HomeMy WebLinkAbout01-23-1990 PTRC Meeting Minutes c
CITY OF ARDEN HILLS
• PARK AND RECREATION COMMISSION MEETING
MINUTES, JANUARY 23, 1990
Call to Order
The regular meeting of the Arden Hills Park and Recreation Commission was
called to order at 7:40 P.M. by Chairman David Sand.
Roll Call
Present: Chairman David Sand, Dorothy McClung, and Don Messerly.
Absent
Keith Enrooth, Tom Mulcahy, Mary Gillies, Alan Montgomery, and Pattie
Green.
Also Present
Mayor Tom Sather, visitor Mark Magers and Parks Director John Buckley.
Chair Sand introduced Mr. Magers to the Committee. Mr. Magers lives at
4521 Keithson Drive and stated he was greatly impressed with the quick
response and genuine concern Mayor Sather gave his neighborhood regarding
construction development problems. He decided to volunteer for City
committee service. The committee heartily welcomed his interest.
MINUTE APPROVAL Minutes of the October 24 meeting were approved as
mailed.
• COUNCIL R:�iORT Mayor Sather reported:
The gambling industry in Minnesota is becoming a billion dollar
industry and still growing. It has grown too fast. The legislature
will have to provide more staff and funding to properly regulate the
State's gambling industry.
- Council passed a charitable gambling ordinance where the City would
receive 10% of the profits from all license holders operating in the
City. Originally, charities could designate where the monies would be
given. The present ordinance states that the City will designate the
use.
PROGRAM SUPERVISOR 104 applications had been received for this position
UPDATE which are being evaluated by using the following
criteria: Education, Work Expeience, Supervisory
Experience and Personal Interests and Skills. Eight to ten applicants
will be interviewed on Feb. 15 and 16. With Council approval, person will
start in March.
ARSENAL ATHLETIC The Arsenal athletic field project is presently on
FIELD hold until the Arsenal can get soil and water envir-
onmental clearance.
1989 REVIEW OF $80,785 was budgeted in 1989 for park development.
PARK DEV. Projects completed include:
•
January 23, 1990 Park Minutes
- Resurfacing hard courts at Arden Oaks, Arden Manor, Hazelnut and
Valentine.
- Hazelnut Trail (Glenpaul to Stowe) was blacktopped.
- New bridges were constructed at trail between Cummings and Floral Park
and between Perry and Chatham.
- New signing and benches were placed on the trail.
Park projects on hold:
- Round Lake park development on hold until entire Round Lake development
is finalized.
- Construction of soccer field on City property east of public works bldg.
is placed on hold.
1990 PROPOSED $234,500 was budgeted in 1990 for park development.
PARK DEV. $175,000 was allocated for Arsenal athletic fields.
1990 expenditure can be revised to $59,000. Trail
development and improvements will take top priority in 1990.
1990 GOALS Buckley suggested that the Parks Committee sponsor a
City-wide beautificatio:: [:L:ogram durin;, 1990. The
• program could include:
- Continuance of the annual yard beautification recognition program.
- Expand Arbor Day celebration to include providing free seedlings to
interested Arden Hills families.
- Work with businesses along County Road E to plant flowers and brighten
up "Main Street" in the City.
- Plant flowers along the heavily traveled streets and avenues.
- Plant flowers at each City park site.
MISC/NEW BUSINESS Mark Magers expressed an interest in being appointed
to the Park Committee. The members recommended his
appointment.
Since the 4th Tuesday in February (February 27) is Precinct Caucus Night
and no evening meetings may be conducted that evening, the next Park
Commission meeting has been set for Tuesday, February 20, at 7:30 P.M.
ADJOURN The meeting was adjourned at 9: 10 P.M.
• AGENDA
Parks and Recreation Committee Meeting
City of Arden Hills
Tuesday, January 23, 1990, 7:30 p.m.
City Hall
Call to Order and Roll Call. filL 1 �
Y2! Welcome Old Members.
V,�3. Oath of Office.
Approval of Octobf�r 2A, 1989 Minutes.
V,/5. Council Report:*
V 6• Program Supervisor Update.
J �
7. Twin Cities Arsenal Athletic Field.
V/ 8 Review 1989 Park Development.
4J. Review 1990 Proposed Park Development.
• VVV 16. 1990 Committee Goals. ray' I\IP �� J
v/11. Miscellaneous/New Business.
✓12. Adjournment.
�" '�' f s Tom,
MEMORANDUM
DATE: February 1, 1990
TO: Mayor and City Council
FROM: John T. Buckley, Parks Director
SUBJECT: Proposed Program Supervisor Position
The new Program Supervisor position is a major step in demonstratin
Arden Hills ' residents and neighboring communities that the Mayor andto
Council are firmly committed to improving the "quality of living" of Arden
Hills' citizens through program growth and high standards of excellence.
The present youth and adult programs are a sound basis for new program
development. a
PROPOSED PROGRAM EXPANSION WITH PROGRAM SUPERVISOR
During the 1989 season the NYSCA Coaches- Training Program was used in
training the T-ball and youth softball volunteer coaches. The NYSCA is
currently co-sponsoring a nationwide campaign with the national
• PTA's/PTO's in promoting "Yes to Better Sports for Kids".
have ali youth volunteer coaches trained with NYSCC programs. goal is to
TOP PRIORITY
Promote "Yes to Better Sports for Kids" in Arden Hills by
-contacting with Valentine Hills PTO and Island Lake PTO
-Contacting Board of Directors of Lake Region Hockey Assn. , Little
Lakes Little League, the North Suburban Soccer Association, Babe
Ruth Baseball Association, Mounds View Football Assn. , and the
Mounds View Mustangs Basketball As
sn.
Assist in training volunteer coaches fo: these youth athletic assns.
TOP PRIORITY
Jr. High/High School Program Focus. Promote:
-Teen sports, softball, broomball, etc.
-Special events, ski trips, vacation outings.
-Jr. leader progrm (training youth leaders) .
-United States Athletic Association Drug Education Program.
TOP PRIORITY
• Increase creative programming in the firm arts field for elementary, Jr.
High and Sr. High children.
• NETWORKING PROGRAMS
A number of programs can be co-sponsored with local agencies and
neighboring park and rec. departments, such as:
Ramsey County Library (story telling, dramatics) ; Ramsey County Naturalist
(programs in Tony Schmidt Park) ; Roseville Parks Naturalist (program in
Crepeau Park and Chatham nature area) ; Mounds View, Shoreview and
Roseville Parks Dept, (team tennis, softball and volleyball) .
Adaptive Recreation Program (co-sponsored with Mounds View, New Brighton
and Shoreview) : Friday Nite Live (adaptive Rec. Teen club); Saturday Club
(adaptive rec. for elementary youth) ; adaptive sports programs such as
bowling, aquatics, track & field "special olympics".
Communication and Publication:
-weekly riews arLicles and phoLos in Bulietin and Focus.
-Take advantage of public access cable channel for publi.c:izing
programs, films and program activities for public viewing.
PARKS AND RECREATION DIRECTOR
NEW OBJECTIVES/EXPANDED RESPONSIBILITIES
CITY-WIDE BEAUTIFICATION EMPHASIS
• Continue and expand the yard beautification/landscaping neighborhood
recognition program.
Recruit volunteers/neighborhood garden clubs to:
-plant and maintain flower beds in neighborhood parks.
-plant and maintain flower beds at "gateways" to City.
-plant flowers at additional City busy intersections.
Become actively
ely involved with North Suburban Chamber and Arden Hills
merchant groups.
Upgrade and beautify City business district, expand Arbor Day celebration
by recruiting scouts and other youth clubs and families to plant trees and
care for neighborhood parks. "Plant a tree campaign" - have free
seedlings available for all families in the City to plant in yard. Plan
City-wide/state-wide Earth Week (celebration and environmental awareness
program) . Promote July 4th Olympic Torch Run. Promote Fall Festival
celebration. Promote Recreation/Wellness Activities with Arden Hills
companies/businesses (employee softball, volleyball basketball, walking) .
ARSENAL ATHLETIC FIELD COMPLEX
The Army has placed the athletic field complex on "hold" until
environmental problems can be cleared un. This complex is of major
importance for future City programs. Continued efforts should be made
• with Ramsey County Parks Dept. and the three neighboring communities to
secure this property.
WHO ARE THE MEMBERS AND LEADERS OF USAA, AND HOW CAN I GET
INVOLVED?
USAA is an organization of Jr. High, High School and College Athletes that
have banned together to promote positive life choices with the common
interest of athletics.
A: Who are the Members?: There are two types of membership. The student
athlete in Jr. High, High School or College and the support individuals i.e.
Athletic Directors, Coaches, Parents, School Administration, Sports Teams,
Sports Suppliers, Educational Institutions, and any person, group, or company
that hove the common goal of promoting excellence in sports through positive
life choices.
B: Who are the National Leaders?: The Board of Directors and National
Leaders include players and administration from Professional and Amateur
(thletic Organizations in many different sports; Medical and dental Health
associations; Educational Associations; and leaders ,n Business.
C: What are the necessary steps for my school(s) to start a chapter?:
1. Get 10 athletes and 1 administrator tc fill out an application and
Potential Sponsor Form, and return it to the National Office.
2. Once that is done, the National Office will work with the local
administrator to coordinate a USAA day. This will be a full day of activities
including speakers on the following topics: A) A Professional athlete
explaining how they got involved, what they have done, and how they handle
professional sports. B) Tips on Training and physical conditioning. C) Drug and
Chemical Abuse films and seminars D) Tips for choosing a college. E) Tips for
choosing a pro career. F) USAA programs, the National Conference, and
Leridership Potential program within the USAA.
D: What if I want to become a State or District Leader?: Forms will become
available to you as you become a member.
LET US KEEP YOU INFORMED ABOUT USAA. ALL YOU HAVE TO DO
TODAY IS COMPLETE YOUR USAA INFORMATION FORM.
•
'RIUfv;PH 1-IFL C ENTER
3735 LAKELAND AVENUE NORTH
United States Athletes Association SUITE 230
Trftx,VO,Lbe Caniw rJlt\I�ILii^^ ie• - a ,,
555 Slmpeon SL SL Paul, MN 56104
ph:812-642-5363
NAT. 1-MO-34 2-d722
DSC
t.ATWKAL IDUTn SPORTS CWCNES ASSOCIATION
�.LIILP II
J hcreb� plebe to Icue up to mg certification as a �G �IC� f�nacE1 b
follotuill t e L Cobe of t its.
• ein of m la ers ahcab� mill place the FnlIItiQlZal aIlb physical b�Cl1 b � � p � ,
of antt7 personal besirc to min.
® —I brill remember to treat each plager as all itibiuibual, remembering the
large spreab of emotional anb physical beuclupmcnt for the same at c
a
group.
• 3 tbill bo m� uerq best to prouibe a safe plap situation for m� planers.
• promise to reuieb3 anb practice the neccso=5 first aib principics
iteebeb to treat injuries of nib plaviers.
• .21 fUill bo m� best to organize practices ihat are full anb -hzilirngin; for
all mg p 7
laurrs.
7
• bill lean, by exam le, in bemonstraiin fair la anb s orternanshi
7 p g p p , p
to all mV Fingers.
• �J Bill insure that 2 am ltnobolebSable in tl r rules of each sport that �
coach, anb that 3 trill teach t4r-se rules to nib plarycrs.
• bmill use these coaching techniqucs aYpr0prLIIfic for cart of t1 v skulls
that �j teach.
•
• mill rPmPmbPr that am a �outl coach, anb t4at the game is rc
chilbrcn nnb not nbults.
N cj�
NATIONAL YOUTH SPORTS COACHES ASSOCIATION
-PAIR Ts CoDE OF
ETHics
I Hereby Tledge To Trovide Tositive Support, Care And Encouragement For
My Child Tar ticipating In Youth Sports By Fo([owing phis Code Of Ethics.
♦ I will encourage good sportsmanship by demonstrating positive support for afl players, coaches
and officials at everygame, practice or other youth sports event.
♦ I will place the emotional and physical well-being of my child ahead of any personal desire to win.
♦ I will insist that my child play in a safe and healthy environment.
i
♦ I wiffprcvide support for coaches and off iciaLz working with my child to provide a positive, enjoy-
able eVerience for all.♦ I will demand a drug, alcohol and tobacco f ee sports environment for my child and agree to assist
by refraining from their use at affyouth sports events.
♦ I wilfremember that the game is for children and not for adults.
♦ I will do my very best to make youth sports fu:-c for my child.
♦ I wiff askmy child to treat other players, coaches,fans and officials with respect re. ardress of
race, sex, creed or ability.
♦ I will promise to help my :hild enjoy the youth sports experience within my personarconstrcints by
assisting with coaching, being a respect-r'ul fan, or oviding transportation or whatever I ant capable
of doing.
♦ I wiff require that my chills coach 6e traine . in tfic responsibilities of being a youth sports coach
and that the coach agree to the youth sports Coax hL-�,' Code of Et.kics.
♦ I wiff read the NySCA 2 gtional S tanc nrds fvr r)outh Sports and do cverything in my ;:7ow::r to
assist aff youth sports organizations to and enforce them.
Parent Signature Parcnt Signature Da-.e
• PARK FUND
1990 PARK DEVELOPMENT
Arden Oaks Picnic Shelter $ 4,000
Cummings Lake Path and Dock 5,500
Hazelnut Warming Shelter 15,000
Lindey' s Landscaping 1 ,000
Valentine Play Structure 9,000
Trails Surface Improvements 25,000
Twin City Athletic Field Development 175,000
TOTAL $234,500
COMMENTS
Park dedication and charitable gambling proceeds are dedicated to the Park
Fund. These monies can only be expended for park land acquisition, park
and trail development and salaries related to park development.
• Account 530 "Improvements Other Than Buildings" increased significantly in
1990 due to the proposed Arsenal Athletic Complex. Also, there will be
related increases in Account 304 "Legal" and 312 "Planner" .
•
• ARDEN HILLS PARKS DEPARTMENT
PEDESTRIAN TRAILS
Proposed Blacktopping Schedule
The trails were divided into four categories: (1) section recommended for
blacktopping in 1987 because of high usage and difficult terrain; (2) ,
(3) , and (4) suggested priority for blacktopping in the future as/if funds
are available
Length Surface
Arden Trail
✓ 1
Glenpaul to Stowe , 500' Grass 2
' Ag Lime 2
,� Stowe to Co Rd E ,500
Chatham Trails
Connection 1 ,200' 160' hard 4
surface, 1,040
grass, blocks
4
Corridors 1
(600' leading to Valentine School)
.--'Natural Area Pathways 81400' Grass 4
Town House Trails
Village Hall Trail 2,300 ' Grass 3
NSP Trail 1 ,300' Grass 3
v, Corridor 740' Grass 4
V Florai to Norma Corridor 600' Ag Lime 1
Cummings Park to Floral Trail
Cummings Park Trail 2,050' Grass
0' Grass 3
Cummings to Floral , 2
2,000' Grass 3
Floral
Crepeau Nature Preserve
2,800' Grass 4
Nature Trails
BREAKDOWN BY RUNNING FOOT
Phase 1 620 feet
Phase 2 6, 125 feet
Phase 3 15,540 feet
Phase 4 4,580 feet
•
•
Parkway System
Feasibility Study
Arden Hills, Minnesota
January , 1985
Prepared by:
Arden Hills Parkway Task Force
and
ultants Associated, Inc.
'rlehrman Cons
Minneapolis , Minnesota
Preliminary Review COPY
C. OBJECTIVES: (continued)
• 3. Maximize the exposure to the Community's natural amenities--
lakes , woods , interestin(; topography, and parks.
