HomeMy WebLinkAbout10-24-1995 PTRC Meeting Minutes • AGENDA
PARKS & RECREATION CONMTTEE
TUESDAY, OCTOBER 24, 1995
4:30 - 6:30 P.M.
MEET AT CITY HALL
1. Trail Walk
- Begin at Briarknoll Drive and Norma Avenue and walk North
(We'll meet at City Hall and car pool to the beginning point).
2. Call to order and roll call
2. Approve September 26, 1995 minutes
4. Trail Discussion
- Set timelines for meeting with residents
- Estimated costs
- Problem areas
- Long range plan to finish this segment and others
5. Council Report
6. TCAAP update (Dorothy McClung & Anita Larson)
7. Master Plan for Gateway Gardens
8. Review 5 year plan on expenditures
9. Program Update
10. Directors Report
- Perry Update
- Council worksession on December 21 to review 1995 goals and set 1996 goals
we will discuss 1996 goals at the November Committee meeting
11. Adjourn
** Please Call Cindy or Megan if you are unable to attend.
MINUTES
• CITY OF ARDEN HILLS, MINNESOTA
PARKS & RECREATION COMMITTEE
SEPTEMBER 26, 1995
7:00 P.M.
ARMY RESERVE CENTER
(HWY 96 & LEXINGTON CLASSROOM)
CALL TO ORDER
Anita Larson called the meeting to order at 7:03 p.m.
ROLL CALL
Members present were: Lynette Kreidler, Maureen Bodene, Louis Speggen,
Mary Robinson, Don Messerly, Council Liaison, Susan Keim, Cindy Walsh, Parks &
Recreation Director; and Tracy Petersen, Program Supervisor.
Also present : Peggy Lynch, Friends of Parks & Trails, Greg Mack, Mark Nolan, Ramsey
County Parks & Recreation and Tami Moberg, Arden Hills resident.
Members absent were: Chair, Megan Ricke
APPROVE MINUTES
Minutes from August 29, 1995 meeting were approved by Dorothy McClung and
seconded by Lynette Kreidler.
AGENDA ITEMS
Ramsey County Tree Sale
Peggy Lynch was present from the Friends of the Parks and Trails. She informed the
Committee that Ramsey County has a tree program in which trees are available for sale.
Ramsey County also has a program in which individuals, groups, etc. can donate trees to
parks. Peggy asked that Arden Hills come up with a list of trees they would want in their
parks. This will be included in a press release. Donors can then select a specific park in
which they want their tree donated to. Peggy recommended that thank you letters be sent
from the City to acknowledge that a tree has been planted in one of their parks.
•
1
Tony Schmidt Park Discussion
Greg Mack, Ramsey County Parks & Recreation Director, presented to the Committee a
sketch of how Tony Schmidt Park would be redeveloped. The project would be done in
three phases:
1. Shoreline
2. Picnic Areas
3. Northern Trails
The Tony Schmidt Park project was rated the number four project within the Parks and
Recreation Department. McCarron's Park was selected this year as the Parks number one
priority based on a set of criteria.
The criteria included: geographic/development, socioeconomic, accessibility by bus and
the overall fact that McCarron's was physically in worse shape than Lake Johanna.
Greg explained that they bid their Park& Recreation projects into the County's overall
request system. Greg also noted that Lake Johanna is not a regional park and; therefore,
is not eligible for regional park funding. Mark Nolan, Parks Chair of the Ramsey County
Parks Commission indicated that Lake Johanna is still a very high priority with his
Committee, but hasn't been a high enough priority to be funded.
Members for the Committee asked Greg and Mark what Arden Hills needs to do so to
• ensure that Tony Schmidt is a top priority for 1997. Greg Mack suggested that our
Committee write a letter to our County Commissioner as well as attend some of the
priority meetings for Ramsey County.
Tami Moberg, a resident of Arden Hills who lives near Lake Johanna, voiced her
concerns about the safety and general deterioration of the park. She indicated she would
be willing to put together a petition within her neighborhood, if needed. Mark Nolan
indicated that the public needs to get more involved by promoting positive behavior in
the parks and creating some good publicity.
Dorothy McClung questioned the County about its interest/involvement in TCAAP. She
feels that the County has not been strong enough in expressing any of their desires for the
TCAAP site. Mark Nolan indicated he would let his Committee be aware of this.
COUNCIL COMMENTS
Susan Keim indicated that the City Council accepted the EAW on the Ogren
Development and that they felt that an EIS was not necessary. County Road F is
completed, except for some sodding. Temporary striping has been put in until it can be
striped in the spring. Retainage Fees for County Road F have been requested in lieu of
insurance claims for Valentine Park.
2
Susan Keim indicated that for the most part, construction on Stowe Avenue is done.
