Loading...
HomeMy WebLinkAbout07-28-1998 PTRC Minutes AGENDA PARKS & RECREATION COMMISSION TUESDAY, JULY 28, 1998 ** 7:00 P.M. ** ARDEN HILLS CITY HALL 4364 W. ROUND LAKE ROAD * Note New Location i 1. Call to Order and Roll Call 2. Approve May 19, 1998 Minutes 3. Council Report 4. 1999 Budget Recommendations 5. Comprehensive Plan a. Trail Changes/Additions b. Approval of Draft Text of the Parks and Trails Comprehensive Plan 6. Program Report 7. Director's Report a. Tony Schmidt Park Update b. Upgrading Athletic Facilities within the #621 School District Update C. Round Lake Trail d. Park Dedication Update 8. Adjourn *** Please Call Cindy or Lynette if you are unable to attend this meeting *** 4P . MINUTES CITY OF ARDEN HILLS, MINNESOTA PARKS & RECREATION COMMISSION TUESDAY, MAY 19, 1998 7:00 P.M. CALL TO ORDER Chair Kreidler called the meeting to order at 7:10 p.m. ROLL.I. CALL I Present were Lynette Kreidler, Megan Ricke, Rich Straummann, Dorothy McClung, Mary Robinson, Jim Johnson, Cindy Walsh-Parks and Recreation Director, Tracy Peterson-Program Supervisor and Susan Keim-Council Liaison. Absent were Don Messerly, Lou Speggen and Anita Larson. APPR0VF. I`II1 TFS Minutes from April 2S_ I99S, were corrected and approved by Megan Ricke and seconded by Rich Straummann. The minutes we:e passed unanimously. C'OUNC II REPORT Arden Hills City offices were moved. Otherwise, there has been little new activity to report. PARK FUND BUD .FT Cindy Walsh handed out the Park Fund Capital Improvement Plan with estimates for each item listed in the "A" and "B"Priority Groups. The County Road F Trail is estimated at Sl 14,667 and with the D\rR Cyn :. :could be 564,667. The County Road E bridge is going to be discussed by Cindy Walsh with Sate officia s in an attempt to get a cane walkway included. The U.S. Fish and Wildlife Service have Cindy Walsh permission to constrict part of Round Lake Trail. Additional easement ma, '�e need to complete the trail north to Highway 96. The Increrson Park soccer field estu=c does not , elude the cost of adding parking spaces. Right now, this project is on hold "':ile -;L 5 e NtiIi—ar iPe school district does on district needs. N-lary Robinson added that if a soccer field is not dz•veloped at that park, some alternative plan should be considered. The Arden 1t-Ianor Parr: estimate does not include drainage correction costs. The City is exploring the cost of correct;,,,-- measures. It may attempt to use the estimate and plans to get the owner to make ;he necessary changes, or if not excessive, the City may undertake the corrective measures when redoing the hard court area. The Hazelnut Shelter needs immediate attention. The "B"Projects were also discussed. Park & Recreation Commission Meeting May 19, 1998 Page 2 It was moved by Megan Ricke and seconded by Dorothy McClung that the Commission recommend to Council that the Hazelnut Shelter Building, Paving Cummings Park Hockey Rink and Arden Manor Park Improvements be done in 1999. This passed unanimously. Also, we recommend that Round Lake Trail and County Road F Trails be funded in 1999 if the DNR grant (for County Road F) and other funding becomes available for Round Lake Trail. Freeway Park/Lindey Redevelopment and Ingerson Park Soccer Field should be funded in 2000. If some additional money is needed from the fund in 1999 for Arden Park, it is recommended more be spent. This does not spend down the entire fund. Money is reserved, if needed, for contn`bution to School District Fund and Nam_ Brighton Road Trail or other trail segments when most economical in connection « t�i oad projects. DAY IN True' PARK ASSIGNNIF.NTS Things are progressing for June 6. Volunteers should be there at 9:00 a.m. at Hazelnut Park. PR0C;RAIy1 REPORT Summer Program registratica av;-- begun. Track is winding down; there were over 230 participants. Spring Progra— =-e-wrapping up. Plans are to encourage ''/z price Friday Programs at Arden Manor. Playgrouc s � June 22, 1998. TRAIL & PARK CO-NIPRFNFNSINT PLALNI It was moved by Dorothy McClung and seconded by Lynette Kreidler to recommend to Council that the map dated 5/19/98 be adopted as part of the City's Comprehensive Plan with text to follow. This was approved unanimously. DIRECTOR'S REPORT 1. `is. Walsh asked Cc =s_on members to think: about use of Sheehy property fo: potential use in the Comprehensive Plan. 2. Joint A-t,l-ticFacili--- ?"aa ;�� Mounds View High could have girls softball,boys baseball (both potentiaU lighted), and two soccf:football fields for practice. The track.bleacherslfoofoall -LE: d ,,would stay the same. Mounds View High School has quite a lot of property surou-drug the existing facility. Ch�pewa could also add more balUsoccer fields. A number of different options are bLig considered for Highview diddle School. The School District proposed several alternatives to the'Nlayors, City Managers and Park & Recreation Directors. Funding for school sites has not been determined. 