Loading...
HomeMy WebLinkAbout03-21-22-SRAPPROVAL OF AGENDA CONSENT CALENDAR Those items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda. Motion To Approve Resolution 2022 -015 Recommending The City Of Coon Rapids Award The 2022 Street Maintenance Program David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF Motion To Approve Resolution 2022 -016 Accepting Bid And Authorizing Award Of Contract To Bituminous Roadways, Inc. –City Hall Parking Lot Improvements Project David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF Motion To Approve PSA Amendment –HR Green –City Hall Parking Lot Improvements Project David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF PULLED CONSENT ITEMS Those items that are pulled from the Consent Calendar will be removed from the general order of business and considered separately in its normal sequence on the agenda. UNFINISHED BUSINESS Resolution 2022 -013 Declaring Costs To Be Assessed, Order The Preparation Of Proposed Assessments And Calling For A Public Hearing –Arden Oaks Street Improvements Project David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor: David Grant Councilmembers: Brenda Holden Fran Holmes Steve Scott David Radziej Special City Council Agenda March 21, 2022 Immediately following Work Session *This meeting is remote. See below for Zoom details. Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651 -792 -7800 Website : www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. THIS MEETING CAN BE ACCESSED REMOTELY BY JOINING VIA ZOOM To join the Zoom Meeting via your computer, click this link (or copy and paste it into a new browser): https://us02web.zoom.us/j/86245020218 CALL TO ORDER 1. 2. 2.A. Documents: 2.B. Documents: 2.C. Documents: 3. 4. 4.A. Documents: 5. APPROVAL OF AGENDACONSENT CALENDARThose items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda.Motion To Approve Resolution 2022 -015 Recommending The City Of Coon Rapids Award The 2022 Street Maintenance ProgramDavid Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF Motion To Approve Resolution 2022 -016 Accepting Bid And Authorizing Award Of Contract To Bituminous Roadways, Inc. –City Hall Parking Lot Improvements Project David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF Motion To Approve PSA Amendment –HR Green –City Hall Parking Lot Improvements Project David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF PULLED CONSENT ITEMS Those items that are pulled from the Consent Calendar will be removed from the general order of business and considered separately in its normal sequence on the agenda. UNFINISHED BUSINESS Resolution 2022 -013 Declaring Costs To Be Assessed, Order The Preparation Of Proposed Assessments And Calling For A Public Hearing –Arden Oaks Street Improvements Project David Swearingen, Public Works Director/City Engineer MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor:David GrantCouncilmembers:Brenda HoldenFran HolmesSteve ScottDavid Radziej Special City Council Agenda March 21, 2022 Immediately following Work Session *This meeting is remote. See below for Zoom details.Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.THIS MEETING CAN BE ACCESSED REMOTELY BY JOINING VIA ZOOMTo join the Zoom Meeting via your computer, click this link (or copy and paste it into a new browser):https://us02web.zoom.us/j/86245020218CALL TO ORDER1.2.2.A.Documents: 2.B. Documents: 2.C. Documents: 3. 4. 4.A. Documents: 5. Page 1 of 2 CONSENT ITEM – 2A MEMORANDUM DATE: March 21, 2022 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: David Swearingen, Public Works Director/City Engineer SUBJECT: 2022 Street Maintenance Program Budgeted Amount: Actual Amount: Funding Source: $220,000 $ TBD Street Maintenance Fund Council Should Consider Motions to approve, table, or deny the following: • Resolution 2022-015, recommending that the City of Coon Rapids Award a Contract for the 2022 Street Maintenance Program. All items need a simple majority for action unless otherwise noted. Background/Discussion In 2005, a Joint Powers Agreement (JPA) for Traffic Markings, Street Sweeping, Crack Sealing, Screening, and Seal Coating was executed by the cities of Coon Rapids, Andover, Brooklyn Center, Columbia Heights, and Fridley. Since 2005, six additional cities have joined the joint powers agreement (Ham Lake, East Bethel, Anoka, Mahtomedi, Circle Pines and Mounds View). On December 11, 2017, the City Council authorized an amendment to the JPA to include the City of Arden Hills. The City of Coon Rapids solicited bids in February 2022 for sealcoating, pavement markings, crack sealing and fog sealing on behalf of the member cities. Bids were opened on March 11, 2022, and summarized in the bid tabulation provided in Attachment A. Page 2 of 2 The program costs for Arden Hills is summarized on Attachment B based on estimated quantities provided to the City of Coon Rapids in January 2022. A map depicting the locations of proposed work in Arden Hills for 2022 is provided in Attachment C. Using the actual bid unit prices, this cost exceeds the budgeted amount for the project so staff revised the plan as can be seen in Attachment D & E. The primary revision was to remove the Chatham neighborhood from this year’s plan and shift it to 2023. Staff has reviewed the bid prices and recommends that the City proceed with the work. Under the terms of the Joint Powers Agreement, the City is required to provide a letter of concurrence to Coon Rapids if the City intends to participate in the program this year. A resolution recommending award of the contract is provided as Attachment F. Council will need to determine which plan to move forward with. Budget Impact The 2022 Operating Budget includes funding in the amount of $220,000 for the proposed work under the 2022 Street Maintenance Program and other annual costs related to resurfacing streets. Attachment B includes the total estimated contract cost in the amount of $253,475.37 Attachment D includes the total estimated contract cost in the amount of $211,905.27 Additional costs to consider is