HomeMy WebLinkAbout11-26-1985 PTRC Meeting Agenda - Minutes ,
•
AGENDA
Regular Parks and Recreation Committee Meeting
Village of Arden Hills
Tuesday, Novembei .26, 1985 - 7:30 p.m.
Village Hall
C�1. Call to Order and-Roll Call
L,i f1. Approval of Minutes, October 22, 19$5.
V---'3. Council Report
4. Review of Park Survey Results //ww
Review Map of Parks and Trails ��—
E,--;.5. Hamline Avenue Improvement Project - Review of Feasibility Report;_
6. Winter Program Proposal _
Miscellaneous/New Business
1986 Park Improvement Program—Possible Grant Applications
December Tour to Observe Types of Hockey Lighting Available
y- Status Report- Mounds View Basketball Association
8. Adjournment
PLEASE CALL THE VILLAGE HALL, 633-5676, IF YOU CANNOT ATTEND THIS
, MEETING OF THE PARKS AND RECREATION COMMITTEE. -
Minutes of Regular Parks and Recreation Committee Meeting
• Village of Arden Hills
October 22, 1985
Village Hall
Call to Order
The meeting was called to order at 7:40 p.m. by Chairman Sand.
Roll Call
Present: D. Sand, A. Anderson, K. Enrooth, D. Messerly, J. Mishek,
T. Mulcahy, J. Otto, M. Peterson
Absent: G. Dreyling, D. Klick
Also Present: Councilmember N. Hansen
Mayor R. Woodburn
Parks Director J. T. Buckley
Mr. Louis Jambois, Supervisor
Parks and Recreation Section
Community Development Division
Minnesota Department of Energy and Economic Development
Approval of Minutes
The minutes of September 24 were approved as submitted.
Discussion of Availability of Grant Money for Park Development
Mr. Jambois' office administers grants for LAWCON (Federal Land and Water Con-
servation) and the State Legislative Commission on Minnesota Resources (LCMR).
• Two types of grants are considered; one focuses on funding for natural -
resource-oriented recreation facilities 'such as swimming beaches, trails and
boat launches; the second is a special program created by LCMR for the develop-
ment of athletic fields. Mr. Jambois stated that the total amount of money
available for this biennium is much lower than in previous years.
If grants are awarded, the Village is required to provide matching funds (in
land, materials, labor, or cash). Grantees are allowed three construction
seasons to complete approved projects. A Village may submit several applica-
tions (for several park areas) but may receive only one grant per biennium.
Applications must be in Mr. Jambois' office by May 6, 1985, for grants for this
biennium.
The application itself is not difficult to complete; does not require inclu-
sion of long narrative. It does require completed site plan, cost breakdowns,
maps, information on the points discussed in the next paragraphs.
Criteria used in recommending approval of the first type of grant '(focusing
on development of natural amenities) (LAWCON) include: (1) site quality,
(2) design considerations (park design, is it safe, attractive, (3) accessi-
bility, (4) redevelopment (priority is given to redevelopment of deteriorated
or outdated park sites, and restoration of natural character of the land-
scape), (5) floodplain (if park is located in a floodplain, extra points are
given), (6) trails, fishing/boating, swimming beaches (extra points are given
if any or all of these amenities are included - Mr. Jambois added that in this
biennium of limited funds, at least one or two would have to be included for
• the grant to receive serious attention), (7) special population (serving
handicapped, elderly, minority), (8) interorganizational cooperation (working
with and use of facility by school districts, surrounding villages, etc. )
Minutes of Regular Parks and Recreation Committee Meeting, October 22
Page two
• (9) recreation priorities (does the plan include the facilities rated highest
in need in survey of citizens' wishes?) (10) a well-thought-out comprehensive
plan.
Criteria used in awarding the second type of grant (athletic field develop-
ment - LCMR) are (1) interorganizational cooperation, (2) site accessibility,
(3) population demographics (young, growing community), (4) site suitability,
(5) design considerations, (6) facility demand and (7) recreation capacity
(priority given to combination projects, �.g. baseball/football fields).
Mr. Jambois reviewed the Arden Hills' "Guidelines for Park Development", felt
that Cummings Park could possibly qualify for grant money (LAWCON) if
access to the lake and a fishing dock or small boat launch were added to the
plan. North Snelling park probably does not have enough acreage to qualify.
For LCMR (athletic field) grant, the Arsenal would score very highly, except
on site accessibility; would probably not qualify this biennium since land
is not available nor plans prepared.
