HomeMy WebLinkAbout12-08-21 Planning CommissionAPPROVAL OF THE AGENDA
APPROVAL OF MINUTES
November 3, 2021 Planning Commission Regular Meeting
11 -03 -21 PC.PDF
PLANNING CASES
Planning Case 21 -028 - 1901 Lake Valentine Road - Planned Unit Development
Amendment (Public Hearing Required)
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
ATTACHMENT F.PDF
UNFINISHED AND NEW BUSINESS
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:
Paul Vijums
Commissioners:
Steven Jones
Subbaya
Subramanian
Jonathan Wicklund
Clayton
Zimmerman
Marcie Jefferys
Kurt Weber
Council Liaison:
Fran Holmes
Planning Commission
December 8, 2021
6:30 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting,
strong residential neighborhoods, vital business community, well -maintained
infrastructure, fiscal soundness, and our long -standing tradition as a desirable
City in which to live, work, and play.
This meeting will be streamed live on local Cable Channel 16 and available for playback on our website
Agenda
CALL TO ORDER
1.
2.
2.A.
Documents:
3.
3.A.
Documents:
4.
5.
5.A.
5.B.
6.
APPROVAL OF THE AGENDAAPPROVAL OF MINUTESNovember 3, 2021 Planning Commission Regular Meeting11-03 -21 PC.PDFPLANNING CASESPlanning Case 21 -028 - 1901 Lake Valentine Road - Planned Unit Development Amendment (Public Hearing Required)MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFATTACHMENT F.PDF
UNFINISHED AND NEW BUSINESS
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:Paul Vijums Commissioners:Steven JonesSubbaya SubramanianJonathan WicklundClayton ZimmermanMarcie JefferysKurt WeberCouncil Liaison:Fran Holmes Planning Commission December 8, 2021 6:30 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting,strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirableCity in which to live, work, and play.This meeting will be streamed live on local Cable Channel 16 and available for playback on our website AgendaCALL TO ORDER1.2.2.A.Documents:3.3.A.Documents:
4.
5.
5.A.
5.B.
6.
Approved: December 8, 2021
CITY OF ARDEN HILLS, MINNESOTA
PLANNING COMMISSION
WEDNESDAY, NOVEMBER 3, 2021
6:30 P.M. - ARDEN HILLS CITY HALL
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Chair Paul Vijums called to order the regular Planning
Commission meeting at 6:30 p.m.
ROLL CALL
Present were: Chair Paul Vijums, Commissioners Marcie Jefferys, Subbaya Subramanian, Kurtis
Weber, and Jonathan Wicklund.
Absent: Commissioners Steven Jones and Clayton Zimmerman.
Also present were: City Planner Jessica Jagoe and Councilmember Fran Holmes.
APPROVAL OF AGENDA – NOVEMBER 3, 2021
Chair Vijums moved, seconded by Commissioner Wicklund, to approve the November 3,
2021, agenda as presented. The motion carried unanimously (5-0).
APPROVAL OF MINUTES
October 6, 2021 – Planning Commission Regular Meeting
Commissioner Wicklund moved, seconded by Commissioner Weber, to approve the
October 6, 2021, Planning Commission Regular Meeting as presented. The motion carried
unanimously (5-0).
PLANNING CASES
A.Planning Case 21-025; 4200 Round Lake Road – Site Plan Review – Public Hearing
Not Required
City Planner Jagoe stated Scannell Properties was approved Resolution 2020-045 for a
Conditional Use Permit (CUP) subject to 35 conditions on October 12, 2020 that was part of a
Planned Unit Development (PUD) for the subject property in order to operate a warehouse use in
the facility to be constructed. The approximate 21 acre site is located south of the cul -de-sac on
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 2
Gateway Boulevard and north of Interstate 694 and east of 35W. The Subject Property had been
vacant since 2006 with wetlands located adjacent to Interstates (“35W and 694”). The site is
highly visible from 694 and 35W. Separate access points to the site are provided via Gateway
Boulevard for employee parking and deliveries. The site development will include office space,
warehousing, ground level unloading access with 38 dock doors located on the north side of the
building, and at-grade office parking lots located on the south side of the building. One of the
conditions from Resolution 2020-045 stated “Site Plan approval shall be required for the
construction of the proof of parking area”. The Applicant has a prospective tenant that will
occupy two-thirds of the building which also necessitates the need for construction of this future
parking area. Therefore, the Applicant is pursuing the Site Plan Review for expansion of the
parking area.
City Planner Jagoe reviewed the surrounding area, the Plan Evaluation and provided the
Findings of Fact for review:
1. The Applicant has submitted an application for Site Plan Review to construct additional
parking previously identified as “proof of parking” at the subject property 4200 Round
Lake Road.
2. The Subject Property is located with the Gateway Business (“GB”) District and is guided
as Light Industrial & Office on the 2040 Land Use Plan.
3. The Applicant operates under a Master Planned Unit Development and has been
approved for construction of a 250,000 square foot office and warehouse facility on the
Subject Property.
4. Flexibility through the PUD process was granted in the following areas: parking setbacks,
minimum caliper inches, and perennials and shrubberies.
5. The proposed plan does not conflict with the general purpose and intent of the Zoning
Code or the Comprehensive Development Plan for the City.
6. The application is not anticipated to create a negative impact on the immediate area or the
community as a whole.
7. The proposed plan will not produce any permanent noise, odors, vibration, smoke, dust,
air pollution, heat, liquid, or solid waste, and other nuisance characteristics.
8. The proposed plan is not anticipated to have any impact on traffic or parking conditions.
9. The accessory off-street parking would be in compliance with all provisions of the
Zoning Code.