the large area patching that will be done by our Public Works Maintenance Workers. Costs include bituminous material, tack oil material, milling operations and other equipment rentals. Staff is currently inspecting and estimating quantities to determine project costs for these operations. Attachments Attachment A: Bid Tabulation Attachment B: Initial Proposed Arden Hills Program Costs Attachment C: Initial Proposed Map Attachment D: Revised Arden Hills Program Costs Attachment E: Revised Map Attachment F: Resolution 2022-015 CITY OF COON RAPIDS - BID TABULATION 2022 STREET MAINTENANCE PROGRAM - PROJECT 22-5 SEALCOATING, PAVEMENT MARKINGS, BID OPENING: MARCH 11, 2022, 10:00 A.M. UNIT UNIT UNIT UNIT UNIT UNIT NO.DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL BID SCHEDULE NO. 1 - SEAL COAT 1 AGGREGATE DRESSER TRAP ROCK (BASE BID) F&I FA-2 AGGREGATE SY 108,650 1.17 127,120.50 1.16 126,034.00 0.00 0.00 0.74 80,401.00 0.00 0.00 F&I FA-1 1/8"SY 345,702 1.24 428,670.48 1.16 401,014.32 0.00 0.00 0.77 266,190.54 0.00 0.00 TOTAL DRESSER TRAP ROCK 454,352 555,790.98 527,048.32 0.00 346,591.54 GRANITE (ALTERNATE) F&I FA-2 AGGREGATE SY 108,650 1.11 120,601.50 1.14 123,861.00 0.00 0.00 0.74 80,401.00 0.00 0.00 F&I FA-1 1/8"SY 345,702 1.24 428,670.48 1.16 401,014.32 0.00 0.00 0.77 266,190.54 0.00 0.00 TOTAL GRANITE 454,352 549,271.98 524,875.32 0.00 346,591.54 2 SEAL COAT OIL F&I CRS-2 SEAL COAT OIL GAL 5,950 1.50 8,925.00 2.63 15,648.50 0.00 0.00 2.65 15,767.50 0.00 0.00 F&I CRS-2P (POLYMER MOD)GAL 129,079 1.60 206,526.40 2.98 384,655.42 0.00 0.00 2.79 360,130.41 0.00 0.00 TOTAL SEAL COAT OIL 135,029 215,451.40 400,303.92 0.00 375,897.91 TOTAL BID SCHEDULE NO. 1 (BASE BID)771,242.38 927,352.24 N/A 722,489.45 N/A N/A TOTAL BID SCHEDULE NO. 1 (ALTERNATE)764,723.38 925,179.24 N/A 722,489.45 N/A N/A BID SCHEDULE NO. 2 - PAVEMENT MARKINGS 1 F&I STREET MARKINGS GAL 5,433 0.00 0.00 0.00 0.00 0.00 28.16 152,993.28 30.00 162,990.00 2 F&I STREET SYMBOLS GAL 612 0.00 0.00 0.00 0.00 0.00 125.00 76,500.00 103.00 63,036.00 TOTAL BID SCHEDULE NO. 2 N/A N/A N/A N/A 229,493.28 226,026.00 BID SCHEDULE NO. 3 - CRACK SEALING 1 F&I STREET ROUT & SEAL CRACK SEALING LF 209,039 0.53 110,790.67 1.20 250,846.80 0.99 206,948.61 0.68 142,146.52 0.00 0.00 2 F&I STREET BLOW & GO CRACK SEALING LF 618,472 0.46 284,497.12 0.95 587,548.40 0.93 575,178.96 0.64 395,822.08 0.00 0.00 3 F&I TRAIL ROUT & SEAL CRACK SEALING LF 0 0.00 0.00 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4 F&I TRAIL BLOW & GO CRACK SEALING LF 3,600 0.46 1,656.00 2.00 7,200.00 1.25 4,500.00 0.64 2,304.00 0.00 0.00 TOTAL BID SCHEDULE NO. 3 396,943.79 845,595.20 786,627.57 540,272.60 N/A N/A BID SCHEDULE NO. 4 - FOG SEALING - STREETS 1 F&I STREET FOG SEALING GAL 29,220 7.66 223,825.20 8.50 248,370.00 0.00 0.00 5.00 146,100.00 0.00 0.00 TOTAL BID SCHEDULE NO. 4 223,825.20 248,370.00 N/A 146,100.00 N/A N/A BID SCHEDULE NO. 5 - FOG SEALING - TRAILS & PARKING LOTS 1 F&I TRAIL FOG SEALING GAL 16,570 4.29 71,085.30 9.00 149,130.00 0.00 0.00 4.09 67,771.30 0.00 0.00 2 F&I PARKING LOT FOG SEALING GAL 2,720 4.29 11,668.80 9.00 24,480.00 0.00 0.00 4.09 11,124.80 0.00 0.00 TOTAL BID SCHEDULE NO. 5 82,754.10 173,610.00 N/A 78,896.10 N/A N/A SUMMARY OF BIDS TOTAL SEALCOATING (BASE BID)771,242.38 927,352.24 N/A 722,489.45 N/A N/A TOTAL SEALCOATING (ALTERNATE)764,723.38 925,179.24 N/A 722,489.45 N/A N/A TOTAL PAVEMENT MARKINGS N/A N/A N/A N/A 229,493.28 226,026.00 TOTAL CRACK SEALING 396,943.79 845,595.20 786,627.57 540,272.60 N/A N/A TOTAL FOG SEALING - STREETS 223,825.20 248,370.00 N/A 146,100.00 N/A N/A TOTAL FOG SEALING - TRAILS & PARKING LOTS 82,754.10 173,610.00 N/A 78,896.10 CRACK SEALING AND FOG SEALING ALLIED BLACKTOP COMPANY WARNING LITESASPHALT SURFACE TECHNOLOGIES CORP.FAHRNER ASPHALT SEALERS LLC PEARSON BROS INC.SIR LINES-A-LOT (Initial proposed) DESCRIPTION BUD UNIT  PRICE QUANTITY UNITS  TOTAL COST  AGG - F&I FA - 1 1/8" (1)$0.77 131,605    SY 101,335.76$    OIL - F&I CRS-2P (POLYMER MOD) (1)$2.79 36,849      GAL 102,809.74$    CRACK SEAL - F&I STREET R&S (2)$0.53 26,644      LF 14,121.50$      CRACK SEAL - F&I TRAIL B&G (2)$0.46 3,595        LF 1,653.55$        F&I STREET FOG SEAL CUL-DE-SAC (1)$5.00 2,238        GAL 11,190.00$      F&I TRAIL FOG SEAL (1)$4.09 2,754        GAL 11,264.77$      F&I STREET MARKINGS (3)$30.00 8                GAL 240.00$            F&I STREET SYMBOLS (3)$103.00 8                GAL 860.05$            Additional Items Contingency for Quantities 10,000.00$      TOTAL ESTIMATED PROJECT COSTS 253,475.37$    (1) Person Bros Inc. (2) Allied Blacktop Company (3) Warning Lites BID SUMMARY 2022 STREET MAINTENANCE PROGRAM CITY OF ARDEN HILLS ATTACHMENT B Tony SchmidtRegional Park Crepeau NaturePreserve HazelnutPark IngersonPark FreewayPark Tony SchmidtRegional Park SampsonPark Lindey's Park CharlesPerry Park Tony SchmidtRegional Park ValentinePark FloralPark Royal HillsPark CummingsPark Arden ManorPark JohannaMarsh Arden OaksPark CommunityGardens Lake Josephine Lake Johanna ValentineLake RoundLake Karth LakeSun FishLake STOWE AVE LAKE VALENTINE RD RE D FOX RD GREY FOX RD INGERSON RDROUND LAKE RD WA M B L E D R SIEMS CTSNELLING AVE NCOL LE EN AVE GLEN PAUL AVE TILL ER LN HAMLINEVENUS AVE T H O M D R ARDE N V IEW DR GLENARDEN RDCHATHAM AVEAM BL E RD NOBL E RD GRAMSIE RD ARDEN PL GRANT RD OAK AVE EDGEWATER AVE JERROLD AVE DUNLAP ST NHARRIET AVE FLORAL DR W G LE NV IEW AVE KARTH LAKE DR GATEWAY BLVD W YNCRESTCARLTON DRFOREST LNPRIOR AVE NCUMMING S PARK DR ROYAL LN KAT IE LN PINE TREE DRFAIRVIEW AVE NRIDGEWOOD RDCR Y S TAL A V E PLEASANT DRA R D E N O A K S DR V A LE N T IN E A V E BENTON WAYINDIAN OAKS TRL SKILESLNBRIAR BECKMAN AVE LA M E TTI LN M C C R A CK EN LNKEITHSON DRASBURY AVE NNURSERY HILL LN BUSSARD CT DAW N CIR W JAMES AVEJANET CT CANNONGLENHILL RDNORMA AVEARDENVIEWCTR O Y KATIE CT G L ENARDENCTRIDGEWOOD CTKARTH LAKE CI RGALE CIRMC CLUNG DR WY N C R E S T L N SA N DEEN RD PARKSHORE DR EIDE CIR NORTH-WOODS DRNURSERY HILL CT CU M MIN GS LN V A L E N T I N E C T INGERSON CT C O L L E E N C T GLENVIEW CT HUNTERS