Committee will discuss applications for grants at a later meeting.
Council Report
Councilmember Hansen reported on Council activities of interest to the Parks
Committee, including progress of third fire station, reconstruction plans for
Hamline Avenue, and new construction planned for Arden Hills.
• In answer to Committee questions, Hansen stated that the engineer's feasi-
bility study on Hamline Avenue will be ready for Committee review at the
November meeting, as provided in the Transportation Element of the Comprehensive
Plan (requirement added as recommended by Parkway ad hoc Committee). The
Council will hold a public hearing in December to allow all residents to review
the plans and submit their input.
Winter Program Activities Possibilities
Buckley stated that the Finance Committee felt there was considerable interest
in cross-country skiing, and suggested facilities be provided for that and
other outdoor winter activities. Buckley stated he will be providing maps
of trails available; hopes that in the future the trails can be groomed and
kept up better; is not feasible to do that now, but he will have the trails
marked more clearly. He asked that the Committee also think of other
possibilities for winter programs that could be incorporated in the 1985-86
winter program; noted there may also be suggestions for programs in the survey
results.
Buckley distributed copies of "1985 - Summer Facility Use Inventory" showing
all facilities heavily used in the season just past.
1986 Park Improvement Proposal
Committee will meet in December, when hockey season has begun, to visit some
lighted rinks to assess effects of different types of lighting available.
Plans will then be made for a meeting with Cummings Park area- residents in
January or February to discuss their wishes regarding construction of hockey
rink, shelter and lights.
Miscellaneous/New Business
Otto asked possibility of installation of traffic lights at the Highway 96/
• Hamline intersection; feels it is very dangerous, traffic count must be very
high. Hansen advised him to contact the chairman of the- Public Safety
Committee with his concerns.
Committee asked for a report from the Mounds View Basketball Association on
the season just completed.
Park and Program Survey Returns
Committee members are asked to meet Monday, October 28, at 7:00 p.m. at the
Village Hall, to help tabulate survey forms returned.
Adiournment
The meeting was adjourned at 9:45 p.m.
Submitted by Shirley Marshall.
THE NEXT REGULAR MEETING OF THE PARKS AND RECREATION COMMITTEE WILL BE
NOVEMBER 26, 1985, 7:30 P.M. VILLAGE HALL
•
i
Minutes of Regular Parks and Recreation Committee Meeting
• Village of Arden Hills
November 26, 1985
Village Hall
Call to Order
The meeting was called to order at 7:35 by Chair Sand.
Roll Call
Present: D. Sand, A. Anderson, G. Dreyling, K. Enrooth, M. Gillies,
D. Messerly, J. Mishek, T. Mulcahy, J. Otto, M. Peterson
Absent: D. Klick
Also Present: Councilmember N. Hansen
City Planner Orlyn Miller
Parks Director J. T. Buckley
Approval of Minutes
It was moved by Mulcahy, seconded by Anderson, that the minutes of October
22 be approved as submitted. Motion carried unanimously.
Hamline Avenue Feasibility Study, Phase II
Planner Miller stated that the Hamline Avenue Feasibility Study was referred
to this committee by Council under authority of the Amendment to the Trans-
portation Plan, which states that any improvement to a designated parkways
route must be referred to the Parks Committee and to the Planning Commission.
He stated that he had originally recommended that Hamline Avenue not be desi-
nated as a parkway, because of lack of potential for parkway-type improvement.
• z..The Parkway Ad Hoc Committee choose, however, to designate Hamline as a po-
tential parkway, because the presently considered improvement was pending
at that time, and thus felt it offered an opportunity to try to apply some
of the parkway concepts.
Deterrents to development of Hamline Avenue as a parkway include:
1. High traffic volume
2,_ Limited right-of-way of 66 feet.
3.: .Preponderance of overhead utility lines (entire length on one side,
-half of .length on other side).
4, Limited availability of landscaping space; fairly extensive development.
5. F Right-,of-Vay not,sufficient to provide a median.
Miller je.lt the only possibility for including any parkway-type amenities
_were ,plantings.of larger shrubs and smaller trees under the utility lines,
and/or either securing some land from private landowners, or encouraging the
privatelandowners to add plantings along the route.
The- F:easibiliz.y.Study shows a walkway on the west side of the road, two
driving, janes, ,. nd a center-turn lane.
