identifies project funding for this intersection improvement. The anticipated
improvements include the following:
- Construction of a single lane roundabout at the intersection of County Road E and Old Snelling Avenue in partnership with Ramsey County;
- Replacement of watermain, sanitary sewer and storm sewer based on a condition assessment.
Project #23-Str-002
Priority 3 Important
Justification
Sanitary sewer within the intersection is identified as an elevated priority for repairs/replacement. The County has identified segments for storm
sewer within the intersection and extending north as needing replacement. A 2018 Intersection Control Evaluation study evaluated intersection
options, including a 4-Way Stop, Traffic Signal, and Roundabout, and recommended construction of a single lane roundabout.
Budget Impact/Other
Useful Life 20-25
Project Name Old Snelling Ave/CR E Intersection Improvements Category Streets: Reconstruction
Type Improvement
TCAAP No
Total Project Cost:$1,687,000
Total20222023202420252026Expenditures
1,687,0001,687,000Construction/Maintenance
1,687,000 1,687,000Total
Total20222023202420252026Funding Sources
20,00020,000Other
1,050,0001,050,000Ramsey County
127,000127,000Sanitary Sewer Utility Fund
330,000330,000State Aid
160,000160,000Water Utility Funds
1,687,000 1,687,000Total
Produced Using the Plan-It Capital Planning Software
25
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Street Department
Description
Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous
pavement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include
Colleen Avenue/McClung (Hamline to Snelling), Brian Knoll Drive & Ct, Norma Avenue (Colleen to Dawn Circle), Arden Vista Ct, and Royal
Hills (Snelling to Arden View Dr).
Project #24-Str-001
Priority 2 Very Important
Justification
Pavement conditions are deteriorating with condition ratings from 25 to 52. Proposed improvements are necessary to continue safe and reliable
street and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement
within the City.
Budget Impact/Other
Useful Life 20-25
Project Name Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista Category Streets: Reconstruction
Type Improvement
TCAAP No
Total Project Cost:$1,885,000
Total20222023202420252026Expenditures
1,885,0001,885,000Construction/Maintenance
1,885,000 1,885,000Total
Total20222023202420252026Funding Sources
900,000900,000Capital Improvement Funds
(PIR)
900,000900,000Other
20,00020,000Sanitary Sewer Utility Fund
45,00045,000Surface Water Mgmt Utility
Funds
20,00020,000Water Utility Funds
1,885,000 1,885,000Total
Produced Using the Plan-It Capital Planning Software
26
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Street Department
Description
Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous
pavement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include: Karth
Lake Dr (Pleasant Dr to Cul-de-Sac), Pleasant Drive (Amble to Karth Lake Dr), Pleasant Circle, Amble Drive (Karth Lake Dr to Lexington
Avenue), and Stowe Ave (New Brighton to Lake Johanna).
Project #26-Str-001
Priority 2 Very Important
Justification
Pavement conditions are showing distress with condition ratings from 33 to 59, with exception of one segment of Pleasant Dr. Pavement
conditions will continue to decline. Proposed improvements are necessary to continue safe and reliable street and utility services. These
improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within the City.
Budget Impact/Other
Useful Life 20-25
Project Name Karth Lake East Neighborhood Streets and Stowe Ave Category Streets: Reconstruction
Type Improvement
TCAAP No
Total Project Cost:$1,385,000
Total20222023202420252026Expenditures
1,385,0001,385,000Construction/Maintenance
1,385,000 1,385,000Total
Total20222023202420252026Funding Sources
650,000650,000Capital Improvement Funds
(PIR)
650,000650,000Other
35,00035,000Sanitary Sewer Utility Fund
30,00030,000Surface Water Mgmt Utility
Funds
20,00020,000Water Utility Funds
1,385,000 1,385,000Total
Produced Using the Plan-It Capital Planning Software
27
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Surface Water Management D
Description
Proposed improvements to storm sewer structures and Best Management Practices (BMPs).
Reconstruct locations would coordinate with street improvement projects.
Lining locations 2015 PMP, 2018 PMP, 2021 PMP, Arden Oaks Neighborhood.
Project #22-Storm-001
Priority 2 Very Important
Justification
Maintenance is required by the City's MS4 permit issued by the MPCA.
Inspections have identified storm sewer structures that are beginning to fail which leads to sink holes and deterioration in the street, which results
in reconstruction becoming necessary. Lining the adjustment rings in newer structures prevents this type of deterioration.
Budget Impact/Other
Useful Life 20-25
Project Name Storm Sewer Structure Rehabilitation Category Storm Water Maintenance
Type Maintenance
TCAAP No
Total Project Cost:$765,000
Total20222023202420252026Expenditures
405,00065,000 80,000 80,000 90,000 90,000Construction/Maintenance
65,000 80,000 80,000 90,000 90,000 405,000Total
Total20222023202420252026Funding Sources
405,00065,000 80,000 80,000 90,000 90,000Surface Water Mgmt Utility
Funds
65,000 80,000 80,000 90,000 90,000 405,000Total
Produced Using the Plan-It Capital Planning Software
28
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Surface Water Management D
Description
Replace failing retaining wall adjacent to the west bank of Karth Lake at the lake outlet pump. Staff will investigate alternatives, including
repair/replacement of wall and removal of wall with bank stabiliztion measures. Short term repairs will be made to redirect drainage from being
conveyed over the top of the wall.
Project #23-Storm-001
Priority 2 Very Important
Justification
Existing retaining wall is in need of repairs.
Budget Impact/Other
Prevent erosion and address park safety issues.
Useful Life 20
Project Name Karth Lake retaining wall Category Storm Water Maintenance
Type Improvement
TCAAP No
Total Project Cost:$65,000
Total20222023202420252026Expenditures
65,00065,000Construction/Maintenance
65,000 65,000Total
Total20222023202420252026Funding Sources
65,00065,000Surface Water Mgmt Utility
Funds
65,000 65,000Total
Produced Using the Plan-It Capital Planning Software
29
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Surface Water Management D
Description
This project is the first phase of a program to address accumulated sediment within stormwater ponds in the City's drainage system to maintain
system compliance with State MS4 requirements. Staff measured sediment accumulation in several ponds in 2019/2020 and identified the Benton
Way pond in 2024 ($225,000) and the Glen Arden pond in 2026 ($160,000) as the higher priority maintenance locations within the drainage
system.
Project #24-Storm-001
Priority 2 Very Important
Justification
Maintenance is required by the City's MS4 permit issued by the MPCA.
Budget Impact/Other
Useful Life 20-25
Project Name Storm Pond and Outfall Maintenance Category Storm Water Maintenance
Type Maintenance
TCAAP No
Total Project Cost:$495,000
Total20222023202420252026Expenditures
385,000225,000 160,000Construction/Maintenance
225,000 160,000 385,000Total
Total20222023202420252026Funding Sources
385,000225,000 160,000Surface Water Mgmt Utility
Funds
225,000 160,000 385,000Total
Produced Using the Plan-It Capital Planning Software
30
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Water Department
Description
2022 - South Water Tower maintenance.
Clean, inspect and repair tank interior of this 1 million gallon storage facility in accordance with MN Department of Health guidelines.
2024 - North Water Tower maintenance.
Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines.
Listed costs are estimates only. Inspections will determine the extent of minor repairs required.
Project #22-W-001
Priority 2 Very Important
Justification
The MN Department of Health recommends that storage facilities for public water supply systems are inspected and maintained on a 5-year cycle.
Budget Impact/Other
Useful Life 10
Project Name Water Tower Maintenance Category Utility Maintenance
Type Unassigned
TCAAP No
Total Project Cost:$135,000
Total20222023202420252026Expenditures
135,00075,000 60,000Construction/Maintenance
75,000 60,000 135,000Total
Total20222023202420252026Funding Sources
135,00075,000 60,000Water Utility Funds
75,000 60,000 135,000Total
Produced Using the Plan-It Capital Planning Software
31
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Water Department
Description
Rehabilitation of pumps, motors, electrical system and building components. This project begins a proactive process to address aging mechanical
equipment to minimize station failures and unscheduled outages. Staff will conduct further evaluation of system components to identify specific
improvements and refine cost estimates.
