HomeMy WebLinkAbout07-24-1984 PTRC Agenda - Minutes • 1
• AGENDA
Regular Parks & Recreation Committee Meeting
Village of Arden Hills
Tuesday, July 24, 1984 07.3u)
Village Hall
Call to Order & Roll Call
Introduction of Secretary
3 - North Heights Lutheran Church Development Presentation
r/ 4 - Park Dedication Discussion 33
L/ 5 .- Council Report
)o �repeau Park - "Hesserly Plan" r s -es8•fur cer�ro) dev,J
Gp Park Dedication Report C;:"e,41
V/Parkway Feasibility Study Approval
Mana.,ement Goals Study
- Fall Program Review & Approval
vl"8 — 1985 Budget j:iwc►udt COS.]
- Park Committee Member Resignation � ,.�' ' �� WA7„c
CFO- Misc. Business
Tennis Court Progress
Corridor for Karth Lake Circle & Nursery Hill Lane �►�•�� � ��
11- Adjournment
•
r
Minutes of Regular Parks and Recreation Committee Meeting
Village of Arden Hills
Tuesday , June 12 , 1984 - 7 : 30 p .m.
Village Hall
Call to Order
The meeting was called to order by Chair Sand at 7 : 38 p .m.
Roll Call
Present - Sand , Dreyling , Klick , Kostishack , Messerly ,
Otto , Sather
Absent - Anderson , Enrooth , Gillies , Tuggle , Wild
Also Present - Buckley
Approval of Minutes
Comments regarding the Park Tour (May 8 , 1984 ) ; no official
minutes were recorded during the tour.
The Committee appreciated walking through Crepeau Park . Members
were impressed with the large mature oaks and natural beauty of
the area . The proposed plan for developing nature paths and
wild flower areas throughout the park is an appropriate and
desirable use of the area .
• Don Messerly is willing to check with consultants regarding the
planning and development of wild flower areas . Some residents
have expressed an interest in donating some flowers from their
gardens for Crepeau Park . The next appropriate time for planting
wild flowers is Mid-September to October 1st . Otto moved ,
seconded by Messerly , that some "native" flowers be purchased at
that time for planting ; $ 1 , 500 is budgeted in 1984 for Crepeau
Park development . Motion carried unanimously .
Messerly is also going to check with the Rice Creek Watershed
District regarding the possibility of raising the water level of
one of the ponding areas to provide an area for marsh flowers
and water fowl .
Messerly is also interested in organizing a bird watching club
for interested residents .
Charlie Tooker Report
The Committee ' s discussion of the Tooker report centered in
three areas :
Programs for Seniors
Presently all seniors programs at the Edgewood Community
Center are available to residents . Additional effort should
be made to provide leisure activities such as hiking clubs ,
trips , bird watching and other possible activities for seniors .
Interest Survey
An interest survey should be developed and mailed to Village
residents ; the results would help in determining future
programs and park development .
Minutes of Regular Parks and Recreation Committee Meeting
Tuesday , June 12 , 1984 - 7 : 30 p .m .
• Page Two
Bequest Brochure
The Committee elt the development of a bequest brochure
could have some long term benefits for the Village .
Report on Tennis Courts
Buckley reported that the tennis court contracts have been signed
by T .A . Schifsky Company . Construction will start when weather
and soil conditions are favorable .
10 Year Park Improvement Review
Buckley reported on the 1984 Park Development .
1984 projects that will be completed this summer are :
- Single tennis court and basketball court at Hazelnut
and Floral Park .
- Double tennis court and basketball court at Cummings
Park .
- Installation of basketball backboards and tennis practice
boards at Cummings , Floral , and Hazelnut Parks .
• - Installation of play climbing structure at Cummings Park .
- Up-grading of pedestrian corridors at Chatham Addition ,
and corridor linking Indian Oaks Court to Norma Avenue .
- Some trees and shrubs will be planted at Hazelnut , Cummings ,
and Perry Parks .
- Arden Oaks Park Area should be seeded this fall if grading
is completed .
- Some pathway improvement and native flowers planted at
Crepeau Park .
1984 projects delayed until later years are west access to
Ingerson Park and grading at Crepeau Park . These items are
delayed so the money could be directed toward the construction
of tennis and basketball courts .
Miscellaneous Business
There was no miscellaneous business .
Adjournment
The meeting was adjourned at 8 : 59 p .m .
•
Minutes of Regular Parks and Recreation Committee Meeting
Tuesday , June 12 , 1984 - 7 : 30 p .m.
Page Three
1985 Park Improvement Proposal
The Committee reviewed the Parks Improvement projects listed on
the 10 year guidelines scheduled for 1985 , and after good discus-
sion , recommend that the following projects be considered for
1985 completion .
Hazelnut Park
A-dditional trees and landscaping $ 500
Arden Oaks Park
Seeding or sodding 1 , 500
Play equipment (delayed to 1986 )
Cummings Park
Trees and landscaping 500
Ingerson Park
West access to park 10 ,000
Play equipment 8 ,000
• Crepeau Park
Pathway 1 ,500
Native flowers and possible grading 6 ,000
Soccer Goals 3 , 000
Trails 4 ,500
(up-grading trail surfaces , benches , signs )
36 , 500
Arsenal softball fields 51 ,000
( if property is available )
Miscellaneous Business
There was no miscel aneous business .
Adjournment
The meeting was adjourned at 8 : 59 p . m.
•
•
TO: Parks Committee
FROM: Tom Mulcahy
DATE: July 12 , 1984
There were several matters of interest to Parks
Committee members that were acted upon by the Council last
Monday evening, July 9 , 1984.
I want to share the news with you because I am so
pleased with the results.
First, the Council endorsed the "Messerly Plan"
for Crepeau Park; we approved $1 , 500 for improvements,
including plantings consistent with the plan that Don
prepared last April. Don made a wonderful presentation and
I am very enthusiastic about this development.
Second, we secured the agreement of a developer of
two industrial parcels to pay into our park fund 10% of the
• appraised value of his raw land--about $40, 000 over a five-
year period.
