HomeMy WebLinkAboutOctober 2016The Official City Newsletter for Arden Hills Residents October 2016
Rice Creek Commons site is officially ready for redevelopment
Decades after it was a place where
people worked, the former Twin
Cities Army Ammunition Plant
(TCAAP), now Rice Creek Commons,
is officially ready for new life and activ-
ity. The site is an important part of Arden
Hills’ past and future but more recently
was known for significant environmental
contamination that had previously limited
redevelopment.
That has now changed as work to clear
and clean the site has reached an important
new milestone. The Minnesota Pollution
Control Agency has awarded a Certificate
of Completion for the site’s cleanup efforts.
Arden Hills and Ramsey County have cre-
ated a Joint Development Authority (JDA)
which has worked to plan for the right way
to redevelop it. Now that the clean-up is
complete, work can focus on new homes,
stores, and jobs in this significant part of
Arden Hills.
“This is a monumental time in Arden Hills’
history. Rice Creek Commons will help our
already thriving community continue to
grow by attracting residents, jobs, and busi-
nesses,” said David Grant, Mayor of Arden
Hills. “The City of Arden Hills, along with
our other partners, worked so hard over the
past three years to ensure that
this valuable piece of property
could be utilized in a way
that will benefit our City, the
County, as well as the whole
State. We are thrilled to start
development and see what the
future holds for Rice Creek
Commons.”
The 427-acre site was origi-
nally home to the Twin Cities
Army Ammunition Plant for
many years, resulting in haz-
ardous materials polluting the soil. In 2013,
working with Arden Hills, Ramsey County
bought the property with the intent to clean
the soil and redevelop the site. The cleanup
efforts were completed in November 2015
after removing 93 percent of the concrete,
metal and other materials to meet residen-
tial standards. The site will be officially
removed from the state’s Superfund list (a
collection of all sites in Minnesota that are
too hazardous for development) in 2017.
“We are at an important place in this com-
plex process,” Grant said. “While crews
worked to clear buildings and clean up the
contamination, we were working with other
partners on a plan for what happens next.
What is the right way to bring together new
homes, businesses, and community space
within a coordinated plan and vision? As
exciting as it is to see the clean-up happen,
we think the redevelopment vision is just as
significant.”
by Mike Zipko of Zipko Strategy
Arden Hills has hired the public relations
company Zipko Strategy in partnership
with the Connelly-Kuhl Group to help
articulate the City’s vision for the Rice
Creek Commons project. The St. Paul-
based company provides communica-
tions services for businesses, non-profits,
government, and advocacy groups. The
contract was approved by the City Council
on August 29.
Arden Hills Mayor David Grant speaks at an August
10 event to celebrate the awarding of the project’s
Certificate of Completion.
When fully redeveloped, Rice Creek Com-
mons will serve as a mixed-use site that
will be home to residential properties, retail
properties, and a business district. Plans
are underway to make this a sustainable,
walkable community with parks and other
community space. Developers are expect-
ing that in the next 10-15 years there will
be 1,400 new homes and 4,000 jobs at the
site. Alatus LLC of Minneapolis is the
master developer for the redevelopment.
Arden Hills will continue to share more
information as the work continues.
To learn more about Rice Creek
Commons please visit
ricecreekcommons.com
There’s an election on the way!Election Day is Tuesday, November 8. In addition to national and state
offices, Arden Hills residents will elect three Councilmembers. Learn
about the candidates and your voting options on pages 3 through 6 of this
newsletter.
City hires Zipko Strategy
After years of cleanup, Rice Creek Commons has received a Minnesota Pollution Control Agency Certificate of Completion
Arden Hills Service Directory
1245 West Highway 96
Arden Hills, MN 55112-5734
www.cityofardenhills.org
Office Hours
Monday through Friday
8:00 a.m. to 4:30 p.m.