4. Preserve and enhance desirable views and vistas.
5. Identify and enhance major entrances to the City.
6. Provide for the safe and efficient movement of automobile
traffic.
7 . Provide safe movement of bicycles and pedestrians in an
attractive environment, preferably separated from auto-
mobiles.
D. CRITERIA FOR SELECTION OF CANDIDATE ROUTES:
1. Utilize existing streets .
2. telect routes with adequate right-of-way width to allow
for design flexibility.
3. Select routes which have "inter-neighborhood" signifi-
cance.
4. Select routes which provide access and exposure to
• existing natural amenities.
E. CANDIDATE PARKWAY ROUTES :
Based upon the preceding selection criteria , the routes shown
on Exhibit 1 were identified as candidate parkway routes . Of
these routes , all except the segment of Hamline Avenue from
County Road F to Highway 96 are under Ramsey County' s juris-
diction.
F. FACTORS AFFECTING PARKWAY DEVELOPMENT:
1. Ramsey County has no specific cross-sectional standards
for County roads . However, since all County roads in
Arden Hills are financed with the State Aid funds , these
roads must meet Minnesota Department of Transportation
standards for such facilities.
If the projected traffic volumes on a route are less than
8,000 trips per day, the following Mn/DOT standards
apply:
44 feet if parking is provided on both sides of
street
36 feet if parking is provided on only one side
of street
32 feet if no on-street parking is provided
•
-2-
F. FACTORS AFFECTING PARKWAY DEVELOPMENT: (continued)
• 7. The County will construct, when funding is available,
bike paths along designated routes . These paths may be
contiguous to the driving lanes or separated if right-of-
way width permits . If paths are separated from the
roadway, however, they become the responsibility of the
City after construction.
8. No major improvement or reconstruction of County roads in
Arden Hills is included in the current 5-year Capital
Improvement Program of Ramsey County. Future improve-
ments will be considered when updating the CIP if the
City makes a specific request.
G. ANALYSIS OF CANDIDATE ROUTES:
1. Exposure to natural amenities. Since a major purpose of
a parkway system is to provide an interesting , aesthetic
driving experience, it is obvious that parkway routes
s�h ould provide exposure to natural amenities , including
lakes, parks and other significant open space, wooded
areas, and interesting topography. (See Exhibit 2)
2. Traffic volumes . Traffic volume is an important factor
because it will dictate the cross-sectional width of the
roadway. If projected volumes exceed 8,000 ADT, a wider
roadway would be required. The following table indicates
the right-of-way widths and 1982 ADT volumes for candi-
date routes. (See also Exhibit 3)
Traffic(a)
Route Row Width Volumes
Lake Johanna Blvd. 4,900
Co . Rd. D to east limit of
Tony Schmidt Park 66'
East limit of Tony Schmidt
Park to Snelling 80'
Snelling Ave. 4,400
Hwy. 51 to Co. Rd. E 200'
Co. Rd. E to 694 100'
Co. Rd. E-2 86' 5,400
Hamline Ave. 66' 7 ,000(b)
Co. Rd. D. 66' 5 ,400
(a) Indicates 1982 ADT on the most travelled portion of
the route.
(b) Based upon consultation with the City Traffic Engineer,
• Hamline Avenue is the only candidate route anticipated
to exceed 8,000 ADT in the future.
-4-
H. FINANCIAL FACTORS: (continued)
The additional amenities related to parkway development--
boulevard landscaping, burial of overhead utility lines , and
decorative street lighting (i : desired) would have to be
financed by funds other than has tax. As previously stated ,
no funding sources for these amenities have been identified at
this time.
The following rough cost estimates for amenities is provided
for informational purposes :
Boulevard landscaping $15 to $25 per lineal foot
Powerline burial $50 to $150 per lineal foot
dependent upon whether
lines are for service ,
distribution, or trans-
mission.
Decorative street lighting $40 to $60 per lineal foot
•
-6-
\f N�
T �
Ll
if I
Y
-8-
C; A N r)IF)ATF PARKWAY RnuTF� _ .. ._ EXH181T 1
s
1
1. Z T tn� -•_� r•
F X�.
o�
i
R'�
AL
EXHIBIT 5
RIGHT-OF-WAY WIDTIH
-12-
r '
qua
71
rA
Ilybed
I1{ i
� 111111�1 ��r/r�iq/�
71,
------- �<--.ter--r ,a , •. �� 9�.�a�fj..._-^, �'1��urrw�
--����.,� �� ,� '•—.rs}-,, ����`.-.,� -�•' � �••�� ,jam
NEED FOR ADDITIONAL
B, 0IJL.FVARF) LANn ,;(7, APING EXH1a1T 7
,,� Ste'.,=n � r-.•
do
-�' ...�_:"^�� _ � �-_._fir-• �,._-�-�.
.. '_�_J_.. _ �/1 •'{ - r,�, •.ate_ :_>.l r_�
r--,r— --r f
-16-
EXISTING OVERHEAD UTILITY LINFF.S EXHIBIT 9
TASK FORCE RECOhMENDATIONS:
The Parkway Task Force recommends that the following action be
taken to begin implementing the development of a parkway system in
Arden Hills:
1. The City Council should adopt, after Planning Commission
review and recommendation, the proposed parkway routes and
Community gateways (See Exhibit 1) as part of the Transportation
Element of the Comprehensive Plan.
2. The City of Arden Hills should support Ramsey County's request
to have Tony Schmidt Park designated as a regional park by the
Metropolitan Council . Such designation would provide access
to additional funding sources for park development and might
speed the improvement of the streetscape of Lake Johanna
Boulevard as it passes through Tony Schmidt Park.
3. If Tony Schmidt Park receives regional park designation, the
City should work with the County Parks Department and Public
Works' Department to pursue the development of a parkway proto-
type on Lake Johanna Boulevard within the park area .
4. As segments of County Roads ire scheduled for improvement or
reconstruction, the City should work with the Ramsey County
Department of Public Works to develop roadway designs com-
patable with the City' s parkway concept.
5. The City should encourage the private utility companies to
bury overhead lines along designated parkway routes when
roadway segments are reconstnicted or when such overhead lines
require major repair or replacement.
6. The City should invite the participation of civic groups and
private citizens in the development of designated Community
gateways. The City should offer design and co-ordination
services for any group which offers to provide materials ,
labor, or funds to accomplish gateway landscaping as a means
of encouraging such participation.
-18-
Page 3
DIRECTORY FOR RAMSEY COUNTY TRAILS ADVOCACY NETWORK
ADDICKS CHARLES AHL
ICYCLE ADVIS. BD. SHOREVIEW PUBL.WORKS
PRESIDENT DIR. PUBLIC WORKS
RM 325M CITY HALL 4665 N. VICTORIA
MINNEAPOLIS, MN 55415 SHOREVIEW, MN 55126
TELE: (W) 673-2041 (H) TELE: (W) 484-3353 (H) 426-8133
MAURICE ANDERSON RICHARD AREY
NEW BRIGHTON PK&REC ST. PAUL PKS&REC COMM.
DIR. PKS. &REC. DEPT COMM. PKS&REC.COMM.
1975 SILVER LAKE RD 534 LAUREL AVE #6
NEW BRIGHTON, MN 55112 ST. PAUL, MN 55102
TELE: (W) 633-8906 (H) 462-5384 TELE: (W) 348-2090 (H) 290-0309
DENNIS ASMUSSEN DELOS BARBER
D.N.R. -DIV. OF PARKS&RECR. MN DEPT. OF NAT. RES.
DIRECTOR-TRAILS & WATERWAYS 2525 COHANSEY ST
500 LAFAYETTE RD ROSEVILLE, MN 55113
ST. PAUL, MN 55155 TELE: (W) (H) 483-8664
TELE: (W) 296-0440 (H)
KIRBY BECK BOB BIERSCHEID
STATE BICYCLE ADVISORY BOARD ROSEVILLE PKS&REC.
PAST CHAIRMAN DIR. PKS. &REC. DEPT.
12215 ILEX ST NW 1114 WOODHILL DR
RAPIDS, MN 55433 ROSEVILLE, MN 55113
_ (W) (H) 755-8341 TELE: (W) 490-2281 (H) 488-3187
JOHN BUCKLEY WAYNE BURMEISTER
ARDEN HILLS PKS. &REC MOUNDS VIEW PARK & REC COMM
DIR. PKS&REC. DEPT CHAIR
1450 W. HWY. 96 7565 KNOLLWOOD DR
ARDEN HILLS, MN 55112 MOUNDS VIEW, MN 55112
TELE: (W) 633-5676 (H) 674-8527 TELE: (W) (H) 786-4890
DAVE CARLSON DAN COLLINS
MN COALITION OF BICYCLISTS MN.DEPT. OF NAT.RES.
BOARD MEMBER TRAILS PLANNING UNIT
3523 HENNEPIN AVE S BX 50, 500 LAFAYETTE
MINNEAPOLIS, MN 55408 ST. PAUL, MN 55155
TELE: (W) (H) TELE: (W) 296-6048 (H) 482-9467
TOM DANGER JIM DUSTRUDE
MN DEPT. OF NAT.RES. MN. DEPT. OF TRANSP.
TRAILS OPERATIONS BICYCLE COORDINATOR
BX 50, 500 LAFAYETTE 807 TRANSP. ' BLDG.
ST. PAUL, MN 55155 ST. PAUL, MN 55155
TELE: (W) 296-4782 (H) TELE: (W) 297-1838 (H)
THOMAS DWIGHT THOMAS DWIGHT
MN.PKS&TRLS.COUNC. &FOUND 'N. METRO PKS&OPEN SPACE COMM.
.MN`.PTCF BOARD COMM. -PKS. &OPEN.SPACE.COMM
1& HALLAM AVE. N 1200 HALLAM AVE N.
M.: OMEDI , MN 55115 MAHTOMEDI, MN 55115
TL`LE: (W) 291-5162 (H) 426-0571 TELE: (W) 291-5162 (H) 426-0571
Page 4
TOM EGGUM JUDITH ERICKSON
PAUL PUBLIC WORKS MN.PKS&TRL.COUNCIL&FOUNDATION
ECTOR EXEC.DIR. MN.PTCF
600 CITY HALL ANNEX E-1311 1ST NATL BK B
ST. PAUL, MN ST. PAUL, MN 55101
TELE: (W) 298-4241 (H) TELE: (W) 291-0715 (H)
BILL FRANK BILL FRANK
RAMSEY CTY.PK&REC COMM. ROSEVILLE PK&REC COMM
COMM. -PK&REC.COMMISS COMM. -PK&REC. COMM
438 IONA LANE 438 IONA LANE
ROSEVILLE, MN 55113 ROSEVILLE, MN 55113
TELE: (W) 733-7387 (H) 484-5068 TELE: (W) 733-7387 (H) 484-5068
STEVE GATLIN NORA GILLE
ROSEVILLE PUBL.WORKS LAUDERDALE VILLAGE
DIR, PUBLIC WORKS DEPT. VOLUN. PKS&REC. COORD
2660 CIVIC CTR. DR 1820 LAKE ST.
ROSEVILLE, MN 55113 LAUDERDALE, MN 55113
TELE: (W) 490-2226 (H) 429-0630 TELE: (W) (H) 645-3153
BUD KORFHAGE GERALD HAFFEMAN
WHITE BEAR LK COMM. SERV. &REC SHOREVIEW PKS&REC DEPT.
DIR. -PKS&REC. DIR. , PKS&REC DEPT.
2399 CEDAR AVE 4665 N. VICTORIA ST
WHITE BEAR LAKE, MN 55110 SHOREVIEW, MN 55126
TELE: (W) 429-5371 (H) 429-1619 TELE: (W) 484-3353 (H) 786-2829
toHAIDER DAVE HARRIS
MAPLEWOOD-PUBL. WORKS LITTLE CANADA-PUB.WORKS
DIR. -PUBLIC WKS DEPT DIR. -PUBLIC WKS DEPT
1830 E CTY RD B 515 LITTLE CAN. RD
MAPLEWOOD, MN 55109 LITTLE CANADA, MN 55117
TELE: (W) 770-4550 (H) TELE: (W) 484-2177 (H)
LARRY HOLMBERG JILL JACOBY
RAMSEY CTY PKS&REC. CITY OF SHOREVIEW
ACQUSITIONS & DEVELOP. SUPVR. TRANSPORTATION PLANNER
2015 N. VAN DYKE ST 4665 N. VICTORIA
MAPLEWOOD, MN 55109 SHOREVIEW, MN 55126
TELE: (W) 777-1707 (H) 647-0978 TELE: (W) 484-3353 (H)
JOE JANASZ ANNE KELLY
ROLLERBLADE, INC. ST. PAUL PARK&REC.COMMISSION
DIR. -R. I. S.A. CHAIRMAN
9700 W. 76TH ST 539 S. LEXINGTON PKW
EDEN PRAIRIE, MN 55344 ST. PAUL, MN 55116
TELE: (W) 930-7000 (H) TELE: (W) 296-5916 (H) 699-6443
PAUL KIRKWOLD DAVE KOTILINEK
RAMSEY CTY-PUBLIC WORKS N. ST.PAUL-PUBL.WORKS
ASST. DIR. DIR. -PUBLIC WKS DEPT
350 ST PETER ST #270 2526 7TH AVE E.
PAUL, MN 55101 NO. ST. PAUL, MN 55109
: (W) (H) TELE: (W) 770-4463 (H) 426-0544
Page 5
(' ROL KRIEGLER PEGGY LYNCH
CON HTS PKS&REC. FRIENDS OF STP&R.CTY. PARKS
U . PKS&REC DEPT. EXEC. DIR-FRIENDS. .
2077 LARPENTEUR AVE W. 1621 BEECHWOOD AVE
FALCON HEIGHTS, MN 55113 ST. PAUL, MN 55116
TELE: (W) 644-5050 (H) TELE: (W) 698-4543 (H) 698-4543
GREGORY MACK JACK MAURITZ
RAMSEY CTY PARKS DEPT. METRO COUNCIL
DIR. , PKS&REC. DEPT. PARKS COORDINATOR
2015 N. VAN DYKE ST. 230 E. 5TH ST
MAPLEWOOD, MN 55109 ST. PAUL, MN 55101
TELE: (W) 777-1707 (H) 483-6582 TELE: (W) 291-6602 (H) 474-5618
MIKE MILLER RIC MINETOR
MINN.COAL.OF BICYCLISTS MOUNDS VIEW PUBL.WKS
CHAIRMAN DIR. -PUBLIC WKS DEPT
DNR- 500 LAFAYETTE 2401 HIWY 10
ST. PAUL, MN 55146 MOUNDS VIEW, MN 55112
TELE: (W) 296-0237 (H) 645-6243 TELE: (W) 784-3055 (H)
JOE MOMSON JIM MORELAN
VADNAIS HTS PUBL.WKS LITTLE CANADA PKS/REC.
DIR.-PUBLIC WKS DEPT DIR. PKS&REC. DEPT. (eves. )
687 E CTY RD F 515 E. LITTLE CANADA
VADNAIS HEIGHTS , MN 55127 LITTLE CANADA, MN 55117
r-OF: (W) 429-5343 (H) TELE: (W) 484-2177 (H) 484-2547
CYNTHIA McARTHUR BOB NETHERCUT
UNIV. OF MN-EXTENSION DIV. RAMSEY CTY. PARKS&RECR. COMM.
BIKE SAFETY EDUCATION CHAIRMAN PARK&REC. COMM.