10. A public hearing is not required for Site Plan Review.
City Planner Jagoe stated staff recommends approval of f Planning Case 21- 025 for Site Plan
Review at 4200 Round Lake Road, based on the findings of fact and the submitted plans, as
amended by the conditions in the November 3, 2021, Report to the Planning Commission:
1) All conditions of the original Conditional Use Permit and Planned Unit Development
shall remain in full force and effect.
2) That the project shall be completed in accordance with the plans submitted as amended
by the conditions of approval. Any significant changes to these plans, as determined by
the City Planner, shall require review and approval by the Planning Commission and City
Council.
3) The proposed parking area shall conform to all other regulations in the City Code.
4) A building permit shall be obtained for the proposed parking lot expansion.
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 3
5) Prior to the issuance of a land disturbance permit, engineering staff shall approve in
writing the final design of parking lot expansion and underground retention system.
6) All light poles, including base, shall be a maximum of 25 feet in height and shall be
shoebox style, downward directed, with high-pressure sodium lamps or LED and flush
lenses. Other than wash or architectural lighting, attached security lighting shall be
shoebox style, downward directed with flush lenses. If complaints are received the
lighting adjacent to residential uses shall utilize house shields as directed by the City. In
addition, any lighting under canopies (building entries) shall be recessed and use a flush
lens.
7) A right of way permit shall be required for work performed within the City right of way.
8) A grading as-built and utility as-built plan shall be provided to the City upon completion
of grading and utility work.
9) All fencing and retaining wall materials shall be complementary to the building materials
and shall be approved in writing by the Planning Division prior to issuance of a building
permit. Retaining walls greater than four (4) feet in height shall be engineered and
detailed calculations shall be submitted to the City.
10) A Grading and Erosion permit shall be obtained from the City’s Engineering Department
prior to commencing any grading, land disturbance or utility activities. The Developer
shall be responsible for obtaining any permits necessary from other agencies, including
but not limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT
prior to the start of any site activities.
11) The Applicant shall be responsible for protecting the proposed on-site storm sewer
infrastructure and components and any existing storm sewer from exposure to any and all
stormwater runoff, sediments and debris during all construction activities. Temporary
stormwater facilities shall be installed to protect the quality aspect of the proposed and
existing stormwater facilities prior to and during construction activities. Maintenance of
any and all temporary stormwater facilities shall be the responsibility of the Applicant.
12) Prior to the issuance of a land disturbance permit, the Applicant shall submit an amended
stormwater facilities operation and maintenance plan for the long-term care of all on-site
and off-site stormwater facilities to the City for review and approval. The Applicant will
be responsible to carry out these operation and maintenance activities and to submit the
appropriate documentation to the City as specified.
13) An amended Stormwater Facilities Operation and Maintenance Agreement shall be
presented to the City Engineer for review by the City Attorney and subject to City
Council approval. The Stormwater Facilities Operation and Maintenance Agreement shall
be fully executed prior to release of a land disturbance permit and building permit.
14) Prior to the issuance of a land disturbance permit, all items identified in the Engineering
Division memo shall be addressed. All comments shall be adopted herein by reference.
15) Prior to issuance of land disturbance permit, the Applicant shall be required to fully
execute the vacation and/or dedication of easement(s) as determined by the Public Works
Director/City Engineer prior to commencement of any site activities associated with the
expanded “proof of parking” area.
16) The Applicant shall be required to submit revised site plans prepared in accordance with
city code to the Zoning Department for approval prior to issuance of the building and/or
land disturbance permits. Site Plan Review does not include approval of setback
flexibility as shown.
City Planner Jagoe reviewed the options available to the Planning Commission on this matter:
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 4
1. Recommend Approval with Conditions
2. Recommend Approval as Submitted
3. Recommend Denial
4. Table
Chair Vijums opened the floor to Commissioner comments.
Commissioner Weber asked if the parking lot was adequately sized given the size of the
building.
City Planner Jagoe stated the parking lot will accommodate the entire capacity of the building.
She discussed the required number of stalls and noted the site would be properly parked.
Chair Vijums noted 362 parking spaces were required. He questioned why an additional 198
spaces were being added.
City Planner Jagoe explained the City’s calculation for parking was based on the floor area of
the building. She reported the developer has a tenant that is going to necessitate additional
parking.
Chair Vijums requested further comment from the applicant regarding the proposed parking.
Dan Salzer, Scannell Properties, explained the 362 stalls was to meet the building square footage
requirements for the City. He commented now that he has tenants, there was a need for more
parking. He discussed how he was working to meet the needs of his tenant.
Chair Vijums questioned if the change to working from home, or working virtually would create
a shift in the parking needs for this property.
Mr. Salzer indicated his tenant has looked into this but based on the tenants other location, the
proposed parking would remain as is.
Councilmember Holmes stated she was confused with why the tenant would require such a
large number of parking spaces given the fact the chart shows a large portion of the building
would be warehouse.
Mr. Salzer discussed how the building would be divided between office, warehouse and lab
space. He stated the additional 198 parking spaces were based on the tenants needs. He noted he
could provide staff with an updated chart for the building space breakdown prior to the City
Council meeting.
Chair Vijums questioned if the additional 198 parking spaces were needed given the fact this
would come at a great cost and disrupts a wetland.
Mr. Salzer explained the site would have 40,000 square feet of office. He reported the tenant
would be bringing a lot more employees to the building than was anticipated in the spec building.
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 5
He commented whether 10 or more parking spaces were built, the underground stormwater
system would still have to be built on this property.
Commissioner Subramanian asked how the parking would be shared.
Mr. Salzer stated the first tenant would have a pro-rata share of the parking spaces and the other
tenant would receive the pro-rate share plus the additional 100 spaces.
Commissioner Subramanian inquired if the proposed parking was based on the number of
people proposed to be coming into the building and not the office/lab square footage.
Mr. Salzer reported this was the case.
Commissioner Subramanian commented this was a difficult matter for the Commission to
consider because based on the size of the building, the proposed number of parking stalls was too
high.