Project #25-W-002
Priority 2 Very Important
Justification
The booster station is a critical component of the water distribution system to supply water to the northern portion of the City. Proactive
rehabilitation will better manage risks associated with water supply disruptions.
Budget Impact/Other
Useful Life 20
Project Name Booster Station Improvements Category Utility Maintenance
Type Unassigned
TCAAP No
Total Project Cost:$90,000
Total20222023202420252026Expenditures
90,00090,000Construction/Maintenance
90,000 90,000Total
Total20222023202420252026Funding Sources
90,00090,000Water Utility Funds
90,000 90,000Total
Produced Using the Plan-It Capital Planning Software
32
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Water Department
Description
Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021.
The evaluation will develop a long-term plan for rehabilitation of this critical water main segment.
Project #26-W-003
Priority 2 Very Important
Justification
The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water
distribution system for supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 years.
Budget Impact/Other
Useful Life 10
Project Name Trunk Water Main Improvements Category Utility Maintenance
Type Unassigned
TCAAP No
Total Project Cost:$300,000
Total20222023202420252026Expenditures
300,000300,000Construction/Maintenance
300,000 300,000Total
Total20222023202420252026Funding Sources
300,000300,000Water Utility Funds
300,000 300,000Total
Produced Using the Plan-It Capital Planning Software
33
Capital Improvement Plan
City of Arden Hills, Minnesota
PROJECTS BY DEPARTMENT
2022 2026thru
Total20222023202420252026DepartmentProject #Priority
Equipment
22-Eqp-006 12,00012,000Replace 2005 Felling Trailer (Unit 414)4
22-Eqp-007 30,00030,000Replace 2001 Toro Workman (Unit 411)3
22-EqpV-002 36,00036,000Building Inspector Vehicle (Unit 504)n/a
23-EqpV-002 80,00080,000Replace F-450 Truck (Unit 211)3
24-Eqp-002 15,00015,000Replace 1996 Wacker 880 Roller (Unit 106)3
24-EqpV-001 165,000165,000Replace Sterling Acterra Truck (Unit 431)3
24-EqpV-002 250,000100,000 150,000Replace 2012 Int'l Plow Wing Truck (115)n/a
25-Eqp-001 80,00080,000Replace 2018 Toro Large Area Mower (Unit 457)3
26-Eqp-001 225,000225,000Replace 1993 Case 621 Loader (Unit 103)n/a
893,00078,000 80,000 280,000 230,000 225,000Equipment Total
GRAND TOTAL 893,00078,000 80,000 280,000 230,000 225,000
Produced Using the Plan-It Capital Planning Software 34
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Replace 2005 Felling lift gate trailer due to corrosion.
Project #22-Eqp-006
Priority 4 Less Important
Justification
Replace the 2005 Felling trailer with a 22 foot trailer with better ergonomics, due to corrosion.
Parts and labor costs (provided by AH PW crew):
2019 - $430
2020 - $252
Budget Impact/Other
Useful Life 13-15
Project Name Replace 2005 Felling Trailer (Unit 414)Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$12,000
Total20222023202420252026Expenditures
12,00012,000Equip/Vehicles/Furnishings
12,000 12,000Total
Total20222023202420252026Funding Sources
12,00012,000Equipment/Building
Replacement Fund
12,000 12,000Total
Produced Using the Plan-It Capital Planning Software
35
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Replace the 2001 Toro Workman with field painter (unit 411).
Hours 2,079
Project #22-Eqp-007
Priority 3 Important
Justification
The workman will be 21 years old in 2022 and is used almost every day during the summer. It is reaching the end of its useful (dependable) life.
The paint sprayer will also be replaced.
Parts and labor costs (provided by AH PW crew):
2018 - $1,700
2019 - $ 825
2020 - $ 885
Budget Impact/Other
Useful Life 13-15
Project Name Replace 2001 Toro Workman (Unit 411)Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$30,000
Total20222023202420252026Expenditures
30,00030,000Equip/Vehicles/Furnishings
30,000 30,000Total
Total20222023202420252026Funding Sources
30,00030,000Equipment/Building
Replacement Fund
30,000 30,000Total
Produced Using the Plan-It Capital Planning Software
36
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2022 2026thru Department Equipment
Description
Purchase a new inspection vehicle in 2022 to replace 2013 Ford Escape.
Project #22-EqpV-002
Priority n/a
Justification
The current vehicle will be 9 years old. A multipurpose vehicle, like an Escape, will serve other City employees when they want to use a City
vehicle to attend meetings and conferences - especially when they are out of town.
Parts and labor costs:
2018 - $ 429
2019 - $1,205
2020 - $ 0
Budget Impact/Other
Cost of maintenance.
Useful Life 10
Project Name Building Inspector Vehicle (Unit 504)Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$36,000
Total20222023202420252026Expenditures
36,00036,000Equip/Vehicles/Furnishings
36,000 36,000Total
Total20222023202420252026Funding Sources
36,00036,000Equipment/Building
Replacement Fund
36,000 36,000Total
Produced Using the Plan-It Capital Planning Software
37
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Replace Vehicle #211 - 2011 Ford F450 crane truck.
VIN #8243
Mileage 75,060
Project #23-EqpV-002
Priority 3 Important
Justification
Parts and labor costs:
2018 - $1,117
2019 - $ 308
2020 - $3,163
This vehicle is used when dealing with emergency lift station work. Reliability is a major concern. The condition of the current vehicle will be
evaluated prior to replacement.
Budget Impact/Other
Reduced repair and maintenance costs.
Useful Life 8-10
Project Name Replace F-450 Truck (Unit 211)Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$80,000
Total20222023202420252026Expenditures
80,00080,000Equip/Vehicles/Furnishings
80,000 80,000Total
Total20222023202420252026Funding Sources
80,00080,000Equipment/Building
Replacement Fund
80,000 80,000Total
Produced Using the Plan-It Capital Planning Software
38
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Replace Equipment #106 - 1996 Wacker Roller.
VIN # 673603994
Hours: 936
This piece of equipment was included in previous CIP's but has been deferred to allow time to determine the size roller that would work best based
on the amount of work the PW staff is able to complete. Also, staff evaluates its condition each year to evaulate its reliability.
Project #24-Eqp-002
Priority 3 Important
Justification
Equipment will be 28 years old. Roller is used for small pothole patching.
Parts and labor costs (provided by AH PW crew):
2018 - $425
2019 - $130
2020 - $635
Budget Impact/Other
Reduced equipment repair costs.
Useful Life 15-17
Project Name Replace 1996 Wacker 880 Roller (Unit 106)Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$15,000
Total20222023202420252026Expenditures
15,00015,000Equip/Vehicles/Furnishings
15,000 15,000Total
Total20222023202420252026Funding Sources
15,00015,000Equipment/Building
Replacement Fund
15,000 15,000Total
Produced Using the Plan-It Capital Planning Software
39
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Community Devl Dir
2022 2026thru Department Equipment
Description
Replace 2009 1,500 gallon tanker truck used for watering, sweeping, dust control and rink flooding.
Mileage 23,697
Hours 3,017
Project #24-EqpV-001
Priority 3 Important
Justification
Current vehicle will be 15 years old in 2024.
Corrosion due to winter operations and availability of parts.
Parts and labor costs:
2018 - $2,112
2019 - $2,618
2020 - $3,303
Budget Impact/Other
Useful Life 10
Project Name Replace Sterling Acterra Truck (Unit 431)Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$165,000
Total20222023202420252026Expenditures
165,000165,000Equip/Vehicles/Furnishings
165,000 165,000Total
Total20222023202420252026Funding Sources
165,000165,000Equipment/Building
Replacement Fund
165,000 165,000Total
Produced Using the Plan-It Capital Planning Software
40
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Vehicle #115 - 2012 International Plow Wing Truck
Mileage 21,934
Hours 2,013
Project #24-EqpV-002
Priority n/a
Justification
Vehicle will be 13 years old.