Third, the Council approved (3-2) my long-standing
proposal for a study of the feasibility of a system of
parkways in Arden Hills. I have enclosed a copy of my
remarks , the proposal and the motion that the Council
passed. Please note that the proposal calls for involvement
by members of the Parks Committee and Planning Commission
who might be interested in serving on the Task Force. I
have very much appreciated your support for this project. I
am confident that the effort will be worthwhile and have
very beneficial long-range effects on the quality of our
environment in Arden Hills.
Enclosure v
cc: John Buckley
Orlyn Miller
Planning Commission
•
• TO: Council
FROM: Tom Mulcahy
SUBJECT: Parkway Study
DATE: July 9 , 1984
I would like again to bring before the Council my
proposal that we authorize a conceptual design study that
would look into the possibility of a system of parkways in
Arden Hills .
I believe that a professional study--under the
direction of the City Planner and involving a task force
that includes interested members of the Planning Commission
and Parks Committee--could give us needed direction in
preparing a long range plan for a parkway system to be
integrated into the City' s existing Transportation Plan.
This idea has been perking in my mind for over two
years . It ' s time it had professional study and evaluation.
The planner and members of the Planning Commission and the
• Parks Committee have the necessary expertise and interest to
look at the possibilities and to come up with feasible
recommendations for long term action.
These things take time--to study, to secure
citizen and professional input, to generate awareness and
support--and, I think, that it' s time to get that process
started.
Orlyn Miller and I have prepared the attached
proposal for a Parkway Plan Study and I request your
favorable consideration.
The estimated maximum cost of this activity is
$2 , 500 . I propose that it be funded from the Parks Capital
Fund and from Planning Consultant funds and that the work
begin immediately. I believe that the study would take
several months and we would have a report in early 1985.
Funding should be provided in the 1985 budget.
TRM: -)mg
Attachment
•
• PARKWAY PLAN STUDY
City of Arden Hills
OBJECTIVE
Preparation of a long-range plan for the development of a
parkway system for Arden Hills to be incorporated into the
Transportation Plan.
APPROACH
The initial investigation/planning stage should include the
following tasks :
1 . Establish basic goals and objectives of the
parkway system.
2 . Identify potential parkway routes.
3 . Establish typical "cross section" of parkway road
and right--,of-way requirements.
4 . Evaluate the existing streets, rights-of-way, and
. adjacent development of potential parkway routes
to determine the physical and financial
feasibility of parkway construction.
5 . Meet with County Traffic Engineer and City
Engineer.
6 . Prepare planning graphics for discussion purposes
(potential routes, typical cross-section, problem
areas) .
7 . Summarize mutual findings and recommendations in
brief report to City Council.
A Task Force comprised of members of the Planning Commission
and Parks Committee and a Council liaison is suggested as
group to work with the Consultant on this planning project.
COST
Not to exceed $2 , 500.
TRM/OWPI:pmg
7-9-84
•
Motion
I move that the City Planner be authorized to
study the concept and feasibility of a parkway system for
Arden Hills for implementation as part of the Transportation
Plan of the City, such study to include the formation of a
task force consisting of interested members of the Planning
Commission, the Parks Committee and the Parks Liaison
Councilmember; such study to cost no more than $2 ,500 and
include the following activities:
1 . Establish basic goals and objectives of the
parkway system.
2 . Identify potential parkway routes.
3 . Establish typical "cross section" of parkway road
and right-of-way requirements.
4 . Evaluate the existing streets, rights-of-way, and
adjacent development of potential parkway routes
to determine the physical and financial
feasibility of parkway construction.
5 . Meet with County Traffic Engineer and City
Engineer.
6 . Prepare planning graphics for discussion purposes
(potential routes , typical cross-section, problem
areas) .
7. Summarize mutual findings and recommendations in
brief report to City Council.
TRM:pmg
7-9-84
v ion
• July 9, 1984
Management Goals for 1984
ohn T. Buckley
Council
Maintain open communications with Council members through:
- frequent contact with Council liaison
- written memos supporting all requests for expenditures
-, written reports for:
summer programs
winter skating
youth and adult fee programs
diseased tree program
so that Council members are knowledgeable of program
philosophy, programs offered and program participation
Parks and Recreation Committee
Promote and encourage Park Committee members' active involvement
In:
- determining program goals and philosophy
. - determining program activities and content
- setting park/trail goals and development through
the preparation of 10 year park/trail development
program, and annual evaluation and review of 10
year program
- developing a gift and endowment program
- secure approval for Crepeau Park Development Plans
Trail Development
A special effort will be directed toward the maintenance and
development of the pedestrian trails during 1984 and 1985
- study and evaluation of excisting ano future traii program
- the agricultural lime surface on the Arden Trail will
be graded every four weeks from April through October
- all trails with grass surfaces will be mowed every
four weeks from April through October
- sitting benches will be installed along the major trails
- trail maps will be published semi-annually
Program Development
Plan and conduct a community interest survey this fall or
winter covering:
• - evaluation of present programs
- now program needs and interests
- when and how Arden Hills' residents use the parks and trails
Page Two
• Volunteer Coaches Clinic
The coach is the single most important factor in determining
whether a child will have a positive or negative experience
while playing in an athletic activity. Therefore , a coaches
clinic will be developed to :
- teach sports skills
- teach .psychology of working with children
Employee Evaluation
Full -time park employees will participate in an annual
performance evaluation .by 12-1-84.
1Ietro olitan Park aCommission
s nd Open Space
• 300 Metro Square Building
Seventh and Robert Streets
Saint Paul, Minnesota 55101
612/291-6401
July 1984
TO: Metropolitan Area Citizens and Government Officials
The Metropolitan Parks and Open Space Commission., working with the regional
implementing agencies, has scheduled a series of 12 joint meetings to hear from
the public about the recreation open space system in the seven-county Metro-
politan Area. The meetings are a first step in considering revisions needed
for the Metropolitan Council "s Development Guide/Policy Plan for Recreation
Open Space. A meeting schedule is attached.