340 COFFEY HALL 4550 GALTIER
ST. PAUL, MN 55108 SHOREVIEW, MN 55126
TELE: (W) 625-9719 (H) 699-8013 TELE: (W) (H) 481-7239
THOMOND R. O 'BRIEN ROBERT ODEGARD
FT. SNELLING ST.PARK ASSOC. MAPLEWOOD PKS&REC
PRES. DIR. PKS&REC. DEPT.
480 GRANDHILL 1830 E. CTY. RD. B
ST. PAUL, MN 55102 MAPLEWOOD, MN 55109
TELE: (W) 224-0043 (H) 227-4351 TELE: (W) 770-4570 (H) 429-2403
GREG PATES LEON PEARSON
MNDOT BICYC. PLNG.UNIT ST. PAUL PUBL.WORKS
TRANSP. PLANNER ROAD LANDSCAPE ENGINEER
807 TRANSP. BLDG. CITY HALL ANNEX-8TH FLOOR
ST. PAUL, MN 55155 ST. PAUL, MN 55102
TELE: (W) 296-1650 (H) 722-4689 TELE: (W) 292-6277 (H)
RON PELTIER ROBERT PIRAM
WHITE BEAR LK-PUB.WORKS ST. PAUL PKS. &REC.
DIR. -PUBLIC WKS DEPT SUPT. PKS&REC. DIV.
WHITAKER AVE 25 W 4TH ST CHA R300
W BEAR LAKE, MN 55110 ST. PAUL, MN 55102
TE , (W) 429-8566 (H) TELE: (W) 298-4126 (H) 699-4283
Page 6
LROPER STEVE ROE
N RIGHTON PUB.WKS N. ST. PAUL PKS&REC
DIR. -PUBLIC WKS DEPT DIR. PARKS&REC.
803 5TH AVE NW 2526 7TH AVE E
NEW BRIGHTON, MN 55112 N. ST. PAUL, MN 55109
TELE: (W) 631-3736 (H) TELE: (W) 770-4471 (H)
MARY SAARION DAVID SAND
MOUNDS VIEW PKS&REC. DEPT. ARDEN HILLS PKS.COMM
DIR. PKS/REC/FOREST CHAIR. PK&REC.COMM.
2401 HIWY 10 1989 JERROLD
MOUNDS VIEW, MN 55112 ARDEN HILLS, MN 55112
TELE: (W) 784-3055 (H) 786-4438 TELE: (W) (H) 636-4384
MARSHA SOUCHERAY MARK STANGE
MN. STATE BICYC. BD. SHOREVIEW TRAILS T.F
BOARD MEMBER CHAIR. TRAILS/BIKEWAYS T.F
5355 HODGSON RD. 655 EVERGREEN CIRC
SHOREVIEW, MN 55126 SHOREVIEW, MN 55126
TELE: (W) 484-6059 (H) 484-6059 TELE: (W) (H) 483-5373
ARNE STEFFERUD TOM WALCZEAC
METRO COUNC.PKS&OPEN SPACE WHITE BEAR TOWNSHIP
SR. PARK PLANNER- DIR. PKS&REC. & PUBL.WORKS
230 E. 5TH ST 1281 HAMMOND RD
ST. AUL, MN 55101 WHITE BEAR TWNS, MN 55110
TE (W) 291-6360 (H) 772-4367 TELE: (W) 429-5827 (H)
MARTIN WALSH KENNETH WELTZIN
VADNAIS HTS. PKS&REC. RAMSEY CTY-PUBL. WORKS
SUPT. PKS&REC. DEPT. DIR. -PUBLIC WKS DEPT
687 E.CTY. RD. F 350 ST. PETER ST#270
VADNAIS HTS. , MN 55127 ST.PAUL, MN 55101
TELE: (W) 429-5343 (H) 484-0024 TELE: (W) 298-4127 (H)
DAN WINKEL VINCE WRIGHT
ARDEN HILLS-PUB.WKS. FALCON HTS. PUBL.WKS
DIR. -PUBLIC WKS DEPT DIR. -PUBLIC WKS DEPT
1450 W. HIWY 96 2077 LARPENTEUR AVE W.
ARDEN HILLS, MN 55112 FALCON HTS, MN 55113
TELE: (W) 633-4443 (H) TELE: (W) 644-5050 (H)
Version 1.2--March 17, 1991
For additions, deletions, corrections, or comments please contact:
Bill Frank, 438 Iona Lane, Roseville, MN 484-5068 (H)
733-7387 (W)
ppy Tralmis to You
An insert for the Friends of St. Paul and Ramsey County Parks
1621 Beechwood Avenue, St. Paul, Minnesota 55116 698-4543
Volume 1, Number 1 February 1991
Task force Charged with formulating a long term plan for parks,trails and open space,the St.Paul
recommendations and Ramsey County Parks Task Force met for two years,issuing their final report in late
1989. Among their key recommendations was the need to use trails to link neighbor-
spur action, network hoods,parks,and other scenic features. Citing the Minneapolis lakes trail network as
formed a model to emulate, the task force recommended improvements in planning,linkage,
safety and coordination. To carry out the trail recommendation, the Trails Advocacy
Network has been formed.
Included in the Network are representatives of each of the 15 Ramsey County
communities plus organizations active in promoting trails and bikeways. Representa-
tives include representatives of the public works and parks departments,state agencies
and various user advocacy groups. "We do not expect the Network to have regularly
scheduled meetings. It is primarily a means to communicate technical information,user
needs,trail plans/status,funding methods,etc. Communication and collaboration are
our goals. Just knowing who the key contacts are in various agencies will be a big help,"
said Bill Frank,Ramsey County Parks Commission member and trail booster.
"There is a huge public appetite for improved and expanded trail systems yet there is
no organized county-wide trail plan in place and no central organization to function as
a clearinghouse or coordinator. Trails programs have proceeded in most communities
but in a haphazard fashion with little coordination among the county and the 14 other
communities," said Frank. "We hope to change that."
Trails inventory under- Updating the county wide inventory of trails/bikeways including trail construction plans
is the rust task of the new Trails Advocacy Network. Larry Holmberg,Planning and
wad/ Development Supervisor for Ramsey County Parks and Recreation Department is
compiling the information from each municipality. When the base map is updated,the
Network will coordinate development of a county-wide comprehensive trails plan.
In-line Skating, the new Call them Roller-Blades, Ultra-Wheels, or Switchit Skates, in-line skates have been
invading the urban trail scene. The sport has been growing by leaps and bounds to the
kid on the block point that on some trails,especially on the Minneapolis Lakes loops,they are almost as
commonplace as bikers.
Over one million in-line skaters plied the trails in the US in 1990 with sales more than
doubling in the last four years.Men and women participate about equally in this growing
sport but it is most popular among the 18 to 30 year old age group. When Dome Skating
was made available this winter,the sport's popularity was obvious. Though four dollars
a time,about 300-400 skaters use the Dome during the three evenings each week that it
is open.
RAMSEY COUNTY
PARKS & RECREATION DEPARTMENT
2015 1 N Van Dyke Street Telephone(612)777.1707
RAMSEY COUNTY Maplewood,Minnesota 55109.3796 Fax(612)777.6519
Gregory A.Mack Director
P A R R S A N D R E C R E A T I O N C 0 M M I S S I' 0 N
TO: Ramsey County Trails Advoca
cy Network
etwork
FROM: Bill Frank �
Ramsey County Parks and Recreation Commission Member
DATE : February 20 , 1991
SUBJECT: Meeting -- "Moving Toward a Ramsey County Comprehensive
Trails Plan"
MEETING DATE: Tuesday, March 19 , 1991
. TIME: 7 : 00 p.m.
PLACE: Phalen Golf Course Clubhouse
( Turn east off Highway 61 onto Wheelock
Parkway. Park entrance is first left;
clubhouse is near end of park road. )
This meeting is cosponsored by the Ramsey County Parks and
Recreation Commission, St. Paul Parks and Recreation Commission,
and Friends of the St. Paul and Ramsey County Parks .
Please call Ms . Cheryl Myran at Ramsey County ( 777-1707 ) by March
15 to confirm your attendance . We encourage participation from
each community or group represented on the trail advocacy network .
Participation by municipal parks and recreation and public works
department staff would be extremely helpful . If you know of others
who could contribute in this effort, feel free to invite them.
WCF/clm
Attachment
POSITION RESPONSIBILITY DESCRIPTION
• DATE: FEBRUARY, 1990
FUNCTIONAL CLASSIFICATION: PARKS AND RECREATION
POSITION TITLE: PARKS tiND RECREATION DIRECTOR
---------------------------------------------------------------------------
PRIMARY OBJECTIVE:
With the oversight and consent of the Council, develops and
periodically updates the general strategy for the City's parks and
recreation program. Translates strategies into specific programs,
developing and maintaining facilities and equipment to carry out those
programs so as to meet the needs of the citizens, within budgetary
constraints.
May exercise limited discretion in the oversight of employees,
expenditure of resources and execution of City policies. Incumbent is
expected to use this authority in a professional manner.
MAJOR RESPONSIBILITY AREAS AND TIME SPENT:
Time Spent
18 . 7`_% 1 . Coordination of Park and Recreation Department
activities and projects with other City departments
. other governmental units and cirizen groups.
27 .25% 2. Recommend parks and recreational areas and facilities
acquisition, develops physical facilities and
administers a maintenance and operations program for
City parks and facilities. Coordinate a trailwav
deveiopment and maintenance program.
05% 3. Administer diseased tree control program.
05% 4. Prepare and administer budget for department.
15.25% 5. Coordinate personnel system for hiring full and
part-time employees.
18. 75% 6. Supervise all maintenance construction protects or
capital improvements in laity parks.
05% 7 . Purchase capital equipment and supplies for the
department.
05% 8. Perform any other duties as directed or apparent.
QUALIFICATIONS:
Must have a bachelors degree in Parks and Recreation or a closely
• related field. Course work should include administration, landscape
architecture, turf care, journalism, public speaking, and personnel.
TASK STATEMENT
Major Responsibility Areas:
1. Coordination of Park and Recreation Department activities and projects
with City Council, City departments, other governmental units, citizen
groups and newspapers.
a. Participate in area-wide programs such as regional open space,
trail systems, Etc.
b. Participate with other area recreation departments and community
education programs to insure coordination and eliminate dupli-
cation of effort.
C. Respond to citizen concerns regarding such things as clean-up
projects, programming, special use (July 4th) , etc.
d. Communicate information via brochures, newspapers, public
Appearances, and other media.
e Supervise a recreation program through the Program Supervisor.
f. Coordinate the recreational program, maintenance and development
• projects so that facilities and programs interface.
2. Recommends parks and recreational areas and facilities acquisition,
develops physical facilities and administers a maintenance and
operation program for City parks and facilities.
a. Negotiate and coordinate purchase of real estate for parks.
b. Coordinate with Council and staff to administer public use
dedication ordinance.
C. Coordinate use of school buildings with the Community Education
Depts. of School Districts 621 and 623.
d. Coordinate with Council, Parks, and consultants, the site plans
for all City park and recreational facilities .
e. Administer and manage all development contracts for work at City
parks.
f. Supervise and approve the construction of all projects on City
park property.
g. Develop maintenance standards and a program to implement said
standards.
•
S. Coordinate a personnel system for the hiring of full & part-time
employees.
a. Coordinate personnel practices with the City system.
b. Supervise and authorize all personnel functions and record
keeping.
c. Coordinate in-service training for personnel.
6. Supervise all maintenance construction projects or capital improve-
ments in City parks.
a. Develop and plan for capital improvements.
b. Coordinate with consultants for plans and specs for capital
improvements.
c. Supervise the construction projects.
d. Authorize the completion and final payment for capital projects.
7 . Purchase capital equipment and supplies for the department.
a. Determine proper equipment for application.
• b. Survey market for price and availability.
C. Let bids or secure price quotes.
d. Purchase according to City guidelines.
8. Performance of any other duties as directed or apparent.
a. Attend staff and City Council meetings as required.
b. Prepare special reports for the Council and Clerk Administrator as
required.
C. Attend all Park Board meetings and acL as liaison between Council
and Park Board.
d. Prepare the Park Board agenda and minutes.
e. Prepare research projects for the Park Board when required.
f. Write miscellaneous departmental policies and procedures.
•
NETWORKING PROGRAMS
A number of programs can be co-sponsored with local agencies and
neighboring park and rec. departments, such as:
Ramsey County Library (story telling, dramatics) ; Ramsey County Naturalist
(programs in Tony Schmidt Park) ; Roseville Parks Naturalist (program in
Crepeau Park and Chatham nature area) ; Mounds View, Shoreview and
Roseville Parks Dept, (team tennis, softball and volleyball) .
Adaptive Recreation Program (co-sponsored with Mounds View, New Brighton
and Shoreview) : Friday Nite Live (adaptive Rec. Teen club) ; Saturday Club
(adaptive rec. for elementary youth) ; adaptive sports programs such as
bowling, aquatics, track & field "special olympics".
Communication and Publication:
-weekly news articles and photos in Bulletin and Focus.
-Take advantage of public access cable channel for publicizing
programs, films and program activities for public viewing.
PARKS AND RECREATION DIRECTOR
NEW OBJECTIVES/EXPANDED RESPONSIBILITIES
CITY-WIDE BEAUTIFICATION EMPHASIS
. Continue and expand the yard ueautificat ion/lands cap ing neighborhood
recognition program.
Recruit volunteers/neighborhood garden clubs to:
-plant and maintain flower beds in neighborhood parks.
-plant and maintain flower beds at "gateways" to City.
-plant flowers at additional City busy intersections.
Become actively involved with North Suburban Chamber and Arden Hills
merchant groups.
Upgrade and beautify City business district, expand Arbor Day celebration
by recruiting scouts and other youth clubs and families to plant trees and
care for neighborhood parks. "Plant a tree campaign" - have free
seedlings available for all families in the City to plant in yard. Plan
City-wide/state-wide Earth Week (celebration and environmental awareness
program) . Promote July 4th Olympic Torch Run. Promote Fall Festival
celebration. Promote Recreation/Wellness Activities with Arden Hills
companies/businesses (employee softball, volleyball basketball, walking) .
ARSENAL ATHLETIC FIELD COMPLEX
The Army has placed the athletic field complex on "hold" until
environmental problems can be cleared up. This complex is of major
importance for future City programs. Continued efforts should be made
with Ramsey County Parks Dept. and the three neighboring communities to
secure this property.
N Sc
MAI IOMAI TOUln IPON($ CoArxtS LCSOCUIIOM
LIIb1 f t
�1 herebp Plebso to IIUP i u to m� LertlflratiIIn IIS a
folloLuilig the �+C�`� Cobe of �Cthirs.
• trill Place the emotional anb phVstcnl troll being of mu pinVers aheab
of anti personal bestre to irin.
• J built remember to treat each glauer as ail iiibiuibual, remembering the
largo 5urC--b Qf CmotiQnai nnb ph�eicnl beuelopment for the Sarno nuC
group.
• :� mill be mu uera best to Frouibe a safe Plad Situation for rni piatlCrs-
• promise to rLuiei-n anb practice the necessaru first nib princiPlIrs
nrebeb to treat injuries of my planers.
• Ill bII mt? best tII IIrganiZP prart'_re That are fun anb Cl?allengiriu for
nil rri� plaoerS.
• 3 trill Ieab, bu oxample, in bemonstratin� fair piziu anb sportsmanshir�
to all m� platJcrS_
• trill Insure that 2 am knoirlebgable in the rules of each sport that 3
coach, anb that bill tenor these rules to ntv Flaycrs.
• mill use thII5C CoaLhing techniques appropriate for each of the Shills
that '3 teach.