Repair costs for parts and labor:
2018 - $ 8,445
2019 - $10,672
2020 - $ 2,685
This is one of our three large dump trucks used primarily for plowing and de-icing streets. While the mileage on this vehicle is relatively low, due
to the corrosiveness of salt, the frame and bodies are beginning to deteriorate. With only three dump trucks in the snow plow fleet it is imperative
that they be dependable during snow events.
Budget Impact/Other
Reduce repair and maintenance costs and improve reliability of our primary snow removal equipment.
Useful Life 10-12
Project Name Replace 2012 Int'l Plow Wing Truck (115)Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$250,000
Total20222023202420252026Expenditures
250,000100,000 150,000Equip/Vehicles/Furnishings
100,000 150,000 250,000Total
Total20222023202420252026Funding Sources
250,000100,000 150,000Equipment/Building
Replacement Fund
100,000 150,000 250,000Total
Produced Using the Plan-It Capital Planning Software
41
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Replacement of the 2018 Toro large area mower.
Hours 931
Project #25-Eqp-001
Priority 3 Important
Justification
The Toro large area mower will be 7 years old in 2025.
Parts and labor costs (provided by AH PW crew):
2019 - $230
2020 - $739
Budget Impact/Other
Useful Life 10-12
Project Name Replace 2018 Toro Large Area Mower (Unit 457)Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$80,000
Total20222023202420252026Expenditures
80,00080,000Equip/Vehicles/Furnishings
80,000 80,000Total
Total20222023202420252026Funding Sources
80,00080,000Equipment/Building
Replacement Fund
80,000 80,000Total
Produced Using the Plan-It Capital Planning Software
42
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2022 2026thru Department Equipment
Description
Vehicle #103 - 1993 Case 621 Loader
Project #26-Eqp-001
Priority n/a
Justification
Vehicle will be 33 years old.
Budget Impact/Other
Useful Life 20-25
Project Name Replace 1993 Case 621 Loader (Unit 103)Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$225,000
Total20222023202420252026Expenditures
225,000225,000Equip/Vehicles/Furnishings
225,000 225,000Total
Total20222023202420252026Funding Sources
225,000225,000Equipment/Building
Replacement Fund
225,000 225,000Total
Produced Using the Plan-It Capital Planning Software
43
Capital Improvement Plan
City of Arden Hills, Minnesota
PROJECTS BY FUNDING SOURCE
2022 2026thru
TotalSourceProject #Priority 2022 2023 2024 2025 2026
Capital Improvement Funds (PIR)
22-Park-001 506,000426,000 80,000Hard Court Reconstruction 3
22-Park-002 90,00090,000Hazelnut Park Warming House 4
22-Park-003 60,00060,000Arden Manor Park Improvements 3
22-Str-001 350,000350,000Arden Oaks Neighborhood Streets 2
22-Str-003 805,000805,000Old Snelling Ave PMP, CR E - Hwy 51 2
22-Str-006 400,000400,000Lexington Ave, CR E to 694 2
23-Park-004 55,00055,000Perry & Cummings Park Roof Maintenance 3
24-Str-001 900,000900,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2
25-Park-003 256,000256,000Playground Structure Replacement 3
26-Park-004 120,000120,000Park Shelter Roof Replacements 4
26-Park-005 400,000400,000MN-51 Trail Connection n/a
26-Str-001 650,000650,000Karth Lake East Neighborhood Streets and Stowe Ave 2
4,592,0002,131,000 55,000 900,000 336,000 1,170,000Capital Improvement Funds (PIR) Total
EDA General Fund
23-EDA-001 310,000270,000 40,000Gateway Signs n/a
310,000270,000 40,000EDA General Fund Total
Equipment/Building Replacement Fun
22-Bldg-005 250,00050,000 50,000 50,000 50,000 50,000City Hall Maintenance 2
22-Bldg-006 254,650254,650City Hall parking lot 3
22-Eqp-006 12,00012,000Replace 2005 Felling Trailer (Unit 414)4
22-Eqp-007 30,00030,000Replace 2001 Toro Workman (Unit 411)3
22-EqpV-002 36,00036,000Building Inspector Vehicle (Unit 504)n/a
23-EqpV-002 80,00080,000Replace F-450 Truck (Unit 211)3
24-Eqp-002 15,00015,000Replace 1996 Wacker 880 Roller (Unit 106)3
24-EqpV-001 165,000165,000Replace Sterling Acterra Truck (Unit 431)3
24-EqpV-002 250,000100,000 150,000Replace 2012 Int'l Plow Wing Truck (115)n/a
25-Bldg-002 150,000150,000City Hall roof 3
25-Eqp-001 80,00080,000Replace 2018 Toro Large Area Mower (Unit 457)3
26-Eqp-001 225,000225,000Replace 1993 Case 621 Loader (Unit 103)n/a
1,547,650382,650 130,000 330,000 430,000 275,000Equipment/Building Replacement Fund
Total
Grants
22-Park-003 189,700189,700Arden Manor Park Improvements 3
22-Str-006 423,000423,000Lexington Ave, CR E to 694 2
26-Park-005 200,000200,000MN-51 Trail Connection n/a
812,700612,700 200,000Grants Total
Produced Using the Plan-It Capital Planning Software
44
TotalSourceProject #Priority 2022 2023 2024 2025 2026
Other
22-Str-001 350,000350,000Arden Oaks Neighborhood Streets 2
22-Str-003 155,000155,000Old Snelling Ave PMP, CR E - Hwy 51 2
22-Str-006 187,000187,000Lexington Ave, CR E to 694 2
23-Str-002 20,00020,000Old Snelling Ave/CR E Intersection Improvements 3
24-Str-001 900,000900,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2
26-Str-001 650,000650,000Karth Lake East Neighborhood Streets and Stowe Ave 2
2,262,000692,000 20,000 900,000 650,000Other Total
Public Safety Capital Fund
22-Pub-001 587,500187,500 400,000LJFD Engine/Ladder Replacement n/a
22-Pub-002 223,25020,500 2,000 57,750 143,000LJFD Rescue/Chief/Utility Vehicle Replacement n/a
22-Pub-003 77,05017,050 15,000 15,000 15,000 15,000LJFD General Equipment n/a
22-Pub-004 47,5805,080 10,000 10,000 12,500 10,000LJFD Station Capital n/a
25-Pub-005 390,000195,000 195,000Lake Johanna Fire Dept Fire Station n/a
1,325,380230,130 27,000 82,750 622,500 363,000Public Safety Capital Fund Total
Ramsey County
23-Str-002 1,050,0001,050,000Old Snelling Ave/CR E Intersection Improvements 3
1,050,0001,050,000Ramsey County Total
Sanitary Sewer Utility Fund
22-Sew-001 300,00090,000 210,000Lift Station Rehabilitation 2
22-Sew-002 505,000175,000 330,000Sewer Lining/Rehabilitation 2
22-Str-001 42,00042,000Arden Oaks Neighborhood Streets 2
22-Str-003 62,00062,000Old Snelling Ave PMP, CR E - Hwy 51 2
23-Str-002 127,000127,000Old Snelling Ave/CR E Intersection Improvements 3
24-Str-001 20,00020,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2
26-Str-001 35,00035,000Karth Lake East Neighborhood Streets and Stowe Ave 2
1,091,000194,000 512,000 20,000 330,000 35,000Sanitary Sewer Utility Fund Total
State Aid
23-Str-002 330,000330,000Old Snelling Ave/CR E Intersection Improvements 3
330,000330,000State Aid Total
Surface Water Mgmt Utility Funds
22-Storm-001 405,00065,000 80,000 80,000 90,000 90,000Storm Sewer Structure Rehabilitation 2
22-Str-001 60,00060,000Arden Oaks Neighborhood Streets 2
22-Str-003 65,00065,000Old Snelling Ave PMP, CR E - Hwy 51 2
23-Storm-001 65,00065,000Karth Lake retaining wall 2
24-Storm-001 385,000225,000 160,000Storm Pond and Outfall Maintenance 2
24-Str-001 45,00045,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2
26-Str-001 30,00030,000Karth Lake East Neighborhood Streets and Stowe Ave 2
