HomeMy WebLinkAbout11-27-1990 PTRC Meeting Minutes w CITY OF ARDEN HILLS
PARK AND RECREATION COMMISSION MEETING
MINUTES, NOVEMBER 27 , 1990
Call to Order
• The regular meeting of the Arden Hills Park and Recreation
Commission was called to order at 7 : 40 P.M. by Chairman David
Sand.
Roll Call
Present: Chairman David Sand, Carol Johnson, and Don Messerly.
Absent
Keith Enrooth, Tom Mulcahy, Mark Magers, Alan Montgomery,
Dorothy McClung, and Pattie Green.
Also Present
Councilmember Tom Mahowald, Program Supervisor Cindy Severtson,
and Parks Director John Buckley.
MINUTE APPROVAL Minutes of the September 25 meeting were
approved as mailed.
� v
COUNCIL REPORT Councilmember Mahowald reported:
- Park dedication for Group Health Inc. - agreed to pa $49 , 000
to the Park Fund. Payment would be made over the next three
years.
- Results of the citizen's survey were distributed to the
committee. Citizen responses to the Park & Program questions
• were discussed.
- Truth in Taxation meeting was discussed.
PARK DEVELOPMENT Buckley reviewed the report prepared for the
Trail Subcommittee. The length of the trails
were measured with the Public Works measuring wheel . The costs
were calculated by multiplying the trail linear footage by
$8 . 00 . The Committee decided to continue the trail development
discussion at their January meeting.
1990 PARK UPDATE Buckley reviewed the projects completed this
past summer.
1990 BUDGET COST
Hazelnut Shelter $15, 000 new $2 , 846 remodeled old one
Lindey's Landscaping 1, 000 450 AH/Shoreview
Rotary Clubs
Valentine Play Structure 9 , 000 9 , 000
Trail Development 25, 000 12 , 020 Hazelnut Trail
New Park Signs 964
Safety Gates 21229
Engineer Fees i ', 'i 2 , 876
• $ 30, 385
Page 2 November 27 , 1990 Park Minutes
MISC PROJECTS
• - Approximately four weeks was spent in removing storm damaged
trees from City parks and streets.
- Sampson Park - topsoil added, regraded, seeded.
- Valentine Park - topsoil addes, regraded, seeded.
- New park signs were placed in the City parks.
- New park safety gates were installed in various parks this
fall.
STATE GRANT Buckley reported that he has secured a grant
application from the MN Dept. of Trade & Economic
Development. All grant money has been allocated for 1991.
Grants submitted this winter would be for 1992 development.
YARD & Don Messerly reported that the yard beautification
LANDSCAPE winners for 1990 are:
RECOGNITION Mr. and Mrs. James Schioner & Kari, 1478
Lametti Lane, Mrs. Melva Pierce, 3316 New Brighton
Rd. , Fred & Eleanore Gilbertson, 3308 New Brighton Road, Tom &
Kathy Goserud, 4350 N. Hamline, and Mark & RaVonn Petersen, 4468
N. Hamline. All received certificates of excellence from the
City at the November 13 Council meeting.
PROGRAM UPDATE
- Dept. has received a strong response from the Fall programs.
Participants and parents have been asked to fill out program
• evaluations . The evaluations have been positive.
- Winter program flier is being finalized and will be mailed
with the December Town Crier. The fees for the programs have
been increased to cover 1991 program costs.
- It is getting increasingly difficult to find suitable school
space for programs during the fall and winter. Severtson is
presently reviewing potential program space in private
schools and Lake Johanna Fire Station halls. Councilmember
Mahowald volunteered to check with St. Odelia for possible
program space.
- Chairman Sand showed the committee the attractive City News
brochures he received from New Brighton and Shoreview. Both
brochures combined City news with Park and Rec. news. Since
the Town Crier has extensive readership in the community, it
was suggested that Arden Hills upgrade their newsletter.
MISC. BUS. Community Flower Gardens -
The Committee felt that the flower gardens was a good
community project. Two suggestions were made for 1991.
- Increase the size of the flower beds in the gateway
locations.
- Recruit volunteers to plant and maintain the beds in 1991.
•
Page 3 , November 27 , 1990
PARK COMMITTEE APPOINTMENTS FOR 1991 -
. Buckley will phone committee members regarding interest in
serving on the committee for 1991.
There will be no meeting in December for the committee.
ADJOURN The meeting was adjourned.
HAPPY HOLIDAYS TO EVERYONE
•
xlev
J � el
C -
°` (e L4. /
I i✓�1��1 ✓�c� ,,�.-yam Z�d�/ .
cql
Al ✓��
RAMSEY COUNTY
PARKS & RECREATION DEPARTMENT
2015 N.Van Dyke Street Telephone(612)777.1707
RAMSEY COUNTY Maplewood,Minnesota 55109.3796 Fax(612)777-6519
Gregory A.Mack,Director
P A R K S A N D R E C R E A T I O N C O M M I S S I O N
TO: Trails Advocates and Professionals
FROM: Bill Frank, Commission Member
SUBJECT: Ramsey County Trails Advocacy Network
DATE: December 20 , 1990
The Task Force for St . Paul and Ramsey County Parks , which met during
1988 and 1989 , culminated their work with a "Plan for Parks , Trails and
Open Space . " That plan ( a 122-page document tha was distributed to all
Par`- cTs an_ Recreation Directors and Mayors within Ramsey County)
recommended the formation of parks and recreation commissions for both
St. Pau an amsey ounty. Bo U T o r 7 F ese were orme wring mid-Y990
an are very active in aking t e ini iative for implementing elements of
the plan. Many of the recommendations of the Task Force related to
trails and bikeways .
