HomeMy WebLinkAbout09-18-1984 PTRC Agenda - Minutes Regular Parks and Recreation Committee Meeting
Village of Arden Hills
Tuesday, September 18, 1984
Arden Hills Village Hall
AGENDA
- Call to Order - Roll Call
- f August l� 984 Regular Meeting Minutes
2=%Lo
- Council Report-- T
Report on Tennis Courts
- Review Village Pedestrian Trails azfd to Open Spaces 4PL k•w-,
Report on Proposed Community Survey on Park and Program
„Ilyy Development (Mary Blomquist) SPt,A-;C ,l'ue...a
,", ,a w`wA7
Miscellaneous Business
Crepeau Park �- ��""
/�� T�
Fall Festival
Summer Program Report
Parkway Joint Committee Report
8 - Adjournment
Ile
Minutes of Regular Parks and Recreation
Village of Arden Hills
• Tuesday, August 14, 1984 - 7 :30 p.m.
Village Hall
Call to Order
The meeting was called to order at 7 : 35 p.m.
Roll Call
Present - C. Sand, D. Klick, D. Kostishack, M. Gillies , K. Enroth,
J. Otto
Absent - A. Anderson, G. Dreyling, D. Messerly , T. Sather , M. Wild
Also Present - Mayor R. Woodburn, .Parks Director J. Buckley , North
Heights Representative A. Lien, and Mounds View
Basketball Assn. Representatives J. Janke and G. Bagan
Approval of Minutes
Motion was made by Jim Otto , seconded by D. Kostishack that the
minutes of July 24th be approved as corrected.
Corrections were made as follows :
a. Page 1 - Under addition to the Tooker Report , the sentence should
read: "Kostishack said the "Charles Tooker Report" should include
Programs (instead of Progress) for People with Handicapping
Conditions , in addition for Senior Citizens ."
• b. Bottom of Page 1 - Another sentence should be added to the last
statement regarding North Heights as follows : "There was , however,
concern expressed about sufficient acreage break-down for storm
drainage and ponding complying to the acreage ordinance.
C. Last part of last sentence under Fall Program Review and Approval
on Page 2 should read: "After hearing from the People who are
putting on the program.
d. The first sentence under Park Committee Member Resignation should
read: "Sand announced that Tim Tuggle resigned because of his
conflict of meetings on Tuesday evenings .
Mounds View Basketball Presentation
Mr. Janke and Mr. Bagan explained to the Committee what their goals
in their program are. The following points were brought forth:
- They felt the need for a stronger in-house and traveling program.
The Mounds View Basketball Program would be patterned after the
Irondale Basketball Program. Their program has been established
for 15 years for grades 3 - 8 .
- Want more participation for girls . A separate girls and boys
program seem to encourage more girls ' participation.
- The 7th and 8th grades have no school basketball pragram. The
• Mounds View Basketball Program will provide an active program
for this age group.
- Want more parent participaiton.
- Get basketball better known in the area.
Minutes of Regular Parks and Recreation August 14, 1984
Page two
• - They haven' t formally organized, but they have had meetings
with about 25 parents volunteering their support. They envision
a program much like Arden Hills ' and Shoreview' s where instruc-
tion is maximized at first.
- A program that permits a child to play for the good experience -
not be eliminated because of lack of ability.
- Winning isn ' t the goal but rather the positive experience or
they can get discouraged.
- They felt they could handle 4 teams from grades 3 and 4; and
4 teams from grades 5 and 6 from each grade school. Grade
schools in Mounds View areas are Island Lake, Snail Lake,
Turtle Lake and Valentine Hills .
- It was further stated that the boys and girls would be separate.
The girls would play in the fall until the last of December.
Then the boys would start in January and play an equal amount
of time.
- Their charge will ba $15.00 to participate in the in-house
program.
- They want the Parks and Recreation Committee support.
• - John Buckley would serve on the Board of Directors and therefore,
be able to monitor the program. Buckley also thinks it will
inspire good community relations .
The Committee was very concerned that the present emphasis on learning,
having fun, and equal participation governing youth athletics continue
to be stressed by the new parent sponsoring group. Kostishack ques-
tioned the idea of the Parks and Recreation relinquishing this program
to others . She said then she wondered why it wouldn' t happen to other
sports also.
After further discussion, Klick made a motion, seconded by Otto, that
the Mounds View Basketball Program be accepted with the idea that
after the girls ' program, a report should be made at the January meet-
ing for evaluation.