1,055,000190,000 145,000 350,000 90,000 280,000Surface Water Mgmt Utility Funds Total
Water Utility Funds
Produced Using the Plan-It Capital Planning Software
45
TotalSourceProject #Priority 2022 2023 2024 2025 2026
22-Str-001 25,00025,000Arden Oaks Neighborhood Streets 2
22-Str-003 163,000163,000Old Snelling Ave PMP, CR E - Hwy 51 2
22-W-001 135,00075,000 60,000Water Tower Maintenance 2
23-Str-002 160,000160,000Old Snelling Ave/CR E Intersection Improvements 3
24-Str-001 20,00020,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2
25-W-002 90,00090,000Booster Station Improvements 2
26-Str-001 20,00020,000Karth Lake East Neighborhood Streets and Stowe Ave 2
26-W-003 300,000300,000Trunk Water Main Improvements 2
913,000263,000 160,000 80,000 90,000 320,000Water Utility Funds Total
15,288,7304,695,480 2,699,000 2,662,750 1,938,500 3,293,000GRAND TOTAL
Produced Using the Plan-It Capital Planning Software
46
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Capital Improvement Funds (PIR)Beginning Balance 6,153,826 5,115,784 3,216,334 3,595,044 2,537,184 3,184,324 2,407,834 2,653,574 2,475,884 3,255,974 2,507,074 Revenues and Other Fund SourcesDonations - Bethel100,000 150,000 150,000 - - - - - - - - Transfer from Park Fund- 225,910 - - - - - - - - - Interest Income30,900 29,250 30,000 25,000 5,000 - - - - - 5,000 Special Assessments496,095 268,390 353,710 467,140 468,240 493,410 550,740 560,810 530,090 530,090 530,090 MSA State Street Aid- - - - 259,900 300,100 - 227,500 - - - Grants60,000 189,700 1,050,000 - - 200,000 - - - - - Tax Levy250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 Total Revenues and Other Fund Sources936,995 1,113,250 1,833,710 742,140 983,140 1,243,510 800,740 1,038,310 780,090 780,090 785,090 Total Funds Available 7,090,821 6,229,034 5,050,044 4,337,184 3,520,324 4,427,834 3,208,574 3,691,884 3,255,974 4,036,064 3,292,164 Expenditures and UsesPrior year projects - final costs(100,000) - - - - - - - - - - Hard Court Reconstruction22-Park-001 - (426,000) - - (80,000) - - (80,000) - - - Hazelnut Park Warming House22-Park-002 - (90,000) - - - - - - - - - Arden Manor Park Improvements22-Park-003 - (249,700) - - - - - - - - - Perry & Cummings Park Roof Maintenance23-Park-004 - - (55,000) - - - - - - - - Playground Structure Replacement25-Park-003 - - - - (256,000) - (130,000) (276,000) - (144,000) - Park Shelter Roof Replacements26-Park-004 - - - - - (120,000) - - - - - MN-51 Trail Connection26-Park-005 - - - - - (600,000) - - - - - Hazelnut Park Parking Lot27-Park-004 - - - - - - (185,000) - - - - Perry Park Parking Lot27-Park-005 - - - - - - (240,000) - - - - Hamline Avenue crosswalks20-Str-005 (102,490) - - - - - - - - - - 2021 PMP - Hazelnut Neighborhood21-Str-005 (1,772,547) - - - - - - - - - - Arden Oaks Neighborhood Streets22-Str-001 - (700,000) - - - - - - - - - Old Snelling Ave PMP, CR E - Hwy 5122-Str-003 - (960,000) - - - - - - - - - Lexington Improvements22-Str-006 - (587,000) - - - - - - - - - Old Snelling Ave/CR E Intersection Improvements23-Str-002 - - (1,400,000) - - - - - - - - Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista24-Str-001 - - - (1,800,000) - - - - - - - Karth Lake East Neighborhood Streets26-Str-001 - - - - - (1,300,000) - - - - - Tiller/Dunlap/Benton Way Resurface/Replace28-Str-001 - - - - - - - (860,000) - - - Cummings/Northwoods/Red Fox/Grey Fox Resurface30-Str-001 - - - - - - - - - (930,000) - Lake Valentine Road Street Improvements30-Str-002 - - - - - - - - - (454,990) - Chatham/McCracken/Fairview/Brighton Way Resurface32-Str-001 - - - - - - - - - - - Total Expenditures and Uses(1,975,037) (3,012,700) (1,455,000) (1,800,000) (336,000) (2,020,000) (555,000) (1,216,000) - (1,528,990) - Change in Fund Balance(1,038,042) (1,899,450) 378,710 (1,057,860) 647,140 (776,490) 245,740 (177,690) 780,090 (748,900) 785,090 Ending Balance 5,115,784 3,216,334 3,595,044 2,537,184 3,184,324 2,407,834 2,653,574 2,475,884 3,255,974 2,507,074 3,292,164 $0.0$0.5$1.0$1.5$2.0$2.5$3.0$3.5$4.02022 2023 2024 2025 2026 2027 2028 2029 2030 2031Millions47
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026EDA General FundBeginning Balance 622,693 642,363 658,803 402,803 414,133 382,713 Revenues and Other Fund SourcesInterest Income3,400 2,850 3,000 3,000 3,000 3,000 Tax Levy100,000 100,000 100,000 100,000 100,000 100,000 Total Revenues and Other Fund Sources103,400 102,850 103,000 103,000 103,000 103,000 Total Funds Available 726,093 745,213 761,803 505,803 517,133 485,713 Expenditures and UsesGateway Signs- - (270,000) - (40,000) - Operating Expenditures(83,730) (86,410) (89,000) (91,670) (94,420) (97,240) Total Expenditures and Uses(83,730) (86,410) (359,000) (91,670) (134,420) (97,240) Change in Fund Balance19,670 16,440 (256,000) 11,330 (31,420) 5,760 Ending Balance 642,363 658,803 402,803 414,133 382,713 388,473 $200.0$300.0$400.0$500.02022 2023 2024 2025 2026Thousands48
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026Equipment/Building Replacement FundBeginning Balance 461,582 36,702 4,052 224,052 244,052 164,052 Revenues and Other Fund SourcesTransfers from Utility funds300,000 300,000 300,000 300,000 300,000 300,000 Interest Income1,900 - - - - - Tax Levy50,000 50,000 50,000 50,000 50,000 50,000 Total Revenues and Other Fund Sources351,900 350,000 350,000 350,000 350,000 350,000 Total Funds Available 813,482 386,702 354,052 574,052 594,052 514,052 Expenditures and UsesHVAC(272,820) - - - - - Parking Lot- (254,650) - - - - Roof- - - - (150,000) - Maintenance/repair placeholder(50,000) (50,000) (50,000) (50,000) (50,000) (50,000) Vehicles(337,960) (36,000) (80,000) (265,000) (150,000) - Equipment(116,000) (42,000) - (15,000) (80,000) (225,000) Total Expenditures and Uses(776,780) (382,650) (130,000) (330,000) (430,000) (275,000) Change in Fund Balance(424,880) (32,650) 220,000 20,000 (80,000) 75,000 Ending Balance 36,702 4,052 224,052 244,052 164,052 239,052 $0.0$200.0$400.02022 2023 2024 2025 2026Thousands49
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Public Safety Capital FundBeginning Balance 125,623 135,423 90,293 298,293 500,543 188,043 135,043 (7,507) (109,302) (241,802) (151,802) Revenues and Other Fund SourcesCharitable Gambling15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 Transfer from General Fund- - - - - - - - - - - Tax Levy120,000 170,000 220,000 270,000 295,000 295,000 295,000 295,000 295,000 295,000 295,000 Total Revenues and Other Fund Sources135,000 185,000 235,000 285,000 310,000 310,000 310,000 310,000 310,000 310,000 310,000 Total Funds Available 260,623 320,423 325,293 583,293 810,543 498,043 445,043 302,493 200,698 68,198 158,198 Expenditures and UsesLJFD Engine/Ladder Replacement22-Pub-001 - (187,500) - - (400,000) - (210,000) - (222,500) - - LJFD Rescue/Chief/Utility Vehicle Replacement22-Pub-002 (26,220) (20,500) (2,000) (57,750) - (143,000) (22,550) (85,500) - - - LJFD General Equipment22-Pub-003 (17,190) (17,050) (15,000) (15,000) (15,000) (15,000) (15,000) (121,295) (15,000) (15,000) (15,000) LJFD Station Capital22-Pub-004 (1,190) (5,080) (10,000) (10,000) (12,500) (10,000) (10,000) (10,000) (10,000) (10,000) (10,000) Lake Johanna Fire Dept Fire Station25-Pub-005 (80,600) - - - (195,000) (195,000) (195,000) (195,000) (195,000) (195,000) (195,000) Total Expenditures and Uses(125,200) (230,130) (27,000) (82,750) (622,500) (363,000) (452,550) (411,795) (442,500) (220,000) (220,000) Change in Fund Balance9,800 (45,130) 208,000 202,250 (312,500) (53,000) (142,550) (101,795) (132,500) 90,000 90,000 Ending Balance 135,423 90,293 298,293 500,543 188,043 135,043 (7,507) (109,302) (241,802) (151,802) (61,802) Ͳ$0.4Ͳ$0.2$0.0$0.2$0.4$0.62022 2023 2024 2025 2026 2027 2028 2029 2030 2031Millions50