Committee concerns included:
- Flow of traffic on Hamline. . .will the proposed improvement increase the
flow? Miller stated present usage is 6,000 to 7,000 cars per day; expect
future usage to increase to 8,000. It was noted that employees of Cardiac
Pacemakers and other businesses along County Road F contribute to this total,
as well as the ±1,000 Arden Hills homes which access to Hamline Avenue.
Minutes of Regular Parks and Recreation Committee Meeting, November 26
Page two
Miller felt only thing that could decrease Hamline Avenue traffic flow would
be a change in the I-694 intersection.
He noted that Hamline is a City-State Aid road, is considered a "collector"
street, whereas Lexington is considered "minor arterial". Partial funding
for this improvement is coming from MSA funds, which necessitates meeting
State standards on lane width, etc.
- Anderson stated she did not feel the center lane would "do any good"; would
only make traffic move faster; is concerned about non-residents using the
route more intensely as a connection from Highway 96 to I-694; asked how resi-
dents wishing to use the pathway would be able to cross the road. She felt
the proposed plan created too much of a through-way; makes the route more
attractive for through traffic; feels the route functions just fine as it
is, would like only addition of a bikeway.
- Mulcahy asked if resident input had been obtained to this plan; does this
represent an improvement for the residents along Hamline, or just create more
problems for them?
- Mishek, Enrooth and Peterson reported their observations that a center turn
lane improves safety, should be included in the plans.
- Anderson asked if it would be feasible to cdnsider eliminating the turn
lane, providing instead a parking lane and striped bikeway along the road.
She expressed concern about the speeds drivers may average when the road is
improved, and safety of anyone attempting to cross the road.
Committee discussed at length various methods of providing a way for persons
to cross Hamline safely at various places along the route, felt this was a
definite need. Suggestions included sidewalk on both sides of the route,
crosswalks, or stop signs (at Wyncrest and/or Briarknoll).
Motion was made by Gillies, seconded by Mishek, that Committee recommend to
Council that $50,000 - for a planting plan and for plantings along Hamline
Avenue - be included in the project's budget, and that a solution for the
persons who will be isolated on either side of the route if only one sidewalk
is constructed be sought. Motion carried unanimously.
Council Report
Councilmember Hansen reported on Council actions of interest to the Parks
Committee. She reported that the Public Works Committee had looked into
the advisability of establishing a Village leaf pickup service; conclusions
will probably be that it is not practical to provide such a service.
The Council has ordered a feasibility study for construction of an additional
water tower.
Council has approved profits from pull-tab gambling operation at Blue Fox
going to the Park Fund, subject to Attorney Lynden's approval.
• Council will be appointing 1986 committee members soon, invited all present
committee members to remain for an additional year as members of this com-
mittee, and asked they inform her before January 1 if they do not wish to
Minutes of Regular Parks and Recreation Committee Meeting, November 26
• Page three
be re appointed.
Park Survey Results - Map of Parks and Trails
Buckley stated that the next Town Crier will carry a summary of the results
of the Parks survey, and a map of the Village parks and trails. Committee
will review the survey more thoroughly in January as it begins planning for
future park improvements.
Winter Program Proposal
The Winter Program Proposal was reviewed and approved.
December Meeting Schedule
Committee concurred to try to schedule a visit to various hockey rinks to
observe types of lighting available during the week between Christmas and
New Year. Buckley will provide a listing of locations where different
types of lighting can be observed to all Committee members.
No regular December meeting of the committee will be held.
January-February Agenda Items
Park Improvement Program
Grant Applications
Lights, Hockey Rink, Shelter, Cummings Park
Mounds View Basketball Association - This Association has just completed
• its second season for girls; sign-up for boys is just being conducted;
Buckley will arrange for someone from the Association to attend the February
meeting to discuss its progress.
Adjournment
The meeting was adjourned at 9:55 p.m.
Submitted by Shirley Marshall.
THE NEXT REGULAR MEETING OF THE PARKS AND RECREATION COMMITTEE WILL BE HELD
JANUARY 28, 1985, 7:30 P.M. VILLAGE HALL.