Mr. Salzer indicated he was not proposing to impact any wetlands, rather he would be changing
the way the water is treated on the site within a manmade structure.
Commissioner Wicklund stated he may be interested in adding Condition 18 to read: The
developer to confirm tenant usage and office/industrial split so that it aligns with current Arden
Hills parking standards.
Chair Vijums supported this recommendation.
Further discussion ensued regarding the parking needs for the two tenants within this building.
Commissioner Jefferys requested further information regarding how traffic patterns would be
impacted with an additional 198 cars in this lot.
Mr. Salzer commented given the location of this building the traffic would come in and out the
same way. He stated he was asking for an additional access point.
Chair Vijums suggested Condition 18 read: The applicant to provide City staff with information
regarding additional employee numbers to confirm the need for 198 additional parking spaces.
Councilmember Holmes reviewed the language within City Code regarding parking
requirements.
Mr. Salzer indicated the code was written as a minimum which meant he did not have to exactly
hit this number. Rather, he was requesting to have more parking because his tenant would be
bringing in more jobs to the community.
Councilmember Holmes stated the City did not want too much parking on the site if it was not
needed. She supported the applicant providing the City with additional information on why so
many additional parking spaces were needed.
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 6
Chair Vijums commented based on the discussion if appears the chart needs to be updated and
the City needs proof for the additional parking spaces. He questioned if the Commission could
take action on this item with these matters unresolved, or should the Planning Case be tabled.
City Planner Jagoe stated she would leave this up to the Planning Commission. She noted
additional conditions could be added to the Planning Case if the item were to move forward to
the City Council for final approval.
Chair Vijums indicated he was comfortable moving the item forward with conditions.
Commissioner Weber stated if all of the additional spaces were not needed, then the infiltration
basin would not be needed which would change the plans for the site. However, he understood
the applicant has requested the parking based on the needs of their tenant.
Mr. Salzer indicated he was asking for something that fell within code. He stated once his chart
was updated, he would be meeting code, with a request for additional parking stalls given the
number of new jobs that would be brought into the community.
Commissioner Wicklund commented he believed the setbacks were adequate and noted he
could support adding an additional 198 parking spaces. He recommended a condition be added to
require the applicant to provide the City Council with additional information regarding the need
for the extra parking spaces.
Chair Vijums supported this recommendation.
City Planner Jagoe reported staff would look for the applicant to provide a breakdown of uses
within the building with the new tenants along with information as to why additional parking
spaces were necessary.
Commissioner Wicklund asked if there was a time constraint to make this decision tonight
versus in a month.
Mr. Salzer reported he would like to keep the project moving along because work on the
stormwater treatment basin would be done over the winter months.
Chair Vijums moved and Commissioner Wicklund seconded a motion to recommend
approval of Planning Case 21-025 for a Site Plan Review at 4200 Round Lake Road based
on the findings of fact and the submitted plans, as amended by the conditions in the
November 3, 2021, report to the Planning Commission, adding Condition 17 (The applicant
shall be required to verify the caliper inches of trees to be planted and in necessary submit
and updated landscaping plan reflective of the minimum caliper inches approved under the
PUD) and Condition 18 (The Applicant shall confirm tenant usage in conformance with the
Arden Hills parking standards and provide any explanation to exceed that standard). The
motion carried unanimously (5-0).
UNFINISHED AND NEW BUSINESS
None.
ARDEN HILLS PLANNING COMMISSION – November 3, 2021 7
REPORTS
A. Report from the City Council
Councilmember Holmes provided the Commission with an update from the City Council. She
noted on October 11th the Council considered the Aldi proposal and did not approve given the
high level of flexibility that was requested. She explained at the October 18th worksession the
Council discussed the Ridgewood Road project. She commented on October 25th the Council
recognized Jason Isaacson and Kelly Moeller for providing the City with State funding to assist
with the Lexington Avenue watermain project. She reported Jessica Jagoe was promoted to City
Planner and the City was now hiring for a Senior Planner. In addition, Grace Arel was hired as
the City’s new Communications Coordinator.
B. Planning Commission Comments and Requests
Commissioner Jefferys asked that the Commission receive background information on the
Comprehensive Plan at a future Planning Commission meeting.
ADJOURN
Chair Vijums moved, seconded by Commissioner Subramanian, to adjourn the November
3, 2021, Planning Commission Meeting at 7:36 p.m. The motion carried unanimously (5-0).
Page 1 of 6
PC AGENDA ITEM - 3C
MEMORANDUM
DATE: December 8, 2021
TO: Planning Commission Chair and Commissioners
FROM: Jane Kansier, AICP, Consulting Planner
Jessica Jagoe, City Planner
SUBJECT: Planning Case #21-028 – Public Hearing Required
Applicant: ISD #621: Mounds View Public Schools
Property Location: 1900 and 1901 Lake Valentine Road
Request: PUD Amendment
Requested Action
Mounds View Public Schools (“The Applicant”) the applicant is requesting an amendment to the
approved Planned Unit Development (PUD) Amendment for Mounds View High School. The
proposed amendment finalizes the road and safety improvements for Lake Valentine Road, and
identifies the final design of the parking lot located at 1901 Lake Valentine Road.
Background
1. Planned Unit Development
At their May 22, 2019 and subsequently amended on April 27, 2020, the City Council approved
Planning Case 18-014 for a Planned Unit Development with Mounds View Public Schools for
Mounds View High School. The approved PUD allowed for several additions to the existing
high school, a reconfiguration of the existing parking lot, and the use of the property at 1901
Lake Valentine Road, for parking and other school purposes. The amendment approved in April,
2020, added 14 additional conditions to the existing Planned Unit Development to address
existing traffic and pedestrian safety issues based on the findings contained within the traffic
study report, an evaluation of existing site conditions, and the Planned Unit Development
Agreement. The terms of the PUD approval require the School District to implement safety
improvements on Lake Valentine Road to address traffic and increased pedestrian crossings
between the school building and the north parking lot, including installation of turn lanes and
other access improvements, trail and sidewalk improvements, pedestrian signal, signage and
striping modifications, and drainage and utility improvements.