North Heights Luthern Church Park Dedication
Lien, a representative of North Heights Luthern Church, explained
some of the tentative plans for walkways and trails . He said they
realize they have to comply to the ordinance, but just how is not
established as of yet .
Sand expressed that there was some concern after the July meeting.
The main concern was if the set aside of approximately 4.3 acres for
storm drainage and ponding will meet the intent of the Park Dedication
• Ordinance.
Buckley passed out copies of the ordinance pertaining to Park
Dedication. After additional discussion, the following conclusions
were established:
Minutes of Regular Parks and Recreation August 14, 1984
Page three
• - Mulcahy said there is a need for ball field and suggested this
could be included in the North Heights Dedication Area.
It was also expressed that if the developer cannot set aside
sufficient amount of acreage for Park Dedication. They must
give a determined portion of money or a combination of so much
money and land.
It was decided that the Architect should come back and give more
information as to what their plans are before further action
from Parks and Recreation.
- Sand announced that the Planning Committee would meet on the
following evening - Wednesday, August 15th at 7 :30 p.m. . They
would be meeting with the North Height Representatives and
everyone interested was encouraged to attend .
Council Report
T. Mulcahy reported on the following:
A. Cable T.V. boxes
- Mulcahy said cable wires are put underground where other
utilities are under the ground. But there will be Cable Boxes
placed in every other yard where the wires are buried and many
feel this will add to the visual pollution.
• - The smaller boxes will be buried but the big ones will be
buried only for a fee of $125 .00 to the individual homeowners .
- Sand wonders if there will be boxes in front of our parks .
- Mulcahy said they' ll get the answers on a report at the next
meeting on the Cable Commission.
B. Roseville Bank Expansion
- The Roseville Bank is planning to redesign into a two-story
bank. With this expansion, there should be some recovery of
Park Dedication area.
- Sand appreciated Mulcahy' s bringing this to the Park Committee' s
attention.
- The berming will be removed in an effort to enhance the bank' s
image.
C. Approval of Fall Park Programs
Tne Council reviewed the Fall Park Programs as recommended by
the Parks Committee. They approved the 1984 Fall Program as
presented and recommended that the Parks Committee review the
need for a basketball program.
• D. Management Goals for 1984
J . Buckley' s management goals as Park Director for 1984 were
received and approved by the Council.
E. Karth Lake Pumping
Mulcahy informed the Committee that the pumping at Karth Lake
had been finished at no extra cost to the residents .
Minutes of Regular Parks and Recreation August 14, 1984
Page four
• F . Resignation of Parks Committee Member
The Council accepted with regret the resignation of Tim Tuggle.
Cre eau Park Progress Report
J. Buckley and D. Messerly met with Rice Creek Watershed. It was
recommended that they write a letter describing the project planned.
Messerly was unable to attend tonight ' s meeting but he has contacted
"Prairie Restoration" in Princeton. They will provide some options
for the plantings of the open areas at no cost to the Village
Parkway Study
Mulcahy asked for volunteers to be on a Parkway Study. Gilies and
Sand volunteered to be on the Committee.
Adjournment
The meeting adjourned at 9: 55 p.m. .
i
The next meeting will be Tuesday, September 18 , 1984 in the Public
Works Building at 7 :30 p.m. .
•
September 6 , 1984
Don Messerly
3915 N . Fairview Avenue
Arden Hills , MN 55112
Steve Mil 1 er
E . A . Hickok: & Associates
545 Indian Mound
Wayzata , f„N 55391
Steve :
On August 1 , 1984 , you met with me and Arden Hills ' Park
Director , John Buckley at the Crepeau feature Center in Arden
Hills . to reviewed our plans to construct an earthen dam to
retain approximately 3/4 acre of water for waterfowl nestino
and the planting of cattails and water lillies for the
• nature center .
Prior to our conference , John and I had al"so met with Arden
Hills ' Consulting Engineer , Don Christoffersen , who sugoested
an earthen dam approximately H feet thick by 24 inches high .
tie would install two - 12 " culverts to carry excess water
with a sodded overflov .
At the time we discussed this with you , no problems were
envisioned . 'vie plan to complete this project by Niovember 15 ,
1984 , unless we hear from you to the contrary .
Thanks for your consideration . Attached is a sketch of the
proposed structure .
Sincerely ,
Don Nesserly
Arden Hills Park Board
DM/ rm
•
�r
•
u ` {
e •
M
•
1-11,
•
MEMO
DATE : August 24 , • 1984
TO : Council , John Buckley
FROM : Don Ilesserly
SUBJECT : Wildflower Order - Crepeau Park
John , attached is an order for 1•.,ildflowers totalling $240 . 50 .