CT SHORELINELNPASCAL AVE NLAKE LN NCONNELLY AVE T H O M C T AMBLE CIRCHATHAM CTCOLLEEN CIRROLLING HILLS RDARDEN OAKS CTNORMA CIRI N D I A N P L EDGEWAT ER AVENORMAAVE TILLER LNSNELLING AVE NDUNLAP ST NARDENPLSKILES LNFAIRVIEW AVE NHAMLINE AVE NG L E N H I L L R D WYNRIDGE PLEASANT CIR ARDEN INDIAN OAKS CT JAMES CIRDELLVIEW AVEDELLVIEW AVEDELLWOOD STGATEWAY CT VAL ENTINE CREST RD BRUEBERR Y LN BRIARKNOLL CIR DELLWOOD AVELAMETTI CIRWALDEN PLWEDGEWOODCIR INDIAN OAKS CIR CHATHAM CIR L A K E JO H ANNABLVDLAKE JOHANNA BLVDRIDGEEDGEWATER AVEFAIRVIEW AVE NFERNWOOD STSNELLING AVE NSHORELINELNK A TIE LN COUNTY ROAD D W SHOREWOODDR LAKE LN COUNTY ROAD E W LAKEJOHAN N A B LVD GLEN PAUL AVECLEVELAND AVE NN E W B R I G H T ON R DNEW BRIGHTON RDHUDSON RDTHOM DRCLEVELAND AVE NBRIGHTON WAYNEW BRIGHTON RDINTERSTATE 35WCOUNTY ROAD E2 W C O U N T Y R O A D E 2 WLAKEVIEWCT C H A TH A M A V E SIEMS CTARDEN PL GLE N ARDENRDOLD SNELLI NGARDEN OAKS DRSNELLING AVE NBETHEL DROLD HIGHWAY 10OLD SNELLINGVENUS AVEINTERSTATE 35WLAKE VALENTINE RDINTERSTATE 35WROUNDLAKERDWO LD HIG H W AY 10 LAKESHORE PL INTERSTATE 694 INTERSTATE 694 HIG H W AY 10 COUNTY ROAD 96 W COUNTY ROAD 96 WTODD DR (Private)TODD DR (Private) PRIORAV E N ( P ri vate)LISA LN (Private)LEXINGTON AVE NKNOLL DR VISTA CTDAW N CIR E COLLEEN A V E ARDENVI EW DR COUNTY ROAD F W INNOVATION WAY (Private)FERNWOOD STPLEASANT DR AMBLE DR COUNTY ROAD 96 W LEXINGTON AVE NLEXINGTON AVE NDRCT BOSTON SCIENTIFIC DR (Private) B E T H E L D R BETHEL DR COUNTY ROAD E W LEXINGTON AVE NBENTON WAYAVE INGERSON RD AVE NWOOD RDCOUNTY ROAD E HAMLINE AVE NHAMLINE AVE NPrivateKATIE LNKEITHSON DR AL HILLS DR2022 Street Maintenance 0 1,000Feet Ü Document Path: P:\PR&PW\Numbered Projects\PW-22-0101 Street Maintenance 2022\02 design\Street Maintenance - 2022.mxdCrack Seal Se al Coat Fog Seal Cul-de-sac Fog and Crack Seal Path Pa rking Lot Seal Coat (Revised proposed) DESCRIPTION BUD UNIT  PRICE QUANTITY UNITS  TOTAL COST  AGG - F&I FA - 1 1/8" (1)$0.77 108,045    SY 83,194.65$      OIL - F&I CRS-2P (POLYMER MOD) (1)$2.79 30,253      GAL 84,404.75$      CRACK SEAL - F&I STREET R&S (2)$0.53 21,844      LF 11,577.50$      CRACK SEAL - F&I TRAIL B&G (2)$0.46 3,595        LF 1,653.55$        F&I STREET FOG SEAL CUL-DE-SAC (1)$5.00 1,742        GAL 8,710.00$        F&I TRAIL FOG SEAL (1)$4.09 2,754        GAL 11,264.77$      F&I STREET MARKINGS (3)$30.00 8                GAL 240.00$            F&I STREET SYMBOLS (3)$103.00 8                GAL 860.05$            Additional Items Contingency for Quantities 10,000.00$      TOTAL ESTIMATED PROJECT COSTS 211,905.27$    (1) Person Bros Inc. (2) Allied Blacktop Company (3) Warning Lites BID SUMMARY 2022 STREET MAINTENANCE PROGRAM CITY OF ARDEN HILLS ATTACHMENT D Tony SchmidtRegional Park Crepeau NaturePreserve HazelnutPark IngersonPark FreewayPark Tony SchmidtRegional Park SampsonPark Lindey's Park CharlesPerry Park Tony SchmidtRegional Park ValentinePark FloralPark Royal HillsPark CummingsPark Arden ManorPark JohannaMarsh Arden OaksPark CommunityGardens Lake Josephine Lake Johanna ValentineLake RoundLake Karth LakeSun FishLake STOWE AVE LA K E V A L E N T I N E R D RED FOX RD GREY FOX RD INGERSON RDROUND LAKE RD WA M B L E D R SIEMS CTSNELLING AVE NCOLLEEN AVE GLEN PAUL AVE TILLER LN HAMLINEVENUS AVE THOM DR ARDEN VIEW DR GLENARDEN RDCHATHAM AVE AMBLE RD NOBLE RD GRAMSIE RD ARDEN PL GRANT RD OAK AVE EDGEWATER AVE JERROLD AVE DUNLAP ST NHARRIET AVE FLORAL DR W GLENVIEW AVE KARTH LAKE DR GATEWA Y B L V D WYNCREST CARLTON DRFOREST LNPRIOR AVE NCUMMINGS PARK DR ROYAL LN KATIE LN PINE TREE DRFAIRVIEW AVE NRIDGEWOOD RDCRYSTAL AVE PLEASANT DRA R D EN O A K S DR V A LE N T IN E A V E BENTON WAYINDIAN OAKS TRL SKILESLNBRIAR BECKMAN AVE LAMETTI LN MCCRAC KE N LNKEITHSON DRASBURY AVE NNURSERY HILL LN BUSSARD CT DAWN CIR W JAMES AVEJANET CT CANNONGLENHILL RDNORMA AVEARDENVIEWCTROY KATIE CT G L ENARDENCTRIDGEWOOD CTKARTH LAKE C IR GALE CIRMCCLUNG DR WY N C R E S T L N SA N D E E N R D PARKSHORE DR EIDE CIR NORTH-WOODS DRNURSERY HILL CT CU M M I N G S L N V A L E N T I N E C T INGERS O N C T COLLEEN CT GL E N V I E W CT HUN T E R S CT SHORELINELNPASCAL AVE NLAKE LN NCONNELLY AVE THOM CT AMBLE CIRCHATHAM CTCOLLEEN CIRROLLING HILLS RDARDEN OAKS CTNORMA CIRI N D I A N P L EDGEWATER AVENORMAAVE TILLER LNSNELLING AVE NDUNLAP ST NARDENPLSKILES LNFAIRVIEW AVE NHAMLINE AVE NGLENHILL RD WYN R I D G E PLEASANT CIR ARDEN INDIAN OAKS CT JAMES CIRDELLVIEW AVEDELLVIEW AVEDELLWOOD STGATEWAY CT VALENTINE CREST RD BRUEBERR Y LN BRIARKNOLL CIR DELLWOOD AVELAMETTI CIRWALDEN PLWEDGEWOODCIR INDIAN OAKS CIR CH A T H A M CIR L A K E JO H ANNABLVDLAKE JOHANNA BLVDRIDGEEDGEWATER AVEFAIRVIEW AVE NFERNWOOD STSNELLING AVE NSHORELINELNKATIELN COUNTY ROAD D W SHOREWOODDR LAKE LN COUNTY ROAD E W LAKEJOHAN N A B LV D GLEN PAUL AVECLEVELAND AVE NN EW B R I G H TO N R DNEW BRIGHTON RDHUDSON RDTHOM DRCLEVELAND AVE NBRIGHTON WAYNEW BRIGHTON RDINTERSTATE 35WCOUNTY ROAD E2 W COUNTY ROAD E 2 WLAKEVIEWCT C H A TH A M A V E SIEMS CTARDEN PL GLE N ARDENRDOLD SNELL ING ARDEN OAKS DRSNELLING AVE NOLD HIGHWAY 10OLD SNELLINGVENUS AVEINTERSTATE 35WLAKE VALENT I N E R DINTERSTATE 35WROUNDLAKERDWO L D H I G H W A Y 1 0 LAKE S H O R E P L INTERSTATE 694 INTERSTAT E 6 9 4 HI G H W A Y 1 0 COUNTY ROAD 96 W COUNTY ROAD 96 W LEXINGTON AVE N KNOL L D R VISTA CTDAWN CIR E COLLEEN A V E ARDENVI EW DR COUNTY ROAD F W INNOVATION WAY (Private)FERNWOOD STPLEASANT DR AM B L E D R COUNTY ROAD 96 W LEXINGTON AVE NLEXINGTON AVE NDRCT BOSTON SCIENTIFIC DR (Private) COUNTY ROAD E W LEXINGTON AVE NBENTON WAYAVE INGERSON RD AVE NWOOD RDCOUNTY ROAD E HAMLINE AVE NHAMLINE AVE NPrivateKATIE LNKEITHSON DR AL HILLS DRSource: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN,and the GIS User Community2022 Street Maintenance 0 1,000FeetÜ Document Path: P:\PR&PW\Numbered Projects\PW-22-0101 Street Maintenance 2022\02 design\Street Maintenance - 2022.mxdCrack Seal Seal Coat Fog Seal Cul-de-sac Fog and Crack Seal Path Revised Proposed Map To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2022-015 A RESOLUTION RECOMMENDING THE CITY OF COON RAPIDS AWARD THE 2022 STREET MAINTENANCE PROGRAM WHEREAS, the City of Arden Hills participates in a joint powers agreement with the North Metro Regional Street Maintenance Consortium for street maintenance services; and WHEREAS, the City of Coon Rapids solicited bids for the 2022 Street Maintenance Program based on work quantities requested by members of said joint powers agreement; and WHEREAS, the City of Coon Rapids opened bids for the 2022 Street Maintenance Program on March 11, 2022 and provided a bid tabulation to members of said joint powers agreement for consideration prior to awarding contracts. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS, MINNESOTA: 1. The Mayor and City Council recommend that the City of Coon Rapids award the 2022 Street Maintenance Program contracts to the low responsible bidders as outlined in the joint powers agreement and summary of bids. 2. The awarded contract includes quantities for seal coating, crack sealing and fog sealing as previously submitted by the City of Arden Hills. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 21ST DAY OF MARCH, 2022. ____________________________________ David Grant, Mayor ATTEST: _______________________________________ Julie Hanson, City Clerk Page 1 of 2 DATE: March 21, 2022 TO: Honorable Mayor and City Councilmembers David Perrault, City Administrator FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: City Hall Parking Lot Improvements – Construction Contract Award Budgeted Amount: Actual Amount: Funding Sources: $300,000.00 $295,241 Equipment & Building Fund Council Should Consider Motions to approve, table, or deny the following: • Resolution 2022-016 Accepting Bid and Awarding the City Hall Parking Lot Improvements Contract to Bituminous Roadways, Inc. in the amount of $233,650. All items need a simple majority for action unless otherwise noted. Background/Discussion The 2022 – 2026 Capital Improvement Program identifies improvements of the Arden Hills City Hall Parking Lot scheduled for construction in the year 2022. The City Council authorized preparation of construction plans in February 2020 and had subsequent discussions regarding the project in September 2020 and December 2020. On February 14, 2022, pursuant of Resolution 2022-007, plans and specifications were approved by the City Council and bids were opened on Wednesday, March 9, 2022. The proposed project includes installation and repairs to ADA concrete sidewalk and ped ramps, drainage improvements, security camera and lighting upgrades, and a new bituminous paved surface. This project also includes installation of additional conduit and handhole adjacent to a parking stall for a “future” EV charging station if desired at a later date. The anticipated schedule will allow for construction starting this summer and a final construction completion date is August 30, 2022. CONSENT ITEM – 2B MEMORANDUM Page 2 of 2 There was a total of eight bids received, the following table lists the bidders name and their total bid: Bidder Total Bid Bituminous Roadways, Inc. $233,650.00 Goodmanson Construction $241,071.70 TA Schifsky $244,000.56 G Urban Companies $245,076.60 North Valley $248,497.13 Omann Contracting Co. $250,492.79 Pember Companies $257,067.20 Minnesota Roadways Co. $311,242.00 All but one of the bids are lower than the Engineer’s estimate which is $271,431.63. Bituminous Roadways, Inc. has successfully completed the Royal Hills Park and Cummings Park Hardcourt Improvements project in 2019 for the City of Arden Hills. Bituminous Roadways has provided a list of references in Attachment B with similar projects completed in the metro area. Attachment A is a letter from HR Green recommending award to Bituminous Roadways Inc. as the lowest responsible bidder. Attachment C is Resolution 2022-016 awarding the City Hall Parking Lot Improvements to Bituminous Roadways, Inc. in the amount of $233,650. Staff recommends adoption of Resolution 2022-016. City Staff recommends approving Resolution 2022-016 and signing Attachment D, the Agreement Between Owner and Contractor for Construction Contract. Budget Impact A summary of the estimated project costs and funding sources is provided below: Total Project Costs: Construction $ 233,650 (Low-bid) Design & Construction Services $ 55,434 (Amendment No. 2) Materials Testing $ 4,297 Camera, bids, misc $ 1,860 TOTAL $ 295,241 Total Funding: Equipment & Building Fund $ 295,241 TOTAL $ 295,241 Attachments Attachment A: HR Green Letter of Recommendation and bid tab Attachment B: Contractor References Attachment C: Resolution 2022-016 Awarding the Contract Attachment D: Agreement Between Owner and Contractor for Construction Contract 2550 University Avenue West | Suite 400N | St. Paul, MN 55114 Main 651.644.4389 + Fax 651.644.9446 HRGREEN.COM March 10, 2022 Mr. David Swearingen Public Works Director/City Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 SUBJECT: Arden Hills City Hall Parking Lot Final Design Project | PW-20-0103 Dear Mr. Swearingen, On February 14th, 2022 the City Council received plans and specifications for the City Hall Parking Lot Final Design project, City project PW-20-0103 and authorized advertisement for bids. On March 9th, 2022 the City of Arden Hills received bids for the City Hall Parking Lot Final Design project. The results were verified by City-consultant, HR Green. Eight (8) bids were received and ranged between $233,650.00 and $311,242.00. The following is a bid summary: G Urban Companies $245,076.60 Minnesota Roadways Company $311,242.00* Bituminous Roadways, Inc. $233,650.00 Goodmason Construction. $241,071.70* Pember Construction $257,067.20 North Valley $248,497.13 Omann Contracting Companies $250,492.79 TA Schifsky $244,000.56* * Adjusted bid total based on corrected math All but one of the bids were lower than the engineer’s estimate of $271,431.63. The low bid price was 13.9% lower than the engineer’s estimate. After a thorough review of the bids received, we feel that the engineer’s estimate, along with the low bid, was comparatively