•
• 3 irill remember that 3 am a gouth coach, nnh that the game i5 for
Chilbren nnb not nbults.
POSITION RESPONSIBILITY DESCRIPTION
DATE: DECEMBER, 1989
FUNCTIONAL CLASSIFICATION: PARKS & RECREATION
POSITION TITLE: PROGRAM SUPERVISOR
-------------------------_------------------------------------------------
PRIMARY OBJECTIVE:
To develop and administer City-wide recreation programs.
MAJOR RESPONSIBILITY AREAS:
Planning, implementing, supervision, and evaluation of City-wide
recreation programs.
Provision of assistance in the preparation of budget requests for the
department.
Provision of information on department activities, policies, and
procedures to the general public.
Performance of any other duties as directed or apparent.
QUALIFICATIONS:
Must have a bachelor' s degree in recreation or a related field.
Should have some supervisory experience in recreation programming.
SUPERVISION/ACCOUNTABILITY:
This position provides general supervision for all part-time
recreation employees and has general accountability to the Director of
Parks and Recreation.
STAFF AND PUBLIC CONTACT:
Frequent contact with staff from other departments. Extensive contact
with the general public.
A
1450 W. HIGHWAY 96, ARDEN HILLS, MINNESOTA 55112 633-5676
Dear Arden Hills Businesses:
This Summer, Arden Hills will become the "Flower Capital" of the
Metro area. The Arden Hills Parks & Recreation Department and the
Arden Hills - Shoreview - North Oaks - Mounds View Chamber of Comm-
erce are coordinating the beautification of County Rd. E ("Down-
town Arden Hills) . We would like each business along County Rd. E
to plant and maintain a flower "garden". If you have space, a
flower bed is preferred. If space is limited, a planter would be
great. The estimated costs are:
Flower bed - 20' X 12' - Landscape timber & flowers - S150.00
Concrete Planters - Round or Square - flowers $10.00
Planters 12" X 22" $ 95.00
18" X 24" 115.00
. 12" X 35" 120.00
24" X 22" 135.00
Flower Garden information Meeting
All businesses interested in learning more about the "flower gardens"
are invited to attend an informational meeting:
Monday - April 30th
8:30 A.M.
McGuire' s - Coffee Shop
Flower Garden Planting Party
McGuire' s Inn and the Chamber of Commerce will be throwing a free
Pancake Breakfast for all flower garden volunteers on Saturday,
May 19th (8:30 A.M. ) at McGuire' s. After eating and instructions,
the planting of flowers (green side up) will start at 9: 15 A.M. and
be completed by Noon.
The Parks Dept. will arrange to have soil, flowers, and other
materials dropped off at the garden sites on May 19th.
Businesses will be responsible for financing and supplying
workers to plant and maintain their flower gardens.
•Other interested volunteers are asked to call the Parks & Rec. Dept.
at 633-5676 for planting assignments.
Don' t miss the fun!
• Help make Arden Hills a beautiful place to shop and live.
ARD EN H=L L S / S HO REV= W
CLEANUP DAY
• S ATURDAY , MAY 5 , 1990
8 _ 00 AM TO 4 _ 00 PM
S HO REV=Ew C T TY HALL/MA=N'T ENAN C E CENTER
PARKING LOT. V I C T O R=A S T _ , NORTH or 'TH 96
GOODWILL INDUSTRIES WILL BE ON HAND AT NITTI DISPOSAL SERVICE WILL BE ON HAND
THE ARENA DISPOSAL AREA TO COLLECT AT THE ARENA DISPOSAL AREA TO COLLECT
RECYCLABLE AND USABLE DONATIONS. ITEMS NOT. ACCEPTED BY GOODWILL OR YOUR
REGULAR GARBAGE HAULER FOR THE FOLLOWING
DONATIONS ACCEPTED BY GOODWILL: CHARGE:
clothing car load $ 3.00
housewares pickup load (level) 14.00
leather station wagon load 4.00
sporting goods mattress (any size) 4. 50
electric appliances (small) box spring (any size) 4.50
furniture stuffed chair 3.00
toys and games couch 4.50
bikes appliances (any size) 4.00
car tires 1.25. each
recyclable materials:
aluminum cans (clean & bagged) - brush must be bundled in 3 foot lengths
aluminum foil & plates - paint and hazardous waste will NOT be
newspapers (in paper bags or boxes) accepted
glass (clean & sorted into green, - large tree stumps will NOT be accepted
brown, or clear, & bagged) - waste oil can be deposited at the ice
arena year round at no charge (see map)
2 4 O�DW INDUSTRIES RESERVES THE - used antifreeze can be flushed down sink
O REFUSE ANY ITEM THAT IS NOT or toilet if house is connected to public
RECYCLABLE OR IN GOOD WORKING ORDER. sanitary sewer system
NITTI DISPOSAL SERVICE RESERVES THE - do NOT bring leaves and grass clippings
RIGHT TO REFUSE ANY ITEM THAT CAN'T to the arena disposal area
BE DISPOSED OF IN A LANDFILL.
ITY HALL
jai O�
_ Ot 1CnR�.� ti
Hud•
°.son — \
� � Lak• - e
o Joronno ,;t r � �
c �
o _
- = SHOREVIEW
MAINTENANCE
yc
Ni CENTER
�mile t
4 . s•
*�rcien Hills/New Brighton Comoost Site 0000
7 . What do you like LEAST about it?
NO ANSWER, 11% ; NOTHING, 32% ; TAXES, 11% ; CITY SERVICES ,
15% ; TRAFFIC, 8% ; GROWTH, 5% ; CITY GOVERNMENT, 5% ; NO
SHOPS , 4% ; SCHOOLS , 2% ; LOCATION, 4% ; PEOPLE, 2% ;
ARSENAL, 1%; SCATTERED, 1%.
8 . How would you rate the general EXCELLENT. . . . . . . . . . . . . 17%
sense of community among Arden GOOD. . . . . . . . . . . . . . . 61%
Hills residents -- excellent, ONLY FAIR. . . . . . . . . . . . 18%
good, only fair, or poor? POOR. . . . . . . . . . . . . . . . . . . 2%
DON'T KNOW/REFUSED. . . . . 2%
9 . Is there a geographical area in the city which you consider
to be the focal point of Arden Hills? (IF "YES , " ASK: )
Where is it?
NO ANSWER, 55% ; COUNTY RD. "E, " 26% ; ARDEN CENTER, 5% ;
LAKE JOHANNA, 6% ; LEXINGTON AVE. , 3% ; OTHER, 5% .
Changing topics. . . .
10 . Would you favor or oppose an in- FAVOR. . . . . . . . . . . . . . . . . 45%
crease in city property taxes if OPPOSE. . . . . . . . . 44%
it were needed to maintain city DON'T KNOW/REFUSED. . . . 11%
services at their current level?
11 . Do you consider property taxes in COMPARATIVELY LOW. . . . . . 6%
Arden Hills to be (ROTATE SERIES) ABOUT AVERAGE. . . . . . . . . 48%
comparatively low, about average, RELATIVELY HIGH. . . . . . . 35%
relatively high, or excessively EXCESSIVELY HIGH. . . . . . . 7%
high? DON'T KNOW/REFUSED. . . . . 5%
As you may know, property taxes are divided between the City of
Arden Hills , Ramsey County, and the Mounds View Public School
District.
12 . For each dollar of property taxes UNDER TEN PERCENT. . . . . 10%
You pay, about what percentage do 10% TO 20%. . . . . . . . . . . . 41%
you think goes to city govern- 21% TO 30% . . . . . . . . . . . . 13%
ment? (READ CHOICES , IF NEEDED) 31% TO 40% . . . . . . . . . . . . . 4%
41% TO 50% . . . . . . . . . . . . . 2%
0
51% TO 60% . . . . . . . . . . . . . 1%
0
OVER SIXTY PERCENT. . . . . 2%
DON'T KNOW/REFUSED. . . . 27%
As you may know, the City share of the property tax in your
school district is about sixteen percent.
13 . During the past few years, has INCREASED. . . . . . . . . . . . . 42%
the City' s tax rate increased, DECREASED. . . . . . . . . . . . . . 2%
decreased, or remained about the ABOUT THE SAME. . . . . . . . 34%
• same? DON'T KNOW/REFUSED. . . . 22%
For your information, the City' s tax rate has relatively stable.
2
14 . When you consider the property EXCELLENT. . . . . . . . . . . . . 18%
• taxes you pay and the quality GOOD. . . . . . . . . . . . . . . . . . 56%
of city services you receive, ONLY FAIR. . . 21%
would you rate the general value POOR. . . . . . . . . . . . . . . . . . . 2%
of city services as excellent, DON'T KNOW/REFUSED. . . . . 3%
good, only fair, or poor?
I would like to read you a list of a few city services. For each
one, please tell me whether you would rate the quality of the
service as excellent, good, only fair, or poor?
EXC GOOD FAIR POOR D. K.
15 . Police protection? 19% 61% 12% 3% 5%
16 . Fire protection? 21% 57% 3% 1% 19%
17 . City street repair and
maintenance? 13% 58% 22% 7% 1%
18 . Sewers and water? 17% 69% 4% 3% 8%
19 . Snow plowing? 29% 55% 10% 3% 3%
20 . Animal control? 10% 58% 17% 7% 9%
• 21. Street sweeping? 10% 64% 15% 3% 8%
22 . Winter park
maintenance? 12% 55% 8% 2% 23%
23 . Summer park
maintenance? 16% 60% 109.- 5% 10%
24 . Street lighting? 10% 45% 27% 16% 3%
25 . Enforcement of city
codes on off-street
parking, weeds and un-
sightly yards, and
building regulations. 8% 59% 1596 10% 9%
IF "ONLY FAIR" OR "POOR" IN QUESTIONS #15-25 , ASK FOR EACH:
26 . Why did you rate as (only fair/poor) ?
NO ANSWER, 21% ; POTHOLES , 9% ; LOOSE ANIMALS , 8% ;
SLOW SERVICE, 6% ; THREE OR MORE, 27% ; NO LIGHTS , 19% ;
SWEEPING, 3% ; CODES , 7% ; SEWERS, 2% .
27 . Other than voting, do you feel YES. . . . . . . . . . . . . . . . . . . 78%
that if you wanted to, you could NO. . . . . . . . . . . . . . . . . . . . 17%
• have a say about the way the City DON'T KNOW/REFUSED. . . . . 6%
of Arden Hills runs things?
3
28 . How much do you feel you know GREAT DEAL. . . . . . . . . . . . . 6%
• about the work of the Mayor and FAIR AMOUNT. . . . . . . . . . . 46%
City Council -- a great deal, a VERY LITTLE. . . . . . . . . . . 47%
fair amount, or very little? DON'T KNOW/REFUSED. . . . . 1%
- APPROVE . .
29 . From what you know, do you ap STRONGLY APPR E. . . . 190
prove or disapprove of the job SOMEWHAT APPROVE. . . . . . 58%
the Mayor and City Council are SOMEWHAT DISAPPROVE. . . . 5%
doing? (WAIT FOR RESPONSE) STRONGLY DISAPPROVE. . . . 3%
And do you feel strongly that DON'T KNOW/REFUSED. . . . 16%
way?
IF OPINION STATED IN QUESTION #29 , ASK:
30 . Why do you feel that way?
GOOD JOB, 32% ; NO PROBLEMS , 20% ; COULD IMPROVE, 13% ;
SPECIFIC ISSUES , 6% ; HEARSAY, 8% ; NO ANSWER, 5% .
31. How much first-hand contact have QUITE A LOT. . . . . . . . . . . . 7%
you had with the Arden Hills City SOME. . . . . . . . . . . . . . . . . . 36%
Staff -- quite a lot, some, very VERY LITTLE. . . . . . . . . . . 39%
little, or none at all? NONE AT ALL. . . . . . . . . . . 18%
DON'T KNOW/REFUSED. . . . . 1%
32 . From what you have seen or heard, EXCELLENT. . . . . . . . . . . . . 14%
how would you rate the job per- GOOD. . . . . . . . . . . . . . . . . . 56%
formance of the Arden Hills City ONLY FAIR. . 10%
Staff -- excellent, good, only POOR. . . . . . . . . . . . . . . . . . . 2%
fair, or poor? DON'T KNOW/REFUSED. . . . 19%
IF RATING GIVEN IN QUESTION #32 , ASK:
33 . Why did you rate city staff as ?
GOOD JOB, 43% ; NO PROBLEMS , 14% ; COULD IMPROVE, 11% ;
SPECIFIC ISSUES , 7% ; HEARSAY, 4% ; NO ANSWER, 5% .
Let's talk about public safety in Arden Hills . . . .
34 . During the past year, have you YES . . . . . . . . . . . . . . . . . . . 45%
been involved in or observed a NO. . . . . . . . . . . . . . . . . . . . 55%
situation in which a member of DON'T KNOW/REFUSED. . . . . 0%
the Ramsey County Sheriff Depart-
ment was present in an official
capacity?
IF "YES , " ASK:
35 . Would you say the way the EXCELLENT. . . . . . . . . . . . . 21%
police handled the situation GOOD. . . . . . . . . . . . . . . . . . 19%
was excellent, good, only ONLY FAIR. . . . . . . . . . . . . . 3%
• fair, or poor? POOR. . . . . . . . . . . . . . . . . . . 2%
DON'T KNOW/REFUSED. . . 1%
4
36. Would you say the time PROMPT. . . . . . . . . . . . . . . . 38%
• it took the police to re- NOT PROMPT. . . . . . . . . . . . . 3%
spond was prompt, or not? DON'T KNOW/REFUSED. . . . . 4%
37 . How would you rate the amount of TOO MUCH. . . . . . . . . . . . . . . 3%
patrolling the police department ABOUT RIGHT. . . . . . . . . . . 68%
does in your neighborhood -- NOT ENOUGH. . . . . . . . . . . . 25%
would you say they do too much, DON'T KNOW/REFUSED. . . . . 4%
about right, or not enough?
38 . During the past year, have you YES . . . . . . . . . . . . . . . . . . . 10%
been involved in or observed a NO. . . . . . . . . . . . . . . . . . . . 90%
situation in which a member of DON'T KNOW/REFUSED. . . . . 0%
the Lake Johanna Volunteer Fire
Department was present in an
official capacity?
IF "YES , " ASK:
39 . Would you say the way the EXCELLENT. . . . . . . . . . . . . . 6%
firefighters handled the GOOD. . . . . . . . . . . . . . . . . . . 3%
situation was excellent, ONLY FAIR. . . . . . . . . . . . . . 0%
good, only fair, or poor? POOR. . . . . . . . . . . . . . . . . . . 0%
DON'T KNOW/REFUSED. . . . . 0%
40 . Would you say the time PROMPT. . . . . . . . . . . . . . . . . 7%
it took the fire department NOT PROMPT. . 1%
to respond was prompt, or DON'T KNOW/REFUSED. . . . . 2%
not?
41. Do you have a working smoke YES/MORE THAN ONE. . . . . 78%
detector installed in your home? YES/ONLY ONE. . . . . . . . . . 18%
(IF "YES , " ASK: ) Do you have NO. . . . . . . . . . . . . . . . . . . . . 4%
more than one? DON'T KNOW/REFUSED. . . . . 0%
42 . Do you have a fire extinguisher YES . . . . . . . . . . . . . . . . . . . 74%
mounted in your home? NO. . . . . . . . . . . . . . . . . . . . 26%
DON'T KNOW/REFUSED. . . . . 0%
Moving on. . . .
