HomeMy WebLinkAbout04-22-1997 PTRC Minutes AGENDA
• PARKS & RECREATION COMMISSION
TUESDAY, APRIL 22, 1997
7:00 - 9:00 P.M.
ARMY RESERVE CENTER
1. Call to order and roll call
2. Approve March 25, 1997 Minutes
3. Council Report
4. Day in the Park Update
5. 1998 Park Fund Budget and 5 year Capital Plan Update
6. Review of 1997 Park Maintenance Projects
7. Tony Schmidt Park Update (if there is any new information)
8. Department Reports
• A. Program
B. Director
9. Adjourn
*** Please Call Cindy or Lynette if you are unable to attend this meeting***
1
CITY OF ARDEN HILLS
• MEMORANDUM
DATE: April 16, 1997
TO: Parks and Recreation Commission
FROM: Cindy S. Walsh, Parks and Recreation Director
CS
SUBJECT: April Agenda Report
Day in the Park
I have included a flyer that lists all of the activities that have been planned for this year's Day in
the Park Celebration on June 7. A smaller version of this flyer will appear in the utility bill
mailing this month. Tracy and I will be asking the Commission members to help in different
areas during the celebration. We will have more specific details at the May meeting.
1998 Park Fund Budget and 5 year Capital Plan Update
I have enclosed a copy of the existing 5 year plan. The Commission should begin discussing the
1998 budget recommendations and expand the 5 year plan to include 2002. I will bring
information on which playground structure is currently scheduled for 2002. Please keep in mind
• that the Hazelnut shelter building is in very bad shape. I intend to recommend to the
Commission that a new building be scheduled in 1998. That may mean that future trail segments
may be delayed until 1999.
Review of 1997 Park Maintenance Projects
I will be providing the Commission with an update of which trail, basketball, and tennis court
areas will be resurfaced and sealcoated this year. I have also budgeted for new hockey rink lights
at Freeway Park. If there are projects or areas you would like to see improved in 1998, please
give me your suggestions at the April or May meeting. Staff will begin the budget process in
May.
Tony Schmidt Park Update
I have enclosed a copy of a letter from Denny Probst to Ramsey County Commissioner, Tony
Bennett. Commissioner Bennett has told Mayor Probst that the beginning stages of planning for
the Tony Schmidt Park redevelopment will occur in 1997. I will attempt to contact Greg Mack
before the April meeting to verify this information.
MINUTES
• CITY OF ARDEN HILLS,MINNESOTA
PARKS & RECREATION COMMISSION
TUESDAY, MARCH 25, 1997
6:30 P.M. - 9:00 P.M.
ARMY RESERVE CENTER
LEXINGTON AVENUE AND HIGHWAY 96
CALL TO ORDER
Lynette Kreidler called the meeting to order at 6:35 p.m.
ROLL CALL
Present were Chair Lynette Kreidler, Megan Ricke, Don Messerly, Dorothy McClung,
Anita Larson, Mary Robinson, Jim Johnson, Cindy Walsh; Parks and Recreation Director, and
Tracy Petersen; Program Supervisor.
Absent were Council Liaison; Susan Keim& Louis Speggen.
APPROVE MINUTES
• Megan Ricke made a motion to approve the February 25, 1997, Minutes. Anita Larson
seconded the motion.
COUNCIL REPORT
In Council Liaison Susan Keim's absence, Ms. Walsh informed the Commission that the Staff
and Council had just finished their retreat.
1997 DAY IN THE PARK
Ms. Petersen outlined the events that would take place for the 1997 event. They included the
following:
13 John Menk - MN Thunder Pro Soccer Clinic 0 Clowns/Balloon Creatures
13 Splatter Sisters Concert 0 Scavenger Hunt
13 Concessions 0 Children's Games/Candy Hunt
13 Facepainting 0 USTA Tennis Demo
0 Caricatures 0 Basketball Free Show Shooting Contest
•
HAZELNUT PARK PLAYGROUND PROPOSALS
• Ms. Walsh informed the Commission that all three 3 proposals meet our budget requirements.( )
p p g
She indicated that she would like to save the original timbers from the current structure. This
would help save on the cost.
