HomeMy WebLinkAbout06-25-1985 PTRC Agenda - Minutes •
AGENDA
Regular Parks and Recreation Committee Meeting
Village of Arden Hills
Tuesday, June 25, 1985, 7:30 p.m.
Village Hall
1. Call to Order
2. Approval of Minutes, April, 1985
3. Business from the Floor
(Clayton Zimmerman, requesting subsidy for residents paying *0 '
non-resident fees to other villages).
4. Council Report
5. Updates
• Crepeau Nature Preserve Planting
Park Dedication for Joe Bussard Property
- Summer Program Review
Capital Improvement Program update
6. Miscellaneous/New Business
7. Adjo arnrnent
PLEASE CALL THE VILLAGE HALL, 633-5676, IF YOU CANNOT ATTEND THIS
MEETING OF THE PARKS AND RECREATION COMMITTEE.
•
Minutes of Regular Parks and Recreation Committee Meeting
. Village of Arden Hills
April 23, 1985
Village Hall
Call to Order
The meeting was called to order at 7:35 p.m. by Chairman Sand.
Roll Call
Present: D. Sand, A. Anderson, G. Dreyling, D. Klick, J. Mishek, T.
Mulcahy, J. Otto, D. Messerly
Absent: K. Enrooth, M. Gillies, M. Peterson
Also Present: Councilperson N. Hansen
Parks Director J. T. Buckley
Council Report
- North Heights Lutheran Church Park Dedication. Hansen reported that Council
concurs with Committee recommendation for dedication of 4.57 acres of land;
final approval is pending Planning Commission consideration of PUD plans
(to be presented at May Planning Commission meeting). Committee noted that
when park dedication is approved, signs should immediately be erected to
indicate park area.
- Parkway System Feasibility Study has been accepted and approved by Council.
Crepeau Nature Preserve
Wildflowers planted last year are growing, some blooming. Protective fencing
• and roping has disappeared; Messerly is replacing. Committee recommends more
signage (in all parks) indicating prairie area, locations of wild flower plant-
ings,•new tree plantings, etc.
Arsenal Ball Fields
Buckley showed Committee letter received from Commander Schulte of the Arsenal
indicating that ". . .excessing action is pending a final determination that
the site is free of contaminants. . .letters indicating interest in the site
have been forwarded to higher headquarters. . ." Klick noted two factors he
feels may make the Arden Hills' proposal attractive. . .usage that does not
require construction of buildings or water usage (such as proposed ball fields)
is preferable to them because of contamination problems; and favorable
publicity that would be generated for Arsenal if land is given for this type
of usage. He again strongly urged Committee members to write letters to
Commander Schulte indicating Arden Hills' urgent need for this space for ball
fields.
Community Survey
Councilperson Hansen reported that Council had approved community survey form
as submitted; asked if Committee had considered having a return date on the
form. After discussion, Committee determined that the survey would be mailed
with the September issue of the Town Crier, and a return date of October 15
added; they would then like a reminder in the October Town Crier to residents
to return the survey.
• Arbor Day, Park Clean Up Plans
Buckley reported that Planner Miller has prepared planting plans. Maples,
Minutes of Park and Recreation Committee Meeting, April 23
Page 2
• Lindens, Flowering Crab, and Scotch Pine are the types of trees being planted.
Excessive rain this week is making it difficult for Parks crews to get the
areas prepared, and may delay delivery of Colorado Spruce.
There will be Park staff persons at each park where trees are being planted.
Buckley will prepare name tags for Park Committee members, and will remind
those members not present at this meeting of their assignments.
Summer Program
Good response has been received for golf lessons; response for tennis lessons
has been very light. Adult softball is stronger than ever; there are six
Arden Hills leagues plus CDC league (74 teams); fields are filled to capacity
continuously.
Summer staffing plans are complete; memo is being sent to Council this week
for approval of staffing. Last summer's three Park Maintenance employees
are returning. Committee strongly concurred with Buckley's recommendation
that they be given salary increases based on their experience and past excel-
lent performance. The supervisor and two employees for playground programs
are returning, and two new individuals recommended.
Because need has been clearly shown for sanitation facilities, Buckley plans
to have satellites available this year at Hazelnut, Cummings and Floral
parks.