The Ramsey Counter Parks and Recreation_ Com fission, chaired by Bob
Net ercut , is charged with the responsibility for formu�_lating
reco—m endations concerning the planning, development and operation of
parks, open space and trails for the County. I have been spearheading the
trails part of that char e . The area of trai s and bikeways is a very
comp ex issue -- made even more complex by the large number of
municipalities and other agencies involved. As a first step, I have
identified a "Ramsey County Trails Advocacy Network" that includes the
key players in the trails movement within Ramsey County. This network is
not meant to be a convening committee , but rather a conduit for
exchanging information.
Because trails have been identified as a major component of the Ramsey
County Parks and Recreation Commission' s charge , the Commission itself
will serve as a County-wide Trails . Advisory Committee with input from the
members of the Trails Advocacy Network . An important role of our
Commission is to create a County-wide comprehensive plan for trails that
will help guide future trail development within the County. In that
regard, our next step is to update the inventory of existing and proposed
trails within own y. a inventory will include trails/bikeway s
wiE'F n regional , County and municipal parks , along with those associated
with roadways -- whether off-road, alongside roadways or bike lanes on
roadways . We also want to identify the schedule for implementing
proposed trail segments .
,....gin,
• Trails Advocates and Professionals
December 20 , 1990
Page Two
During early 1990 , at the request of the Ramsey County League of Local
G nments ( RCLLGY, Larry Holmberg, Ramsey County' s Acquisition and
Development Supervisor , comps e a ase map--of-'tth; County showing
ex i 1 an p anne ra"1 s an ike lanes . Each municipality-should
have recei ed one e tr_om--tTe RCLLG.^ An addition-TT copy is being sent,
under separate cover , to the individuals listed in the first column of
the Trails Advocacy Network matrix. A lot of new construction occurred
during 1990 and many other trails didn' t get included on the original
map. We need your help in updating this map. Specific instructions will
accompany tFe map, calling for updated information from your community
( or agency) as soon as possible , but no later than February 1 , 1991 .
Please respond to this call for information.
The follow-up step, after incorporating your input on the base map, will
be to have an open forum meeting in March to discuss a inven-Eory-and a
com�1re ensive trails plan for Ramsey County. This will prove e
opportune y to see how each municipality' s trail programs mesh with those
of adjacent municipalities and the County. The agenda may be expanded to
include other trails advocacy issues .
I have enclosed a copy of the initial version of the Ramsey County Trails
Advocacy Network which includes separate listings of addresses, agencies ,
telephone numbers , etc . Additionally, a copy of a ye_ry useful article by
Stuart H. McDonald on "Building Support for Urban Trails, " taken from tie
Na tonal Recreation and Park Association s Par an ecreation"
magazine , is enclosed. Please supply updated information for the Trails
Advocacy Network to me , Bill Frank . We may have overlooked some
individuals and, in some cases , you may prefer to designate someone else
for the trails coordination responsibility. Please let us know of any
additions or corrections .
Your comments and recommendations will be greatly appreciated. Thank you
very much for your cooperation and support .
On behalf of the Ramsey County Parks and Recreation Commission and staff,
we look forward to working with you.
WF/clm
Enclosures
RAMSEY COUNTY TRAILS ADVOCACY NETWORK
CITY: PARK&REC. DIR. : PUBLIC WORKS DIRPR TR
. : CITIZEN COMM/COORD BD BD
SEY Greg Mack 777-1707 Kenneth Weltzin Bill Frank 484-5068 Y Y
OUNTY Larry Holmberg 298-4127 Bob Nethercut P&R Ch
777-1707 481-7239
1ARDEN John Buckley Dan Winkel David Sand HILLS 633-5676 429-4443 y N
1989 Jerrold
636-4384
FALCON Carole Krieger `Vince Wright
HEIGHTS 644-5050 644-5050 Y
Willard Anderson Willard Anderson Nora Gille 645-3153
LAUDERDALE (mayor) 631-0300 631-0300 (Vol. P&R Coord)
LITTLE Jim Morelan Dave Harris
CANADA 484-2547 day 484-2177 Y
484-2177 eve.
Robert Odegard Ken Haider
MAPLEWOOD 770-4570 770-4550 y N
Mary Saarion Rick Minetor
MOUNDSVIEW 784-3055 633-1533 Y N
EW Maurice Anderson Les Proper
IGHTON 633-8906 631-3736 Y N
NORTH Steve Roe Dave Kottelnik
ST. PAUL 770-4471 770-4463 Y N
Bob Bierscheid Steve Gatlin Bill Frank
ROSEVILLE 490-2281 490-2226 Y y
484-5068
Bob Piram Tom Eggen 298-4241 Richard Arey y ST. PAUL 298-4126 Leon Pearson (Engr) 290-0309 y
292-6277 Anne Kelley- P&R Ch
Gerald Haffeman Charles Ahl Mark Stange y y
SHOREVIEW 484-3353 348-2090 483-5373
Dan Collins 482-9467
VADNAIS Martin Walsh Joe Momson
HEIGHTS 429-5343 429-5343
WHITE BEAR Dave Guenther Ron Peltier
LAKE 653-2722 429-8566 Y
WHITE BEAR Tom Walczeak Tom Walczeak
OWNSHIP 429-5827 429-5546
Version 1, 12-20-1990
OTHER AGENCIES/ORGANIZATIONS
MN DEPT.OF Paul Swenson, Dir. Dan Collins
NATURAL 296-4822 Tom Danger
ESOURCES 296-6048
Trails Planning Trails Operations
MN DEPT.OF Greg Pates 296-1650 Jim Dustrude
TRANSPORT. 297-1838
Bicycle Ping. Unit Bicycle Policy
MN.PKS&TRL Judith Erickson
COUNCIL & 291-0715 Tom Dwight 426-0571
FOUNDATION
METRO Jack Mauritz Arne Stefferud Tom Dwight 426-0571
COUNCIL 291-6602 291-6360
Larry Kitto (Ch. )
FRIENDS OF Peggy Lynch
ST.P&RAMS. 698-4543
CTY. PARKS
MN.COALTN. Mike Miller
BICYCLISTS 296-0237 (at DNR)
645-6243 (R)
ROLLERBLAD Joe Janasz
IN-LINE 944-6726
SKTG.ASSOC
MN. STATE Kirby Beck, Chairm Jim Dustrude
BICYCLE 755-8341 ? Marsha Soucheray
OARD 297-1838 484-6056
MN. DEPT.