The commission has invited implementing agency board members to sit with them
to hear from the public about what is good and not so good in the policies
guiding acquisition and development of regional parks. At the meetings, any
comment will be welcome, whether verbal or written, on any topic concerning
regional parks. Time has been reserved at the end of each meeting for dis-
cussion by the policy board members present. During the time period for
meetings, July 17 through Aug. 23, the commission will also accept written
comments, sent to 300 Metro Square, 7th and Robert Sts. , St. Paul , 55101.
• The commission has developed a paper suggesting several issues surrounding pur-
poses and goals of the system, how it should be funned and by what pr'orities,
and about its future development. If you would like a copy, please call the
Council at 291-6401.
Following these meetings, the commission will begin to discuss and resolve the
issues and to prepare a revised Development Guide/Policy Plan for submission to
the Council for public hearing. After the hearing, currently scheduled for
November, the commission plans to recommend, and the Council plans to adopt, a
revised recreation open space plan.
Your participation will be important and very welcome. You can also help by
publicizing the meetings. Enclosed is a news release, which you may find
useful .
Sincerely,
/l
Jo McBride
C it
JM:vld
•
Established by the Minnesota Legislature
as an agency of the Metropolitan Council
r
5.30.84
• RECREATION OPEN SPACE DEVELOPMENT GUIDE/POLICY PLAN
ISSUES PAPER
INTRODUCTION
The Metropolitan Council is reviewing its Policy Plan for Regional Recreation
Open Space and will adopt a revised plan by early 1985. The Council seeks com-
ments about the strengths and weaknesses of the current plan and also seeks new
issues which people believe should be considered in the revision. This issue
paper is the first part of that public process. It has been prepared by the
Metropolitan Parks and Open Space Commission to prompt discussion at a series
of public meetings in July and August, 1984.
The goals from the 1980 plan, with some questions, are listed as a first issue,
followed by a series of specific issues received from individuals and agencies.
Issues were selected to provoke public reaction as well as to list what the
commission and Council hope to hear about. The commission is confident that
other issues exist and hopes they will come forward during the meetings. The
meetings will also give the public a chance to speak for or against any
specific or general topics they believe should be considered about the regional
recreation open space system. Following the meeting, a revised draft policy
plan will be developed and circulated for a public hearing, currently scheduled
for November of 1984. After the hearing, a final revised policy plan will be
reviewed and adopted.
BACKGROUND
• In 1974, following extended discussion, the Minnesota Legislature passed the
Metropolitan Parks Act. The law makes the Metropolitan Council , with the
advice of the Metropolitan Parks and Open Space Commission, responsible for
preparing and adopting a policy plan for a regional recreation open space
system. The parks act requires periodic Council review of this policy plan.
The first policy plan was adopted as a chapter for regional recreation open
space in the Council-s Metropolitan Development Guide in 1974. Following
extensive discussion, the plan was revised and adopted again in 1980.
The regional recreation open space system is implemented by 10 agencies--
counties, municipalities and special park districts. Implementing agencies are
eligible to receive grants from the Council for acquisition and development of
regional parks in accord with master plans which the agencies prepare. The
Metropolitan Council reviews master plans for consistency with the regional
recreation open space system policy plan and then approves them. The imple-
menting agencies own and operate the regional parks.
3
3. The regional system lies within a larger metropolitan system, all the pub-
licly available open space in the Metropolitan Area, regardless of owner-
ship. The plan calls for a regional system which provides approximately
equal access to parks, in distance or time traveled, for everyone in the
region. It also calls for equity of service, that is, everyone should be
able to find parks which provide about the same kind of service, across the
region.
Should the equity apply to the entire metropolitan system, to the regional
recreation open space system, to the municipal or local system, or to some
combination of the above. Where is the greater problem? Where is change
needed most?
4. Research shows that certain sub-populations in the region visit regional
parks less than might be expected, especially elderly, minority, low income
and teens. What are the barriers to their use? Must the plan call for
identification and removal of barriers to use more, or differently, than it
does? Are there other things the plan should call for to remedy the
apparent problem?
5. Is the year 2000 target for a completed system plan reasonable?
Appropriate? Feasible?
6. A major Council task has been obtaining adequate funds for the system.
Should that task become a formal goal of the Council? What is the appro-
priate task, exactly?
• 7. Should the Council adopt a goal calling for a more active (pro-active)
posture to park and recreation issues in the region? In what areas might
stronger leadership or activity applied earlier be of benefit to the
regional system?
8. Minnesota has stressed the importance of tourism and economic development
in public projects including arks. Should the Council -s goals add this
P P J 9 P
directive to the regional system goals? Clearly, regional parks can and do
function in this area.
9. The State Comprehensive Outdoor Recreation Plan (SCORN is in revision and
a similar national plan review (ORRC II ) may begin soon. Should the plan
outline an increased role for the regional and metropolitan system in a
state and national framework? What concerns need to be met?
ISSUE 2. Is the system acquiring the right parks in the right places at the
right times and is it providing the right facilities withinthem?
This question is one which is asked, appropriately, every time a policy plan/
system plan for any public service is opened for discussion.
Subquestions follow rather predictably:
Has acquisition proceeded at an appropriate rate, too fast, or too slowly?
Is the planned completed system too large, too small , incorrectly guided in
. the places being acquired, or correct?
5
Related Questions:
I . In your opinion, what are the greatest needs for the regional system?
Where are problems the greatest?
2. Are the categories for priority the most appropriate statements the Council
can make to direct the acquisition of land and development of facilities
for regional recreation open space?
3. Do the categories and the goal and objective statements of the Council
match? Do both direct the system to the same point and will it meet
regional needs for recreation open space?
4. Is the process by which priorities are decided adequate and appropriate?
How might it be improved?
ISSUE 4. Should there be a change in the scope of the regional system or the
Councils role in implementing the system?
The regional recreation open space system emphasizes natural resource based
recreation opportunities (picnicking, swimming, boating, fishing, trail uses,
camping and nature interpretation) . A few existing special uses include a zoo,
a conservatory and a floral display garden.
• Regional system components now are:
o Park Reserves - large, open, natural areas.
o Regional Park - moderately large, open spaces with good recreation
resources such as lakes.
o Regional Trail Corridors - linear parkland for trail activities.
o Regional Historic Parks - areas of regional historic importance.
o Regional Special Recreation Use Areas - areas which support unique
recreation uses for the region.