ARDEN HILLS PARKS AND RECREATION DEPARTMENT
PROPOSED PROGRAM ACTIVITIES
Winter 1985-86
1984-85 Winter Program 1985-86 Proposed Program
Youth Youth
Ice Skating Instruction Ice Skating Instruction
Elementary Gymnastics Elementary Gymnastics
Pre-school Pre-school
Elementary Age Elementary Age
Break Dancing Tap, Ballet, Jazz Dancing
Sports Club Floor Hockey
Adults Adults
Men's Basketball League (CDC) Men's Basketball League (CDC)
Three Man Basketball Three Man Basketball
Men's Open Volleyball Men's Open Volleyball
Co-Rec Volleyball (CDC) Co-Rec Volleyball (CDC)
Co-Rec Volleyball (LOL) Co-Rec Volleyball (LOL)
Jazzercise Jazzercise
Thinning Your Thighs and Slimming Jackie Sorensen Aerobics
your Hips
Racquetball Instruction
. Tennis Instruction
Youths and Adults Youths and Adults
Winter Skating (Rinks and Ponds) Winter Skating (Rinks and Ponds)
Bethel Intramural Broomball Bethel Intramural Broomball
Co-Rec Broomball Co-Rec Broomball
Aquatic Program Aquatic Program
Joint Sponsorship/Assist Other Groups Joint Sponsorship/Assist Other Groups
Mustang Basketball Mustang Basketball
Girl's Gymnastics (Mary Jane Olson) Girl's Gymnastics (Mary Jane Olson)
Youth Speed Skating Youth Speed Skating
North Suburban Community Orchestra North Suburban Community Orchestra
Cross County Skiing (Hennepin Cty. Cross Country Skiing (Hennepin Cty.
Park Preserves) Park Preserves
Seniors' Programs (Edgewood Community Seniors' Program (Edgewood Community
Center) Center)
People Going Places People Going Places
Women's Volleyball League (N.B. ) Women's Volleyball League (N.B. )
Men's Basketball League (N.B. ) Men's Basketball League (N.B. )
Men's Broomball League (Shoreview) Men's Broomball League (Shoreview)
Men's Volleyball League (Shoreview) Men's Volleyball League (Shoreview)
Four Man Hockey League (Moundsview) Four Man Hockey League (Moundsview)
55 Alive Mature Driving
•
II
9 I i N
1
�5
(14) (S)
--------------
Ll Lv--- _
T
r
NEW gRIGNTON z_� _ F r -.
21
.
(8)
- - (9)
O__-+!+ff" � -w•
VILLAGE OF
ARDEN HILLS , MINNESOTA
4w000soH Indicates Pedestrian Trails -- Hiking and Cross Country Skiing.
October, 1985
• REPORT ON RESULTS OF PARK INTEREST SURVEY
This report is intended for distribution to the Council and the Parks and
Recreation Committee, and for publication in the Town Crier.
All the results are now in from our Parks Interest Survey, and the answers
you gave have been compiled and are being used by the Parks and Recreation
Committee for future planning. Some of your comments about maintenance will
be implemented immediately.
About 326 surveys were returned (15%), _which is a good return rate according
to those who do surveys professionally. We'd like to have heard .from more,.
of you. . .and if you have comments after reading the results of our survey,
• we'd still like to hear from you.
Overall, most of you who replied were pleased with your parks and with the
care they receive. We were especially surprised and pleased with the positive
response we received to the development being done in Crepeau Nature Preserve,
and to trail development. You wanted more trails, better-maintained trails,
and better-marked trails. The Parks maintenance crews, within the limitations
of manpower and funds available, will be adding more identification to the
trails and maintaining them more regularly. They will be upgraded as funds
are available, but we'll probably give them a higher priority as a result of
this survey.
One thing we learned from the survey was that many of you aren't sure where
all the parks are located, or where all of the trails are located. We're pre-
paring a description of each park, and a map showing all of the parks and trails,
for distribution to each resident.
The most responses were received from the Hazelnut Park area, with Perry Park,
. Floral Park, Crepeau and Cummings following closely. Valentine Park came
next in numbers of respondents calling it their home park, Ingerson, Freeway
and Arden Oaks following closely.
The surveys indicated many of you interested in more pre-school equipment
at your park, and adding that will become a high priority item in our 1986
planning.
You seemed to greatly appreciate the tennis courts added in the last two years
and asked for more. A few of you would like some of them lighted. The Parks
Committee will consider these comments in its 1986 planning also.
Dogs in the parks, and dog droppings in the parks, continue to be a problem
which we'll try to police, but we need you help on this too. It is the owner's
responsibility to remove any feces deposited by his dog, and dogs must be
under the control of their owners at all times.
We did have some negative comments. Some of you felt Perry Park too heavily
used, with four league-sized ballfields. We think it's too heavily used too,
and are continuously searching for additional locations for league-sized soft-
ball fields. As soon as we can possibly do so, we'll find alternate locations
for some of the teams using those fields.