PUBLIC Mike McBride
SAFETY 636-4990
12-10-1990
•
DIRECTORY FOR RAMSEY COUNTY TRAILS ADVOCACY NETWORK
ARLES AHL MAURICE ANDERSON
OREVIEW PUBL.WORKS NEW BRIGHTON PK&REC
R. PUBLIC WORKS DIR. PKS. &REC. DEPT
4665 N. VICTORIA 1975 SILVER LAKE RD
SHOREVIEW, MN 55126 NEW BRIGHTON, MN 55112
TELE: (W) 484-3353 (H) 426-8133 TELE: (W) 633-8906 (H) 462-5384
RICHARD AREY BOB BIERSCHEID
ST. PAUL PKS&REC COMM. ROSEVILLE PKS&REC.
COMM. PKS&REC.COMM. DIR. PKS. &REC. DEPT.
534 LAUREL AVE #6 1114 WOODHILL DR
ST. PAUL, MN 55102 ROSEVILLE, MN 55113
TELE: (W) 348-2090 (H) 290-0309 TELE: (W) 490-2281 (H) 488-3187
JOHN BUCKLEY DAN COLLINS
ARDEN HILLS PKS. &REC MN.DEPT. OF NAT.RES.
DIR. PKS&REC. DEPT TRAILS PLANNING UNIT
1450 W. HWY. 96 BX 50, 500 LAFAYETTE
ARDEN HILLS, MN 55112 ST. PAUL, MN 55146
TELE: (W) 633-5676 (H) 674-8527 TELE: (W) 296-6048 (H) 482-9467
TOM DANGER JIM DUSTRUDE
MN DEPT. OF NAT.RES. MNDOT BICYCLE PLANNG.
TRAILS OPERATIONS BICYCLE POLICY
BX 50, 500 LAFAYETTE 807 TRANSP. BLDG.
ST. PAUL, MN 55146 ST. PAUL, MN 55155
TELE: (W) (H) TELE: (W) 297-1838 (H) 722-8090
THOMAS DWIGHT TOM EGGEN
0•PKS&TRLS.COUNC. &FOUND 'N. ST. PAUL PUBLIC WORKS
.MN. PTCF BOARD DIRECTOR
43 DAHLIA ST 600 CITY HALL ANNEX
MAHTOMEDI, MN 55115 ST. PAUL MN
TELE: (W) 291-5162 (H) 426-0571 TELE: (W) 298-4241 (H)
JUDITH ERICKSON BILL FRANK
MN.PKS&TRL.COUNCIL&FOUNDATION ROSEVILLE PARK&REC COMM.
EXEC.DIR. MN.PTCF COMM. -PK&REC. COMM
E-1311 1ST NATL BK B 438 IONA LANE
ST. PAUL, MN 55101 ROSEVILLE, MN 55113
TELE: (W) 291-0715 (H) TELE: (W) 733-7387 (H) 484-5068
BILL FRANK STEVE GATLIN
RAMSEY CTY.PK&REC COMM. ROSEVILLE PUBL.WORKS
COMM. -PK&REC. COMMISS DIR, PUBLIC WORKS DEPT.
438 IONA LANE 2660 CIVIC CTR. DR
ROSEVILLE, MN 55113 ROSEVILLE, MN 55113
TELE: (W) 733-7387 (H) 484-5068 TELE: (W) 490-2226 (H) 429-0630
NORA GILLE DAVID GUENTHER
LAUDERDALE VILLAGE WHITE BEAR LK COMM. SERV. &REC
VOLUN. PKS&REC.COORD DIR. -PKS&REC.
1820 LAKE ST. 2399 CEDAR AVE
LAUDERDALE, MN 55113 WHITE BEAR LAKE, MN 55110
TELE: (W) (H) 645-3153 TELE: (W) 429-5371 (H) 429-1619
GERALD HAFFEMAN KEN HAIDER
S OREVIEW PKS&REC DEPT. MAPLEWOOD-PUBL. WORKS
W. , PKS&REC DEPT. DIR. -PUBLIC WKS DEPT
6 5 N. VICTORIA ST 1830 E CTY RD B
SHOREVIEW, MN 55126 MAPLEWOOD, MN 55117
TELE: (W) 484-3353 (H) 786-2829 TELE: (W) 770-4550 (H)
DAVE HARRIS LARRY HOLMBERG
TTLE CANADA-PUB.WORKS RAMSEY CTY PKS&REC.