3. We discussed revisiting what should be done with replacing the play stricture at Sampson Park in the year 2002, in light of Tony Schmidt redevelopment. e at the re ular time, The meeting was adjourned at 8:30 p.m. after deciding we will meet to Jun g June 23, 1998. CITY OF ARDEN HILLS MEMORANDUM DATE: July 22, 1998 TO: Parks and Recreation Com ission FROM: Cindy S. Walsh l SUBJECT: July Monthly Report udget Recomm ndatiM The Commission prioritized Park Fund projects and spending at the May meeting. Recommendations for the 1999 Park Fund Budget should be confirmed at this meeting. Camp rehensiy Plan There are two additional trail segments that the Planning Commission requested that the City add to the Comprehensive Plan. The first one is on the west side of Lexington Avenue from Red Fox Road to south to County Road E. The second is along Lake Johanna Road from County Road E south to County Road D. I will bring the revised trail and park map to the meeting to further explain the additions. . I have included a copy of the draft text of the Parks and Trail Chapter of the Comprehensive Plan. Please review the chapter prior to the meeting so that we are able to discuss any changes or suggestions. Rqwxts a. Tony Schmidt Park i Tpdate --Ramsey County is on the August Planning Commission Agenda for the final approval of Phase I. They have not yet put the project out for bid. It is my understanding that they hope to begin this fall. I do not believe that we will see a lot of activity until next Spring. At this time, the County has not received approval for Phase II. b. 14Wu ing the A hl tir Facilities within h 62 1 School District�st -- I have enclosed a copy of the recommendations and priorities. We have met with the City Mayors, Managers, and School Superintendent to present this plan. The School is deciding how to potentially fund these improvements. One options is to include the projects in a school bond referendum. c. Bound Lake Trail -- Welsh Companies, the developer for the new Gateway Business District buildings, has begun construction of the trail abutting their property. The construction of the trail was part of their park dedication requirement. d. Park edi ation -- John McClung is splitting his final piece of property for development of two additional houses. As a part of this process, he is required to pay park dedication. I am recommending an amount of$4,500. This is 6% of his land value. • CITY OFARDENHILLS COMPREHENSIVE PLAN CHAPTER 5: PARKS AND TRAILS I. Overview II. Goals and Policies III. Existing Facilities and Service Areas IV. Park and Trail Improvements A. Parks B. Trails V. Implementation APPENDICES A. Park Classification and Design Standards B. Trail Classification and Design Standards TABLES 5.1 City Parks and Facilities 5.2 Planned Trail Connections N.Za pS 5.1 Parks and Trails Plan 5_? Park Service Areas McCombs Frank Roos Associates June, 1998 . I. OVERVIEW Arden Hills has 15 parks within its borders totaling approximately 350 acres. The City is well served by its neighborhood park system, with parks and open space within 1/4 - 1/2 mile of most residences. Residents are also served by Tony Schmidt Lake Johanna County Park, which is owned and operated by Ramsey County. Connections between parks and community destinations are incomplete in several areas of the community. The City is traversed by several major highways and freeways which present effective barriers and/or safety issues for pedestrians and bicyclists. Trail use has soared for all ages, with walking,jogging, biking and in-line skating all gaining popularity as forms of exercise and recreation. Linkages within and through the City are important to citizens, as highlighted by the 1996 Quality of Life Survey. Connecting trails among areas of the community will provide the ability to walk, bike and skate both recreationally and to destinations within the City and surrounding areas. Future facilities for the TCAAAP area involve: a joint athletic facility for Arden Hills and the surrounding communities, a community park, a nature preserve, and four (4) neighborhood parks. The TCAAP area will be connected by a series of trails to the existing developed area south of Highway 996 as it develops. II. GOALS AND POLICIES Arden Hills has endeavored to provide a strong system of park and trail facilities. The following goals build on past efforts and work toward strengthening recreation facilities and systems. The goals relate to parks and trails both in the "South of Highway 996" and the "TCAAP" areas. Overall Goal: Expand Recreation Facilities Policies: l. Continue to expand the trail system to connect neighborhoods of the community to parks, trails and other area destinations according to defined priorities. 