In brief the three (3) proposals were from the following manufacturers:
Earl F. Andersen - This proposal contains two (2) totally separate structures; one for preschool
age children and one for elementary age children. Swings on this proposal are separate. This
proposal has proposed two (2) ADA accessibility access points to the structure.
Note: The Commission suggested that toddler/baby swings be located closest to the
playstructure so you would not have small kids crossing over the regular swings to get
to their area.
Game Time - This proposal contains one (1) structure with quite a bit of platform space. The
swings and sand diggers are together on this proposal but are separated entirely from the
playstructure. Ms. Walsh noted that the stainless steel slide from the current Hazelnut structure
could be incorporated into this one. On a whole, the Commission felt this proposal was not as
"hands on" and interactive as the other two (2) proposals.
• Miracle -This proposal had two (2) options; both of them were proposed as one (1) unit with
preschool age activities on one end of the structure. Once again, the Commission felt that the
long rampways may not be the safest for the children.
FUTURE MEETING DATES
The next meeting will be held on Tuesday, April 22, 1997.
ADJOURNMENT
The meeting was adjourned at 7:30 p.m.
HAZELNUT PARK RESIDENT MEETIN
MARCH 25, 1997 •
NOTES/IDEAS
• Liked EFA proposal with separated areas.
• Asked about possibility of tract slide.
• Curly Q Pole.
• Corkscrew Climber.
• Horizontal Loop Ladder.
EFA -No spiral climber, but want one similar to one in Game Time Proposal.
• Overall Consensus - EFA Proposal with possibility of some changes in a couple of the
apparatuses.
•
a o x >
Cr
x o
-Gi --1 'G+
00
a
z
a
G
o
G
d
0 un
r
C
o w o
0 0 (D \-o)
0 0 0
o 0 0 .�
O O
0 0 0
O o 0 00 �^
` 1
Eo� 4,
0 0 0 I'm
O o o
0 0 o y
W N O
o z
0 0 o O
0 0
CD CD CDO
0
w
O N
O O
O O
O �
VJz:J
CITY OF ARDEN HILLS
1450 WEST HIGHWAY 96
ARDEN HILLS, MN 55112-5794
March 31, 1997
Tony Bennett, Commissioner
Ramsey County-District 1
15 West Kellogg Boulevard - Suite 316
St. Paul, MN 55102
Dear Commissioner Bennett:
On behalf of City Councilmembers Aplikowski, Hicks, Keim and Malone, and City staff, I
wanted to thank you for your attendance at our March 17, 1997 Council Worksession. We
appreciated your availability and comments to Council.
While your comments, and our questions and observations, involved a variety of issues,I'did
want to touch base with you regarding our discussion of Tony Schmidt Park.
As this park is of vital importance to the City of Arden Hills,we were encouraged to hear that
it was also a priority with the Ramsey County Commissioners and Parks &Recreation staff.
While not only the City's image is affected by the condition of the park, equipment and
facilities, the high usage of this amenity should speak for itself in the importance our
residents and constituents place on Tony Schmidt Park.
We're very pleased to hear that $300,000 of funding has been made available for design work
to begin in 1997. While the full project will not begin this year,we were encouraged by your
comment that some construction will begin this fall,with the remaining planned
improvements to be completed by 1999. We would like to encourage Mr. Mack to be in = .
contact with the City's Parks&Recreation Director,Ms. Cindy Walsh,to coordinate this
design process and construction activity. We would like to work cooperatively with the
County in keeping our residents up-to-date on the construction, and the availability for use of
the park.
We were also excited to hear about the 1998 funding available for the trail system north of
Lake Johanna. Again, we would ask that Greg Mack keep our Parks&Recreation Director
informed of the progress and timetable on this trail system as well.
PHONE: (6121 633-5676 - FAX (612) 633-7839
Tony Bennett, Commissioner
Page Two
March 31, 1997
Again, Commissioner Bennett, it was a pleasure to spend time with you at the meeting, and
we hope you will consider attending another of our meetings at your convenience, and as
your time allows. We appreciate your input and your interest in our community. With your
extensive experience in various government roles, we feel very well-represented by you and
ADennis
t
Mayor
DP/sls
rrV i'iu
CC/CindyWalsh,Parks & Recreation Director %
Greg Mack,Ramsey County Parks &Recreation Director
r