accurate, aside from a few bid items. Given the nature of raw materials and labor expenses over the past two years, it was difficult to estimate the construction costs. The engineer’s estimate was based on previous projects and historical data. Excavation – Common, Bituminous Wearing Course, and Concrete Sill bid items make up the majority of the difference between the engineer’s estimate and Bituminous Roadway’s bid. Excavation and bituminous material bid items are notoriously difficult to estimate. Excavation cost estimate fluctuate from contractor to contractor because the quantity is generally larger than other quantities and 2 contractors use this item to bury incidental items or find efficiencies with mean and methods that can save them money and effort. Bituminous material costs are always changing and with the recent rise in oil, the engineer’s estimate had been more conservative than typical to try and anticipate rising costs of bituminous. The Concrete Sill bid item may carry a small amount of risk as it is relatively new bid item and some contractors or sub contractors may not be familiar with the specifications and expectations associated with the bid item. The intent is to create a sill for sidewalk adjacent to curb and gutter to rest on to eliminate the sidewalk from settling below the curb over time. The Remove Light Foundation, Lighting Unit Type LP1, Lighting Unit Type LP2, and Light Foundation Design E Modified were the items with higher costs in the engineer’s estimate than Bituminous Roadway’s bid. Over the past 24 months, we have seen the cost of electrical related raw materials rise exponentially and despite estimating with that inflation in mind, the lighting items still came in above estimate. Upon further examination of the apparent low bid, the bid provided by Bituminous Roadways was found to be responsive and not materially unbalanced. Staff recommends Council accept the bids, awarding the contract to Bituminous Roadways for the 2022 Arden Hill City Hall Parking Lot Final Design projects, City Project PW-20-0103. HR GREEN, INC Jordan Horejsi, PE Project Manager To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2022-016 RESOLUTION ACCEPTING BID AND AUTHORIZING AWARD OF CONTRACT FOR THE CITY HALL PARKING LOT IMPROVEMENTS PROJECT WHEREAS, pursuant to an advertisement for bids for the City Hall Parking Lot Improvements Project, bids were received, opened, and tabulated according to the law, and the following bids were received complying with the advertisement: Bituminous Roadways, Inc. $233,650.00 Goodmanson Construction $241,071.70 TA Schifsky $244,000.56 G Urban Companies $245,076.60 North Valley $248,497.13 Astech Corp. $165,893.03 Urban Companies $171,058.50 and; WHEREAS, it appears that Bituminous Roadways, Inc. of Mendota Heights, Minnesota, is the lowest responsible bidder. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS, MINNESOTA: 1. The Mayor and City Clerk are hereby authorized and directed to enter into the attached contract with Bituminous Roadways, Inc. Mendota Heights, Minnesota in the name of the City of Arden Hills for the City Hall Parking Lot Improvements Project according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder i shall be retained until a contract has been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 21st DAY OF MARCH, 2022. ____________________________________ David Grant, Mayor ATTEST: Julie Hanson, City Clerk Page 1 of 2 CONSENT ITEM – 2C MEMORANDUM DATE: March 21, 2022 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Professional Services Amendment for City Hall Parking Lot Improvements Budgeted Amount: Actual Amount: Funding Source: $300,000 $295,241 Equipment & Building Fund Council Should Consider Motion to approve, table, or deny the following: • Professional services Amendment No. 2 with HR Green in the amount of $6,349 for the City Hall Parking Lot Improvements. All items need a simple majority for action unless otherwise noted. Background/Discussion On February 25, 2019, the City Council approved a professional services contract with HR Green for Hamline Avenue Crosswalk Improvements. On February 24, 2020, the City Council approved a professional services agreement with HR Green for the design of the City Hall Parking Lot & Shorewood Drive Drainage Improvements which would also include the Hamline Avenue Crosswalks all in one plan set. On December 14, 2020, the City Council amended the professional services agreement to split the plans into two separate plans. On May 10, 2021, City Council approved the Professional Services Amendment No. 1 with HR Green to account for staff changes within the City. In 2021 the Hamline Ave Crosswalks and the Shorewood Dr Drainage Improvements project was constructed and completed. On February 14, 2022, the City Council approved plans & specifications and ordered plans and specifications for the City Hall Parking Lot Improvements. Page 2 of 2 With the complexity of how this project has continually changed scope and direction due to various reasons, Professional Services Amendment No. 2 (Attachment A) is appropriate to account for the work completed by HR Green and to continue this project through construction. The City now has an Assistant Public Works Director who will be filling the role for daily construction observation, so the “Contractor Questions” item in the amendment may not be utilized. It is recommended by staff to approve Professional services Amendment No. 2 with HR Green in the amount of $6,349 for the City Hall Parking Lot Improvements Budget Impact The initial proposal provided by HR Green included fees of $46,540 for design and construction observation, for the project. These costs were increased by $2,544.60 with the splitting of the plans in December 2020. The proposed amendment for changes to the scope of work has a total of $6,349 bringing the total Design and Construction Contract with HR Green to $55,434. Project funding is provided by the Equipment & Building fund. A summary of the estimated project costs and funding sources is provided