Sheriff and Fire
911
Water and Sewer Problems
(During non-business hours)
651-767-0640
Mayor:
David Grant 651-538-0747
dgrant@cityofardenhills.org
Councilmembers:
Brenda Holden 651-636-2987
bholden@cityofardenhills.org
Fran Holmes 651-631-1866
fholmes@cityofardenhills.org
Dave McClung 651-332-0352
davemcclung@comcast.net
Jonathan Wicklund 651-278-8077
jwicklund@cityofardenhills.org
Acting City Administrator:
Sue Iverson 651-792-7816
siverson@cityofardenhills.org
Communications Committee
Editors/writers: Susan Cathey, Tina
Kulzer
Council Liaison: Jonathan Wicklund
Staff Liaison: Julie Hanson
Desktop Publisher: Mary Nosek
Council meetings are held at City Hall
on the second and last Monday of the
month at 7 p.m. Meetings are televised
live on Cable Channel 16. Meetings of
the Planning Commission are televised
as well. Visit www.cityofardenhills.org
for information about archived meeting
playbacks.
Arden Hills Notes is the official news-
letter of the City of Arden Hills, an
equal-opportunity employer.
2
Recreation news for man and beast
Kids (ages 3-12) and their famil
i
e
s
can win prizes at a carnival, pl
a
y
Ghost Bingo, make Halloween
crafts, carve and decorate a pu
m
p
-
kin, and share in a pizza dinne
r
.
Saturday, October 22
5:30 – 7:00 pm
City Hall
Pre-registration is required
Registration deadline is Wedne
s
-
day, October 19
$10.00 per person – children m
u
s
t
be accompanied by a paid adul
t
Get ready for Boo Bash
Recreation and civic involvement are important contributors to the quality of life in
Arden Hills. Here are a few notes about why this is such a good place to live:
Off-leash dog park now open at Perry Park
Baseball field No. 4 at Perry Park, located on the north side of the parking lot adjacent to
the park pavilion and playground, has
been repurposed as a fully enclosed
dog run.
This Little League ball field has seen
minimal use for several years due
to a decline in the popularity of the
program. Ball field fencing already in
place provides the bulk of the contain-
ment needed to prepare the area for
its new use. Approximately $4,000 in
additional fencing has been added to
close off dugout entrances and gaps in
outfield fencing.
A fenced-in staging area with a double gate has also been added to allow owners to bring
in their dogs and remove their leashes before entering. These fencing modifications al-
low for easy conversion back to a ball field if Little League programming returns.
Parks and Recreation Coordinator Sara Grant reports that the changes are popular with
resident dog owners and the park is seeing heavy use. Compared to the off-leash area
at Hazelnut Park, where there is a long hill to traverse to get to the off-leash area, this
dog park offers better accessibility. Dog owners can also take advantage of the ball field
bleachers to take a break while their dogs get exercise.
Operation of this dog park is the same as the hours established at Hazelnut Park:
• Season of operation: May 1 – November 1
• Hours of operation: 30 minutes before sunrise to 30 minutes after sunset
Our thanks to the
Roberts Management Group!
Roberts Management Group (RMG) has
provided a $1,000 donation to the Arden
Hills Foundation for Parks and Recreation
Department event programming.
This donation was used in part to support
the popular Bark and Rec Day in July
at Perry Park. RMG also sent staff (with
their dogs and families) to the event,
where they were able to talk with
attendees and provide community infor-
mation. Remaining funds will support
future Parks and Recreation events.
Roberts Management Group is a Com-
mercial Property Owner and Developer
of Lexington Station,
Red Fox Business
Center, and other
commercial properties
in Arden Hills.
by Tina Kulzer
3
Local election contests, voting information and more!
Dan Burns (4-year)
I spent my formative years just south of Arden Hills in Roseville. Most recently, my wife Rachel and I, moved
to Arden Hills as we found a wonderful opportunity to become a member of this community for years to come.
Rachel works for Concur Technologies in St. Louis Park. I work downtown Minneapolis for Wells Fargo Bank
NA. I have five years experience working for the Federal Government, Department of Homeland Security, 10
years experience working for an insurance company, and five years experience working for a Board of Pensions.
I am a graduate of the University of St. Thomas - BA - Operations Management, University of St. Thomas –
MBA- Finance. I’m an active member of the men’s club and volunteer at my church. Additionally, I volunteer through the Wells Fargo
Volunteers program.