Related Questions:
1. Should the system incorporate more special recreation uses? If so, what
kind?
2. Would providing some special attractions in certain parks encourage use
or redistribute use to new parks? Would that be desirable?
3. Does the region have a responsibility for unique or unusually large rec-
reation facilities now provided by municipalities? What would the benefits
or drawbacks be of bringing these into a regional plan?
4. Are there some traditionally municipal facilities that are not being ade-
quately provided or might be discontinued? What are they? Is there a
regional responsibility for these?
5. Are the current classifications and definitions of regional system com-
ponents appropriate? Should some be deleted or others added? Should some
be modified?
t '
7
• The second type, fees charged for entry, for parking, or other fees which have
the effect of admission fees, have received more attention. Most of the imple-
menting agencies do not charge such fees. Of those which do, some charge only
for certain sites, others charge for all vehicles entering all parks. Some
collect by parking meters, some by daily and annual stickers.
Related Questions:
1. Are general fees for regional parks appropriate, or should basic entry be
free for all users?
2. Are fees which have the effect of general admissions discriminatory against
user groups such as low income, minorities, physically handicapped, and peo-
ple who do not live nearby, as opponents say, or, are they basically fair
in that they are paid by those who use the parks most, as proponents say?
3. If it is reasonable to charge a general fee, would it make sense to apply a
uniform entrance fee to all regional parks? Should it be the same as the
state park fee? Should it be an actual statewide park sticker with
revenues shared by state parks and regional parks?
4. What is a reasonable mechanism to charge a regional park user fee (if one
is desirable)? Could it be a license rather than a parking sticker? Would
something like the Winter Carnival and Aquatennial badge system work? Any
other ideas?
• ISSUE 7. Is there a need for a comprehensive marketing plan for the regional
open space system? a s the Council s appropriate role in ace i a ing
public use of the regional recrea ion open space system.
Offering a balanced system, with equitable recreation opportunity across the
Region, may not be enough. A low level of awareness could be a problem. Some-
times, a problem is in what people perceive to be limits on their use. The
1980 policy plan accurately states that there is no general public image of a
comprehensive regional park system.
Policy 23. The Council will coordinate, with the implementing agencies, a
public information program to make the public more aware of the
regional recreation open space system.
Public information efforts of the implementing agencies are mostly localized--
dealing only with parks and programs in their jurisdiction and usually aimed
specifically at their constituents. The Council coordinates a limited infor-
mation program about the regional system, in concert with the implementing
agencies" programs, to make the public more broadly aware. Simple dissemina-
tion of information probably does not meet the public-s need. One increasingly
frequent suggestion is for the Council to coordinate a system marketing plan
with the implementing agencies which sets regional objectives including deter-
mining potential audiences, informing potential users and evaluating program
response, all throughout the regional system.
• A sample objective might be greater public identity for the regional recreation
open space system. The Council is selecting a logo for regional recreation
open space. The logo could become an identifier, universal in the regional
system, clearly marking all opportunities in all regional facilities.
9
Related Questions:
1. Should the Council seek an answer now to this problem of the future, or
must the future take care of itself?
2. Is the problem one which could be met by an investment or set-aside program
begun now? Is there a useful model of a "public trust" which could be
adapted?
3. Should the Council and the commission take a pro-active role, working with
other levels of government to find a solution?
ISSUE 9. Is there a need for guidelines for service levels for development and
or operation and maintenance in regional parks?
Metropolitan Council staff, working with staff from implementing agencies, have
developed draft guidelines for service levels (GSL) for both development and
for 0 & M. The GSL delineate both the quantity and quality of service which
facilities in regional parks will provide (development) , and the quantity and
quality of service which they can sustain through the maintenance they receive
(0 & M) . The documents are working drafts, to be tried and adjusted in use.
Ultimately, proponents feel that GSL offer a way to measure and predict the
quality as well as quantity of service returned from investment in regional
recreation open space. Opponents say the measures may be so imprecise at the
• outset as to be meaningless, therefore, misleading to persons attempting to use
them. Some view GSL as undue infringement on implementing agency prerogatives,
feeling that, as owners and operators, the implementing agencies alone should
set service levels in the regional parks for which they are responsible.
A draft suggests the definition of appropriate level of service as follows:
A level of service which meets all health and safety needs, provides an
aesthetically pleasing environment, maintains the quality of both natural
and built resources, and permits a satisfactory recreation experience up to
the facility"s designed capacity and lifetime.
Both Policy 22 and the 1980 text get to "levels of service" in the areas of
development and 0 & M. However, the current plan has no definition nor are any
levels set.
Related Questions:
I . Is it important that the regional system meet minimum acceptable service
levels throughout? Who (and how) decides what they are? Is the suggested
definition (above) appropriate? Adequate?
2. Is the difficulty of developing usable service level guidelines such that
they are worth pursuing or not?
3. If usable GSL can be written, should they become part of the policy plan?
• (The Council has other separate guidelines which are not part of policy
plans. )
11
The intent seems plain. Some municipalities have stated that their access to
master plans has come only after the agency has adopted the plan, making subs-
tantive change to meet their concerns improbable. If this has happened, it is
not consistent with policy.
From another point of view, some implementing agencies cite cases in which
municipalities have delayed plan approval unduly in some cases insisting upon
conditions which work against the agency or the regional interest. Some imple-
menting agencies have been prevented from installing needed improvements, even
developments for which the municipalities had given earlier concept approval .
There are differences in the laws which control implementing agencies from one
jurisdiction to another and some of these have, on occasion, blocked an
implementing agency from going ahead with regional projects.
One major effect some municipalities have exerted upon regional open space has
been special assessments levied against parks. The Council , the commission and
some of the implementing agencies have stated increasing concern over the pro-
cess by which municipalities have made special assessments against regional
parkland, questioning if they were based upon actual benefits to the park.
Other concerns are about how assessments should be paid and when they should
be set.
