HomeMy WebLinkAbout03-24-1987 PTRC Meeting Agenda • AGENDA
Regular Parks and Recreation Committee Meeting
Village of Arden Hills
Tuesday, March 24, 1987, 7:30 p.m.
Village Hall
1. Call to Order and Roll Call
2. Approval of Minutes, February 24, 1987
3. Council Report
4. Crepeau Park Report
5. Miscellaneous/New Business
A. Trail Development
B. Parks Publicity
C. Arbor Day Plans
6. Adjournment
• PLEASE CALL JOHN OR SHIRLEY AT THE VILLAGE HALL, 633 5676
IF YOU CAN'T ATTEND THIS MEETING
4
Minutes of Regular Parks and Recreation Committee Meeting
Village of Arden Hills
• February 24, 1987
Village Hall
Call to Order
The meeting was called to order at 7:35 p.m. by Chairman Sand.
Roll Call
Present: Dave Sand, Keith Enrooth, Mary Gillies, Don Messerly, Jim Mishek
Alan Montgomery, Tom Mulcahy, Jim Otto, Mark Peterson, Tom
Suedbeck
Absent: Adele Anderson
Also Present: Council-member Tom Sather, Mayor Robert Woodburn, Parks Director
John T. Buckley
Oaths of Office
The oath of office was administered to Alan Montgomery by Mayor Woodburn.
Approval of Minutes
It was moved by Mishek, seconded by Suedbeck, that the minutes of January 27 be
approved as submitted. Motion carried unanimously.
Council Report
Recent Council actions of interest to this committee were reviewed by Mayor
Woodburn.
• Trails Subcommittee Report
This subcommittee was formed to review all Arden Hills' trails, and make
recommendations for additions and improvements. The particular focus was to
determine if blacktopping of portions of the trails was feasible and desirable.
The committee walked all of the existing and proposed trails. A proposed
schedule for blacktopping was devised, should the committee decide they would
like this. A list of the trails and this schedule is attached to these
minutes.
Peterson stated that asphalt trails should be eight feet wide (to be put in
most economically - trucks laying asphalt are equipped to spread it at that
width). Estimated cost is $7.50 per running foct, which includes 4" base and
2" blacktop. The subcommittee is recommending two areas be blacktopped in 1987
-- short trail leading down hill from Chatham area to Valentine Hills School,
and trail access to Floral Park from Norma Avenue (605 feet total).
$7,500 is budgeted in 1987 for trail improvement. This amount would cover this
blacktopping, and grading and identification of the trail leading from the
Village Hall, to Colleen Avenue, and hence to North Snelling Park. Buckley
feels with the development of the Keithson Addition, it is essential that this
trail be laid out and identified this year.
Committee asked that the developer of Keithson be asked if he would consider
grading the trail in conjunction with his own grading.
• Committee comments regarding blacktopping of trails included:
1
Minutes of Regular Parks and Recreation Committee Meeting
• Page 2
Concern was expressed about abuse of the trails by motorized vehicles if
they were blacktopped. The subcommittee maintained that unimproved trails
are more attractive to these than are blacktopped trails, and abuse would
probably be less.
Enrooth, noting that the results of the recent Parks survey indicated a
high interest in trails by residents, stated that past efforts have been
concentrated on development of the parks themselves; efforts should now
properly be directed to providing a means to get to the parks and from park
to park.
Alan Montgomery felt that for safety reasons, further trail development
should be pursued; wanted youngsters to be able to go to their neighborhood
parks on marked trails.
Jim Otto suggested Buckley contact neighboring villages who have
blacktopped trails to ask their experience in maintenance time and costs.
Sand felt strongly that emphasis should be placed on beautification of
trails as well, and that benches and trash receptacles should be added
along the trails.
Buckley stated that trails are obviously important to the residents of the
city; if they are accessible and easy to use, they are going to be used
• more.
He recommended budgeting an amount each year for trail improvement.