2. Continue to provide a balance of active and passive recreational areas, while emphasizing the natural beauty of the area. Page 1 of 8 3. Connect neighborhoods to the City's trail system by constructing pedestrian crossings that eliminate or avoid conflicts with major transportation barriers. 4. Strengthen the existing neighborhood park system by making improvements as determined through the annual budgeting and CIP process. 5. Develop the TCAAP area Nvith an integrated neighborhood park and trail system. 6. Work with the surrounding communities to plan the Joint Athletic Facility. 7. Develop a community park in the Civic Center area of TCAAP. 8. Expand recreation activities to meet a broader variety of ages and interests. 9. Strive to involve users in the parks and recreation planning process. 10. Pursue outside funding sources for park and trail improvements. 11. Require new neighborhood parks to be a minimum of 5 acres in size to ensure viable space for active recreation. III. EXISTING FACILITIES AND SERVICE AREAS FACILITIES Arden Hills has over 145 acres of City-owned parks and open space within its borders, along with approximately 208 acres of land in the Tony Schmidt Lake Johanna County Park (See Map 5.1). The City system includes: ■ 7 small parks ranging from 1 acre to 5 acres in size ■ 4 neighborhood parks ranging from 12-20 acres in size ■ 2 natural conservancy areas totaling 55.5 acres Each park and its facilities is noted in Table 5.1. Trails extend through portions of the City's neighborhoods, both off-road and on-road as shown on Map 5.1. SERVICE AREAS Residents are typically able and willing to walk 1/4 to 1/2 mile to reach a neighborhood park. Map 5.2 shows 1/4 and 1/2 mile service areas for neighborhood parks in the City. This ser.,:ce area is disrupted in several areas by major physical barriers including major roads, rail lines and lakes. These obstacles present effective barriers for pedestrians, resulting in disconnected neighborhoods and lack of access to city park and trail facilities for some neighborhoods. • Page 2 of 8 F Ls eo c .ae h C ■ ■ ■ ■ T u yi C N u E c 0 m O U ■ a u u C ed 0 C V U y 2 � • U c3 lu U b 0 4 0 1-4 to tj 77 a c0 c �c ■ ■ ■ , Y 0 ` tt ry � J Page 3 of 8 To better connect neighborhoods with existing parks, several pedestrian connections are planned. Completing connections will help to increase the opportunities for recreation and transportation. Two (2) residential areas in the community are outside of the 1/2 mile service area for neighborhood parks. These are (a) the area on the southeast side of Round Lake and (b) the area on the southeast side of Lake Johanna. These two areas will be effectively connected when the trail system is completed, allowing access to existing facilities. IV. PARK AND T"I� IMPROVEMENTS PARKS South of Highway #96 The developed portion of the City is well served by neighborhood parks, as shown in Map 5.1 and Table 5.1. No new neighborhood parks are planned for the already develope?a:-ea of Arden Hills. Improvements to neighborhood parks are determined o an armual basis, through the annual budgeting process. TCAAP Area The TCAAP area«ill include a series of integrated parks and trails. This system v6ll serve new residents and «ill physically and socially connect the existing, developed portion of the City with the TCAAP area as it develops. The park system has been identified in the TCAAP area on Map 5.1. The system includes: • Four (4) neighborhood parks to be relatively evenly spread through the residential are -,. eichborhood parks will be 5-20 acres in size and are intended for active play. • A Joint Athliric Facility - to be de eloped by the cities of Arden Hills, Mo'ands View,zw Biighton, Shore-,iew, and School District i�62 1. • A Community Park, to be developed in the Civic Center area near Lexington and uig-h-way -96. This park is intended as a community gathering pla7e fir festivals, concerts and events, as well as standard park activities. • The Park Preserve, consisting of approximately 1,100 acres will become a public regional amenity of outstanding value. The `'hill" (kame), Lake Marsden, woodlands and wetland will all be public open space. Trails will Page 4 of traverse the preserve, connecting the Civic Center area with the Joint Athletic Facility and Rice Creek corridor