Page 2 of 6
The Applicant originally proposed two separate phases of traffic and pedestrian safety
improvements for Lake Valentine Road. Phase 1 safety improvements, installed in 2020, included
installation of a pedestrian traffic signal system, crosswalk markings, temporary painted center
median, curb ramps and sidewalk pedestrian routes to the front of the school.
The Phase 2 traffic and pedestrian safety improvements were scheduled for construction in 2021
in order to allow the School District to acquire additional property from the State of Minnesota.
This additional property would have allowed the relocation of the west entrance to the north
parking lot to align with the drop-off/pick-up lot on the south side of Lake Valentine Road.
Additional improvements include construction of a center median at the crosswalk, modifications
to the south boundary of the north parking lot, and the construction of dedicated right turn lanes
for westbound traffic accessing the east parking lot entrance and for the eastbound traffic accessing
the drop-off/pick-up lot. The Applicant worked with the State of Minnesota for nearly two years
on purchasing property, but has been unsuccessful in obtaining an easement or acquisition of land.
The State indicated they were at least another year out in considering the sale of this land. As a
result, the Applicant believes this option is no longer feasible and asked the City Council to
consider a revised alignment. The City Council reviewed this issue at their May 17, 2021,
workshop. The Council noted the use of the State property is preferred; however, they understand
there is no guarantee the school district will be able to purchase that land. Safety is the most
important factor. In August, 2021, the City Council approved an extension of the original Phase 2
construction to 2022.
2. Overview of Request
The proposed amendment consists of two elements. The first is the final design of the road
improvements to Lake Valentine Road. These improvements include a raised center median to
complement the mid-block crossing and pedestrian traffic signal. The project also aligns access
points and provides right turn lanes and left turn lanes. The second element is the final design of
the north parking lot. The revised layout accommodates the revised access points, as well as a new
surface, striping, parking lot islands and landscaping and lighting. The Applicant is requesting the
Planning Commission consider the proposed amendments.
Application Review
1. 1355.04 Procedural Requirements for Specific Applications
A public hearing for a PUD Amendment request is required before the request can be brought
before the City Council. The applicant or its representative shall be given the opportunity to appear
before the Planning Commission to answer questions or give explanations regarding the proposal.
Upon completion of the public hearing and its study and consideration of the application, the
Planning Commission shall submit its written report, containing its findings, conclusions, and
recommendations as to the application, to the City Council.
Under Section 1355.06 subd.4, an application for an amendment shall be administered in the same
manner as required for a new application. Any structural alteration, enlargement or intensification
change in site plan, or similar change not specially permitted, shall require City Council action and
all procedures shall apply as if a new application were being requested; provided, however, that
Page 3 of 6
when such changes are deemed to be insignificant by the Zoning Administrator, the requirements
of a public hearing may be waived.
2. Phase II Roadway Improvements
In the attached narrative (Attachment B), the Applicant describes the Phase II roadway
improvements. These improvements are intended to expand upon pedestrian signal work
completed in 2020 with a raised center median. This median will provide an additional level of
safety for pedestrians crossing Lake Valentine Road. The project also aligns the access points on
both the west side and the east side of the school site. A single intersection is proposed on the west
side of the site, providing access to both the school drop-off/pick-up on the south and to the parking
lot on the north. On the east, a single intersection provides access to the accessible parking lot on
the south and the parking lot on the north.
Right turn lanes are also provided at both the east and west access points to improve traffic
operations and to allow for any queuing needs to occur in a dedicated turn lane. Left turn lanes on
eastbound Lake Valentine Road are provided for access at both entrances to the north parking lot.
A left turn lane on westbound Lake Valentine Road is also provided for access into parent drop-
off area on the south side of the road. Overall, the proposed improvements are expected to improve
safety and mobility for pedestrians, Lake Valentine Road thru traffic, and traffic entering/exiting
the Mounds View High School Site. Attachment C is a color rendering of the proposed
improvements, while Attachment D includes the plans. These plans have been reviewed by the
City Engineer and consultants.
3. North Parking Lot Improvements
The north parking lot, at 1901 Lake Valentine Road, was originally the site of the First Student
bus garage. The Applicant is proposing to reconstruct the existing parking lot and stripe it for more
efficient car parking. The existing building on the site will be used for School District maintenance
equipment.
4. Zoning Code Review
A. Landscaping – Section 1325.05, Subd. 1
The Zoning Ordinance requires planting islands in parking lots to visually break up expanses
of hard-surface parking areas, to provide safe and efficient traffic movement, and to define
rows of parking. Planting islands must occupy at least ten (10) percent of the parking area, and
must be edged with concrete curbs. Parking lot planting islands are also required to be a
minimum of 150 square feet in area, be of appropriate width and length, and include at least
one tree meeting the requirements of this ordinance.
The approved PUD plan does not include any planting islands, and the City Council granted
flexibility to this provision. The proposed plan (Attachment E) includes some planting islands,
equaling approximately 6% of the parking area.
B. Drainage – Section 1325.05, Subd. 2
The drainage plan, approved as part of the original PUD. directs stormwater runoff to a large
stormwater pond located north of Lake Valentine Road, west of Janet Court, and east of the
Page 4 of 6
existing bus storage building. This pond has been constructed, and should be sized
appropriately to meet the drainage criteria. The parking lot grading plan must be approved
by the City Engineer and the Rice Creek Watershed District prior to any construction.
C. Lighting – Section 1325.05, Subd. 3
The plan proposes new lighting in the parking lot on the north side of Lake Valentine Road.