• Buckley noted that tennis courts at Bethel will be available for public use
after 4:30 p.m. each day; exercise trail will be available to public at all
times•. (This availability will be listed in Summer Program. )
Miscellaneous Business
- Park Tour. Because of Memorial Day holiday, the Council will be meeting
on May 28, regular May meeting date of Parks Committee. Committee recom-
mended meeting be rescheduled for May 23; that it begin at 6:00 p.m. with
tour of the Village parks. Members are asked to meet at the Village Hall
at 6:00 p.m. to car-pool on the Parks tour.
- Trail Maintenance. Dreyling noted that road down to path in Cummings Park
(from Lexington) is quite steep and difficult to negotiate, asked if there
were plans to improve this.
Buckley asked Committee input re establishing a policy for maintenace
of bike-path systems adjoining streets; should property owners be
encouraged to mow the portion between street and pathway, or should it become
a part of Park Maintenance regular schedule? Otto noted that some of the
blacktop on the Lexington Avenue path is settling and cracking (from
Control Data area north to STH 96). Buckley noted that, on County Road
E pathway, property owners have been regularly mowing boulevard portion,
except for portion between gas station and MSI Claims building (noted that
Ospina-Anderson Clinic is planned for this location this summer).
• Lexington Avenue pathway should still be under warranty; Committee suggested
Ramsey County be notified of defects so they can alert the contractor.
Minutes of Park and Recreation Committee Meeting, April 23
• Page 3
Committee felt regular maintenance and mowing of all trails and bike-path
systems a high priority.
(Sec'y's Note: past Public Works policy has been twice-yearly mowing of
all Village boulevards. Joint Powers Agreement with Shoreview, dated
December 19, 1983, "Relating to Maintenance of Bike Path System on Lexington
Avenue", states "(3) Maintenance shall be (by the Village of Arden Hills)
on a monthly basis or more frequently when necessary and shall require:
(a) the removal of all sand, glass, or other debris in order to insure safe
usage of the system; (b) placement and maintenance of appropriate pavement
markings or other signs which designate the area of the bike path or which
are otherwise required to insure safe usage of the system; (4) maintenance
shall commence on the 1st day of May each year and shall continue until
the 1st day of November each year.")
Capital Outlay, 1985
Buckley noted that Park Maintenance crews will have an exceptionally busy
year, with plans to erect two complete play structures, at Arden Oaks and
Ingerson parks. In addition, they will be installing tennis practice boards
(budgeted in earlier years) at Floral, Cummings, Hazelnut and Valentine
parks, along with landscaping and trail improvements planned. He feels, with
experienced summer personnel returning, that it will be possible to accomplish
all these goals, if it is not an unusually rainy year.
• Adjournment
Motion was made by Klick, seconded by Otto, that the meeting adjourn at
8:45 p.m. Motion carried unanimously.
Submitted by Shirley Marshall.
THE NEXT REGULAR MEETING OF THE PARKS AND RECREATION COMMITTEE WILL BE HELD
MAY 23, 1985, 6:00 P.M. - TOUR OF VILLAGE PARKS
•
•
ARDEN HILLS
------------------------------ANNUAL BUDGET
---------------------
, UNCTION: FUND: D I V. & DEPT. s ACCOUNT NO. :
----------
Dark ---------------g?7_4niee-----
__J
____________ EXPENDITURES BY_CLASSIFICATION_____________________------
------------ -----------
Code 1983 1984 1985 1985 1986
No. - _________item______ ActualActua= Budret.....Est.
Persona: ggryices
109 Park Salaries f 5095 $ 6952 * 7565
Su22:ies
228 Miscellaneous Expenses 129 112 0 a
• Other Services & Charges
304 Legal 26 313 0 o S
312 Planner 3241 338 1250 0 �60 O
441 Refunds & Reimbursements 3204 0 0 L
Capital_Outlay
530 Imp. Other Than Bl dgs. 37298 70315 36500
--------------------------------------------
70TAL $ 48, 993 $ 78, 030 $ 45, 315 y 3 yl 5 13 C 9 C
i��� z ���
ARDEN HILLS
--ANNUAL BUDGET --------------------------
• FUNCTION: FUND: __---DIV. & DEPT. : ACCOUNT NO.