to the west; and connecting to the City of Shoreview on the north at County Road I. TRAILS South of Highway 496 Because Arden Hills is crossed by several major roadways, travel by foot or bike between certain areas of the community is nearly impossible. Several trail connections are planned in order to link areas of the City with each other, as well as linking to surrounding communities. Many regional destinations, including Tony Schmidt Lake Johanna County Park, Long Lake Regional Park, Como Park, and Shoreview Community Center could be easily accessed through a connected trail system. In addition to recreation opportunities, trail connections can provide an alternative transportation system. Several major employers are located in Arden Hills and with a connected system, commuters will have the opportunity to use the trail system to reach work. Map 5.1 shows existing and future parks and trails. Some of the planned trail links include a new pedestrian crossing to complete the connection. These connections will allow safer pedestrian and bike travel throughout the city and connecting to the surrounding communities. Most of the planned trails are along roads. Connections around Round Lake, Valentine Lake, and Lake Johanna are also planned. Two (2) rail bridges over 1-35W are planned to become pedestrian linkages: a. A spur from New Brighton into the Gateway Business Area is minimally used, and can provide a pedestrian-'bicycle connection from the Round Lake area to Long Lake Regional Park and downtown New Brighton. b. A spur from Mounds View into the TCAAP area is no longer used, and will be a connection into the TCAAP area. This rail line is north of Highway r96 and crosses 1-35W south of the Highway -10 intersection. The existing bridges provide a cost-efficient opportunity to adapt existing bridge facilities for current trail needs. Page 5 of 8 Three (3) new pedestrian crossings are planned to connect parts of the City together: a. The bridge over Highway #51 on County Road E does not allow any pedestrian movements and is dangerous for bicycles. An addition of a pedestrian facility will enable residents to access Tony Schmidt Lake Johanna County Park more easily. b. A connection between Royal Hills Park and the Round Lake area is planned over Highway #51, north of Interstate 4694. c. At the intersection of Highways#10 and #96, a safe pedestrian crossing is needed, and will be incorporated into construction plans. TCAAP Area Trails will connect residential neighborhoods, parks, the Civic Center area and the Park Preserve area in the TCAAP area. Ramsey County intends to install a trail along both sides of Rice Creek in the County Park. A rail spur from Mounds View into the TCAAP area north of Highway 496 and crosses I-35W south of the Highway 910 intersection is planned for a pedestrian connection. VI. IMPLEMENTATION CAPITAL I NIP ROVE NIENTS PLANNING AND BUDGETING Each year the City prepares a five-year Capital Improvements Plan (CIP) and a budget. The CIP is a long range plan, allowing a broad look and an opportunity to consider financial implications, whereas the budget determines actions for the next year. For park facilities and equipment replacement, the CIP sets forth needs for the next 5 years. Equipment replacement is prioritized according to wea:. age, condition and other factors. Priorities within the CIP and budgeting process are often shuffled, due to changing or unforeseen circumstances. PRIORITIES Table 5.2 sets forth_priorities for trails A, B and C, with A being the Llizhest prior -it This list of priorities will be utilized in the Capital Impro•_�erts Plan and bu. et rg processes. With these priorities laid out, the City vvia mAe spendinc- determinations on an annual basis, and plan appropriate Lea;? improvements to be coordinated with road upgrade projects. The Ci`;-will worl,: closely with Ramsey County to plan for constriction of trails with County road projects. Page 6 of 8 Table 5.2. Planned Trail Connections . w�Segiiierit`jr = ' 1 New Brighton Road a. Co. Rd. E2 to Co. Rd. E A 9 b. Co. Rd. E to Stowe A 2 c. Stowe to Co. Rd. D A .5 2 Pedestrian crossing - Highway #51 and County Road E, on q existing bridge. 3 Co. Rd. F from Lexington to Hamline?.venue; north on q 7 Hamline to existing trail. 4 Parkshore Drive west of Snelling Ave-nue to Blueberry Lane; around the west side os RoLmd Lake. a. Gateway Business Park to Highway#96 q 8 b. Park Shore Drive to Gateway Business Park A .4 5 Old Highway #10, from the southern City border north to Highway #96. a. Hwy #96 to Park Shore Drive B 8 b. Park Shore Drive to Co. Rd. E B 1.4 c. Co. Rd. E to Co. Rc D B 1 1 6 Lake Johanna Boulevard wrest to Tor-, Schmidt Park g 4 7 Lake Valentine Road - Snelling west to Mounds View High g 5 School. 