Candidate Statement
First and foremost, I believe that with my inclusion in the City Council, I would bring a new and fresh perspective to current and future
initiatives. As your community representative, I would work diligently and conscientiously to couple this perspective with the wants
and desires of our residents through the pursuit and consideration of resident input. In circumstances where I would serve to facilitate
and/or guide a project, I would do so to assure a fair and equitable outcome for all parties, whether it be public works initiatives or the
Rice Creek Commons undertaking.
Having worked at an insurance company, pension board and bank, I am passionate and driven by sound fiscal management. I would
work to assure limited waste. In doing so, I would collaborate with other entities to accomplish City initiatives while practicing mindful
fiscal responsibility and conservatism. In addition, residing only a short time in Arden Hills, I have a great appreciation for the natural
beauty of our neighborhoods. That being said, my other passion is to serve as a steward and custodian of our environmental resources.
This stewardship would result in supporting green initiatives.
I am very excited about this opportunity to serve on the Council with energy and enthusiasm. This is a great chance to have a new voice
on the Council and to potentially shift the paradigm.
Election Day is Tuesday, November 8. On these pages you’ll find information about the local elections and details about where to
vote.
General election information: The City of Arden Hills has contracted with Ramsey County to administer elections. The County is us-
ing new ballot counters beginning this year. New accessible ballot marking devices for elderly and disabled voters will be available as
well. Although voters will still be marking paper ballots, there are some minor differences to be aware of. You may see an example of
the new machine on display at City Hall. A video demonstrating its use can be viewed on the Ramsey County
website www.ramseycounty.us/residents/elections-voting.
Precinct information
Poll hours are from 7 a.m. to 8 p.m. on election day. Arden Hills has three precincts:
• Precinct 1: Presbyterian Church of the Way, 3382 Lexington Avenue N. 55126
• Precinct 2: Valentine Hills Elementary School, 1770 County Road E2 55112
• Precinct 3: Ramsey County Public Works, 1425 Paul Kirkwold Drive 55112
Absentee voting options: You may vote before Election Day by casting an absentee ballot at City Hall, the County Elections Office, or
by mail. For more information on absentee ballots, go to the City website or to the Ramsey County website above.
About the City Council race:
In addition to national and state offices, Arden Hills residents will be voting for three City Councilmembers. Brenda Holden and Dave
McClung have terms expiring on December 31, 2016. Those seats have four-year terms. Five candidates, including the two incumbents,
have filed for the two, four-year seats.
Councilmember Jonathan Wicklund’s seat is also expiring on December 31, 2016. He was appointed due to the death of Councilmem-
ber Robert Woodburn. Since there were more than two years remaining in Councilmember Woodburn’s term, under state law, that seat
is up for re-election for a special two-year term. Two candidates have filed for the single two-year seat.
Following are statements by each candidate.
Brenda Holden (4-year, incumbent)
My husband, Jim Holden and I have lived on Beckman Ave in the SW corner of Arden Hills for over 35 years. I
served on the City’s newsletter committee prior to joining the City Council in 2002 and have had the privilege of
serving on the Arden Hills City Council for the past 15 years. I am recently retired as Director of Operations of the
Minnesota Cancer Surveillance System. My participation on boards includes: TCAAP Joint Development Au-
thority, TCAAP Energy Resiliency Committee, Lake Johanna Fire Department and Relief Association, Northeast
Youth and Family Services, Minnesota Advisory Council on Patient Safety, and Open Your Heart to the Hungry
and Homeless. I am an active member of Nativity Lutheran Church. When Jim dealt with serious medical issues in
2013, I was reminded of the importance of neighbors, community and our own back yards.
Candidate Statement
It is crucial to current and future Arden Hills taxpayers that the 427-acre TCAAP development be a complementary extension of our cur-
rent City. TCAAP development must be sensitive to current residents who are already burdened with traffic issues and we must continue
to work with the Metropolitan Council to provide bus service (A line) to Arden Hills and TCAAP.
I will continue to push for developments throughout the City that reflect our community. The former library property was placed back
on the tax rolls with custom homes. The Round Lake business area continues to bring in high-end companies. I encourage and support
pedestrian-friendly retail, such as Lexington Station, for Lexington Avenue and County Road E.
We need to focus on encouraging businesses to create public amenities, shared parking, and trails. These partnerships have and will al-
low the City to add and connect trails. I am always seeking out opportunities for grants and partnerships that keep cost and taxes down
while providing quality services.