Recreation General �__Park_!"a=r,tenar,ce
EXPENDITURES BY CLASSIFICATION
------------------------------------------------------------------------------
Code 1983 1984 1985 1985 198E
-No______________1ter_r,-------____--Actual_ Actual._--Budget___--Est.
------____--
Personal Services
:0u51ic Works Salaries $ 2841 $ 2204 $ 2185
109 Park Salaries 49000 49150 50375 51
i 20 PE RA/E I CA 5591 5845 5080
130 Employer Paid Health Ins. 4600 5550 5300 S 30..)
'42 nemployment Compensation 0 547 0 o p
Supclies
207 Travel, Conf. , Schools 173 184 200 2OJ
212 Gas & Oil 6369 4149 7000
217 Misc. Operating Supplies 50 458 500 q-)!;
221 Equip. Mt nce. & Repairs 4409 71 12 5200 5 01>0 } Sty
228 Maint. Parks & Playgrounds 3035 1748 3200
Other Services & Charges
O
31 Planner 500 0 0 2 O
321 Telephones 384 442 305 3a0 300
,381 Electric Utilities 509 659 1575 6!�b i
417 Uniforms 284 335 405 'A05
438 Employee Paid Health ins. 671 629 895 Q`Zy 9345
Capital-Outlay
550 Automotive Equipment 0 9990 7500 17
580]!+f i sc. Equipment 130 3275 2450
--------------------------------------------,
TOTAL $ 78, 545 $ 92, 277 $ 92, 1170
ARDEN HILLS
• _ _ _ __ -_ANNUAL BUDGET ------------------------------
-
-cUNCTION. FUND. DIV. & DEFT ACCOUNT No.
RecrgationGenera=_ Sk�_B. inks 101 4� 28
------ -------�/-- -------101--51-------
EXPENDITURES BY CLASSIFICATION
------------------------------------------------------------------------------
Code 1983 1984 1985 1985 1986
_No_ item Actual Actual BudggtEst____
---------- --------------- --------
Personal Services
-------- --------
104 Temporary Employees $ 3316 $ 4352 $ 4630 y884 S�o2-5
109 Dark Salaries 8328 1001 1 10350 3. o 5.5r
120 PERA/FICA 1125 1190 1180 i18o t, ISo
Supplies
212 Gas & Oil 0 58 75 15 �S
/28�Maint. Parks & PlaYgrounds 1463 1936 1000 ;L y aov�
0t!3er Services & Charges
321 Telephones 600 682 690 600 64o
381 Electric Utilities 1777 1962 1835 2033 3co
383 Fuel 0 0 0 C>
--------------------------------------------
T.OTAL $ 16, 609 $ 20, 191 $ 19, 760
t
• ARDEN HILLS
ANNUAL BUDGET.
FUNCT 1 ON: FUND: D T -a-DE -Tr ACCOUNT !\O. .
Summer P11aygroun
Recrea---------_on____-___--Genera=-----____-- ragram___________ :0:=4---------
____EXPENDITURES PY CCASS=c:CAT1O!�
----------------- -------------------- ----------------------------
Code i983 11984 1985 :985 1198E
N,o ------------item-------------Actual---Actual--_Budgret-____Est. ----------
Sups:ies
217 Misc. Operating Supplies $ 691 # 626 � 1000 qoo ��
259 Summer Playground Trips 1463 739 150ei
Other Services & Charges
308 instructor' s Fees 4105 4104 4425 46.50 4 Q 440
331 Mileage Reimbursement 96 84 100 A(a 100
441 Refunds & Reimbursements 0 0 0 35 O
--------------------------------------------
TOTAL $ 6, 355 $ 5, 553 a 7, 025 6 y 6%4 0
' ''. - ► �.E30
JL
303 -
J a o
�l
OL
�cl6
s
ARDEN ! ILLS
------------------------------ANNtit_:_A_L_BUDGET_---------------------------------
FUNCTION: FUN _ D I V. d DEPT. . ACCOUNT N0. .