The Applicant submitted a photometric plan (Attachment F) that indicates the lighting does
not exceed 0.4 foot candles at the property boundary, which is consistent with ordinance
requirements.
D. Parking Requirements – Section 1325.06
The required parking for Mounds View High School is 622 spaces. Before construction of the
additions and use of the north lot, the school included 517 parking spaces. The approved PUD
plan included 500 parking spaces on the north lot, for a total of 710 parking spaces. The
reconfiguration of the lot to accommodate the new driveways and the landscape island reduces
the number of spaces on the north lot to 381 spaces, for a total of 591 parking spaces. Although
this number is less than the required 622, it exceeds the original number of spaces provided.
The additions to the school are not expected to generate additional parking demand on the
campus.
The Applicant may be able to provide additional parking spaces on the site if the landscape
islands are completely eliminated. The Planning Commission should comment on the tradeoff
between landscaping and parking spaces.
Additional Review
Public Works Director/City Engineer
City Engineering staff has reviewed and commented on the design team’s 60% plans. The team
will be making revisions from those comments and will bring back 90% plans for City staff to
review and comment. Before this project can move into construction the following permits are
anticipated to be required:
x Arden Hills Grading and Erosion Control
x Arden Hills Right-of-Way
x Rice Creek Watershed District Stormwater Management
x MnDOT Approval
Findings of Fact
The Planning Commission must make a finding as to whether or not the proposed application
would adversely affect the surrounding neighborhood or the community as a whole based on the
aforementioned factors. Staff offers the following findings for consideration:
1. The properties located at 1900 and 1901 Lake Valentine Road are located in the R-1 Single
Family Residential District.
2. The proposed conditions when implemented will create a safer environment for pedestrian
movement across Lake Valentine Road.
Page 5 of 6
3. The proposed roadway improvements will improve traffic flow through the road section
adjacent to the school.
4. With the applied conditions, the application is not anticipated to create a negative impact
on the immediate area or the community as a whole.
5. The traffic and pedestrian study was reviewed as part of the April 2020 Amended PUD
application by City and School District staff.
6. The City and School District staff concur on the proposed conditions and recommended
improvements.
Proposed Motion Language
Staff has provided the following options and motion language for this case.
1. Recommend Approval with Conditions: Motion to recommend approval of Planning Case 21-
028 for an Amended PUD at 1900 and 1901 Lake Valentine Road, based on the findings of
fact, as amended by the conditions in the August 4, 2021, Report to the Planning Commission:
a) The road construction and realignment as shown on the approved plans must be
completed prior to the start of the 2022-2023 school year.
b) All other conditions of the original Planned Unit Development and Amended
Planned Unit Development shall remain in full force and effect.
2. Recommend Approval without Conditions: Motion to recommend approval of Planning Case
21-028 for an Amended PUD at 1900 and 1901 Lake Valentine Road, based on the findings of
fact.
3. Recommend Denial: Motion to recommend denial of Planning Case 21-028 for an Amended
PUD at 1900 and 1901 Lake Valentine Road, based on the following findings of fact: findings
to deny should specifically reference the reasons for denial and why those reasons cannot be
mitigated.
4. Table: Motion to table Planning Case 21-028 for an Amended PUD at 1900 and 1901 Lake
Valentine Road for the following reasons: a specific reason and/or information request should
be included with a motion to table.
Public Notice and Comments
Notice was published in the Pioneer Press on November 26, 2021. Notice was prepared by the
City and mailed to property owners within 1,000 feet of the subject property.
Deadline for Agency Actions
The City of Arden Hills received the completed application for this request on December 1, 2021.
Pursuant to Minnesota State Statute, the City must act on this request by January 30, 2022 (60
days), unless the City provides the petitioner with written reasons for an additional 60-day review
period. With consent of the applicant, the City may extend the review period beyond the initial
120 days.
Page 6 of 6
Attachments
A. Location Map
B. Applicant’s Narrative
C. Road Realignment (Color Rendering)
D. Road Realignment Plans
E. North Parking Lot Plan and Landscape Plan (2 Sheets)
F. Photometric Plan
Location Map
Legend
Municipal Boundary
City Mask
May 17, 2021
Map Powered By DataLink
1 in = 752 ft
±
Attachment A
November 24, 2021
Jessica Jagoe
City of Arden Hills
1245 West Highway 96
Arden Hills, Minnesota 55112
Jane Kansier
Bolton & Menk, Inc.
12224 Nicollet Avenue
Burnsville, Minnesota 55337
Re: Independent School District #621
North Parking Lot at MVHS / Lake Valentine Road Improvements Project Narrative
Commission No. 212190 / 212191
Dear Jessica and Jane:
Wold Architects and Engineers, with Bolton and Menk, Inc., is currently working with
representatives from Independent School District #621 (ISD #621) and Mounds View High School
(MVHS), in the City of Arden Hills, to implement site improvements and associated roadway
improvements to Lake Valentine Road. The project is intended to improve site circulation, enhance
pedestrian safety, and expand existing parking facilities.
MVHS is located on the south side of Lake Valentine Road and the bus garage is located on the
north side. The bus garage property is being improved to accommodate student parking and
overflow event parking. Pedestrian and roadway improvements are being constructed to address
the expected increase in pedestrians crossing Lake Valentine Road.
Phase I of the project was constructed in 2020, as an interim improvement, that replaced the two
existing marked crosswalks on Lake Valentine Road, located at the school driveways with a new
centralized midblock crossing with a pedestrian traffic signal. A pedestrian traffic signal was
selected for MVHS because it achieves a high rate of compliance and also offers flexibility in
operations and timing if a desire exists to manage pedestrian and vehicle movements during peak
traffic periods. Phase II of the project will commence in 2022 and will construct site improvements
and the remaining roadway improvements to Lake Valentine Road.