I strive to ensure infrastructure is a priority and have led the Council to establish trail, sewer, park, and recreational courts maintenance
programs to reduce costs. I will continue to move the City to reduce energy consumption by using best practices in recycling, lighting,
City buildings and property.
My name is Tania Dreon and I am running for a four year term on the Arden Hills City Council. I have been a
resident of Arden Hills for three years this fall. My husband grew up in Arden Hills and went to college here as well.
We have two young children.
I am a Certified Public Accountant with ten years experience in audit, finance and process improvement. Most
recently I was in management at Ernst and Young (EY), one of the big four accounting firms. While at EY, I served
as the Vice Chair of their Minneapolis Professional Women’s Network. I am currently a stay-at-home mom. In my
spare time I like to read, cook and be outdoors.
Candidate Statement
I am passionate about our community. I care about maximizing the use of our parks, lakes and local businesses through safer roadways
and more pedestrian-friendly trails and sidewalks. I believe it is important to balance short term needs with the long term vision for our
City when making decisions around development. Arden Hills has a unique opportunity right now with TCAAP, and it is necessary that
we create a space that is desirable to new and existing residents and businesses now and in the long term.
I make decisions based on research and evidence. I value consistency but appreciate when new information warrants change. I am ex-
perienced in listening, researching and developing solutions to problems. If elected, I look forward to connecting with fellow residents
to learn what is working well for them and where there are opportunities for improvement. I want to be a resource for those that have
questions or need help. I want to help make sure that the community we live in retains all of the qualities we love about it while also
looking ahead to the future. I would consider it an honor to be elected to the Council and have the opportunity to serve the residents of
Arden Hills through this role
4
Tania Dreon (4-year)
Steven L. Jones (4-year)
My wife Belinda and I moved to Arden Hills in 1999 from the Frogtown neighborhood of St. Paul. Our two sons
moved with us, our daughter joined our family in 2002. Belinda teaches in the Roseville School District. Isaac
graduated from Mounds View High School in 2015 and is now in college. Levi (2017) and Lillian (2020) both at-
tend MVHS - Go Mustangs!
We are active members of the Centennial United Methodist Church as well as Boy Scouts, Job’s Daughters and
numerous school and community endeavors. I have enjoyed working on the Arden Hills Planning Commission for
nearly three years.
I have a degree in HVAC design and hold a license in Wisconsin as a Designer of Engineering Systems. I have worked in the mechani-
cal engineering field for over 22 years, with more than 16 years at the Gustave A. Larson Co. where I oversee the North Central Region
design and engineering department.
Candidate Statement
First and foremost, I highly recommend to anyone interested, get involved with one or more of the numerous committees and com-
missions in the City of Arden Hills. They offer citizens a look at the inner workings of our City government, as well as a voice as to its
future. The past two-and-a-half years on the planning commission, working with the City Council, fellow commissioners, residents and
local businesses have proven very rewarding.
My initial interest in the planning commission was the expansion and development of our City into the TCAAP area. Living in a part of
our city about as far from the TCAAP as you can get, I often talk to neighbors about the future of our entire City. My interest in the City
Council is much the same.
The next ten to twenty years promise many changes to the City of Arden Hills. Population, land mass, jobs, housing, business climate,
tax revenues and expenditures, firefighting and policing, and many others will all be affected. Will the new services and utilities offered,
be they internet access, public WiFi, fiber optics, trash, recycling, green energy, etc… be City-wide? I’ll work to insure they are.
Dave McClung (4-year, incumbent)
I have been proud to represent you as a City Council member these last four years as well as from 2006 – 2010. I
am running for re-election to keep Arden Hills an ideal place to work, play, and live. I have a long track record of
advocating for the residents of Arden Hills, and I am asking for your vote to allow me to continue that advocacy
for you.
My family has been involved in the life of the Arden Hills community since before we were a City. My Grand-
father Rex McClung served on the first City Council and my family has continued our service to Arden Hills
tirelessly over the years.
Candidate Statement
First and foremost I believe in communication and listening to the thoughts and concerns of residents. I have always been open and
approachable and willing to have a discussion about what is best for the future of Arden Hills. This has never changed and will never
change.