One remedy suggested is that the municipality and the implementing agency
could agree to treat the master plan as a conditional use permit, possibly
meeting at once concerns on the part of the municipalities, the implementing
agency and the Council about the current planning process.
Related Questions:
1. How much control over regional park development should municipalities
have? What happens if more than one municipality is involved?
2. Are the problems real and large enough to be worth bothering about?
3. If an implementing agency and municipality agreed to treat a regional park
master plan for development as a conditional use permit, would it help
resolve the problems cited?
4. Is there a simpler and, therefore, better way to deal with the concerns?
5. What are the "pluses and minuses" to a municipality from a regional park
located within or adjacent to its boundaries?
ISSUE 12. How much leadership does or should the Council -s recreation open
space program provide in the area of affirmative action and minority usiness
enterprises?
Currently, the policy plan for recreation open space does not address this
issue.
In its recent contracts, the Council (May 1983) has inserted language as
follows:
The Council shall not discriminate. . .on the basis of race, color, creed,
religion, national origin, sex, affectional or sexual preference, age,
political affiliate, marital status, or status with regard to public
13
2. Should master plan preparation, as a matter of course, incorporate
preparation of an EAW?
3. If yes, should it be prepared and circulated separately or should it be
required as part of a master plan, the contents of which are spelled out in
the policy plan?
ISSUE 14. To what extent should revenues from non-recreation use of regional
parklands be controlled?
Some implementing agencies have realized revenues from non-recreation activity
on land purchased for regional parks. Most comes from continuing existing
uses. Agencies have collected agricultural land rent or crop shares. Some
have rented or leased buildings. A lesser amount has come from sale of build-
ings and equipment. It"s important to remember that the implementing agencies
are the owners and operators of the regional park.
According to the 1980 policy plan, the implementing agencies are restricted to
using such revenue for costs which are grant eligible. Policy 20 states:
Grants to implementing agencies will be made for acquisition and
development as follows:
o Acquisition grants will include land costs, relocation assistance,
land stewardship, utility assessments and fees for services performed
• by other than agency staff.
o Revenue from interim land uses will be used by the agency for grant-
eligible costs.
o Grants for development will include improvements within the regional
parks, park reserves or trail corridors of recreational facilities,
utilities, landscaping, roads and parking, building construction, and
maintenance facilities to serve the particular unit; as well as
natural resource rehabilitation within park reserves.
o System-wide improvements are grant-eligible. When such eligible
system-wide facilities are also used for other than regional park
purposes, the regional funding will be on a negotiated prorated basis.
Barring plan change, if 0 & M grants become part of the regional program,
interim revenues could presumably support 0 & M.
The 1980 plan does not allow revenues from interim uses to be applied to
0 & M. Certain of the implementing agencies suggest that the plan mistakenly
assumed all regional parks were purchased undeveloped and that no recreation
use could occur until regional development grants are made. Interim management
of parks is confined to stewardship because no operation is believed to be
feasible in the undeveloped parks. In fact, several regional parks have been
put into service in the interim between acquisition and development, creating
operating costs which policy says cannot be supported by interim revenues. The
• agencies feel they should be permitted to use interim revenues to support
interim 0 & M costs.
• Metropolitan Parks and Open Space Commission
Joint Public Meetings Schedule
SUBJECT: Issues for Revision of the Regional Recreation Open Space Development
Guide/Policy Plan
For information, contact Jack Mauritz, 291-6602
Date: Tuesday, July 17, 7:30 p.m.
With: Minneapolis Park and Recreation Board
Place: Northeast Park
16th and Pierce Street, N.E. , Minneapolis
Date: Thursday, July 19, 7:30 p.m.
With: Washington County Board of Commissioners
Place: Washington County Government Center, Board Room
Stillwater
Date: Tuesday, July 24, 7:30 p.m.
With: Anoka County Board of Commissioners
Place: Anoka County Courthouse, Commissioners Board Room
Anoka
Date: Thursday, July 26, 7:30 p.m.
With: Dakota County Board of Commissioners
• Scott County Board of Commissioners
(and Hennepin County Park Reserve District)
Place: Burnsville Government Center, City Council Chambers
Burnsville
Date: Tuesday, July 31, 7:30 p.m.
With: Minneapolis Park and Recreation Board
Place: Sumner Olson Council
900 - 8th Ave. , N. (8th & Bryant) , Minneapolis
Date: Thursday, August 2, 7:30 p.m.
With: Ramsey County Board of Commissioners
Place: Maplewood Government Center, Council Chambers
Maplewood
Date: Wednesday, August 8, 7:30 p.m.
With: Bloomington City Council and
Hennepin County Park Reserve District
Place: Bloomington City Hall , Council Chambers
Bloomington
Date: Thursday, August 9, 7:30 p.m.
With: Minneapolis Park and Recreation Board
Place: Hosmer Library
347 E. 36th St. , Minneapolis
i 5 n-..
9<L
NEWS
For more information
contact the Public
Information Office
612/291-6464
Ken Reddick
For Immediate Release: 291-6422
Public Meetings to be Held Friday,
On Region 's Park System June 29 , 1984
Area residents will have an opportunity this summer to help shape parks
policy for the Twin Cities Area.
The Metropolitan Parks and Open Space Commission, working with regional
implementing agencies, has scheduled a series of 12 joint public meetings on
the parks and park reserves. The meetings are the first step in revising the
• Metropolitan Councils Development Guide/Policy Plan for Recreation Open Space
"The meetings will give the public a chance to speak for or against any
topic they consider important to the regional park system," said John Mauritz,
Council park planner. Some topics that may prompt discussion, he said, include
land acquisition, maintenance of regional parks and the fairness of park user
fees.
The Metropolitan Parks and Open Space Commission will co-sponsor each
meeting with the implementing agency listed below. Each meeting will begin at
7: 30 p.m. The schedule is:
--July 17 , Minneapolis Park and Recreation Board, Northeast Park, 1615 N.E.
Pierce St. , Minneapolis.