43 . During the past twelve months, YES . . . . . . . . . . . . . . . . . . . 54%
have you contacted anyone working NO. . . . . . . . . . . . . . . . . . . . 46%
for the City of Arden Hills, other DON'T KNOW/REFUSED. . . . . 0%
than the police or fire depart-
ments, whether to obtain informa-
tion, to get service, or make a
complaint of any kind?
IF "YES , " ASK:
44 . What was the nature of your most recent inquiry; that
• is , what information or service did you need?
PERMIT, 7% ; COMPLAINT, 17%, PARK QUESTION, 8% ; GEN-
ERAL INFO, 14%; RECYCLING, 5%; TREE REMOVAL, 3% .
5
45 . What department or official did you contact first about
• this inquiry?
"CITY HALL, " 26% ; PARK & REC, 8% ; BLDG. INSPECTOR,
4% ; PUBLIC WORKS , 6% ; SCATTERED, 3%, DON'T KNOW, 7% .
46. In general, were you satis- SATISFIED. . . . . . . . . . . . . 41%
fied or dissatisfied with the DISSATISFIED. . . . . . . . . . 13%
way your inquiry was handled? DON'T KNOW/REFUSED. . . . . . 3
IF "DISSATISFIED, " ASK:
47 . Why were you dissatisfied?
NOTHING DONE, 11% ; INCORRECT INFORMATION, 2% .
48 . Have you visited the Arden Hills YES . . . . . . . . . . . . . . . . . . . 62%
City Hall during the past two NO. . . . . . . . . . . . . . . . . . . . 38%
years? DON'T KNOW/REFUSED. . . . . 0%
49 . From what you have heard or seen, EXCELLENT. . . . . . . . . . . . . . 6%
how would you rate the condition ADEQUATE. . . . . . . . . . . . . . 56%
of the building -- excellent, ade- INADEQUATE. . . . . . . . . . . . 14%
quate, inadequate, or poor? POOR. . . . . . . . . . . . . . . . . . . 4%
DON'T KNOW/REFUSED. . . . 20%
. 50 . In general , do you feel that the ADEQUATE. . . . . . . . . . . . . . 59%
structure is adequate or inade- INADEQUATE. . . . . . . . . . . . 17%
quate for providing service to DON'T KNOW/REFUSED. . . . 24%
the residents of Arden Hills?
Let' s talk about future economic development in Arden Hills. . . .
51. How would you rate the pace of TOO RAPID. . . . . . . . . . . . . 13%
economic development in Arden ABOUT RIGHT. . . . . . . . . . . 73%
Hills -- too rapid, about right, TOO SLOW. . . . . . . . . . . . . . 10%
or too slow? DON'T KNOW/REFUSED. . . . . 5%
IF OPINION IS GIVEN, ASK:
52 . Why do you feel that way?
GOOD MIX, 70% ; TOO FAST, 12% ; NEEDS NOT MET, 10% .
53 . If the City were to attract more development, what kind
would you most prefer?
DON'T KNOW, 15% ; NONE, 9%; RESIDENTIAL, 19% ; OFFICE, 25% ;
RETAIL - STORES , 12% ; RECREATIONAL, 3% ; LIGHT INDUSTRY , 17% .
6
54 . Do you support or oppose the City STRONGLY SUPPORT. . . . . . 27%
taking an active and aggressive SUPPORT. . . . . . . . . . . . . . . 48%
role in attracting targeted devel- OPPOSE. . . . . . . . . . . . . . . . 12%
opment to Arden Hills? (WAIT FOR STRONGLY OPPOSE. . . . . . . 14%
RESPONSE) And, do you feel strong- DON'T KNOW/REFUSED. . . . 11%
ly that way?
55 . Do you favor or oppose the City STRONGLY FAVOR. . . . . . . . . 9%
offering financial incentives to FAVOR. . . . . . . . . . . . . . . . . 28%
attract various types of devel- OPPOSE. . . . . . . . . . . . . . . . 24%
opment to the community? (WAIT STRONGLY OPPOSE. . . . . . . 27%
FOR RESPONSE) And, do you feel DON'T KNOW/REFUSED. . . . 13%
strongly that way?
The City could undertake many different initiatives to attract or
discourage various types of future development. For each of the
following categories , please tell me if you feel the City of
Arden Hills should act aggressively to attract that type of
growth, act aggressively to discourage that type of growth, or
take no action one way or the other. If you have no opinion, just
say so.
AGG AGG NO DK/
ATT DIS ACT REF
56 . Single family homes for moderate
income families . 56% 8% 30% 5%
57 . Low income family housing. 20% 40% 33% 8%
58 . Apartment buildings . 16% 52% 27% 5%
59 . Townhouses. 44% 25% 26% 5%
60 . Condominiums . 32% 36% 27% 5%
61. Senior citizen housing. 64% 14% 19% 4%
62 . Mobile homes . 7% 77% 13% 3%
63 . Retail shopping centers . 33% 43% 21% 3%
64 . Commercial office buildings. 49% 26% 21% 3%
65 . Light industrial plants . 44% 36% 15% 5%
66 . Parks and recreational open
75% 10% 12% 3%
spaces .
67 . Should the TOP priority for devel- TAX BASE. . . . . . . . . . . . . . 29%
opment in this city be on increa- JOBS . . . . . . . . . . . . . . . . . . 12%
sing the tax base, providing head- HOUSING. . . . . . . . . . . . . . . 20%
of-household jobs , providing hou- RECREATION. . . . . . . . . . . . 19%
sing opportunities for young RETAIL SHOPPING. . . . . . . . 6%
families and retirees, providing COMBINATION (VOL) . . . . . . 6%
recreational and leisure time NONE OF ABOVE. . . . . . . . . . 4%
offerings , or attracting more re- DON'T KNOW/REFUSED. . . . . 5%
tail shopping opportunities?
68 . What should be the second prior- TAX BASE. . . . . . . . . . . . . . 13%
ity? (RE-READ ABOVE LIST, IF JOBS . . . . . . . . . . . . . . . . . . 19%
NECESSARY. ) HOUSING. . . . . . . . . . . . . . . 21%
RECREATION. . . . . . . . . . . . 20%
RETAIL SHOPPING. . . . . . . . 8%
• COMBINATION (VOL) . . . . . . 6%
NONE OF ABOVE. . . . . . . . . . 6%
DON'T KNOW/REFUSED. . . . . 8%
7
There is the possibility that the Arsenal property in Arden Hills
could become available for other uses. The property lies
completely within the city and covers 2 , 331 acres.
69 . Would you favor or oppose the STRONGLY FAVOR. . . . . . . . 33%
City initiating action to speed FAVOR. . . . . . . . . . . . . . . . . 31%
up the sale of this property? OPPOSE. . . : . . . . . . . . . . . . 10%
(WAIT FOR RESPONSE) Do you feel STRONGLY OPPOSE. . . . . . . . 8%
strongly that way? DON'T KNOW/REFUSED. . . . 18%
70 . Should the City of Arden Hills PURCHASE. . . . . . . . . . . . . . 17%
attempt to purchase that land to REGULATE. . . . . . . . . . . . . . 65%
directly control its use or should DEPENDS (VOL) . . . . . . . . . . 7%
it try to regulate its future use DON'T CARE (VOL) . . . . . . . 3%
through zoning decisions without DON'T KNOW/REFUSED. . . . . 8%
buying the property?
If the City were to purchase and redevelop that land, substantial
costs might be involved. The City would not only have to pay
fair value for the land, but would have to bear costs to clean up
contaminated soil and remove buried ammunition. The City might
have to ask residents to permit the issuing of long term bonds to
finance this project. Property owners would be asked to increase
their property taxes to cover the principal and interest of the
bonds.
• 71. Would you favor or oppose a prop- STRONGLY FAVOR. . . . . . . . . 3%
erty tax increase to purchase and FAVOR. . . . . . . . . . . . . . . . . 12%
redevelop the Arsenal site? (WAIT OPPOSE. . . . . . . . . . . . . . . . 23%
FOR RESPONSE) And do you feel STRONGLY OPPOSE . . . . . . . 51%
strongly that way? DON'T KNOW/REFUSED. . . . . 9%
IF "STRONGLY FAVOR" OR "FAVOR, " ASK:
72 . How much would you be willing NOTHING. . . . . . . . . . . . . . . . 0%
to see your property taxes $25 . 00 . . . . . . . . . . . . . . . . . 3%
increase per year? Let' s $50 . 00 . . . . . . . . . . . . . . . . . 5%
say, would you be willing to $100 . 00 . . . . . . . . . . . . . . . . 5%
see a yearly increase of $125 . 00 . . . . . . . . . . . . . . . . 0%
$ ? (CHOOSE RANDOM START- $150 . 00 . . . . . . . . . . . . . . . . 1%
ING LEVEL; MOVE UP OR DOWN $175 . 00 . . . . . . . . . . . . . . . . 2%
DEPENDING ON ANSWER. ) How DON'T KNOW. . . . . . . . . . . . . 1%
about $ ? (REPEAT PROCESS) REFUSED. . . . . . . . . . . . . . . . 0%
73 . Should the arsenal property be SINGLE FAMILY DWELL. . . 19%
developed PRIMARILY for single MULTIPLE' FAMILIES . . . . . . 0%
family dwellings, multiple family RETAIL SHOPPING. . . . . . . . 3%
housing, retail shopping, light LIGHT INDUSTRY. . . . . . . . 10%
industry, offices, OR recreational OFFICES . . . . . . . . . . . . . . . . 4%
and park uses? RECREATIONAL/PARKS . . . . 17%
COMBINATION (VOL) . . . . . 37%
NONE OF ABOVE (VOL) . . . . 4%
• DON'T KNOW/REFUSED. . . . . 7%
8
74 . If the City cannot procure all of YES . . . . . . . . . . . . . . . . . . . 47%
• the Arsenal property, should it NO. . . . . . . . . . . . . . . . . . . . 39%
attempt to purchase parts of it? DON'T KNOW/REFUSED. . . . 14%
There has been some discussion about the need for a new City Hall
and Public Works Building. The present City Hall is about forty
years old, provides inadequate office space, needs major repairs ,
and has been cited for building code violations .
75 . Do you favor or oppose the cons- STRONGLY FAVOR. . . . . . . . 22%
truction of a new City Hall? FAVOR. . . . . . . . . . . . . . . . . 36%
(WAIT FOR RESPONSE) And, do you OPPOSE. . . . . . . . . . . . . . . . 11%
feel strongly that way? STRONGLY OPPOSE. . . . . . . 18%
DON'T KNOW/REFUSED. . . . 1^
76 . Should a new City Hall just con- JUST CITY OFFICES . . . . . 34%
tain city offices or should it be MULTI-USE FACILITY . . . . 55%
a multi-use facility in which DON'T KNOW/REFUSED. . . . 11%
space can be rented to other
government bodies, such as the
School District?
77 . Should a new City Hall be placed CURRENT SITE. . . . . . . . . . 64%
at the current site or in some OTHER SITE. . . . . . . . . . . . 16%
other part of the community? DON'T KNOW/REFUSED. . . . 20%
. IF "OTHER PART OF COMMUNITY, " ASK:
78 . Where would you like to see a new City Hall built?
BY ARSENAL, 3% ; "E" & LEXINGTON, 4% ; OTHER CENTRAL
LOCATION, 4% ; LEXINGTON & 694 , 2% .
Several cities in the Metropolitan Area have built community
centers adjoining their city halls. Would you strongly favor,
somewhat favor, somewhat oppose, or strongly oppose, a community
center addition which contained. . . .
StF SmF Sm0 St0 DKR
79 . Meeting rooms for community
groups? 16% 39% 20% 22% 3%
80 . Athletic facilities, such as
a gymnasium or exercise rooms? 10% 28% 27% 31% 5%
81. An indoor swimming pool? 11% 23% 30% 32% 4%
82 . Would you be most likely to favor CITY HALL ALONE. . . . . . . 37%
a new City Hall if it stood alone, INCLUDE COM CENTER. . . . 39%
included a community center addi- OPPOSE IT. . . . . . . . . . . . . 16%
tion, or would you oppose it under DON'T KNOW/REFUSED
•
either condition?
The building of a new City Hall and/or Community Center would
9
likely require citizens to approve a bond referendum. Property
• owners would be asked to increase their property taxes to cover
the principal and interest of the bonds. First, let's consider
just a City Hall . . . .
83 . Would you favor or oppose a prop- STRONGLY FAVOR. . . . . . . . 13%
erty tax increase to construct a FAVOR. . . . . . . . . . . . . . . . . 34%
new City Hall? (WAIT FOR RE- OPPOSE. . . . . . . . . . . . . . . . 18%
SPONSE) And do you feel strongly STRONGLY OPPOSE. . . . . . . 27%
that way? DON'T KNOW/REFUSED. . . . . 8%
IF "STRONGLY FAVOR" OR "FAVOR, " ASK:
84 . How much would you be willing NOTHING. . . . . . . . . . . . . . . . 0%
to see your property taxes $10 . 00 . . . . . . . . . . . . . . . . . 5%
increase per year? Let' s $20 . 00 . . . . . . . . . . . . . . . . 12%
say, would you be willing to $30 . 00 . . . . . . . . . . . . . . . . 10%
see a yearly increase of $40 . 00 . . . . . . . . . . . . . . . . . 4%
$ ? (CHOOSE RANDOM START- $50 . 00 . . . . . . . . . . . . . . . . . 5%
ING LEVEL; MOVE UP OR DOWN $60 . 00 . . . . . . . . . . . . . . . . . 4%
DEPENDING ON ANSWER. ) How DON'T KNOW. . . . . . . . . . . . . 6%
about $ ? (REPEAT PROCESS) REFUSED. . . . . . . . . . . . . . . . 0%
How about a new City Hall with adjoining Community Center. . . .
85 . Would you favor or oppose a prop- STRONGLY FAVOR. . . . . . . . 11%
• erty tax increase to construct a FAVOR. . . . . . . . . . . . . . . . . 25%
new City Hall and Community Cen- OPPOSE. . . . . . . . . . . . . . . . 17%
ter? (WAIT FOR RESPONSE) And, do STRONGLY OPPOSE. . . . . . . 41%
you feel strongly that way? DON'T KNOW/REFUSED. . . . . 6%
IF "STRONGLY FAVOR" OR "FAVOR, " ASK:
86 . How much would you be willing NOTHING. . . . . . . . . . . . . . . . 0%
to see your property taxes $15 . 00 . . . . . . . . . . . . . . . . . 3%
increase per year? Let' s $30 . 00 . . . . . . . . . . . . . . . . 11%
say, would you be willing to $45 . 00 . . . . . . . . . . . . . . . . . 8%
see a yearly increase of $60 . 00 . . . . . . . . . . . . . . . . . 5%
$ ? (CHOOSE RANDOM START- $75 . 00 . . . . . . . . . . . . . . . . . 1%
ING LEVEL; MOVE UP OR DOWN $90 . 00 . . . . . . . . . . . . . . . . . 3%
DEPENDING ON ANSWER. ) How DON'T KNOW. . . . . . . . . . . . . 3%
about $ ? (REPEAT PROCESS) REFUSED. . . . . . . . . . . . . . . . 0%
�f Turning to parks and recreational opportunities . . . .
87 . In general , do you usually spend OUTDOOR ACTIVITIES . . . . 61%
your leisure time in outdoor INDOOR ACTIVITIES . . . . . 16%
activities, weather permitting, BOTH (VOL. ) . . . . . . . . . . . 23%
or indoor activities? NO FREE TIME (VOL. ) . . . . 1%
DON'T KNOW/REFUSED. . . . . 0%
•
10
• 88 . In general, how well informed are VERY WELL INFORMED. . . . 22%
you about the Arden Hills park SOMEWHAT INFORMED. . . . . 53%
system and facilities. Would you NOT TOO WELL INFORMED. 22%
say you are very well informed, NOT AT ALL INFORMED. . . . 3%
somewhat informed, not too well DON'T KNOW/REFUSED. . . . . 0%
informed, or not at all informed?