We received several comments suggesting we have a broader range of programs.
The philosophical guidelines used in developing programs and activities have
been:
- Emphasis on personal development through relaxation and fun.
- Emphasis on skill development for activities that can be enjoyed
-3-
GENERAL COMMENTS (for Council and Parks and Recreation Committee members)
•
Arden Hills is on track -- keep up the good work!
"Enjoy the parks and open space when driving by. . .thanks for the parks and
maintenance. It's worth it."
"Excellent job of park planning and programming."
"Tax money should not be used for baseball fields for people not paying
taxes in Ard
en Hills."
"Charge non-resident fees."
"Have lived in Arden Hills for six months; delighted with parks, people, and
Village service."
"I don't know location of parks so don't use them."
PARK YOU CONSIDER YOUR NEIGHBORHOOD PARK:
Sampson 8
Hazelnut 40
Perry Park 35
Valentine 24
Floral 38
Crepeau 34
Freeway 13
Ingerson Park 15
Arden Manor 1
Arden Oaks 13
Cummings 31
TRAILS 58 persons stated they used, and made comments, about
the trails.
•
Cummings
Shelter/Picnic/Benches (5)
More playground equipment (5)
Soccer net and goals (2)
Lighted hockey rink (3)
General
We need a community sized park.
More equipment for younger children.
Buy Lindey's Triangle for softball.
•
• Maintenance Comments
Please spray for mosquitoes (3)
Better upkeep at Sampson
Excellent at Cummings
Better maintenance at Hazelnut, particularly of tennis courts.
Repair broken equipment more rapidly.
Better maintenance of tree plantings (regular watering, etc. )
Better field maintenance for Perry.
Perry's too small for adult softball (2)
Better maintenance of the ice at Freeway, Floral and Hazelnut.
Cut grass more often (Floral)
Keep dogs out of the parks! (3)
Can we get rid of the poison ivy (Cummings, particularly)
PRELIMINARY FEASIBILITY REPORT
Study WEHRMAN b. keith wehrman
Parkway , Minnesota CONSULTANTS roy a. anderson
Arden Hills ,
November 20, 1984 ASSOCIATED iohn o. bergly
INC.
Investigation of the Ramsey County's plans and requirements for reconstruc-
tion of candidate parkway routes revealed the following information:
1. No major improvement or reconstruction of County roads in Arden
a,bt�Ct�w.t � Hills is included in the current 5-year Captial Improvement Program
Y,,.yGw of Ramsey County. Future improvements will be considered when
updating the CIP if the City makes a specific request.
2. Ramsey County has no specific cross-sectional standards for County
roads. However, since all County roads in Arden Hills are financed
with the County-State Aid funds, these roads must meet Minnesota
Department of Transportation standards.
If the projected traffic volumes on a route are less than 8,000
trips per day, the following standards apply:
1O 44 feet if parking is provided on both sides of street
36 feet if parking is provided on only one side of street
32 feet if no on-street parking is provided &e -or
If projected volumes on a route exceed 8,000 trips per day, the
standards increase to a range of 48 feet to 52 feet in width.
(See Page 2 for right-of-way widths and traffic volumes on candidate
• routes.)
3. If the preceeding standards are satisfied, some design flexibility
may be permitted. However, if significant design modifications
increase the cost of construction, the City would be responsible
/UO,T&_ for additional costs.
4. The Ramsey County Department of Public Works definitely restricts o ff
landscaping within the rights-of-way of County roads. Landscaping
Np r6r (berms , trees, shrubs) which encroaches upon the rights-of-way must
!i be reviewed and may be approved by the County. However, it is a
general policy that no landscaping be provided within the right-of-
° way; it must be installed behind the right-of-way line.
due+><
5. No funding sources for financing landscaping along County-State Aid
G✓ X �` Highways are available to either the County or the City. Land-
scaping costs, except those associated with restoration after
construction, a`re no in a as probe cos or ounty road
construction: If additional landscaping is to be accomplished, it
will be the City's responsibility.