Proposed Site Improvements:
ISD #621 purchased the existing bus garage during the summer of 2019. The site is to be
reconstructed to accommodate student parking and MVHS’s use of the existing garage.
Improvements include better circulation as well as beautification including the planting of
landscape islands. The current plans meet the ordinance requirements of minimum 10% green
space in the parking islands. This layout does not meet the required parking counts of 622 stalls that
were previously approved. An alternate plan will be submitted for consideration that will increase
parking counts but will not meet the 10% green space requirements. The alternate plan will follow
the same general layout and will reduce the size of the landscaped islands. Both options will
provide additional parking for the School and provide better pedestrian safety crossing Lake
Valentine Road.
$WWDFKPHQW%
Letter to Jessica Jagoe and Jane Kansier
Page 2
Proposed Phase II Roadway Improvements:
Phase II roadway improvements will expand upon work completed in 2020 to include a raised
center median to complement the mid-block crossing and pedestrian traffic signal. The addition of a
center median will provide an added level of safety for pedestrians crossing Lake Valentine Road
during all hours of the day. The project will also look to align access points on the west end of the
school site by to provide a singular intersection with the south leg accessing the school drop-
off/pick-up area and north leg accessing the improved parking lot. Right turn lanes will also be
provided at both the east and west access points to improve operations by removing slowing traffic
from Lake Valentine Road and allowing for any queuing needs to occur in a dedicated turn lane
rather than in the thru lane. Overall, the proposed improvements are expected to improve safety
and mobility for pedestrians, Lake Valentine Road thru traffic, and traffic entering/exiting the
Mounds View High School Site.
If there are any questions, regarding the project or the above narrative, please do not hesitate to
reach out to us. Thank you.
Sincerely,
Wold Architects and Engineers
Douglas Kahl | AIA
Associate
cc: Carole Nielsen, ISD #621
Dave Rey, BMI
Mike Tierney, BMI
Jacob Bongard, BMI
Derek Arens, BMI
Paul Aplikowski, Wold
LW/ISD_621/212190/crsp/nov21
DlKhl|AIA
Attachment C
Attachment D
C A T T A I L S5 FT. CHAIN LINKFENCE5 FT. CHAIN LINKFENCEWATERWATERT R E E ST R E E ST R E E ST R E E ST R E E ST R E E ST R E E S4 FT. WROUGHTIRON FENCEG R A S SG R A S SSHRUBSCONCB I T U M I N O U SB I T U M I N O U S34B I T U M I N O U SB I T U M I N O U SCONCCONCCONCGRASSG R A S SCONCGRASSGRASSB I T U M I N O U SKEYSTONEWALLCONCSTEPSCONCWALLCONCWALLSTNH=918.17B I T U M I N O U SW E T L A N D SND SWETLANDSWETLANDSWETLANDSWETLAND FLAGSWETLAND FLAGSWETLAND FLAGSTA 3000STA30092525PARKINGSTALLS)8122018371210202020444848181825236 PROPOSEDNORTH PARKING381 STALLSPAINTED ACCESSIBLE SYMBOL (TYPICAL)4" WIDE PAINT STRIPE @ 3" O.C. WITHWORDS "NO PARKING" (TYPICAL)4" WIDE PAINT STRIPE (TYPICAL)9' x 18' STALLS (TYPICAL)4" WIDE PAINT STRIPE@ 3" O.C. (TYPICAL)4" WIDE PAINT STRIPE (TYPICAL)9' x 18' STALLS (TYPICAL)4" WIDE PAINT STRIPE (TYPICAL)9' x 18' STALLS (TYPICAL)20.00'20.00'20.00'20.00'24.00'20.00'20.00'24.00'20.00'20.00'20.00'20.00'32.00'32.00'32.00'25.00'20.00'32.00'20.00'32.00'20.00'32.00'26.00'16.00'16.00'24.00'32.00'32.00'32.00'16.00'2' x 8' PAINTED CROSSWALKPANELS (TYPICAL)REFER TO "CONSTRUCTION PLAN FOR GRADING, CONCRETE & BITUMINOUSPAVEMENT, STORM SEWER, ADA IMPROVEMENTS" FOR LAKE VALENTINE ROAD WORKDateRegistration NumberCheck:Drawn:Date:Comm:I hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly Licensedunder the laws of the State ofCMNRevisionsDescription Date NumScale:NorthMVHS NORTHPARKING LOTREPLACEMENT1900 LAKE VALENTINE ROADARDEN HILLS, MINNESOTA 551124570 VICTORIA STREET NSHOREVIEW, MINNESOTA 55126ISD #621: MOUNDS VIEWPUBLIC SCHOOLSPROFESSIONAL ENGINEERMINNESOTANOT FOR CONSTRUCTIONCITY SUBMITTALC1.211" = 30'DARMET11/08/202121219040180xx/xx/xxDAVID A. REYPLANSITENOTES:1. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN, FOR GENERAL NOTES.2. CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT.3. SIGNAGE SHALL GENERALLY BE INSTALLED 18" BEHIND THE BACK OF CURB.4. ALL DISTURBED AREAS WHICH ARE NOT DESIGNATED TO BE PAVED SHALL RECEIVE AT LEAST6" OF TOPSOIL AND SHALL BE SODDED.5. WHERE NEW SOD MEETS EXISTING TURF, EXISTING TURF EDGE SHALL BE CUT TO ALLOW FORA CONSISTENT, UNIFORM STRAIGHT EDGE. JAGGED OR UNEVEN EDGES WILL NOT BEACCEPTABLE. REMOVE TOPSOIL AT JOINT BETWEEN EXISTING AND NEW AS REQUIRED TOALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING.6. FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE ANACCEPTABLE TURF, THE CONTRACTOR SHALL RE-SOD ALL APPLICABLE AREAS, AT NOADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER.LEGENDREFERENCE KEY TO SITE DETAILS DETAIL I.D NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM)PROPOSED CONCRETE WALKPROPOSED CONCRETE SLABPROPOSED BITUMINOUS PAVEMENTPROPOSED RETAINING WALLPROPOSED DECORATIVE METAL FENCINGPROPOSED TRAFFIC CONTROL SIGNPAINTED ACCESSIBLE SYMBOLPROPOSED CATCH BASIN (CB)PROPOSED FLARED END SECTION (FES)PROPERTY LINE1C2.11EXISTING PARKING COUNTS (680 TOTAL STALLS):NORTH PARKING = 158 CAR STALLSBUS / EAST PARKING = 446 CAR STALLSSOUTH PARKING = 68 STALLSWEST PARKING = 8 STALLSPROPOSED PARKING COUNTS (591 TOTAL CAR STALLS):NORTH PARKING = 381 STALLSBUS / EAST PARKING = 29 BUS STALLS, 174 CAR STALLSSOUTH PARKING = 14 STALLSWEST PARKING = 8 STALLSACCESSIBLE PARKING = 14 STALLSACCESSIBLE PARKING STALL REQUIREMENTS = 18 STALLSACCESSIBLE PARKING STALLS PROVIDED = 22 STALLSSITE STATISTICS:BUILDINGS: 27,101 SQ. FT.PARKING AND DRIVES: 149,927 SQ. FT.WALKWAYS: 5,688 SQ. FT.IMPERVIOUS SURFACE BREAKDOWN: $WWDFKPHQW(
C A T T A I L S5 FT. CHAIN LINKFENCE5 FT. CHAIN LINKFENCEWATERWATERT R E E ST R E E ST R E E ST R E E ST R E E ST R E E ST R E E S4 FT. WROUGHTIRON FENCEG R A S SG R A S SSHRUBSCONCB I T U M I N O U SB I T U M I N O U S34B I T U M I N O U SB I T U M I N O U SCONCCONCCONCGRASSG R A S SCONCGRASSGRASSB I T U M I N O U SKEYSTONEWALLCONCSTEPSCONCWALLCONCWALLSTNH=918.17B I T U M I N O U SW E T L A N D SND SWETLANDSWETLANDSWETLANDSWETLAND FLAGSWETLAND FLAGSWETLAND FLAGSTA 3000STA30092525DEAD TREEDEAD TREEDEAD TREEDEAD TREE2"ELM18"COT12"ELM12"OAK5"POP6"OAK5"POP7"OAK8"TR2"CRAB6"POP5"OAK6"TR2"TR8"TR3-2"OAK2"TR7"TR4"TR3"POP5"POP5"POP2"ELM8"SPR3"POP2"POP3"TR2"POP4"TR6"POP6"POP2"POP10"BOX7"ASH2"OAK6"TR2-6"POP2-6"POP2-3"POP4"ASH6"ASH6"ELM6"ASH6"POP4"OAK11"SPR3"ELM3-4"BOX30"OAK9"BOX15"ASH7"POP3-5"BOX6"TR4"ASH2"ELM10"SPR7-3"TR10"ASH3"TR6-25"COT2-2"MPL2-2"MPL8"ELM8"ELM6"ELM20"ELM1"ELM4"ELM11"POP2"ELM8"POP8"ELM2-12"OAK15"WIL6"BOX3"BOX6"ELM2.11"OAK4"BOX10"POP12"POP12"POP2.3"POP11"POP11"POP6"OAK3"ELM2.3"BOX8"POP2"ELM3"POP2"ELM5"ELM2"ELM5"ELM3-18"POP3"ELM2"ELM 2"ELM2-2"ELM3"ELM5"ELM3"ELM4"ELM14"ELM2-16"ELM2.3"BOX4"BOX13"POP2.3"BOX5"ELM3.3"BOX8"BOX7"OAK7"ASH6"ELM2"ELM7"POP6"POP4"ELM5"ELM5"POP6"POP6"POP7"OAK6"ELM5"POP7"POP2"ELM5"BOX5"BOX7"POP7"POP7"POP7"POP3"BOX3"BOX5"POP7"POP4"POP2-4"POP5"BOX2"ELM7"ELM4"ELM3"ELM3-16"WIL2-6"ELM4"ELM4"ELM4"ELM5"ELM3"ELM2"ELM9"ELM3"ELM2-4"ELM14"ELM3-4"ELM3"ELM2-3"ELM3"ELM2"ELM4"ELM3"ELM3"ELM8"ASH4"ELM2"ELM2-3"ELM2"ELM4"ELM1"ELM7-12"ELM3"ELM8"ASH2"ELM4"ELM2"ELM5"ELM2"ELM12"ELM6"ELM2"ELM2"ELM6"ELM2"ELM2"ELM6"ELM6"ELM2"ELM3"ELM4"ELM3"ELM2-3"ELM2-3"ELM2"ELM4"ELM2"ELM7-2"TR2"ELM3"ELM2"ELM2"ELM5-16"ELM2"ELM4"ELM3"ELM2"ELM3"ELM16"ELM2"ELM2"ELM3"ELM3"ELM5"ELM9"TR5"ELM5"ELM5"ELM2"ELM3"ELM5"ELM7"ELM2"ELM7"ELM3-4"ELM5"ELM8"ELM8"ELM6"ELM3"ELM5"ELM3"ELM3"BOX8"ELM2-10"ELM8"ELM16"ELM2-8"ELM2-8"ELM8"ELM3"ELM2-7"ELM2-7"BOX12"ELM6"BOX8"ELM13"ELM21"ELM2-15"ELM14"ELM4"ELM9"ELM2-3"ELM9"ELM6"ELM3"ELM6"ELM16"ELM21"ELM5"ELM7"ELM2-4"ELM6"ELM8"ELM6"ELM8"ELM8"BOX5"ELM8"ELM8"ELM8"ELM4"ELM7"ELM2-7"ELM6"ELM9"ELM6"ELM6"ELM9"ELM4"ASH2-6"ELM12"ELM2-5"ELM14"ELM12"ASH9"BOX12"ELM2"ELM3"ELM2-4"ELM6"ELM3"CED3"SPR6"ELM8"ASHPARKINGSTALLS)913911911912913914915903903903