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Sanitary Sewer Utility FundBeginning Balance667,738 26,124 123,074 (72,816) 249,544 284,384 560,804 424,124 548,399 750,739 608,809 Revenues and Other Fund SourcesOperating Revenue2,064,570 2,133,230 2,207,500 2,284,360 2,363,910 2,364,060 2,411,170 2,459,220 2,508,230 2,558,230 2,609,240 Total Revenues and Other Fund Sources2,064,570 2,133,230 2,207,500 2,284,360 2,363,910 2,364,060 2,411,170 2,459,220 2,508,230 2,558,230 2,609,240 Total Funds Available 2,732,308 2,159,354 2,330,574 2,211,544 2,613,454 2,648,444 2,971,974 2,883,344 3,056,629 3,308,969 3,218,049 Expenditures and UseLift Station Rehabilitation22-Sew-001 (294,225) (90,000) (210,000) - - - (90,000) (75,000) (77,000) (80,000) - Sewer Lining/Rehabilitation22-Sew-002 (220,000) - (175,000) - (330,000) - (350,000) - - (350,000) - 2021 PMP - Hazelnut Neighborhood21-Str-005 (397,319) - - - - - - - - - - Arden Oaks Neighborhood Streets22-Str-001 - (42,000) - - - - - - - - - Old Snelling Ave PMP, CR E - Hwy 5122-Str-003 - (62,000) - - - - - - - - - Old Snelling Ave/CR E Intersection Improvements 23-Str-002 - - (127,000) - - - - - - - - Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista24-Str-001 - - - (20,000) - - - - - - - Karth Lake East Neighborhood Streets26-Str-001 - - - - - (35,000) - - - - - Tiller/Dunlap/Benton Way Resurface/Replace28-Str-001 - - - - - - - (95,000) - - - Cummings/Northwoods/Red Fox/Grey Fox Resurface30-Str-001 - - - - - - - - - (10,000) - Lake Valentine Road Street Improvements30-Str-002 - - - - - - - - - (10,000) - Chatham/McCracken/Fairview/Brighton Way Resurface32-Str-001 - - - - - - - - - - - Debt Service(40,650) (39,450) (38,250) (37,050) (40,750) (39,350) (37,950) (36,725) (40,600) - - Operating Expenses(1,627,990) (1,676,830) (1,727,140) (1,778,950) (1,832,320) (1,887,290) (1,943,900) (2,002,220) (2,062,290) (2,124,160) (2,187,890) Operating transfer to Equipment Fund(126,000) (126,000) (126,000) (126,000) (126,000) (126,000) (126,000) (126,000) (126,000) (126,000) (126,000) Total Expenditures and Uses(2,706,184) (2,036,280) (2,403,390) (1,962,000) (2,329,070) (2,087,640) (2,547,850) (2,334,945) (2,305,890) (2,700,160) (2,313,890) Change in Fund Balance(641,614) 96,950 (195,890) 322,360 34,840 276,420 (136,680) 124,275 202,340 (141,930) 295,350 Ending Balance 26,124 123,074 (72,816) 249,544 284,384 560,804 424,124 548,399 750,739 608,809 904,159 Ͳ$0.2$0.0$0.2$0.4$0.6$0.8$1.02022 2023 2024 2025 2026 2027 2028 2029 2030 2031Millions51
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Surface Water Mgmt Utility FundsBeginning Balance321,801 (1,328) 161,682 354,882 327,822 545,042 566,082 760,452 917,652 1,077,172 1,070,472 Revenues and Other Fund SourcesOperating Revenue903,620 930,690 930,690 930,690 930,690 930,690 930,690 930,690 930,690 930,690 930,690 Total Revenues and Other Fund Sources903,620 930,690 930,690 930,690 930,690 930,690 930,690 930,690 930,690 930,690 930,690 Total Funds Available 1,225,421 929,362 1,092,372 1,285,572 1,258,512 1,475,732 1,496,772 1,691,142 1,848,342 2,007,862 2,001,162 Expenditures and Uses2021 PMP - Hazelnut Neighborhood21-Str-005 (535,449) - - - - - - - - - - Arden Oaks Neighborhood Streets22-Str-001 - (60,000) - - - - - - - - - Old Snelling Ave PMP, CR E - Hwy 5122-Str-003 - (65,000) - - - - - - - - - Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista24-Str-001 - - - (45,000) - - - - - - - Karth Lake East Neighborhood Streets26-Str-001 - - - - - (30,000) - - - - - Tiller/Dunlap/Benton Way Resurface/Replace28-Str-001 - - - - - - - (20,000) - - - Cummings/Northwoods/Red Fox/Grey Fox Resurface30-Str-001 - - - - - - - - - (23,000) - Lake Valentine Road Street Improvements30-Str-002- - - - - - - - - (15,000) - Chatham/McCracken/Fairview/Brighton Way Resurface32-Str-001- - - - - - - - - - - Karth Lake runoff control21-Storm-001 (56,210) - - - - - - - - - - Shorewood Drive drainage20-Storm-003 (71,790) - - - - - - - - - - Storm Sewer Structure Rehabiliation22-Storm-001 - (65,000) (80,000) (80,000) (90,000) (90,000) (90,000) (90,000) (90,000) (90,000) - Karth Lake retaining wall23-Storm-001 - - (65,000) - - - - - - - - Storm Pond and Outfall Maintenance24-Storm-002 - - - (225,000) - (160,000) - - - (110,000) - Operating Expenses(489,300) (503,680) (518,490) (533,750) (549,470) (555,650) (572,320) (589,490) (607,170) (625,390) (644,150) Transfer to Equipment Fund(74,000) (74,000) (74,000) (74,000) (74,000) (74,000) (74,000) (74,000) (74,000) (74,000) (74,000) Total Expenditures and Uses(1,226,749) (767,680) (737,490) (957,750) (713,470) (909,650) (736,320) (773,490) (771,170) (937,390) (718,150) Change in Fund Balance(323,129) 163,010 193,200 (27,060) 217,220 21,040 194,370 157,200 159,520 (6,700) 212,540 Ending Balance (1,328) 161,682 354,882 327,822 545,042 566,082 760,452 917,652 1,077,172 1,070,472 1,283,012 $0.0$0.5$1.0$1.52022 2023 2024 2025 2026 2027 2028 2029 2030 2031Millions52
City of Arden Hills, MinnesotaCapital Improvement PlanSOURCES AND USES OF FUNDS2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Water Utility FundsBeginning Balance1,352,952 1,021,682 1,006,412 1,093,832 1,253,262 1,342,212 1,134,062 1,230,812 410,702 421,047 576,087 Revenues and Other Fund SourcesOperating Revenue2,412,010 2,518,530 2,629,820 2,746,100 2,747,020 2,747,960 2,802,510 2,858,150 2,859,150 2,860,170 2,861,210 Grants- 423,000 - - - - - - - - - Total Revenues and Other Fund Sources2,412,010 2,941,530 2,629,820 2,746,100 2,747,020 2,747,960 2,802,510 2,858,150 2,859,150 2,860,170 2,861,210 Total Funds Available 3,764,962 3,963,212 3,636,232 3,839,932 4,000,282 4,090,172 3,936,572 4,088,962 3,269,852 3,281,217 3,437,297 Expenditures and Uses2021 PMP - Hazelnut Neighborhood21-Str-005 (581,980) - - - - - - - - - - Arden Oaks Neighborhood Streets22-Str-001 - (25,000) - - - - - - - - - Old Snelling Ave PMP, CR E - Hwy 5122-Str-003 - (163,000) - - - - - - - - - Lexington Avenue, CR E to 69422-Str-006 - (423,000) - - - - - - - - - Old Snelling Ave/CR E Intersection Improvements 23-Str-002 - - (160,000) - - - - - - - - Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista24-Str-001 - -- (20,000) - - - - - - - Karth Lake East Neighborhood Streets26-Str-001 - -- - - (20,000) - - - - - Tiller/Dunlap/Benton Way Resurface/Replace28-Str-001 - -- - - -- (150,000) - - - Cummings/Northwoods/Red Fox/Grey Fox Resurface30-Str-001 - -- - - -- - - (20,000) - Lake Valentine Road Street Improvements30-Str-002- -- - - -- - - (10,000)- Chatham/McCracken/Fairview/Brighton Way Resurface30-Str-001 - -- - - -- - - -- Water Tower Maintenance22-W-001 - (75,000) - (60,000) - -- - - -- Booster Station Improvements25-W-002 - -- - (90,000) - - - - - - Trunk Water Main Improvements26-W-003 - -- -- (300,000) - - - - - Water Meters- -- -- -- (750,000) - - - Debt Service(248,150) (250,750) (248,050) (250,050) (246,750) (248,150) (249,150) (250,950) (248,675) - - Operating Expenses(1,813,150) (1,920,050) (2,034,350) (2,156,620) (2,221,320) (2,287,960) (2,356,610) (2,427,310) (2,500,130) (2,575,130) (2,652,390) Transfer to Equipment Fund(100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) Total Expenditures and Uses(2,743,280) (2,956,800) (2,542,400) (2,586,670) (2,658,070) (2,956,110) (2,705,760) (3,678,260) (2,848,805) (2,705,130) (2,752,390) Change in Fund Balance(331,270) (15,270) 87,420 159,430 88,950 (208,150) 96,750 (820,110) 10,345 155,040 108,820 Ending Balance 1,021,682 1,006,412 1,093,832 1,253,262 1,342,212 1,134,062 1,230,812 410,702 421,047 576,087 684,907 $0.0$0.2$0.4$0.6$0.8$1.0$1.2$1.4$1.62022 2023 2024 2025 2026 2027 2028 2029 2030 2031Millions53
Page 1 of 2
AGENDA ITEM – 1D
MEMORANDUM
DATE:
July 19, 2021
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Gayle Bauman, Finance Director
SUBJECT: Water Meters Discussion
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A Water Fund
Council Should Consider
Council should consider discussion of water meter interference issues the City has been
experiencing since November 2020.
Background
Sometime around 12/31/2020, when staff was working on the 4th quarter utility billing for 2020, it
became apparent that we weren’t receiving reads on about 300 of our 2600+ meters, mostly in the
southern portion of the City. Staff needed to complete the billing cycle per City Code and went
about estimating the 4th quarter reads for properties based on usage amounts from the past 3 years.
Staff met with employees from Metering & Technology Solutions who deal with the meters,
transmitters and collectors in conjunction with Badger Meter. It was determined that the collectors
and meters were operating properly and that the likely cause was signal interference.
Metering & Technology Solutions suggested that the city have Ancom conduct an RF Study in an
attempt to locate the source of any potential interference to the automated water meter reporting
system. Ancom had recently worked with another City on identifying interference issues.
As staff was preparing the 1st quarter utility billing for 2021, it became apparent that we were still
not getting reads on about 150 properties. A note was included in the 03/26/21 Admin Update
indicating that letters were being sent out to these properties in an attempt to get accurate meter
reads for the billing cycle. The City received about 95 responses to their inquiry so only about 55
accounts needed to be estimated.
The Ancom Study has since been completed and it was determined that the only likely source of
interference was an elevated noise floor, as there were no other discernable sources of interference
present during the testing.
Page 2 of 2
For this 2nd quarter billing, we ended up not getting reads on about 140 properties. In looking back,
the meter readings seemed to drop off about a week before Thanksgiving, which is also the same
time the State went into lockdown again because of COVID 19. It also appears as if some of the
reads came back on line, at least intermittently, in mid January. This would correspond to the time
the lockdown started to be lifted. There is a possibility that some of this interference had to do with
an increased use of electronic devices and companies working to increase their signal strength for
their customers.
Discussion
The three solutions presented to the City by Ancom were to (1) replace our antennas; (2) upgrade
our antennas; or (3) install a 4th collector in the City. Metering & Technology Solutions also
strongly suggested that we upgrade our Read Center software as they no longer support the
transmitters we currently use. As we need additional transmitters or the old ones start to fail, they
will be replaced with ones that use a cellular signal to transmit data and the Read Center software
does not work with them.
Staff is moving forward with upgrading our Read Center software to Beacon software. This should
be completed by the end of July. This upgrade won’t help with the interference issues we are
having but we were told it will take care of the power issues we are experiencing at the North
Tower. Also, it will enable us to obtain additional transmitters as old ones wear out and new
services are added.
A benefit of the new Beacon software is a Customer Portal that will be made available to all
customers, regardless of the type of transmitter they have in their home/business. Once customers
sign up for this portal, they will be notified of abnormal water usage (potential leaks) in real time,
and the City will no longer need to prepare the courtesy leak letters.
Staff is currently working with Metering & Technology Solutions and Badger Meter to overcome
the interference issues we are experiencing. They have one of our old collectors in their warehouse
which they are currently working to repair so the City can test out the effectiveness of a potential
4th collector for the City. We are still waiting to hear if it is repairable or not. If it is not repairable,
we will need to look at either purchasing an additional collector or replacing/upgrading our
antennas.
Budget Impact
Estimated cost to repair our old collector is $1,300. Estimated cost to upgrade Read Center is
$6,580. We do not currently have estimates on a new collector or replacing/upgrading the antennas.
A new collector was purchased in 2020 at a cost of $6,500. Any invoices received related to these
items will be paid from the Water Fund.
Attachments
Attachment A: Ancom Report and Recommendations
Attachment B: Map designating no reads due to interference
1800 Cliff Road East
Burnsville, MN 55337
(952) 808-7699
4/21/2021
Contained herein is the report and recommendations
based on RF study conducted in Arden Hills, MN
Attachment A
Summary of Testing
On Thursday April 8th 2021, ANCOM conducted an RF study of the area in and around
Arden hills, MN to determine any potential interference to the automated water meter data
collection system that is currently used by the City of Arden Hills.
Test equipment used was a Viavi (formerly Aeroflex) 8800SX series Digital Radio Test
Set, Anritsu S332D Spectrum Analyzer, Neon Signal Mapping Software, a Motorola XPR 7550e
portable radio, and iBwave Design Enterprise software for post processing and data mapping.