6. The County will construct, when funding is available, -
bike paths along designated routes. These paths may
be contiguous to the driving lanes or separated if
N�y� right-of-way width permits. If paths are separated '"
from the roadway, however, they become the responsi- `°
bility of the City.
c. Ce 4/ -1-
engineering — landscape architecture phone 612-546-4303 — 1415 north lilac drive, minneaoolis, mn 55422
planning — urban research
o
RIGHT-OF-WAY AND TRAFFIC VOLUME ANALYSIS
Traffic(a)
Route Row Width Volumes
1. Lake Johanna Blvd. 4,900
rcA,_ Co. Rd. D to east limit of Tony Schmidt Park 66'
wr I TA r t c,��rD� East limit of Tony Schmidt Park to Snelling 80'
r LtX V A
ink b, .$, 2. Snelling Ave. 4,400
Hwy. 51 to Co. Rd. E 200'
Co. Rd. E to 694 100'
3. Co. Rd. E-2 86' 5,400
4. Hamline Ave. 66' 7,000(b)
5. Co. Rd. D 66' 5,400
(a) Indicates(1982 ADT on the most travelled portion of the route.
(b) Based upo -ansultation with the City Traffic Engineer, Hamline II
Avenue is the only candidate route anticipated to exceed 8,000
ADT in the future.
ALTERNATIVE PARKWAY CROSS-SECTIONS
• The following sketches of roadway cross-sections graphically depict the
CSAH standards identified on page 1, paragraph 2. These cross-sections
are shown related to the varying right-of-way widths of candidate routes.
All alternatives assume separated bike/pedestrian paths to reduce the
width of paved roadway and to improve safety.
-2-
Z
• O
LU
a0 to
I cooO
_ I 0r
W
i >
a0 Q
Z
H
Ne
st� iz
. Q ! ..
T
3-
CONCLUSIONS
• 1. The development of a true parkway system, (that is scenic roadways
with limited access and for non-commercial traffic only) is not
feasible in Arden Hills because the system must follow existing
routes which cannot be restricted in that manner.
2. If the City wishes to pursue the development of a parkway system,
its efforts should concentrate on:
Separation of bike/pedestrian paths from the roadway to
reduce pavement widths, and
�b. Beautification of roadways through more intense and/or
uniform landscaping.
3. The County's present restrictions on landscaping within the rights-
of-way of County roads present a major barrier to the development
of streets with parkway character. If significant landscaping is
to be accomplished, it will have to be located behind the right-of-
way 1 i ne. ar al I-NI - r cry,,, A ��e.�C�a r�� /rvt�V^ a�° �o�
Una<ss G)$ cM► �cj� .,, Y4 .1 /w f .,.lw WI/ .
l 4 Development Zo
parkway cross-section within segments of candidate
parkway routth right-of-way widths of less than 80 feet is not
considered f1e..r J�?p✓�it.dl J' �'+�I�.
5. Establishment of a parkway system in Arden Hills can only be
accomplished through a long-term improvement plan. Implementation
• of such a plan would require:
a. Co-ordination with Ramsey County in the design of future
County roa recons ruction projects in order to achieve
separated bikeLuedestrian paths and reduce_rayPmPnt
widths.
b. Working with the County to achieve the relaxation of the
�� present landscaping restrictions. `—
C. Co-or ina io wi �n iapro erty owners to en-
courage priva e p an ing, or permit pub is y financed ?
planting on private property, to enhance the parkway
U character.;,'" e-
p- A r WA-We- XIA.,V ,
'
d. Co-ordinate with NSP for the burl of overhead power
lines/when replacement of various segments is required.
nod 7•-��c.nii�,.., lihn�
6. Based upon the right-of-way widths, traffic volume, availability of
__— landscaping space, beyond right-of-way lines, and exposure to
natural amenities, the following routes have the greatest potential
for parkway development:
a. Lake Johanna Boulevard from Stowe Avenue to Snelling
b. Snelling Avenue from T.H. 51 to I-694
C. Co. Rd. E-2 from Snelling Avenue to I-35W
-A� �-42
-4-
MSEY
0
COUNTY LEAGUEL-i Li 183 University Avenue East
OF LOCAL GOVERNMENTS St. Pain, Minnesota -55101
CAPITOL COLNTI
OF %11NNIS0TA
RCLLG JANUARY MEETING
Ardcn Hills
Falcon Heights "THE PAST, PRESENT, AND FUTURE OF RAMSEY COUNTY'S PARK SYSTEM"
Gern Lake Most counties in the metropolitan area seem to have a parks
Lauderdale commission, but Ramsey County does not. Should it have one?
What exactly is being done in other counties? And how does
Little Canada the Metropolitan Council fit into the picture? Attend the
MaPle,Aood. RCLLG general membership meeting on January 16 to find out.