R. -PUBLIC WKS DEPT PARKS DEVELOPM. SUPVR.
0.1'5
LITTLE CAN. RD 2015 N. VAN DYKE ST
LITTLE CANADA, MN 55109 MAPLEWOOD, MN 55109
TELE: (W) 484-2177 (H) TELE: (W) 777-1707
(H) 647-0978
JOE JANASZ DAVE KOTTELNIK
ROLLERBLADE, INC. N. ST.PAUL-PUBL.WORKS
DIR. -R. I. S.A. DIR. -PUBLIC WKS DEPT
9700 W. 76TH ST 2526 7TH AVE
EDEN PRAIRIE, MN 55344 NO. ST. PAUL, MN 55109
TELE: (W) 944-6726 (H) 869-3289 TELE: (W) 770-4463 (H)
CAROLE KRIEGER PEGGY LYNCH
FALCON PKS&REC. FRIENDS OF STP&R.CTY. PARKS
DIR. PKS&RS&REC DEPT. EXEC. DIR-FRIENDS. .
2077 LARPENTEUR AVE 1621 BEECHWOOD AVE
FALCON HEIGHTS, MN 55113 ST. PAUL, MN 55116
TELE: (W) 644-5050 (H) TELE: W
( ) 698-4543 (H) 698-4543
GREGORY MACK JACK MAURITZ
RAMSEY CTY PARKS DEPT. METRO COUNCIL
DIR. , PKS&REC.DEPT. PARKS COORDINATOR
2015 N. VAN DYKE ST. 230 E. 5TH ST
MAPLEWOOD, MN 55109 ST. PAUL, MN 55101
TELE: (W) 777-1707 (H) 483-6582 TELE: (W) 291-6602 (H) 474-5618
MIKE MILLER RICK MINETOR
MINN.COAL.OF BICYCLISTS MOUNDS VIEW PUBL.WKS
fTAIRMAN DIR. -PUBLIC WKS DEPT
500 LAFAYETTE 2401 HIWY 10
. PAUL, MN 55146 MOUNDS VIEW, MN 55112
TELE: (W) 296-0237 (H) 645-6243 TELE: (W) 633-1533 (H)
JOE MOMSON JIM MORELAN
VADNAIS HTS PUBL.WKS LITTLE CANADA PKS/REC.
DIR. -PUBLIC WKS DEPT DIR. PKS&REC. DEPT. (eves. )
687 E CTY RD F 515 E. LITTLE CANADA
VADNAIS HEIGHTS, MN 55110 LITTLE CANADA, MN 55117
TELE: (W) 429-5343 (H) TELE: (W) 484-2177
(H) 484-2547 (day)
THOMOND R. O 'BRIEN ROBERT ODEGARD
MAPLEWOOD PKS&REC
480 GRANDHILL DIR. PKS&REC. DEPT.
ST. PAUL, MN 1830 E. CTY. RD. B
MAPLEWOOD, MN 55109
TELE: (W) 224-0043
(H) 227-4351 TELE: (W) 770-4570 (H) 429-2403
BOB NETHERCUT GREG PATES
RAMSEY CTY. PARKS&REC. COMM. MNDOT BICYC. PLNG.UNIT
CHAIRMAN-PKS&REC. COMM. TRANSP. PLANNER
4550 GALTIER 807 TRANSP. BLDG.
SHOREVIEW, MN 55126 ST. PAUL, MN 55155
TELE: (H) 481-7239 TELE: (W) 296-1650
(H) 722-4689
LEON PEARSON RON PELTIER
ST. PAUL PUBL.WORKS WHITE BEAR LK-PUB.WORKS
'o D LANDSCAPE ENGINEER DIR.-PUBLIC WKS DEPT
Y HALL ANNEX-8th Flr. 1884 WHITAKER AVE
PAUL, MN 55102 WHITE BEAR LAKE, MN 55110
TELE: (W) 292-6277 (H) TELE:
(W) 429-8566 (H)
ROBERT PIRAM LES PROPER
0 PAUL PKS. &REC. NEW BRIGHTON PUB-WKS
PT. PKS&REC. DIV. DIR.-PUBLIC WKS DEPT
W 4TH ST CHA R300 803 5TH AVE NW
ST. PAUL, MN 55102 NEW BRIGHTON, MN 55112
TELE: (W) 298-4126 (H) 699-4283 TELE: (W) 631-3736 (H) 633-7198
STEVE ROE MARY SAARION
N. ST. PAUL PKS&REC MOUNDS VIEW PKS&REC. DEPT.
DIR. PARKS&REC. DIR. PKS/REC/FOREST
2526 7TH AVE E 2401 HIWY 10
N. ST. PAUL, MN 55109 MOUNDS VIEW, MN 55112
TELE: (W) 770-4471 (H) TELE: (W) 784-3055 (H) 786-4438
DAVID SAND MARSHA SOUCHERAY
ARDEN HILLS PKS.COMM MN. STATE BICYC. BD.