I will need a check from Arden Hills totalling $213 . 00 . I
have included a personal order in this order , totalling $27 . 50 .
I will add my check for $27 . 50 to the Arden Hills check for
$213 . 00 for a total of $240 . 50 . Out of this order , I am
planning to keep 10 red trilliams for $ 10 . 00 , 2 ladies slippers
for $ 10 . 00 and 5 may apples for $5 . 00 , totalling $25 . 00 . I
have added the 6 sales tax and split the $2 . 00 handling charge
For a total of $27 . 50 . Upon receipt of the $213 . 00 check , I
will add my check to this and submit the order to Orchid
Gardens . Order must be rprpiye-d at Orchid Gardens by September
1 for fall delivery . I will request that the delivery be made
approximately October 1 . Planting will then be completed
October 15 , 1984 .
rm
• MEMO
LATE : August 24 , • 19"14
TO : Council , John Buckley
FROM : Don Messerly
SUBJECT : Crepeau Park Development
Progress
1 . Surveyed and marked park boundaries .
2 . Created pathway from Benton Way south to the prairie
area of the park . This pathway was developed so it
does not interfere with the houses on idaldon Place .
3 . Continuous mowing of existing pathways and trails
throughout the park .
4 . Removed several small elms , box elder , and aspen trees
from the prairie area .
• 5 . The City Council approved change and name to Crepeau
Nature Center and !;ild Life Sanctuary . The Council
also approved expenditures up to $ 1 , 500 for 1984 .
6 . Met with Ron Bowen , President of Prairie Restoration .
Mr . Bowen has sent written proposals for development
of the park . There has been no obligation or
expenditures on our part for this consultation .
7 . Ilet with Arden Hills Consulting Engineer , Don
Christoffersen and Rice Creek Watershed District ' s
Engineer Steve Miller . We got verbal approval from
Steve Miller for the construction of this dam .
8 . Began clearing of underbrush in the area east of houses
on Dunlap Street for the first of wildflower plantings .
9 . Worked with Nancy Hansen re the formation of a volunteer
group to work in the nature center .
10 . Submitted article to Sue Schroeder for the September
"Town Crier" .
rm
MEMO
DATE : August 24 , .1984
TO : Council , John Buckley
FROM : Don Messerly
SUBJECT : Plans for Consideration and Approval through
June 1 , 1985
Completion Date
1 . 9/ 1/84 - Order flowers from Orchid Gardens , Grand
Rapids , MPJ . Approximate cost is $200 . 00 .
2 . 9/ 15/84 - Install signs marking walking trails and
changing name to Crepeau Nature Center .
3 . 9/ 15/84 - Letter to Steve Miller of E . A . Hickok and
Associates confirming our plans to contruct an earth-
en dam . Along with this letter , I will submit a
sketch of the proposed dam and a photograph of the
sight .
4 . 10/ 1/84 - Organize work party of ,park Committee
members and others to clear underbrush for fall
wildflower planting .
5 . 10/ 15/84 - Plant wildflowers .
6 . 11/ 15/84 - Construction of the dam . Approximate cost
$200 . 00
7 . 1/ 31/85 - Removal of cottonwood trees north of the
Dellwood entrance . There are approximately 20 cotton-
wood trees diameter 2 " - 6 " which are not native to
this area . Removal of these trees will enable us to
mow the open area at the Dellwood entrance .
8. 4/ 1/85 - Clear brush for wildflower p-lantinsq- in spring
of 1985 and fall of 1985 . The brush clearing will be
an on going project in the fall and the winter of 1984-
1985 .
9 . 4/ 1/85 - Install bird houses throughout the' Nature
Center .
10 . 5/ 1/85 - Plant 6-8 river birch in the area of the
dam . Approximate cost is $200 . 00
11 . 5/ 1/85 - Spring planting of wildflowers to be completed .
MEMO - Cont ' d
12 . 5/ 1/ 85 - Install benches at appropriate resting places
along the trails . Approximate cost will be $250 . 00
No major construction or brush clearing will take place without
consulting you . Give me a call at 566-6110 anytime .
I.C. SYSTEM, INC.
444 East Highway%
P.O. Box 43444
St. Paul, Minnesota 55164
9(0® Phone: 612/483-8201
WATS: 800/328-9595
DOUGLAS C.WYCKOFF
Vice President
Sales and Marketing
August 21 , 1984
John Buckley
Arden Hills Parks $ Recreation Dept.