Testing began at the Red Fox Road collector. We documented that the noise floor in the
area around Arden Hills was noticeably elevated likely due to the proximity of the Shoreview
broadcast towers. There were no other discernable sources of interference present during the
testing. The portable radio was set to the water meter transmit frequency of 456.7625 MHz so
that we could verify that transmissions were actually coming from the water meters and not
another source.
Once it was determined that the only likely source of interference was the elevated noise
floor itself, we began to map the level of the noise floor throughout the city and surrounding
areas.
At no time during the testing was any other potential source of interference identified.
Conclusions
Based on our test results, and signal documentation, it is our conclusion that the existing
collectors are functioning. However, due to the elevated noise floor, signals coming from too far
away are being "washed out" by the noise, and therefore not receivable by the collectors.
Essentially, the collectors are trying to "listen" for a transmission that is being
"whispered" from a mile away; while something is "screaming" right next to them. The
collectors cannot separate out the water meter transmission from the noise if the water meter
transmission arrives at a signal level that is below the noise floor at the collector.
Based on noise floor levels and the collection data provided by the city, we have
generated a diagram that illustrates the effective receive area of each collector. In areas where
the noise floor is high, the water meters need to be close to the collector for reliable
functionality. This leads us to make the following recommendations.
Recommendations
We have determined multiple courses of action we would recommend to the City of
Arden Hills. They are arranged in this document in terms of Good, Better, and Best. If desired,
ANCOM can provide a quote to provide any of the following solutions.
First, we present the "Good" Solution:
The receive antennas and collectors have been exposed to the elements for several years
now, and there may be some degradation in receive capability due to this. We could replace all
the receive antennas and cable assemblies with new equipment. This would rule out the
possibility of equipment failure as a cause of the decreased reading, but would do nothing to
change the way that the collectors function. The antennas that are in use are readily available as
are the cable assemblies, so this solution could be implemented relatively soon. This would also
be the lowest cost solution. However, this solution does not address that there is still an elevated
noise floor present, and any interference coming in to the collector would increase along with the
water meter transmissions.
Next, we will discuss the "Better" Solution:
Since there is collection deficiency in a defined area of the city, our "Better" solution is to
replace the receive antennas with a completely different antenna system. This would involve the
use of directional antennas that have higher gain. Instead of utilizing the low-profile antennas
that are currently in place, we would install a set of directional Yagi antennas that would receive
water meter transmissions from a set direction. Utilizing a directed array of antennas would
allow us to "shape" the area of reception from a particular collector.
Last, we offer, for your consideration, the Best solution:
This solution is to install a 4th collector in the southern area of the city. We have
determined that if available, a 4th collector utilizing the directional antennas would greatly
increase the receive area of the system.
We have identified Johanna Marsh Park as a viable location for the potential 4th collector.
This solution would require the installation of a structure or pole that would put the collector
around 40 feet above the ground. This would ensure an adequate RF pathway would exist
between any potential water meter and the collector.
We understand there are many logistical challenges that are present when trying to install
poles in a marshland environment, and there are certainly other locations that may be available.
Our recommendation is simply the most centrally located, City owned property we could find.
Report Pictures
Below are images of the test data collected, as well as the illustrations describing the various
recommendations above:
This image is the noise floor data that we collected. Areas where the colors are “warmer” means
the noise floor is higher and therefor the meters need to be closer to the collectors in order to be
received.
This image is composite of the collector receive area over the noise floor data. Note that the red
fox road collector has the smallest area due to the higher noise floor levels surrounding it.
This is an image of the collector receive area only. This image is included to provide a clear
distinction between the current receive area and the “better” plan receive area. (illustrated below)
This is an illustration of the collector receive area if we replace the antenna systems as described
in the “better” plan. Note that in this plan most of the area of the city can be included without
the addition of a 4th collector, however, the very southern edge of the city may still have some
marginal areas. This could be addressed by using a higher gain antenna on the Red Fox Road
collector.
This image illustrates the 4th collector scenario. The 4th collector would be installed with the
directional antenna array from the outset to ensure that the entire southern portion of the city is
within the receive area. This illustration assumes that the collector is installed at the Johanna
Marsh park area.
Mapdesignatingnoreadsduetointerference.
YellowhighlightedareasarefromtheJanuarybillingcycle.
Blue/GreenhighlightedareasarefromtheAprilbillingcycle.
$WWDFKPHQW%
Page 1 of 2
AGENDA ITEM – 1E
MEMORANDUM
DATE: July 19, 2021 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Community Development Staffing
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
For Council Consideration
Council may provide direction on Community Development staffing.
Background
The City Council discussed Community Development Staffing at its June work session;
following that discussion Council directed Staff to bring back a draft job description for a
Community Development Director position, which had a focus on planning duties.
The City currently has a Senior Planner on Staff. Prior the departure of the previous Community
Development Manager/City Planner, Council intended to hire two positions to facilitate the
City’s planning functions. One option proposed would be to have a Community Development
Director who has a focus on planning, but also oversees the Building Department and is the
overall head for the Community Development Department. Another option would be to re-post
for a City Planner position and see what the pool of applicants looks like; however, this approach
would still leave a gap in the Community Development Department Head function.
For reference, here are the proposed salary ranges for either a City Planner or Community
Development Director:
City Planner
Grade 15: $76,761 - $97,238
Community Development Director
Grade 20: $102,723 - $130,127
Page 2 of 2
Budget Impact
The impact will depend on how the Council wants to move forward. The 2021 budget includes
an Associate Planner (grade 11) and a Community Development Manager/City Planner (grade
16). The current Senior Planner is grade 13, so either option will have a slight impact on the
budget.
Attachment
Attachment A: Draft Community Development Director Job Description
Attachment B: City Planner Job Description
1
CITY OF ARDEN HILLS
POSITION DESCRIPTION
Position Title: Community Development Director
Department: Community Development
Accountable to: City Administrator
Positions Supervised: Building Official, City Planner, Associate PlannerSenior Planner
Status: Regular Full Time
June 2015July
2021
PRIMARY OBJECTIVES
Performs complex professional work managing and directing all planning, building inspection, code enforcement,
and community development activities, identifying public-private partnerships for new economic opportunities,
assisting in the daily City operations, assuring compliance with City policies, goals and programs, and related
work as apparent or assigned. Responsible for overall planning duties and delegates work to the Senior Planner.
Work involves setting policies and goals under the direction of the City Administrator. Departmental supervision
is exercised over Building Official, Associate Planner and City Plannerand Senior Planner. Limited oversight is
exercised over the Building and Code Enforcement Inspector.
QUALIFICATION REQUIREMENTS
To perform this job successfully, an individual must be able to perform each essential function satisfactorily.
The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable
accommodations may be made to enable individuals with disabilities to perform the essential functions.
ESSENTIAL FUNCTIONS OF THE POSITION
Serves as the principal planner and zoning administrator for the City of Arden Hills and delegates planning
activities to the Senior Planner as appropriate.
Receives and processes zoning and land use applications, completes detailed analysis for conformity with City
Codes, prepares case files, coordinates publication of notices to property owners as necessary, and presents
cases to Planning Commission and the City Council.
Oversees and coordinates community development activities, providing technical and administrative assistance
to property owners, promoting development and redevelopment activities, and assists in the marketing of
properties within the City; responsible for identifying and managing the elements essential to the success of all
aspects of Economic Development and (re)development projects.
Serves as staff liaison to the Economic Development Commission and Executive Director at the Economic
Development Authority.
Conducts research, interprets data, and prepares reports and recommendations on issues and projects as
assigned, which may impact the economic vitality of the City.
Ensures developer compliance with Council directives and development contracts.
2
Supervises, plans, and organizes activities in the areas of Planning, Recycling, Inspections, Economic
Development and Code Enforcement; supervises and assists the City Planner and Associate PlannerSenior
Planner in developing, changing and implementing land use plans, regulations, and policies.
Serves as the Development Director for the TCAAP Joint Development Authority.