CHAIR. PK&REC.COMM. BOARD MEMBER
1989 JERROLD 5355 HODGSON RD.
ARDEN HILLS, MN 55112 SHOREVIEW, MN 55126
TELE: (W) (H) 636-4384 TELE: (W) (H) 484-6056
MARK STANGE ARNE STEFFERUD
SHOREVIEW TRAILS T. F METRO COUNC.PKS&OPEN SPACE
CHAIR. TRAILS/BIKEWAYS T. F SR. PARK PLANNER-
655 EVERGREEN CIRC 230 E. 5TH ST
SHOREVIEW, MN 55126 ST. PAUL, MN 55101
TELE: (W) (H) 483-5373 TELE: (W) 291-6360 (H) 772-4367
PAUL SWENSON TOM WALCZEAC
DNR-DIV. OF PARKS & RECREATION WHITE BEAR TOWNSHIP
SECTOR-TRAILS & WATERWAYS DIR. PKS&REC. & PUBL.WORKS
op LAFAYETTE RD 1281 HAMMOND RD
ST. PAUL, MN 55155 WHITE BEAR TWNS, MN 55110
TELE: (W) 296-4822 (H) 436-7024 TELE: (W) 429-5827 (H)
MARTIN WALSH KENNETH WELTZIN
VADNAIS HTS.PKS&REC. RAMSEY CTY-PUBL. WORKS
SUPT. PKS&REC.DEPT. DIR. -PUBLIC WKS DEPT
687 E. CTY. RD. D 350 ST. PETER ST#270
VADNAIS HTS. , MN 55110 ST.PAUL, MN 55101
TELE: (W) 429-5343 (H) 484-0024 TELE: (W) 298-4127 (H)
DAN WINKEL VINCE WRIGHT
ARDEN HILLS-PUB.WKS. FALCON HTS. PUBL.WKS
DIR. -PUBLIC WKS DEPT DIR. -PUBLIC WKS DEPT
1450 W. HIWY 96 2077 LARPENTEUR AVE
ARDEN HILLS, MN 55112 FALCON HTS, MN 55113
TELE: (W) 633-4443 (H) TELE: (W) 644-5050 (H)
Version 1, 12-20-1990
For additions, deletions, corrections, or comments please contact:
Bill Frank, 438 Iona Lane, Roseville, MN 55113 484-5068 (H)
733-7387 (W)
0
S u p
up
r
Urb
Trails
By STuART H. MACDONALD
r.
f
t
•
r.
- ....f.� .. �,f.'n•a..•. •..-..... ,' T -;::'• Yew�iH1,MP.y�¢r'
wilding urban trails has R ■
changed dramatically in this -
post-urban renewal era. No
longer do we hear the voice of the `
federal agency looking for a few
good fundable projects. The new
big issues are funding, user fees, r, r.« . .: .
and private sector involvement, not __�; l: -- -- " Because of public
planning, programs, and social re- +; r' and private coopera-
,; `
search. As we examine ways to get tion, support, and
trails built under uncertain circum- publicity, cyclists of
stances, there is one fact we must - all ages can use
face: trails in face: no urban trail is going to get �I Col-
orado. Pictured at
built without solid political and ! `�:,� left and on the pre-
community support. ceding page is the
Another fact we must face is that Arapahoe Green-
in a society so committed to moto- `-� way/Platte River
rized transportation, urban trails _ Trail, which runs for
and pedestrian facilities are seen a5 ,�. - -: ten miles within the
;•- Denver, CO city
a luxury. People expect trails in the >s ts> " - limits.
mountains and parks for the"pure"
recreation of weekend trips and urban trails. trail plan identifies available corri-
vacation time. Much has been writ- Urban trails are different from dors, so trail development means
ten about the trend toward urban other types of pedestrian facilities picking the top priority and pursu-
recreation, but we are still waiting because they are separated from ing it. Sometimes an opportunity
for the energy crisis that actually roadways. Emphasizing landscap- comes along, like a major flood-
forces people to go to a city park ing or natural environments, es- control project or railroad
instead of a national park. In fact, sentially they are linear parks using abandonment, to which the trail
records are set every year for a wide variety of corridors. The project may be tied. Multiple use of
wilderness and back-country trail three projects discussed here use a corridor is especially appropriate
use. stream corridors, which in Col- in urban areas and is often a wav to
What has changed is the increas- orado are as attractive on the arid enhance funding and public sup-
ing numbers of people using urban plains as in mountain towns. There port. Other opportunities for mov-
trails.The number of cyclists in the is hardly a town here of any size that ing a trail project to the head of the
U.S. is about 80 million, or 31 per- does not have a river or creek run- priority list are a new park and rec-
cent of the population (Wall Street ning through it, providing an reation study, new land develop-
Journal,April 21, 1986,p. 5D).The opportunity for some kind of trail ment, highway improvement, in-
1982-1983 Nationwide Recreation development. Other suitable corri- volvement of a major firm, urban
Survey of the U.S.Department of the dors include power lines and pipe- redevelopment, and changes in
Interior shows a rise in bicycling lines, road rights-of-way, irrigation political leadership.The complexity
from nine percent of respondents canals, drainageways, and aban- of these projects usually means that
to 28 percent in 1982. While the doned railroads. it can take years for a trail to get
study indicates 26 percent run or When establishing a trail, one of built, and a project that has already
jog,in 1960"running was limited to the main concerns is the complexity gathered political and community
a relatively few young athletes. It of the route's ownership.Neighbor- support will be the one that goes
was considered so insignificant as hood linkages, access to open ahead rapidly when the right oppor-
not to warrant inclusion in the 1960 space,and scenery are also criteria, tunity emerges. In almost all cases
National Recreation Survey (which but in the urban setting these quasi- there is a local jurisdiction—town,
included rock.climbing)!" Finally, industrial corridors are attractive city, park district or county-
53 percent were found to walk for alternatives. pushing the project.While state and
pleasure,compared with 14 percent How do urban trails get built? federal agencies may be of great
involved in day hiking. All of these Selecting a suitable trail route is the help, in urban areas you need a
activities increase the demand for first step. In many areas, a regional specific local agency committed to
MR/NOVEMBER 1987/27
the project. Finally, active citizens' • Using an exiting non-profit ter along the river. Further south,
advocate groups participating on group. This is a chicken-and-egg three development corporations
the local level are essential question, whether one creates an are cooperating with the City of Lit-
organization to build a trail,or cre- tleton in a riverfront master plan to
ates a trail project for an existing blend residential, office, and com-
Case Study: organization.Whichever came first, mercial developments with over a
Arapahoe Greenway/ the group provides leadership, a mile of the Arapahoe Greenway.