Susan also mentioned the Committee barbeque to be held on October 3 at City Hall at
6:00 p.m. in honor of Cities week.
TCAAP UPDATE
Dorothy indicated that the reutilization Committee has come up with their final plan,
along with the Arden Hills Task Force. The Community will be able to comment on the
plan before it is submitted to Vento's Office.
TRAIL TIME LINES
Cindy indicated she would like to bump up the time lines for the City Hall/McClung trail
in order for construction to begin in April or May. She indicated she would like the
Committees to meet with Engineer Stonehouse at 4:30 p.m. on October 24 to walk the
trail. Parks and Recreation Committee meeting would follow at City Hall. A meeting
with residents along the trail will be set up at this meeting as well.
STAFF REPORT
• Directors Report:
Director Walsh gave an update on Perry Park. Perry Park is complete except for the
lighting, a final lift on the parking lot and some minor finishing touches. She indicated
that the parking lot will be paved in the spring and that additional fencing may be needed
for the Little Lakes Little league field and the adult fields. Cindy indicated she would
like to do a dedication for the park next June. Cindy informed the Committee of the
repeated vandalism at Hazelnut Park with the warming house and satellite.
Program Report:
Tracy reported that the afterschool programs for fall are starting and are very successful.
The pre-soccer program is going well. They also informed the Committee of the
departments Pumpkin Hunt to be held on October 27 at Valentine Hills School.
NEXT MEETING:
Next meeting is set for Tuesday, October 24, 1995 at 4:30 p.m. at City Hall.
ADJOURN
Meeting was adjourned at 9:07 p.m.
•
3
CITY OF ARDEN HILLS
MEMORANDUM
DATE: October 18, 1995
TO: Parks & Recreation Committee
FROM: Cindy S. Walsh, Parks & Recreation Director
SUBJECT: October Parks & Recreation Committee
Trail Walk
We will meet as a group at City Hall and car pool to Briarknoll Drive. With $40,000 that is
budgeted, it may be possible to get the asphalt trail in as far north as McClung's 4th addition.
Greg Stonehouse, the City Engineer and I walked the trail last week. The terrain of this first
segment will be difficult. Extensive grading, clearing and grubbing of trees and one or two
bridges will be needed in this area.
After the walk, we will discuss the difficult areas, possible solutions, estimated costs and set
timelines to meet with the residents. I have included a copy of some initial trail easements.
Master Plan for Gateway Gardens
One of the Committee's goals was to develop a master plan for expanding one of the City's
gateway garden areas each year. Due to construction this summer, the Committee decided not to
make any permanent improvements in 1995. The Committee should consider which sites to
upgrade and then set a master plan.
Review Five Year Plan Expenditures
This was also one of the Committees goals for 1995. I will bring a copy with essential upgrades.
The Committee can discuss other projects and funding timelines. It is necessary to begin
scheduling the replacement of the playground structures at the parks. I have enclosed a copy of
the playground structures that exist in our parks and the age of each.
Council Worksession December 21
The Mayor and the City Council are meeting with each Committee to review their 1995 goals
and set 1996 goals. They are requesting two or three members from each Committee to be
present. I will let the Committee know when their designated times is to meet with Council.
I hope to see you all at 4:30 p.m. on October 24. We will try to finish by 6:30 or 7:00 p.m.
CSW\jt
•
ARDEN HILLS PARKS & RECREATION
PLAY-STRUCTURE INSTALLATIONS
PARK DATE # OF YRS. OLD
Hazelnut 1981 14
Perry 1982 13
Cummings 1984 11
Ingerson 1985 10
Arden Oaks 1985 10
Sampson 1986 9
Floral 1987 8
Arden Manor 1988 7
Royal Hills 1988 7
Freeway 1989 Moved from Valentine
(Plus Perry swings & Monkey bars)
probably a 1978 model 17
Valentine 1990 5
Arden Oaks Swings 1992 3
•
•
i
W
Y I C'
CITY HALL LEG
APPROX. COST:
o $19,600
M7
RDEN
ARDEN \\ rvcrvO ..-,• ,In-,cES AT
� a P..7EN itl,IL 'IRTII .-WDlTION
CENTRAL LEG
D 1'11J -! OPTION A COST: $14,700
COURT v�� + FLOATING PATH COST
���� ($4,000—$5,000)
ii ^�,rz D OPTION B COST: $25,200
McCLUNG /
o
UZ
BRIE I1�'K:' fit.'! McCLUNG COURT LEG
A�NuE APPROX. COST: $14,000
+ FLOATING PATH COST
Z.. ($6,000—$9,000)
WEST LEG "'`•
Q
APPROX. COST: SOUTH LEG
$10,500
r z APPROX. COST:
eRiq�� JvE $8,400 0 400