8 North Snelling Avenue, f —m Royal fizp-s Park to Highway#96 g 5 9 Lake Johanna Boulevard, south from ?ark to Co. Rd. D C 8 Co 10 the south side of Lake Johanna, around Northwestern C College. 1.1 11 Ingerson Road Trail a. Lexington to Hamline b. Ha C 5 mline south to border C .4 12 Bethel College - around the east side of Valentine Lake C 13 Pedestrian bridge - Highway #10 Royal Hills Park to Round C 1 1 Lake area •2 14 Rail spur in Gateavay BuC;,ess Park C 5 15 Three (3) underpasses - v den with `treet reconstruction C 16 TCAAP rail fine from Mounds View C Trail easements in a_ea identired ^gay be acquired when land is developed. In developed areas, traii easements or land can be acquired as redevelopment occurs or as opporti+.^ities arise, abandoned railroad right-of-way or in utility rights-of-rya}'. No new neighborhood parks are planned outside of the TCAAP area. Within the 40 TCAAP area, parks and trails will be constructed as development occurs. Page 7 of 8 PARKS AND RECREATION COMMISSION The City Parks and Recreation Commission is an appointed citizen body that makes recommendations to the City Council on Parks and Recreation issues. Each year the Staff works closely with the Commission to reevaluate priorities and bring forth recommendations for future park and trail improvements as a part of the CIP and budgeting process. RECREATION Arden Hills offers a variety of recreation programs in the community. Quarterly brochures are sent to all residents that detail these opportunities, including many summer recreation programs for children and leagues and lessons for adults. Several youth associations organize soccer, baseball, basketball, football hockey, soccer, softball, s-,rzmming, volleyball and «,_ling. These associations work with the City to schedule City parks as agrez�d won for various activities. Page 8 of 8 ATHLETIC FACILITY ANALYSIS RECOMMENDATIONS AND PRIORITIES Based on the inventories and opportunities illustrated on the attached schedules and the Athletic Facility Needs Analysis (Ingraham & Voss-10/97), the following recommendations and associated priorities are below: Priority - 1 to 3 Years Gymnasiums • Construct a facility (single station) at Mounds View Community Center Under Construction • Construct a facility (single station) at Island Lake Elementary School (or most opportune location) $1,750,000. • Construct a facility (double station) at Highview Middle School (or most opportune location) $2,290,000. • Construct a facility (double station) at Edgewood Middle School (or most opportune location) $2,080,000. Soccer Fields • Revise location of fields at Highview Middle School to gain 1 Large and 2 Youth Soccer Fields $30,000. • Construct 1 Youth Soccer Field at Ingerson Park (Arden Hills) $40,000. Construct 1 Large Soccer Field at Southpoint Park (North Oaks) - designated for construction 1999 Cost Unknown • Lease 4 Large Soccer Fields from National Sports Center (Blaine) $8,000/Year Baseball / Softball Fields • Construct Girl's Varsity Fast-Pitch Softball and relocate Boy's Varsity Baseball at Mounds View High School. Reconstruct/ relocate soccer fields and practice football fields. 1. 'Base' Construction, including new topsoil, irrigation, drainage, paths, turf $1,200,000. 2. Backstops, fencing, scoreboards, benches for Fast-Pitch Softball and Baseball $72 3. Dugouts, bleachers, storage/ concession building $122 000. Athletic Facility Analysis Wold Arch/AJA Assoc. Page 2 Priority - 1 to 3 Years (continued) • Construct 1 13+ Years Baseball Field at Highview Middle School (work to be completed with soccer fields noted above) $10,000. • Add grassed infield at Bucher Park ( ) to allow for 13+ Years play $15,000. • Add grassed infield at McCullough Park (S i:tthview) to allow for 13+ Years play $15,000. • Construct 1 Adult Large BB/SB and 1 Little League Field at Southpoint Park (North Oaks) Under Construction • Construct 2 Fast-Pitch and 2 Little League Fields at the University Property (Shoreview) Cost Unknown (--$200,000.) • Construct 1 Youth Small BB/SB Field at Bel Air Elementary School $25,000. Priority - 4 to 6 Years Baseball / Softball Fields • Construct/ relocate existing fields at Chippewa Middle School to respond to the re-alignment of the County Road. Upgrade 1 Adult Large BB/SB Field $270,000. Priority - 7 to 10 Years • Acquire property for a Sport Tournament Facility to host regional, state and national events. The facility should include 8 to 12 fields, including soccer, baseball and softball. The property should be located on a parcel of approximately 40 to 60 acres. Cost Unknown