Platte River Trail focus for support, and a vehicle for • Bringing keypeople tothe trail
contributions. corridor. The foundation has held
The Platte River Greenway has be- • Having a definite goal. The several tours to show elected offi-
come a well known example of an goal was simple—to reach Chatfield cials and project sponsors the com-
urban river recreation project. Pub- reservoir—but specific. Progress pleted and planned trail. Showing
lic support developed the ten miles can be measured, and participants off accomplishments gives a feeling
of trail within the Denver city limits feel they are part of an accomplish- of continual progress and clarifies
as part of a complex project of flood ment rather than a concept. the trail's benefits.
control and urban rehabilitation • Tying in with larger projects. • Involving legislators. Founda-
along the river corridor.As a spine The Colorado Greenway Project tion board members never miss an
for a series of loop trails and access loop trail and the Army Corps of opportunity to lobby the area's state
along tributary streams and canals, Engineers flood-control project,for legislators. These officials also vote
the Platte River Greenway is the example. on the lottery allocation for trails
most important trail in the Denver • Working with existing trail funding, state highway funds, and
metropolitan area. The South Sub- plans. The Arapahoe County exten- outdoor recreation legislation.
urban Park Foundation,established sion of the Platte River trail has been Keeping successful projects in view
in 1979"to enrich the environment on trail master plans for years, in- of the legislature helps build sup-
and improve open space and rec- cluding the 1974, 1980, and 1985 port for trails at the highest political
reational amenities for residents in State Recreational Trails Master level.
the South Suburban communities Plans. No one needed to be con- • Using an appropriate consul-
of metropolitan Denver," de- vinced of the importance of the tant. While the consulting firm,
termined that extending the trail project. Urban Edges,Inc.,has considerable
was critical. • Building on precious efforts. trail-development experience, it
In addition, the state legislature As in other endeavors,continuing a subcontracts working drawings,
contributed $300,000 of Colorado successful trails effort is easier than water engineering, and other tech-
Lottery revenue. None of this fund- starting a new one.Acknowledging nical work. As part of the contract,
ing, however, went toward South previous efforts, of course, is es- however, the consultant assists in
Suburban's project.The foundation sential. fundraising presentations, public-
felt it was important to keep its sep- • Breaking theproject into man- ity,trail tours,and what amounts to
arate visibility and to clarify its own ageable pieces. Rather than solicit community development work.
goal of extending the Platte River funds for a giant, multi-million- • Making the most of publicity.
trail to Chatfield State Recreation dollar project,organizers identified The foundation publishes a news-
Area. In the same way that 22 agen- sections of a mile or less and tied letter quarterly, speaks on the
cies and municipalities gave funds them into other efforts.The first link project, and sends out news re-
and support to the loop trail, the reached Bear Creek in concert with leases regularly. While publicity
South Suburban Park Foundation the loop trail; the second helped costs money and time, it is a good
solicited funds from every town in complete one town's open space investment.
its area. In addition to a $125,000 plan;the third was planned with the
challenge grant from the Gates Corps of Engineers channelization; Case Study
Foundation, more than 100 in- the fourth involves commercial Mesa County/Colorado
dividuals, associations, and busi- riverfront development. River Trail
nesses gave to the effort. • Seeking cooperation from de-
Following is a summary of the velopers. The first trail link involved A serious effort was made in the
efforts involved in building political donations of both right-of-way and early 1970s to develop a trail along
and community support for the Ara- cash from the Phillip Nolan Com- the magnificent Colorado River
pahoe Greenway/Platte River Trail: pany,developers of a business cen- through Grand Junction in western
28/NOVEMBER 1987/P&R
t
d
f
4r � ;
• !r'G' � i. C it�. _ _
Colorado. A Greenbelt Foundation planning at every level of govern- nunciation of the entire greenbelt
was formed which gathered con- ment,we may forget the importance concept. It may be that the time for
siderable public interest, including of planning as an orderly way of the trail project had not vet arrived,
a board of directors composed of reaching a goal. that not enough broad-based sup-
influential local citizens. Ten years Another problem was mainte- port was in place.Certainly the sim-
later, however, only a short, little- nance. With the migrations of the ple idea of public access to the river
used section of trail was in place, late 1960s came transients who took had been buried in a plan that
and the county-owned parkland up residence along the river. What turned out to be too vague and
along the river was closed to the efforts the county made at law ambitious for the time. In any case,
public. How had such a well- enforcement are no longer remem- people continued to ignore the riv-
organized effort faded into a bad bered, but the result was a per er through the oil-shale boom years
memory? One problem was failing manent closure of all the public when resources were available for
to establish the greenbelt system open space.A final blow to the foun- many other public works projects.
firmly in city and county master dation was its widely-publicized in- It was not until 1984 that another
plans. tent to acquire a strip of parkland for attempt at establishing the Colorado
Ineffective long-term planning miles along the river. As innocent River Trail was made. Mesa County
for the entire region hurt trails as and logical as that idea may be, it applied for and received a grant for
much as any fault of the Greenbelt shocked farmers, landon•ners, and trail construction through the state's
Foundation. Todav, after the last anyone with a vague distrust of gov- Division of Parks and Outdoor Rec-
decade's frenzy of planning and re- ernment into an emotional de- reation. However, in the deepening
P&R/NOVEMBER 1987/29
gloom of the economic boom-
turned-bust, the county abolished
its own parks department and cut
Fourteen Ways to Develop, Fund, back on others.When the dust had
and Maintain Your Urban Trail(s) settled,it was clear that political sup-
port for the river trail was nonexis-
■ Put together a citizens'com- and publicizing the good tent,except for a couple of survivors
mittee. The group's make-up works of others. in the Planning Department. These
will change over time, but ■ Use the talents and resources People picked up the trail project
committee citizens and in- of others. Attract a wide vari- yet again,and this time started with
fluential community leaders ety of supporters to the the determination to build enoughcitizen and government support to
are essential. project, put them to work at ensure success.