—July 19 , Washington County Board of Commissioners, Washington County
Courthouse board room, 14900 61st St. N. , Stillwater. -
--July 24 , Anoka County Board of Commissioners, Anoka County Courthouse
board room, 325 E. Main St. , Anoka.
more
• TO: Council
FROM: Tom Mulcahy
SUBJECT: Parkway Study
DATE: July 9 , 1984
I would like again to bring before the Council my
proposal that we authorize a conceptual design study that
would look into the possibility of a system of parkways in
Arden Hills.
I believe that a professional study--under the
direction of the City Planner and involving a task force
that includes interested members of the Planning Commission
and Parks Committee--could give us needed direction in
preparing a long range plan for a parkway system to be
integrated into the City' s existing Transportation Plan.
This idea has been perking in my mind for over two
years . It ' s time it had professional study and evaluation.
The planner and members of the Planning Commission and the
Parks Committee have the necessary expertise and interest to
look at the possibilities and to come up with feasible
recommendations for long term action.
These things take time--to study, to secure
citizen and professional input, to generate awareness and
support--and, I think, that it ' s time to get that process
started.
Orlyn Miller and I have prepared the attached
proposal for a Parkway Plan Study and I request your
favorable consideration.
The estimated maximum cost of this activity is
$2 , 500 . I propose that it be funded from the Parks Capital
Fund and from Planning Consultant funds and that the work
begin immediately. I believe that the study would take
several months and we would have a report in early 1985.
Funding should be provided in the 1985 budget.
TRr2:pmg
Attachment
•
• PARKWAY PLAN STUDY
City of Arden Hills
OBJECTIVE
Preparation of a long-range plan for the development of a
parkway system for Arden Hills to be incorporated into the
Transportation Plan.
APPROACH
The initial investigation/planning stage should include the
following tasks:
1 . Establish basic goals and objectives of the
parkway system.
2 . Identify potential parkway routes.
3 . Establish typical "cross section" of parkway road
and right-of-way requirements.
• 4 . Evaluate the existing streets, rights-of-way, and
adjacent development of potential parkway routes
to determine the physical feasibility of parkway
construction.
5 . Meet with County Traffic Engineer and City
Engineer.
6 . Prepare planning graphics for discussion purposes
(potential routes, typical cross-section, problem
areas) .
7 . Summarize mutual findings and recommendations in
brief report to City Council .
A Task Force comprised of members of the Planning Commission
and Parks Committee and a Council liaison is suggested as
group to work with the Consultant on this planning project.
COST
Not to exceed $2 , 500.
TRM/OWM:pmg
• 7-9-84
•
Motion
I move that the City Planner be authorized to
study the concept and feasibility of a parkway system for
Arden Hills for implementation as part of the Transportation
Plan of the City, such study to include the formation of a
task force consisting of interested members of the Planning
Commission, the Parks Committee and the Parks Liaison
Councilmember; such study to cost no more than $2 ,500 and
include the following activities:
1 . Establish basic goals and objectives of the
parkway system.
2 . Identify potential parkway routes.
• 3 . Establish typical "cross section" of parkway road
and right-of-way requirements.
4 . Evaluate the existing streets, rights-of-way, and
adjacent development of potential parkway routes
to determine the physical feasibility of parkway
construction. 1 .
5 . Meet with County Traffic Engineer and City
Engineer.
6 . Prepare planning graphics for discussion purposes
(potential routes, typical cross-section, problem
areas) .
7. Summarize mutual findings and recommendations in
brief report to City Council.
TRM:pmg
7-9-84
•
•lA
--July 26, Dakota and Scott County Boards of Commissioners, and Hennepin •
County Park Reserve District, Burnsville City Hall council chambers, 1313
E. Hwy. 13, Burnsville.
--July 31 , Minneapolis Park and Recreation Board, Sumner Olson Council, 900
8th Av. N. , Minneapolis.
--Aug. 2, Ramsey County Board of Commissioners, Maplewood City Hall
council chambers, 1380 Frost Av. , Maplewood.
--Aug. 8, Bloomington City Council and Hennepin County Park Reserve
District, Bloomington City Hall council chambers, 2215 W. Old Shakopee
Road, Bloomington.
--Aug. 9 , Minneapolis Park and Recreation Board, Hosmer Library, 347 E.
36th St. , Minneapolis.
--Aug. 14 , St. Paul City Council, St. Paul Seminary, Room 203, Brady
Center, 2260 Summit Av. , St. Paul.
--Aug. 20. St. Paul City Council, St. Paul Technical Vocational Institute
auditorium, 235 Marshall Av. , St. Paul.
--Aug. 22, Hennepin County Park Reserve District, Golden Valley City Hall
council chambers, 7800 Golden Valley Rd. , Golden Valley.
--Aug. 23, Carver County Board of Commissioners and Hennepin County Park
Reserve District, Chanhassen City Hall council chambers, 690 Coulter Drive,
Chanhassen.
Following the meetings in July and August, the commission will develop
policy plan revisions. A public hearing on the revised plan is scheduled for
November.
For a paper discussing issues surrounding the system"s purposes, goals,
funding and future development, call the Council at 291-6401 .
-30-
MPOSC Joint Public Meetings Schedule
Page 2 .
Date: Tuesday, August 14, 7:30 p.m.
With: St. Paul City Council
Place: St. Paul Seminary
Brady Center, Room 203
2260 Summit Ave. , St. Paul
Date: Monday, August 20, 7:30 p.m.
With: St. Paul City Council
Place: St. Paul Technical Vocational Institute, Auditorium, St. Paul
Date: Wednesday, August 22, 7:30 p.m.
With: Hennepin County Park Reserve District
Place: Golden Valley City Hall , Council Chambers
Golden Valley
Date: Thursday, August 23, 7:30 p.m.
With: Carver County Board of Commissioners
(and Hennepin County Park Reserve District)
Place: Chanhassen City Hall , Council Chambers
Chanhassen
14
Two arguments against-freeing up interim revenue use are:
- Policy should not endorse management which is aimed at generating maximum
revenue over a prolonged period. That is not the purpose for which the
land was acquired.
- Interim uses could be viewed by surrounding municipalities as a source of
tax revenues. Land put into recreation open space has been removed from
tax rolls for a public use. If it is used as a revenue generator by other
use for some extended time, the municipality from which the land was
removed might feel it has a supportable claim.