903903904904904904904905906
907907903903904905905906906907907907907908908908908908908908908909909909909
909909909909909
910
910910911911911912912912913913913914914915915 PROPOSEDNORTH PARKING381 STALLS>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>REFER TO "CONSTRUCTION PLAN FOR GRADING, CONCRETE & BITUMINOUSPAVEMENT, STORM SEWER, ADA IMPROVEMENTS" FOR LAKE VALENTINE ROAD WORK3AN3QA4CO2QA3GS3AN2CO5GS2GSDateRegistration NumberCheck:Drawn:Date:Comm:I hereby certify that this plan, specification or report was prepared byme or under my direct supervision and that I am a duly Licensedunder the laws of the State ofCMNRevisionsDescription Date NumScale:NorthMVHS NORTHPARKING LOTREPLACEMENT1900 LAKE VALENTINE ROADARDEN HILLS, MINNESOTA 551124570 VICTORIA STREET NSHOREVIEW, MINNESOTA 55126ISD #621: MOUNDS VIEWPUBLIC SCHOOLSLANDSCAPE ARCHITECTMINNESOTANOT FOR CONSTRUCTIONCITY SUBMITTALL1.111" = 30'DCRDCR11/08/202121219056877xx/xx/xxDANIEL C. REBOKPLANLANDSCAPINGNOTES:1. REFER TO SHEET C1.31, GRADING AND DRAINAGE PLAN, FOR GENERAL NOTES.2. REFER TO SWPPP NARRATIVE FOR CONSTRUCTION SEQUENCING AND EROSION CONTROLREQUIREMENTS.3. LANDSCAPE ARCHITECT MUST INSPECT AND APPROVE FINISH GRADING BEFORECONTRACTOR PROCEEDS WITH SODDING OR SEEDING.4. ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD WHICH ARE NOT DESIGNATED TO BEPAVED SHALL RECEIVE AT LEAST 6" OF TOPSOIL AND SHALL BE SODDED.6. FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE ANACCEPTABLE TURF, THE CONTRACTOR SHALL RE-SOD ALL APPLICABLE AREAS, AT NOADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER.7. BEGIN TURF ESTABLISHMENT IMMEDIATELY AFTER SODDING OR SEEDING, REFER TOSPECIFICATION FOR PROCEDURE.8. ALL TREES TO BE BALLED AND BURLAPPED.9. ALL TREES SHALL RECEIVE 4" DEPTH OF CLEAN SHREDDED HARDWOOD MULCH, UNLESSOTHERWISE SPECIFIED.10. ALL PLANT MATERIALS SHALL BE NO. 1 QUALITY, NURSERY GROWN AND SPECIMENS MUST BEMATCHED. ALL OVERSTORY TREES ADJACENT TO DRIVE AND IN PARKING LOT SHALL BEGINBRANCHING NO LOWER THAN 6'.LEGENDSODPROPOSED SEED MIX #1PROPERTY LINEDECIDUOUS TREESCODEBOTANICAL NAME COMMON NAMESIZECONTAINERQTYAN NORTHWOOD MAPLE Acer Rubrum 'Northwood' 3" CAL. B&B 6QA WHITE OAK Quercus Alba 3" CAL. B&B 5GS SKYLINE HONEY LOCUST Gledista triacanthos 'Skyline' 3" CAL. B&B 10CO COMMON HACKBERY Celtis Occidentalis 3" CAL. B&B 61'-0"MIN1'-0"MIN2.5 X BALL DIA. MIN.DECIDUOUS TREESET TREE WITH ROOT COLLAR ATFINISH GRADE - ADJUST TREE ASREQUIRED SO THAT ROOT COLLARSTANDS LEVEL TO OR SLIGHTLYABOVE FINISHED GRADESHREDDED HARDWOOD MULCH(4" MIN DEPTH)PLANTING SOIL (MIN. DIMENSIONSHOWN)SOIL SAUCER: USED PREPAREDSOIL (4" MIN.)ROPES AT TOP OF BALL SHALL BECUT. REMOVE TOP 1/3 OF BURLAP.NON-BIODEGRADABLE MATERIALSHALL BE TOTALLY REMOVED.PREPARED SUBSOIL TO FORMPEDESTAL TO PREVENT SETTLING.PLANT_SCHEDULE
09+63$5.,1*/27/,*+7,1*'HVLJQHU'DWH6FDOH1RWWR6FDOH'UDZLQJ1R6XPPDU\RI$$$$$$$$$$$$$$$$$$$$$$$$$$3ODQ9LHZ6FDOH IW6FKHGXOH6\PERO /DEHO ,PDJH 4XDQWLW\ 0DQXIDFWXUHU 'HVFULSWLRQ1XPEHU/DPSV/XPHQV3HU/DPS/LJKW/RVV)DFWRU:DWWDJH$$ /LWKRQLD/LJKWLQJ 56;$UHD)L[WXUH6L]H3/XPHQ3DFNDJH.&&77\SH5'LVWULEXWLRQ $$ /LWKRQLD/LJKWLQJ 56;$UHD)L[WXUH6L]H3/XPHQ3DFNDJH.&&77\SH5'LVWULEXWLRQ $$ /LWKRQLD/LJKWLQJ 56;$UHD)L[WXUH6L]H3/XPHQ3DFNDJH.&&77\SH5'LVWULEXWLRQ
Attachment F