■ Examine the feasibility of the what they know best, and The Colorado River Trail has
project. Research land provide opportunities for reached the construction phase a
ownership, physical and so- volunteers. ter three years of widespread effort.
ty
I
cial concerns, and communi- ■ Exploit every publicity.oppor- Many of the old problems have been
needs: tunity. Be shameless about overcome as new ones surface.
■ dentify funding sources, using publicity; your project Some lessons from this project in
Federal, state, local, business, must become part of the building political and community
foundations, and the public. common knowledge of the support are summarized below:
■ T Identify potential supporters. entire community. • Overcoming past problems.
There are many groups, in- ■ Get key people to visit the Negative feelings left over from past
nesse als, agencies, and busi- site. No slide show, presenta- failures can sink the most de-
national—that local and tion or appeal is as convinc termined effort.The problems were
national—that are interested• in as a walk aloe the trail in civic improvement proj- g g identified, acknowledged, and ad-
corridor. dressed with new ideas. Circum-
■ Selll the concept. Make per-
ect ■ Create a realistic develop- stances do change, but obstacles sonal contacts, try to reach ment plan. Agree on a clear may endure.
everyone, have all the an-
goal, establish a level of de- • Involving state agencies.
swers, and make others be- velopment appropriate to Three state agencies were inter-
lieve in the project as strong- your resources, and commit ested in the project.The Division of
ly as you do. everything to actually build- Local Affairs helped plan and coor-
■ Make the connections. Es- ing the trail. dinate low-cost student research
a
tablish the project in. every
w Developmanagement and design projects.The Division of
known planning effort, fit it plan. Agree on who covers, Wildlife wanted to build trails at its
into other projects, and build liability, who will maintain wildlife refuge on the river and sup-
on past accomplishments. the trail, and how it will be ported other trails as part of habitat
■ Emphasize the positive. Stress used and managed. improvement.The Division of Parks
and Outdoor Recreation had es-
t
the benefits of the project, ■ Be flexible and tenacious. tablished a Sate Trails Program
make it irresistible to those Sheer energy and will are a
who need to be identified must, with the goal helping local com-
but sometimes a con- with ties plan and build trails. Most
with positive achievements, cept needs years to take states now have similar programs
and listen to their good root. You must keep the ideas. project alive, establish it through their Department of Nat-
ural Resources.Investigating the re-
■ Acknowledge support and firmly in the minds of com- sources of state government may
assistance. Create good will munity and political leaders, turn up interest in surprising places.
by giving recognition, and be prepared to,take • Becoming a leader in trails de-
encouraging cooperation advantage of any opportunity velopment. Mesa County's persist-
among groups and agencies, that comes along. ence with its project has encour-
aged latent trail projects with Grand
junction and the Division of Wild-
30/NOVEMBER 1987/P&R
life, and inspired other towns in depressed areas is "economic de- an effective sales device. Each trip,
western Colorado.Becoming an ac- velopment." The trail, especially however,was seen as a fun event in
knowledged leader brings a great through the city, is tied in to river- itself, with hiking, birdwatching,
deal of pride and continued politi- front rehabilitation. One design socializing, a chance to enjoy the
cal support. shows a linear park along the river outdoors. To celebrate receiving a
• Identifying a demonstration as part of redeveloping the city's in- trail construction grant, trail sup-
project. A project linking two sec- dustrial zone. The success of these porters joined the State Parks Board
tions of existing bikeways will be a kinds of projects throughout the for a picnic.Such events are a good
major contribution and an example country can help convince political lure for television coverage.
for future efforts. It also establishes and business leaders that trails and
a specific goal for fundraising. parks are important to urban Case Study
• Finding a corridor that works. revitalization and improving a city's Cation City/Arkansas Rives'
Planners originally envisioned the image. Trail
along the river bank,but prob- • Stimulating volunteer partici
lems with easements led to a new pation. The local Audubon Society For 25 years, Wes Carhartt has
route through a scenic wildlife area became a project sponsor, and thought about a trail along the
on the right-of-way of an adjacent when it became clear that the coun- Arkansas River through Canon City
canal. Flood plain zoning will give ty needed help, offered to help in south central Colorado. In 1980,
the county more control over the build and maintain the trail as an- several Canon City citizens met to
riverfront in the future as develop- other Aubudon group had done in walk along the river, research the
ment takes place.The City of Grand the City of Pueblo. Finding a strong corridor's ownership, and put
Junction, however, has established core group can provide the neces- together a plan for a trail. The
ownership of the flood-control sary focus for public participation. following year the group presented
levees and is not as limited by pri- • Bringing the public into the their plan,now known as the Arkan-
vate ownership.Willingness to com- project. Planners conducted a series sas Riverwalk,to the Canon CityMet-
promise and find creative trail of public meetings to increase the ropolitan Park and Recreation Dis-
• routes can make the difference in a project's visibility. Invitations to key trict. Continuing to publicize the
project's success. people, radio and newspaper plan, the Steering Committee
• Encouraging cooperation notices, and the Audubon Society's obtained endorsements for the trail
from business interests. PepsiCo, grapevine achieved the best results. from the Recreation Board, the Lin-
Inc., the local utility company, and Presenting the trail plans and asking coln Park Sanitation District, the
two construction firms along the for ideas stirred up excitement and Daily Record newspaper,and mem-
trail route granted free trail ease- generated a list of active trail sup- bers of the city council, County
ments. A business along the trail porters. A special meeting with the Board of Commissioners, and the
may welcome the exposure and county commissioners enabled school district.
positive association. Other firms supporters to speak directly to their The sanitation district, which
contribute as a community service elected officials. owns land along the river,agreed to
and encourage political support. • Creating a project strategy. As a greenbelt on their property if the
• Using tourism to sell the trail. too many meetings can burn out the recreation district would manage it.