Mounds View This first meeting of the year will focus on the structure and
Ne„ Brighton operations of Ramsey County's park system. Speakers for this
meeting will be John McBride, Chair of Metropolitan Council's
North oaks Parks and Open Space Commission, and Tony Crea, Executive
• N. St. Paul Director of the Ramsey County Parks and Recreation Department.
Ramsey County Parks and Recreation directors, as well as park board members
Roseville from RCLLG member municipalities have been invited to this
meeting in order to add different viewpoints to the discussion.
St. Anthom
St. Paul Summer is not the only time to think of parks; the future of
Ramsey County parks is a topic of importance year *round-- so
snorr,ity. mark your calendars now to attend this meeting.
Vadnais Heights
DATE: Wednesday, January 16, 1985
Whit,, Bear Lake
�1 I;itc Bear Tcmnslim TIME: 7:30-9:00 p.m.
PLACE: Vadnais Heights City Hall, 687 E. County Road E
Directions:
1 . 35 East - North; take 96 exit, go west 1 block,
turn left (south) on Centerville Road, right on
County Road F. City Hall is at intersection of
Clover and County Road F.
2. 694 - take Rice Street exit; go north 1 1/2 miles
then turn right. on County Road F.
For more information, call RCLLG Coordinator Jeanette Cizek at.
Is 227-5600.
TRA=L S
•
1. Please sod or pave the trails. (4)
2. Need more biking trails, along thoroughfares and around the lake. (5)
3. Keep trails in good condition for winter skiing and summer hiking (3).
4. Continue upgrading of Chatham trails. (6)
5. Expand hiking trails (3)
6. In some areas, too remote -- not safe for-children (1)
7. Trails need better markings.
8. Connect bike path along Lexington to connect Josephine to Arden Plaza.
i
•
PROGRAM SUGGESTIONS
1. Longer summer play programs. •
2. Gym and dance programs later in the day for working parents.
3. Have skating rinks open only every other night -- small numbers of
skaters doesn't seem to warrent open every night.
4. Would like tennis lessons for all ages at Hazelnut and at Floral (5)
5. Summer basketball program.
6. Horseshoe courts.
7. Need a football field.
8. Nature walks in Fall and Spring.
9. Square dance.
10. Tour of parks for citizens.
11. Day time activities for people who work
12. CPR Instruction.
13. Saturday program for kids.
14. Preschool programs
15. Soccer in evening for working parents.
16. T-Ball for Kindergartners.
17. Expand programs to be more like Shoreview's.
18. Puppet show.
19. Better swimming lessons.
20. Walking group for adults.
We need a map and a description of the parks. . . .(5)
•
NEGATIVES
1. Too noisy, and too late in the evening - Broomball for Bethel
at Hazelnut (3)
2. Need better supervision of softball leagues.
3. Felt softball league excellent (school age), T-ball poor.
4. Reduce softball at Perry Park.
5. Resent paying non-resident fee to Shoreview for programs at
Island Lake. (10)
CONSTRUCTION COMMENTS
Hazelnut
Slide too dangerous for little kids.
More pre-school play equipment needed for kids (5)
More swings
Better tennis net (John tok care of this)
Less sports and more nature trails
No more construction -- (2)
Drinking fountain
More tennis courts (3)
Somewhat concerned about vandalism.
Valentine
No more development -- keep it as it is.
Too wet!
More landscaping and trees
More climing and play equipment (2)
Perry Park
More preschool and play equipment, particularly swings (5)
Tennis courts (2)
Freeway
Tennis courts
Pre-school play equipment (3)
Picnic tables
Bigger warming house
Crepeau
Very happy with nature preserve and trail (5)
Can we have some play equipment? (2)
Don't remove sumac
Delighted with bridge
Ingerson
Need another park access
Tennis court
Arden Oaks
Preschool equipment swings (2)
Tennis court
Basketball hoop
Softball field
$ccer nets
Better grass
Sod on bank to prevent erosion
Floral
More swings and preschool equipment (5) wading pool
More tennis courts (5)
Light the tennis courts (2)
More parking
Soccer fields •
More picnic tables and benches
SURVEY RESULTS NO. OF SURVEY RETURNED: 321
Ages of Respondents: 153 under 20 32%
47 between 20 and 30 10%
197 30 to 50 42%
77 over 50 16%
# of years living in Arden Hills: 43 -- Under 2 16%
59 -- 2 to 5 22%
98 -- 6 to 15 36%
72 -- Over 15 26%
Do you use parks? 34 do not 13%
223 do use parks 87%
Seasons used: 197 use parks in the summer 35%
144 Fall 25%
96 Winter 17%
128 Spring 23%
Are you satisfied with the appearance of your park?