The Arden Hills park system is composed of neighborhood parks and
trails.
89 . How often do you visit or use an FREQUENTLY. . . . . . . . . . . . 35%
Arden Hills park or recreational OCCASIONALLY. . . . . . . . . . 38%
facility -- frequently, occasion- RARELY. . . . . . . . . . . . . . . . 20%
ally, rarely, or never? NEVER. . . . . . . . . . . . . . . . . . 8%
DON'T KNOW/REFUSED. . . . . 0%
90 . How would you rate park and rec- EXCELLENT. . . . . . . . . . . . . 23%
reational facilities in Arden GOOD. . . . . . . . . . . . . . . . . . 58%
Hills -- excellent, good, only ONLY FAIR. . . . . . . . . . . . . 11%
fair, or poor? POOR. . . . . . . . . . . . . . . . . . . 2%
DON'T KNOW/REFUSED. . . . . 7%
IF RATING IS GIVEN, ASK:
91. Why do you feel that way?
• CLEAN - KEPT UP, 45% ; GOOD - FUN TO USE, 29% ; COULD
IMPROVE, 15% ; NEED MORE OF THEM, 4% .
92 . If you could choose, would you PAVED/ASPHALT. . . . . . . . . 33%
prefer trails in the city to be UNPAVED/WOODCHIPS . . . . . 38%
paved surfaces, with materials DON'T CARE. . . . . . . . . . . . 24%
such as asphalt, or unpaved DON'T KNOW/REFUSED. . . . . 4%
surfaces , with materials such as
woodchips , or don't you care?
93 . Should trails in the City serve PEDESTRIANS ONLY. . . . . . 26%
pedestrians only or pedestrians PEDESTR + BICYCL. . . . . . 53%
and bicyclists? SOME OF BOTH (VOL) . . . . 17%
DON'T CARE (VOL) . . . . . . . 2%
DON'T KNOW/REFUSED. . . . . 2%
94 . Do you feel that the current mix YES . . . . . . . . . . . . . . . . . . . 84%
of recreational opportunities NO. . . . . . . . . . . . . . . . . . . . 16%
sufficiently meets the needs of DON'T KNOW/REFUSED. . . . . 0%
members of your household?
IF "NO, " ASK:
95 . What additional recreational opportunities would you
like to see the City of Arden Hills offer residents?
• TRAILS, 6% ; FOR YOUTH, 4%. BALLFIELDS , 1% ; SWIMMING,
1% ; SCATTERED, 3% .
The Arden Hills Park System has been constructed and maintained
11
through the use of park dedication fees , and has never required
any type of property tax funding. That financial situation may
change in the future.
96 . Would you favor or oppose a prop- STRONGLY FAVOR. . . . . . . . 22% � �S�o
erty tax increase to maintain and FAVOR. . . . . . . . . . . . . . . . . 33%
improve the park system? (WAIT OPPOSE. . . . . . . . . . . . . . . . 19%
FOR RESPONSE) And do you feel STRONGLY OPPOSE. . . . . . . 20%
strongly that way? DON'T KNOW/REFUSED. . . . . 7%
IF "STRONGLY FAVOR" OR "FAVOR, " ASK:
97 . How much would you be willing NOTHING. . . . . . . . . . . . . . . . 1%
to see your property taxes $10 . 00 . . . . . . . . . . . . . . . . 17%
increase per year? Let' s $20 . 00 . . . . . . . . . . . . . . . . 12%
say, would you be willing to $30 . 00 . . . . . . . . . . . . . . . . . 9%
see a yearly increase of $40 . 00 . . . . . . . . . . . . . . . . . 5%
$ ? (CHOOSE RANDOM START- $50 . 00 . . . . . . . . . . . . . . . . . 7%
ING LEVEL; MOVE UP OR DOWN $60 . 00 . . . . . . . . . . . . . . . . . 3%
DEPENDING ON ANSWER. ) How DON'T KNOW. . . . . . . . . . . . . 5%
about $ ? (REPEAT PROCESS) REFUSED. . . . . . . . . . . . . . . . 0%
Changing topics . . . .
98 . Do you approve or disapprove of STRONGLY APPROVE. . . . . . 16%
charitable gambling in Arden Hills APPROVE. . . . . . . . . . . . . . . 23%
• establishments? (WAIT FOR RE- DISAPPROVE. . . . . . . . . . . . 15%
SPONSE) And do you feel strongly STRONGLY DISAPPROVE. . . 36%
that way? DON'T KNOW/REFUSED. . . . 11%
The City raises $110 , 000 . 00 per year through taxes on charitable
gambling activities.
99 . Would you support the elimination YES . . . . . . . . . . . . . . . . . . . 27%
of charitable gambling in the city NO. . . . . . . . . . . . . . . . . . . . 64%
even if property taxes would have DON'T KNOW/REFUSED. . . . . 9%
to be raised or city services cut
to make up the difference?
Some people feel that neighborhood improvements should be paid
for only by the people directly affected in the area. Others
feel that neighborhood improvements should be paid for by general
city funds , since property values across the city are indirectly
impacted. For each of the following improvements, please tell me
if you think that only property owners in the area, or the entire
city should pay. . . .
AREA CITY BOTH DKRF
100 . Street lighting? 30% 47% 20% 3%
10 101. Sidewalks? 41% 38% 20% 5%
102 . Street reconstruction? 15% 61% 21% 3%
12
• Suppose the City decided to use a cost-sharing formula to pay for
these types of improvements. Residents directly affected by
neighborhood improvement would pay a certain percentage of the
costs , while general city funds would be used to pay for the
remainder.
103 . If you set the percentage to be ENTIRE AMOUNT. . . . . . . . . . 5%
paid by directly impacted home- THREE-QUARTERS . . . . . . . . . 9%
owners , would you require them to ONE-HALF. . . . . . . . . . . . . . 26%
pay the entire amount, three- ONE-QUARTER. . . . . . . . . . . 23%
quarters , one-half, one-quarter or NONE. . . . . . . . . . . . . . . . . . 18%
none of the costs? DON'T KNOW/REFUSED. . . . 19%
As you may know, recyclable materials are picked up at the curb
in Arden Hills . Households are asked to separate recyclables
from the rest of their trash and haulers carry them away.
104 . Do you now participate in the YES . . . . . . . . . . . . . . . . . . . 86%
curbside pick-up program? NO. . . . . . . . . . . . . . . . . . . . 14%
DON'T KNOW/REFUSED. . . . . 0%
IF "YES , " ASK:
105 . How often do you put recy- WEEKLY. . . . . . . . . . . . . . . . 54%
clables out for collection TWICE MONTHLY . . . . . . . . . 25%
• weekly, twice monthly, ONCE MONTHLY. . . . . . . . . . . 6%
monthly, quarterly, or less? QUARTERLY . . 1%
LESS . . . . . . . . . . . . . . . . . . . 0%
DON'T KNOW/REFUSED. . . . . 0%
106 . Are you satisfied or dis- SATISFIED. . . . . . . . . . . . . 77%
satisfied with the recycling DISSATISFIED. . . . . . . . . . . 9%
program? DON'T KNOW/REFUSED. . . . . 0%
IF "DISSATISFIED, " ASK:
107 . Why do you feel that way?
PICK UP PLASTICS , 5% ; NEED MORE INFO, 1% ; MORE
FREQUENT - ON TIME , 3% .
IF "NO, " ASK:
108 . Which of the following best STATEMENT A. . . . . . . . . . . . 2%
describes your reasons for STATEMENT B. . . . . . . . . . . . 5%
not participating: STATEMENT C. . . . . . . . . . . . 2%
A. I wasn't aware of the STATEMENT D. . . . . . . . . . . . 2%
program. STATEMENT E. . . . . . . . . . . . 2%
B. I knew about it, but need ALL OF THE ABOVE (VOL) . 0%
more information. OTHER REASON. . . . . . . . . . . 2%
C. The program is too incon- NONE OF ABOVE (VOL) . . . . 1%
. venient. DON'T KNOW/REFUSED. . . . . 0%
D. I am just not interested.
E. It isn't worth it to take
the time.
13
109 . How do you currently dispose of COMPOST ON PROPERTY . . . 51%
grass clippings and yard waste USE DROP-OFF SITE. . . . . 21%
do you compost on your prop- GARBAGE HAULER. . . . . . . . 8%
erty, use a yard waste drop-off OTHER METHOD (VOL. ) . . . 16%
site, or have your garbage hauler DON'T KNOW/REFUSED. . . . . 5%
collect it?
As you also may know, several refuse haulers serve Arden Hills .
This arrangement has permitted citizens to choose their own
haulers and contract directly with them. Some people say it has
created significant overlap between the hauler routes and
increased noise and congestion on city streets .
110 . Of the following three proposals, PROPOSAL A. . . . . . . . . . . . 65%
which do you most favor: PROPOSAL B. . . . . . . . . . . . 13%
A. The present system. PROPOSAL C. . . . . . . . . . . . 15%
B. The City assigns current ALL EQUALLY . . . . . . . . . . .
. 3%
haulers to exclusively handle DON'T KNOW/REFUSED. . . . . 6%
specific areas ;
C. The City designates one hauler
to serve the entire city;
Changing topics again. . . .
Ill . What is your primary source of information about community
events going on in Arden Hills?
• NONE, 3% ; CABLE, 2% ; PAPER, 9% ; NEWSLETTER, 9% ; TOWN
CRIER, 50% ; FOCUS , 12 NEW BRIGHTON BULLETIN, 15% ;
PEOPLE , 3% ; FLYERS , 2% .
112 . What is your primary source of information about City
government and its activities?
NONE , 5% ; CABLE, 4% ; PAPER, 7% ; NEWSLETTER, 8% ; TOWN
CRIER, 50% ; FOCUS , 10% ; NEW BRIGHTON BULLETIN, 12% ;
PEOPLE , 2% ; DISPATCH, 2% ; FLYERS , 1% .
113 . Do you receive the quarterly RECEIVE/READ. . . . . . . . . . 94%
"Town Crier" Newsletter"? (IF RECEIVE/DON'T READ. . . . . 3%
"YES , " ASK: ) Do you regularly DON'T RECEIVE. . . . . . . . . . 3%
read the newsletter? DON'T KNOW/REFUSED. . . . . 0%
IF "RECEIVE AND READ, " ASK:
114 . Are there any changes in the format or coverage you
would like to see? (IF "YES, " ASK: ) What are they?
MORE OFTEN, 3% ; LARGER, 6% ; BETTER FORMAT, 3% .
115 . Does your household currently YES . . . . . . . . . . . . . . . . . . . 46%
subscribe to cable television? NO. . . . . . . . . . . . . . . . . . . . 54$
• DON'T KNOW/REFUSED. . . . . 0%
IF "YES , " ASK:
14
116 . Would you say you watch local FREQUENTLY . . . . . . . . . . . . . 2%
• government access Channel 16 OCCASIONALLY. . . . . . . . . . 11%
frequently, occasionally, RARELY . . . . . . . . . . . . . . . . 15%
rarely, or not at all? NOT AT ALL. . . . . . . . . . . . 19%
DON'T KNOW/REFUSED. . . . . 0%
IF "FREQUENTLY" OR "OCCASIONALLY, " ASK:
117 . How would you rate the EXCELLENT. . . . . . . . . . . . . . 0%
quality of the picture GOOD. . . . . . . . . . . . . . . . . . . 6%
and sound -- excellent, ONLY FAIR. . . . . . . . . . . . . . 6%
good, only fair, or POOR. . . . . . . . . . . . . . . . . . . 1%
poor? DON'T KNOW/REFUSED. . . . . 0%
118 . Would you say you watch City FREQUENTLY. . . . . . . . . . . . . 1%
Council meeting telecasts OCCASIONALLY. . . . . . . . . . . 8%
telecasts frequently, occa- RARELY . . . . . . . . . . . . . . . . 11%
sionally, rarely, or not at NOT AT ALL. . . . . . . . . . . . 23%
all? DON'T KNOW/REFUSED. . . . . 3%
119 . Do you read either the "Focus" or "FOCUS" ONLY . . . . . . . . . . 6%
the "New Brighton Bulletin" or "BULLETIN" ONLY. . . . . . . . /%
both newspapers? BOTH NEWSPAPERS . . . . . . . 80%
NEITHER. . . . . . . . . . . . . . . . 3%
DON'T KNOW/REFUSED. . . . . 0%
• Now, just a few more questions for demographic purposes . . . .
Could you tell me how many people in each of the following age
groups live in your household. Let' s start oldest to
youngest, and be sure to include yourself. . . .
NONE, 86% ; ONE , 6% ;
120 . Persons over 65? TWO OR MORE, 8% .
NONE, 12% ; ONE , 10% ; TWO, 59% ;
121 . Adults over 18? THREE , 13% ; FOUR OR MORE, 6% .
NONE, 62% ; ONE , 14% ;
122 . School-aged children? TWO , 18% ; THREE OR MORE, 6% .
NONE, 83% ; ONE , 14% ;
123 . Preschoolers? TWO, 4% ;
124 . Do you own or rent your present OWN. . . . . . . . . . . . . . . . . . . 94%
residence? RENT. . . . . . . . . . . . . . . . . . . 6%
REFUSED. . . . . . . . . . . . . . . . 0%
125 . Which of the following categories 18 - 24 . . . . . . . . . . . . . . . . 6%
contains your age, please? 25 - 34 . . . . . . . . . . . . . . . 12%
35 - 44 . . . . . . . . . . . . . . . 30%
55 64 . . 14%
65 AND OVER. . . . . . . . . . . 12%
15
126 . Which of the following best SINGLE FAMILY HOME. . . . 37%
describes your present residence? DUPLEX/DOUBLE BUNGALOW. 1%
(READ CHOICES #1-#6 • ) 3-PLEX OR 4-PLEX. . . . . . . 3%
APARTMENT BUILDING OF
5-9 UNITS . . . . . . . . . 0%
APARTMENT BUILDING OF
10 OR MORE UNITS . . l%
MOBILE HOME. . . . . . . . . . . . 2%
OTHER. . . . . . . . . . . . . . . . . . 7%
DON'T KNOW/REFUSED. . . . . 0%
127 . What is the last grade of LESS THAN HIGH SCHOOL. . 2%
education you completed? HIGH SCHOOL GRADUATE. . 14%
VO-TECH SCHOOL. . . . . . . . . 5%
SOME COLLEGE. . . . . . . . . . 17%
COLLEGE GRADUATE. . . . . . 35%
POST-GRADUATE. . . . . . . . . 27%
REFUSED. . . . . . . . . . . . . . . . 0%
128 . What is your occupation and, if applicable, the occupation
of your spouse? (CODED AS HEAD OF HOUSEHOLD)
PROFESSIONAL - TECHNICAL, 30% ; OWNER - MANAGER, 37% ;
CLERICAL - SALES , 7% ; BLUE COLLAR, 7% ; RETIRED, 15% ;
SCATTERED, 4% .