below: Total Estimated Costs Construction $ 233,650 (low-bid) Design & Construction Services $ 55,434 Materials Testing $ 4,297 Camera, bids, misc $ 1,860 TOTAL $ 295,241 Total Estimated Funding Equipment & Building Fund $ 295,241 TOTAL $ 295,241 Attachments Attachment A: Proposed Amendment No. 2 for Changes to Scope of Services 2550 University Ave. West, Suite 400N |St. Paul, MN 55105 Main 651.644.4389 + Fax 651.644.9446 HRGREEN.COM March 14, 2022 David Swearingen, PE City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 Subject: Amendment #2 – City Hall Parking Lot Final Design Dear David: The following scope for Amendment #2 covers the City Hall Parking Lot Final Design plans and project manual for bidding. The following items are included make up the scope that and relates to the summary of costs: Arden Hills City Hall Parking Lot Final Design 1. Future charging station a. Coordination, plan, details, and specifications 2. Final design plan changes a. Pavement section from stabilized full depth reclaim to full depth reclaim b. Updated ADA details for new MnDOT standard plans and bid items c. Lighting and camera specification update with future charging station d. Special provision update for MnDOT 2020 bid items 3. Project Manual a. Original contract was for technical specifications b. Does not include time for Amendment #1 4. Materials testing scope for contract proposals from Braun and AET 5. Contractor questions during construction Please contact Jordan Horejsi at 651-659-7716 with any comments or questions. HR Green, Inc. Jordan Horejsi, PE Project Manager Page 2 AMENDMENT #2 SUMMARY Hours Costs Final Design Plans 21.5 $3,773.00 Project Manual 7 $1,230.00 Material Testing Scope 1.25 $206.00 Contractor Questions 8 $1,140.00 Total Cost $ 6,349.00 Page 1 of 3 DATE: March 21, 2022 TO: Honorable Mayor and City Councilmembers David Perrault, City Administrator FROM: Larry Poppler, Project Engineer - TKDA David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Arden Oaks Street Improvement Project – Declaring Costs to be Assessed and Order Assessment Hearing Budgeted Amount: Actual Amount: Funding Source: $583,000 (2022 CIP) $660,879.68 PIR, Special Assessments, Utility Funds Council Should Consider Motion to approve, table, or deny the following: • Resolution 2022-013 Declaring Costs to be Assessed and Ordering the Preparation of the Proposed Assessments and Calling for a Public Hearing on the Proposed Assessments for the Arden Oaks Street Improvement Project. All items need a simple majority for action unless otherwise noted. Background/Discussion On February 14, 2022, the City Council approved plans & specifications and ordered advertisement for bids for the Arden Oaks Street Improvement Project located within the Arden Oaks residential neighborhood. The proposed improvements include bituminous paving, storm water improvements, concrete curb and gutter repair, and appurtenant work on Arden Oaks Drive from Snelling Avenue North to County Road E and Arden Oaks Court. On March 14, 2022, City Council decided to table this item to tonight’s meeting to address questions raised related to the contractor bid bond and how assessments will be affected by the awarded contractor. This information was provided to council and can be discussed as needed. UNIFINISHED BUSINESS – 4A MEMORANDUM Page 2 of 3 Pursuant of Resolution 2022-006, bids were opened on March 9, 2022, after receiving 9 bids for the project. The four lowest bids are listed below. A full bid tabulation is provided in Attachment A. Company Bid Amount Astech Corporation $520,377.70 T.A. Schifsky & Sons, Inc. $522,711.61 Park Construction $526,500.62 Valley Paving $537,970.10 The low bid of $520,377.70, received from Astech Corporation, compares favorably with the construction engineer’s estimate which is $538,607. Further analysis of the low bid by adding overhead, the total project cost for the street improvements is $466,746.84. The total project costs were then used for the assessable cost which, as described in the City’s Assessment Policy, is half of the street project cost for residential properties. The results of this analysis are as follows: • Assessment Rate of $5,834.34 per unit as compared to the Engineer’s estimate of $6,131.10. Many cities set their interest rate for assessments at two (2) percentage points over the bond interest rate. The City’s assessment policy states that the interest rate used for the assessment shall be designated at the prime rate plus two (2) percentage points. For the 2021 PMP, the assessment interest rate was set at two (2) percentage points over the assumed bond interest rate which was based on current market conditions at the time, our AAA rating, plus 15 basis points. The result was an assessment interest rate of 3.15%. Our current assumed bond interest rate is 2.05% and the prime rate is 3.25%. Both of these could change by the time of the assessment hearing. The council should look at setting the assessment rate somewhere between 4% and 6%. The attached resolution is consistent with this recommended action. The exact amount can be decided on tonight or wait until the assessment hearing date. The current assessment policy also states that the typical overhead for a public improvement project is 37% of the construction costs. Staff believes this percentage is higher than necessary and recommends that approximately 27% (exact dollar amount below) of the construction costs is used as overhead when calculating the assessment rates. The breakdown of the overhead costs can be found below. Attachment B, Resolution 2022-013 declares the costs to be assessed and orders the Assessment Hearing which would be held on April 25th at the Regular City Council meeting. The construction contract is not awarded at tonight’s meeting. Staff has gathered contractor references, Attachment C, to verify the low-bidder is a responsible contractor and has completed similar projects. Staff and TKDA have reviewed the references and recommend using the low- bid to declare the costs to be assessed. Page 