63 always 30%
21 some times 10%
122 most of the time 59%
1 Never 1%
Are you satisfied with the level of development in your park?
156 yes 78%
44 No 22%
Have you participated in any programs offered?
125 No 52%
114 Yes 48%
How do you rate the program you participated in?
Excellent - 44 32%
Good 81 59%
Fair 11 8%
Poor 1 1%
throughout an individual's entire life.
- Providing more active athletics for women and girls •
- Stressing the importance of skill development and individual participation
rather than winning, and
- Coordinating activities with the school district, neighboring parks and
recreational departments, athletic associations and private agencies to
keep the duplication of effort at a minimum.
Many of you in the Cummings Park area were concerned about having to pay
non-resident fees for programs at Island Lake School, your home school. Most
of the programs offered at that school are sponsored by the Shoreview
Recreation Department, and it is their policy to charge non-resident fees,
School district boundaries were established before the village boundaries and
unfortunately, your children are attending Shoreview schools.
A complete tabulation of survey results is available in the Village Office.
-30-
October, 1985
sm
The beach at Lake Johanna, and Tony Schmidt Park, are not a part of the Arden
Hills' parks system. They are owned and maintained by Ramsey County.
•
Some of the comments we received about park maintenance in general concerned
controlling poison ivy and pesky bugs. We will try to control the poison
ivy in the major park areas, but we can't do too much about the mosquitoes
you mentioned. We're part of the Metropolitan Mosquito Control Commission,
and they take care of mosquito control.
32% of those of you replying to the survey were under 20, 10% between 20 and
30 years of age, 42% in the 30 to 50 year age group, and 16% over 50.
16% of you had lived in Arden Hills less than two years, 22% from 2 to 5 years,
36% from 6 to 15 years, and 26% over 15 years. 13% of those of you respond-
ing said you didn't use the parks; 87% stated that they did. They seem to
be used pretty equally in each season of the year, 35% in summer, 25% in the •
fall, 17% in the winter, and 23% use them in the spring of the year.
Most of _you (59%) were satisfied with the appearance of your park most of the
time, 30% are satisfied with the appearance of your park all of the time, 10%
are pleased only some of the time, and the inevitable 1% -- never.
78% of you are satisfied with the level of development of the park you use,
22% were not satisfied, some feeling it was over-developed, probably an equal
number feeling it underdeveloped.
Responses on questions as to program usage were more mixed, with 52% of you
having used an Arden Hills' sponsored recreation program, and 48% of you
not having participated. Of those who have participated, 32% rated the programs
excellent, 59% rated them good, 8% fair and -- here's our 1% again -- 1% poor.
-2-
s�teMq�Ba x >< X1 x
BuTTXS Aajuno:) ssoa:) X X ><
TTTH BuTPTTS X x >1 >1 >1 >t >1
b
XuTS BuT4PXS Teaauaa w k k x >t >t I x
XuTH A83100H x X X
aa�IagS w a x a
xI k X x
eaay oTuoTa X x x x x X X x
quamdTnbg AETa X X >t x x I X >t I k x
eaay -4anoD PaeH x X x X x x x X
s T uual •-+ C4 •� •
"
X X x >C N 0
aa000S
> O
b �U w
TTEgaseg/TTEggjoS x XI x XI x � X i v
�n �n o o 0 0 0 0 0 0 0 Ln
wz
Saa'y N M N t� O N v1 O 1-4 M N 7
N -i N
H
w oc
•--1 N M �T In 00 O% O N M �
uOTIL,:)o l dEW
y y A
w >
01
c
3a w N 00) > 41 > 6 a
x A & a d o A w 0 0 0 sw u
w w > •14 x a+ x oc x G U a �+ 3
v� �+ ro �+ w 0 0) 0 m w mx 144 � c >
a cox wE- UZ www .4 w w
H tp •,., eti 10 E m w +� = c cc 3 x c
a ¢ id 3 �c 3 C 3 •-� 3 �0 3 c z �n 2 z o .a -W 3 to 3 c
.r co 3 '� ,� � ►n �o c..o 'D0
04 aci -� aci M o a s o w m m o m
S7 O V r to O w N N O N 0) n N CD 0au1 w CD
O —+ 1n r 0)
�+ �0 3' .7 Lt� �' .N- U � w � pc .-+ xMHM G4M CI� � � - > z v)