0 129 . Do you and/or your spouse, if RESPONDENT ONLY . . . . . . . 11%
applicable, work in Arden Hills? SPOUSE ONLY . . . . . . . . . . . . 6%
BOTH. . . . . . . . . . . . . . . . . . . 6%
NEITHER. . . . . . . . . . . . . . . 71%
DON'T KNOW/REFUSED. . . . . 6%
130 . Which of the following categories BELOW $12 , 500 . . . . . . . . . . . 2%
includes your 1989 total pre-tax $12 , 501-$25 , 000 . . . . . . . . . 6%
household income. Please stop me $25 , 001-$37 , 500 . . . . . . . . . 9%
when I read the right one. $37 , 501-$50 , 000 . . . . . . . . 18%
$50 , 001-$62 , 500 . . . . . . . . 17%
$62 , 501-$75 , 000 . . . . . . . . 13%
$75 , 001-$87 , 500 . . . . . . . . . 6%
$87 , 501-$100, 000 . . . . . . . . 8%
OVER $100 , 000 . . . . . . . . . . . 9%
DON'T KNOW. . . . . . . . . . . . . . 2%
REFUSED. . . . . . . . . . . . . . . . 13%
131 . Gender (DO NOT ASK) MALE . . . . . . . . . . . . . . . . . . 50%
FEMALE. . . . . . . . . . . . . . . . 50%
LIST: PRECINCTS ONE & TWO. . . 38%
PRECINCT THREE. . . . . . . . 30%
PRECINCT FOUR. . . . . . . . . 32%
16
plllt
l p vv-vv u-Yw-;
•
4ro w�— -;wo (,,o c ro-'. w,.s
Ax-r&.vc, t-►.j• 3 ut
ok- rQsQo S.. J
4
L C qo lcj-
( a,at� off- ct �� f�►��� C ��rclt ���-(— �rtooC-j
`. �Lf Cv E� C�I( �„`� c'afi�&Jcl
VLt.
yttj
a
lAi..S(Li'Ufa-��L7aJ we.til� �i.���w�'" �r��a-Jt 4,+)c- crrro,c t
C L d rg {' �"�i-(` &-A l/`d�CcJ� �rLU 6 l�.
61 lV {1 1 Cs fir- G w�dc�o �/� In Q i eCt f�F- -�i�c a�c 17 C,'�•:J i /
—7 �/- 1 r(6 r— v,( 4-c )9f- 6zAu
jer" iLoI
E�e.
`1 C�a ► A.; Iz o-� ('�c• e �o J h� .�r- v�e�c d
to c� i.-L �-oa-� •t ltic r�.a �e �h vti.�.�--.'�-��
vko�—
�� �e Se to ►+�cs,«�— ���1..� S&-o Rc.� ci cL,�-4 u a,�� 4o d cc L) (o"o,
fr
�Or
MA - awA-) e��
1nc w j
ARDEN HILLS PARKS DEPARTMENT
PEDESTRIAN TRAILS
Proposed Blacktopping Schedule
The trails were divided into four categories: (.1) section recommended `or
blacktopping in 1987 because of high usage and difficult terrain; (2) ,
(3) , and (4) suggested priority for blacktopping in the future as/if 'funds
are available
Length Surface
Arden Trail
✓Glenpaul to Stowe 2,575 ' Ag Lime 2
,,-Stowe to Co Rd E 1 ,500 ' Grass 2
Chatham Trails
A Connection 1 ,200' 160 ' hard 4
surface, 1 ,040
grass, blocks
Corridors
(600' Leading to `valentine School)
Natural Area Pathways 8,400' Grass
Town House Trails
Village Hall Trail 2, 300 ' Grass 3
NSP Trail. 1 , 300 ' Grass 3
Corridor /40 ' Grass 4
L/�Florai to Norma Corridor 600' Ag Lime 1
Cummings Park to Floral Trail
Cummings Park Trail 1 ,500 ' Grass 3
Cummings to Flor1al 2,050 ' Grass 2
.,W� coral / 2,000' Grass 3
Crepeau Nature Preserve
Nature Trails 2,800 ' Grass 4
BREAKDOWN BY RUNNING FOOT
Phase 1 620 feet
Phase 2 6, 125 feet
Phase 3 15, 540 feet
Phase 4 4, 580 feet
�^„Zy i'l�itit�
PROPOSED PLAY EQUIPMENT FOR VALENTINE PARK � �j� }^,r^✓
GAMETIME �ML
QUALITY
PLASTIC SPIRAL SLIDE 11' CYCLONE SLIDE PLASTIC SPIRAL SLIDE
WAVE SLIDE 16' TUBE SLIDE STRAIGHT TUBE SLIDE
PRE-SCHOOL SLIDE PRE-SCHOOL SLIDE PRE-SCHOOL SLIDE
8' CRAWL TUBE 8' RAMP HORIZONTAL LADDER
SLIDING POLE i SLIDING POLE SLIDING POLE
CLIMBING NET I SMALL CHAIN LADDER CHAIN NET
SPIRAL CLIMB CURVED CLIMBER ARCH CLIMBER
STEPS 8' CRAWL TUBE SUSPENDED BRIDGE
TIC-TACK-TOE I SPIDER CLIMBER TWO BELT SWINGS
5 DECKS VERTICAL LADDER 6 DECKS
CARGO NET CLIMBER
I
8' RAMP
i
CURVED HORIZONTAL
LADDER WEND CLIMBER
i
PVC STEPS
I
5 DECKS
I
I
i
I
i
I
i
i
I I
I
I
i
i
I
AGENDA
Parks and Recreation Committee Meeting
City of Arden Hills
Tuesday, February 20, 1990, 7:30 p.m.
Cite Hall
1. Call to Order and Roll Call.
2. Approval of January 23, 1990 Minutes.
3. Council Report:
4. Program Supervisor Update.
- Results of interviews Feb. 15th & 16th
- Proposed program expansion with Program Supervisor
5. 1990 Park Development
6. 1990 Trail Development
7. 1990 Arbor Day activities
8. Citywide beautification emphasis.
• - Yard beautification/Landscape Recognition Program
- City Parks flowers
- Review Parkway System Study
9. Misc./New Business
10. Adjournments
• AGENDA
Parks and Recreation Committee Meeting
City of Arden Hills
Tuesday, February 20, 1990, 7:30 p.m.
City Hall
1. Call to Order and Roll Call.
2. Approval of January 23, 1990 Minutes.
3. Council Report:
4. Program Supervisor Update.
- Results of interviews Feb. 15th & 16th
- Proposed program expansion with Program Supervisor
5. 1990 Park Development
6. 1990 Trail Development
7. 1990 Arbor Day activities
8. Citywide beautification emphasis.
- Yard beautification/Landscape Recognition Program
- City Parks flowers
- Review Parkway System Study
9. Misc./New Business
10. Adjournments
ARD E N H TILL S PARKS R E C REA T T O N D E P T _
1990 ARBOR DAY C E L E B RA T T O N
Trees are nature' s way of purifying the air we breathe. You can help your planet
earth keep its environment clean by planting trees and seedlings in City parks and
along City trails this Arbor Day.
ARBOR DAY , SAT - MAY 5 , 10 AM T O NOON
Tree planting volunteers (scouts, 4-H, Camp Fire, PTO' s, etc. ) call John Buckley
or Cindy Severtson at the Parks Dept. , 633-5676 for Arbor Day assignments.
C T TY—WIDE FLOWER GARD EN S
Flowers brighten up the living space in Arden Hills. The Parks Dept. will be
coordinating a City-wide flower planting campaign this Spring between May 15 and
Memorial Day. The flower power campaign will have two emphases.
GATEWAY GARDENS
Flower beds will be prepared at the following gateway sites: City Hall, Hwy. 96/
Hamline, Hwy. 96/Lexington, Lexington/Co. Rd. E (McGuires) , Co. Rd. E/Old 10
(Lindey' s) , Co. Rd. E-2/Old 10. Other sites will include Hamline/Co. Rd. F
and Co. Rd. D/Fairview
The Parks Dept. will be responsible for preparing the flower beds, buying the plants .
and watering the beds throughout the Summer. Flower volunteers are needed to adopt:
a Gateway Garden and be responsible for planting the flowers and weeding the bed
through the Summer.
Flower volunteers please contact John Buckley or Cindy Severtson at Cite Hall, 633-5676.
NET GHB O RHO O D F LOWER P O W ER C AM PA T GN
The Parks Dept. is extending the flower campaign into the neighborhoods also. We
are asking that all property owners plant flowers by their mailbox this Spring
between May 15 and Memorial Day. Join in the magical miracle of turning Arden Hills
into the "flower capital" of the State. Neighborhoods with the most flowers will be
given recognition on Cable TV this August.
Flower volunteers are needed to organize and encourage neighborhood "Mail Gardens" .
Volunteers please call John Buckley or Cindy Severtson at 633-5676.
TASK STATEMENT
Major Responsibility Areas:
1 . Planning, implementing, supervision, and evaluation of City-wide
recreation programs.
a. Assess community recreation needs.
b. Propose activities and programs to meet community needs.
C. Arrange for faci-lities for programs.
d. Recruit instructors.
e. Interview, select, and train part-time staff.
f. Prepare brochures, program information, registration information,
general department information.
g. Establish fee structure based on instructor costs, material cost,
facility fees.
h. Advertise and distribute brochures.
i. Register participants and notify registrants of program changes
or cancellations.
j . Prepare information for instructors, class lists, emergency
procedures, building use policies, etc.
k. Recommend items to be purchased, after obtaining necessary price
information.
1. Spot check each activity periodically to ensure program quality.
M. Prepare payroll requests for staff.
n. Evaluate each staff person hired for programs on ability and
compliance with contract.
o. ~valuate activity for content and success.
?. Provision of assistance in the preparation of budget requests for the
department.
a. Prepare budget memo on recreation needs for the coming year.
b. Recommend improvements on recreation facilities.
C. Provide justification for budget requests.
d. Present request and appropriate information to director.
3. Provision of information on department activities, policies, and pro-
cedures to the general public.
a. Provide miscellaneous information on specific program activities.
b. Provide explanation of miscellaneous departmental policies and
background information when required.
C. Prepare newspaper articles, take photos, and perform related
public relations work.
4. Performance of any other duties as directed or apparent.
a. Recommend the purchase of various items used in the department.
b. Attend Park Board and City Council meetings when required.
C. Speak to community leaders and groups regarding various .
recreation programs.
d. Assist other staff in the department with various duties.
NATIONAL YOUTH SPORTS COACHES ASSOCIATION
AR
ENTS ' CODEOF ETH-ics
I Hereby Fledge To Provide Tositive Support, Care And Encouragement For i
My Child Tarticipating In youth Sports By Following This Code Of Ethics.
♦ I wiff encourage good sportsmiznship by demonstrating positive support for alf players, coaches
and officials at everygame, practice or other youth sports event.
t I will place the emotional and physical well-being of my child ahead of any personal desire to win.
♦ I will insist that my child play in a safe and healthy environment.
♦ w ill r ide support r - an 'in ith m child to provide a ositive, en'o -
I ,.v p ov s ppo for coa„ ..e,s d ofJic.aGs worl� g w y p p � y
able experience for all
+ I will a.'e„wind a drug, alcohol and to6acee free sports environment for my child and agree to as*
by r efraining from their use at all youth sports events.
♦ I will remember that the game is for children and not for adults.
♦ I will do my very best to mate youth sports fun for my child.
i
♦ I will asl`my child to treat other players, coaches,fans and officiafs with respect regardless of
race, sex; creed or ability.
i
+ I will romise to help m child en'o the youth sports e erience within m ersonafconstraints 6
P P y 1 y y P �P y P y
assisting with coaching, being a respectful fan, providing transportation or whatever I am capable
of doing.
♦ I will require that my childs coach be trained in the responsibilities of being a youth sports coach
and that the coach agree to the youth sports Coaches' Code of Ethics.
♦ I will read the NYSCA National Standards for Youth Sports and do everything in my power to
assist aff youth sports organizations to impter,xnt and enforce them.
Parent Signature Parent Signature Date
i
ol �,,�� i �—*�*it �' I �j- I • I �'' qr ,��it ,�
WHO ARE THE MEMBERS AND LEADERS OF USAA, AND HOW CAN I GET
INVOLVED?
USAA is an organization of Jr. High, High School and College Athletes that
Have banned together to promote positive life choices with the common
interest of athletics.
A: Who are the Members?: There are two types of membership. The student
athlete in Jr. High, High School or College and the support individuals i.e.
Athletic Directors, Coaches, Parents, School Administration, Sports Teams,
Sports Suppliers, Educational Institutions, and any person, group, or company
that have the common goal of promoting excellence in Sports through positive
life choices.
B: Who are the National Leaders?: The Board of Directors and National
Leaders include players and administration from Professional and Amateur •
Athletic Organizations in many different sports; Medical and Mental Health
Associations; Educational Associations; and leaders in Business.
C: What are the necessary steps for my school(s) to start a chapter?:
1. Get 10 athletes and 1 administrator to fill out an application and
Potential Sponsor Form, and return it to the National Office.
2. Ortce that is done, the National Office will work with the local
administrator to coordinate a USAA day. This will be a full day of activities
including speakers on the following topics: A) A Professional Athlete
explaining how they got involved, what they have done, and how they handle
professional sports. B) Tips on Training and physical conditioning. C) Drug and
Chemical Abuse films and seminars D) Tips for choosing a college. E) Tips for
choosing a pro career. F) USAA programs, the National Conference, and
Leadership Potential program within the USAA.
D: What if I want to become a State or District Leader?: Forms will become
available to you as you become a member.
LET US KEEP YOU INFORMED ABOUT USAA. ALL YOU HAVE TO DO
TODAY IS COMPLETE YOUR USAA INFORMATION FORM.
TRIUMPH LIFE CENTER
3735 LAKELAND AVENUE NOF3TF9
United States Athletes Association SUITE 230
T.ku.ph L09 Cmv6w MINNEAPC'_IS. ,)01 55422
555 SJmpaon SL SL Paul, MN 56104 b
ph:612-642-9W
NAT. I-s00-342-8722
MEMORANDUM
---------------------------------------------------------------------------
---------------------------------------------------------------------------
DATE: February 1, 1990
TO: Mayor and City Council
FROM: John T. Buckley, Parks Director
SUBJECT: Proposed Program Supervisor Position
--------------------------------------------------------------------------
--------------------------------------------------------------------------
The new Program Supervisor position is a major step in demonstrating to
Arden Hills' residents and neighboring communities that the Mayor and
Council are firmly committed to improving the "quality of living" of Arden
Hills' citizens through program growth and high standards of excellence.
The present youth and adult programs are a sound basis for new program
development.
PROPOSED PROGRAM EXPANSION WITH PROGRAM SUPERVISOR
During the 1989 season the NYSCA Coaches Training Program was used in
training the T-ball and youth softball volunteer coaches. The V SCA is
currently co-sponsoring a nationwide campaign with the national •
PTA' s/PTO' s in promoting "Yes to Better Sports for aids" . The goal is to
have all. youtn volunteer coaches trained with tiYSAC programs.
TOP PRIORITY
Promote "Yes to Better Sports for kids" in Arden Hills by
-contacting with Valentine Hills PTO and Island Lake PTO
-Contacting Board of Directors of Lake Region Hockey Assn. , Little
Lakes Little League, the North Suburban Soccer Association, Babe
Ruth Baseball Association, Mounds View Football Assn. , and the
Mounds View Mustangs Basketball Assn.
Assist in training volunteer coaches for these youth athletic assns.
TOP PRIORITY
Jr. High/High School Program Focus. Promote:
-Teen sports, softball, broomball, etc.
-Special events, ski trips, vacation outings.
-Jr. leader progrm (training youth leaders) .
-United States Athletic Association Drug Education Program.
TOP PRIORITY
Increase creative programming in the fine arts field for elementary, Jr. •
High and Sr. High children.
h. Supervise the maintenance and operation of the parks, recreational
facilities, city hall and other outside City property through the
maintenance employees.