Related Questions:
1. What limits, if any, are appropriate to place on generation and expendi-
tures of revenues earned from non-recreation activity in regional recrea-
tion open space?
2. Is generation of revenue a reasonable use of part of a regional park if it
supports recreation services elsewhere?
i
•
SA2082-PHOPNI
5.30.84
i
12
assistance or disability. The Council shall act affirmatively, through its
minority business enterprise program, and otherwise, to promote and enter
into contracts with minority business enterprises (MBEs) , and firms having
effective, implemented affirmative action programs.
The clause in the Council -s regional and open space acquisition and development
grant contracts, since 1974, is as follows:
g. The Grantee agrees to comply with all applicable laws relating to
nondiscrimination, affirmative action and public purchase, involvement
and use. In particular, Grantee agrees not to discriminate against
any employee or applicant for employment because of race, color, reli-
gion, sex or national origin and to take affirmative action to assure
that applicants and employees are treated equally with respect to the
following: employment, upgrading, demotion, transfer, recruitment,
lay-off, termination, rates of pay and other forms of compensation,
and selection for training.
In 1984, the 1975 clause appears less than adequate.
Related Questions:
1. Does the Council-s current recreation open space program provide adequate
leadership in Affirmative Action and Minority Business Enterprise (AA/MBE)
questions?
2. Would any of the following alternatives better the status quo? •
- Insert an AA/MBE clause in the policy plan as an added objective?
- Require an AA/MBE statement from the responsible implementing agency
as a content element of each master plan?
- Require proof o n aldequ�e Irma 1ve Action and Minority Business
Enterprise program as a contract element for all subsequent regional
recreation open space gr—an —
- as ove3—
- None of the above?
- Another way?
ISSUE 13. How much environmental information should be required in regional
park master plans?
In recent years, some park master plans have been challenged over the adequacy
of their review for environmental impacts from the proposed development. The
challenge often has come from local resident groups. The plans have generally
withstood the challenges. In at least one case, review of the planning process
showed that preparation of the master plan had gathered the equivalent of the
information needed to prepare an Environmental Assessment Worksheet (EAW) under
Minnesota environmental laws.
Related Questions:
1 . In your opinion, does the current regional master planning process ade-
quately address environmental concerns about park development?
10
ISSUE 10. What"s the status of local or municipal recreation open space in the
metropolitan system? What should the Council s involvement be in i
Working from municipal comprehensive plans, the Council has assembled data, and
will report on the condition of local recreation open space in terms of what
acreage is provided, in what categories, by planning areas (MOF zones) . The
report will help to identify municipal recreation open space needs in the
region and should help in priority development for grant reviews. The report
will not be adequate to complete a comprehensive regional plan for local or
municipal recreation needs. Much of what local recreation provides is in the
form of facilities, that is, built resources, necessary for active recreation.
That part of recreation demand in the Region will require continuing Council
study to complete future reports.
Related Questions:
1. Is it appropriate and important for the Council to analyze and coordinate
local efforts in the metropolitan recreation system? Would it be helpful
to the region?
2. Would Council-offered technical assistance help communities do more
effective long-range planning for recreation services?
3. Related to issue 11 as well as issue 10; should there be rewards to those
communities which grant consent to regional park acquisition and develop-
ment within their jurisdiction and, conversely, should there be penalities
to those which do not? •
4. Is it correct to state that municipalities more often need active recrea-
tion facilities rather than the recreation open space which the regional
plan tends emphasize? How strongly is this true? How might the Council "s
recreation open space plan change to help with problems?
5. Would it be helpful to local recreation agencies and their users if a
program were developed which coordinated the needs of local agencies with
programs available in the regional recreation open space system?
ISSUE 11. What is an appropriate level of municipal participation and control
in the developing regional regional recreation open space system.
The 1974 parks act says that:
. . . (the implementing agency) . . .shall prepare, after consultation with all
affected municipalities, and submit. . .a master plan.
The policy plan uses similar language in policy 9:
Each implementing agency is responsible for preparing a master plan for
each regional system unit assigned to it by this policy plan. An imple-
menting agency shall present the master plan to affected local units of
government and addresss their concerns prior to submission to the Council .
8
Related Questions: •
1. Should there be an effort to:
- identify programming being offered in regional recreation open space?
- identify potential users for programs being offered?
- match users and programs by alerting potential users?
- evaluate user response to programs and recommend ways to make them
more compatible with expressed needs, plus suggest new programs to
meet unmet needs?
In other words, should there be a coordinated, system-wide, regional
marketing program for recreation open space?
2. What role in a coordinated marketing program is appropriate for the
Council? For the implementing agencies?
3. Is it appropriate for public agencies to "sell " users on tax-provided
recreation facilities?
4. Specifically, would it be a good idea for the Council to require that all
regional parks and facilities be identified by a conspicuous, well-
publicized logo?
ISSUE 8. Should there be a program for long-term capital maintenance in
regions parks? •
In regional parks which pre-date the regional system, especially in Minneapolis
and St. Paul , facilities constructed in WPA days have reached the end of their
life. They're important in the regional system; 50 years use by people across
the region, and from outside, has established a tradition. Rebuilding these
facilities will take place over the next 10 years, using regional funds. No
major issue is anticipated as long as regional development funds are adequate.
What is not established is how future redevelopment in the regional system is
to be funded. Structures, roads, and bridges built with regional funds will
require attention starting about the year 2010. Given that the regional sys-
tem, from 1974 to 1983, spent approximately $34 million regional dollars for
development, and from 1984-2000 anticipates spending $100 million more, the
required funds will be significant.
As a specific example from the past, a recent estimate set the 1940 investment
at Como Park, including zoo and conservatory, at $662,000. Using a conserva-
tive inflation value, the 1940 facilities would cost approximately $7.5 million
in 1983 dollars to build today. More zoo and park additions will bring the
total anticipated expenditure at Como Park, Zoo & Conservatory, by 1990, to
approximately $20 million.