I will work to focus the City’s budgetary priorities on critical City services: health and public safety; building roads and maintaining our
infrastructure; providing sewer and water services; and maintaining safe, clean parks and trails for all residents.
I will work tirelessly to ensure that development on TCAAP/Rice Creek Commons brings value to existing Arden Hills and the sur-
rounding community and continues our tradition of valuing parks and open-space.
If re-elected, I will remain:
• Committed to a family-friendly City
• Responsive to resident concerns
• Dedicated to responsible City budgeting
I ask for your support and vote on November 8th.
5
Steve Scott (2-year)
I am 64 years old and have been an Arden Hills resident since 1996, with my wife Eileen and our now adult
children Kelly and Alex.
Education: MBA, Western New England University, Springfield, MA; BBA, Pacific Lutheran University,
Tacoma, WA; AFROTC Graduate, University of Puget Sound, Tacoma, WA; AA/AT Data Processing, Pierce
College, Tacoma, WA
Occupation: Information Technology, U.S. Dept. of Veteran Affairs (current) Prior public sector: Tacoma
Public Schools and U.S. Air Force Prior private sector: Federal Reserve Bank, commercial banking, credit union service providers and
Europe’s largest certification/quality management body; W2 and 1099 independent IT consultant work
Relevant Civic Experience: Arden Hills Parks, Trails, and Recreation Committee since 2008 (chair in 2011); Head and Assistant Head
election judge since 2004; “Celebrating Arden Hills” Planning Committees; ISD 621 Facilities and Technology Committees; Currently
representing the City with my wife on the Suburban Ramsey County Beyond the Yellow Ribbon steering group.
Candidate Statement
I am seeking the Council seat currently open via special election for three reasons:
1. TCAAP is the largest, most complex and riskiest project the City will ever undertake. It will dominate local and regional policy
for years to come. The Parks, Trails, and Recreation Committee developed a master plan for the PTRC portion in each of the three
planned TCAAP neighborhoods consistent with the existing recreational and green space amenities which have made Arden Hills
a top suburban community to raise a family. The initial plan recently presented by our master developer differs significantly in this
vision. It emphasizes more density including high rise (15-20 story) condominiums at the expense of our recreation and green spaces.
I hold federal certifications in project management and contracting with decades of experience in driving large enterprise projects. I
will work diligently to preserve the suburban feel of our suburban community.
2. The Council still needs to be proactive to the needs of our existing business communities. My formal education is in business with
extensive private and public sector experience. I will work on policies to attract new businesses and keep our existing partners com-
petitive.
3. Lastly, as a veteran and as the City’s co-representative on the Beyond the Yellow Ribbon Committee, I want to forge a stronger rela-
tionship with the City’s substantial military community, their families and our neighbors.
Nicholas Tamble (2-year)
I currently Founder and CEO of Lawn and Landscape Gardens Ltd., a landscape design, installation and mainte-
nance company based in Arden Hills. I provide oversight as well as Sales and Marketing Management to LLG,
who is a leading provider for beautification of outdoor spaces in the Twin Cities North Metro. I have appeared
on HGTV and Twin Cities Live and have branded DIY and How-To videos on HGVids.com and YouTube. I was
raised in Roseville, Minnesota and have been a resident of Arden Hills with my wife Kim for 17 years. We have
a 5-year-old daughter, Elizabeth, who recently started kindergarten at Snail Lake. I am an alumnus of Cretin-Der-
ham Hall and Concordia University St. Paul where I received a BA in Education and minor in Studio Art. Other
course work has been completed in the areas of Environmental Horticulture, Geology and Water Quality. I love to travel with family and
friends as well as scuba diving, fishing, writing and of course, gardening!
Candidate Statement
I was appointed to Arden Hills City Council in 2011 and served on the newsletter and website committees. My two-year tenure was
spent learning the inner workings of the City, and I participated in the decision-making process of the extensive road work renovations
that we are still experiencing today. The development of the Twin Cities Army Ammunition Plant (TCAAP), now referred to as Rice
Creek Commons, has many moving parts that I have a working knowledge of and special interest in. With my extensive experience in
Stormwater Management and membership with Minnesota Renewable Energy Society, I will be able to readily contribute to develop-
ment processes with our ever changing climate and provide guidance to the Public Works Department. Ultimately I am hopeful to im-
prove the communication processes among the committees, especially Parks and Recreation, and will promote broader resident partici-
pation in the dealings of the City. With more young families choosing Arden Hills as home, I will bring 26 years of business experience
to promote modern-day conveniences that stem from economic development. I will provide leadership skills that bring our City and
adjacent communities closer together as we work together on the many projects that are at our doorstep!