1450 West Hwy. #96
Arden Hills , Minnesota SS112
Dear John :
Thanks to you and thanks to Arden Hills for your summer softball
program. We just finished our seventh season in your program and
I thought you would be interested in my reactions .
1 . Of our 275 employees , 17% participate directly in the
men' s and women' s programs .
2 . Turnover of team members is virtually non-existent .
3 . Sick days of team members are almost dangerously non-
existent . I ' ve had players who wouldn' t stay home
according to doctor ' s orders because they wanted to
play that week.
4 . The fan support for our team is enormous and is a
source of spirit and team play for our company.
S . It ' s fun and it ' s healthy.
Our ICERS (our pride and joys) are 20 players of widely different
athletic ability, yet their own rules require that everyone bats
and plays . I think they even play better as the stronger players
tend to support their less skillful teammates . Victory is just
that much sweeter when they have all pulled together.
John, this year we finally won our first championship. I hope it
doesn' t take seven years to do it again. But , if it does , the
ICERS will be there as long as you' ll have us . Again, on behalf
of the ICERS , the ICEMEN and I . C. System, Inc. , let me thank Arden
Hills for making it all possible.
cerely,
oug as4C. W koff
Vice President , Sales & Marketing
ICER Coach
DCW:ml
First Trust
Saint Paul
First Trust Company of Saint Paul Steven A. Laraway
First National Bank Building Employee Benefit officer
Saint Paul, Minnesota 5,.101 612 291-5043
August 15, 1984
Mr. John Buckley
Parks Director
1450 West Highway 96
Arden Hills, MN 55112
Dear John:
I want to thank you again this year for the wonderful job you and your
associates did within our parks and recreation system. I thoroughly
enjoyed softball agian this summer, even though we were 0-11, and look
forward to next year. Keep up the good work!
Sinc.c"r'ely,
I
Xmployee Benefit Officer
SAL:sar
Member First Bank System
Minutes of Regular Parks and Recreation Committee Meeting
Tuesday , June 12 , 1984 - 7 : 30 p .m.
Page Three
1985 Park Improvement Proposal
The Committee reviewed the Parks Improvement projects listed on
the 10 year guidelines scheduled for 1985 , and after good discus-
sion , recommend that the following projects be considered for
1985 completion .
Hazelnut Park $ 500
Additional-trees and landscaping
Arden Oaks Park 1 , 500
Seeding or sodding
Play equipment (delayed to 1986)
Cumminqs Park
Trees and landscaping 500
Ingerson Park
West access to park 10 ,000
Play equipment 8 ,000
Crepeau Park
Pathway 1 ,500
Native flowers and possible grading 6 ,000
Soccer Goals 3 ,000
Trails 4 ,500
(up-grading trail surfaces , benches , signs )
6 , 500
Arsenal softball fields 51 ,000
( if property is available)
Miscellaneous Business
There was no miscellaneous business .
Adjournment
he meeting was adjourned at 8 : 59 p.m.
wArden Hills Park and Recreation Deyartment
1983 Fall Prof,rnm 128k Fall Program
YOUTH YOUTH
,an Safety Gun Safety
Pre-School Halloween Party Pre-School. Halloween Part;
3 - 4 Grade Basketball (Boys & Girls)
LL� 5 - 6 Grade Basketball (Boy: & Girls)
A9, 7th Grade T a.sketball (Boys)
8th Grade Basketball (Boys) "b
B Sitting* Instructions (Cone,-,Ed.) Baby Sittin�st ction
Baby
Elementary Gymnastics Elementary Gymnastics
Pre,School Pre-School
Elementary Age Elementary Age
Sports Club (Floor Hockey)
Break Dancing <--
ADULTS ADULTS
Perpetual Potion Hips & Thighs
Men's Open Volleyball 'len's Ops n Volleyball
Racquetball Instruction Racquetball Instruction
Tennis Instructions Tennis Instructions
Broomball (Men - Co Rec) Broomball.
Volleyball Ler"Ras
e Volleyball League
Wo,leyball ))
Three �,I _ Rec Tl i eague Three liar. Basketbal l
_ �.n
�oninrS� .lLt�#-.Sports In juriF, Clln.'.c
OTHER OTHER
Lake Region Hockey Lake Region Hockey
North Suburban Wrestling Wrestling
Aquatic Program Aquatic Prograr.:
11inter Fair Equipment Swap Winter Fun Equipment Sw ,,