Inspect condition of ail areas regularly for conformance to
standards and for health and safety.
j . Coordinate with City staff in placement and construction of
trailways.
k. Develop a maintenance program for trailways that exist or are part
of the comprehensive plan.
1. Supervise the maintenance of the trailways and easements including
blacktop, turf, landscape, material, fencing and accessory
structures.
3. Administer a diseased tree control program.
a. Maintain State Certification for tree inspector.
b. Comply with all state law and Dept. of Agriculture rules and
regulations.
C. Coordinate purcnase ana installation of all new trees oi.anted
on public property. •
d. Coordinate the public information system.
e. Coordinate the bid process Tor retaining a Citv contractor for
removal of trees on public and private property.
f. Act as the City Forester.
4. Prepare and administer annual budget for Department.
a. Analyze previous year' s budget and gather information on projected
cost.
b. Using projected costs and administrative guidelines for budget
increases, prepare budget draft.
C. Review budget with Council and Clerk Administrator.
d. Make revisions as directed after budget adoption.
e. Develop and supervise the administration of revenue producing
programs.
f. Authorize expenditures from budget and revenue funds according to
general accounting practices and City guidelines.
•
Should have a master' s degree in Parks and Recreation or a closely
related field.
Must have a minimum of five years increasingly responsible supervisory
experience in parks and recreation administration.
SUPERVISION/ACCOUNTABILITY:
This position provides general supervision for all employees in the
Park and Recreation department and the shade tree disease program.
This position has general accountability to the Mayor and City-
Council.
STAFF AND PUBLIC CONTACT:
Extensive contact with staff from other departments and the general
public.
•
•
of <� _
cp
- C _
- ---�._L.tI. •. �V. .� \ � �_.__• ,r�titi•.w.{w.vr.•.titiv.ynti. -
oll
Im
06
I
Kr.IYMd.TON r "�,
-
-_ - r
f_ r
ADAPTABILITY TO PARKWAY DFVrr--t._nPMFN i EXHIRIT 10
1
$� C;l
iZZ, ��•-
�'f
-
1 .
S; �, 41, '\•• --mac -y _, .� �� j � '
oor
Newyp(�T^,}. .Y , 71�. ei i• 3 i_. 1 all
AY��•- .mil_ ..:�:; `�' i, '_=�� i -%/ '•
r l
=15-
AVAILABILITY OF LANDSCAPING - - - -
SPACE RFYON',-) R.O.W. EXHIBIT 8
r
,].•..a� 9��939 .� 1
LIB._.. ;._ __• 1 �:J.�' '-���:_ _ �-"__- -` �
71
OL
`ram
-13-
ON -STRFFT PARKIT �G NFEDS _._. EXHIBIT 6
Cl)
-�- LU
CO
o
_ ap U
W
Z
Lij
� o
I �
j
-- - EXHIBIT 4
. s
01
— , a as IL,-,A
3\li �`�.� '•"t ;_.ate-"+`°`— y '�"�
I `•-- _ _ \ .'It'.�_ =:4•{t"
- � __-. 1q•^:� ti..". 4 � _� it
H u i t !•` / •' ' fit. �f - i �'`-+- � y
old,
��., ice_---_ ;,`��Ir •` _ — — :_ EXHIBIT
-�-
A� 1Tj •S
I . CONCLUSIONS: •
The preceding analysis has resulted in the following con-
clusions:
1. Although the establishment of a parkway system in the
true sense of the term ( i .e. scenic roadways for non-
commercial traffic only and with limited access to
adjacent properties) is not feasible in Arden Hills
because of the existing level of development, improve-
ments can be made which will lend a parkway character to
selected routes.
2. Parkway system improvement efforts should concentrate on:
a. Reduction of excessive pavement widths .
b. Separation of pedestrian/bike paths from the vehicular
roadway.
C. Beautification of roadways through more intense and
uniform boulevard landscaping.
3. Establishment of a parkway system in Arden Hills can
feasibly be accomplished only through a long-term improve-
ment plan. Implementation of such a plan would require:
a . Co-ordination with Ramsey County in the design of
future County road reconstruction projects in order
to achieve separated bike/pedestrian paths and •
reduced pavement widths .
b. Working with the County to achieve the relaxation of
the present landscaping restrictions along future
parkways.
C. Co-ordination with individual property owners to
encourage private planting , or permit publicly
financed planting or private property, to enhance
the parkway character.
d. Co-ordination with utility companies for the burial
of overhead power and telephone lines when replacement
of various segments is required.
4. Based upon the various factors evaluated in this analysis ,
the following routes have the greatest potential for
parkway development:
a. Lake Johanna Boulevard from County Road E to Snelling
b. Snelling Avenue from T.H. 51 to I-694
C. Co. Rd. E-2 from Snelling Avenue to I-35W
•
-7-
G. ANALYSIS OF CANDIDATE ROUTES: (continued) •
3. Right-of-way width. Utilizing the preceding traffic
volume information and the State Aid standards (See
Paragraph F. l) , alternative roadway cross-sections were
developed and tested against the varying right-of-way
widths of candidate routes. (See Exhibit 4) All al-
ternative cross-sectiors assume separated bike/pedestrian
paths to reduce the width of paved roadway and improve
safety. (See Exhibit 5 for graphic identification of
right-of-way widths for all candidate routes. )
4. On-street parking needs. Since provision of on-street
parking space significantly affects the cross-sectional
width of future parkways , areas where on-street parking
is needed were identified. Generally, where residences
front directly onto a candidate parkway route, a need for
on-street parking was assumed. (See Exhibit 6)
5. Need for additional boulevard landscaping. In some
locations , natural wooded areas or mature landscaping on
private property minimize the need for additional street
landscaping. Other areas could benefit from boulevard
landscaping to create parkway character. (See Exhibit 7)
6 . Availability of landsca innc space beyond right-of-way-
As stated in paragraph F .3, County policy is to restrict
landscaping within the right-of-way. Therefore, the
flexibility to provide boulevard-type landscaping beyond
the right-of-way line is important to the long-term
establishment of a parkway character. (See Exhibit 8)
7 . Existing overhead utility; lines . Overhead power and
telephor-2 lines not only seriously reduce the attractive-
ness of the parkway, but also limit the location and type
of future boulevard landscaping. The preponderance of
overhead lines along certain segments of candidate routes
is a definite hindrance to parkway development. (See
Exhibit 9)
H. FINANCIAL FACTORS:
Within the scope of this study, no engineering estimates of
specific costs of parkway consturction were prepared. Assum-
ing basic road construction costs of $75 to $85 per lineal
foot (the approximate cost currently being experienced for
street construction in Arden Hills) , it is obvious that large-
scale road reconstruction witf,in a short time-frame would be
financially prohibitive to both the County and City. Extensive
parkway development is considered feasible only if it is
accomplished on a programmed basis as segments of roadway
require reconstruction. It is also considered in the City' s
financial interest to maintain the present County-State Aid
Highway designation on these routes to fund basic roadway and
pedestrian/bike path construction.
r
F. FACTORS AFFECTING PARKWAY DEVELOPMENT: (continued)
I. (continued) •
If projected volumes on a route exceed 8,000 trips per
day, the standards increase to a range of 48 feet to 52
feet in width.
(See Paragraph G.2 for right-of-way widths and traffic
volumes on candidate routes. )
2. If the preceding standards are satisfied, some design
flexibility may be permitted. However, if significant
design modifications increase the cost of construction ,
the City would be responsible for additional costs.
3. The Ransey County Department of Public Works restricts
landscaping within the rights-of-way of County roads.
Landscaping (berms, trees , shrubs) which encroaches upon
the rights-of-way must be reviewed and may be approved by
'the County. However, it is a general policy that no
landscaping be provided within the right-of-way; it must
be installed behind the right-of-way line.
4. Theoretically, commercial traffic could be restricted on
some segments of the County State Aid roads if they are
designated as parkways . However, if commercial traffic •
is restricted, the maintenance and reconstruction needs
will be reduced, and the amount of State Aid funds re-
ceived will be reduced accordingly. Since the County has
an established allotment of CSAH mileage, it is their
desire to maximize generation of State Aid funds for all
designated mileage. Therefore, restriction of commercial
traffic on segments of existing CSAH routes might cause
the County 'to remove those segments from the CSAH system
and designate some other non-restricted road elsewhere in
the County for State Aid.
5. If a segment of road looses its State Aid designation, it
remains under County jurisdiction, but without State Aid
funds. Any costs of reconstruction must then be borne by
(a) special County appropriations from general revenue
sources , (b) assessment to adjacent property owners , (c)
City funds , or (d) a combination thereof.
6. No funding sources for 17inancing landscaping along County-
State Aid Highways are currently available to either the
County or the City. Landscaping costs , except those
associated with restoration after construction, are not
included as a project cost for County road construction.
If additional landscaping is to be accomplished, it will
be the City' s responsibility.
•
-3-
PARKWAY SYSTEM FEASIBILITY REPORT
City of Arden Hills , Minnesota •
A. ASSIGNMENT:
In July, 1984, the City Council authorized the study of the
concept and feasibility of a parkway system for Arden Hills
for implementation as part of the Transportation Plan of the
City. The study was to include the following activities :
1. Establish basic goals and objectives of the parkway
system.
2. Identify potential parkway routes.
3. Establish typical "cross section" of parkway road and
right-of-way requirements.
4. Evaluate the existing streets , rights-of-way, and ad-
jacent development of potential parkway routes to de-
4termine the physical and financial feasibility of parkway
construction.
5. Discuss possible parkway development with County Traffic
Engineer and City Engineer.
6. Prepare planning graphics for discussion purposes (po- •
tential routes , typical cross-section, problem areas) .
7. Summarize findings and recommendations in brief report to
City Council .
B. GOAL :
Development of a- City-wide parkway system in Arden Hills
which, in addition to serving basic transportation needs ,
provides a pleasant environment for travel , offers exposure to
natural amenities , and enhances the visual image of the
Community.
C. OBJECTIVES :
1 . Establish a parkway system which will connect the various
neighborhoods and segments of the Community.
2. Improve the visual image of the parkway route by:
a. improving the definition of roadways and parking
areas;
b. redesigning cross-section of roadway, if feasible;
C. eliminating excess paved areas ;
d. screening objectional facilities and views ;
e. eliminating overhead utilities ; and
f. intensely landscaping boulevard areas along the
roadway.
-i-
• AGENDA
Parks and Recreation Committee Meeting
City of Arden Hills
Tuesday, January 23, 1990, 7:30 p.m.
City Hall
Call to Order and Roll Call.
�2! Welcome Old Members.
Oath of Office.
Approval of October 24, 1Q89 Minutes.
V,/5. Council Report: i
V °• Program Supervisor Update.
V 7. Twin Cities Arsenal Athletic Field. --
14
Review 1989 Park Development. —cap
/ G1�2. tiyv►rl .
Jl. Review 1990 Proposed Park Development.
• VVV , . 1990 Committee Goals. N QCV,*-
�1. Miscellaneous/New Business.
✓12. Adjournment.
CITY OF ARDEN HILLS
PARK AND RECREATION COMMISSION MEETING
MINUTES, OCTOBER 24, 1989
• Call to Order
The regular meeting of the Arden Hills Park and Recreation Commission was
called to order at 7:31 P.M. by Chairman David Sand.
Roll Call ,/ 1/ ,j
Present: Chairman David Sand, Dorothy McClung, Don Messerly, Tom
Mulcahy.
Absent
Keith Enrooth, *ark-Pet-er�, Mary Gillies, Alan Montgomery, and Pattie
Green.
Also Present
Councilmember Tom Mahowald and Parks Director John Buckley.
MINUTE APPROVAL Minutes of the September 26 meeting were approved as
mailed.
COUNCIL REPORT Councilmember Mahowald reported:
- Arden Hills entered into a purchase agreement with Kem Milling for
their property in the Round Lake district. Price was $385,000. The
City will be responsible for cleaning up the property and removing the
building.
- Arden Hills has entered an agreement with Shoreview to sell sewer and
water service to the Arsenal for the Army Reserve Training Center.
• - Mahowald and Buckley reviewed Cook' s Continental Development proposed
park dedication. Mulcahy moved, seconded by Sand, that Parks
Committee recommend the Council secure a cash dedication from Cook.
Motion carried.
PARK DEVELOPMENT PLAN/ The Committee reviewed the 10 year Park Develop-
PEDESTRIAN TRAILS ment Plan and the pedestrian trail blacktopping
DEVELOPMENT study. Committee members decided to continue the
development study at the November meeting.
PARK SURVEYS The Committee reviewed the Community Park Surveys
- 1985 Arden Hills survey
- New Brighton community survey
- Shoreview community survey
- Shakopee Park survey
No action was taken.
MISC. BUSINESS Mahowald reminded the Committee that the Council
is seeking volunteers to serve on the new City
Hall Committee. Park Committee members are encouraged to contact Mahowald
if interested in serving.
• The Parks Committee has several positions open (Jim Otto and Jim Mishek
have moved out of the City). Members are asked to give names of possible
new members to Mahowald or Buckley.
Meeting adjourned at 8:40 P.M.
PARK FUND
• 1990 PARK DEVELOPMENT
Arden Oaks Picnic Shelter $ 4,000 4 0 �r
Cummings Lake Path and Dock 5,500
Hazelnut Warming Shelter 15,000
Lindey's Landscaping 1,000
Valentine Play Structure 9,000
Trails Surface Improvements 25,000 '+' 1HM�1�%*�^ '1r �(/
Twin City Athletic Field Development 175,000 (//
TOTAL $234,500
17T
COMMENTS
Park dedication and charitable gambling proceeds are dedicated to the Park
Fund. These monies can only be expended for park land acquisition, park
and trail development and salaries related to park development.
Account 530 "Improvements Other Than Buildings" increased significantly in
1990 due to the proposed Arsenal Athletic Complex. Also, there will be
related increases in Account 304 "Legal" and 312 "Planner".
•
s-
•
• ARDEN HILLS PARKS DEPARTMENT
PEDESTRIAN TRAILS
Proposed Blacktopping Schedule
The trails were divided into four categories: (1) section recommended for
blacktopping in 1987 because of high usage and difficult terrain; (2) ,
(3), and (4) suggested priority for blacktopping in the future as/if funds
are available
'Length Surface
Arden Trail
Glenpaul to Stowe 2,575' Ag Lime 2
Stowe to Co Rd E 1 ,500' Grass 2
Chatham Trails
Connection 1 ,200' 160' hard 4
surface, 1,040
grass, blocks
Corridors 4
(600' leading to Valentine School) 1
Natural Area Pathways 8,400' Grass 4
Town House Trails
• Village Hall Trail 2, 300' Grass 3
NSP Trail 1 ,300 ' Grass 3
Corridor 740' Grass 4
Floral to Norma Corridor 600 ' Ag Lime 1
Cummings Park to Floral Trail
Cummings Park Trail 1,500 ' Grass 3
Cummings to Floral 2,050' Grass 2
Floral 2,000' Grass 3
Crepeau Nature Preserve
Nature Trails 2,800' Grass 4
BREAKDOWN BY RUNNING FOOT
Phaca 1 620 feet
•
CITY OF ARDEN HILLS
MEMORANDUM
DATE: January 11, 1990
TO: Park and Recreation Commission Members
FROM: Gary R. Berger, City Administrator
SUBJECT: Reappointment to Park & Recreation Commission
At the January 8 City Council meeting, the Council voted to reappoint each
of you to the Park and Recreation Commission for 1990.
On behalf of the Mayor and City Council, I wish to extend my thanks to you
for your volunteer service. I look forward to working with you in the
new year.
GRB:madlr