6
In March of 2016, they won the United
States’ first world championship in Lon-
don. Then it was on to the Olympics in
Rio, where they rode at a record-breaking
pace and took the silver medal behind
Great Britain.
Relief at their strong finish after all the
hard work and preparation was perhaps the
high point for Kelly at the Olympics. She
also enjoyed the surreal feeling of standing
on the winners’ podium.
Kelly is now looking forward to college
life at the University of Minnesota and
her studies in math and Chinese. Her goal
is medical school and then a career in
pathology and oncology. She has plans for
Julie Hanson, who joined the City as
Deputy Clerk in 2015, was appointed to
the City Clerk position effective June 13,
2016.
Julie reports, “I am excited
to have been afforded the
opportunity to serve the
residential and business
communities of Arden
Hills in my new role as City Clerk. I look
forward to working closely with our resi-
dents, the City Council, and City boards
and commissions as I perform key job
responsibilities such as Council agenda
packet preparation, business licensing, pro-
viding support to other City departments,
and elections administration, to name just
a few.”
A motion to appoint Jolene Trauba as the
Deputy Clerk, effective July 11, 2016, was
approved by the City Council as well.
“I am thrilled to be promoted
to Deputy Clerk after work-
ing at the City of Arden Hills
for only six months,” Jolene
says. “I look forward to as-
sisting with agenda packets,
licensing of businesses, elections, Council
meetings and helping the Planning Depart-
ment.”
Hanson and Trauba appointed to City posts Hiring a tree maintenance service de-
serves careful consideration and cau-
tion. While City staff is not authorized to
recommend a specific contractor, residents
are urged to consider the following:
• Most reputable companies have all the
work they can handle without going
door-to-door. Many times, door-knockers
are looking to earn quick money.
• Do not be rushed to make a decision and
never pay in advance.
• Obtain multiple bids, compare estimates,
and always ask for references. You can
also contact the Better Business Bureau
to check the company’s reputation.
• Get a written contract that outlines
expectations such as dates, work to be
performed, clean-up details, and costs.
Hiring a tree service?
July 25, 2016
• Approved Municipal Consent of Reso-
lution 2016-025 approving layout of
I-35W MnPASS Project SP 6284-172
(4-1 McClung).
• Approved Planning Case 16-016 – for
Final PUD Phase 2 of Land O’ Lakes
based on the finding of facts and
submitted plans, and the 22 conditions
in the July 25, 2016, Report to the City
Council (5-0).
August 8, 2016
• Authorized Request for Proposals for
Engineering Services for the Bethel
Trail (5-0).
August 29, 2016
• Accepted a proposal from C.W. Houle
Inc. in the amount of $8,000 for the
addition of a catch basin at 1776 Venus
Avenue and a proposal from Quibzon
Outdoor in the amount of $1,475 to
grade an overflow swale (5-0).
• Accepted a proposal from Midwest
Asphalt Corporation for the bitumi-
nous mill and overlay in the amount of
$44,394 for Shorewood Drive (5-0).
Note: Other actions were approved. Com-
plete City Council minutes are available at
www.cityofardenhills.org
Benchmarks: A summary of City Council action
Want to know more about what’s hap-
pening in your City? Be sure to check
out www.cityofardenhills.org
Arden Hills’ Kelly Catlin is having a
whirlwind year. The Olympic track
cyclist won a team world championship
in March, medaled in Rio in August, and
started college in September.
Kelly, a triplet, grew up in Arden Hills and
graduated from Mounds View High School
in 2014. Her cycling career started on a
unicycle, as a member of the Twin Cities
Unicycle Club. Both she and her brother
rode for Roseville High School’s moun-
tain biking team. In 2014, she competed
in the Nature Valley Grand Prix and was
discovered by USA Cycling. That led to
her attending a track cycling camp at the
Olympic Training Center in Colorado and
making the women’s team. In 2015, the
team won silver in team pursuit.
another world championship event in two
years.