3 of 3 Budget Impact The estimated total project cost and funding sources based on the final plans and specifications are summarized below. Total Estimated Expenses Construction: $ 520,378 Engineering Feasibility & Design: $ 55,300 Construction Mgmt: $ 26,300 Gen Admin & Legal: $ 10,000 Material Testing: $ 15,000 Const. Contingency: $ 33,902 TOTAL ESTIMATE: $ 660,880 Proposed project funding sources are a combination of the City’s Permanent Improvement Revolving (PIR) fund, utility funds, and special assessments for street improvements summarized in the following table: Total Estimated Funding PIR Fund: $ 233,373.42 Special Assessments: $ 233,373.42 Water Utility: $ 5,099.05 Sanitary Sewer Utility: $ 20,358.10 Surface Water Utility $ 168,675.69 TOTAL FUNDING: $ 660,879.68 Attachments Attachment A: Bid Tabulation Attachment B: Resolution 2022-013 Attachment C: Contractor References Attachment D: 3-14-21 Mtg Presentation Slides $5'(12$.61(,*+%25+22',03529(0(176$5'(1+,//60,11(627$&,7<352-(&7123:7.'$352-(&712%,'623(1(' 0$5&+$730 '(127(6(5525,1%,''(5&$/&8/$7,21ITEM SPEC.UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTALNO. NO. DESCRIPTION QUANTITYUNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICEAMOUNTMOBILIZATION /6        CLEARING 75((        GRUBBING 75((        REMOVE CASTING ($        SAWING BIT PAVEMENT (FULL DEPTH) /)        SAWING CONCRETE PAVEMENT (FULL DEPTH) /)        REMOVE CURB AND GUTTER /)        SALVAGE AND REINSTALL MAILBOX($       REMOVE BITUMINOUS DRIVEWAY PAVEMENT 6<        REMOVE CONCRETE DRIVEWAY PAVEMENT 6<        SALVAGE AND REINSTALL BRICK PAVERS 6<        GEOTEXTILE FABRIC TYPE 1 6<        GEOTEXTILE FABRIC TYPE 5 6<        COMMON EXCAVATION &<        SUBGRADE EXCAVATION &<        DEWATERING /6        SELECT GRANULAR BORROW &<        CRUSHED ROCK (1" CLEAR) 71        CRUSHED ROCK (3" MINUS) 71        TEST ROLLING 52$'67$       BASE PREPARATION 52$'67$       STREET SWEEPER (WITH PICKUP BROOM) +5        WATER 0*$/        AGGREGATE BASE CLASS 5 71        FULL DEPTH RECLAMATION 6<        TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 71        3" BITUMINOUS DRIVEWAY PATCHING 6<        6" PERF PVC PIPE DRAIN /)        DRAIN TILE CLEANOUT($       CONNECT INTO EXISTING DRAINAGE STRUCTURE($       ADJUST VALVE BOX($       REPLACE VALVE BOX($       CASTING ASSEMBLY($       ADJUST FRAME AND RING CASTING ($       CONCRETE CURB & GUTTER DESIGN D418 /)        CONCRETE CURB & GUTTER DESIGN VALLEY GUTTER /)        6" CONCRETE DRIVEWAY PAVEMENT 6<        TRAFFIC CONTROL /6        STABILIZED CONSTRUCTION EXIT /6        STORM DRAIN INLET PROTECTION ($       SEDIMENT CONTROL LOG TYPE COMPOST /)        COMMON TOPSOIL BORROW &<        FERTILIZER TYPE 3 /%        CATEGORY 20 - STRAW 6<        SEEDING$&         SEED MIXTURE 25-151 /%         RAPID STABILIZATION METHOD 3 0*$/        TOTAL    TABULATION OF BIDSPARK CONSTRUCTIONENGINEER ESTIMATEASTECH CORP. T.A. SCHIFSKY & SONS%,'7$%8/$7,213DJH $5'(12$.61(,*+%25+22',03529(0(176$5'(1+,//60,11(627$&,7<352-(&7123:7.'$352-(&712%,'623(1(' 0$5&+$730 '(127(6(5525,1%,''(5&$/&8/$7,21ITEM SPEC.NO. NO. DESCRIPTION QUANTITYUNITMOBILIZATION/6CLEARING75((GRUBBING75((REMOVE CASTING($SAWING BIT PAVEMENT (FULL DEPTH) /)SAWING CONCRETE PAVEMENT (FULL DEPTH) /)REMOVE CURB AND GUTTER /)SALVAGE AND REINSTALL MAILBOX($REMOVE BITUMINOUS DRIVEWAY PAVEMENT 6<REMOVE CONCRETE DRIVEWAY PAVEMENT 6<SALVAGE AND REINSTALL BRICK PAVERS 6<GEOTEXTILE FABRIC TYPE 1 6<GEOTEXTILE FABRIC TYPE 5 6<COMMON EXCAVATION &<SUBGRADE EXCAVATION &<DEWATERING/6SELECT GRANULAR BORROW &<CRUSHED ROCK (1" CLEAR) 71CRUSHED ROCK (3" MINUS) 71TEST ROLLING 52$'67$BASE PREPARATION 52$'67$STREET SWEEPER (WITH PICKUP BROOM) +5WATER 0*$/AGGREGATE BASE CLASS 5 71FULL DEPTH RECLAMATION 6<TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 713" BITUMINOUS DRIVEWAY PATCHING 6<6" PERF PVC PIPE DRAIN /)DRAIN TILE CLEANOUT($CONNECT INTO EXISTING DRAINAGE STRUCTURE($ADJUST VALVE BOX($REPLACE VALVE BOX($CASTING ASSEMBLY($ADJUST FRAME AND RING CASTING ($CONCRETE CURB & GUTTER DESIGN D418 /)CONCRETE CURB & GUTTER DESIGN VALLEY GUTTER /)6" CONCRETE DRIVEWAY PAVEMENT 6<TRAFFIC CONTROL/6STABILIZED CONSTRUCTION EXIT/6STORM DRAIN INLET PROTECTION ($SEDIMENT CONTROL LOG TYPE COMPOST /)COMMON TOPSOIL BORROW &<FERTILIZER TYPE 3 /%CATEGORY 20 - STRAW 6<SEEDING$& SEED MIXTURE 25-151 /% RAPID STABILIZATION METHOD 30*$/TOTALTABULATION OF BIDSUNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTALPRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICEAMOUNT                                                                                                                                                                                                                                                                                                                                            VALLEY PAVING BITUMINOUS ROADWAYS NW ASPHALT MN PAVING & MATERIALS%,'7$%8/$7,213DJH $5'(12$.61(,*+%25+22',03529(0(176$5'(1+,//60,11(627$&,7<352-(&7123:7.'$352-(&712%,'623(1(' 0$5&+$730 '(127(6(5525,1%,''(5&$/&8/$7,21ITEM SPEC.NO. NO. DESCRIPTION QUANTITYUNITMOBILIZATION/6CLEARING75((GRUBBING75((REMOVE CASTING($SAWING BIT PAVEMENT (FULL DEPTH) /)SAWING CONCRETE PAVEMENT (FULL DEPTH) /)REMOVE CURB AND GUTTER /)SALVAGE AND REINSTALL MAILBOX($REMOVE BITUMINOUS DRIVEWAY PAVEMENT 6<REMOVE CONCRETE DRIVEWAY PAVEMENT 6<SALVAGE AND REINSTALL BRICK PAVERS 6<GEOTEXTILE FABRIC TYPE 1 6<GEOTEXTILE FABRIC TYPE 5 6<COMMON EXCAVATION &<SUBGRADE EXCAVATION &<DEWATERING/6SELECT GRANULAR BORROW &<CRUSHED ROCK (1" CLEAR) 71CRUSHED ROCK (3" MINUS) 71TEST ROLLING 52$'67$BASE PREPARATION 52$'67$STREET SWEEPER (WITH PICKUP BROOM) +5WATER 0*$/AGGREGATE BASE CLASS 5 71FULL DEPTH RECLAMATION 6<TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 713" BITUMINOUS DRIVEWAY PATCHING 6<6" PERF PVC PIPE DRAIN /)DRAIN TILE CLEANOUT($CONNECT INTO EXISTING DRAINAGE STRUCTURE($ADJUST VALVE BOX($REPLACE VALVE BOX($CASTING ASSEMBLY($ADJUST FRAME AND RING CASTING ($CONCRETE CURB & GUTTER DESIGN D418 /)CONCRETE CURB & GUTTER DESIGN VALLEY GUTTER /)6" CONCRETE DRIVEWAY PAVEMENT 6<TRAFFIC CONTROL/6STABILIZED CONSTRUCTION EXIT/6STORM DRAIN INLET PROTECTION ($SEDIMENT CONTROL LOG TYPE COMPOST /)COMMON TOPSOIL BORROW &<FERTILIZER TYPE 3 /%CATEGORY 20 - STRAW 6<SEEDING$& SEED MIXTURE 25-151 /% RAPID STABILIZATION METHOD 30*$/TOTALTABULATION OF BIDSUNIT TOTAL UNIT TOTALPRICE AMOUNT PRICE AMOUNT                                                                                                                                              NORTH VALLEY, INC. MEYER CONTRACTING, INC.