elf-Sustaining
-------------------( Recreatiar, 226---
______EXPENDITURES BY CLASSIFTCATIO!� _________________
--------------- ---------------------- --------
Code 1983 2984 1985 1985 1986
No. --------- --------
item __ActualActua:___$ugget_____Sst_ ------
---- -------- ---
Personal Services
207 Administrative Office 2839 # 2853 # 2960 a-9b0 9 �0
109 Park Salaries ub 8618 8887 '9245 5 :Z4 5, q ? y 5
120 PERA/FICA 63( 1393 1401 1380 38o 380
130 Employer Paid !health 1ns.6oq 1032 1221 1190 i I Dy0 i ! q0
Supplies
200 Office Supplies & Postage 6y� 385 385 385 3;5- 3 4jS�
218 Sports Equipment i216(, 6277 6557 6500 5q2;L 0000
Other Services & Charges
308 instructor' s Fees �i37 20104 14077 9950 9 l0 � G0�
343 Fliers & Programs u" 629 1 133 10 1 000
4!2 building Rent ,56e 2477 3033 2800 3(0 2, 4a on
438 Employee Paid Health Ins. n3 142 133 195 tq5- iq5
• 441 Refunds d Reimbursements ,.4o 167 143 100 / !50 J50
--_-----------------------------------
70TAU #-34, 063 # 39, 823 # 35, 805 3G,v Li-I 37, 1
rt�-DAL'J LC r Cc A o t
�5►�0 1985 �`+8{
Z�"' 17- Ytior.it•..S �Sf:,M.a�f. � S �
Ad... 64,
Plc SA!
jo'r 9I-pAt — ►�4S o f
rs �3rr r'
o t S",-k
5�s+ F r���
t9 q,�3�g C'A' 10 ,
1 j��cS 1tr� V,Ao + S-LO + ano
�+ dc► �4 v� '' f a►t IS 6 d
d L35
3c, o y 3'1 ► 1�1
j
3
S+Mtffue�r a _ ------
b
cp,S0 x 1 weew4) C 16o
ht�
S 41(0)__
C. y,&J .c �c„t+�s �y .,�, ,c 146 Nits
�3SiJ4 360
Asa;sf. 360, t t10 IAA
Lo )
Meta\ ? h `OI 6 �yo
1
(I
Allikk
iLv.p
s
,,11 H cIs03 hb,.�rs r44� 3 _; �� �5 — 1500 '+ �-1 '3•3S
_ _- __ &,a b✓ —. __
Pe��.I � s S
S
so
- ��'° �.►�o ----- PE�� if�c� ---.__ _ -_1180 _—.__. ---- --�ER.A.1 F�c.�__ -- __ -
n,,,, Prr�s ►PL _
2�g 13�.1 uoo - ;5c•�li �a+ -10 a.000
ItA f
i
600
9Q5 1 a o 33 �1-3b
i�
_ f
i
I
t
►G�5 iq8�
fOi �15 ? ►� YN.n. �t,�� vS R1
c S q1. a1,y6s 3 d,66D.wv 53 QQ,,�� cycwy N sb� $ 1'. Yo
Cr✓ ►o ly: k J
��a-n� p►c,a
►, 0 aJ �080
300---------- - _ _ - ---
1wP
Il i,01
qgntl t
-
I+- a 1"t 4't S ,500
!i Z71t 50 coo 5� ��� L , � ��— AvAA. A tA�a r.
-yt Pic + PL I �ntw Perrbes
�Loo
/ibNNtb d"
i
300 300
-
381 8So �-u,�t ��s. 13'0p lik,I -A mv,
p H VI '?-15 z S?S S,ocu�ts r CP't�nJ
61
-I9a
r-
ki
iSco dw/ r¢Ai- r
_ � �IC>a0 Ste,• �bwk wC��c b._�:,..Z,
-To vo ea�jy �b
'v 1 —C a vn !owe V
!D
boo
9�, ioy 981 �tS?.
i
{
r
�483 i986
�L,;.l • 44 1 oo 1 a- r'+o ro 5 a 1
Qzctt SAl ��<< Pa I( 3
`Fo W4,341 ?,fp 1?3G
t.
li
_ ta.q At
sf 30 zt D
Pk
st S.:a 33 � st)O 5'U
o90