1987 Park Improvement Proposal - Trail Development
Motion was made by Peterson, seconded by Enrooth, that Committee recommend to
Council approval of the 1987 Park Development Proposal as outlined by Buckley,
and further recommends that the $7,500 designated for trail development be
utilized for asphalt on trails as outlined by the subcommittee. Motion carried
unanimously.
Publicity for Parks and Trails
Committee discussed means to further publicize the location of the trails and
parks in the city. Suggested were:
- Walking tours of the trails, either as a group or with each park
member leading a group from his neighborhood, were enthusiastically
recommended.
- Cable and Town Crier publicity of the blacktopping project and location
of the trails, with request for donations, i.e. "buy a foot of
blacktopping for $7.50".
- Committee also proposed a "Fall Color Tour" of the parks.
- Signs in the parks, identifying various wild flowers and foliage, and
. mileage markers.
Y
Minutes of Regular Parks and Recreation Committee Meeting
• Page 3
Miscellaneous/New Business
Arden Hills has received "Tree City USA" designation. Arbor Day will be
celebrated with tree plantings again this year on April 25. The award will be
presented to the Mayor at that time; citizens will all be encouraged to
participate.
Lexington and Highway 96 Gateway
Committee concurred to take steps to find out if MnDOT would be willing to
release enough of their easement on the southwest corner of Highway 96 and
Lexington to allow plantings, berming, and identification as outlined in the
Parkway Study Plan.
Mulcahy will represent the Parks Committee at a meeting at Shoreview Village
Hall, called to discuss beautification possibilities for the Highway 96
corridor.
Adjournment
It was moved by Mishek, seconded by Otto, that the meeting be adjourned at 9:05
p.m. Motion carried unanimously.
Submitted by Shirley Marshall.
• THE NEXT REGULAR MEETING OF THE PARKS AND RECREATION COMMITTEE WILL BE HELD
MARCH 24, 1987, AT 7:30 P.M.
1
• ARDEN HILLS PARKS DEPARTMENT
PEDESTRIAN TRAILS
Proposed Blacktopping Schedule
The trails were divided into four categories; (1) section recommended for
blacktopping in 1987 because of high usage and difficult terrain, (2) (3)
and (4) suggested priority for blacktopping in the future as/if funds are
available.
Length Surface
Arden Trail
Glenpaul to Stowe 2,575 ft. Ag Lime 2
Stowe to Cty. Rd. E 1,500 Grass 2
Chatham Trails
Connection 1,200 160 ft. 4
hard surface
1,040 ft.
grass, blocks
Corridors 4
(600 ft. leading to Valentine School) 1
Town House Trails
Village Hall Trail 2,300 Grass 3
NSP Trail 1,300 Grass 3
• Corridor 740 Grass 4
Floral to Norma Corridor 600 Ag Lime 1
Cummings Park to Floral Trail -
Cummings Park Trail 1,500 Grass 3
Cummings to Floral 2,050 Grass 2
Floral 2,000 Grass 3
Crepeau Nature Preserve
Nature trails 2,800 Grass 4
Breakdown by Punning Foot
Phase 1 - 620 ft.
Phase 2 - 6,125 ft.
Phase 3 - 15,540 ft.
Phase 4 - 4,580 ft.
•
• ARDEN HILLS PARKS AND RECREATION DEPART?KENT
1987 PARK DEVELOPMENT GUIDELINES
Hazelnut Park
Picnic tables ; 300
Grading Front Area 5,000
Grill 450
Sampson
Color Coating 600
Arden Oaks
Ball Backstop 750
Picnic 400
Picnic Shelter 3,500
Perry Park
Parking 10,000
Crepeau
Flowers, Floating Bridge 3,000
Floral Park
Play Equipment 8,000
Picnic Shelter 3,500
Cummings
Lake Path 2,000
North Snelling
Grading 7,500
Trail Resurfacing (Floral) 7,500
Grading 5,000
Park Planning S00
TOTAL $58,000