%,'7$%8/$7,213DJH 1 To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2022-013 RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENTS AND CALLING FOR HEARING ON THE PROPOSED ASSESSMENTS WHEREAS, the construction bids have been received for the proposed Arden Oaks Street Improvements Project, the improvement of Arden Oaks Drive and Arden Oaks Court, and the contract bid price for such improvement is $520,378, and the expenses incurred or to be incurred in the making of such improvement amount to $140,502 so that the total cost of the improvement will be $660,880; and WHEREAS, the City Clerk has prepared a proposed assessment of the cost of the improvement; and WHEREAS, the City Clerk has notified the City Council that such proposed assessment has been completed and filed at City Hall for public inspection. NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF ARDEN HILLS: 1. The portion of the cost of such improvement to be paid by the City is hereby declared to be $427,506 The portion of the cost to be assessed against benefited property owners is declared to be $233,374. 2. Assessments shall be payable in equal annual installments extending over a period of 10 years, the first of the installments to be payable with property taxes for the year 2022, and shall bear an interest rate of between 4% to 6% from date of the adoption of the assessment resolution. 3. The City Clerk, with the assistance of the City Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece or parcel of land within the district affected, without regard to cash valuation, as provided by law, and shall file a copy of such proposed assessment in her office for public inspection; and 2 To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS, MINNESOTA: 1.A hearing shall be held on April 25, 2022, in the Council Chambers at 7:00 p.m. or as soon thereafter as possible, to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given an opportunity to be heard with reference to such assessment. 2.Publication by the City Clerk is hereby directed to cause notice of the hearing on the proposed assessment once in the official newspaper at least two weeks prior to the hearing, stating in the notice the total cost of the improvement is hereby approved. Notice shall be mailed to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearings is also approved. 3.The owner of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on such property, with interest accrued to the date of payment, to the City, except that no interest shall be charged if the entire assessment is paid within 30 days from the adoption of the assessment. The owner may at any time thereafter, pay to the City the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 or interest will be charged through December 31 of the succeeding year. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 21ST DAY OF MARCH 2022. ________________________________ Mayor Attest: ______________________________ City Clerk - 2021 Accept Bids & Order Assessment Hearing 2022 Arden Oaks Street Improvements Council Meeting March 14, 2022 1 Overview •Project Location •Bid Tabulation •Project Costs •Project Funding •Assessment Map •Assessment Rates •Next Steps 2 Project Location Arden Oaks Neighborhood 3 Bid Tabulation and Engineer’s Estimate Bids Received: Wednesday, March 9, 3:00PM Contractor Total Base Bid Astech Corporation $520,377.70 T.A. Schifsky & Sons $522,711.61 Park Construction $526,500.62 Valley Paving $537,970.10 Bituminous Roadways $547,442.92 NW Asphalt $559,392.91 MN Paving & Materials $578,652.75 North Valley, Inc.$614,885.02 Meyer Contracting, Inc.$679,762.75 Engineer’s Estimate $538,607.50 4 Project Costs Construction Cost + 27% (of Construction Costs) in Indirect Costs Project Cost Cost Category Approximate Costs Street Improvements $ 367,517.20 Indirect Costs for Street Improvements (27%)*$ 99,229.64 Total Costs for Street Improvements $ 466,746.84 Storm Sewer Improvements $ 132,815.50 Indirect Costs for Storm Sewer Improvements (27%)*$ 35,860.19 Total Costs for Storm Sewer Improvements $ 168,675.69 Sanitary Sewer Improvements $ 16,030.00 Indirect Costs for Sanitary Sewer Improvements (27%)*$ 4,328.10 Total Cost for Sanitary Sewer Improvements $ 20,358.10 Water Improvements $ 4,015.00 Indirect Costs for Water Improvements (27%)*$ 1,084.05 Total Cost for Water Improvements $ 5,099.05 Total Improvement Cost $ 520,377.70 Total Indirect Costs for City (27%)*$ 140,501.98 Total Project Cost $ 660,879.68 5 Project Funding Project Funding Amount Pavement Improvement Revolving Fund $233,373.42 Assessment (50%)$233,373.42 Utility Fund –Storm Sewer $ 168,675.69 Utility Fund –Sanitary Sewer Fund $ 20,358.10 Utility Fund –Water Fund $ 5,099.05 Total Project Funding $660,879.68 6 Assessment Map 7 Assessment Rates 50% of the Street Improvement costs Assessable Total Street Cost = $466,746.84 Feasibility Report Assessment Rate $5,834.34 /Unit Interest Rate on Assessments = 4% to 6% (Decided at Assessment Hearing) Paid over 10 years Assessment Calculation Total Project Cost $ 660,879.68 Assessable Amount (Total Street Cost)$ 466,746.84 Assessment (50% of Assessable Amount)$ 233,373.42 Single Family Dwelling Units 40 Units Unit Assessment (Assessable amount/ 40 Units)$ 5,834.34 8 Next Steps •Assessment Hearing and Award April 25, 2022 •Assessment Hearing •Award Construction Contract •Public Engagement –Newsletter and Website •Begin Construction May 2022 •Substantial Competition October 2022 •Certify Assessments to County November 2022 9 Questions? 10