Clearly a risk-taker, she offers this advice:
“If you commit to something, it can take
you anywhere. You never know what will
happen.”
Arden Hills cyclist wins silver in Rio
Kelly Catlin (second from right) and her teammates
News and Notes from City Hall
7
by Susan Cathey
I
n
s
i
d
e
Arden Hills, MN . 55112-5734
Rice Creek Commons moves ahead
New dog park open at Perry Park
Election information
Arden Hills has an Olympic medal winner
ECR-WSS
PRST STD
U.S. Postage Paid
Twin Cites, MN
Permit #1962
Once lines are cleaned, Public Works
inspects the lines via a robotic camera. The
camera is about six inches in diameter by
two feet long and takes motion pictures
as it travels down the sanitary sewer line.
Public Works is looking for anything that
may need maintenance, including cracked
linings, roots intrusion, sags in the line, and
misaligned joints. Roots can be removed,
but some of the other items may require
digging up the sewer line in order to per-
form needed repairs.
Some of the sanitary sewer lines are old
and made of older materials, even clay
in some cases. These older lines are on
a maintenance schedule to be relined in
place. This process installs a liner without
having to dig up the road to reach the line.
Sanitary sewer lines flow downhill by
gravity and with our many hills there is
ample ability for the sewer to flow. The dif-
ficulty comes when the wastewater reaches
the bottom of the hill. The solution is a lift
station that pumps the water uphill so that
it can continue to flow down the next hill.
Arden Hills has 14 lift stations. Our lift
stations appear as concrete platforms with
electrical boxes on the platform. Most are
visible from City streets, but some are in
remote locations.
Postal Customer
People are familiar with City water
service. We purchase water from St.
Paul, put it in one of two City water
towers and deliver it to your home or busi-
ness via a pressurized waterline. The water
is available when you turn on the faucet,
the shower or flush the toilet. What you
may not be as familiar with is what hap-
pens to the wastewater when it leaves your
home or business and just what the City
does every day to make that happen.
The wastewater as it leaves your home
or business ends up in the City sanitary
sewer, what most of us would simply call
the sewer. This is not to be confused with
road runoff that drains into catch basins
which empty into what is called the storm
sewer, what most of us would simply call
the storm drain. The two are not physically
connected but they share similar names and
are both located in the street.
Sewer lines are located deep beneath the
manhole covers which are generally locat-
ed in the middle of the street. I sometimes
get asked what Public Works is doing with
the large truck parked in the middle of the
street. The large truck is called “The Jetter”
and it is the largest vehicle in the City fleet,
even making our snow plows look small.
The Jetter is used to wash the inside of the
sewer line. Our goal is to clean sanitary
sewer lines every three years.
If the lift station stops functioning for an
extended period of time, there is the pos-
sibility of wastewater backup, also known
as a sewer backup. One type of wastewa-
ter backup is when the lift station does
not pump wastewater over the next hill.
Eventually wastewater fills the line and the
pressure from uphill wastewater, can force
wastewater into homes at the bottom of
the hill. To ensure that our lift stations are
functioning properly, they are electroni-
cally monitored and an onsite inspection is
done daily. This is one of the reasons you
may see a City vehicle out on the week-
ends. The physical inspection ensures that
if something is wrong that the electronic
monitoring has not yet reported, Public
Works becomes aware and can take appro-
priate corrective action. In the event of a
power outage, the City has backup genera-
tors that can be deployed to lift stations.
Our sanitary sewer reaches an interceptor
that takes the wastewater to the Metropoli-
tan Wastewater Treatment Plant in St. Paul.
There several steps are taken to clean the
wastewater before it can eventually be re-
leased to public waters owned by the State.
The costs of cleaning, inspecting, repair-
ing, monitoring, lining, and operating the
sanitary sewer are included in utility bills.
Operating and maintaining the sanitary
sewer may not be as visible as other Public
Works functions, but it is an important City
Service.
Sincerely,
David Grant
Mayor
News from the Mayor’s office
The line down under...
What is it?
This gadget is a robotic camera. It crawls through the City’s
sanitary sewer lines. The images it sends help the City
monitor the condition of the utility.