Supervises and assists the Building Official to ensure positive and effective enforcement of City plans, policies,
and ordinances; including monitoring developer compliance with Council directives and development contracts.
Performs special assignments and projects as assigned by the City Administrator and City Council.
Provides technical assistance to City departments on projects and activities as directed by the City Administrator.
Represents the City on various boards and to various state, metropolitan and county agencies.
Attends all City Council meetings, Economic Development Commission meetings, Economic Development
Authority meetings, and other meetings as appropriate.
EDUCATION and/or EXPERIENCE
Bachelor’s degree with coursework in urban planning, public administration, urban and regional studies, or
related field and considerable experience in planning, economic development, management, or equivalent
combination of education and experience. Master’s degree, Minnesota local government experience and
previous supervisory experience preferred.
A minimum of five years of experience as a City Planner, or similar role, is required.
KNOWLEDGE, SKILLS AND ABILITIES
Comprehensive knowledge of the principles and practices of local government functions and practices;
comprehensive knowledge of State Statutes related to planning and economic development; comprehensive
knowledge of economics and municipal finance as they apply to City community development; thorough
knowledge of current literature and recent developments in the field; general knowledge of the principles and
practices of civil engineering as they relate to planning and subdivision design and control; ability to maintain
confidentiality; ability to organize, prioritize, and communicate community development work plans; develop
goals, policies, plans and procedures related to management of the department and development projects; ability
to interpret and analyze technical and statistical information to prepare and present technical oral and written
reports; ability to use standard office equipment including related hardware and software; ability to communicate
effectively with governing bodies, the public, and developers; ability to establish and maintain professional
working relationships with employees, officials, other agencies and the general public.
PHYSICAL DEMANDS
This work requires the occasional exertion of up to 10 pounds of force; work regularly requires sitting, frequently
requires speaking or hearing and repetitive motions and occasionally requires using hands to finger, handle or
feel, reaching with hands and arms and lifting; work has standard vision requirements; vocal communication is
required for expressing or exchanging ideas by means of the spoken word; hearing is required to perceive
information at normal spoken word levels; work requires preparing and analyzing written or computer data,
operating machines and observing general surroundings and activities; work occasionally requires exposure to
outdoor weather conditions; work is generally in a quiet location (e.g. library, private offices).
SPECIAL REQUIREMENTS
Valid driver's license.
SELECTION GUIDELINES
Formal application, rating of education and experience; oral interview and reference check; job related tests may
be required. The duties listed above are intended only as illustrations of the various types of work that may be
3
performed. The omission of specific statements of duties does not exclude them from the position if the work is
similar, related or a logical assignment to the position.
CITY OF ARDEN HILLS IS AN EQUAL OPPORTUNITY EMPLOYER
___________________________________________________________________
NON-DISCRIMINATION POLICY
The City of Arden Hills does not discriminate
on the basis of handicapped status
in the admission or access to or treatment or employment
in its programs and activities.
__________________________________________________________________
1
CITY OF ARDEN HILLS
POSITION DESCRIPTION
Position Title: City Planner
Department: Community Development
Accountable to: Community Development Director
Positions Supervised: Senior Planner
Status: Regular Full Time
February 2021
PRIMARY OBJECTIVES
Performs difficult advanced technical work assisting the director in a wide variety of planning, zoning and code
enforcement work, and related work as apparent or assigned. Provides supervision to the Senior Planner
position. Work is performed under the general direction of the Community Development Director.
QUALIFICATION REQUIREMENTS
To perform this job successfully, an individual must be able to perform each essential function satisfactorily.
The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable
accommodations may be made to enable individuals with disabilities to perform the essential functions.
ESSENTIAL FUNCTIONS OF THE POSITION
Coordinates, reviews and evaluates proposed land use development plans including tracking the land use
approval process in accordance with City Code and Minnesota State Statutes.
Provides direct supervision to the Senior Planner.
Under limited supervision performs analysis and review of proposed land use applications.
Conducts research and analysis of development proposals and other projects based upon appropriate plans,
policies and ordinances.
Staff liaison to Planning Commission including: presenting planning cases to Planning Commission and City
Council, maintaining case files, preparation of agendas, preparation and publication/mailing of public hearing
notices in accordance with legal requirements, research and analysis of issues, and makes recommendations
to the Planning Commission and the City Council.
Negotiates development agreements and works with the City Attorney to prepare documents.
Monitors developer compliance with Council directives and development agreements by reviewing approved
documents and inspecting sites. Advises developers, petitioners and their agents, and other City departments
on status of required improvements and conditions.
Ensures that building and zoning permit applications are in compliance with the Zoning Code.
Perform site inspections as requested for development applications, compliance during construction, annual
reviews, code enforcement and for security release.
Represents Planning Commission at City Council meetings and represents the department at meetings as
needed.
2
Responds to inquiries concerning City land use plans, policies and ordinances and development review
procedures.
Maintains Comprehensive Plan materials, GIS information, and demographic data; provides information and
advice on necessary changes, and recommended modifications.
Prepares periodic updates of and amendments to the City Code and Comprehensive Plan.
Assists in the enforcement and administration of the City’s Zoning Ordinance. Helps provide interpretation of
the City Code language and requirements.
Investigate citizen complaints and/or inquiries pertaining to development applications, code enforcement, zoning,
and resolved such matters in a tactful and equitable manner
Assists the Community Development Director in long range planning activities including the TCAAP master
planning and zoning process and small area planning.
Works with the Administration Department to administer the Rental Registration Program.
EDUCATION and/or EXPERIENCE
Five or more years experience in municipal planning and a bachelor's degree with coursework in city
planning, urban and regional development, or related field and considerable experience, or equivalent
combination of education and experience.
Master’s Degree in urban planning or related field is preferred.
KNOWLEDGE, SKILLS AND ABILITIES
Thorough knowledge of the principles and practices of urban planning; general knowledge of economics,
sociology, environmental issues, municipal finances, and tax-increment financing as applied to urban planning;
general knowledge of current literature and recent developments in the field of urban planning; general skill in
the use and administration of Geographic Information Systems (GIS); ability to utilize standard office equipment
and related hardware and software, including job-specific software; ability to analyze and systematically compile
technical and statistical information and to prepare technical reports; ability to make presentations; ability to
establish and maintain effective working relationships with associates.
PHYSICAL DEMANDS
This work requires the occasional exertion of up to 25 pounds of force; work regularly requires sitting, frequently
requires speaking or hearing and repetitive motions and occasionally requires standing, walking, using hands to
finger, handle or feel, reaching with hands and arms and lifting; work has standard vision requirements; vocal
communication is required for expressing or exchanging ideas by means of the spoken word; hearing is required
to perceive information at normal spoken word levels; work requires preparing and analyzing written or computer
data, using of measuring devices, operating machines, operating motor vehicles or equipment and observing
general surroundings and activities; work occasionally requires exposure to outdoor weather conditions; work is
generally in a moderately noisy location (e.g. business office, light traffic).
SPECIAL REQUIREMENTS
Valid driver's license.
SELECTION GUIDELINES
Formal application, rating of education and experience; oral interview and reference check; job related tests may
be required. The duties listed above are intended only as illustrations of the various types of work that may be
performed. The omission of specific statements of duties does not exclude them from the position if the work is
similar, related or a logical assignment to the position.
3
CITY OF ARDEN HILLS IS AN EQUAL OPPORTUNITY EMPLOYER
___________________________________________________________________
NON-DISCRIMINATION POLICY
The City of Arden Hills does not discriminate
on the basis of handicapped status
in the admission or access to or treatment or employment
in its programs and activities.
__________________________________________________________________
Page 1 of 1
AGENDA ITEM – 1F
MEMORANDUM
DATE:
TO:
FROM:
July 19, 2021
Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
SUBJECT: Council Tracker Update
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
The Council should provide further direction on items presented on the Council Request Tracker.
Background
City Council will receive a verbal update on items the Council has previously directed staff to
research and/or bring forward.
Discussion
N/A
Budget Impact
N/A
Attachments
N/A