As a tourist attraction, the river is brightest idea, organizers decided In 1982, the two agencies signed a
simply unknown. Approaching the to form a steering committee of a lease agreement, followed by an
city across the bridges, visitors are few dependable supporters. This agreement to purchase a 3-1/2-mile
dismayed by junked cars lining group worked directly..with._the_, right-of-way owned by the Santa Fe
parts of the river and b} its in- project sponsors, providing input,r Railway.The price of$15,000 for the
accessibility elsewhere. Emphasiz- critiquing design ideas, selecting a ten-acre parcel depended on com-
ing recreation and tourism poten- consultant, and reporting on prog- pleting the purchase byyear-end for
tial helped gain the assistance of the ress.They established timelines and tax purposes.Citizen support,com-
visitor and convention bureau, recruited new supporters. mitted local officials and agencies,
which has ties with the chamber of • Publicizing the trail through and a Colorado Greenway Project
commerce and business interests. field trips.One very successful effort trail construction grant are making
• Participating in urban was a series of field trips along the the Arkansas Riverwalk a reality.
• redevelopment efforts. The magic trail corridor.Getting key people to Following is a summary of the
phrase in Mesa County and other see the beauty of the river area was project:
P&R/NOVEMBER 1987/31
• Developing a core group. The that could benefit from the trail and and Rotary Clubs, high school shop
number of people who began the be useful politically. classes, scouts, and the state peni-
project was very small,but they had • Developing good media rela- tentiary promised labor and Ion-
a clear idea of what they wanted to lions. By including local newspaper struction.The city,county,U.S. For-
accomplish and a commitment to people and convincing them of the est Service, and agricultural exten-
the trail over the long term. value of the trail,the committee en- sion office contributed tools,
• Organizing formal support. sured good publicity for project machinery,and technical assistance.
Putting together a citizen's steering events. Perhaps more important, • Assessing broad public senti-
committee was the first step. As because the editors understood the ment.A recreation facility question-
more groups and individuals be- project, they supported it during naire sent to a large sample of the
came involved and the recreation periods of controversy. The com- city's population included the trail
district became the leading agency, mittee also enlisted a local radio sta- project.The high level of interest in
planners grouped participants into tion and cable TV station as support- the project revealed by the ques-
several action units: Long-Range ers. tionnaire helped convince political
Planning and Engineering;Finance, • Gearing development to the leaders of the trail's importance.
Land Acquisition, and Legal; Public available resources. Limited cash 0 Recognizing the concerns of
Involvement and Publicity; and was available for the project,but the adjacent landowners. The classic
Construction and Maintenance. extensive community support made problem of trail development is the
• Reaching the larger communi- it possible to secure donations of hostility of adjacent residents who
ty. Early on,the steering committee labor and materials. The County envision a loss of property value,
identified all the possible groups Homebuilders Association, Lions safety,and privacy.Evidence linking
32/NOVE,XIBER 1987/1)&R
Have You Made out Your Christmas List?�
problems to trail construction is ex y :ttt
tremely rare, but an axiom of trail ,
• .
development is that existing resi-
dents will always protest,while new r
purchasers of housing along the
trail see it as an amenity.
• Continuing the project in the
face of opposition. Because trails
are linear parks, they can affect
more people and run into more f
physical and legal obstacles than the "u
average park project. While criti-
cized as an inappropriate tax dollar •%
expenditure, the trail won out as a ' .
priority. Trails are an investment in
the future and their value to the ..
community becomes readily appar-
ent as they become a reality. j
As you can see from these case
studies, each trail project has
unique opportunities and prob- 0
lems. Building a critical mass of
political and community support is y,
like foreign diplomacy: you must
explore unknown territory,find outti.
who is important and why,learn the
• bewildering rituals and customs of III
the native organizations, and find a —
mutual benefit with each of them. Nrks M44-n-al loll WANTED
Some important issues in trails
development are only briefly men-
tioned here: fundraising, managing Change of Recreation Director;
boards and committees, securing South Hadley, MA.
easements,liability,trail design,and Address opportunity to create and
trail operation. There are many
good sources of information for maintain an all-eneom-
each of these issues.On page 30 is a Please let us know two months in
advance so you will receive your passing recreation pro-
checklist of actions for cultivating PARKS & ,RECREATION_may;a gram, BS or BA in recre-
public support of an urban trail nines without interruption.
project. Included are ideas from ation or leisure services
Mary Carter of the South Suburban f---� with 3 years experience
Park Foundation and Kari Van Meter I N
of the Loveland Planning Depart- I I including administration or
meet. ❑ I s I N supervision. $19,500 to
$21,200. Resume dead-
EDITOR'S NOTE:A list of currently I �,
available references that are good line Nov. 12, 198'I. Infor-
sources of information on develop- i i o mation and resume to:
ing an urban trail project is avail- l x I Recreation Commission,
ablefrom the author at the Division CEO Mongeau, 58 Mt.
of Parks & Outdoor Recreation,
1313 Sherman, Rm. 618, Denver, I I View, South Hadley, MA
CO 80203. L--—� U 01075.
Please circle reader service card number 27
P&R/NOVEMBER 1987/33