The current CIP anticipates a total investment, regional and other sources, of
approximately $175 million to completely develop (and/or redevelop) regional
recreation open space by year 2000. If a 50-year life span is assumed for all
development, what will be needed in the years 2025-2050? It has been said that •
our present generation has mortgaged America, to the detriment of the genera-
tion which follows, who must retire the mortgage. Can regional parks be an
exception to that problem?
6
ISSUE 5. What"s needed for regional operation and maintenance funding •
,policies?
In 1984, the Council adopted a position statement on regional 0 & M funding for
parks and declared an intent to seek legislation in 1985 which would authorize
a program of supplementary 0 & M grants to implementing agencies and provide
state funding, therefore the discussion on pages 31-34 of the 1980 Policy Plan
is no longer current.
Policy 22 reads:
The regional recreation open space system should be analyzed and- recom-
mendations formulated to achieve equitable outdoor recreation opportunities
and consistent operating policies throughout the Metropolitan Area financed
by an adequate, stable and equitable revenue source.
By adopting its position, the Council responded to several 1980 policy
questions including:
- The Council determined that there is a need and that a solution lies in a
supplementary program of regional 0 & M funding.
- The goals of the proposed program include:
o Facilitating system plan implementation.
o Meeting acceptable levels of service system wide (a definition is
provided) . •
o Reducing undesirable differences in costs and needs for 0 & M in the
system.
The Council has suggested a stable source of state funds for the program
which it believes will be adequate and fair.
Related Questions:
1. Do you agree with the Council -s position on 0 & M funding? What do you
recommend?
2. What policies are needed to guide a regional 0 & M funding program?
3. How should 0 & M in regional parks be measured? How can one tell what
services and/or levels of service are appropriate?
4. What safeguards are necessary to a regional 0 & M funding program? How
should they be provided?
ISSUE 6. Is it appropriate and fair to charge fees in regional parks?
The current policy plan does not mention fees charged regional park users by
implementing agencies. Fees charged are primarily one of two types. The first
is fees for special recreational services, product sales, or revenue from con-
cessions for special services or sales. These have not been questioned except
in the appropriateness of the kind or level of activity for some single enter-
prise. Basically, there seems to be agreement that special services should be
paid for by users.
4
Has development proceeded at an appropriate rate, too fast, or too slowly?
Are developments being placed in the right areas? Are the right kinds of
developments being built and are the priorities appropriate?
The system has given priority to acquisition over development. Is that
still a correct point of view, or should development receive higher
priority than it now has?
What measurements should the Council use in addressing questions about
rate of development? What are the important questions to answer?
ISSUE 3. How should priorities be set for the recreation open space capital
improvement program.
As part of its task in establishing a CIP for regional recreation open space,
the Council has established a priority list. Six categories, which correspond
to demands identified in the Council "s recreation resource program, are as
follows:
A - Region-wide functions necessary for continuing the system.
B - Acquisition of parcels critical to completion of the planned system.
C - Development of certain facilities including:
o Deteriorated high use facilities;
o Essential components of'a high priority project;
o Projects in areas with gross service deficiencies; and •
o Public access to high quality resources.
D - Specifically designated (by Metropolitan Council ) regional trails and
special uses.
E - Support facilities which provide no direct service to users.
F - Lower priority acquisitions and developments.
The list is used to assign priority but is not absolute in itself. Experience
has shown that (1) all the high priority projects in the CIP cannot be accom-
plished in a single biennium, and (2) not all projects in any category are
immediately ready. Some can only be accomplished in the more distant future.
Hence, some category "D" projects, ready immediately, may be funded despite the
fact that there are unfinished category "B" projects. Projects receive prior-
ity both by the category to which they are assigned and by the biennium to
which they are allocated.
A separate priority process is used for projects after the Council finds out
what funds are available for a specific biennium. At that time, an implementa-
tion plan shows, as specifically as possible, when each project is to be funded
in the time period according to anticipated revenues. The implementation plan
is adopted by the Council yearly to reflect available capital .
Revisions to both the CIP and implementation plan are made following consulta-
tion by the commission and the Council with implementing agencies and other •
interested persons, preparation of a draft for hearing, a public hearing,
preparation of responses to comments at the hearing, and preparation of a final
draft which is considered and adopted by the Council following commission and
Council recommendations.
ISSUE 1: Are the Purpose and Goals Statements in the 1980 plan appropriate?
PURPOSE AND GOALS (from the 1980 plan) •
The purpose of the regional system is to provide recreation open space that
will meet the outdoor recreational needs of the people of the Metropolitan
Area.
Consistent with this purpose, the Council has eight goals for the regional
system to be accomplished in conjunction with the implementing agencies:
1. Plan and provide regional facilities within the framework of the larger
metropolitan recreation open space system and facilities provided by the
private sector.
2. Acquire park reserves to protect and manage at least one representative
example of each of the eight major landscape types found in the Metro-
politan Area and develop recreational facilities consistent with natural
resource protection.
3. Acquire and develop regional parks, park reserves and regional trail cor-
ridors sufficient to meet facility needs for the variety of experiences
possible for swimming, picnicking, fishing, boating, camping, trail activ-
ities, and nature study and appreciation.
4. Provide regional special recreation use areas within regional parks and
park reserves to meet identified regional needs when consistent with the
overall purpose of the facility. •
5. Improve public awareness and accessibility to the regional system through
improved public information, expanded non-auto access (that is, transit and
bike) and accommodations for handicapped people.
6. Provide equitable levels of recreational service throughout the Metropoli-
tan Area, finance the capital and operating costs of the regional system
and secure a continuing funding authority.
7. Provide ongoing opportunity for citizen participation throughout the plan-
ning and operation of the regional recreation open space system.
8. Support general Metropolitan Council goals for development of the Metro-
politan Area by locating and scheduling park acquisition and development
in coordination with schedules for other metropolitan services.
This system plan is aimed at meeting regional recreational needs to the year
2000.
Questions:
1. Are the goals stated for the regional recreation open space system
appropriate? What do you think the goals should be? Should there be more
priority given to certain goals? Which ones; and in what order would you
arrange them?
2. Is the need for a "balanced" system an appropriate goal ? If so, is it
adequately stated in the plan?